Episode 3 — Closure Ritual
Purpose
- Formally close Episode 3 with auditable gates and a clean, self-contained handoff into Episode 4 (no chat context required).
- Rationale: Ensures a frozen, internally coherent packet and explicit documentation of any parked items and evidence to be attached at submittals.
Pre‑conditions
- Workspace present:
Episode_2_Q-32859/(CF01–CF04) - Client_Profile set: ADNOC (see Client_Profile_Baselines)
- Standards toolkit open: Standards_Catalog
Inputs (Episode 3 results)
- CF01:
Episode_2_Q-32859/CF01/output/Targeted_RFI.md(C01/C02 closed),Revision_Timeline_Log.md - CF02:
Episode_2_Q-32859/CF02/output/Compliance_Matrix_Extended.csv(High‑Risk rows finalized) - CF03:
Episode_2_Q-32859/CF03/output/Hazardous_Area_Component_Matrix.md,Deviation_Report_Draft.md - CF04:
Episode_2_Q-32859/CF04/output/Executive_Summary.md,Client_Packet_Skeleton.md(frozen),Appendix2_Technical_Deviation_List.md,Appendix3_Technical_Clarification_List.md, Manifests (Attachments/Quality/Datasheets/References) - Knowledge library:
Past_Deviations_Library.md(D‑001/D‑002 appended) - Standards updates:
DryRun_RunOfShow.md,Master_Sequencing_MVP_Demo.md(Cross‑walk + Evidence Pack gates),Evidence_Pack_Checklist.md,Spec_Crosswalk_Template.md
Quality Gates (Method Asserts)
- matrix_high_risk_finalized == true → PASS (R‑0001, R‑0003, R‑0006, R‑0007, R‑0008, R‑0010 have Status_Final)
- deviations_writeback_done == true → PASS (D‑001, D‑002 in
Past_Deviations_Library.md) - rfi_closure_complete true OR parked_with_rationale true → PASS (C01, C02 Closed with citations)
- attachments_manifest_frozen true AND executive_summary_refreshed true → PASS
- evidence_pack_enumerated == true → PASS (EMC/IECEx/Spec Extract placeholders listed)
Standard Work — Closure (TOTE)
- Test
- Open
Compliance_Matrix_Extended.csv. Filter High‑Risk. Confirm: Status_Final present; Offer_Evidence and Source lines present; any Partially Compliant rows reference Evidence Pack.
- Operate
- Freeze
Client_Packet_Skeleton.md(mark frozen) and ensure manifests enumerate only referenced items plus Evidence Pack section. - Confirm appendices reflect current states: Appendix 2 (D‑001/D‑002 Closed; D‑003 Open), Appendix 3 (RFIs Closed with citation rationale).
- Ensure
Past_Deviations_Library.mdcontains Episode 3 accepted deviations with citations.
- Test
- Open
DryRun_RunOfShow.mdandMaster_Sequencing_MVP_Demo.md; verify Cross‑walk and Evidence Pack gates are present. - Verify
Metrics.mdEpisode 3 section updated;CHANGELOG_MVP_Updates.mdEpisode 3 note added.
- Exit
- Mark Episode 3 closed; link to Episode 4 Onramp.
Deliverables Checklist (Vault‑relative)
- Matrix CSV (MVP):
Episode_2_Q-32859/CF02/output/Compliance_Matrix_Extended.csv - Appendices:
Episode_2_Q-32859/CF04/output/Appendix2_Technical_Deviation_List.md,Appendix3_Technical_Clarification_List.md - Manifests:
Attachments_Manifest.md(with Evidence Pack),Quality_Documents_Manifest.md,Datasheets_CoCs_Manifest.md,Reference_List.md - Handoff:
Executive_Summary.md,Client_Packet_Skeleton.md - Library:
Past_Deviations_Library.md
Parked Items (explicit)
- EMC declarations: attach at submittals (Evidence Pack EP‑001)
- IECEx certificate for IIC variant (if mandated): attach at submittals (EP‑002)
- D‑003 Motor IP: park pending client mandate (document in Appendix 2; rationale in matrix)
Exit Criteria
- All gates green; parked items listed; Episode 3 metrics logged; standards updated.
- Proceed to Episode_4_Onramp.