Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 21699 Saipem COMP2

❯

HSE TBE

❯

Equipment Maintenance Log

Inspection Checklist

Unnamed: 0Packing Wood Saw Weekly Inspection ChecklistUnnamed: 2Unnamed: 3Unnamed: 4
NaNOwner: Packing DepartmentNaNNaNNaN
NaNAny inspection failures must be immediately reported to your line Manager and Head of Site MaintenanceNaNNaNNaN
NaNActionPassFailComments
1.0Visually inspect the entire wood saw for any signs of damage or wear.NaNNaNNaN
2.0Check for loose bolts or fasteners; tighten as necessary.NaNNaNNaN
3.0Ensure the machine is securely anchored to the floor.NaNNaNNaN
4.0Inspect the saw blade for any signs of damage, cracks, or missing teeth.NaNNaNNaN
5.0Verify that the blade is securely fastened and properly aligned.NaNNaNNaN
6.0Check all machine guards and barriers for proper installation and integrity.NaNNaNNaN
7.0Ensure that the guards effectively prevent access to moving parts, especially the saw blade.NaNNaNNaN
8.0Test the emergency stop button to ensure it halts the machine immediately.NaNNaNNaN
9.0Confirm that the emergency stop system is clearly labeled and easily accessible.NaNNaNNaN
10.0Inspect the dust extraction system for any blockages or damage.NaNNaNNaN
11.0Ensure that the system is effectively capturing wood dust during operation.NaNNaNNaN
12.0Inspect the power cord for any issues and replace if necessary.NaNNaNNaN
13.0Verify that the electrical components, including switches, are functioning properly.NaNNaNNaN
14.0Check and adjust the alignment of the saw blade, fence, and miter gauge.NaNNaNNaN
15.0Ensure that emergency response equipment, such as first aid kits and fire extinguishers, is readily accessible and in good condition.NaNNaNNaN
NaNNaNNaNNaNNaN
NaNPrint Name:NaNNaNNaN
NaNSignature:NaNNaNNaN
NaNDate of Inspection:NaNNaNNaN

Maintenance Master Log

Maintenance Master LogUnnamed: 1Unnamed: 2Unnamed: 3
Equipment:NaNNaNNaN
Location:NaNNaNNaN
Department:NaNNaNNaN
Week commencingPassFailIntials
2024-02-19 00:00:00NaNNaNNaN
2024-02-26 00:00:00NaNNaNNaN
2024-03-04 00:00:00NaNNaNNaN
2024-03-11 00:00:00NaNNaNNaN
2024-03-18 00:00:00NaNNaNNaN
2024-03-25 00:00:00NaNNaNNaN
2024-04-01 00:00:00NaNNaNNaN
2024-04-08 00:00:00NaNNaNNaN
2024-04-15 00:00:00NaNNaNNaN
2024-04-22 00:00:00NaNNaNNaN
2024-04-29 00:00:00NaNNaNNaN
2024-05-06 00:00:00NaNNaNNaN
2024-05-13 00:00:00NaNNaNNaN
2024-05-20 00:00:00NaNNaNNaN
2024-05-27 00:00:00NaNNaNNaN
2024-06-03 00:00:00NaNNaNNaN
2024-06-10 00:00:00NaNNaNNaN
2024-06-17 00:00:00NaNNaNNaN
2024-06-24 00:00:00NaNNaNNaN
2024-07-01 00:00:00NaNNaNNaN
2024-07-08 00:00:00NaNNaNNaN
2024-07-15 00:00:00NaNNaNNaN
2024-07-22 00:00:00NaNNaNNaN
2024-07-29 00:00:00NaNNaNNaN
2024-08-05 00:00:00NaNNaNNaN
2024-08-12 00:00:00NaNNaNNaN
2024-08-19 00:00:00NaNNaNNaN
2024-08-26 00:00:00NaNNaNNaN
2024-09-02 00:00:00NaNNaNNaN
2024-09-09 00:00:00NaNNaNNaN
2024-09-16 00:00:00NaNNaNNaN
2024-09-23 00:00:00NaNNaNNaN
2024-09-30 00:00:00NaNNaNNaN
2024-10-07 00:00:00NaNNaNNaN
2024-10-14 00:00:00NaNNaNNaN
2024-10-21 00:00:00NaNNaNNaN
2024-10-28 00:00:00NaNNaNNaN
2024-11-04 00:00:00NaNNaNNaN
2024-11-11 00:00:00NaNNaNNaN
2024-11-18 00:00:00NaNNaNNaN
2024-11-25 00:00:00NaNNaNNaN
2024-12-02 00:00:00NaNNaNNaN
2024-12-09 00:00:00NaNNaNNaN
2024-12-16 00:00:00NaNNaNNaN
2024-12-23 00:00:00NaNNaNNaN
2024-12-30 00:00:00NaNNaNNaN

Project: Q-21699 - Saipem COMP2 Folder: HSE TBE


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further