NFPS Offshore Compression Complexes Project COMP2

COMPANY Contract No.: LTC/C/NFP/5128/20

CONTRACTOR Project No.: 033734

Document Title

:

DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

COMPANY Document No.

: 560-20-SH-DTS-00021

Saipem Document No.

: 033734-B-D-30-SPM-LP-B-10029

Discipline

: HSE&Q

Document Type

: DATA SHEET

Document Category/Class

: 2

Document Classification

: INTERNAL

A

15-Aug-2023

Issued for Review

Maria Fransisca

Vijayakumar Rajaram

Oprescu Luminita

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

CHECKED BY

APPROVED BY

Saipem S.p.A.

THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.

Company No._Rev. 560-20-SH-DTS-00021_A

1 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

REVISION HISTORY

Revision

Date of Revision

Revision Description

A1

A

10-Aug-2023

Issued for Inter-Discipline Check

15-Aug-2023

Issued for Review

HOLDS LIST

Hold No

Hold Description

1

2

Quantity will be confirmed based on detail design development.

Tag numbers of equipment.

Company No._Rev. 560-20-SH-DTS-00021_A

2 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

TABLE OF CONTENTS

1

2

3

4

5

INTRODUCTION … 4

1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4

DEFINITIONS AND ABBREVIATIONS … 6

2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7

REGULATIONS, CODES AND STANDARDS … 9

3.1 COMPANY DOCUMENTS … 9 3.2 PROJECT DOCUMENTS … 9 INTERNATIONAL CODES AND STANDARDS … 10 3.3

PURPOSE … 11

DATASHEET … 12

Company No._Rev. 560-20-SH-DTS-00021_A

3 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.

Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.

1.1 Project Objective

The objective of this Project includes:

• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,

and efficient throughout their required life.

• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality

performance.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit‐for‐purpose in all respects.

Offshore

CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:

• CP6S Compression Complex

• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S

• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5

• Bridge linked Tie-in to RP6S

Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.

• CP7S Compression Complex

• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S

• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5

• Bridge linked Tie-in to RP7S

Company No._Rev. 560-20-SH-DTS-00021_A

4 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.

RGA Complex Destressing

Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:

• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex

• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex

Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.

Onshore

An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.

Figure 1.2.1: NFPS Compression Project COMP2 Scope

Company No._Rev. 560-20-SH-DTS-00021_A

5 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

Qatargas Operating Company Limited

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

MILESTONE

A reference event splitting a PROJECT activity for progress measurement purpose.

PROJECT

NFPS Offshore Compression Complexes Project COMP2

SITE

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Scope of Work defined in the CONTRACT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

VENDOR

The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.

Company No._Rev. 560-20-SH-DTS-00021_A

6 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

2.2 Abbreviations

Code

Definition

BR

CCR

CP

EEBD

ELICS

EN

EPC

Bridge

Central Control Room

Compression Platform

Emergency Escape Breathing Device

Electrical Integrated Control System

European Norm

Engineering, Procurement and Construction

EPCOL

Offshore and Pipelines Project

FL

HFE

IMO

IP

LQ

Flare Platform

Human Factors Engineering

International Maritime Organization

Ingress Protection

Living Quarter Platform

NFPS

North Field Production Sustainability

OCC

QG

RGA

RGE

RL

RLIC

RP

SOLAS

TR

Onshore Collaborative Center

Qatar Gas Operating Company Limited

Ras Gas Alfa

Ras Gas Expansion

Ras Laffan

Ras Laffan Industrial City

Riser Platform

Safety of Life at Sea

Temporary Refuge

Company No._Rev. 560-20-SH-DTS-00021_A

7 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

Code

Definition

UV

WBS

WHP

Ultraviolet

Work Breakdown Structure

Wellhead Platform

Company No._Rev. 560-20-SH-DTS-00021_A

8 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

3 REGULATIONS, CODES AND STANDARDS

In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.

In general, the order of precedence shall be followed:

a) Qatari Governmental and Regulatory Requirements

b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)

c) Project Specifications.

d) Industry Codes and Standards

e) COMPANY and CONTRACTOR’s Lessons Learned

If CONTRACTOR/ SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/ SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.

The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.

3.1 Company Documents

S. No

Document Number

Title

PRT-PRS-PRC-014

Offshore Loss Prevention Philosophy

COMP-QG-PR-REP- 00008

North Field Production Sustainability (NFPS), NFPS Compression Project: EPC-2 – Basis of Design EPC2

PRT-ENV-PRC-013

Environmental Aspects and Impacts Procedure

3.2 Project Documents

S. No

Document Number

Title

200-20-SH-DEC-00005

200-20-SH-DEC-00008

200-20-SH-SPC-00006

200-20-ME-DEC-00003

200-20-PI-SPC-00015

200-20-SH-SPC-00011

200-20-CE-DEC-00003

Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Safety and Lifesaving Equipment for CP6S and CP7S Complexes Material Handling Philosophy for CP6S and CP7S Complexes Piping Material Specification for CP6S and CP7S Complexes HFE Workplace Design Specification for CP6S and CP7S Complexes Material Selection Philosophy for CP6S and CP7S Complexes

Company No._Rev. 560-20-SH-DTS-00021_A

9 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

S. No

Document Number

Title

200-20-CE-SPC-00015

Painting Specification for CP6S and CP7S Complexes

560-20-SH-PLN-00008- 0001

560-20-SH-PLN-00007- 0001

562-83-SH-PLN-00001- 0003&0004 562-83-SH-PLN-00002- 0003 &0004 562-83-SH-PLN-00003- 0003&0004 562-20-SH-PLN-00002- 0003&0004 562-20-SH-PLN-00001- 0003&0004

Escape Route, Life Saving and Fire Fighting Equipment Layout – PSV Service Platform for Compression Platform CP6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Production Deck for Compression Platform CP6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 1 for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 2 for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 3 for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Roof Deck for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Cellar Deck for LQ6S

  1. Note 1

Safety Equipment List Report for CP6S Complex

Note 1: Document number shall be updated in next submission of Datasheet for Emergency Escape Breathing Device (EEBD) and Cabinet for CP6S Complex.

3.3

International Codes and Standards

S. No

Document Number

Title

EN 1146

IMO IE110E

Respiratory protective devices - Self-contained open- circuit compressed air breathing apparatus incorporating a hood for escape - Requirements, testing, marking International Convention for the Safety of Life at Sea (SOLAS)

Company No._Rev. 560-20-SH-DTS-00021_A

10 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

4 PURPOSE

The purpose of this datasheet is to covers the technical requirements for Emergency Escape Breathing Device (EEBD) and Cabinet for CP6S Complex in the NFPS Offshore Compression Complexes Project, COMP2. This datasheet shall be read in conjunction with Specification for Safety & Life Saving Equipment for CP6S And CP7S Complexes [Ref.6]. VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this datasheet and referred specifications.

Company No._Rev. 560-20-SH-DTS-00021_A

11 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

5 DATASHEET

EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET

A DATASHEET IDENTIFICATIONS

1 DOCUMENT NO

560-20-SH-DTS-00021

B ADMINISTRATIVE IDENTIFICATIONS

1 PROJECT NUMBER

033734

2 PROJECT

NFPS OFFSHORE COMPRESSION COMPLEXES PROJECT COMP2

TOTAL UNIT LQ: 255 NOS TOTAL CABINET LQ:

  • 1 CABINET @ 120 UNITS AT TR - 1 UNIT AT CRANE’S CABIN
  • 1 CABINET @ 17 UNITS AT CCR - 105 UNITS AT BED CABINS
  • 1 CABINET @ 12 UNITS AT CELLAR DECK

3 QUANTITY (HOLD 1)

TOTAL UNIT CP: 57 NOS TOTAL CABINET CP:

  • 1 CABINET @ 55 UNITS AT TR
  • 2 UNITS AT CRANES’ CABIN

C EQUIPMENT IDENTIFICATION

1

TAG NUMBER

2 SERVICE

HOLD 2

LIFE SAVING

OPERATION DATA

ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

D

ENVIRONMENTAL / SITE CONDITIONS

MINIMUM

NORMAL

MAXIMUM

UNITS

1 AMBIENT TEMPERATURE

2 RELATIVE HUMIDITY DAILY AVERAGE

8.3

37.0

49.0

100.0

°C

%

3 ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

TECHNICAL SPECIFICATION

E

EQUIPMENT DESIGN CRITERIA

1 TYPE

PORTABLE SELF-CONTAINED AIR- BREATHING UNIT, POSITIVELY PRESSURE TYPE (I.E. CONTINUOUS SUPPLY OF AIR)

12 DURATION OF AIR SUPPLY

MINIMUM BREATHING DURATION OF 15 MINUTES

2 DIMENSION

VENDOR TO ADVISE

13 DONNING INSTRUCTION

IN ENGLISH, WITH ILLUSTRATION / PICTOGRAM

3 MATERIAL

4 WEIGHT

5 COLOUR

HEAT RESISTANT MATERIAL

14 COUNTRY OF ORIGIN

VENDOR TO ADVISE

VENDOR TO ADVISE

15 MANUFACTURE NAME

VENDOR TO ADVISE

VENDOR TO ADVISE

16 MODEL

VENDOR TO ADVISE

SUITABLE TO BE USED IN H2S ENVIRONMENT

6

REQUIRED

15 MINUTE AIR SUPPLY BASED ON HEAVY BREATHING ASSOCIATED WITH AEROBIC LEVELS OF ESCAPE

7

REQUIRED

EEBD SET STEEL AIR CYLINDER SHALL BE USER SERVICABLE AND SHALL BE CAPABLE OF BEING REFILLED.

8

REQUIRED

17

18

19

CHANGING THE CYLINDER OF THE EEBD WHILE IN USE, WHICH IS NOT POSSIBLE IN EEBD SETS. HOWEVER PLEASE NOTE THAT THE SETS COMES WITH AIRLINE CONNECTION WHICH CAN BE CONNECTED TO THE CASCADE SYSTEM.

THERE SHALL BE WARNING ALARM FITTED WITH THE EEBD SET UNIT WHICH WILL INITIATE ALARM WHEN THE CYLINDER AIR IS LESS THAN FOR 5 MINUTES A FIRST STAGE REDUCER SHALL BE INCLUDED TO PROVIDE A HIGH PERFORMANCE FOR 200 OR 300 BAR WITHOUT ADJUSTMENT (1000 I/MIN. AVAILABLE NOMINAL FLOW, 500 I/MIN AVAILABLE FLOW AT CYLINDER PRESSURE AS LOW AS 20 BAR). THE BALANCED PISTON DESIGN FOR THE LUNG DEMAND VALVE ELIMINATES MEDIUM PRESSURE SENSITIVITY AND IT HAS THE OPTIMUM RELATIONSHIP BETWEEN SIZE, SERVICEABILITY AND RELIABILITY (4-10 MILLIBAR FIRST ACTIVATION PRESSURE; NO BY-PASS REQUIRED; SUPPLEMENTARY SUPPLY INCLUDED, POSITIVE PRESSURE MAINTAINED, EVEN AT 10 BAR AND 300 I/MIN.

REQUIRED

REQUIRED

REQUIRED

EEBD SET UNIT SHALL BE ABLE TO PREVENT TOXIC GAS FROM ENTERING THE FACEMASK WHILE REPLACING THE EMPTY CYLINDER WITH CHARGED CYLINDER.

9

REQUIRED

11 CYLINDER MATERIAL

STEEL

Company No._Rev. 560-20-SH-DTS-00021_A

12 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S COMPLEX

CYLINDER CAPACITY OF 3 LITRES AT 200 BAR

10

REQUIRED

EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET

F PHYSICAL DATA

1

FACEMASK WITH FIVE ADJUSTABLE HEAD STRAPS, HARD-COATED POLYCARBONATE LENS, BUILT-IN NOSECUP AND SPRING- LOADED DUAL EXHAUST VALVES, ALSO INCLUDE THREADED INLET AT CENTRE FRONT FOR CONNECTION WITH PRESSURE DEMAND VALVE

REQUIRED

3

INCLUDE DUST CAPS FOR ENDS OF HOSES FOR AIR LINES

VENTILATION LOUVERS AND DRAINAGE HOLES

2

COMPACT CARRYING POUCH TO CARRY FACEMASK

REQUIRED

G CABINET DESIGN CRITERIA

4

1/4” MALE FOSTER ADAPTER FOR CONNECTION TO HOSE AND BREATHING AIR MANIFOLD.

STAINLESS STEEL SS316

1 CAPACITY

VENDOR TO ADVISE

8

CABINET PAINT FINISH

2 CABINET MATERIAL

UV RESISTANT FIRE-RETARDANT GRP

9

VENTILATION / DRAINAGE

TRANSPARENT/CLEAR MATERIAL TO ENABLE VISIBILITY OF CONTENT

PROVISIONS FOR BOTH DRAINAGE AND VENTILATION AND AFFORD FULL WEATHER PROOFING TO THE STORED CONTENTS

3 COLOUR

GREEN

10 COUNTRY OF ORIGIN

VENDOR TO ADVISE

4 LABELLING (NOTE 3)

“EMERGENCY ESCAPE BREATHING DEVICE”

11

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

STAINLESS STEEL, SS316

5 MOUNTING

6

IP RATING

7

INSTRUCTIONS

FIXING ASSESSORIES FOR MOUNTING CABINET INSIDE AND OUTSIDE THE BUILDING WILL BE PROVIDED

12 MANUFACTURE NAME

VENDOR TO ADVISE

VENDOR TO ADVISE

13 MODEL

VENDOR TO ADVISE

DONNING INSTRUCTIONS IN ENGLISH, CONTAINED IN A WEATHER-PROOF COVER AND PERMANENTLY ATTACHED INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT

H SPECIAL REQUIREMENTS

1 COMPLIANCE STANDARD

EN, IMO / SOLAS

2 ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

I

PHYSICAL DATA

1 WEIGHT OF FILLED CABINET

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

2 WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

J NOTES

1 ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT DESIGN SPECIFICATION [REF.2].

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

3

THE DESIGNATED CABINET SHALL BE LABELLED IN CAPITAL LETTER WITH CLEARLY PAINTED WITH WHITE BLOCK LETTERS ON THE OUTSIDE OF THE CABINET.

4

THIS DATASHEET SHALL BE READ IN CONJUCTION WITH SPECIFICATION FOR SAFETY AND LIFE SAVING EQUIPMENT (200-20-SH-SPC-00006) [REF. 6] AND SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEETS

5 COMPLIANCE CERTIFICATES, THIRD PARTY VERIFICATION CERTIFICATES, TESTS AND TEST CERTIFICATES SHOULD BE PROVIDED BY THE VENDOR.

6 EN 1146 APPROVAL CERTIFICATE WILL BE PROVIDED.

Company No._Rev. 560-20-SH-DTS-00021_A

13 of 13

Project: Q-21699 - Saipem COMP2 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further