NFPS Offshore Compression Complexes Project COMP2

COMPANY Contract No.: LTC/C/NFP/5128/20

CONTRACTOR Project No.: 033734

Document Title

:

SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

COMPANY Document No.

: 560-20-SH-LIS-00001

Saipem Document No.

: 033734-B-D-30-SPM-LP-L-10001

Discipline

: HSE&Q

Document Type

: LIST

Document Category/Class

: 2

Document Classification

: INTERNAL

A

23-Aug-2023

Issued for Review

Maria Fransisca Rama Krishna K.

Luminita Oprescu

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

CHECKED BY

APPROVED BY

Saipem S.p.A.

THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.

Company No._Rev. 560-20-SH-LIS-00001_A

1 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

REVISION HISTORY

Revision

Date of Revision

Revision Description

A1

A

08-Aug-2023

Issued for Inter-Discipline Check

23-Aug-2023

Issued for Review

HOLDS LIST

Hold No

Hold Description

1

Quantity will be confirmed as per detail design development.

Company No._Rev. 560-20-SH-LIS-00001_A

2 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

TABLE OF CONTENTS

1

2

3

4

5

6

INTRODUCTION … 4

1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4

DEFINITIONS AND ABBREVIATIONS … 6

2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7

REGULATIONS, CODES AND STANDARDS … 8

3.1 COMPANY DOCUMENTS … 8 3.2 PROJECT DOCUMENTS … 8

PURPOSE … 10

SCOPE … 10

SAFETY EQUIPMENT LIST … 10

6.1 SAFETY EQUIPMENT LIST FOR CP6S … 11 6.2 SAFETY EQUIPMENT LIST FOR LQ6S … 17 6.3 SAFETY EQUIPMENT LIST FOR FL6S AND BRIDGES CP-FL, CP-LQ, CP-RP … 21 6.4 SAFETY EQUIPMENT LIST FOR RP6S (COMP2 BROWNFIELD MODIFICATION SCOPE) … 22

Company No._Rev. 560-20-SH-LIS-00001_A

3 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.

Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.

1.1 Project Objective

The objective of this Project includes:

• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,

and efficient throughout their required life.

• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality

performance.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit‐for‐purpose in all respects.

Offshore

CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:

• CP6S Compression Complex

• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S

• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5

• Bridge linked Tie-in to RP6S

Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.

• CP7S Compression Complex

• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S

• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5

• Bridge linked Tie-in to RP7S

Company No._Rev. 560-20-SH-LIS-00001_A

4 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.

RGA Complex Destressing

Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:

• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex

• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex

Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.

Onshore

An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.

Figure 1.2.1: NFPS Compression Project COMP2 Scope

Company No._Rev. 560-20-SH-LIS-00001_A

5 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

Qatargas Operating Company Limited.

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

MILESTONE

A reference event splitting a PROJECT activity for progress measurement purpose.

PROJECT

NFPS Offshore Compression Complexes Project COMP2

SITE

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Scope of Work defined in the CONTRACT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

VENDOR

The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.

Company No._Rev. 560-20-SH-LIS-00001_A

6 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

2.2 Abbreviations

Code

Definition

BR

CP

ELICS

EPC

FL

LQ

MICC

NFPS

OCC

QG

RGA

RGE

RL

RLIC

WBS

WHP

Bridge

Compression Platform

Electrical Integrated Control System

Engineering Procurement Construction

Flare Platform

Living Quarter Platform

Main Instrumentation & Control Contractor

North Field Production Sustainability

Onshore Collaborative Center

Qatargas Operating Company Limited

Ras Gas Alfa

Ras Gas Expansion

Ras Lafan

Ras Lafan Industrial City

Work Breakdown Structure

Wellhead Platform

Company No._Rev. 560-20-SH-LIS-00001_A

7 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

3 REGULATIONS, CODES AND STANDARDS

In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.

In general, the order of precedence shall be followed:

a) Qatari Governmental and Regulatory Requirements

b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)

c) Project Specifications.

d) Industry Codes and Standards

e) COMPANY and CONTRACTOR’s Lessons Learned

If CONTRACTOR/SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.

The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.

3.1 Company Documents

S. No

Document Number

Title

PRT-PRS-PRC-014

Offshore Loss Prevention Philosophy

3.2 Project Documents

S. No

Document Number

Title

200-20-SH-DEC-00005

200-83-SH-DEC-00001

200-20-SH-DEC-00008

200-83-SH-SPC-00005

200-20-SH-SPC-00006

560-20-SH-PLN-00008

560-20-SH-PLN-00002

560-20-SH-PLN-00006

560-20-SH-PLN-00007

Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Active Fire Protection Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Firefighting Equipment for CP6S and CP7S Complexes Specification for Safety and Lifesaving Equipment for CP6S and CP7S Complexes Escape Route, Life Saving and Fire Fighting Equipment Layout – PSV Service Platform for Compression Platform CP6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Discharge Cooler Platform for Compression Platform CP6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Main Deck for Compression Platform CP6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Production Deck for Compression Platform CP6S

Company No._Rev. 560-20-SH-LIS-00001_A

8 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

S. No

Document Number

Title

560-20-SH-PLN-00009

562-83-SH-PLN-00001- 0003&0004 562-83-SH-PLN-00002- 0003 &0004 562-83-SH-PLN-00003- 0003&0004 562-20-SH-PLN-00002- 0003&0004 562-20-SH-PLN-00001- 0003&0004 562-20-SH-PLN-00003- 0001

564-20-SH-PLN-00001

561-20-SH-PLN-00001

563-20-SH-PLN-00001

233-20-SH-PLN-00005

233-20-SH-PLN-00016

Escape Route, Life Saving and Fire Fighting Equipment Layout – Sump Deck for Compression Platform CP6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 1 for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 2 for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 3 for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Roof Deck for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Cellar Deck for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Sub Cellar Deck for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout Drawing – Flare Platform FL6S (CP6S Complex) Escape Route, Life Saving and Fire Fighting Equipment Layout Drawing – CP – LQ Bridge (CP6S Complex) Escape Route, Life Saving and Fire Fighting Equipment Layout Drawing – CP –FP Bridge (CP6S Complex) Fire, Safety Equipment and Escape Route Layout RP6S- Top Deck Fire, Safety Equipment and Escape Route Layout RP6S- PSV/BDV Access Platform

Company No._Rev. 560-20-SH-LIS-00001_A

9 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

4 PURPOSE

The purpose of this specification is to present the list of firefighting, safety and lifesaving equipment that have been identified for CP6S compression complex, including bridge linked LQ6S, FL6S, associated bridges, and brownfield modification in RP6S of the NFPS Offshore Compression Complexes Project COMP2.

5 SCOPE

This safety equipment list covers for CP6S compression complex, which includes CP6S, LQ6S, FL6S, brownfield scope of RP6S and the connecting bridges. By Design One Build Many (D1BM) concept, this safety equipment list will also be applicable for CP7S compression complex.

6 SAFETY EQUIPMENT LIST

The firefighting, safety and lifesaving equipment that shall be provided as part of the COMP2 project scope are presented in the following sections.

Company No._Rev. 560-20-SH-LIS-00001_A

10 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

6.1 Safety Equipment List for CP6S

Table 6.1 Summary of Firefighting, Safety and Lifesaving Equipment for CP6S

No

Description

PSV SERVICE PLATFORM

DISCHARGE COOLER PLATFORM

MAIN DECK

PRODUCTION DECK

SUMP DECK

Total Quantity (Hold 1)

Remarks

FIREFIGHTING EQUIPMENT

1

2

3

4

5

6

7

8

9

10

159kg DCP (BC) Wheeled Extinguisher 68kg DCP (BC) Wheeled Extinguisher 57kg DCP (BC) Wheeled Extinguisher 14kg DCP (BC) Portable Extinguisher 9kg DCP (BC) Portable Extinguisher

125L Mobile Foam Cart

22.5kg CO2 Wheeled Extinguisher

6.8kg CO2 Handheld Extinguisher

9kg DCP (ABC) Portable Extinguisher 4.5kg Dry Powder (ABC) Portable Fire Extinguisher

Company No._Rev. 560-20-SH-LIS-00001_A

11

6

14

1

1

1

22

1

5

1

2

1

11

1

3

1

2

3

8

Note 1

Note 1

Note 1

63

Note 1

1

0

3

0

0

Note 1

Note 1

Note 1

Note 1

Note 1

11 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

No

Description

PSV SERVICE PLATFORM

DISCHARGE COOLER PLATFORM

MAIN DECK

PRODUCTION DECK

SUMP DECK

Total Quantity (Hold 1)

Remarks

3

3

1

3

3

2

1

7

7

2

1

11

Fire Hydrant - Two Way

12

Fire Hydrant Hose Box

13

Firewater Hose Reel

14

Remote Operated Firewater Monitor

15

DIFFS Skid

16

NOVEC 1230 Skid

17

Hose Reel Alarm Valve Skid

18

Sprinkler Alarm Valve Skid

19

Deluge Skid (2nos Deluge Valves)

20

Deluge Skid (3nos Deluge Valves)

21

Deluge Nozzles

22

Sprinkler Nozzles

23

24

Wet Chemical Fire Suppression System Firemen Equipment Cabinet (4 sets of Fire Fighting Equipment)

Company No._Rev. 560-20-SH-LIS-00001_A

6

6

1

1

2

2

21

21

0

5

0

3

0

0

1

1

226

0

0

1

12 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

No

Description

PSV SERVICE PLATFORM

DISCHARGE COOLER PLATFORM

MAIN DECK

PRODUCTION DECK

SUMP DECK

Total Quantity (Hold 1)

Remarks

SAFETY AND LIFESAVING EQUIPMENT

1

2

3

4

5

6

7

8

9

10

11

12

Combined Safety Shower and Eye Wash Station

Plumbed Eye Wash Station

Portable Eye Wash Station

Lifeboat (55 Persons Capacity)

Liferaft (25 Persons Capacity each)

Scramble Net

Lifebuoys With Lifeline

Lifebuoys With Lifeline, Smoke Signal, Light Life Jacket Cabinet With 55 Units of Life Jacket Life Jacket Cabinet With 25 Units of Life Jacket Life Jacket Cabinet With 24 Units of Life Jacket Life Jacket Cabinet With 16 Units of Life Jacket

1

10

1

2

4

2

8

4

2

0

2

0

4

2

4

22

Note 1

Note 1

Note 1

Note 1

0

0

4

2

0

2

Company No._Rev. 560-20-SH-LIS-00001_A

13 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

No

Description

PSV SERVICE PLATFORM

DISCHARGE COOLER PLATFORM

MAIN DECK

PRODUCTION DECK

SUMP DECK

Total Quantity (Hold 1)

Remarks

13

14

Work Vest Cabinet with 25 units of Work Vest Work Vest Cabinet with 10 units of Work Vest

15

First Aid Kit

16

Stretcher And Cabinet

17

18

19

20

21

Self-Contained Breathing Apparatus Cabinet with 4 units of SCBA (45-mins working set) Self-Contained Breathing Apparatus Cabinet with 2 units of SCBA (45-mins working set) Self-Contained Breathing Apparatus Cabinet with 1 unit of SCBA (45-mins working set) Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 120 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 55 units

Company No._Rev. 560-20-SH-LIS-00001_A

1

1

4

5

8

2

2

2

1

3

1

1

0

2

2

2

2

7

Note 1

Note 1

Note 1

15

Note 1

0

1

14 of 22

Note 1

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

No

Description

PSV SERVICE PLATFORM

DISCHARGE COOLER PLATFORM

MAIN DECK

PRODUCTION DECK

SUMP DECK

Total Quantity (Hold 1)

Remarks

22

23

Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 17 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 12 units

24

Lighted Windsock

2

25

Fire Blanket and Cabinet

26

27

28

29

Helicopter Crash and Rescue Equipment Cabinet Personal Grab Bag Container with 12 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit) Personal Grab Bag Container with 93 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit) Personal Grab Bag Container with 50 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit)

0

0

2

0

0

0

0

1

Note 2

Note 1

1

Company No._Rev. 560-20-SH-LIS-00001_A

15 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

No

Description

PSV SERVICE PLATFORM

DISCHARGE COOLER PLATFORM

MAIN DECK

PRODUCTION DECK

SUMP DECK

Total Quantity (Hold 1)

Remarks

30

31

32

Common Safety Cabinet with EEBD, Life Jacket, Smoke Hood in each bed cabin Common Safety Cabinet with EEBD, Life Jacket, First Aid, 4.5 kg ABC Portable Extinguisher in crane cabin Chemical Handling Safety Kit and Cabinet

33

Personnel Transfer Basket

34

Swing Rope

2

1

1

0

2

2

0

8

8

Note 1

Note 1: Spare capacity shall be considered for liferaft (1 unit), SCBA and EEBD (15%), Lifebuoy, Work vest, Personnel Grab Bag, Swing Rope (20%), and Life jacket (50%).

Note 2: This is part of Crane Vendor Package.

Company No._Rev. 560-20-SH-LIS-00001_A

16 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

6.2 Safety Equipment List for LQ6S

Table 6.2 Summary of Firefighting, Safety and Lifesaving Equipment for LQ6S

No

Description

FIREFIGHTING EQUIPMENT

1

2

3

4

5

6

7

8

9

10

159kg DCP (BC) Wheeled Extinguisher 68kg DCP (BC) Wheeled Extinguisher 57kg DCP (BC) Wheeled Extinguisher 14kg DCP (BC) Portable Extinguisher

9kg DCP (BC) Portable Extinguisher

125L Mobile Foam Cart

22.5kg CO2 Wheeled Extinguisher

6.8kg CO2 Handheld Extinguisher

9kg DCP (ABC) Portable Extinguisher 4.5kg Dry Powder (ABC) Portable Fire Extinguisher

11

Fire Hydrant - Two Way

12

Fire Hydrant Hose Box

13

Firewater Hose Reel

14

Remote Operated Firewater Monitor

15

DIFFS Skid

16

NOVEC 1230 Skid

17

Hose Reel Alarm Valve Skid

18

Sprinkler Alarm Valve Skid

19

Deluge Skid (2nos Deluge Valves)

20

Deluge Skid (3nos Deluge Valves)

21

Deluge Nozzles

ROOF OUTDOOR/ HELIDECK/ CRANE CABIN

ROOF DECK INDOOR

LEVEL 3 OUTDOOR

LEVEL 3 INDOOR

LEVEL 2 OUTDOOR

LEVEL 2 INDOOR

LEVEL 1 OUTDOOR

LEVEL 1 INDOOR

CELLAR DECK INDOOR

CELLAR DECK OUTDO OR

SUB CELLAR DECK & JACKET

Total Quantity in LQ6S (Hold 1)

Remarks

3

5

1

2

0

2

2

1

4

7

1

9

11

2

2

2

2

2

2

2

4

1

4

4

10

5

2

1

5

1

5

1

2

2

1

1

1

0

0

5

5

Note 1

Note 1

Note 1

44

Note 1

1

4

Note 1

Note 1

17

Note 1

Note 1

Note 1

0

0

12

12

7

0

1

2

1

1

0

0

0

Company No._Rev. 560-20-SH-LIS-00001_A

                                                                                                                 17 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

No

Description

ROOF OUTDOOR/ HELIDECK/ CRANE CABIN

ROOF DECK INDOOR

LEVEL 3 OUTDOOR

LEVEL 3 INDOOR

LEVEL 2 OUTDOOR

LEVEL 2 INDOOR

LEVEL 1 OUTDOOR

LEVEL 1 INDOOR

CELLAR DECK INDOOR

CELLAR DECK OUTDO OR

SUB CELLAR DECK & JACKET

Total Quantity in LQ6S (Hold 1)

Remarks

22

Sprinkler Nozzles

13

34

23

24

Wet Chemical Fire Suppression System Firemen Equipment Cabinet (4 sets of Fire Fighting Equipment)

SAFETY AND LIFESAVING EQUIPMENT

83

1

1

2

3

4

5

6

7

8

9

10

11

12

13

14

Combined Safety Shower and Eye Wash Station

Plumbed Eye Wash Station

1

Portable Eye Wash Station

1

Lifeboat (55 Persons Capacity)

Liferaft (25 Persons Capacity each)

Scramble Net

Lifebuoys With Lifeline

Lifebuoys With Lifeline, Smoke Signal, Light Life Jacket Cabinet With 55 Units of Life Jacket Life Jacket Cabinet With 25 Units of Life Jacket Life Jacket Cabinet With 24 Units of Life Jacket Life Jacket Cabinet With 16 Units of Life Jacket Work Vest Cabinet with 25 units of Work Vest Work Vest Cabinet with 10 units of Work Vest

4

4

3

4

2

1

15

First Aid Kit

1

16

Stretcher And Cabinet

17

18

Self-Contained Breathing Apparatus Cabinet with 4 units of SCBA (45- mins working set) Self-Contained Breathing Apparatus Cabinet with 2 units of SCBA (45- mins working set)

1

1

1

2

2

77

207

2

1

1

3

0

1

2

3

0

0

4

16

Note 1

Note 1

Note 1

Note 1

Note 1

Note 1

Note 1

4

2

2

0

1

2

0

6

2

2

0

1

1

1

4

2

2

Company No._Rev. 560-20-SH-LIS-00001_A

                                                                                                                 18 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

ROOF OUTDOOR/ HELIDECK/ CRANE CABIN

ROOF DECK INDOOR

LEVEL 3 OUTDOOR

LEVEL 3 INDOOR

LEVEL 2 OUTDOOR

LEVEL 2 INDOOR

LEVEL 1 OUTDOOR

LEVEL 1 INDOOR

CELLAR DECK INDOOR

CELLAR DECK OUTDO OR

SUB CELLAR DECK & JACKET

Total Quantity in LQ6S (Hold 1)

Remarks

1

2

1

87

18

1

1

1

0

1

0

1

1

1

2

2

1

1

Note 1

Note 1

Note 1

Note 2

Note 1

Note 1

105

Note 1

1

1

2

1

No

Description

19

20

21

22

23

Self-Contained Breathing Apparatus Cabinet with 1 unit of SCBA (45- mins working set) Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 120 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 55 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 17 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 12 units

24

Lighted Windsock

25

Fire Blanket and Cabinet

26

27

28

29

30

31

Hood,

Smoke

Helicopter Crash and Rescue Equipment Cabinet Personal Grab Bag Container with 12 units of Grab Bags (Inclusive of Flashlight, Gloves in each Unit) Personal Grab Bag Container with 93 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit) Personal Grab Bag Container with 50 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit) Common Safety Cabinet with EEBD, Life Jacket, Smoke Hood in each bed cabin Common Safety Cabinet with EEBD, Life Jacket, First Aid, 4.5 kg ABC Portable Extinguisher in crane cabin

Company No._Rev. 560-20-SH-LIS-00001_A

                                                                                                                 19 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

No

Description

ROOF OUTDOOR/ HELIDECK/ CRANE CABIN

ROOF DECK INDOOR

LEVEL 3 OUTDOOR

LEVEL 3 INDOOR

LEVEL 2 OUTDOOR

LEVEL 2 INDOOR

LEVEL 1 OUTDOOR

LEVEL 1 INDOOR

CELLAR DECK INDOOR

CELLAR DECK OUTDO OR

SUB CELLAR DECK & JACKET

Total Quantity in LQ6S (Hold 1)

Remarks

32

Chemical Handling Safety Kit and Cabinet

33

Personnel Transfer Basket

1

34

Swing Rope

0

1

4

4

Note 1

Note 1: Spare capacity shall be considered for SCBA and EEBD (15%), Lifebuoy, Work vest, Personnel Grab Bag, Swing Rope (20%), and Life jacket (50%).

Note 2: This is part of Crane Vendor Package.

Company No._Rev. 560-20-SH-LIS-00001_A

                                                                                                                 20 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

6.3 Safety Equipment List for FL6S and Bridges CP-FL, CP-LQ, CP-RP

Table 6.3 Summary of Firefighting, Safety and Lifesaving Equipment for FL6S and Bridges CP-FL, CP-LQ, CP-RP

No

Description

FLARE PLATFORM

BRIDGE CP-FL

BRIDGE CP-LQ

BRIDGE CP-RP

Total Quantity in FL6S and Bridges (Hold 1)

SAFETY AND LIFESAVING EQUIPMENT

1

Lifebuoys with Lifeline

2

3

6

3

14

Note 1: Spare capacity shall be considered for lifebuoys (20%).

Remarks

Note 1

Company No._Rev. 560-20-SH-LIS-00001_A 21 of 22

NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP6S COMPLEX

6.4 Safety Equipment List for RP6S (COMP2 Brownfield Modification Scope)

Table 6.4 Summary of Firefighting, Safety and Lifesaving Equipment for RP6S (COMP2 Brownfield Modification Scope)

No

Description

TOP DECK

PSV/ BDV ACCESS PLATFORM

Total Quantity in RP6S

Remarks

FIREFIGHTING EQUIPMENT

1

14kg DCP (BC) Portable Extinguisher

3

2

5

Note 1

Note 1: Spare capacity shall be considered for Portable Fire Extinguishers (10%).

Company No._Rev. 560-20-SH-LIS-00001_A 22 of 22

Project: Q-21699 - Saipem COMP2 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further