Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 21699 Saipem COMP2

❯

RFQ Files

❯

570 20 SH DTS 00011_A DTS Lifejacket

NFPS Offshore Compression Complexes Project COMP2

COMPANY Contract No.: LTC/C/NFP/5128/20

CONTRACTOR Project No.: 033734

Document Title

:

DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

COMPANY Document No.

: 570-20-SH-DTS-00011

Saipem Document No.

: 033734-B-D-30-SPM-LP-B-10014

Discipline

: HSE&Q

Document Type

: DATA SHEET

Document Category/Class

: 2

Document Classification

: INTERNAL

A

15-Aug-2023

Issued for Review

Maria Fransisca

Vijayakumar Rajaram

Luminita Oprescu

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

CHECKED BY

APPROVED BY

Saipem S.p.A.

THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.

Company No._Rev. 570-20-SH-DTS-00011_A

1 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

REVISION HISTORY

Revision

Date of Revision

Revision Description

A1

A

20-Jul-2023

Issued for Inter-Discipline Check

15-Aug-2023

Issued for Review

HOLDS LIST

Hold No

Hold Description

1

2

Quantity will be confirmed based on detail design development.

Tag numbers of equipment.

Company No._Rev. 570-20-SH-DTS-00011_A

2 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

TABLE OF CONTENTS

1

2

3

4

5

INTRODUCTION … 4

1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4

DEFINITIONS AND ABBREVIATIONS … 6

2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7

REGULATIONS, CODES AND STANDARDS … 9

3.1 COMPANY DOCUMENTS … 9 3.2 PROJECT DOCUMENTS … 9 INTERNATIONAL CODES AND STANDARDS … 10 3.3

PURPOSE … 11

DATASHEET … 12

Company No._Rev. 570-20-SH-DTS-00011_A

3 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.

Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.

1.1 Project Objective

The objective of this Project includes:

• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,

and efficient throughout their required life.

• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality

performance.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit‐for‐purpose in all respects.

Offshore

CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:

• CP6S Compression Complex

• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S

• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5

• Bridge linked Tie-in to RP6S

Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.

• CP7S Compression Complex

• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S

• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5

• Bridge linked Tie-in to RP7S

Company No._Rev. 570-20-SH-DTS-00011_A

4 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.

RGA Complex Destressing

Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:

• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex

• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex

Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.

Onshore

An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.

Figure 1.2.1: NFPS Compression Project COMP2 Scope

Company No._Rev. 570-20-SH-DTS-00011_A

5 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

Qatargas Operating Company Limited.

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

MILESTONE

A reference event splitting a PROJECT activity for progress measurement purpose.

PROJECT

NFPS Offshore Compression Complexes Project COMP2

SITE

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Scope of Work defined in the CONTRACT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

VENDOR

The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.

Company No._Rev. 570-20-SH-DTS-00011_A

6 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

2.2 Abbreviations

Code

Definition

BR

CFR

CP

EEBD

ELICS

EPC

EPCOL

FEED

FL

GRP

HFE

IMO

IP

LQ

LSA

MED

NFPS

OCC

QG

RGA

RGE

RL

RLIC

Bridge

Code of Federal Regulations

Compression Platform

Emergency Escape Breathing Device

Electrical Integrated Control System

Engineering, Procurement and Construction

Offshore and Pipelines Project

Front End Engineering Design

Flare Platform

Glass Reinforced Plastic

Human Factors Engineering

International Maritime Organization

Ingress Protection

Living Quarter Platform

Life Saving Appliances

Marine Equipment Directive

North Field Production Sustainability

Onshore Collaborative Center

Qatar Gas Operating Company Limited

Ras Gas Alfa

Ras Gas Expansion

Ras Laffan

Ras Laffan Industrial City

Company No._Rev. 570-20-SH-DTS-00011_A

7 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

Code

Definition

RP

SOLAS

UV

WBS

WHP

Riser Platform

Safety of Life at Sea

Ultraviolet

Work Breakdown Structure

Wellhead Platform

Company No._Rev. 570-20-SH-DTS-00011_A

8 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

3 REGULATIONS, CODES AND STANDARDS

In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.

In general, the order of precedence shall be followed:

a) Qatari Governmental and Regulatory Requirements

b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)

c) Project Specifications.

d) Industry Codes and Standards

e) COMPANY and CONTRACTOR’s Lessons Learned

If CONTRACTOR/SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.

The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.

3.1 Company Documents

S. No

Document Number

Title

PRT-PRS-PRC-014

Offshore Loss Prevention Philosophy

COMP-QG-PR-REP- 00008

North Field Production Sustainability Compression Project: EPC-2 – Basis of Design EPC2

(NFPS), NFPS

PRT-ENV-PRC-013

Environmental Aspects and Impacts Procedure

3.2 Project Documents

S. No

Document Number

Title

200-20-SH-DEC-00005

200-20-SH-DEC-00008

200-20-SH-SPC-00006

200-20-ME-DEC-00003

200-20-PI-SPC-00015

200-20-SH-SPC-00011

200-20-CE-DEC-00003

Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Safety and Lifesaving Equipment for CP6S and CP7S Complexes Material Handling Philosophy Complexes Piping Material Specification Complexes HFE Workplace Design Specification for CP6S and CP7S Complexes Material Selection Philosophy Complexes

for CP6S and CP7S

for CP6S and CP7S

for CP6S and CP7S

Company No._Rev. 570-20-SH-DTS-00011_A

9 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

S. No

Document Number

Title

200-20-CE-SPC-00015

Painting Specification for CP6S and CP7S Complexes

200-21-ST-DEC-00001

Note 1

Note 1

Note 1

Note 1

Note 1

Note 1

Note 1

Note 1

Greenfield Structural Design Basis for Substructure of CP6S and CP7S Complexes Escape Route, Life Saving and Fire Fighting Equipment Layout – PSV Service Platform for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Production Deck for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Sump Deck for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 1 for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 2 for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 3 for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Roof Deck for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Cellar Deck for LQ7S

Note 1

Safety Equipment List Report for CP7S Complex

Note 1: Document numbers shall be updated in next submission of Datasheet for Life Jacket with Cabinet for CP7S Complex.

3.3

International Codes and Standards

S. No

Document Number

Title

IMO IE110E

International Convention for the Safety of Life at Sea (SOLAS)

IMO ID982E

Life Saving Appliances (LSA) Code

OSHA 1910

Occupational Safety and Health Standard

46 CFR Part 161 Subpart 161.012 46 CFR Part 164 Subpart 164.018

Code of Federal Regulations - Personal Flotation Device Lights Code of Federal Regulations - Retroreflective Material for Lifesaving Equipment

Company No._Rev. 570-20-SH-DTS-00011_A

10 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

4 PURPOSE

The purpose of this datasheet is to covers the technical requirements for the Life Jackets with Cabinet for CP7S Complex in the NFPS Offshore Compression Complexes Project, COMP2. This datasheet shall be read in conjunction with Specification for Safety & Life Saving Equipment for CP6S And CP7S Complexes [Ref.6]. VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this datasheet and referred specifications.

Company No._Rev. 570-20-SH-DTS-00011_A

11 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

5 DATASHEET

LIFE JACKETS & CABINET

DATASHEET IDENTIFICATIONS

DOCUMENT NO

570-20-SH-DTS-00011

ADMINISTRATIVE IDENTIFICATIONS

PROJECT NUMBER

033734

PROJECT

NFPS OFFSHORE COMPRESSION COMPLEXES PROJECT COMP2

TOTAL LIFE JACKETS LQ: 176 (INSIDE CABINET AS BELOW) +105 (ONE FOR EACH BED CABIN) + 1 (AT CRANE CABIN) LIFE JACKET CABINETS LQ:

QUANTITY & LOCATION

(HOLD 1)

• 2 CABINETS @ 55 LIFE JACKETS • 2 CABINETS @ 25 LIFE JACKETS • 1 CABINET @ 16 LIFE JACKETS

TOTAL LIFE JACKETS CP: 148 (INSIDE CABINET AS BELOW) + 2 (AT CRANE CABINS) LIFE JACKET CABINETS CP:

• 4 CABINETS @ 25 LIFE JACKETS • 2 CABINETS @ 24 LIFE JACKETS

EQUIPMENT IDENTIFICATION

TAG NUMBER

SERVICE

HOLD 2

LIFE SAVING

OPERATION DATA

ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

ENVIRONMENTAL / SITE CONDITIONS

MINIMUM

NORMAL

MAXIMUM

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

8.3

37.0

49.0

100.0

UNITS

°C

%

ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

TECHNICAL SPECIFICATION

EQUIPMENT DESIGN CRITERIA

LIFEJACKET CRITERIA:

A

1

B

1

2

3

C

1

2

D

1

2

3

E

1

1.1

SOLAS/MED LIFE JACKETS.

REQUIRED

1.7

COLOUR

INTERNATIONAL ORANGE

1.2

TYPE-I LIFE JACKET (ADULT SIZE).

REQUIRED

1.3

UNICELLULAR, WITH PLASTIC PANEL AND SYNTHETIC FOAM FILLED.

REQUIRED

1.8

1.9

HIGH BUOYANCY (190N BOUYANCY), INHERENTLY BOUYANT AND SELF- RIGHTING TYPE.

REQUIRED

NOT SUSTAIN BURNING AFTER BEING ENVELOPED IN A FIRE FOR A PERIOD OF 2 SECONDS.

REQUIRED

REVERSIBLE AND MADE OF HEAVY- DUTY MARINE GRADE FABRIC, POLYPROPYLENE OR NYLON WEBBING AND MARINE HARDWARE.

HAVE AT LEAST 0.02 M2 OF RETRO- REFLECTIVE MATERIAL ATTACHED TO EACH FRONT SIDE, BACK SIDE, AND REVERSIBLE SIDES.

THE MATERIAL ATTACHED ON EACH SIDE OF THE JACKET MUST BE DIVIDED EQUALLY BETWEEN THE UPPER QUADRANTS OF THE SIDE, AND THE MATERIAL IN EACH QUADRANT MUST BE ATTACHED AS CLOSELY AS POSSIBLE TO THE SHOULDER AREA OF THE JACKET.

EQUIPMENT ACCESSORIES

REQUIRED

1.10

SPLASH GUARD

REQUIRED

REQUIRED

1.11

DESIGNED TO TURN AN UNCONSCIOUS PERSON FROM FACE DOWN IN THE WATER TO A VERTICAL OR SLIGHTLY BACKWARD (FACE-UP) POSITION

REQUIRED

REQUIRED

1.12

SEWN WITH MILDEW RESISTANT, ROT RESISTANT THREAD.

REQUIRED

EACH LIFE JACKET SHALL HAVE THE FOLLOWING ACCESSORIES:

1.4

1.5

1.6

F

1

1.1 WHISTLE AND LANYARD

REQUIRED

1.5

BATTERY FOR LIGHTS

REQUIRED

1.2

SEAWATER ACTIVATED ILLUMINATING LIGHT

REQUIRED

1.6

LIFTING STRAPS

REQUIRED

1.3

BODY STRAP (SHALL BE FULLY ADJUSTABLE WITH BUCKLE)

REQUIRED

1.7

SUITABLE FOR FASTENING WITH EEBD

REQUIRED

1.4

REFLECTIVE STRIPS (RETRO REFLECTIVE TAPE)

REQUIRED

1.8

STAINLESS STEEL FOR SNAP HOOK AND D-RING

REQUIRED

2

LIFEJACKET LIGHT CRITERIA:

Company No._Rev. 570-20-SH-DTS-00011_A

12 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE JACKETS WITH CABINET FOR CP7S COMPLEX

HAVE A LUMINOUS INTENSITY OF NOT LESS THAN 0.75 CD IN ALL DIRECTIONS OF THE UPPER HEMISPHERE.

REQUIRED

2.4 WHITE COLOUR.

REQUIRED

LIFE JACKETS & CABINET

HAVE A SOURCE OF ENERGY CAPABLE OF PROVIDING A LUMINOUS INTENSITY OF 0.75 CD FOR A PERIOD OF AT LEAST 8 HOURS

REQUIRED

VISIBLE OVER AS GREAT A SEGMENT OF THE UPPER HEMISPHERE AS IS PRACTICABLE WHEN ATTACHED TO A LIFEJACKET.

REQUIRED

2.5

HAZARDOUS AREA CLASSIFICATION REQUIREMENT: ZONE 1, GAS GROUP IIB, TEMPERATURE CLASS T3.

REQUIRED

2.1

2.2

2.3

G

1

CABINET DESIGN CRITERIA

SIZED FOR

2

CABINET TYPE

3

MOUNTING / INSTALLATION

VARIOUS QUANTITY AS SPECIFIED IN SECTION B.3

SIDE OPEN DOOR / EASY REACHING TYPE

8

9

COUNTRY OF ORIGIN

VENDOR TO ADVISE

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

VENDOR TO ADVISE

FREE STANDING, WITH PROVISION OF ADEQUATE BOTTOM AND BACK FRAMES TO PERMIT DECK OR BULKHEAD MOUNTING

10

DONNING INSTUCTIONS

IN ENGLISH, CONTAINED IN A WEATHER- PROOF COVER AND PERMANENTLY ATTACHED TO THE INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT

4

5

6

7

CABINET MATERIAL

UV RESISTANT GRP

IP RATING

IP56

CABINET PAINT FINISH

INTERNATIONAL ORANGE

VENTILATION / DRAINAGE

REQUIRED

H

SPECIAL REQUIREMENTS

11

12

13

LABELLING (NOTE 1)

“LIFE JACKETS” IN ENGLISH

MANUFACTURE NAME

VENDOR TO ADVISE

MODEL

VENDOR TO ADVISE

COMPLIANCE STANDARD

SOLAS

INTERNATIONAL LIFE SAVING APPLIANCES CODE

CERTIFICATION

MED / SOLAS

ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

PHYSICAL DATA

WEIGHT OF FILLED CABINET

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

EQUIPMENT IDENTIFICATIONS

EQUIPMENT TYPE

VENDOR TO ADVISE

MANUFACTURER NAME

VENDOR TO ADVISE

3

4

MODEL NUMBER

VENDOR TO ADVISE

MANUFACTURER COUNTRY

VENDOR TO ADVISE

1

2

3

I

1

2

J

1

2

K

NOTES

1

2

3

4

5

6

THE DESIGNATED CABINET SHALL BE LABELLED “LIFE JACKETS” IN ENGLISH AND PLATFORM NAME IN BOLD BLACK LETTERS. TYPE AND SIZE AND PRINTING ON THE LIFEJACKET CABINET SHALL FULFIL THE REQUIREMENT OF LSA/SOLAS.

FOR LIFE JACKETS WITH CABINET SHALL BE PROVIDED AT CORRESPONDING AREA. REFER ESCAPE ROUTE, LIFE SAVING AND FIRE FIGHTING EQUIPMENT LAYOUTS.

THIS DATASHEET SHALL BE READ IN CONJUCTION WITH SPECIFICATION FOR SAFETY AND LIFE SAVING EQUIPMENT (DOC. NO. 200-83-SH-SPC-00006) [REF.6] AND SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEETS.

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT DESIGN SPECIFICATION [REF.2 ]

ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

COMPLIANCE CERTIFICATES, THIRD PARTY VERIFICATION CERTIFICATES, TESTS AND TEST CERTIFICATES SHOULD BE PROVIDED BY THE VENDOR.

Company No._Rev. 570-20-SH-DTS-00011_A

13 of 13

Project: Q-21699 - Saipem COMP2 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further