NFPS Offshore Compression Complexes Project COMP2

COMPANY Contract No.: LTC/C/NFP/5128/20

CONTRACTOR Project No.: 033734

Document Title

:

DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

COMPANY Document No.

: 570-20-SH-DTS-00020

Saipem Document No.

: 033734-B-D-30-SPM-LP-B-10026

Discipline

: HSE&Q

Document Type

: DATA SHEET

Document Category/Class

: 2

Document Classification

: INTERNAL

A

15-Aug-2023

Issued for Review

Maria Fransisca

Vijayakumar Rajaram

Luminita Oprescu

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

CHECKED BY

APPROVED BY

Saipem S.p.A.

THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.

Company No._Rev. 570-20-SH-DTS-00020_A

1 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

REVISION HISTORY

Revision

Date of Revision

Revision Description

A1

A

20-Jul-2023

Issued for Inter-Discipline Check

15-Aug-2023

Issued for Review

HOLDS LIST

Hold No

Hold Description

1

2

Quantity will be confirmed based on detail design development.

Tag numbers of equipment.

Company No._Rev. 570-20-SH-DTS-00020_A

2 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

TABLE OF CONTENTS

1

2

3

4

5

INTRODUCTION … 4

1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4

DEFINITIONS AND ABBREVIATIONS … 6

2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7

REGULATIONS, CODES AND STANDARDS … 8

3.1 COMPANY DOCUMENTS … 8 3.2 PROJECT DOCUMENTS … 8 INTERNATIONAL CODES AND STANDARDS … 9 3.3

PURPOSE … 10

DATASHEET … 11

Company No._Rev. 570-20-SH-DTS-00020_A

3 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.

Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.

1.1 Project Objective

The objective of this Project includes:

• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,

and efficient throughout their required life.

• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality

performance.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit‐for‐purpose in all respects.

Offshore

CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:

• CP6S Compression Complex

• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S

• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5

• Bridge linked Tie-in to RP6S

Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.

• CP7S Compression Complex

• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S

• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5

• Bridge linked Tie-in to RP7S

Company No._Rev. 570-20-SH-DTS-00020_A

4 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.

RGA Complex Destressing

Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:

• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex

• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex

Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.

Onshore

An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.

Figure 1.2.1: NFPS Compression Project COMP2 Scope

Company No._Rev. 570-20-SH-DTS-00020_A

5 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

Qatargas Operating Company Limited

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

MILESTONE

A reference event splitting a PROJECT activity for progress measurement purpose.

PROJECT

NFPS Offshore Compression Complexes Project COMP2

SITE

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Scope of Work defined in the CONTRACT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

VENDOR

The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.

Company No._Rev. 570-20-SH-DTS-00020_A

6 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

2.2 Abbreviations

Code

Definition

BR

CP

ELICS

EPC

EPCOL

FEED

FL

HFE

IP

ISO

LQ

NFPS

OCC

OSHA

QG

RGA

RGE

RL

RLIC

RP

USCG

WBS

WHP

Bridge

Compression Platform

Electrical Integrated Control System

Engineering, Procurement and Construction

Offshore and Pipelines Project

Front End Engineering Design

Flare Platform

Human Factors Engineering

Ingress Protection

International Organization for Standardization

Living Quarter Platform

North Field Production Sustainability

Onshore Collaborative Center

Occupational Safety and Health Administration

Qatargas Operating Company Limited

Ras Gas Alfa

Ras Gas Expansion

Ras Laffan

Ras Laffan Industrial City

Riser Platform

United States Coast Guard

Work Breakdown Structure

Wellhead Platform

Company No._Rev. 570-20-SH-DTS-00020_A

7 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

3 REGULATIONS, CODES AND STANDARDS

In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.

In general, the order of precedence shall be followed:

a) Qatari Governmental and Regulatory Requirements

b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)

c) Project Specifications.

d) Industry Codes and Standards

e) COMPANY and CONTRACTOR’s Lessons Learned

If CONTRACTOR/SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.

The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.

3.1 Company Documents

S. No

Document Number

Title

PRT-PRS-PRC-014

Offshore Loss Prevention Philosophy

COMP-QG-PR-REP- 00008

North Field Production Sustainability Compression Project: EPC-2 – Basis of Design EPC2

(NFPS), NFPS

PRT-ENV-PRC-013

Environmental Aspects and Impacts Procedure

3.2 Project Documents

S. No

Document Number

Title

200-20-SH-DEC-00005

200-20-SH-DEC-00008

200-20-SH-SPC-00006

200-20-ME-DEC-00003

200-20-SH-SPC-00011

200-20-CE-DEC-00003

Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Safety and Lifesaving Equipment for CP6S and CP7S Complexes Material Handling Philosophy Complexes HFE Workplace Design Specification for CP6S and CP7S Complexes Material Selection Philosophy Complexes

for CP6S and CP7S

for CP6S and CP7S

200-20-CE-SPC-00015

Painting Specification for CP6S and CP7S Complexes

Company No._Rev. 570-20-SH-DTS-00020_A

8 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

S. No

Document Number

Title

200-21-ST-DEC-00001

Note 1

Note 1

Greenfield Structural Design Basis for Substructure of CP6S and CP7S Complexes Escape Route, Life Saving and Fire Fighting Equipment Layout – Production Deck for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Cellar Deck for LQ7S

Note 1

Safety Equipment List Report for CP7S Complex

Note 1: Document numbers shall be updated in next submission of Datasheet for Work Vest and Container for CP7S Complex.

3.3

International Codes and Standards

S. No

Document Number

Title

OSHA 1926.106

ISO 12402-5

Safety and Health Regulations for Construction - Personal Protective and Life Saving Equipment - Working over or near water. Personal flotation devices — Part 5: Buoyancy aids (level 50) — Safety requirements

Company No._Rev. 570-20-SH-DTS-00020_A

9 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

4 PURPOSE

The purpose of this datasheet is to covers the technical requirements for the Work Vest and Container for CP7S Complex in the NFPS Offshore Compression Complexes Project, COMP2. This datasheet shall be read in conjunction with Specification for Safety & Life Saving Equipment for CP6S And CP7S Complexes [Ref.6]. VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this datasheet and referred specifications.

Company No._Rev. 570-20-SH-DTS-00020_A

10 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

5 DATASHEET

WORK VEST AND CONTAINER

A

1

B

1

DATASHEET IDENTIFICATIONS

DOCUMENT NO

570-20-SH-DTS-00020

ADMINISTRATIVE IDENTIFICATIONS

PROJECT NUMBER

033734

2

PROJECT

NFPS OFFSHORE COMPRESSION COMPLEXES PROJECT COMP2

3

C

1

2

D

1

2

3

E

1

2

QUANTITY (HOLD 1)

TOTAL AT LQ: 2 CONTAINERS @ 25 UNITS TOTAL AT CP : 2 CONTAINERS @ 10 UNITS

EQUIPMENT IDENTIFICATION

TAG NUMBER

SERVICE

HOLD 2

SAFETY

OPERATION DATA

ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

ENVIRONMENTAL / SITE CONDITIONS

MINIMUM

NORMAL

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

8.3

37.0

MAXIMUM

49.0

100.0

UNITS

°C

%

ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

TECHNICAL SPECIFICATION

EQUIPMENT DESIGN CRITERIA

TYPE

SIZE

V PFD USCG (USA)

9

MINIMUM BUOYANCY OF 70 NEWTONS REQUIRED

FIT FOR ADULT

10

SUITABLE FOR WEARING OVER COVERALLS

REQUIRED

3

MATERIAL

COATED WITH VINYL, WHICH IS TOUGH, FIRE RETARDANT, SELF- EXTINGUISHING, HIGHLY ABRASIVE RESISTANT, EASILY CLEANED AND SHALL RETAIN BUOYANCY EVEN WHEN PUNCTURED

11

INSTRUCTION

IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION

4

5

6

7

8

F

1

WEIGHT

COLOUR

LABELLING

VENDOR TO ADVISE

12

RETRO-REFLECTIVE TAPES

REQUIRED

INTERNATIONAL ORANGE

SCREEN PRINTED IN WATER RESISTANT VINYL INK

13

14

BREAST POCKET COMPLETE WITH WHISTLE

REQUIRED

EQUIPPED WITH STAINLESS STEEL SNAP HOOKS AND D-RINGS, WITH TWO ENCIRCLING BELTS WITH SNAG RESISTANT BUCKLES

REQUIRED

RESISTANT TO SUNLIGHT DETERIORATION

REQUIRED

15

MARKING

“WORK VEST” IN BLOCK LETTERS

OPEN ON THE BACK TO ACCOMMODATE MOST BRANDS OF FALL PROTECTION HARNESSES

REQUIRED

CABINET DESIGN CRITERIA

16

SELF-EXTINGUISHING UNDER ASTM1692-74

REQUIRED

CAPACITY

VENDOR TO ADVISE

7

CABINET PAINT FINISH

VENDOR TO ADVISE

2

COLOUR

INTERNATIONAL ORANGE

8

VENTILATION / DRAINAGE

INCORPORATE PROVISIONS FOR BOTH DRAINAGE AND VENTILATION AND AFFORD FULL WEATHER PROOFING TO THE STORED CONTENTS

3

4

5

6

G

1

2

H

1

2

LABELLING (NOTE 3)

“WORK VEST” 50MM WHITE LETTER

9

COUNTRY OF ORIGIN

VENDOR TO ADVISE

CABINET MATERIAL

MOUNTING

IP RATING

SPECIAL REQUIREMENTS

HEAVY-DUTY GLASS REINFORCED PLASTIC (GRP)

10

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

STAINLESS STEEL, SS316

VENDOR TO ADVISE

11

MANUFACTURE NAME

VENDOR TO ADVISE

IP56

12

MODEL

VENDOR TO ADVISE

COMPLIANCE STANDARD

USCG

ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

PHYSICAL DATA

WEIGHT OF FILLED CABINET

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

Company No._Rev. 570-20-SH-DTS-00020_A

11 of 12

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR WORK VEST AND CONTAINER FOR CP7S COMPLEX

EQUIPMENT IDENTIFICATIONS

MODEL NUMBER

VENDOR TO ADVISE

3

MANUFACTURER COUNTRY

VENDOR TO ADVISE

WORK VEST AND CONTAINER

MANUFACTURER NAME

VENDOR TO ADVISE

NOTES

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT DESIGN SPECIFICATION [REF.2]

ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

THE DESIGNATED CABINET SHALL BE LABELLED IN CAPITAL LETTER OF ROMAN ALPHABET WITH WHITE COLOUR AND SHALL BE LOCATED AT CORRESPONDING AREA. REFER ESCAPE ROUTE, LIFE SAVING AND FIRE FIGHTING EQUIPMENT LAYOUTS

CE MARKING SHALL BE STAMPED ON ALL MATERIALS.

THIS DATASHEET SHALL BE READ IN CONJUCTION WITH SPECIFICATION FOR SAFETY AND LIFE SAVING EQUIPMENT (200-83-SH-SPC-00006) [REF.6] AND SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEETS.

COMPLIANCE CERTIFICATES, THIRD PARTY VERIFICATION CERTIFICATES, TESTS AND TEST CERTIFICATES SHOULD BE PROVIDED BY THE VENDOR.

I

1

2

J

1

2

3

4

5

6

Company No._Rev. 570-20-SH-DTS-00020_A

12 of 12

Project: Q-21699 - Saipem COMP2 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further