NFPS Offshore Compression Complexes Project COMP2
COMPANY Contract No.: LTC/C/NFP/5128/20
CONTRACTOR Project No.: 033734
Document Title
:
SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
COMPANY Document No.
: 570-20-SH-LIS-00001
Saipem Document No.
: 033734-B-D-30-SPM-LP-L-10002
Discipline
: HSE&Q
Document Type
: LIST
Document Category/Class
: 2
Document Classification
: INTERNAL
A
23-Aug-2023
Issued for Review
Maria Fransisca Rama Krishna K.
Luminita Oprescu
REV.
DATE
DESCRIPTION OF REVISION
PREPARED BY
CHECKED BY
APPROVED BY
Saipem S.p.A.
THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.
Company No._Rev. 570-20-SH-LIS-00001_A
1 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
REVISION HISTORY
Revision
Date of Revision
Revision Description
A1
A
08-Aug-2023
Issued for Inter-Discipline Check
23-Aug-2023
Issued for Review
HOLDS LIST
Hold No
Hold Description
1
Quantity will be confirmed as per detail design development.
Company No._Rev. 570-20-SH-LIS-00001_A
2 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
TABLE OF CONTENTS
1
2
3
4
5
6
INTRODUCTION … 4
1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4
DEFINITIONS AND ABBREVIATIONS … 6
2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7
REGULATIONS, CODES AND STANDARDS … 8
3.1 COMPANY DOCUMENTS … 8 3.2 PROJECT DOCUMENTS … 8
PURPOSE … 10
SCOPE … 10
SAFETY EQUIPMENT LIST … 10
6.1 SAFETY EQUIPMENT LIST FOR CP7S … 11 6.2 SAFETY EQUIPMENT LIST FOR LQ7S … 17 6.3 SAFETY EQUIPMENT LIST FOR FL7S AND BRIDGES CP-FL, CP-LQ, CP-RP … 21 6.4 SAFETY EQUIPMENT LIST FOR RP7S (COMP2 BROWNFIELD MODIFICATION SCOPE) … 22
Company No._Rev. 570-20-SH-LIS-00001_A
3 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
1
INTRODUCTION
The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.
Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.
1.1 Project Objective
The objective of this Project includes:
• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.
• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,
and efficient throughout their required life.
• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality
performance.
1.2 Project Scope
The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit‐for‐purpose in all respects.
Offshore
CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:
• CP6S Compression Complex
• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S
• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5
• Bridge linked Tie-in to RP6S
Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.
• CP7S Compression Complex
• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S
• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5
• Bridge linked Tie-in to RP7S
Company No._Rev. 570-20-SH-LIS-00001_A
4 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.
RGA Complex Destressing
Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:
• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex
• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex
Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.
Onshore
An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.
Figure 1.2.1: NFPS Compression Project COMP2 Scope
Company No._Rev. 570-20-SH-LIS-00001_A
5 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
2 DEFINITIONS AND ABBREVIATIONS
2.1 Definitions
Definition
Description
COMPANY
Qatargas Operating Company Limited.
CONTRACTOR
Saipem S.p.A.
DELIVERABLES
FACILITIES
All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.
fabricated,
MILESTONE
A reference event splitting a PROJECT activity for progress measurement purpose.
PROJECT
NFPS Offshore Compression Complexes Project COMP2
SITE
(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.
SUBCONTRACT
Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.
SUBCONTRACTOR
Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.
WORK
Scope of Work defined in the CONTRACT.
WORK PACKAGE
The lowest manageable and convenient level in each WBS subdivision.
VENDOR
The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.
Company No._Rev. 570-20-SH-LIS-00001_A
6 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
2.2 Abbreviations
Code
Definition
BR
CP
ELICS
EPC
FL
LQ
MICC
NFPS
OCC
QG
RGA
RGE
RL
RLIC
WBS
WHP
Bridge
Compression Platform
Electrical Integrated Control System
Engineering Procurement Construction
Flare Platform
Living Quarter Platform
Main Instrumentation & Control Contractor
North Field Production Sustainability
Onshore Collaborative Center
Qatargas Operating Company Limited
Ras Gas Alfa
Ras Gas Expansion
Ras Lafan
Ras Lafan Industrial City
Work Breakdown Structure
Wellhead Platform
Company No._Rev. 570-20-SH-LIS-00001_A
7 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
3 REGULATIONS, CODES AND STANDARDS
In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.
In general, the order of precedence shall be followed:
a) Qatari Governmental and Regulatory Requirements
b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)
c) Project Specifications.
d) Industry Codes and Standards
e) COMPANY and CONTRACTOR’s Lessons Learned
If CONTRACTOR/SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.
The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.
3.1 Company Documents
S. No
Document Number
Title
PRT-PRS-PRC-014
Offshore Loss Prevention Philosophy
3.2 Project Documents
S. No
Document Number
Title
200-20-SH-DEC-00005
200-83-SH-DEC-00001
200-20-SH-DEC-00008
200-83-SH-SPC-00005
200-20-SH-SPC-00006
Note 1
Note 1
Note 1
Note 1
Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Active Fire Protection Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Firefighting Equipment for CP6S and CP7S Complexes Specification for Safety and Lifesaving Equipment for CP6S and CP7S Complexes Escape Route, Life Saving and Fire Fighting Equipment Layout – PSV Service Platform for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Discharge Cooler Platform for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Main Deck for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Production Deck for Compression Platform CP7S
Company No._Rev. 570-20-SH-LIS-00001_A
8 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
S. No
Document Number
Title
Note 1
Note 1
Note 1
Note 1
Note 1
Note 1
Note 1
Note 1
Note 1
Note 1
228-20-SH-PLN-00004
228-20-SH-PLN-00016
Escape Route, Life Saving and Fire Fighting Equipment Layout – Sump Deck for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 1 for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 2 for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 3 for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Roof Deck for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Cellar Deck for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Sub Cellar Deck for LQ7S Escape Route, Life Saving and Fire Fighting Equipment Layout Drawing – Flare Platform FL7S (CP7S Complex) Escape Route, Life Saving and Fire Fighting Equipment Layout Drawing – CP – LQ Bridge (CP7S Complex) Escape Route, Life Saving and Fire Fighting Equipment Layout Drawing – CP –FP Bridge (CP7S Complex) Fire, Safety Equipment and Escape Route Layout RP7S- Top Deck Fire, Safety Equipment and Escape Route Layout RP7S- PSV/BDV Access Platform
Note 1: Document numbers shall be updated in next submission of Safety Equipment List for CP7S Complexes.
Company No._Rev. 570-20-SH-LIS-00001_A
9 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
4 PURPOSE
The purpose of this specification is to present the list of firefighting, safety and lifesaving equipment that have been identified for CP7S compression complex, including bridge linked LQ7S, FL7S, associated bridges, and brownfield modification in RP7S of the NFPS Offshore Compression Complexes Project COMP2.
5 SCOPE
This safety equipment list covers for CP7S compression complex, which includes CP7S, LQ7S, FL7S, brownfield scope of RP7S and the connecting bridges. By Design One Build Many (D1BM) concept, this safety equipment list will also be applicable for CP7S compression complex.
6 SAFETY EQUIPMENT LIST
The firefighting, safety and lifesaving equipment that shall be provided as part of the COMP2 project scope are presented in the following sections.
Company No._Rev. 570-20-SH-LIS-00001_A
10 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
6.1 Safety Equipment List for CP7S
Table 6.1 Summary of Firefighting, Safety and Lifesaving Equipment for CP7S
No
Description
PSV SERVICE PLATFORM
DISCHARGE COOLER PLATFORM
MAIN DECK
PRODUCTION DECK
SUMP DECK
Total Quantity (Hold 1)
Remarks
FIREFIGHTING EQUIPMENT
1
2
3
4
5
6
7
8
9
10
159kg DCP (BC) Wheeled Extinguisher 68kg DCP (BC) Wheeled Extinguisher 57kg DCP (BC) Wheeled Extinguisher 14kg DCP (BC) Portable Extinguisher 9kg DCP (BC) Portable Extinguisher
125L Mobile Foam Cart
22.5kg CO2 Wheeled Extinguisher
6.8kg CO2 Handheld Extinguisher
9kg DCP (ABC) Portable Extinguisher 4.5kg Dry Powder (ABC) Portable Fire Extinguisher
Company No._Rev. 570-20-SH-LIS-00001_A
11
6
14
1
1
1
22
1
5
1
2
1
11
1
3
1
2
3
8
Note 1
Note 1
Note 1
63
Note 1
1
0
3
0
0
Note 1
Note 1
Note 1
Note 1
Note 1
11 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
No
Description
PSV SERVICE PLATFORM
DISCHARGE COOLER PLATFORM
MAIN DECK
PRODUCTION DECK
SUMP DECK
Total Quantity (Hold 1)
Remarks
3
3
1
3
3
2
1
7
7
2
1
11
Fire Hydrant - Two Way
12
Fire Hydrant Hose Box
13
Firewater Hose Reel
14
Remote Operated Firewater Monitor
15
DIFFS Skid
16
NOVEC 1230 Skid
17
Hose Reel Alarm Valve Skid
18
Sprinkler Alarm Valve Skid
19
Deluge Skid (2nos Deluge Valves)
20
Deluge Skid (3nos Deluge Valves)
21
Deluge Nozzles
22
Sprinkler Nozzles
23
24
Wet Chemical Fire Suppression System Firemen Equipment Cabinet (4 sets of Fire Fighting Equipment)
Company No._Rev. 570-20-SH-LIS-00001_A
6
6
1
1
2
2
21
21
0
5
0
3
0
0
1
1
226
0
0
1
12 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
No
Description
PSV SERVICE PLATFORM
DISCHARGE COOLER PLATFORM
MAIN DECK
PRODUCTION DECK
SUMP DECK
Total Quantity (Hold 1)
Remarks
SAFETY AND LIFESAVING EQUIPMENT
1
2
3
4
5
6
7
8
9
10
11
12
Combined Safety Shower and Eye Wash Station
Plumbed Eye Wash Station
Portable Eye Wash Station
Lifeboat (55 Persons Capacity)
Liferaft (25 Persons Capacity each)
Scramble Net
Lifebuoys With Lifeline
Lifebuoys With Lifeline, Smoke Signal, Light Life Jacket Cabinet With 55 Units of Life Jacket Life Jacket Cabinet With 25 Units of Life Jacket Life Jacket Cabinet With 24 Units of Life Jacket Life Jacket Cabinet With 16 Units of Life Jacket
1
10
1
2
4
2
8
4
2
0
2
0
4
2
4
22
Note 1
Note 1
Note 1
Note 1
0
0
4
2
0
2
Company No._Rev. 570-20-SH-LIS-00001_A
13 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
No
Description
PSV SERVICE PLATFORM
DISCHARGE COOLER PLATFORM
MAIN DECK
PRODUCTION DECK
SUMP DECK
Total Quantity (Hold 1)
Remarks
13
14
Work Vest Cabinet with 25 units of Work Vest Work Vest Cabinet with 10 units of Work Vest
15
First Aid Kit
16
Stretcher And Cabinet
17
18
19
20
21
Self-Contained Breathing Apparatus Cabinet with 4 units of SCBA (45-mins working set) Self-Contained Breathing Apparatus Cabinet with 2 units of SCBA (45-mins working set) Self-Contained Breathing Apparatus Cabinet with 1 unit of SCBA (45-mins working set) Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 120 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 55 units
Company No._Rev. 570-20-SH-LIS-00001_A
1
1
4
5
8
2
2
2
1
3
1
1
0
2
2
2
2
7
Note 1
Note 1
Note 1
15
Note 1
0
1
14 of 22
Note 1
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
No
Description
PSV SERVICE PLATFORM
DISCHARGE COOLER PLATFORM
MAIN DECK
PRODUCTION DECK
SUMP DECK
Total Quantity (Hold 1)
Remarks
22
23
Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 17 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 12 units
24
Lighted Windsock
2
25
Fire Blanket and Cabinet
26
27
28
29
Helicopter Crash and Rescue Equipment Cabinet Personal Grab Bag Container with 12 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit) Personal Grab Bag Container with 93 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit) Personal Grab Bag Container with 50 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit)
0
0
2
0
0
0
0
1
Note 2
Note 1
1
Company No._Rev. 570-20-SH-LIS-00001_A
15 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
No
Description
PSV SERVICE PLATFORM
DISCHARGE COOLER PLATFORM
MAIN DECK
PRODUCTION DECK
SUMP DECK
Total Quantity (Hold 1)
Remarks
30
31
32
Common Safety Cabinet with EEBD, Life Jacket, Smoke Hood in each bed cabin Common Safety Cabinet with EEBD, Life Jacket, First Aid, 4.5 kg ABC Portable Extinguisher in crane cabin Chemical Handling Safety Kit and Cabinet
33
Personnel Transfer Basket
34
Swing Rope
2
1
1
0
2
2
0
8
8
Note 1
Note 1: Spare capacity shall be considered for liferaft (1 unit), SCBA and EEBD (15%), Lifebuoy, Work vest, Personnel Grab Bag, Swing Rope (20%), and Life jacket (50%).
Note 2: This is part of Crane Vendor Package.
Company No._Rev. 570-20-SH-LIS-00001_A
16 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
6.2 Safety Equipment List for LQ7S
Table 6.2 Summary of Firefighting, Safety and Lifesaving Equipment for LQ7S
No
Description
FIREFIGHTING EQUIPMENT
1
2
3
4
5
6
7
8
9
10
159kg DCP (BC) Wheeled Extinguisher 68kg DCP (BC) Wheeled Extinguisher 57kg DCP (BC) Wheeled Extinguisher 14kg DCP (BC) Portable Extinguisher
9kg DCP (BC) Portable Extinguisher
125L Mobile Foam Cart
22.5kg CO2 Wheeled Extinguisher
6.8kg CO2 Handheld Extinguisher
9kg DCP (ABC) Portable Extinguisher 4.5kg Dry Powder (ABC) Portable Fire Extinguisher
11
Fire Hydrant - Two Way
12
Fire Hydrant Hose Box
13
Firewater Hose Reel
14
Remote Operated Firewater Monitor
15
DIFFS Skid
16
NOVEC 1230 Skid
17
Hose Reel Alarm Valve Skid
18
Sprinkler Alarm Valve Skid
19
Deluge Skid (2nos Deluge Valves)
20
Deluge Skid (3nos Deluge Valves)
21
Deluge Nozzles
ROOF OUTDOOR/ HELIDECK/ CRANE CABIN
ROOF DECK INDOOR
LEVEL 3 OUTDOOR
LEVEL 3 INDOOR
LEVEL 2 OUTDOOR
LEVEL 2 INDOOR
LEVEL 1 OUTDOOR
LEVEL 1 INDOOR
CELLAR DECK INDOOR
CELLAR DECK OUTDO OR
SUB CELLAR DECK & JACKET
Total Quantity in LQ7S (Hold 1)
Remarks
3
5
1
2
0
2
2
1
4
7
1
9
11
2
2
2
2
2
2
2
4
1
4
4
10
5
2
1
5
1
5
1
2
2
1
1
1
0
0
5
5
Note 1
Note 1
Note 1
44
Note 1
1
4
Note 1
Note 1
17
Note 1
Note 1
Note 1
0
0
12
12
7
0
1
2
1
1
0
0
0
Company No._Rev. 570-20-SH-LIS-00001_A
17 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
No
Description
ROOF OUTDOOR/ HELIDECK/ CRANE CABIN
ROOF DECK INDOOR
LEVEL 3 OUTDOOR
LEVEL 3 INDOOR
LEVEL 2 OUTDOOR
LEVEL 2 INDOOR
LEVEL 1 OUTDOOR
LEVEL 1 INDOOR
CELLAR DECK INDOOR
CELLAR DECK OUTDO OR
SUB CELLAR DECK & JACKET
Total Quantity in LQ7S (Hold 1)
Remarks
22
Sprinkler Nozzles
13
34
23
24
Wet Chemical Fire Suppression System Firemen Equipment Cabinet (4 sets of Fire Fighting Equipment)
SAFETY AND LIFESAVING EQUIPMENT
83
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Combined Safety Shower and Eye Wash Station
Plumbed Eye Wash Station
1
Portable Eye Wash Station
1
Lifeboat (55 Persons Capacity)
Liferaft (25 Persons Capacity each)
Scramble Net
Lifebuoys With Lifeline
Lifebuoys With Lifeline, Smoke Signal, Light Life Jacket Cabinet With 55 Units of Life Jacket Life Jacket Cabinet With 25 Units of Life Jacket Life Jacket Cabinet With 24 Units of Life Jacket Life Jacket Cabinet With 16 Units of Life Jacket Work Vest Cabinet with 25 units of Work Vest Work Vest Cabinet with 10 units of Work Vest
4
4
3
4
2
1
15
First Aid Kit
1
16
Stretcher And Cabinet
17
18
Self-Contained Breathing Apparatus Cabinet with 4 units of SCBA (45- mins working set) Self-Contained Breathing Apparatus Cabinet with 2 units of SCBA (45- mins working set)
1
1
1
2
2
77
207
2
1
1
3
0
1
2
3
0
0
4
16
Note 1
Note 1
Note 1
Note 1
Note 1
Note 1
Note 1
4
2
2
0
1
2
0
6
2
2
0
1
1
1
4
2
2
Company No._Rev. 570-20-SH-LIS-00001_A
18 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
ROOF OUTDOOR/ HELIDECK/ CRANE CABIN
ROOF DECK INDOOR
LEVEL 3 OUTDOOR
LEVEL 3 INDOOR
LEVEL 2 OUTDOOR
LEVEL 2 INDOOR
LEVEL 1 OUTDOOR
LEVEL 1 INDOOR
CELLAR DECK INDOOR
CELLAR DECK OUTDO OR
SUB CELLAR DECK & JACKET
Total Quantity in LQ7S (Hold 1)
Remarks
1
2
1
87
18
1
1
1
0
1
0
1
1
1
2
2
1
1
Note 1
Note 1
Note 1
Note 2
Note 1
Note 1
105
Note 1
1
1
2
1
No
Description
19
20
21
22
23
Self-Contained Breathing Apparatus Cabinet with 1 unit of SCBA (45- mins working set) Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 120 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 55 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 17 units Breathing Apparatus Escape Set (15-mins) / Emergency Escape Breathing Apparatus Container with 12 units
24
Lighted Windsock
25
Fire Blanket and Cabinet
26
27
28
29
30
31
Hood,
Smoke
Helicopter Crash and Rescue Equipment Cabinet Personal Grab Bag Container with 12 units of Grab Bags (Inclusive of Flashlight, Gloves in each Unit) Personal Grab Bag Container with 93 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit) Personal Grab Bag Container with 50 units of Grab Bags (Inclusive of Smoke Hood, Flashlight, Gloves in each Unit) Common Safety Cabinet with EEBD, Life Jacket, Smoke Hood in each bed cabin Common Safety Cabinet with EEBD, Life Jacket, First Aid, 4.5 kg ABC Portable Extinguisher in crane cabin
Company No._Rev. 570-20-SH-LIS-00001_A
19 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
No
Description
ROOF OUTDOOR/ HELIDECK/ CRANE CABIN
ROOF DECK INDOOR
LEVEL 3 OUTDOOR
LEVEL 3 INDOOR
LEVEL 2 OUTDOOR
LEVEL 2 INDOOR
LEVEL 1 OUTDOOR
LEVEL 1 INDOOR
CELLAR DECK INDOOR
CELLAR DECK OUTDO OR
SUB CELLAR DECK & JACKET
Total Quantity in LQ7S (Hold 1)
Remarks
32
Chemical Handling Safety Kit and Cabinet
33
Personnel Transfer Basket
1
34
Swing Rope
0
1
4
4
Note 1
Note 1: Spare capacity shall be considered for SCBA and EEBD (15%), Lifebuoy, Work vest, Personnel Grab Bag, Swing Rope (20%), and Life jacket (50%).
Note 2: This is part of Crane Vendor Package.
Company No._Rev. 570-20-SH-LIS-00001_A
20 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
6.3 Safety Equipment List for FL7S and Bridges CP-FL, CP-LQ, CP-RP
Table 6.3 Summary of Firefighting, Safety and Lifesaving Equipment for FL6S and Bridges CP-FL, CP-LQ, CP-RP
No
Description
FLARE PLATFORM
BRIDGE CP-FL
BRIDGE CP-LQ
BRIDGE CP-RP
Total Quantity in FL7S and Bridges (Hold 1)
SAFETY AND LIFESAVING EQUIPMENT
1
Lifebuoys with Lifeline
2
3
6
3
14
Note 1: Spare capacity shall be considered for lifebuoys (20%).
Remarks
Note 1
Company No._Rev. 570-20-SH-LIS-00001_A 21 of 22
NFPS Offshore Compression Complexes Project COMP2 SAFETY EQUIPMENT LIST FOR CP7S COMPLEX
6.4 Safety Equipment List for RP7S (COMP2 Brownfield Modification Scope)
Table 6.4 Summary of Firefighting, Safety and Lifesaving Equipment for RP7S (COMP2 Brownfield Modification Scope)
No
Description
TOP DECK
PSV/ BDV ACCESS PLATFORM
Total Quantity in RP7S
Remarks
FIREFIGHTING EQUIPMENT
1
14kg DCP (BC) Portable Extinguisher
3
2
5
Note 1
Note 1: Spare capacity shall be considered for Portable Fire Extinguishers (10%).
Company No._Rev. 570-20-SH-LIS-00001_A 22 of 22
Project: Q-21699 - Saipem COMP2 Folder: RFQ Files