UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

FACILITIES SYSTEM AND UNIT NUMBER CODES AND DESCRIPTIONS PROCEDURE

APPROVAL

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 1 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

REVISION HISTORY

Rev No.

Issue Date

Revision Description

00

01

02

03

04

05

06

07

08

01 SEPT 2007

First Issue

05 NOV 2007 Updated to reflect latest status

27 APR 2008 Updated to reflect latest status

11 APR 2011 Updated to reflect latest status

12 DEC 2011 Updated to reflect latest status

18 NOV 2012 Updated to reflect latest status

14 JUL 2013

Updated to reflect latest status

12 OCT 2014 Updated to reflect latest status

15 OCT 2017 Old Procedure 01 50 06 01 R07 System and Unit Numbers updated into new format to comply with related Manage Document procedure and templates

Valid Until Date

01 SEPT 2010

05 NOV 2010

27 APR 2011

11 APR 2014

12 DEC 2014

18 NOV 2015

14 JUL 2016

12 OCT 2017

11 OCT 2020

09

30 AUG 2018 Updated to reflect latest status

30 AUG 2021

10

11

12

NFPS / NFE approved System / Unit Numbers incorporated RLTO approved System incorporated

/ Unit Numbers

03 DEC 2018

RLTO Scope definition incorporated

03 FEB 2019 Unit 28 added to Refinery

Updated System Numbers for NFE Offshore (Table 3.12)

System

/ Unit Numbers

18 JUN 2019 Updated to reflect latest status QG1 Upstream incorporated Qatargas South (existing) System / Unit Numbers incorporated NFE Offshore incorporated NFE Onshore approved Helium Recovery and Utilities Unit Numbers incorporated

System Numbers

approved

03 DEC 2021

02 FEB 2022

17 JUN 2022

13

11 DEC 2019 Updated System Numbers for Liquid Product

10 DEC 2022

Berths (Table 3.11)

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 2 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

Rev No.

Issue Date

Revision Description

Valid Until Date

14

31 MAY 2020 Updates performed to following tables to reflect

07 JUN 2023

latest status: System Numbers - Table 3.1, Table 3.4, Table 3.6, Table 3.8, Table 3.10, Table 3.11, Table 3.12, Table 3.14 and Table 3.15 modified Unit Numbers - Table 4.9 modified Unit Numbers - Table 4.5 added

15

16 AUG 2020 Updates performed to following tables to reflect

30 AUG 2023

latest status: System Numbers - Table 3.8 and Table 3.16 modified System Numbers - Table 3.17 and Table 3.18 added Unit Numbers - Table 4.7, Table 4.9 and Table 4.10 modified

16

04 OCT 2020 Updates performed to following tables to reflect

11 OCT 2023

latest status: System Numbers - Table 3.14, Table 3.16 and Table 3.18 modified

17

29 NOV 2020 Updates performed to following tables to reflect

13 DEC 2023

latest status: System Numbers - Table 3.14 and Table 3.16 modified Unit Numbers - Table 4.5, Table 4.6 and Table 4.10 modified

18

19 MAY 2021 Updates performed to following tables to reflect

30 MAY 2024

latest status: Unit Numbers - Table 4.13 and Table 4.14 modified merged into one Table 4.13

19

09 JUN 2021 Update performed to following tables to reflect

20 JUN 2024

latest status: System Numbers - Table 3.15 and Table 3.17 modified

20

21

23 AUG 2021 Update performed to following tables to reflect

31 AUG 2024

latest status: System Numbers - Table 3.12 and Table 3.17 modified

14 DEC 2021 Update performed to following table to reflect

11 JAN 2025

latest status: System Numbers - Table 3.14 modified

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 3 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

CONTENTS

1 GENERAL … 5

1.1 Purpose… 5 1.2 Scope … 5 1.3 Criticality… 5 1.4 Key Risks and Controls … 5 1.5 Classification … 6 1.6 Compliance … 6 1.7 Roles and Responsibilities … 6 2 PROCEDURE … 7

2.1 Addition and changes … 7 APPENDICES … 8

Appendix 1 - References and Relevant Documents … 8 Appendix 2 - Glossary of Terms: Definitions, Acronyms and Abbreviations … 9 Appendix 3 - System Numbers … 10 Appendix 4 - Unit Numbers … 23

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 4 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

1 GENERAL

1.1 PURPOSE The purpose of this procedure is to provide a single source for the control and allocation of System and Unit Numbers.

1.2 SCOPE This procedure is applicable to the Equipment and Document Numbering for all Qatargas North facilities and new Qatargas facilities post 2018.

Scope definition for Qatargas South and RLTO operated Assets:

• Qatargas South and RLTO operated Assets will maintain their original Equipment

Numbering System.

• New Equipment installed within any particular Qatargas South or RLTO operated Asset

will inherit the parent Asset Equipment Numbering.

• Standalone new projects that are not an extension to the existing Qatargas South or RLTO

operated Assets will follow the Qatargas Equipment and Document Numbering.

• Documents issued for new facilities that are an extension to the existing Qatargas South or RLTO operated Assets, will follow the Qatargas Document Numbering as per Section 2 in the Document Numbering Procedure (PRJ-PJL-PRC-004), whereas the modified or reissued documents will retain their original Document Number.

1.3 CRITICALITY This Procedure has been determined to be a Medium Criticality document.

Criticality Level: Medium

1.4 KEY RISKS AND CONTROLS The key risks and controls associated with this procedure are listed below.

Key Risks

Key Controls

Documents / Equipment with duplicate / incorrect numbers

Assign Unique System and Unit Number as per procedure

Users cannot find accurate data

Duplicate equipment data or documents may be in use

All valid data with unique document numbering are made available to authorized users through COMPANY EDMS End user shall refer to this procedure to ensure the System Numbers and Units Numbers they are using in the project is correct

Table 1: Key Risks and Controls

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 5 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

1.5 CLASSIFICATION This Procedure has been classified as Internal based on INF-ISG-POL-001 Information Classification Policy.

1.6 COMPLIANCE All projects shall comply with the requirements as defined in this procedure for the effective handover of Project Information to Company.

Compliance with this procedure is verifiable by Company Technical Documentation section at any time during project execution.

1.7 ROLES AND RESPONSIBILITIES Roles and responsibilities related to this procedure are as defined in Section 1.5 of Procedure PRJ-PJL-PRC-004 (Facilities Engineering and Vendor Document Numbering).

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 6 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

PROCEDURE

2 Qatargas use a structured intelligent numbering scheme for numbering engineering documents, drawings, equipment and component tag numbering. System Number codes and Unit Number codes are integral to those numbering systems.

System Number codes and Unit Number codes are also used as abbreviated references in technical documents.

Qatargas System Number codes and System descriptions are listed in Appendix 3 of this procedure.

Qatargas Unit Number codes and Unit descriptions are listed in Appendix 4 of this procedure.

2.1 ADDITION AND CHANGES Qatargas Head of Technical Documentation & Drafting Services shall approve any addition or change to the System and / or Unit Number tables before implementation.

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 7 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

APPENDICES

APPENDIX 1 - REFERENCES AND RELEVANT DOCUMENTS

Number PRJ-PJL-PRC-004 PRJ-PJL-PRC-006 PRJ-PJL-PRC-008 PRJ-PJL-PRC-048

Title Facilities Engineering and Vendor Document Numbering Project Information Handover Qatargas Equipment Numbering Philosophy Facilities Documentation Metadata Requirements

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 8 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

APPENDIX 2 - GLOSSARY OF TERMS: DEFINITIONS, ACRONYMS AND ABBREVIATIONS

Term

N/A

Description

N/A

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 9 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

APPENDIX 3 - SYSTEM NUMBERS

TABLE 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18

TABLE DESCRIPTION QG1 Downstream System Numbers QG1 Upstream - Onshore Receiving System Numbers QG1 Upstream - Offshore System Numbers QG2 Onshore System Numbers QG2 Offshore System Numbers QG3&4 Onshore System Numbers QG3&4 Offshore System Numbers Common LNG Storage and Loading (CLNG S&L) System Numbers Qatargas North Common System Numbers Refinery System Numbers Liquid Product Berths (LPB) System Numbers Ras Laffan Terminal Operations (RLTO) System Numbers Qatargas South System Numbers North Field Production Sustainability (NFPS) System Numbers North Field East (NFE) Onshore System Numbers North Field East (NFE) Offshore System Numbers North Field South (NFS) Onshore System Numbers North Field South (NFS) Offshore System Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 10 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QG1 DOWNSTREAM SYSTEM NUMBER 00 01 02 03 04 08 09 10 21 56

SYSTEM DESCRIPTION

QG1 Common / General Downstream LNG Process Train 1 LNG Process Train 2 LNG Process Train 3 AGR 4 / SRU 4 Off-sites Utilities Helium Recovery (Common QG1, QG2, QG3 and QG4) Common / General Onshore (QG1, QG2, QG3 and QG4) Jetty BOG Recovery Facilities

Table 3.1 - QG1 Downstream System Numbers

QG1 UPSTREAM - ONSHORE RECEIVING SYSTEM NUMBER CF CL DC IF ON ST TE UP

SYSTEM DESCRIPTION

Common Facilities Condensate Loading Controls / DCS Systems NF1 / NF2 Interconnection Onshore Condensate Storage Telecommunication Systems Receiving & Condensate Stabilization

Table 3.2 - QG1 Upstream - Onshore Receiving System Numbers

QG1 UPSTREAM - OFFSHORE SYSTEM NUMBER CF DC FL JA LQ OF PR PU SL TE WH

SYSTEM DESCRIPTION

Common Facilities Controls / DCS Systems Flare, Bridges and Supports Jackets Living Quarters Platform Topsides Offshore Process Platform Topsides Process and Utilities Platform Topsides Sealine Telecommunication Systems Wellhead Platform Topsides

Table 3.3 - QG1 Upstream - Offshore System Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 11 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QG2 ONSHORE SYSTEM NUMBER 10 20 21 24 25 28 29

SYSTEM DESCRIPTION

Helium Recovery (Common QG1, QG2, QG3 and QG4) Common / General QG2 Onshore Common / General Onshore (QG1, QG2, QG3 and QG4) LNG Process Train 4 LNG Process Train 5 Off-sites Utilities

Table 3.4 - QG2 Onshore System Numbers

QG2 OFFSHORE SYSTEM NUMBER 30 31 32 33

SYSTEM DESCRIPTION

Common / General Offshore (QG2, QG3 and QG4) Wellhead Platform 4 Wellhead Platform 5 Wellhead Platform 6

Table 3.5 - QG2 Offshore System Numbers

QG3&4 ONSHORE SYSTEM NUMBER 10 21 50 52 53 58 59

SYSTEM DESCRIPTION

Helium Recovery (Common QG1, QG2, QG3 and QG4) Common / General Onshore (QG1, QG2, QG3 and QG4) Common / General QG3&4 Onshore LNG Process Train 6 LNG Process Train 7 Off-sites Utilities

Table 3.6 - QG3&4 Onshore System Numbers

QG3&4 OFFSHORE SYSTEM NUMBER 30 34 35 36

SYSTEM DESCRIPTION

Common / General Offshore (QG2, QG3 and QG4) Wellhead Platform 7 Wellhead Platform 8 Wellhead Platform 9

Table 3.7 - QG3&4 Offshore System Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 12 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

COMMON LNG STORAGE AND LOADING (CLNG S&L) SYSTEM NUMBER 00 07 20 26 27 47 50 56 57

SYSTEM DESCRIPTION

QG1 Common / General Downstream LNG Storage and Loading QG1 Downstream Common / General QG2 Onshore LNG Storage and Loading NFE Onshore (Lot N3) LNG Storage and Loading (Lot N) LNG Storage and Loading NFS Onshore Common / General QG3&4 Onshore Jetty BOG Recovery Facilities LNG Storage and Loading QG3&4 Onshore

Table 3.8 - Common LNG Storage and Loading (CLNGS&L) System Numbers

QATARGAS NORTH COMMON SYSTEM NUMBER 99 100

SYSTEM DESCRIPTION

Waste Materials Management Facility (QGN) Qatargas North (QGN) Common

Table 3.9 - Qatargas North Common System Numbers

REFINERY SYSTEM NUMBER 70 80 81 82 88 89 90 91 95 96

SYSTEM DESCRIPTION Zekreet Gasoline Complex Common / General Refinery Refinery Process Train 1 Refinery Process Train 2 Off-sites Laffan Refinery 1 Utilities Laffan Refinery 1 Utilities Laffan Refinery 2 Off-sites Laffan Refinery 2 Off-sites Zekreet Utilities Zekreet

Table 3.10 - Refinery System Numbers

LIQUID PRODUCT BERTH (LPB) SYSTEM NUMBER 92 94

SYSTEM DESCRIPTION

Liquid Product Berth (LPB) 30 Liquid Product Berth (LPB) 31

Note: For the above System Numbers, Unit Numbers as applicable to Ras Laffan Terminal Operations (RLTO) Table 4.9 shall be applied.

Table 3.11 - Liquid Product Berths (LPB) System Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 13 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

RAS LAFFAN TERMINAL OPERATIONS (RLTO) SYSTEM NUMBER 11 12 86 87 301 302 303 304 305 306 307 308 309 310 315 320 330

SYSTEM DESCRIPTION

Common Sulphur Facilities (QG1, QG2, QG3 and QG4) Common Sulphur Facilities (NFE) Storage and Loading Zekreet Storage and Loading Laffan Refinery 1 & 2 RLTO Common CCSL / CLPG CLSC / CLPG CCSL CLPG CLSC QSGTL RLOC (Pygas) ORYX GTL VOC CO2 Pipeline and Injection RLIC Common Facilities Lean Gas Export

Table 3.12 - Ras Laffan Terminal Operations (RLTO) System Numbers

QATARGAS SOUTH SYSTEM NUMBER 999

SYSTEM DESCRIPTION

Qatargas South

Note: System Number 999 shall only be applied for the assignment of new Document Numbers within the existing Qatargas South assets.

Table 3.13 - Qatargas South System Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 14 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 200 201 202 210 211 212 213 214 215 217 218 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247

SYSTEM DESCRIPTION

NFPS Common Offshore NFPS Common Onshore NFPS Umbilical (Common Infrastructure) NFPS Riser Platform RT-2 NFPS Bridge BR2S-1 NFPS Riser Platform RP3S NFPS Bridge BR3S-1 NFPS Pipeline (Intrafield) PL3LS NFPS Pipeline (Export) PL1L NFPS Bridge BR3S-2 NFPS Bridge Support Platform BSP3S-1 NFPS Wellhead Platform WHP12S NFPS Pipeline (Intrafield) PL12S NFPS Subsea Cable SC12S NFPS Riser Platform RP4S NFPS Bridge BR4S-1 NFPS Wellhead Platform WHP13S NFPS Pipeline (Intrafield) PL13S NFPS Subsea Cable SC13S NFPS Riser Platform RP7S NFPS Bridge BR7S-1 NFPS Wellhead Platform WHP14S NFPS Pipeline (Intrafield) PL14S NFPS Subsea Cable SC14S NFPS Riser Platform RP6S NFPS Bridge BR6S-1 NFPS Riser Platform RP9S NFPS Bridge BR9S-1 NFPS Pipeline (Intrafield) PL9S NFPS Pipeline (Intrafield) PL9LS NFPS Pipeline (Export) PL49L NFPS Riser Platform RP5S NFPS Bridge BR5S-1 NFPS Pipeline (Intrafield) PL5S NFPS Pipeline (Intrafield) PL5LS NFPS Pipeline (Export) PL75L NFPS Riser Platform RP10S NFPS Bridge BR10S-1 NFPS Pipeline (Intrafield) PL10S

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 15 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 278 279 280 281 286 510 512 513 514

SYSTEM DESCRIPTION

NFPS Pipeline (Intrafield) PL10LS NFPS Pipeline (Export) P610L NFPS Wellhead Platform WHP10N NFPS Pipeline (Intrafield) PL10N NFPS Subsea Cable SC10N NFPS Wellhead Platform WHP11N NFPS Pipeline (Intrafield) PL11N NFPS Subsea Cable SC11N NFPS Riser Platform RP1N NFPS Bridge BR1N-1 NFPS Bridge BR1N-2 NFPS Pipeline (Export) PL1N NFPS Wellhead Platform WHP12N NFPS Pipeline (Intrafield) PL12N NFPS Subsea Cable SC12N NFPS Riser Platform RP4N NFPS Bridge BR4N-1 NFPS Wellhead Platform WHP13N NFPS Pipeline (Intrafield) PL13N NFPS Subsea Cable SC13N NFPS Riser Platform RP6N NFPS Bridge BR6N-1 NFPS Riser Platform RP8S NFPS Bridge BR8S-1 NFPS Riser Platform RP11S NFPS Bridge BR11S-1 NFPS Pipeline (Intrafield) PL11S NFPS Pipeline (Intrafield) PL11LS NFPS Riser Platform RP3N NFPS Riser Platform RP5N NFPS Bridge BR5N-1 NFPS Pipeline (Intrafield) PL5N-1 NFPS Pipeline (Intrafield) PL5N-2 NFPS Pipeline (Intrafield) PL13LS NFPS Compression Platform CP1S NFPS Living Quarters Platform LQ1S NFPS Bridge BR1S-3 NFPS Flare Platform FL1S

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 16 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 515 518 519 523 524 525 540 541 542 543 544 545 546 547 548 560 561 562 563 564 565 566 567 568 570 571 572 573 574 575 576 577 578 580 581 582 583 584 585

SYSTEM DESCRIPTION

NFPS Bridge BR1S-4 NFPS Bridge BR1S-7 NFPS Bridge BR1S-8 NFPS Bridge Support Platform BSP1S-3 NFPS Bridge Support Platform BSP1S-4 NFPS Bridge Support Platform BSP1S-5 NFPS Compression Platform CP4S NFPS Bridge BR4S-2 NFPS Living Quarters Platform LQ4S NFPS Bridge BR4S-3 NFPS Flare Platform FL4S NFPS Bridge BR4S-4 NFPS Bridge BR4S-5 NFPS Bridge Support Platform BSP4S-1 NFPS Bridge Support Platform BSP4S-2 NFPS Compression Platform CP6S NFPS Bridge BR6S-2 NFPS Living Quarters Platform LQ6S NFPS Bridge BR6S-3 NFPS Flare Platform FL6S NFPS Bridge BR6S-4 NFPS Bridge BR6S-5 NFPS Bridge Support Platform BSP6S-1 NFPS Bridge Support Platform BSP6S-2 NFPS Compression Platform CP7S NFPS Bridge BR7S-2 NFPS Living Quarters Platform LQ7S NFPS Bridge BR7S-3 NFPS Flare Platform FL7S NFPS Bridge BR7S-4 NFPS Bridge BR7S-5 NFPS Bridge Support Platform BSP7S-1 NFPS Bridge Support Platform BSP7S-2 NFPS Compression Platform CP8S NFPS Bridge BR8S-2 NFPS Living Quarters Platform LQ8S NFPS Bridge BR8S-3 NFPS Flare Platform FL8S NFPS Bridge BR8S-4

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 17 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 586 587 588 606 610 613 614 615 616 617 621 622 623 640 641 642 643 644 645 646 651 652 653 660 661 662 663 664 665 666 667 671 672 673

701

702

703

SYSTEM DESCRIPTION

NFPS Bridge BR8S-5 NFPS Bridge Support Platform BSP8S-1 NFPS Bridge Support Platform BSP8S-2 NFPS Bridge BR6S-6 NFPS Compression Platform CP1N NFPS Bridge BR1N-3 NFPS Flare Platform FL1N NFPS Bridge BR1N-4 NFPS Bridge BR1N-5 NFPS Bridge BR1N-6 NFPS Bridge Support Platform BSP1N-1 NFPS Bridge Support Platform BSP1N-2 NFPS Bridge Support Platform BSP1N-3 NFPS Compression Platform CP4N NFPS Bridge BR4N-2 NFPS Living Quarters Platform LQ4N NFPS Bridge BR4N-3 NFPS Flare Platform FL4N NFPS Bridge BR4N-4 NFPS Bridge BR4N-5 NFPS Bridge Support Platform BSP4N-1 NFPS Bridge Support Platform BSP4N-2 NFPS Bridge Support Platform BSP4N-3 NFPS Compression Platform CP6N NFPS Bridge BR6N-2 NFPS Living Quarters Platform LQ6N NFPS Bridge BR6N-3 NFPS Flare Platform FL6N NFPS Bridge BR6N-4 NFPS Bridge BR6N-5 NFPS Bridge BR6N-6 NFPS Bridge Support Platform BSP6N-1 NFPS Bridge Support Platform BSP6N-2 NFPS Bridge Support Platform BSP6N-3 NFPS Fuel Gas Network Onshore (Common Infrastructure) NFPS Fuel Gas Network Offshore (Common Infrastructure) NFPS Fuel Gas Spurline RT-2

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 18 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 704 705 706 707 708 711 712 713 714 715 720

SYSTEM DESCRIPTION

NFPS Fuel Gas Spurline RP4S NFPS Fuel Gas Spurline RP7S NFPS Fuel Gas Spurline RP8S NFPS Fuel Gas Spurline RP4N NFPS Fuel Gas Spurline RP6N NFPS Fuel Gas Metering Station 1 (Offplot) NFPS Fuel Gas Metering Station 1 (Onplot) NFPS Fuel Gas Metering Station 2 (Offplot) NFPS Fuel Gas Metering Station 2 (Onplot) NFPS QG South Onshore Collaborative Building NFPS Onshore Logistics Base (Common Infrastructure)

Table 3.14 - North Field Production Sustainability (NFPS) System Numbers

SYSTEM DESCRIPTION

NORTH FIELD EAST (NFE) ONSHORE SYSTEM NUMBER Common / General NFE Onshore (Train 8 - 11) 60 Common / General NFE Onshore (Train 8 and 9) 61 LNG Process Train 8 62 LNG Process Train 9 63 Off-sites (Train 8 and 9) 64 Utilities (Train 8 and 9) 65 Helium Recovery 68 Common / General NFE Onshore (Train 10 and 11) 71 LNG Process Train 10 72 LNG Process Train 11 73 Off-sites (Train 10 and 11) 74 Utilities (Train 10 and 11) 75 Workshop & Support Services 78 79 NFE Waste Materials Management Facility Table 3.15 - North Field East (NFE) Onshore System Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 19 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

NORTH FIELD EAST (NFE) OFFSHORE SYSTEM NUMBER 101 114 115 116 117 118 119 120 121 129 130 131 132 140 141 142 145 400 401 402 409 410 411 412 413 414 415 416 417 418 420 421 422 423 424 425 426 427 428

SYSTEM DESCRIPTION

Common / General NFE Offshore Wellhead Platform NFQ 14 Wellhead Platform NFQ 15 Wellhead Platform NFQ 16 Wellhead Platform NFQ 17 Wellhead Platform NFQ 18 Wellhead Platform NFQ 19 Wellhead Platform NFQ 20 Wellhead Platform NFQ 21 Wellhead Platform NFQ 29 Wellhead Platform NFQ 30 Wellhead Platform NFQ 31 Wellhead Platform NFQ 32 Sensor Tower Platform STP General Sensor Tower Platform STPM9 Sensor Tower Platform STPM10 Sensor Tower Platform STP / NSS Onshore NFE Pipelines Common NFE Cables Common NFE Pipelines and Cables - Onshore Facilities NFE Pipeline (Trunkline) TL15 NFE Pipeline (Trunkline) TL14 NFE Pipeline (Trunkline) TL17 NFE Pipeline (Trunkline) TL19 NFE Pipeline (Trunkline) TL21 NFE Pipeline (Intrafield) IP15 NFE Pipeline (Intrafield) IP16 NFE Pipeline (Intrafield) IP18 NFE Pipeline (Intrafield) IP20 NFE Pipeline (Intrafield) IP14 NFE Pipeline (MEG) MP14 NFE Pipeline (MEG) MP14-21 NFE Pipeline (MEG) MP21-20 NFE Pipeline (MEG) MP20-15 NFE Pipeline (MEG) MP15-16 NFE Pipeline (MEG) MP16-17 NFE Pipeline (MEG) MP17-18 NFE Pipeline (MEG) MP18-19 NFE Pipeline (MEG) MP19

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 20 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

SYSTEM DESCRIPTION

NORTH FIELD EAST (NFE) OFFSHORE SYSTEM NUMBER NFE Subsea Cable SC14 429 NFE Subsea Cable SC14-21 430 NFE Subsea Cable SC21-20 431 NFE Subsea Cable SC20-15 432 NFE Subsea Cable SC15-16 433 NFE Subsea Cable SC16-17 434 NFE Subsea Cable SC17-18 435 NFE Subsea Cable SC18-19 436 NFE Subsea Cable SC19 437 STP Subsea Cable SC16-STPM9 439 STP Subsea Cable SC17-STPM9 440 STP Subsea Cable SC20-STPM10 441 STP Subsea Cable SC21-STPM10 442 NFE SSIV Umbilical U14 443 NFE SSIV Umbilical U17 444 NFE SSIV Umbilical U19 445 446 NFE SSIV Umbilical U21 Table 3.16 - North Field East (NFE) Offshore System Numbers

SYSTEM DESCRIPTION

NORTH FIELD SOUTH (NFS) ONSHORE SYSTEM NUMBER 360 361 362 363 364 365 368 371 372 373 374 375 378 379 Table 3.17 - North Field South (NFS) Onshore System Numbers

Common / General NFS Onshore (All Trains) Common / General NFS Onshore (Train 12 and 13) LNG Process Train 12 LNG Process Train 13 Off-sites (Train 12 and 13) Utilities (Train 12 and 13) Helium Recovery Common / General NFS Onshore (Train 14 and 15) LNG Process Train 14 LNG Process Train 15 Off-sites (Train 14 and 15) Utilities (Train 14 and 15) Workshop & Support Services NFS Waste Materials Management Facility

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 21 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

SYSTEM DESCRIPTION

NORTH FIELD SOUTH (NFS) OFFSHORE SYSTEM NUMBER 102 122 123 124 125 126 127 128 450 451 452 455 456 460 461 462 463 464 465 470 471 472 473 474 475 476 477 478 480 481 482 483 484 485 486 487 488 Table 3.18 - North Field South (NFS) Offshore System Numbers

Common / General NFS Offshore Wellhead Platform NFQ 22 Wellhead Platform NFQ 23 Wellhead Platform NFQ 24 Wellhead Platform NFQ 25 Wellhead Platform NFQ 26 Wellhead Platform NFQ 27 Wellhead Platform NFQ 28 NFS Pipelines Common NFS Cables Common NFS Pipelines and Cables - Onshore Facilities NFS Pipeline (Trunkline) TL23 NFS Pipeline (Trunkline) TL24 NFS Pipeline (Intrafield) IP26-1 NFS Pipeline (Intrafield) IP26-2 NFS Pipeline (Intrafield) IP22 NFS Pipeline (Intrafield) IP25 NFS Pipeline (Intrafield) IP27 (Future) NFS Pipeline (Intrafield) IP28 (Future) NFS Pipeline (MEG) MP25 NFS Pipeline (MEG) MP26 NFS Pipeline (MEG) MP22-26 NFS Pipeline (MEG) MP22-23 NFS Pipeline (MEG) MP23-24 NFS Pipeline (MEG) MP24-25 NFS Pipeline (MEG) MP22-27 (Future) NFS Pipeline (MEG) MP23-28 (Future) NFS Pipeline (MEG) MP27-28 (Future) NFS Subsea Cable SC25 NFS Subsea Cable SC26 NFS Subsea Cable SC22-26 NFS Subsea Cable SC22-23 NFS Subsea Cable SC23-24 NFS Subsea Cable SC24-25 NFS Subsea Cable SC22-27 (Future) NFS Subsea Cable SC23-28 (Future) NFS Subsea Cable SC27-28 (Future)

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 22 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

APPENDIX 4 - UNIT NUMBERS

TABLE 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13

TABLE DESCRIPTION QG1 Downstream Unit Numbers QG1 Upstream - Onshore Receiving Unit Numbers QG1 Upstream - Offshore Unit Numbers QG2 / QG3&4 and NFPS Onshore Unit Numbers NFE and NFS Onshore Unit Numbers QG2 / QG3&4 / NFPS / NFE and NFS Offshore Unit Numbers Common LNG Storage and Loading (CLNG S&L) Unit Numbers Refinery Unit Numbers Ras Laffan Terminal Operations (RLTO) Unit Numbers Qatargas South - Onshore Unit Numbers Qatargas South - Barzan Onshore Unit Numbers Qatargas South - Offshore Unit Numbers NFE and NFS - Helium Recovery and Utilities Unit Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 23 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QG1 DOWNSTREAM UNIT NUMBER 00 01 02 03 04 05 06 07 08 09 10 30 41 42 43 44 45 48 49 50 51 52 53 59 61 63

71

72 73 74 75 81 82 83 84 86 87 88 91

UNIT DESCRIPTION

Common / General Downstream Inlet Facilities Acid Gas Removal / Amine Storage Dehydration / Mercaptan Removal LNG Recovery Gas Chilling and Liquefaction Refrigeration Fractionation / LNG Treating Nitrogen Rejection Sulphur Recovery Helium Recovery Common / General Upstream (Onshore) Buildings HVAC Steel Structures Concrete Foundations / Structures Paving, Roads, Fencing and Bunds High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection Workshop Qatargas North Headquarters (Ras Laffan) Camp LNG Loading / Unloading and Storage Condensate / Refined Products Loading Refrigerant Make-Up and Storage NGL Transfer LNG and Liquid Products Jetty Bunkering Facilities Common Reception Facilities Sea Water Systems Fire Protection Systems Flare and Liquid Burners Sulphur Export Effluent Treatment / Site Drainage Irrigation Water Systems Power Generation / Distribution

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 24 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QG1 DOWNSTREAM UNIT NUMBER 92 93 94 95 96

UNIT DESCRIPTION

Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems Nitrogen Systems

Table 4.1 - QG1 Downstream Unit Numbers

QG1 UPSTREAM SYSTEM NUMBER CF ON DC TE

UP

ST CL IF

QG1 UPSTREAM UNIT NUMBER

UNIT DESCRIPTION

00 02 03 04

80

81 82 83

84

85 88 89 90

Overall Upstream Common Facilities Onshore Control Systems Telecommunications Common Facilities, Receiving Facilities and Condensate Stabilization Plant Condensate Stabilization and Gas Transfer Unit 1 Condensate Stabilization and Gas Transfer Unit 2 Condensate Stabilization and Gas Transfer Unit 3 Common Unit for Condensate Stabilization, Off- Gas Compression and Flares Utilities Production and Off-sites Condensate Storage Facilities Condensate Loading Facilities NF1 / NF2 Interconnection

Table 4.2 - QG1 Upstream - Onshore Receiving Unit Numbers

QG1 UPSTREAM SYSTEM NUMBER CF OF DC TE

WH

QG1 UPSTREAM UNIT NUMBER

UNIT DESCRIPTION

00 01 03 04 10 11 12 13 15 19

Overall Upstream Common Facilities Offshore Control Systems Telecommunications Common Facilities Wellhead Platforms Wellhead Platform 1 Wellhead Platform 2 Wellhead Platform 3 Utilities Jackets

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 25 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QG1 UPSTREAM SYSTEM NUMBER

QG1 UPSTREAM UNIT NUMBER

UNIT DESCRIPTION

PR

PU

JA

FL

SL

LQ

20

50

23 25 26 27 28

51 52 53 54 55 56 57 58 59 79 60 61 62 69 65

Common Facilities Production Platform (including Flares) Closed / Open Drains Utilities Distribution Power Distribution Sea Water Cooling Fuel Gas Distribution Common Facilities Process & Utilities Platform (including Flares) Process Train 1 Process Train 2 Closed / Open Drains Oily Water Treatment Utilities Production Power Generation Sea Water Cooling Fuel Gas / Diesel Jacket PU Platform Jacket Accommodation Platform Common Facilities Flare, Bridges & Supports Flare Tower Topsides Bridges / Supports Flare Tripod Sealine Common Facilities Accommodation Platform Topside Common Facilities Accommodation Platform Topside Common Facilities Accommodation Platform Topside (LQX) Closed / Open Drains / Distribution Utilities Power Generation / Distribution Table 4.3 - QG1 Upstream - Offshore Unit Numbers

73 75 76

72

70

71

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 26 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QG2 / QG3&4 / NFPS ONSHORE UNIT NUMBER 00 02 03 04 05 06 07 08 09 10 30

31

32 33 41 42 43 44 45 48 49 50 51 52 53 63 82 83 84 86 87 91 92 93 94 95 96 98

UNIT DESCRIPTION

Common / General Downstream Acid Gas Removal / Amine Storage Dehydration / Mercaptan Removal LNG Recovery Gas Chilling and Liquefaction Refrigeration Fractionation / LNG Treating Nitrogen Rejection Sulphur Recovery Helium Recovery Common / General Upstream (Onshore) Inlet Facilities (Slug catcher / Condensate Stabilization / Off gas Compression & Metering Station) Condensate Treating Waste Water Injection Buildings HVAC Steel Structures Concrete Foundations / Structures Paving, Roads, Fencing and Bunds High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection Camp Sea Water Systems Fire Protection Systems Flare and Liquid Burners Sulphur Export Effluent Treatment / Site Drainage Power Generation / Distribution Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems Nitrogen Systems CO2 Systems

Table 4.4 - QG2 / QG3&4 / NFPS Onshore Unit Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 27 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

NFE / NFS ONSHORE UNIT NUMBER 00 02 03 04 05 06 07 08 09 10 30

31

32 33 41 42 43 44 45 48 49 50 51 52 53 59 63 72 79 82 83 84 86 87 91 92 93 94 95

UNIT DESCRIPTION

Common / General Downstream Acid Gas Removal / Amine Storage Dehydration / Mercaptan Removal LNG Recovery Gas Chilling and Liquefaction Refrigeration Fractionation / LNG Treating Nitrogen Rejection Sulphur Recovery Helium Recovery Common / General Upstream (Onshore) Inlet Facilities (Slug catcher / Condensate Stabilization / Off gas Compression & Metering Station) Condensate Treating Waste Water Injection Buildings HVAC Steel Structures Concrete Foundations / Structures Paving, Roads, Fencing and Bunds High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection Workshop Camp Refrigerant Make-Up and Storage Chemicals and Catalyst Storage Sea Water Systems Fire Protection Systems Flare and Liquid Burners Sulphur Export Effluent Treatment / Site Drainage Power Generation / Distribution Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 28 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

NFE / NFS ONSHORE UNIT NUMBER 96 97 98

UNIT DESCRIPTION

Nitrogen Systems MEG Systems CO2 Systems

Table 4.5 - North Field East (NFE) and North Field South (NFS) Onshore Unit Numbers

QG2 / QG3&4 / NFPS / NFE / NFS OFFSHORE UNIT NUMBER 20 21 22 23 24 25 26 30 42 48 49 50 51 52 53 79 82 83 84 87 91 92 93 94 95 96 97

UNIT DESCRIPTION

Common / General Upstream (Offshore) Fixed Platform Structure (Jacket / Piles) Topside Structure Offshore Production System and Equipment Flow line / Risers Pipeline / Risers Subsea Cable Common / General Upstream (Onshore) HVAC High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection Chemicals and Catalyst Storage Sea Water Systems Fire Protection Systems Flare and Liquid Burners Effluent Treatment / Site Drainage Power Generation / Distribution Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems Nitrogen Systems MEG Systems

Table 4.6 - QG2 / QG3&4 / NFPS / NFE and NFS Offshore Unit Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 29 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

COMMON LNG STORAGE AND LOADING (CLNG S&L) UNIT NUMBER 00 37 41 42 43 44 45 48 49 50 51 52 53 63 71 72 73 74 83 84 87 91 92 93 94 95 96

UNIT DESCRIPTION

Common / General Downstream Common Boil Off Gas Recovery Unit Buildings HVAC Steel Structures Concrete Foundations / Structures Paving, Roads, Fencing and Bunds High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection Camp LNG and Liquid Products Loading / Unloading Refrigerant Make-Up and Storage NGL Transfer LNG and Liquid Products Jetty Fire Protection Systems Flare and Liquid Burners Effluent Treatment / Site Drainage Power Generation / Distribution Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems Nitrogen Systems

Table 4.7 - Common LNG Storage and Loading (CLNG S&L) Unit Numbers

REFINERY UNIT NUMBER 00 12 13 14 15 16 17 18

UNIT DESCRIPTION Common / General Downstream Condensate Fractionation Saturation Gas Plant Propane Trim Treating Naphtha Hydrotreating Kerosene Hydrotreating Hydrogen Production Amine Regeneration

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 30 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

REFINERY UNIT NUMBER 19 28 29 41 42 43 44 45 48 49 50 51 52 53 59

71

76 77 78 83 84 87 88 89 90 91 92 93 94 95 96

UNIT DESCRIPTION Sour Water Stripping Gas Oil Blending Diesel Hydrotreater (DHT) Buildings HVAC Steel Structures Concrete Foundations / Structures Paving, Roads, Fencing and Bunds High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection Workshop Storage Condensate / Refined Products Loading and Unloading Condensate Feed Product Storage (Refinery) Refrigerated LPG Storage Fire Protection Systems Flare and Liquid Burners Effluent Treatment / Site Drainage Irrigation Water Systems Condensate Loading Zero Liquid Discharge (ZLD) Power Generation / Distribution Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems Nitrogen Systems

Table 4.8 - Refinery Unit Numbers

RAS LAFFAN TERMINAL OPERATIONS (RLTO) UNIT NUMBER 00 37 41 42

UNIT DESCRIPTION

Common Common Boil Off Gas Recovery Unit Buildings HVAC

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 31 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

RAS LAFFAN TERMINAL OPERATIONS (RLTO) UNIT NUMBER 43 44 45 48 49 50 51 52 53 60 62 64 65 66 67 68 69 71 72 73 74 76 77 78 82 83 84 87 88 89 91 92 93 94 95 96 98

UNIT DESCRIPTION

Steel Structures Concrete Foundations / Structures Paving, Roads, Fencing and Bunds High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection Condensate Storage (PC, DFC & NC) CLPG Loading CLSC Storage CLSC Loading GTL Storage GTL Loading MEG Storage MEG Unloading LNG and Liquid Products Loading / Unloading Refrigerant Make-Up and Storage NGL Transfer LNG and Liquid Products Jetty Condensate Feed Product Storage (Refinery) Refrigerated LPG Storage Sea Water Systems Fire Protection Systems Flare and Liquid Burners Effluent Treatment / Site Drainage Irrigation Water Systems Condensate Loading Power Generation / Distribution Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems Nitrogen Systems CO2 Systems

Table 4.9 - Ras Laffan Terminal Operations (RLTO) Unit Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 32 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QATARGAS SOUTH ONSHORE UNIT NUMBER 00 01 02 03 04 05 06 07 10 100 101 102 11 116 119 12 13 130 132 133 134 135 136 137 139 145 15 16 160 162 163 164 166 167 169 17

171

174

UNIT DESCRIPTION

General Process Unit, Train-1 Common Process Unit, Train-2 Common Process Unit, Train-3 Common Process Unit, Train-4 Common Process Unit, Train-5 Common Process Unit, Train-6 Common Process Unit, Train-7 Common Inlet Facilities, Train-1&2 Process Unit, AKG-1&2 Process Unit, AKG-1 Common Process Unit, AKG-2 Common Gas Treating, Train-1 Lee Break Water, Offsite LPG Loading Berth 3A (RGO), Offsite Acid Gas Removal, Train-1 Dehydration, Train-1 Al Shaheen Gas Facilities, AKG-1&2 Acid Gas Removal, AKG-1 Dehydration, AKG-1 Guard Mercury Removal, AKG-1 Dew Point Control, AKG-1 NGL Recovery, AKG-1 Refrigerant Preparation (Fractionation), AKG-1&2 Sulfur Recovery, AKG-1 Dew Point Control, AKG 2 Gas Chilling and Liquefaction, Train-1 Refrigeration, Train-1 Inlet Facilities, AKG-2 Acid Gas Removal, AKG-2 Dehydration, AKG-2 Guard Mercury Removal, AKG-2 NGL Recovery, AKG-2 Refrigerant Preparation (Fractionation), AKG-1&2 Sulfur Recovery, AKG-2 Refrigerant Preparation (Fractionation), Train-1&2 LPG Rundown and Common LPG Storage and Loading, Offplot LPG Loading Jetty, Offplot

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 33 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QATARGAS SOUTH ONSHORE UNIT NUMBER 175 178 18 19 192 193 197 201 21 22 23 25 26 27 28 29 30 300 310 311 312

313

314 315 316 318 32 320 321 322 323 324 325 326 328 33 338 34

UNIT DESCRIPTION

MEG Storage Facilities (FAP), Offsite Sales Gas Custody Metering System, Offplot & AKG-2 Nitrogen Rejection, Train-1 Sulfur Recovery, Train-1 Steam Generation (NGL), Utilities Excess Gas Compression, AKG-1&2 and Utilities Hot Oil System, AKG-1&2 and Utilities Pipeline Compressor Station, Utilities Gas Treating, Train-2 Acid Gas Removal, Train-2 Dehydration, Train-2 Gas Chilling and Liquefaction, Train-2 Refrigeration, Train-2 Refrigerant Preparation (Fractionation), Train-2 Nitrogen Rejection, Train-2 Sulfur Recovery, Train-2 Inlet Facilities, Train-3 & AKG-1 HeXU & HeRU - Common, Helium Crude Helium Inlet Measurement, Helium Inter Facilities - Feed Compression, Helium Purification Unit, Helium Liquefaction Gas Compression - Liquefier Cold Box, Helium Storage and Loading, Helium Storage, Helium Air Separation Unit, Helium Unit, Helium & Train-1 Acid Gas Removal, Train-3 Upgrader (Helium Project), Helium Inlet Metering, Helium-2 Purification, Helium-2 Compression, Helium-2 Liquefaction, Helium-2 Storage, Helium-2 Air Separation, Helium-2 Extraction Unit, Helium & Train-2 Dehydration, Train-3 Extraction Unit, Helium & Train-3 Guard Mercury Removal, Train-3

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 34 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QATARGAS SOUTH ONSHORE UNIT NUMBER 348 35 358 36 368 37 371A 378 38 381 39 391 39A 40 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66

UNIT DESCRIPTION

Extraction Unit, Helium & Train-4 Gas Chilling and Liquefaction, Train-3 Extraction Unit, Helium & Train-5 Refrigeration, Train-3 Extraction Unit, Helium & Train-6 Refrigerant Preparation (Fractionation) Train-3 Nitrogen Production and Storage (HeRU), Helium Extraction Unit, Helium & Train-7 Nitrogen Rejection, Train-3 HeXu - Infrastructure, Helium & Offsite Sulfur Recovery, Train-3 Recovery Power Distribution, Helium Acid Gas Injection (AGI), Train-3 Inlet Facilities, Train-4 Acid Gas Removal, Train-4 Dehydration, Train-4 Guard Mercury Removal, Train-4 Gas Chilling and Liquefaction, Train-4 Refrigeration, Train-4 Refrigerant Preparation (Fractionation), Train-4 Nitrogen Rejection, Train-4 Sulfur Recovery, Train-4 Inlet Facilities, Train-5 Gas Treating, Train-5 Acid Gas Removal, Train-5 Dehydration, Train-5 Guard Mercury Removal, Train-5 Gas Chilling and Liquefaction, Train-5 Refrigeration, Train-5 Refrigerant Preparation (Fractionation), Train-5 Nitrogen Rejection, Train-5 Sulfur Recovery, Train-5 Security Administration Building DCS - TMR Fire and Gas Civil Works Paving, Roads, Fencing and Bunds ICIMS

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 35 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QATARGAS SOUTH ONSHORE UNIT NUMBER 660 661 662 663 664 665 666 667 668 669 67 68 69 70 700 71 71A 72 73 74 75 76 77 770 772 773 774 775 776 777 778 779 78 79 79A 80 80A 82 83

UNIT DESCRIPTION

Inlet Facilities, Train 6 Gas Treating, Train 6 Acid Gas Removal, Train 6 Dehydration and Regeneration, Train 6 Mercury Polished Bed, Train 6 NGL Extraction and Liquefaction, Train 6 LNG Refrigeration, Train 6 Common NGL Recovery Fractionation, Train 6 Nitrogen Rejection, Train 6 Sulfur Recovery, Train 6 Telecommunication Protective Coating including Cathodic Protection Camp Offplot Common Common, Train 6 & 7 LNG Rundown, Storage and Loading, Offplot Heavy Fuel Oil – LNG Berth 2 and 3, Offplot Refrigerant Make up and Storage, Offplot Condensate Rundown, Storage and Loading, Offplot LNG Loading Jetty (civil and structural), Offplot Bunkering Facilities, Offplot Condensate Loading Jetty (civil and structural), Offplot Solid Sulfur Storage, Ship Loading, Offplot Inlet Facilities, Train 7 Acid Gas Removal, Train 7 Dehydration and Regeneration, Train 7 Mercury Polished Bed, Train 7 NGL Extraction and Liquefaction, Train 7 LNG Refrigeration, Train-7 Common NGL Recovery Fractionation, Train 7 Nitrogen Rejection, Train 7 Sulfur Recovery, Train 7 Gas Export, Offplot Temporary Facilities, Offplot Potable Water Pipeline, Offplot Offsite Common South Piperack, Offsite Sea Water System, Offsite & Utilities Fire Protection Facilities, Utilities

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 36 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QATARGAS SOUTH ONSHORE UNIT NUMBER 84 85 86 87 87A 87B 88 89 90 91

92

93 94 95 96 99

UNIT DESCRIPTION

Flare and Liquid Blowdown, Utilities Acid Gas Injection, AGI Molten Sulfur Storage and Solidification, Train 1 Effluent Treatment - Solid Waste, Utilities Water Well Injection, Utilities Treated Industrial Process Water (TIPW), Utilities Irrigation Water System, Utilities Offplot Fire Protection, Offplot Utilities Common Power Generation – Distribution, Utilities Steam and Condensate Systems (including BFW), Utilities Fuel Systems, Utilities Fresh Water Systems, Utilities Compressed Air Systems, Utilities Nitrogen System, Utilities Offplot Utilities

Table 4.10 - Qatargas South - Onshore Unit Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 37 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QATARGAS SOUTH BARZAN ONSHORE UNIT NUMBER B00 B01 B02 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25 B26 B27 B28 B29

B300

B310 B311 B312 B313 B314 B315 B316 B383 B70 B80 B82 B83 B84 B86

UNIT DESCRIPTION

General Process Unit, Train-1 Common Process Unit, Train-2 Common Inlet Facilities, Train-1 Condensate Treating, Train-1 Acid Gas Removal, Train-1 Dehydration, Train-1 Mercaptan Removal, Train-1 Propane Refrigeration Compressors, Train-1 NGL Recovery - Nitrogen Rejection, Train-1 Fractionation, Train-1 NGL Product Treaters, Train-1 Sulfur Recovery, Train-1 Inlet Facilities, Train-2 Condensate Treating, Train-2 Acid Gas Removal, Train-2 Dehydration, Train-2 Mercaptan Removal, Train-2 Propane Refrigeration Compressors, Train-2 NGL Recovery - Nitrogen Rejection, Train-2 Fractionation, Train-2 NGL Product Treaters, Train-2 Sulfur Recovery, Train-2 Common, Interconnection Systems and Lead Sheets, Helium-3 Utilities, Helium-3 Feed Compression, Helium-3 Helium Purification, Helium-3 Helium Compression, Helium-3 Helium Liquefaction, Helium-3 Storage & Loading, Helium-3 ASU & LIN Storage, Helium-3 OSBL, Helium-3 Offplot (Corridor Area), Offplot Offsite Common, Offsite Sea Water System, Utilities Fire Protection Facilities, Utilities Flare and Liquid Blow Down, Utilities Molten Sulfur Storage, Train-1

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 38 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QATARGAS SOUTH BARZAN ONSHORE UNIT NUMBER B87 B88

UNIT DESCRIPTION

B89

B91

B90

Effluent Treatment, Solid Waste, Utilities Irrigation Water System, Utilities Water Well Injection, Produced Water Degassing, Utilities Utilities Common Power Generation - Distribution - Purchased Power (ELICS), Utilities Steam and Condensate Systems, Utilities B92 Fuel Systems, Utilities B93 Fresh Water System, Utilities B94 Compressed Air System, Utilities B95 Nitrogen System, Utilities B96 B99 Sales Gas System, Utilities Table 4.11 - Qatargas South - Barzan Onshore Unit Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 39 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QATARGAS SOUTH OFFSHORE UNIT NUMBER BA BB BC BD BE BF BG BJ BJ1 BJ2 BJ3 BT1 BT2 BT3 BZOF FJ1 FJ2 FJ3 FT1 FT2 FT3 IC IP MP OFGN PJ PT QJ QT RGA RJ RT SC WJ1 WJ10 WJ11 WJ2 WJ3 WJ4

UNIT DESCRIPTION

Bridge “A” from QT to PT Bridge “B” from RT to WT1 Bridge “C” from PT to RT Bridge “D” from RT to BT Bridge “E” from BT to FT Bridge “F” from PT to RT Bridge “G” from PT to RT Bridge “J” from RT to FT Wellhead Platform 1 - Jacket Wellhead Platform 2 - Jacket Wellhead Platform 3 - Jacket Wellhead Platform 1 - Topside Wellhead Platform 2 - Topside Wellhead Platform 3 - Topside Barzan Offshore General FJ1 - Flare Tower 1 - Jacket Flare Tower 2 - Jacket Flare Tower 3 - Jacket Flare Tower 1 - Topside Flare Tower 2 - Topside Flare Tower 3 - Topside Intrafield Subsea Cable Intrafield Pipeline MEG Pipeline Qatargas South Offshore General Process Utility Platform - Jacket Process Utility Platform - Topside Quarters Platform - Jacket Quarters Platform - Topside RasGas Alpha Riser Platform - Jacket Riser Platform - Topside Subsea Cable to Shore Wellhead Platform 1 - Jacket Wellhead Platform 10 - Jacket Wellhead Platform 11 - Jacket Wellhead Platform 2 - Jacket Wellhead Platform 3 - Jacket Wellhead Platform 4 - Jacket

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 40 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

QATARGAS SOUTH OFFSHORE UNIT NUMBER WJ5 WJ6 WJ7 WJ8 WJ9 WT1 WT10 WT11 WT2 WT3 WT4 WT5 WT6 WT7 WT8 WT9 XP

UNIT DESCRIPTION

Wellhead Platform 5 - Jacket Wellhead Platform 6 - Jacket Wellhead Platform 7 - Jacket Wellhead Platform 8 - Jacket Wellhead Platform 9 - Jacket Wellhead Platform 1 - Topside Wellhead Platform 10 - Topside Wellhead Platform 11 - Topside Wellhead Platform 2 - Topside Wellhead Platform 3 - Topside Wellhead Platform 4 - Topside Wellhead Platform 5 - Topside Wellhead Platform 6 - Topside Wellhead Platform 7 - Topside Wellhead Platform 8 - Topside Wellhead Platform 9 - Topside Export Pipeline

Table 4.12 - Qatargas South - Offshore Unit Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •

Page 41 of 42

Classification: Internal

UNCONTROLLED IF PRINTED PRJ-PJL-PRC-005 Procedure

NFE ONSHORE HELIUM RECOVERY AND UTILITIES UNIT NUMBER 00

10

11 12 13 14 15 16 41 42 43 44 45 48 49 50 51 52 53 82 83 84 87 88 91 92 93 94 95 96

UNIT DESCRIPTION

Common / General Downstream Helium Recovery Flash Drum, Helium Recovery Exchanger and Crude Helium Warming Up Heater Inlet Metering and Compression Unit Purification / Upgrader Helium Compression Unit Liquefaction Unit Helium Storage & Loading Air Separation Unit (ASU) Buildings HVAC Steel Structures Concrete Foundations / Structures Paving, Roads, Fencing and Bunds High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection Sea Water Systems Fire Protection Systems Flare and Liquid Burners Effluent Treatment / Site Drainage Irrigation Water Systems Power Generation / Distribution Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems Nitrogen Systems

Table 4.13 - NFE and NFS - Helium Recovery and Utilities Unit Numbers

Effective 11 JAN 2022

• Facilities System and Unit Number Codes and Descriptions • Rev 21 • Criticality Level: Medium • Classification: Internal •