UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Qatargas Equipment Numbering Philosopy Procedure
Revision: 16
Issued On: 02 Aug 2022
Valid Until : 04 Aug 2025
Group Engineering AND Projects
Department Facilities AND Discipline Engineering
Division
Section
APPROVAL
Issued By
Humayun Paracha (13164) - Engineering System & Governance Lead
SIGNED (by Mohammed Eid Al-Zaraa (3117) )
Reviewed By (RMC)
Bilel Zaghouani (20644) - Systems and Governance Coordinator
SIGNED (by Abdul Nasir Aramkottukuzhi (14442) )
Reviewed By (Document Control)
Akrm Zaid Zabara (20284) - QGMS Coordinator
SIGNED
Accepted By (Document Owner)
Humayun Paracha (13164) - Engineering System & Governance Lead
SIGNED (by Mohammed Eid Al-Zaraa (3117) )
Accepted By
Nayef Jassim M A Al-Thani (14947)
- Projects Management Manager
SIGNED (by Hamdan Easa Al-Kubaisi (1708) )
Accepted By
Saleh Taher Saleh M. Aseel (1640)
- Operations Support Manager
SIGNED (by Nasser Bilal Al-Ali (947) )
02 Aug 2022 Date
02 Aug 2022 Date
02 Aug 2022 Date
02 Aug 2022 Date
03 Aug 2022 Date
04 Aug 2022 Date
Effective 04 Aug 2022
•Qatargas Equipment Numbering Philosopy •Revision:16 •Criticality Level:Medium•Classification:Internal•
Cover Page 1 of 2
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Approved By
Khalid Hamad F.A. Al-Dosari (1742) - Facilities & Disciplines Eng. Manager
SIGNED
04 Aug 2022 Date
Effective 04 Aug 2022
•Qatargas Equipment Numbering Philosopy •Revision:16 •Criticality Level:Medium•Classification:Internal•
Cover Page 2 of 2
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
REVISION HISTORY
Rev No.
Issue Date
Revision Description
Valid Until Date
00
01
01 DEC 2002 First Issue
10 OCT 2002 Scope increased to include new Upstream Facilities.
to
Updated to include Qatargas II, Helium and Refinery requirements. Updated equipment, instrumentation, fire systems and piping numbering system details. Replaces/incorporates Equipment Numbering, which has been withdrawn.
Downstream
02.50.07.02
auxiliary
include
02 Draft 1 19 SEP 2003
System Number Code updated for QG2 Unit Number Codes updated for QG2 and Refinery Section 4.8 Other Numbering Systems Deleted. New Section 4.8 Electrical Equipment Numbering System Added. Appendices 10, 11 and 12 added Refinery Project Unit Number updates to Document Numbering Procedure added Unit 34 QG2 DSO Processing Added
02
03
04
17 MAR 2004 Revision 02 Draft 1 Released
05 JUL 2004 Updated to include QG3.
System No. 11 allocated to Common Sulphur Facilities
03 APR 2005 System Numbers 50 through 59 Allocated to QG3 and
to
tag structure added
QG4 Onshore System Numbers 34 through 38 Allocated to QG3 and QG4 Offshore System Numbers 70 through 79 Allocated to Barzan Project. Restriction Orifice the procedure (Section 4.3.7). Tag structure changed System Number moved to the front and Unit Number added. PRV tag structure added (Section 4.4.1) Tag Structure updated, System Field moved to the front, Unit Field and Package Field added, to align with other types of Instrument and Process valves. New section inserted at 4.4 for SP Items and Vacuum Breakers. Previously SP Item tag numbers did not have inventory control and for a structure suitable maintenance coding in SAP.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 1 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Rev No.
Issue Date
Revision Description
Valid Until Date
Previous section 4.4 (Numbering System for Valves) becomes 4.5 and all subsequent level 2 section numbers incremented by 1. 4.8. Electrical Equipment Numbering now section 4.9 – All references to Telecommunications Equipment removed. Cable numbering removed from Electrical Numbering System (4.9) and included as a separated section 4.11 Section 4.10 Telecommunications Equipment added. A revised Tag Number structure for Telecommunications equipment introduced. Section 4.11 Cable Numbering added no changes have been made to Cable Numbering methodology. Appendix 4 – Unit Numbers for Equipment updated to include Unit Numbers for QG4 and to make provision for Barzan Project. Appendix 5 – Unit Numbers for Instruments updated to make provision for QG4 and Barzan Project. Appendix 7 – Package Number Unit Numbers updated to make provision for QG4 and Barzan Project. Appendix 9 – Package Numbers for Fire Protection updated to make provision for QG4 and Barzan Project. Appendix 11 – Voltage Levels updated, description against code “1” amended to read “High Voltage 11 KV and above”. Appendix 12 – Minor Electrical Equipment Codes Updated - Telecommunications Equipment Codes removed. Appendix 13 – Telecommunications Equipment Codes, added. Appendix 14 – Telecommunications Location Codes, added
05
10 NOV 2005 Revision 5 is a consolidation of Procedure Update Issued between
through No. 20
Notices No.5 14/04/2004 and 10/11//2004. Procedure Update notice No.5 issued 14/04/2005 Appendix 10 – Electrical Equipment Type updated – Following New Codes added ET _ Earthing Truck, PD Power Socket, CD Convenience Socket Procedure Update Notice No. 7 issued 16/05/2005 Finalized & implemented 30/05/2005. Section 4.9.1.1 Main Electrical Equipment, Double Digit Sequence Number Introduced. Section 5.11 Appendix 11 Voltage
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 2 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Rev No.
Issue Date
Revision Description
Valid Until Date
Level Codes, Descriptions amended and new codes 6 through 9 added. Procedure Update Notice No. 8 issued 26/05/2005. Telecommunications – Appendix 13 Equipment Types and Appendix 14 Location Codes updated. 4.5 Numbering System for Valves reformatted, Valve Codes removed and placed in Appendix 15, additional Valve codes added. Section 4.5 now shows only the Valve Tag structure and format. Procedure Update Notice No.9 issued 08/06/2005 Appendix 3 - Equipment Class Codes – Additional codes, plus the description against some codes has been expanded. Appendix 15 - Valve Codes. This is a new Appendix. Valve Codes were originally listed within the body of Section 4.5 Numbering System for Valves. The existing codes have now been moved to Appendix 15, and additional Valve Codes for Offshore have been added. Procedure Update Notice No.9a issued 26/06/2005 Appendix 3 - Equipment Class Codes – Correction to Sample/ Connection Point Code. Procedure Update Notice No.10 issued 26/06/2005. Appendix 3 - Equipment Class Codes, additional codes added. Procedure Update Notice No.11 issued 26/06/2005. Appendix 6 – Line Service Codes, additional codes added. Barzan Project Removed – All Codes reassigned as Spare 30/07/2005. Reconciliation and Consolidations Exercise Revised cut- off date 21/07/2005 Procedure Update Notice No. 14 issued 14/08/2005 Following note added to 4.11 Cable Numbering: The number of characters and position of the hyphens shown in the equipment item number in the procedure tag are format/structure will depend on the type of equipment to which the cable is attached. Fiber Optic Cable Numbering – Section 4.11.10 title changed to LAN Fiber Optic Cables Section 4.11.12 added - Fiber Optic Cable & Composite Cable Procedure Update Notice No. 15 issued 23/08/2005 Procedure Title Changed to - Equipment and Component Numbering Principles
indicative not prescriptive,
the actual
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 3 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Rev No.
Issue Date
Revision Description
Valid Until Date
Appendix 2 – System Code System Codes 70 through 79 are now spare – Barzan Project deleted from procedure scope. Appendix 3 – Equipment Classes Code ST (Steam Turbine Driving a Generator) deleted - use code GT (Generator Turbine). Code EDG (Emergency Diesel Generator) deleted - use code DG to Diesel Generator. Code GTG (Gas Turbine Generator) deleted – use code GT Appendix 4 – Unit Numbers for Equipment: Unit 48 assigned to HIPPS Unit 49 assigned to PSS Unit 50 assigned to PCS Barzan Project deleted from procedure scope all Barzan Unit Number allocations removed. Appendix 6 – Line Service Codes Code CA assigned to Clean Agent Fire Extinguisher Gas (originally assigned to Catalyst, but there is no Catalyst piping), Code CO assigned to CO2 Fire Fighting Network… Appendix 10 Electrical Equipment Type, New codes added:
-
BD - Bus Duct, NGR - Neutral Ground Resister, CBK -
Capacitor Bank, VSD - Variable Speed Device Appendix 13 - Telecommunication Equipment Types New codes added:
ACS - Access Control System, LAN - Local Area
Network, TMR - Trunked Mobile Radio Code FO (Fiber Optic Cable) deleted – not Equipment. Codes for Fiber optic Cable will be covered in Section 4.11 Cable Numbering. Procedure Update Notice No. 16 issued 27/08/2005 Appendix 3 – Equipment Classes updated Code XE – Pad Eyes added. Procedure Update Notice No. 17 issued 20/09/2005 Following sections for Instrument Cable Numbering Added: 4.10.13 – Instrument Cables – Direct, 4.10.14 – Instrument Cables – Multiple (JB) 4.10.15 – Instrument Cables - Multiple (Control Room). 4.10.16 – Instrument Cables - Individual Procedure Update Notice No. 18 issued 19/10/2005 Appendix 6 – Line Service Codes, New and Amended Codes:
BA – Breathing Air, FO – Fuel Oil (Diesel Oil), KF – Well
Kill Fluid
Qatargas Equipment Numbering Philosophy
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 4 of 115
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Rev No.
Issue Date
Revision Description
Valid Until Date
06
30 JUN 2006
Procedure Update Notice No. 19 issued 26/10/2005 Following sections for Instrument Cable Numbering Added: 4.10.17 – Instrument Grounding Wire Procedure Update Notice No. 20 issued 10/11/2005 Following sections for Instrument Junction Boxes Added: 4.3.8 - Field Junction Box Numbering Procedure Update Notice No. 21 issued 16/12/2005 Appendix 2 – System Codes Updated System Number 04 allocated to AGR4 / SRU 4 QG1 AGX Project. System Number 05 allocated to AGR5 / SRU 5 QG1 AGX Project. Procedure Update Notice No. 23 issued 24/01/2006 Appendix 4 – Unit Numbers for Equipment updated. QGII added to Unit No. 63 - Camp
07
07 AUG 2006 Procedure Update Notice No. 33 issued 07/08/2006
Line Numbering System – Line Number (Serial Number) Field Procedure Section 4.6 – Line Numbering System Sub-Section 4.6.1.3 – Line Number This field has been increased from a 3 digit serial number to a 4 digit serial number. Procedure Update Notice No. 34 issued 08/08/2006. Appendix 13 Telecoms Equipment Codes updated additional codes added. VMX -VCL Mux., VMO - VCL Optimux, VAL - VCL Remote Alarm Device, DVR - Lenel DVR, FOM - F.O. Modem, VPP
- BNC Patch Panel Appendix 14 Telecoms Location Codes updated additional Offshore codes added. WH1 - Wellhead Platform 1, WH2 - Wellhead Platform 2, WH3 - Wellhead Platform 3, WH4 - Wellhead Platform 4, WH5 - Wellhead Platform 5, WH6 - Wellhead Platform 6 Procedure Update Notice No. 35 issued 12/08/2006. Appendix 13 Telecoms Equipment Codes updated additional codes added. VAR - VHF Aeronautical Radio, CAD - Central Alarm Device Procedure Update Notice No. 36 issued 29/10/2006. Appendix 13 Telecoms Equipment Codes updated additional codes added: ACU - Access Control Unit, SRI - Single Reader Interface, DRI - Dual Reader Interface, FPR - Fixed Proximity Card Reader, WPR - Wireless Proximity Card Reader, PIM - Qatargas Equipment Numbering Philosophy
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 5 of 115
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Rev No.
Issue Date
Revision Description
Valid Until Date
08
08 JAN 2007
Panel Interface Module, MUX – Multiplexer, TET - TETRA. Terrestrial Trunked Radio
Procedure Update Notice No. 40 issued 20/11/2006. Appendix 4 Unit Numbers For Equipment updated additional code added: 39 – Calm Buoy Mooring System Procedure Update Notice No. 41 issued 17/12/2006. 4.10.11 CCTV Power Cables has been changed to CCTV Cables and additional CCTV cable types have been added Cable type – Data Cable has been added, this now becomes 4.10.12 Cable type Antenna Cable has been added this now becomes 4.10.13 As a result of the insertion of the 2 new cable types - Fiber Optic Cable & Composite Cable (previously section 14.10.12) now becomes section 4.10.14 and all subsequent for Cables are incremented by 2. Appendix 14 Telecommunications Location Codes has been updated to include the following new codes: MEZ - Mezzanine Deck, LD - Lower Deck, CAM - Control and Auxiliary Model (Telecom Equip Cabin) Procedure Update Notice No. 42 issued 21/12/2006. Appendix 11 – Voltage Levels. The description against Code “5” has been amended to include 220V
section numbers
09
15 MAR 2007 Procedure Update Notice No. 44 issued 15/03/2007.
Appendix 8 – Equipment Codes for HVAC Systems Update to Include: PSD - Pneumatic Shut-off Damper, MD - Modulating Damper, PRD - Pressure Relief Damper Procedure Update Notice No. 46 issued 02/05/2007. Appendix 10 – Electrical Equipment Type updated to include: CTR - Control Transformer, CT - Current Transformer, HTTR - Heating Trace Transformer, PFCU - Power Factor Correction Unit, VT - Potential Transformer Appendix 12 – Minor Electrical Equipment Types updated to include: CTE - Control Terminal Enclosure (Box) Procedure Update Notice No. 50 Issued 09/09/2007: Appendix 2 System Codes – The System Code table has been replaced with a reference to Procedures 01.50.06.01 System Number and Unit Number Codes and Descriptions Appendix 2 System Numbers.
Qatargas Equipment Numbering Philosophy
10
09 SEP 2007
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 6 of 115
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Rev No.
Issue Date
Revision Description
Valid Until Date
11
27 JUL 2008
Appendix 4 Unit Numbers for Equipment – The Unit Code table has been replaced with a reference to Procedures 01.50.06.01 System Number and Unit Number Codes and Descriptions Appendix 3 Unit Numbers.
Procedure Update Notice No. 57 Issued 27/04/2008: Line Numbering System – Line Number (Serial Number) Field Procedure Section 4.6 – Line Numbering System Sub-Section 4.6.1.3 – Line Number This field has been increased from a 4 digit serial number to a 6 digit serial number. This update was necessary to accommodate Line Number format changes implemented by QG2 and QG3&4 Onshore projects. QG2 and QG3&4 Onshore projects have used a 5 digit serial number where the first two digits are the Unit Number It is not necessary for existing projects to implement this change retroactively – Line numbers already allocated can remain at 4 digits and do not have to be padded out with a leading “0” to make 6 digits
12
21 AUG 2008 General Update and Formatting
The number of Paragraph cross-references reduced and replaced with Appendix reference or direct text to make procedure easier to use. Correction to paragraph 4.3.7.1.5 – should read 3 digits not 2 digits, tag structure shown in procedure has a 3 digit Sequence Number field. Date Format Changed to DD/MM/YYYY as per email instruction issued 17/06/2008 QG/ESU-MVN-MOM-001 Issued 24/07/2008 Section 4.4.1 Title changed to Numbering Structure – Non-Manual Valves. Addition of Section 4.4.2 Numbering Structure - Manual Valves. Appendix 15 – Valve Codes updated to include Manual Valve codes.
12a
12b
12c
13
01 DEC 2011 Revalidated
01 JAN 2014
Revalidated
01 JAN 2015
Revalidated
01 DEC 2015 The document was modified after several meetings with the multidiscipline team and updated with typical
31 NOV 2018
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 7 of 115
Qatargas Equipment Numbering Philosophy
Valid Until Date
20 AUG 2020
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Rev No.
Issue Date
Revision Description
14
tag structure for all disciplines, list of abbreviations, examples. The document number has been changed to PRJ-PTI PRC-002 as per QGMS requirement. Previous number was 01.50.07.01.
21 AUG 2017 Section 3: The contents of Procedure “ 02.50.07.12 Equipment Numbering for Existing Qatargas 1 Upstream Facilities” incorporated in this section and to reffered only for the existing Qatargas 1 Upstream Facilities minor brownfield modification. Electrical tag structure sec 2.7 modified based on review by Electrical engineering. Typo correction of JB abbreviations table, section 2.8. Appendix 6. Additional abbreviations added. Attachment 7. Additional generic codes. Appendix 8. Additional examples General formats and texts corrections. As per level 3 QGPM requirement this procedure PTI (Manage Project Technical Information) has been change to PJL (Manage Plant & Facilities Projects), accordingly document number has been changed from PRJ-PTI PRC-002 to PRJ-PJL-PRC-008.
15
21 June 2019 The procedure has been re-written to reflect the
30 June 2022
revision.12c of the same procedure. Abbreviation lists have been updated based on inputs from different disciplines and new Projects.
16
Refer to cover page
Refer to cover page
1.1 Purpose: PRJ-PTI-PRC-003 Equipment Numbering Workflow for Brownfield Modifications replaced by PRJ-PJL-PRC-080 - AIMS TAG Management Procedure. 1.2 Scope: ICS Security Equipment scope added. Section 4 added for ICS Security Equipment. Appendix 4,5,6,7,8 compiled in Appendix 3 to meet Tag Management System. Additional Management System. General formats and texts corrections. Additional clarification added to make procedure easier to use. Non-used appendix removed.
abbreviations
as per
added
Tag
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 8 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
CONTENTS 1 GENERAL…12
1.1 Purpose …12 1.2 Scope…12 1.3 Criticality …13 1.4 Key Risks and Controls …13 1.5 Classification …13 1.6 Compliance…13 1.7 Roles and Responsibilities …13 2 DESCRIPTION OF DOCUMENT CONTENT…15
2.1 Definition of Tag Number…15 2.2 References…15 TAG Numbering Structure…15 2.3 Main Equipment Tag Numbering…16 2.3.1
2.3.2
Auxiliary Equipment Numbering System …17
2.4 2.4.1
Instrument Numbering System …18 Looped DCS Instrument Numbering System …18
2.4.2
2.4.3
2.4.4
2.4.5
2.4.6
2.4.7
2.4.8
2.4.9
Looped Non DCS Instrument Numbering System…19
Non Looped Instrument Numbering System …20
PLC Functional Logic Numbering System…21
DCS Functional Logic Numbering System …22
Hardwired Relay Functional Logic Numbering System …22
Hardwired Solid State Shutdown Logic Numbering System …22
Restriction Orifice …23
Field Junction Box Numbering …24
2.5 Mechanical Items Numbering System…25 Special Items and Vacuum Breakers…25 2.5.1
2.5.2
Numbering System for Valves…26
2.6 2.6.1
Fire Protection System …28 Fire / Gas Detectors …28
2.6.2
2.6.3
2.6.4
2.6.5
2.6.6
For Other Instruments and Alarms …29
For Fire Protection System Valves …30
Fire Protection System Valve Headers…31
Line Fault Alarm of Fire/Gas Detectors and other Instruments…32
Line Fault Alarm of Fire Protection System Valves …33
2.7 2.7.1
Line Numbering System …34 Numbering Structure for Line …34
2.8 HVAC Numbering System…35
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 9 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.8.1
Numbering Structure for HVAC …35
2.9 2.9.1
Electrical Numbering System …36 Main Electrical Equipment…36
2.9.2
2.9.3
2.9.4
2.9.5
2.9.6
2.9.7
Building Electrical Equipment …37
Motor Numbering for Main Equipment…38
Motor Numbering for Auxiliary Equipment …38
Electrical Heater Numbering…38
Local Control Unit Numbering …38
FIRE ALARM NUMBERING…39
2.10 Tlecommunications Numbering System …39 2.11 Cable Numbering System …40 Feeder Cable …40 2.11.1
2.11.2
2.11.3
2.11.4
2.11.5
2.11.6
2.11.7
2.11.8
2.11.9
2.11.10
2.11.11
2.11.12
2.11.13
2.11.14
2.11.15
2.11.16
2.11.17
2.11.18
2.11.19
Power Cable for Motor …40
Power Cable for Electric Heater…40
Control Cable for Motor …41
Power and Control Cable for Panel…41
Welding Socket Power Cable …41
Fire Alarm Cable…41
Telephone Cable …41
Public Address Cable…42
LAN Fiber Cable…42
CCTV Cable Numbering…42
Data Cable Numbering…42
Antenna Cable Numbering…43
Fiber Optic & Composite Cable…43
Instrument Cable - Direct…43
Instrument Cable – Multiple Junction Box (JB) …44
Instrument Cable – Multiple Control Room…44
Instrument Cable – Individual…44
Instrument Grounding Wire …44
3
EXISTING QATARGAS 1 UPSTREAM FACILITIES (ONLY FOR MINOR BROWN FIELD CHANGES)…46
3.1 3.2 3.2.1
Method of Numbering …46 Equipment Number Format …46 Project Code …46
3.2.2
3.2.3
3.2.4
Equipment Type (Class) …46
Unit Number …46
Equipment Serial Number…46
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 10 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
3.2.5
Secondary Identifier…47
4
INDUSTRIAL CONTROL SYSTEM SECURITY - ENGINEERING EQUIPMENT TAGGING
SPECIFICATION …48
4.1 4.1.1
Tagging Philosophy for Workstation …48 ICS Location …48
4.1.2
4.1.3
4.1.4
ICS Location Sequence Number…48
ICS Workstation Function …48
System Identifier…48
4.2 4.2.1
Taggging Philosophy for Servers …49 ICS Location …49
4.2.2
4.2.3
4.2.4
4.2.5
ICS Location Sequence Number…49
ICS Server Function …49
System Identifier…49
Sequence Number …49
4.3 4.3.1
Tagging Philosophy for Network Drives …49 ICS Locations …50
4.3.2
4.3.3
4.3.4
4.3.5
4.3.6
ICS Location Sequence Number…50
ICS Network Function …50
System Identifier…50
Sequence Number …50
ICS Network Type…50
4.4 4.4.1
Tagging Philosophy for ICS Laptops…51 SITE …51
4.4.2
4.4.3
ICS Laptop Function …51
Sequence Number …51
APPENDICES…58
Appendix 1 – References and Relevant Documents …59 Appendix 2 – Glossary of Terms: Definitions, Acronyms and Abbreviations …60 Appendix 3 – Equipment Classes…61 Appendix 4 – Package Numbers…102 Appendix 5 – Voltage Levels…107 Appendix 6 – Telecommunications Location codes …108 Appendix 7 – Only for QG1 upstream minor brown FIELD: Code Tables …110 Appendix 8 – List of Project specifications for reference …115
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 11 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
1
GENERAL
1.1
PURPOSE
This equipment Tag numbering procedure details the structure of tag numbering that needs to be followed to maintain consistency in Qatargas (QG) operated facilities.
It will minimize conflicts and ambiguity, thus ensuring a reliable plant operations and maintenance.
This procedure shall be implemented in conjunction with Qatargas procedure PRJ-PJL- PRC-005 - Facilities System and Unit Number Codes and Descriptions, and with procedure PRJ-PJL-PRC-080 - AIMS TAG Management Procedure.
1.2
SCOPE
This procedure is applicable to all Qatargas facilities, including new greenfield projects built within all Qatargas.
Modifications to upstream facilities of QG-1 (Onshore/Offshore) shall continue to use the tagging structure as per the upstream numbering procedure 02.50.07.12. The contents of this old procedure (02.50.07.12) are added to this procedure in Section-3, which is applicable for QG-1 Upstream facilities.
The soft calculations and logics in DCS, PLC’s derived from field equipment tags which do not fall under the applications mentioned in section 2.1 need not follow this tag numbering philosophy. Examples: DCS, PLC internal calculation blocks, internal memory tags etc.
For the ICS Security Equipment, all the Greenfield projects shall follow the new Tagging convention added to this procedure in Section-4.
Exceptions
Tag numbers in existing Facilities: the addition of tag numbers in existing facilities shall follow the projects specific tag structure of the existing facilities for the future modifications.
Tag numbers in existing South Facilities: due to the differences in numbering systems between QG North and QG South, QG South facilities will continue to use their specific assets project specifications for the addition of tag numbers into the existing QG South facilities.
Ras Laffan Terminal Operations (RLTO): Tag numbering of facilities operated by RLTO, built by other companies and handed-over to Qatargas shall continue to use projects specific tag structure for the future modifications. For new greenfield projects in RLTO this tag numbering philosophy shall be used.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 12 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
1.3 CRITICALITY
This Procedure has been determined to be a Medium Criticality document.
Criticality Level : Medium
1.4 KEY RISKS AND CONTROLS
Key Risks
Key Controls
Lack of consistency in equipment numbers may lead to time delays in locating the equipment, related documents, maintenance history, etc. This may adversely affect the overall efficiency of operations, maintenance and engineering day to day activities.
If projects do not follow Qatargas guidelines on equipment numbering from early stage of project, there might be tag conflicts and ambiguity at the advanced stage of the project. Conflicts and inconsistencies detected at advanced stage of project may results in huge cost and time delay.
Following the guidelines in this document from the early stage of project will minimize the risk
Following the guidelines in this document from the early stage of project will minimize the risk
Table 1: Key Risks and Controls
1.5 CLASSIFICATION
This Procedure has been classified as Internal based on INF-ISG-POL-001 Information Classification Policy.
1.6 COMPLIANCE
All projects shall comply with the requirements as defined in this procedure to maintain consistency of equipment tagging in Qatargas.
Compliance with this procedure is verifiable by Engineering Systems and Governance section at any time during project execution.
1.7 ROLES AND RESPONSIBILITIES
Roles
Responsibilities
Engineering Systems and Governance
With the support of the Discipline Engineering Lead Under Facilities & Discipline Department:
-
Guides and provide clarifications to ensure that this
procedure is applied correctly by Projects. Reviews and approves any additional function codes or equipment tag structure. Ensure that this procedure is applied correctly by Contractor into the Project.
PROJECT MANAGEMENT TEAM (PMT) / PROJECT ENGINEER (PE)
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 13 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Contractor
Contractor shall ensure all equipment covered by this procedure are tagged as per Qatargas Equipment Numbering procedure
Contractor shall ensure all their Subcontractors, Vendors and Manufacturers incorporate required Qatargas Equipment Numbering into all deliverables.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 14 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2 DESCRIPTION OF DOCUMENT CONTENT
Explains the structure of tag number to be followed to maintain consistency in Qatargas operated facilities.
2.1 DEFINITION OF TAG NUMBER
Tag number is a unique identification reference of an entity (equipment, instrument or function) within the Qatargas operated facilities.
Unique tag number is required in following (but not limited to) purposes,
Required for unique reference in Piping and Instrumentation Diagrams (P&ID). Required for unique reference in SAP for maintenance management and in permit
to work system.
Required as unique
Identification of Equipment’s (Mechanical, Electrical, Instruments, Fire & Gas, and Telecommunication) and monitoring & control functions.
This Equipment Numbering Philosophy shall be applicable to all physical equipments and the functions (logics) which need to be referred by unique identification numbers for the purposes mentioned above.
Examples of physical items: Pumps, Compressors, Transformers, Valves, Panels etc. Examples of functions (soft tags): Shutdown functions-UZ, DCS logics- UY, etc. Project need to ensure same tag numbers are used in field, F&G System and in all documentation. Mismatch of tags usage between field/ system/documentation leads to confusion, hence such mismatches are not acceptable.
No trailing spaces are allowed within the tag number structure.
2.2 REFERENCES
Equipment numbering and tagging philosophies used by major projects in Qatargas listed in Appendix-8.
2.3 TAG NUMBERING STRUCTURE
Following is the tag structure to assigning tag numbers for all Qatargas operated facilities. Detailed description of each column is given in succeeding sections.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 15 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.3.1 MAIN EQUIPMENT TAG NUMBERING
Main equipment numbering system shall apply to major equipment such as columns, drums, heat exchangers, etc.
AAA
NNN 0 1 - P
NNN 2 0
NN 0 1
A A
Secondary Identifier
Sequence Number
Unit Number
Equipment Class
System Number
N = Numeric A = Alphabet
2.3.1.1 System Number
System Number consists of 2 or 3 characters. New major projects will be assigned unique
system Number(s). For details refer to the procedure PRJ-PJL-PRC-005 - Facilities System
and Unit Number Codes and Descriptions.
2.3.1.2 Equipment Class or Functional Identification Abbreviation
Unique abbreviated identifiers for the type of the Equipment, Instruments and functions.
List of equipment’s and functional identifiers are defined in the Appendix 3 of this
procedure depending on the equipment type and the disciplines.
Hyphen: Use hyphen between System number and equipment identifier.
2.3.1.3 Unit Number
Unit number should be as per the procedure PRJ-PJL-PRC-005 - Facilities System and Unit
Number Codes and Descriptions.
2.3.1.4 Sequence Number
Two-digit serial number through the same equipment category and the same unit shall be
assigned in series to the equipment in the system.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 16 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.3.1.5 Suffixes (Secondary Identifier)
Process equipment in the same service for either throughout or standby reasons shall be
numbered using A, B, C etc.
2.3.2 AUXILIARY EQUIPMENT NUMBERING SYSTEM
Main Equipment Number NNN
0 1 - K T
AAA NNN 0 6
NN 0 1
A
Auxiliary Equipment Number A AAA P A
N 1
H
Main/ Spare Designator
Sequence Number
Heater Identification if required
Indented Equipment Class
Secondary Identifier
Sequence Number
Unit Number
Equipment Class
System Number
N = Numeric A = Alphabet H = Heater ID (Constant Value)
Example: 01-KT0601-P1A
2.3.2.1 System Number
Same as 2.3.1.1
2.3.2.2 Equipment Class or Functional Identification Abbreviation
Same as 2.3.1.2
2.3.2.3 Unit Number
Same as 2.3.1.3
2.3.2.4 Sequence Number
Same as 2.3.1.4
2.3.2.5 Suffixes (Secondary Identifier)
Same as 2.3.1.5
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 17 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.3.2.6 Indented Equipment Class
One to three characters, codes in Appendix 3 - Equipment Classes are used to designate indented equipment classification including drivers’ equipment class.
2.3.2.7 Heater Identification
This column is only used with “H” when identifying heaters of auxiliary equipment, such as lube oil tank heater, space heater of auxiliary motors.
2.3.2.8 Sequence Number
Indented equipment items having different services within an equipment class for a given of equipment shall be differentiated with a numeric designator (1 through 9). The sequence number shall be omitted if there is only one (1) item within that equipment class.
2.3.2.9 Main Service/Standby or Spare Designator
Indented equipment services having primary and spare items shall be differentiated using alpha characters A, B, C etc.
2.4 INSTRUMENT NUMBERING SYSTEM
2.4.1 LOOPED DCS INSTRUMENT NUMBERING SYSTEM
NNN 0 1
AAAA Z A H H
NN 0 6
A A
NNN 1 0 0
A B
A A
Letter Suffix for Parallel Elements
Letter Suffix for Identical Package Units
Sequence Number
Package Number
Unit Number
Functional Identification Symbol
System Number
N = Numeric A = Alphabet
2.4.1.1 System Number
Same as 2.3.1.1
2.4.1.2 Functional Identification Symbol
A minimum of two and maximum of four letters depicting instrument variable/function shall be specified, such as PI, PC, FFC, LA H, LHH, UZA, LZH, PZL, PDHH and etc. Refer Appendix - 3
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 18 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.4.1.3 Unit Number
Same as 2.3.1.3
2.4.1.4 Package Number
Package number in Appendix 4 - Package Numbers shall be applied for package units. For non-package items 0 should be placed in the Package Number field to retain tag structure integrity.
2.4.1.5 Sequence Number
Three digit numerical shall be specified to identify the sequence number of the loop of a particular instrument variable/function.
2.4.1.6 Letter Suffix
Letter suffix for identical package unit:
Letter suffix for parallel elements:
Letter suffix shall normally blank but be reserved for identical package units of which the package number is the same. (Appendix 4) Letter suffix shall be normally blank but be reserved for parallel elements of the same loop.
2.4.2 LOOPED NON DCS INSTRUMENT NUMBERING SYSTEM
NNN 0 1
AAAA P D I
NNN 0 2
A H
NNN 1 0 0
A B
A A
Letter Suffix for Parallel Elements
Letter Suffix for Identical Package Units
Sequence Number
Package Number
Unit Number
Functional Identification Symbol
System Number
N = Numeric A = Alphabet
2.4.2.1 System Number
Same as 2.3.1.1
2.4.2.2 Functional Identification Symbol
A maximum of four or a minimum of two letters shall be specified, such as PI, TIC, FCC, LAH, PdIC, LAHH and etc. Refer Appendix - 3
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 19 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.4.2.3 Unit Number
Same as 2.3.1.3
2.4.2.4 Package Number
Same as 2.4.1.4
2.4.2.5 Sequence Number
Two digit numerical (00 through 99) shall be specified to identify the sequence number of the loop of a particular instrument variable/function
2.4.2.6 Letter Suffix
Letter suffix for identical package unit:
Letter suffix for parallel elements:
Letter suffix shall normally blank but be reserved for identical package units of which the package number is the same. (Appendix 4) Letter suffix shall be normally blank but be reserved for parallel elements of the same loop.
2.4.3 NON LOOPED INSTRUMENT NUMBERING SYSTEM
0 5
P G
0 8
H
1
0
0
A
Letter Suffix for Parallel Elements
Letter Suffix for Identical Package Units
Sequence Number
Package Number
Unit Number
Functional Identification Symbol
System Number
N = Numeric A = Alphabet
2.4.3.1 System Number
Same as 2.3.1.1
2.4.3.2 Functional Identification Symbol
A maximum of four or a minimum of two letters shall be specified, such as PG, TG, FG, LG, FE, TW, PCV, PdCV, TCV and etc. Refer Appendix - 3
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 20 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.4.3.3 Unit Number
Same as 2.3.1.3
2.4.3.4 Package Number
Same as 2.4.1.4.
2.4.3.5 Sequence Number
Three digit numerical (100 to 999) shall be specified to identify the sequence number of a particular instrument variable/function.
2.4.3.6 Letter Suffix
Letter suffix for identical package unit:
Letter suffix for parallel elements:
Letter suffix shall normally blank but be reserved for identical package units of which the package number is the same. (Appendix 4) Letter suffix shall be normally blank but be reserved for parallel elements of the same loop.
2.4.4 PLC FUNCTIONAL LOGIC NUMBERING SYSTEM
NNN 2 8
AAAA U Y
NNN 8 1
A H
NNN 1 0 0
A A
A
Letter Suffix for Parallel Elements
Letter Suffix for Identical Package Units
Sequence Number
Package Number
Unit Number
Functional Identification Symbol
System Number
N = Numeric A = Alphabet
2.4.4.1 System Number
Same as 2.3.1.1
2.4.4.2 Functional Identification Symbol
The letter shall be UY, fixed for functional logic designate and UZ, fixed for shutdown logic designate.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 21 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.4.4.3 Unit Number
Same as 2.3.1.3
2.4.4.4 Package Number
Same as 2.4.1.4.
2.4.4.5 Sequence Number
Two digit numerical (00 through 99) shall be specified to identify the sequence number of the loop of a particular instrument variable/function
2.4.4.6 Letter Suffix
Letter suffix for identical package unit:
Letter suffix for parallel elements:
Letter suffix shall normally blank but be reserved for identical package units of which the package number is the same. (Appendix 4)
Letter suffix shall be normally blank but be reserved for parallel elements of the same loop.
2.4.5 DCS FUNCTIONAL LOGIC NUMBERING SYSTEM
Functional identification symbol for DCS functional logic for sequential or operational control are designated as UY, fixed. The numbering system shall be same as Paragraph 2.4.4
2.4.6 HARDWIRED RELAY FUNCTIONAL LOGIC NUMBERING SYSTEM
Functional identification symbol for hardwired relay logic for permissive or sequential control are designated as I, fixed. Functional identification symbol for hardwired relay logic for emergency shutdown are designated as IZ, fixed. The numbering system shall be same as Paragraph 2.4.4.
2.4.7 HARDWIRED SOLID STATE SHUTDOWN LOGIC NUMBERING SYSTEM
Hardwired solid-state logic is primarily for emergency shutdown (ESD) and designated as UZ also, fixed. The numbering system shall be same as Paragraph 2.4.4.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 22 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.4.8 RESTRICTION ORIFICE
NNN 0 5
AA RO R O M R
NNN 1 0
NNN 5
0
2
A A
Secondary Identifier
Sequence Number
Unit Number
Line Service Code
RO - Functional Identification Symbol for Restriction Orifice
System Number
N = Numeric A = Alphabet
2.4.8.1 System Number
Same as 2.3.1.1
2.4.8.2 Functional Identification Symbol
Line Service Codes shall be applied as per Appendix - 3
2.4.8.3 Unit Number
Same as 2.3.1.3
2.4.8.4 Sequence Number
Three digit numerical (001 through 999) shall be specified to identify the sequence number of the loop of a particular instrument variable/function
2.4.8.5 Letter Suffix
Letter suffix for identical package unit:
Letter suffix for parallel elements:
Letter suffix shall normally blank but be reserved for identical package units of which the package number is the same. (Appendix 4)
Letter suffix shall be normally blank but be reserved for parallel elements of the same loop.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 23 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.4.9 FIELD JUNCTION BOX NUMBERING
AAA S
JB
N 2
A A
NNN 0
0
1
A A
N 1
Numeric Suffix (For secondary JB if there is Foundation Fieldbus) A, B, C………. shall be applied to same type Junction Boxes of similar Package Units Serial Number (001 to continuous for each signal type and Plant number / Train designation, 500 to continuous for Package Unit. Serial number can be split into blocks according to Signal Categories.
Signal Category (Table 1)
ITR / Control Room Number [Onshore] System Number [Offshore] System Function Identifier (from Table 2 or 3 as Applicable)
N = Numeric A = Alphabet
A - Analogue Input / Output Signal (4 20mADC.) D - Digital Input / Output Signal – Switches such as Pressure Switch, Level Switch, Limit Switch etc. (24VDC) V - Solenoid Valve (120V AC / 24V DC.) T - Thermocouple Signal (mv-low level analogue, TK, TT, ……….) R - Resistance Temperature Detector (RTD) Signal P - Power Source (120VAC) F - Foundation Fieldbus Signal S – Serial Communication Note: 1. For intrinsically safe signals the suffix “i” shall be added at the beginning of each category.
Table- 2 – Signal Category
Code and System Description
C E H S F P
Process Control System (DCS) Safety System (ESD / EDP / LBD) High Integrity Protective Systems (HIPS) Safety System (PSS) Safety System (Fire and Gas) S (PSS) and C (Control) for Packages Table-3 – System Function Identifier – Existing Facilities
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 24 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
C E
S
F Z
Code and System Description
-
Process Control System (DCS) Safety System (IPS / PSS)
Safety System (HIPPS)
Safety System (Fire and Gas) System Communication Optical Signal Communication
Apply to Internal Instrument Cables Only
O -
P
- Power Source
Table-4 – System Function Identifier – New Facilities
2.5 MECHANICAL ITEMS NUMBERING SYSTEM
2.5.1 SPECIAL ITEMS AND VACUUM BREAKERS
NNN AAAA 0 1 S P
NN 0 2
NN 0 1
A A
A A
Letter Suffix for Parallel Elements
Letter Suffix for Identical Package Units
Sequence Number
Unit Number
Functional Identification Symbol As per Appendix 3 (Special Item category)
System Number
N = Numeric A = Alphabet
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 25 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.5.2 NUMBERING SYSTEM FOR VALVES
2.5.2.1 Numbering Structure - Non-Manual Valves
NNN 0 1
AAAA B D V
NN 0 2
A B
NN 0 1
A A
A A
Letter Suffix for Parallel Elements
Letter Suffix for Identical Package Units
Sequence Number
Package Number
Unit Number
Functional Identification Symbol As per Appendix 3
System Number
N = Numeric A = Alphabet
2.5.2.2 System Number
Same as 2.3.1.1
2.5.2.3 Functional Identification Symbol
Refer to Appendix – 3 for the functional identification symbol
2.5.2.4 Unit Number
Same as 2.3.1.3
2.5.2.5 Package Number
Package number in Appendix 4 - Package Numbers shall be applied for package units. For non-package items 0 should be placed in the Package Number field to retain tag structure integrity.
2.5.2.6 Sequence Number
Two digit numerical (00 through 99) shall be specified to identify the sequence number of the loop of a particular instrument variable/function
2.5.2.7 Letter Suffix
Letter suffix for identical package unit:
Letter suffix shall normally blank but be reserved for identical package units of
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 26 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Letter suffix for parallel elements:
which the package number is the same. (Appendix 4)
Letter suffix shall be normally blank but be reserved for parallel elements of the same loop.
2.5.2.8 Numbering Structure – Manual Valves
0 1 - Q V
0 2
0 0 0 1
Sequence Number
Unit Number
Functional Identification Symbol As per Appendix 3 (Category Manual Valve)
System Number
2.5.2.9 System Number (Plant Code)
Same as 2.3.1.1
2.5.2.10 Functional Identification Symbol
Appendix 3 – Equipment Classes
2.5.2.11 Unit Number
Same as 2.3.1.3
2.5.2.12 Sequence Number
Four digit numerical (0001 through 9999) Numbering to start 0001 for each unique System Number/Unit Number combination
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 27 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.6 FIRE PROTECTION SYSTEM
2.6.1 FIRE / GAS DETECTORS
NNN AAAA 0 8 G E
83 8 3
A/N 0
NNN 0
0
1
A S
AA A A
Individual Detector Identifiers
Detector Type
Sequence Number
Area Number Package Number
Unit Number
Functional Identification Symbol
System Number
N = Numeric A = Alphabet
2.6.1.1 System Number
Same as 2.3.1.1
2.6.1.2 Functional Identification Symbol
For Fire/Gas Detectors - The functional identification symbol shall be GE, fixed. For Other Instruments and Alarms - A maximum of four or a minimum of two letters shall be specified, such as PG, LT, PSH, UA, AAH, etc. A maximum of three letters for Line Fault Alarm shall be specified. For Line Fault Alarm – LM shall be added for Line Fault Alarm.
2.6.1.3 Unit Number
The Unit Number Shall be 83, Fixed.
2.6.1.4 Area Number
Project Specific - Fire Protection Area Numbers to be developed by Project. For numbering methodology refer to below list:
0: in field 1: in MCB 2: in ITR 3: in Sub-Station
4: in Analyzer House / Analyzer Shelter 5: in Other building
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 28 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.6.1.5 Package Number
Package Number in Appendix 4 - Package Numbers for Fire Protection System shall be applied for package units
2.6.1.6 Sequence Number
Three digit numerical (001 through 999) shall be specified. For instruments that are categorized by zones, this sequence number shall be assigned in series to the zone.
2.6.1.7 Detector Type
The detector type shall be selected among types listed below.
F:
S:
T:
C:
Fire Detectors (General Alarm)
Smoke Detector
Toxic Gas Detectors
Combustible Gas Detectors
H:
M:
L:
O:
Heat Detectors
Pull Handles
Low Temperature Detectors Optical Flame Detectors (W/IR)
2.6.1.8 Individual Detector Identifiers
Individual identifier shall be usually blank and ignored. For detectors that are connected to the same loop, this individual identifier shall be two-digit alphabet to identify each individual detector of the loop.
2.6.2 FOR OTHER INSTRUMENTS AND ALARMS
NNN 0 8
AAAA A A H H
83 8 3
X 0
NNN 0
0
1
A C
A A
Letter Suffix for Location
Detector Type
Sequence Number
Area Number Package Number
Unit Number
Functional Identification Symbol
System Number
N = Numeric A = Alphabet X = Alphanumeric
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 29 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.6.2.1 System Number (Plant Code)
Same as 2.3.1.1
2.6.2.2 Functional Identification Symbol
See Para. 2.6.1.2
2.6.2.3 Unit Number
See Para. 2.6.1.3
2.6.2.4 Area Number
See Para. 2.6.1.4
2.6.2.5 Package Number
See Para. 2.6.1.5
2.6.2.6 Sequence Number
Three digit numerical (001 through 999) shall be specified
2.6.2.7 Detector Type
See Para. 2.6.1.7
2.6.2.8 Letter suffix for Location
Letter suffix shall be normally blank but be reserved for Location of Alarm Indication
2.6.3 FOR FIRE PROTECTION SYSTEM VALVES
AA NNN
0 8 - X V
NN 8 3
X 0
NNN 0
0
1
AA A A
Letter Suffix for Parallel Elements
Sequence Number
Area Number Package Number
Unit Number
Functional Identification Symbol (V to be replaced with Y for solenoid valve)
System Number
N = Numeric A = Alphabet X = Alphanumeric
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 30 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.6.3.1 System Number
Same as 2.3.1.1
2.6.3.2 Functional Identification Symbol
V to be replaced by Y for Solenoid Valve
2.6.3.3 Unit Number
See Para. 2.6.1.3
2.6.3.4 Area Number
See Para. 2.6.1.4
2.6.3.5 Package Number
See Para. 2.6.1.5
2.6.3.6 Sequence Number
Three digit numerical (001 through 999) shall be specified
2.6.3.7 Letter suffix for Parallel Elements
Letter suffix shall be normally blank but be reserved for parallel elements of the same zone
2.6.4 FIRE PROTECTION SYSTEM VALVE HEADERS
NNN 0 8
AAA V
D
H
NN 8 3
X 0
NNN 0
0
1
A A
A: Auto and M: Manual
Sequence Number
Area Number Package Number
Unit Number
Functional Identification Symbol (DV to be replaced with IA for instrument air header)
System Number
N = Numeric A = Alphabet X = Alphanumeric
2.6.4.1 System Number
Same as 2.3.1.1
2.6.4.2 Functional Identification Symbol
DV to be replaced by IA for Instrument Air header
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 31 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.6.4.3 Unit Number
See Para. 2.6.1.3
2.6.4.4 Area Number
See Para. 2.6.1.4
2.6.4.5 Package Number
See Para. 2.6.1.5
2.6.4.6 Sequence Number
Three digit numerical (001 through 999) shall be specified
2.6.5 LINE FAULT ALARM OF FIRE/GAS DETECTORS AND OTHER INSTRUMENTS
NNN 0 8
AAA G E
L M L M 8 3
83
X 0
NNN 0
0
1
A S
Detector Type
Sequence Number
Area Number Package Number
Unit Number
Line Fault Alarm
Functional Identification Symbol
System Number
N = Numeric A = Alphabet X = Alphanumeric
2.6.5.1 System Number
Same as 2.3.1.1
2.6.5.2 Functional Identification Symbol
See Para. 2.6.1.2
2.6.5.3 Line Fault Alarm
LM shall be added for Line Fault Alarm
2.6.5.4 Unit Number
See Para. 2.6.1.3
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 32 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.6.5.5 Area Number
See Para. 2.6.1.4
2.6.5.6 Package Number
See Para. 2.6.1.5
2.6.5.7 Sequence Number
Three digit numerical (001 through 999) shall be specified
2.6.5.8 Detector Type
See Para. 2.6.1.6
2.6.6 LINE FAULT ALARM OF FIRE PROTECTION SYSTEM VALVES
NNN 0 8
AA X V
8 3
L M L M 8 3
X 0
NNN 0
0
1
AA A A
Letter Suffix for Parallel Elements
Sequence Number
Area Number Package Number
Unit Number
Line Fault Alarm
Functional Identification Symbol
System Number
N = Numeric A = Alphabet X = Alphanumeric
2.6.6.1 System Number
Same as 2.3.1
2.6.6.2 Functional Identification Symbol
V to be replaced with Y for solenoid valve
2.6.6.3 Line Fault Alarm
LM shall be added for Line Fault Alarm
2.6.6.4 Unit Number
See Para. 2.6.1.3
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 33 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.6.6.5 Area Number
See Para. 2.6.1.4
2.6.6.6 Package Number
See Para. 2.6.1.5
2.6.6.7 Sequence Number
Three digit numerical (001 through 999) shall be specified
2.6.6.8 Letter Suffix for Parallel Elements
Letter suffix shall be normally blank but be reserved for parallel elements of the same zone
2.7 LINE NUMBERING SYSTEM
2.7.1 NUMBERING STRUCTURE FOR LINE
AAA
NNN NNN 0 0
M E G 0 1
NNNN
NNNN
(
XXXXX
0 0 0 6 - 1
8 ( 1 R 0
J
XXX ) ( ) 1 0 A (
NNN )
- 1 6 0 )
Insulation Temperature (Normal Operating Temp.)
Insulation Type
Line Class
Line Size
Line Number
Unit Number
System Number
Line Service Code
N = Numeric A = Alphabet X = Alphanumeric
2.7.1.1 Line Service Code
Appendix 3 – Equipment classes
2.7.1.2 System Number
Same as 2.3.1.1
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 34 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.7.1.3 Line Number
Six-digit serial number through the same line service code category shall be assigned to the line in the system. For the piping in packages, the first letter of this sequence number shall be the alphabet in Appendix 4 - Package Numbers to identify the package.
Z
A
0 1
Sequence Number (01 TO 99)
Letter Suffix for Identical Package Units (Appendix 9 - Package Numbers) Package Number in Appendix 9 - Package Numbers
2.7.1.4 Line Class
Line class shall be specified in the “Technical Specification Piping Material Classes”
2.7.1.5 Insulation Type
Insulation Type shall be specified in the “Technical Specification Summary of Coating, Insulation and Passive Fire Protection Requirements”
2.7.1.6 Design Code
The design code assigned in FEED. Package shall not be applied in line with the Company’s instruction during bidding stage
2.8 HVAC NUMBERING SYSTEM
2.8.1 NUMBERING STRUCTURE FOR HVAC
AA NN 0 1 - Y H
NN 4 2
NN 0 1
AAAA H U
A
NN 0 1
A A
Secondary Identifier
Sequence Number
Equipment Code
Equiupment Number
Unit Number
Equipment Class
System Number
N = Numeric A = Alphabet X = Alphanumeric
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 35 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.8.1.1 System Number
Same as 2.3.1.1
2.8.1.2 Equipment Class
YH to be used for HVAC Equipment for Structure YK to be used for HVAC Equipment for Building
2.8.1.3 Unit Number
Unit number for HVAC shall be designated as 42, fixed
2.8.1.4 Equipment Number
Two-digit serial number through the same equipment category and the same unit shall be in the system
2.8.1.5 Equipment Code
Maximum of 4 digits, codes in Appendix 3.
2.8.1.6 Sequence Number
Two-digit serial number through the same equipment category and the same unit shall be assigned in series to be equipment in the system
2.8.1.7 Secondary Identifier
Equipment in the same service for either throughout or standby reasons shall be numbered using A, B, etc.
2.9 ELECTRICAL NUMBERING SYSTEM
2.9.1 MAIN ELECTRICAL EQUIPMENT
S B
- 0 8
2
0 1 A/B
Secondary Sequence Number
Sequence Number
Voltage Level, Appendix 12 – Voltage Levels shall be applied
System Number
Equipment Type, Appendix 6 – Electrical Equipment Type shall be applied
Note: Sequence Number: Double digit shall be applied if the units are more than 9 and the designation shall be 01, 02, and 03 and so on, both the primary and the secondary sequence number field can be filled in. Single digits shall be used if the units are between 1
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 36 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Transformer:
and 9 and only primary sequence field can be filled in, and Secondary Sequence Number Field is to be deleted. Example: Switch Board:
SB -0821 for QG-1 (SB -0821A or B with section identifier) SB- 24202 for QG-II (SB -24202A or B with section identifier) TR-0222 (QG-1) ETR- 0932A (QG-1) TR 24202B (QG-II Onshore) AC-0231 DC-0931 Control Panel Board: CP-0731 Welding Socket:
Distribution Panel:
WO-0232
2.9.2 BUILDING ELECTRICAL EQUIPMENT
E L P
0 0
0
1
3
A
Example:
Lighting Panel:
ELP-000131
LP-000131
Outlet Panel:
OP-000131
Small power Panel:
SPP-000131
Secondary Sequence Number (If Required)
Sequence Number
Voltage Level, Appendix 12 – Voltage Levels shall be applied
Building Sequence Number
System Number
Equipment Type, Appendix 6 – Electrical Equipment Type shall be applied
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 37 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.9.3 MOTOR NUMBERING FOR MAIN EQUIPMENT
0 1 - P M 0 7
0 1 A / B
Secondary Identifier (If Required)
Equiupment Number
Unit Number
Equipment Class, Appendix 3 - Equipment Classes shall be applied
System Number
Examples:
01-PM0701-A 01-EM0205-A 01-XCM0601-B
2.9.4 MOTOR NUMBERING FOR AUXILIARY EQUIPMENT
MAIN EQUIPMENT NUMBER
Main / Spare Designator (If Required) Sequence Number (If Required)
Equipment Class, Appendix 3 - Equipment Classes shall be applied
Example:
01-K0601-PM2B
2.9.5 ELECTRICAL HEATER NUMBERING
0 1 - P M 0 5 0 1 -
H
1
MOTOR OR EQUIPMENT NUMBER
Main / Spare Designator (If Required) Sequence Number (If Required)
Example:
01-PM0501-H, 01-K0601-H, 01-K0601-PM2B-H3
2.9.6 LOCAL CONTROL UNIT NUMBERING
0 9 - Y H 4 1 0 2 - C P
MOTOR OR EQUIPMENT NUMBER
Example:
09-YH4102-CP01
Sequence Number (If Required)
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 38 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.9.7 FIRE ALARM NUMBERING
2.9.7.1 Fire Alarm Equipment
F
M
P - 0 0
0 1
Secondary Sequence Number (If Required)
Sequence Number
System Number
Equipment Type, Appendix 6 – Electrical Equipment Type shall be applied
Example:
FMP-0001, FMP-0771, MAC-0101
2.9.7.2 Fire Alarm Terminal Board
- 0 0
0 0 -
Secondary Sequence Number (If Required)
Sequence Number
Building Sequence Number
System Number
Equipment Type, Appendix 6 – Electrical Equipment Type shall be applied
2.10 TLECOMMUNICATIONS NUMBERING SYSTEM
0 1 - A
M
P - C D
- 0 1
Secondary Sequence Number (If Required) Sequence Number
Location Code, Physical Location - Refer Appendix - 13 Equipment Class, Appendix 7- Telecommunication Equipment Types shall be applied
System Number
Example:
01-AMP-CD-01
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 39 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.11 CABLE NUMBERING SYSTEM
Note: The number of characters and position of the hyphens shown in the equipment item number in the procedure are indicative not prescriptive, the actual tag format/structure will depend on the type of equipment to which the cable is attached.
2.11.1 FEEDER CABLE
T R
0 2 1 1 -
F
ELECTRICAL EQUIPMENT NUMBER
Splicing Number (If Required)
Sequence Number
Phaser (Single Cable Only, R, Y, B)
Feeder Cable
Electical Equipment Item Number
Example:
TR-0211-FR1-A (Single Cable), TR-0021-F1 (3 Core Cable)
2.11.2 POWER CABLE FOR MOTOR
0 2
P M 0 2 0 3
P
MOTOR ITEM NUMBER
Sequence Number (If Required)
Phaser (Single Cable Only, R, Y, B)
Power Cable
Motor Item Number
Example:
02-PM0203A-PR1 (Single Cable), 02-PM0203-P1 (3 Core Cable)
2.11.3 POWER CABLE FOR ELECTRIC HEATER
0 2
P M 0 7 0 5 A - H
P
ELECTRICAL HEATER ITEM NUMBER
Sequence Number (If Required)
Power Cable
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 40 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Example:
02-PM0705A-H1-P1
2.11.4 CONTROL CABLE FOR MOTOR
0 1 - P M 0 7 0 5 A -
C
1
MOTOR ITEM NUMBER
Example:
01-PM0705A-C
Sequence Number (If Required)
Control Cable
2.11.5 POWER AND CONTROL CABLE FOR PANEL
E L P - 0 1 3 1 -
EQUIPMENT OR PANEL ITEM NUMBER
Example:
ELP-0131-P
Sequence Number (If Required)
P = Power Cable C = Control Cable
2.11.6 WELDING SOCKET POWER CABLE
W O - 0 2 3 2 -
P
WELDING SOCKET ITEM NUMBER
Sequence Number (If Required)
Power Cable
Example:
WO-0232-P
2.11.7 FIRE ALARM CABLE
M C A - 0 1 1 - F A
EQUIPMENT ITEM NUMBER
Splicing Number (Alphabet If Required)
Sequence Number (If Required)
Example:
MCA-011-FA1
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 41 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.11.8 TELEPHONE CABLE
T B B - 0 1 1 - T L
EQUIPMENT ITEM NUMBER
Splicing Number (Alphabet If Required)
Sequence Number (If Required)
Example:
TBB-011-TL1-A
2.11.9 PUBLIC ADDRESS CABLE
A M P - 0 1 1 - P A
EQUIPMENT ITEM NUMBER
Splicing Number (Alphabet If Required)
Sequence Number (If Required)
Example:
AMP-0111-PA1-A
2.11.10
LAN FIBER CABLE
O J B - 0 7 1 - O
CP
EQUIPMENT ITEM NUMBER
Splicing Number (Alphabet If Required)
Sequence Number (If Required)
Optical Fiber Cable
Example:
OJB-071-OPC-A
2.11.11
CCTV CABLE NUMBERING
C T V - 0 1 1 - X
X
X -
EQUIPMENT ITEM NUMBER
Example:
CTV-0111-CMP
Sequence Number (If Required)
Cable Type: P = Power CX = Coaxial CMP = Composit
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 42 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.11.12
DATA CABLE NUMBERING
D A T - 0 0 1 - X
X
X -
EQUIPMENT ITEM NUMBER
Example:
DAT-001-UTP
Sequence Number (If Required)
Cable Type: SER = Serial UTP = Unshielded Twisted Pair STP = Shielded Twisted Pair
2.11.13
ANTENNA CABLE NUMBERING
A N T - 0 0 1 - X
X
X -
EQUIPMENT ITEM NUMBER
Sequence Number (If Required)
Cable Type: CX = Coaxial SCX= Slotted Coaxial LLF = Low Loss Foam WG = Waveguide
Example:
ANT-001-CX
2.11.14
FIBER OPTIC & COMPOSITE CABLE
-
X
X
X
EQUIPMENT ITEM NUMBER
Splicing Number(Alphabet if required)
Sequence Number (If Required)
Cable Type: BOC = Burried/Subsea Fiber Optic SOC = Surface Run/Topside Fiber Optic BCC = Burried/Subsea Composite Power and Fiber Optic SCC = Surface Run/Topside Composite Power and Fiber Optic
The Equipment Item Number is the Tag Number of the equipment at which the cable originates. For Composite Power / Fibre Optic Cables it will be the Equipment on the Power side
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 43 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
2.11.15
INSTRUMENT CABLE - DIRECT
- Direct cables between field instrument and control panels in technical building shall
have the same tag number as field instrument.
Example:
Tag Number 01-FT0925
Cable Number 01-FT0925
- Direct cables between analyzer house or local panel and control panel in technical building shall have the same house number or same local panel number as field equipment.
Equipment Number AH11
AH11
Cable Number
2
S
001
Sequence Number
Control Room Number
Typical Function (Refer to Section 2.4.9 Table 2 or Table 3 )
Equipment Number
2.11.16
INSTRUMENT CABLE – MULTIPLE JUNCTION BOX (JB)
Multi cables between field junction box and marshaling cabinet in technical building shall be numbered as follows:
Field Junction Box Number JBS-2V001
Cable Number 001
S2V001
Sequence Number
Junction Box Number
2.11.17
INSTRUMENT CABLE – MULTIPLE CONTROL ROOM
Multi cables between Control Room and Main Control Room in both rooms shall be the same number as equipment numbers
Marshalling Cabinet Number (In Control Room) IMC01
Equipment Number (In Main Control Room) MMC01
001
Sequence Number
Example:
IMC01-MMC01-001
2.11.18
INSTRUMENT CABLE – INDIVIDUAL
Individual cables between field instrument and junction boxes shall have the same Tag number as field instrument
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 44 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument Tag Number 01TT0317
Cable Number 01TT0317
2.11.19
INSTRUMENT GROUNDING WIRE
2 4 -
51A NSE
999
Sequence Number
Type of Earth
ITR / Control Room Number
System Number
2.11.19.1
System Number
Same as 2.3.1.1
2.11.19.2
ITR / Control Room Number
Three digit identifier for related ITR or MCR signal
2.11.19.3
Type of Earth
Minimum two digits – maximum 3 digits as per below Table:
PE
IE
Plant Earth
I.S. Earth
NSE Non DCS Earth
RE
SE
Reference Earth
DCS Earth
2.11.19.4
Sequence Number
Three-digit Sequence Number 001 through 999
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 45 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
3
EXISTING QATARGAS 1 UPSTREAM FACILITIES (ONLY FOR MINOR BROWN FIELD CHANGES) This section is only applicable for the tag numbering during the minor brownfield modifications in the existing QG1 upstream facilities. Minor modification works in this area need not follow the tag structure detailed in previous sections and can follow the tag structures detailed below in this section. For electrical tags please refer to section 2.7 also.
3.1 METHOD OF NUMBERING
Equipment identification (Tag) numbers shall be listed by Project Code, Unit, Equipment Serial number, and/or alphabetical order. However, drive units shall be listed immediately after the item of equipment they drive.
3.2 EQUIPMENT NUMBER FORMAT
The process and utility equipment, their auxiliary equipment and other major items shall be identified as shown below.
Example: Equipment Tag Number U-P8301A is for a Pump, in Unit number 83, sequential number 01, item A, in the Upstream Facilities.
3.2.1 PROJECT CODE
One digit – ‘U’ has been assigned to the Upstream Facilities.
3.2.2 EQUIPMENT TYPE (CLASS)
One or two digit - Refer to Appendix 7 - Equipment Type Codes
3.2.3 UNIT NUMBER
Two Digit - Refer to Appendix 7 - Common Unit Numbers, Onshore Unit Numbers and Offshore Unit Numbers.
3.2.4 EQUIPMENT SERIAL NUMBER
Two Digit - A serial number allocated sequentially within Equipment Type in each Unit. e.g. Within each Unit equipment shall be allocated serial numbers sequentially,
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 46 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
starting at 01 for each Equipment Type. Serial numbers shall be kept in reserve for each type of equipment, to assure a measure of continuity in their identification.
3.2.5 SECONDARY IDENTIFIER
One digit - Items of equipment installed in parallel or in series shall bear the same Equipment Serial Number followed by an additional letter by A, B, C, etc. to differentiate them. ‘S’ shall be used to designate spare. Refer below for examples.
Example 1 :
U-P 5101 A:
Pump
U-P 5101 S:
Pump Backing Up U-P 5101 A
Example 2 :
U-E 5101 A :
1st Shell of Exchanger U-E 5101
U-E 5101 B :
2nd Shell of Exchanger U-E 5101
U-E 5101 C :
3rd Shell of Exchanger U-E 5101
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 47 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
4
INDUSTRIAL CONTROL SYSTEM SECURITY - ENGINEERING EQUIPMENT TAGGING SPECIFICATION
4.1 TAGGING PHILOSOPHY FOR WORKSTATION
B S
I
H
1
0
1
- H
M
I
D
1
0
0
Sequence Number (Digit 1-3)
System Identifier (1 digit)
ICS Workstation Function (Digit 2-3)
ICS Location Sequence Number(Digit 1-3)
ICS Location,(Digit 1-4)
4.1.1 ICS LOCATION
A maximum of Four and minimum of 1 digit shall be specified, such as L, SIH, LCS, BSIH etc. Refer Teble-3
4.1.2 ICS LOCATION SEQUENCE NUMBER
A maximum of Four and minimum of 1 digit shall be specified, such as 1, 06, 101,1116 etc.
4.1.3 ICS WORKSTATION FUNCTION
A maximum of Three and minimum of two letter shall be specified, such as OS, OPC, ES, HMI etc. Refer Table-4
4.1.4 SYSTEM IDENTIFIER
Maximum of One Alpha-Numeric shall be specified, such as A, B, E,1,2 etc., Refer Table- 9. 1.5 Sequence Number A Maximum of Three and minimum of one-digit numbers shall be specified, such as 1,10,101 etc.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 48 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
4.2 TAGGGING PHILOSOPHY FOR SERVERS
B
S
I H
1
0 1
P
D
C
A
1
0
0
Sequence Number (Digit 1-3)
System Identifier (1 digit)
ICS Server Function (Digit 2-3)
ICS Location Sequence Number (Digit 1-3)
ICS Location (Digit 1-4)
4.2.1 ICS LOCATION
Same as 4.1.1
4.2.2 ICS LOCATION SEQUENCE NUMBER
Same as 4.1.2
4.2.3 ICS SERVER FUNCTION
A Maximum of three and minimum of two letters shall be specified such as DB,HS,EPO,PDC etc. Refer Table-5
4.2.4 SYSTEM IDENTIFIER
Same as 4.1.3
4.2.5 SEQUENCE NUMBER
Same as 4.1.4
4.3 TAGGING PHILOSOPHY FOR NETWORK DRIVES
Following Network devices naming tagging included” Switches/Routers/Firewalls/Data Diodes/NTP”
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 49 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
B
S
I
H
1
0
1
S
W
E
1
0
0
P
ICS Network Type (1 Digit)
Sequence Number (Digit 1-3)
System Identifier(1 Digit)
ICS Network Function (2 Digit)
ICS Location Sequence Number (Digit 1-3)
ICS Location (Digit 1-4)
4.3.1 ICS LOCATIONS
Same as 4.1.1
4.3.2 ICS LOCATION SEQUENCE NUMBER
Same as 4.1.2
4.3.3 ICS NETWORK FUNCTION
Two letters shall be specified such as SW, DD, FW etc. Refer Table-6
4.3.4 SYSTEM IDENTIFIER
Same as 4.1.4
4.3.5 SEQUENCE NUMBER
Same as 4.1.5
4.3.6 ICS NETWORK TYPE
One letter shall be specified such as P,S .Refer Table-8
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 50 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
4.4 TAGGING PHILOSOPHY FOR ICS LAPTOPS
N F
P
S
L
P -
1
0 0
0
Sequence Number (Digit 1-4)
ICS Laptop Funtion( 2 Digit)
SITE(Digit 3-4)
4.4.1 SITE
A Maximum of four and minimum of three letters shall be specified such as QGS, QGN, NFPS etc. Refer Table-2
4.4.2 ICS LAPTOP FUNCTION
One letter shall be specified such as LP . ReferTable-7
4.4.3 SEQUENCE NUMBER
A Maximum of four and minimum of one number shall be specified, such as 1,02,101,9999 etc.
Note: - Respective projects / change management execution party shall coordinate with ICS Security Engineering for the sequence numbers for the ICS Laptops being added.
Table 5 : Equipment Codes For Ics System
Equipment Type
Workstation/Server
Network Device Laptop
CODE ICWS ICSVR ICNAS ICSW ICFW ICDD ICGPS ICIDS ICIPS ICLP
Equipment Description ICS Workstation/HMI ICS Server ICS NAS Drive ICS Network Switch ICS Network Firewall ICS Data Diode ICS GPS Time Server ICS Intrusion Detection system ICS Intrusion Prevention system ICS Laptop
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 51 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Table 6: Site Codes: D
CODE QGS QGN OTR BRZ NFE NFS NFPS
Department Description Qatargas South Qatargas North Offshore-Terminals-Refining Barzan North Field Expansion North field South North field production Sustainability
CODE SIH LCS ITR MTB CCB BCCB HCCB MCR PT QT SCCB BAH AH WH SS GT MCB PU PR XK LQ SRU CSP LCB BER DRP GTG BSIH MRR
Table 7: ICS Location Codes
Location Description Satellite Instrument House Local Control Station Instrument Technical Room Marine Terminal Building Central Control Building Barzan Central Control Building Helium Central Control Building Main control Room Production Terminal Quarters Terminal Central Control Building Barzan Analyzer House Analyzer House Wellhead Sub-Station Gas Turbine Generator Area Main Control Building Process and Utility Platform Process Platform Other Buildings living quarters Sulphur Recovery Unit Common Sulphur Plant Local Control Building Berth Disaster Recovery Protocol Gas Turbine Generator Barzan Satellite Instrument House Main Rack Room Qatargas Equipment Numbering Philosophy
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 52 of 115
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
MER OTS
MPR
NOC
I
L
BVS
NMCB
OS
NFQ
STP
LER
CCR
RR
SGR
ER
OCC
TER
MCC
TR
ECC
RR
CODE HMI OPC OS ES SOE MS TCW PIW FMW MMW ASW ADW IMW AMW
Main engineering Room Operator Training Simulator Room
Printer Room
NFE Operation Center
Instrument Technical Room
Local Panel installed at Field connected to the ITRxxx
Beach Valve station building
North Main Control Building
Operations center
NFXP Wellheads
Sensor tower platform
Local Equipment Room
Central control Room
Rack Room
switch gear Room
Engineering Room
Onshore Collaborative Center
Telecom Equipment Room
Motor control center
Temporary refuge
Emergency Control Center
Radio room
Table 8: ICS Workstation Function Codes
Location Description Human Machine Interface Open Platform communication Operator Station Engineering Workstation Sequence of Events Maintenance station Thin Client Workstation POIS System workstation FMS System workstation MMS System workstation ASC system workstation ADAS System Workstation IAMS Workstation AMS Workstation Qatargas Equipment Numbering Philosophy
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 53 of 115
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
PMW MPW ELW PKG DTS FSW FGS HIP IPS IAM MLM PMS TDA TCS UPS VFD RES LPS EDG LDS RES GTC GTG CPM PEM
CODE PDC SDC EPO BKP LOG KVM PTR PES SES TCS DB PDB
PMS Workstation MPC Workstation ELICS System Workstation Package Workstation Distributed Temperature Sensing System Field ware System Workstation Fire & Gas System High Integrity pipe Protection System Instrumented Protection System Integrated Asset management Systems Mooring Load Monitoring System Pipeline Management Systems Tank Data Acquisition System Turbine Control System Uninterrupted Power Supply Variable Frequency Drive Remote Engineering station Loop Performance System Emergency Diesel Generator Leak Detection System Remote Engineering station Gas Turbine Controller Gas Turbine Generator Condition Predictive Monitoring Predictive Emission Monitoring
Table 9: ICS Server Function Codes
Location Description Primary Domain controller Secondary Domain controller EPO Server Backup Server Log server Keyboard-Video-Mouse Printer Primary Engineering Server Secondary Engineering Server Thin client server Database Server Primary Database Server
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 54 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
SDB NMS EVT SRV HS PHS SHS PVS SVS DRS ISS POC SOC PIS FMS MMS ASC ADS AMS ALM PMS MPC CEM ELS MOB SEM
CODE SW FW DD GP RT NT CF SF MF
Secondary Database Server Network Monitoring Server Event Server Server History Server Primary History Server Secondary History Server Primary Virtualized Host server Secondary Virtualized Host Server Disaster Recovery/Hot spare Host Server (Virtualized) Intrusion Scanning server Primary OPC server Secondary OPC server POIS System Server FMS System Server MMS System Server ASC system Server ADAS System Server IAMS Server AMS Alarm Management Server PMS - Pipeline Management Server MPC Server Continuous Emission Monitoring System ELICS System Server Mobile Portal Server Security Information and Event Management Server
Table 10: ICS Network Device Function Codes
Location Description Switch Firewall Data Diode Global Positioning System Router NTP Device Controller Firewall Safety firewall MODBUS Firewall
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 55 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Table 11: ICS Laptop Function Codes
CODE LP
Location Description Laptop
Table 12: ICS Network type
CODE P S
Location Description Primary Secondary
CODE 0 1 2 3 4 5 6 A B C D E F G H I J K L M N O P Q R S T
Table 13: ICS system Identifier
Location Description Emergency/Auxiliary Diesel Generator (DG) Leak Detection system (LDS) Glycol Burner Management Systems (GBMS) Mooring System (MLM) Tank Data Acquisition System (TDAS) Distributed Temperature Sensing System (DTSS) SIEM system Advanced Process Control Systems (APC) Beach Valve system (BVS) Distributed Control System (DCS) Gas Detection Perimeter System (GDPS) Safety Instrumented System (ESD/IPS/SIS) Fire & Gas System (FGS) HVAC Integrated Asset Management System (IAMS) Alarm Management System (AMS) Analyzer Data Acquisition System (ADAS) Loop Performance System (LPS) Machine Monitoring System (MMS) Anti-Surge/Compressor Control System (ASCS) Onsite Monitoring (OSM) Plant Operating Information System (POIS) Electrical Control Systems (ELICS) Fiscal Measurement System (FMS) Turbine Control System (TCS) HIPPS High Integrity Pipe Protection System (OOPS)
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 56 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
V W X Y Z
Variable Frequency Drive (EFVD) Operator Training System (OTS) Pipeline Management System (PMS) ICS Security Centralized System Continuous Emission Monitoring System (CEMS)
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 57 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
APPENDICES
Appendix 1 – References and Relevant Documents
Appendix 2 – Glossary of Terms: Definitions, Acronyms, and Abbreviations
Appendix 3 – Equipment Classes
Appendix 4 – Package Numbers
Appendix 5 – Voltage Levels
Appendix 6 – Telecommunications Location Codes
Appendix 7 – Code Tables (Only For QG1 Upstream Minor Brown Field)
Appendix 8 – List of Project Specifications for Reference
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 58 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
APPENDIX 1 – REFERENCES AND RELEVANT DOCUMENTS
Number
Title
PRJ-PJL-PRC-005
PRJ-PJL-PRC-080
Facilities System and Unit Number Codes and Descriptions
AIMS TAG Management Procedure
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 59 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
APPENDIX 2 – GLOSSARY OF TERMS: DEFINITIONS, ACRONYMS AND ABBREVIATIONS
Term
DCS
TMS
PLC
Description
Distributed Control System
Tag Management System
Programmable Logic Controller
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 60 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
APPENDIX 3 – EQUIPMENT CLASSES
Category Description
Function Code
Function Code Desription
Administrative
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
Cable
ZZ
FOUC
BCC
BOC
CX
CMP
C
SE
E
F
FA
IE
I
IC
NSE
OPC
PE
P
PA
RE
SER
STP
SSC
SCC
Administrative / Group tag
50M Fibre Optic Umbilical Cable
Burried/Subsea Composite Power and Fiber Optic Cable
Burried/Subsea Fiber Optic Cable
Coaxial Cable
Composit Cable
Control Cable
DCS Earth Cable
Earth cable
Feeder Cable
Fire Alarm Cable
I.S. Earth Cable
Instrument Cable
Instrument Cable
Non DCS Earth Cable
Optical Fiber Cable
Plant earth (ground) Cable
Power cable
Public Address Cable
Reference Earth Cable
Serial Cable
Shielded Twisted Pair Cable
Subsea composite Cable
Surface Run/Topside Composite Power and Fiber Optic Cable
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 61 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Cable
Cable
Cable
Cable
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
SOC
T
TL
UTP
AH
XK
I
L
MAT
XX
STG
PR
STN
A
XH
SS
US
AC
ACC
ACCU
EM
ACWC
AHU
AWL
ANN
AN
AVR
Surface Run/Topside Fiber Optic Cable
Telecom Cable
Telephone Cable
Unshielded Twisted Pair Cable
Analyser House
Building-Loading Station, Warehouse, Maintenance shop, etc
Instrument Earth Pit with Electrode
Lightning Earth Pit with Electrode
MAST
Miscellaneous Structure
Operating Stage Platform
Pipe Rack
Pipe Stanchion
Pit, Pond, Basin
Steel Structure, Shelters, Warehouse, Platform
Substation
Utility Station
AC Power Distribution Panel
Air Cooled Condenser
Air Cooled Condenser Unit (Reserved for HVAC System)
Air Cooled Exchanger Motor
Air Cooled Water Chiller (Reserved for HVAC System)
Air Handling Unit (Reserved for HVAC System)
Aircraft Warning Lighting Panel
Annunciator
Anode
Automatic Voltage Regulator
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 62 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
BB
BC
BM
BD
CBK
Battery Bank
Battery Charger
Battery Monitoring System panel
Bus Duct
Capacitor Bank
CWPM
Chilled Water Pump Motor
CB
CCU
GHC
KM
CGU
ACP
CP
CTR
CD
XCM
CT
DCP
DC
DLB
ELDB
LDB
DTR
IRP
ES
EB
ET
Circuit Breaker
Close Control Unit
Color Graphic Hard Copy
Compressor Motor
Computer Gateway Unit to DCS
Control Panel, HVAC
Control Panel, non-HVAC
Control Transformer
Convenience Socket
Crane Motor
Current Transformer
DC Distribution Panel
DC Power Distribution Panel
Disconnecting Link Box
Distribution Board - Emergency Lighting
Distribution Board - Low Voltage
Distribution Transformer
E/I Interposing Relay Panel
Earth Switch
Earthing Protection
Earthing Transformer
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 63 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
EBH
EDH
G
H
M
EPH
SH
EUH
EBB
EBC
EMG
ELP
ELSB
ELTR
ESB
ETR
ELF
EFM
FCU
FLP
FLC
FH
Electric Base Board Heater, HVAC
Electric Duct Heater
Electric Generator
Electric Heater
Electric Motor
Electric Panel Heater
Electric Steam Humidifier, HVAC
Electric Unit Heater, HVAC
Emergency Battery Bank
Emergency Battery Charger
Emergency Light
Emergency Lighting Panel
Emergency Lighting Switch Board -
Emergency Lighting Transformer
Emergency Switch Board
Emergency Transformer
Essential Light Fixture
Exhaust Fan Motor
Fan Coil Unit
Fence Lighting Panel
Flood Light Contactor
Fog Horn
GTCP
Gas Turbine Control Panel
GCP
GSB
HS
HG
Generator Control Panel
Generator Switch Board
Hand Switch
Heat Recovery Steam Generator
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 64 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
HTR
HTP
HE
XE
IFM
LCP
LTR
LAR
LSC
LCS
ML
NET
MCS
MLSC
XX
XP
Heat Trace Transformer
Heat Tracing Panel
Heater - Element
Ignitor
Intake Fan Motor
Lighting Control Panel
Lighting Transformer
Lightning Arrestor
Load Shedding Controller
Local Control Station
Main Lantern
Main Starcoupler Panel
Master Clock System
Master Load Shedding Controller
Miscellaneous Electrical
Miscellaneous Panel
XMM
Mixer Motor
MOVPNL
MOV Panel
NCP
NER
NGR
NLF
LP
OLTC
OP
LPLC
PC
Navaids Control/Distribution Panel
Neutral Earthing Resistor
Neutral Grounding Resistor
Normal Light Fixture
Normal Lighting Panel
On Load Tap Changer
Outlet Panel
PDCS Local PLC Panel
Photocell
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 65 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
VT
PDB
PDC
PGC
PMS
PS
PFM
PM
RC
RY
RP
RTU
RAC
SSW
PAC
SPP
Potential Transformer
Power Distribution Board
Power Distribution Control Console
Power Generation Control Console
Power Management System Console
Power Supply Panel
Pressurised Fan Motor
Pump Motor
RC snubber
Relay
Relay Panel
Remote Terminal Unit
Room Air Conditioner / Condenser
Safety Switch
Single Package Unit Condenserless Package Unit
Small Power Panel
SMBD
Smart board
SP
SR
SAC
SLTG
SLP
SSJB
SL
Solar Array panel / Solar Panel
Solar Regulator & Distribution Panel
Split Type Room Air Conditioner
Street Light
Street Lighting Panel
Subsea Splitter Box
Subsidiary lantern
SSANN
Substation Annunciator Panel (QG1 DS)
HSB
LSB
Switch Board - HVAC
SwitchBoard - Lighting
Qatargas Equipment Numbering Philosophy
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 66 of 115
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
SB
USB
SG
SYN
TR
CPR
UPS
SwitchBoard - Normal
SwitchBoard - UPS
Switchgear
Synchronization Panel
Transformer
Transformer - Cathodic Protection Rectifier
Uninterruptible Power Supply
UPSDP
UPS Distribution Panel
VFD
VSCF
VSD
VFP
WO
ACC
MX
A
BF
B
BNR
SMX
CFU
CWP
CWT
C
KD
KT
K
Variable Frequency Drive
Variable Speed Constant Frequency
Variable Speed Drive
VFD Panel
Welding Outlet / Socket
Accumulator
Agitators, Blenders, Static Mixers
Air Cooler
Bleed Fan
Boiler
Burner
Caustic static mixer
Chemical Filter Unit for HVAC
Chilled Water Pump, HVAC
Chilled Water Pump, HVAC
Column
Compressor Diesel Engine
Compressor Turbine
Compressor, Blower
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 67 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
A4
XE
XT
XC
CYL
DMP
DVT
D
J
EF
EXT
EW
S
FU
XZ
FE
FH
FM
FSD
FL
FJY
FF
FDI
F
GD
GT
GR
Conductor Annulus
Conveying and Feeding Equipment
Conveyors, Chute, Screws, Rotary Feeders, X-Mas Tree
Crane
Cylinder
Damper
Davit
Desuperheater / Drum (QG1 Upstream only)
Ejector
Exhaust Fan, HVAC
Expansion Tank
Eyewash
Filter
Filter Unit, HVAC
Fire and Safety Equipment
Fire Extinguisher / Extinguishing Agent Bottle
Fire Hydrant
Fire Monitor
Fire Smoke Damper
Flare
Flow Computer (Supervisory)
Fresh Air Intake Fan, HVAC
Fuel Dispenser
Furnace
Generator Diesel Engine
Generator Turbine
Grill / Diffuser / Louver
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 68 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
HD
E
YK
YH
HT
IT
Header
Heat Exchanger
HVAC for Building
HVAC for Structure
Hydraulic Turbine
Inhibitor Tank
XCH
Lifting Equipment
LB
L
MT
X
XM
M
MD
XB
U
Y
PSD
XP
PRD
A1
P
PD
PDE
PT
R
FI
Liquid Burner
Loading Arm / Pig Launcher Receiver (QG1 Upstream only)
Meter
Miscellaneous
Mixer
Mixer, Agitator
Modulating Damper
Monorail
Package Unit
Package Unit
Pneumatic Shut-off Damper
Portable Equipment
Pressure Relief Damper
Production Annulus
Pump
Pump Diesel Engine
Pump Diesel Engine
Pump Turbine
Reactor
Rotameter
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 69 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Fire and Gas
Instrument
Instrument
SSWR
SEW
STF
SA
A3
T
VE
V
VOT
NFQ
XW
WE
N
C
F
GE
H
TKS
L
HSK
O
M
S
AST
T
PDCY
AC
Safety Shower
Safety Shower with Eyewash
Sand Trap Filter
Sound Attenuator / Silencer
Surface Annulus
Tank, Silo, Hopper
Vehicle
Vessel, Drum, Converter, Reactor
Volume Tank
Wellhead
Winch
Workshop Equipment
Acoustic Detector
Combustible Gas Detector
Fire Detector (General Alarm)
Gas Detector
Heat Detector
Heat Detector (Rate of Rise)
Low Temperature Detector
Manual Alarm Call Point
Optical Flame Detector (W/IR)
Pull Handle
Smoke Detector
Toxic Gas Detector
Toxic Gas Detector
3 Way Single Solenoid Valve on CV
Actuator
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 70 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
AL
Alarm
GAHHH
Alarm High High High
AAH
AAL
AALL
AIC
AI
AP
ASH
Analysis Alarm High
Analysis Alarm Low
Analysis Alarm Low Low
Analysis Controller
Analysis Indicator
Analysis Point
Analysis Switch High
AAHH
Analysis Trip High
UT
AVY
AE
AS
AT
XC
AA
AQZ
AQA
Analytical Transmitter
Analyzer Control Valve Solenoid Valve
Analyzer Element
Analyzer switch
Analyzer Transmitter
Antisurge controller
Audible Alarm
Auto Sampler
Auto Sampler Alarm
HSAM
Auto/Manual Selection
ZZE
BOV
BDV
BDY
BRV
BAL
BALL
Axial Position Element
Blow Off Valve
Blowdown Valve
Blowdown Valve Solenoid Valve
Breather Valve
Burner Alarm Low
Burner Alarm Low Low
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 71 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
BSL
BE
BS
BSLL
BT
CI
CJ
ZSCY
ZSLY
HSL
LQI
PDFV
CTRL
CE
CP
CT
IAL
XL
UCY
DCS
DV
DVH
DY
DI
DT
DW
GAC
Burner Flame Contact
Burner Flame Detector
Burner Flame Switch
Burner Flame Switch
Burner Flame Transmitter
Calculated Indication (calculation using manual entries)
Calibrator Switch
Close Indication Lamp
Close Limit Indication
Close PB
Contents Indicator
Control Valve
Controller
Corrosion Element
Corrosion test Point
Corrosion Transmitter
Current Alarm Low
DCS Indication
DCS logic
DCS System
Deluge Valve
Deluge Valve Header
Deluge Valve Solenoid
Density Indicator
Density Transmitter
Density Well
Detector Calibrate Mode
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 72 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
GAF
YA
DHSV
UZY
EWS
ESM
UA
FGM
FGS
XZS
AX
ZSP
FSDY
FGA
FA
FAH
FAL
FC
FCV
FV
FZT
FE
FX
FG
FI
FIA
FIC
Detector Fault
Digital Repeat Alarm / Event Alarm
Downhole Safety Valve
EDP Permissive from DCS
Engineering Work Station
ESD Marshalling
Fault Alarm
FGS Marshalling
FGS Marshalling
FGS Trip Command
Field Element ANDOR Preconditioning Unit
Field Partial Stroke Test Hand Switch
Fire Damper - Solenoid Valve
Fire/Gas Alarm
Flow alarm
Flow Alarm High
Flow Alarm Low
Flow Computer
Flow Control Valve
Flow Control Valve
Flow Control Valve Position Transmitter
Flow Element
Flow Element
Flow Glass
Flow Indicator
Flow Indicator Alarm
Flow Indicator Controller
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 73 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
FO
FFV
FFY
FS
FSH
FSL
FSLL
FQ
FQI
FT
FAHH
FALL
FCY
AWV
FD
TSE
UY
GAH
GAHH
GA
HA
HCY
HV
HC
HIC
HS
HZ
Flow Orifice
Flow Ratio Control Valve
Flow Ratio Control Valve Solenoid
Flow Switch
Flow Switch High
Flow Switch Low
Flow Switch Low Low
Flow Totalizer
Flow Totalizer Indicator
Flow Transmitter
Flow Trip High
Flow Trip Low
Flow valve Solenoid
Flow Wing Valve (Hydraulic)
Fog detector/ Visibility Detector
Frangible Bulb Fusible
Functional Logic Designate
Gas Alarm High
Gas Trip High
General Alarm
Hand alarm / Humidity Alarm
Hand control valve Solenoid valve
Hand Control Valve, Hand Valve (Remote Operated)
Hand Controller / Humidity Controller
Hand Indicator Controller
Hand Switch
Hand Switch (ESD)
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 74 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
HSU
HSUZ
HCV
I
IZ
AY
BY
VY
XYV
ESCY
FY
HY
LY
ZY
PY
PDY
KY
SDCY
SY
TY
IN
HL
ZLP
IAH
CAB
IL
IPS
Hand Switch Reset
Hand Switch Reset
Hand Throttling Valve
Hardwired Relay Logic
Hardwired Relay Logic Emergency Shutdown
I/P Converter
I/P Converter
I/P Converter
I/P Converter
I/P Converter Emergency Shutdown Valve
I/P Converter Flow
I/P Converter for Cooling Tower
I/P Converter Level
I/P Converter Position
I/P Converter Pressure
I/P Converter Pressure Diff
I/P Converter Sequence
I/P Converter Shutdown Valve
I/P Converter Speed
I/P Converter Temperature
Indication
Indication
Instrument Air Heaser
Instrument Cabinet / Panel
Instrument Loop
Instrumented Protective System
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 75 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
IPM
KI
KV
KWV
KXV
UZA
LA
LAH
LAL
LCV
LV
LZT
LCY
LC
LG
LGS
LI
LIC
LS
LSH
LSHH
LSL
LSLL
LT
LAHH
LALL
ZSL
IPS Marshalling
Keyphasor Indicator
Kill Valve / Sequence valve
Kill wing valve
Kill Wing Valve (Hydraulic)
Lamp related with UZ function
Level Alarm
Level Alarm High
Level Alarm Low
Level Control Valve
Level Control Valve
Level Control Valve Position Transmitter
Level control valve Solenoid Valve
Level Controller
Level Gauge
Level Gauge Switch
Level Indicator
Level Indicator Controller
Level Switch
Level Switch High
Level Switch High High
Level Switch Low
Level Switch Low Low
Level Transmitter
Level Trip High
Level Trip Low
Limit Switch Closed(SOFT)
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 76 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
ZSH
ZSLL
LM
LWV
MMS
XXA
XXC
XE
XI
XX
XS
XT
EAH
EAHH
EALL
EI
HSC
HSO
II
KAH
KAL
ZAI
MAH
MI
MIC
MT
EHLM
Limit Switch Open (SOFT)
Limit Trip Closed
Line Fault Alarm
Lower Wing Valve
Machine Monitoring System
Miscellaneous Alarm
Miscellaneous Controller
Miscellaneous Element
Miscellaneous Indicator
Miscellaneous Instrument
Miscellaneous Switch
Miscellaneous Transmitter
ModBus
ModBus
ModBus
ModBus
ModBus
ModBus
ModBus
ModBus
ModBus
Modbus
Moisture Alarm High
Moisture Indicator
Moisture Indicator Controller
Moisture Transmitter
MOS Indication
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 77 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
FHLM
GHLM
HHLM
LHLM
MOS Indication
MOS Indication
MOS Indication
MOS Indication
MHLM
MOS Indication
PHLM
THLM
XHLM
ZHLM
EHSM
FHSM
GHSM
HHSM
LHSM
MHSM
PHSM
THSM
XHSM
ZHSM
MA
MS
MOV
MV
MOY
HSH
UI
XV
MOS Indication
MOS Indication
MOS Indication
MOS Indication
MOS Switch
MOS Switch
MOS Switch
MOS Switch
MOS Switch
MOS Switch
MOS Switch
MOS Switch
MOS Switch
MOS Switch
Motion Alarm
Motion Detection
Motor Operated Valve
Motor Operated Valve
Motor Operated Valve Solenoid
MOV Open Command
Multipoint Indicator
Multivariable (Sequence/On-Off/Surge) Valve
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 78 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
XA
ZAB
Multivariable Alarm
Not Close Alarm
GAOC
Open Circuit Alarm
ZSOY
ZSHY
OWS
X
AOM
ESDV
ESDY
PLC
ZA
ZAC
ZAH
ZAL
ZAO
ZE
ZIS
ZI
ZL
ZLC
ZLO
ZS
ZSC
ZSHH
ZSO
ZSLH
Open Indication Lamp
Open Limit Indication
Operator Work Station
Oxygen Detector
Oxygen Override Switch
Plant Boundary Emergency Shutdown Valve
Plant Boundary Emergency Shutdown Valve Solenoid Valve
PLC System
Position Alarm
Position Alarm Close
Position Alarm High
Position Alarm Low
Position Alarm Open
Position Element
Position Indication Switch (Pig)
Position Indicator
Position Lamp
Position Lamp Closed
Position Lamp Open
Position Switch
Position Switch Closed
Position Switch High High
Position Switch Open
Position Switch Open/Closed(SOFT)
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 79 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
ZT
ZZT
ZAHH
ZALL
JT
JI
PDHH
PDLL
PA
PAH
PAL
PCV
PV
PCY
PC
PZT
PDAH
PDAL
PDCV
PDG
PDI
PDS
PDSH
PDSL
PDT
PDV
PE
Position Transmitter
Position Transmitter
Position Trip High
Position trip Low
Power / Current Transmitter
Power Indicator
Press Differential Trip High
Press Differential Trip Low
Pressure Alarm
Pressure Alarm High
Pressure Alarm Low
Pressure Control Valve
Pressure Control Valve
Pressure Control Valve Solenoid Valve
Pressure Controller
Pressure Ctrl Valve Position Transmitter
Pressure Differential Alarm High
Pressure Differential Alarm Low
Pressure Differential Control Valve
Pressure Differential Gauge
Pressure Differential Indicator
Pressure Differential Switch
Pressure Differential Switch High
Pressure Differential Switch Low
Pressure Differential Transmitter
Pressure Differential Valve
Pressure Element
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 80 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
PG
PIC
PI
PISH
PRV
PSV
PS
PSH
PSHH
PSL
PSLL
PT
PAHH
PALL
PVRV
PWV
LX
ROV
HSRR
RI
RO
BD
BDA
PSS
PSE
SPT
AQC
Pressure Gauge
Pressure Indicating Controller
Pressure Indicator
Pressure Indicator Switch High
Pressure Relief Valve
Pressure Safety Valve
Pressure Switch
Pressure Switch High
Pressure Switch High High
Pressure Switch Low
Pressure Switch Low Low
Pressure Transmitter
Pressure Trip High
Pressure Trip Low
Pressure Vacuum Relive Valve
Production Wing Valve
Purge Supply
Remote Operated Valve
Reset PB
Response Indication
Restriction Orifice
Rupture Disc
Rupture Disc Alarm
Rupture Disc Switch
Rupture Disk
Sample Point / Test Station
Sampler Controller
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 81 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
AQE
AQY
SPR
KA
KC
KS
KCV
GASC
YZ
UZ
YZUZ
SDV
SDY
SG
ACY
ESXY
ROY
SOV
WY
XY
SA
SCV
SCY
SC
SE
SI
Sampler Element
Sampler Solenoid Valve
Sand Probe
Sequence Alarm
Sequence Controller
Sequence Switch
Sequence Valve
Short Circuit Alarm
Shutdown / Trip Signal (generally for pumps, compressors, unit shutdown)
Shutdown Function
Shutdown Signal from UZ function or ITR
Shutdown Valve
Shutdown valve Solenoid Valve
Sight Glass
Solenoid Valve
Solenoid Valve
Solenoid Valve
Solenoid Valve
Solenoid Valve
Solenoid Valve
Speed Alarm
Speed Control Valve
Speed Control Valve Solenoid
Speed Controller
Speed Element
Speed Indicator
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 82 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
SSH
SSHH
ST
SAHH
SALL
YS
YAL
YI
YL
SQ
Speed Switch High
Speed Switch High High
Speed Transmitter
Speed Trip High
Speed Trip Low
Start/Stop Status
Status Alarm Low
Status Indicator
Status Lamp
Stroke Counter
SCSSSV
Surface Controlled Sub-Surface Safety Valve
SV
KCY
TA
TAH
TAL
TCV
TCY
TC
TIC
Swab Valve
Switching Valve Solenoid Valve
Temperature Alarm
Temperature Alarm High
Temperature Alarm Low
Temperature Control Valve
Temperature control valve Solenoid
Temperature Controller
Temperature Controller
TDAL
Temperature Differential Alarm Low
TDI
TE
TG
TI
TIAH
TKAH
Temperature Differential Indicator
Temperature Element
Temperature Gauge
Temperature Indicator
Temperature Indicator Alarm High
Temperature Rate Alarm High
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 83 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
TMP
TSH
TSHH
TSL
TSLL
TT
TAHH
TSV
TS
TW
XZA
TALL
Temperature Sensor Unit
Temperature Switch High
Temperature switch High High
Temperature Switch Low
Temperature switch Low Low
Temperature Transmitter
Temperature Trip High
Thermal Safety Valve
Thermostat
Thermowell
Trip Indication
Trip Low Low
TR-SCSSSV
Tubing retrievable (Both non equalizing and self- Equalizing)
USV
UMV
UWV
VRV
VAH
VE
VXE
VYE
VI
VIAH
VS
VSH
VSHH
VT
Underwater Safety Valve
Upper Master Valve/ Master Valve (Hydraulic)
Upper Wing Valve
Vacuum Relief Valve
Vibration Alarm High
Vibration Element
Vibration Element X Axis
Vibration Element Y Axis
Vibration Indicator
Vibration Indicator Alarm High
Vibration Switch
Vibration Switch High
Vibration Switch High High
Vibration Transmitter
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 84 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Junction Box
Junction Box
Junction Box
VXT
VYT
Vibration Transmitter X Axis
Vibration Transmitter Y Axis
VAHH
Vibration Trip High
EAL
ET
WAL
WIC
WE
WI
WSL
WT
WV
Voltage Alarm Low
Voltage Transmitter
Weight Alarm Low
Weight Controller
Weight Element
Weight Indicator
Weight Switch
Weight Transmitter
Wing Valve
WR-SCSSSV
Wireline Retrievable (Both non equalizing and self- Equalizing)
WS
XZT
ACJB
AJB
CJB
Work Station
XV Position Transmitter
Access Control System Junction Box
Anode Junction Box
Cathode Junction Box
Junction Box
CTVJB
CCTV Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
JBFA
JBFD
JBFV
HJB
JBH
JB
LJB
MJB
F&G Junction Box
F&G Junction Box
F&G Junction Box
Heat trace junction box
High Integrity Protective Systems HIPS (existing facilities)
Junction Box
Lighting Junction Box
Meteorological Equipment Junction Box
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 85 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Junction Box
Line
Line
Line
Line
Line
JBO
PABJB
PAJB
PASJB
SJB
PJB
JBCA
JBCD
JBCF
JBCT
JBC
JBP
JBEA
JBED
JBEV
JBE
JBF
JBS
JBZ
TJB
AC
AG
A
SV
AV
Optical Signal Communication (new facilities)
PA/GA Beacon Junction Box
PA/GA Control I/F Junction Box
PA/GA Speaker Junction Box
PA/GA Speaker Junction Box
Power Junction Box
Process Control Junction Box
Process Control Junction Box
Process Control Junction Box
Process Control Junction Box
Process Control System DCS (existing and new facilities)
S PSS and C Control for Packages (existing facilites), Power Source (new facilites)
Safety Junction Box
Safety Junction Box
Safety Junction Box
Safety System ESD/EDP/LBD (existing facilities), Safety System IPS/PSS (new facilities)
Safety System Fire and Gas (existing and new facilities)
Safety System PSS (existing facilities), Safety System HIPPS (new facilities)
System Communication (new facilities)
Telephone Junction Box
Acid
Acid Gas
Air
Amine Solvent
Atmospheric Vent
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 86 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
BD
VBW
BW
BA
BR
CD
NS
NA
CH
CS
P
CHR
CHS
CA
CO
CC
HW
CW
CL
DG
DM
AF
AI
AP
AS
BO
BT
Blowdown
Boiler Feed Water For VHS
Boiler Feed Water/ Softened Water
Breathing Air
Brine Drain
Carbon Dioxide
Caustic Sewer
Caustic Soda
Chemical
Chemical Contaminated Water
Chemical Process
Chilled Water Return
Chilled Water Supply
Clean Agent Fire Extinguisher Gas
CO2 Fire Fighting Network
Contaminate (Suspect) Condensate
Cooling Water (Fresh) Return
Cooling Water (Fresh) Supply
Corrosion Loop
Defrost Gas
Demineralized Water
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 87 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
BU
CI
CK
D
DE
DHC
DO
DOW
EQA
EQC
EQE
EQF
EQP
EQS
EQT
EQV
EQX
EQY
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
ESDY
DESCRIPTION MISSING
F
FA
FB
FC
FL
FS
GD
GF
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 88 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
GI
GNI
GV
HBW
HC
HCP
HCU
HE
HH
HHS
HSE
IAU
L
LT
MC
MEG
MQXS
MR
MV
NGL
NU
OB
OD
ODU
OG
OK
OL
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 89 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
ON
PA
PDT
PH
PL
PP
RBD
RD
RFD
SCC
SCH
SCL
SCM
SCT
SD
SP
ST
TFC
TL
TR
U
UA
UC
UD
UL
US
UW
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 90 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
UWU
DESCRIPTION MISSING
V
VA
VR
VT
WA
WS
WU
WWA
X
ZSCE
DF
DR
DW
CV
DB
DP
ET
FW
FF
FR
FG
FO
GW
HG
HF
HS
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
DESCRIPTION MISSING
Diluted Foam Solution
Drain
Drinking Water
Dry Gas Flare
Dry Liquid Blowdown
Dry Powder (Chemical)
Ethane
Fire Water
Flushing Fluid
Freon Refrigerant
Fuel Gas
Fuel Oil (Diesel Fuel)
Glycol Solution
Helium
High Expansion Foam Concentrate
High Pressure Steam
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 91 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
HO
HY
IA
LB
LG
LP
SL
LF
LS
LO
MS
ME
NG
GL
N
NR
NW
OW
OZ
OX
PC
PW
PR
RW
RS
SY
SR
Hot Oil
Hydraulic Oil
Instrument Air
Line Branche
Liquefied Natural Gas
Liquefied Petroleum Gas
Liquid Sulphur
Low Expansion Foam Concentrate
Low Pressure Steam
Lube Oil
Medium Pressure Steam
Methane
Natural Gas
Natural Gas Liquid
Nitrogen
Nitrogen Refrigerant
Non Contaminated Water
Oily Contaminated Water
Oxazolidone
Oxygen
Process Condensate
Process Water
Propane Refrigerant
Raw Water (Desalinated Water)
Recovered Slops
Sanitary Sewer
Sea Water Return
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 92 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Manual Valve
Manual Valve
Manual Valve
Manual Valve
Manual Valve
Manual Valve
Manual Valve
Manual Valve
Manual Valve
Manual Valve
SS
SG
SO
SX
SA
SW
SU
SF
SC
TW
VC
VE
VHS
WW
KF
RV
WB
WHV
RVX
VX
CV
DXV
QV
MKV
MMV
MWV
LMV
Sea Water Supply
Seal Gas
Seal Oil
Selexol
Service Air
Service Water
Sour Condensate
Sour Gas Flare
Steam Condensate
Tempered Water
Vacuum Condensate
Vacuum Exhaust
Very High Pressure Steam
Waste Water
Well Kill Fluid
Wet Gas Flare / Tankage Gas Flare
Wet Liquid Blowdown
Annuli Valves (Manual)
Auto Recirculation check Valve A2 Intermediate Annulus
Check Valve
Choke Valve
Diaphragm Valves
Gate/Globe/Ball/Plug/Butterfly Valve Manual valves
Kill Wing Valve (Manual)
Manual Lower Master Valve
Manual Wing Valve/ Flow Wing Valve(Manual)
Master valve (Manual)
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 93 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Manual Valve
Special Item
Special Item
Special Item
Special Item
Special Item
Special Item
Special Item
Special Item
Special Item
Special Item
Special Item
Special Item
Special Item
Special Item
Telecommunication
Telecommunication
VV
BLSP
FLA
HO
HCO
JT
PP
OF
ST
SP
SB
STR
SNR
TL
VV
ACBS
ACRD
Vent Valve / Drain Valve
Blind and Spacer
Flame Arrestor
Hose
Hose Coupling
Joint
Nozzle / Pressure Point
Orifice Flange
Sand Trap
Special Item
Spectacle Blind
Steam Trap
Strainer
Trap Liquid
Vacuum Breaker
Beacon and Sounder
Access Card Reader
Telecommunication
ACS
Access Control System
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
ACBG
ACPB
ACU
ADC
ACPS
ALMD
AMP
ANT
Access Control System Break Glass Window Box
Access Control System Release Push Button
Access Control Unit
ACS Door Contact
ACS Power Supply
Alaram Monitoring Device
Amplifier
Antenna
Telecommunication
ANTUT
Antenna UHF
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 94 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Telecommunication
ANTVT
Antenna VHF
Telecommunication
Telecommunication
RATT
ATU
Attenuator
ATU
Telecommunication
AVAMP
Audio Amplifier
Telecommunication
AVMX
Audio Mixer
Telecommunication
AVPRO
Audio Processor
Telecommunication
Telecommunication
Telecommunication
AVS
APS
BC
Audio Video System
Automatic Protection Switching
Beacon
Telecommunication
BNCPP
BNC Patch Panel (50 OHMS)
Telecommunication
BORA
BORA 600
Telecommunication
PACAB
CAB MediaMatrix for PA/GA System
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
CB8
ACV
TVC
CTVCE
CTVCP
CAB8
Card Access Server
CCTV Camera (All kind of Cameras)
CCTV Camera Explosion proof
CCTV Camera Pole
Telecommunication
CTVCW
CCTV Camera Weather proof
Telecommunication
CTVWS
CCTV Client Station
Telecommunication
CTVFO
CCTV Fiber Options
Telecommunication
CTVJT
CCTV Joystick for Camera Controller
Telecommunication
CTVMN
CCTV Monitor
Telecommunication
Telecommunication
CTVRC
CTSRV
CCTV RCU
CCTV Server
Telecommunication
CTV
CCTV System
Telecommunication
CTVWB
CCTV Washer Unit
Telecommunication
CDPLR
CD Player
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 95 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Telecommunication
Telecommunication
Telecommunication
Telecommunication
CAD
CHG
CVG
CLK
Central Alarm Device
Character Generator
Cisco Analog Voice Gateway
Clock
Telecommunication
RACOM
Combiner
Telecommunication
PACMP
Conman Pc
Telecommunication
CON
Console
Telecommunication
CLAM
Control & Alarm Module
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
CVT
CPP
CRA
DAT
DOL
DPP
DEC
DEH
DSK
ENS
PBXET
DPMS
ESD
ENC
EPIRB
ESDM
ETPF
ETAE
ETP
Convertor
Copper Patch Panel
Crane Radio
Data Equipment
Data Outlet
Data Patch Panel
Decoder
Dehydrator
Desk Console
Dialogic Emergency Notify. Sys
Digital Extender
Dual Port manual switcher
Emergency Shut Down (SHIP)
Encoder
Emergency Position-Indicating Radio Beacon
ESD Module
Engineering Test Panel
ET100AE
ETP
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 96 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Telecommunication
BCTE
EX Tel Beacon
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
FAX
FOF
FOM
FOPP
FSB
FTB
fax
Fiber Optic Filter
Fiber Optic Modem
Fiber Optic Patch Panel
Fiber Splice Box
Fiber Terminal Box
Telecommunication
AVFTB
Fliptop Box
Telecommunication
Telecommunication
FOAC
GAP
FO Accomulator
Gap PC Touch Screen
Telecommunication
HDMX
HDMI eTender
Telecommunication
HOTP
Hot Phone
Telecommunication
Telecommunication
Telecommunication
HLT
IOM
IDF
Hotline
Input / Output Module
Intermediate Distribution Frame
Telecommunication
IPSRV
IPT server
Telecommunication
Telecommunication
Telecommunication
Telecommunication
ISBR
ISMF
LAP
LCD
IS Barrier
ISMT
LAP
LED Screen
Telecommunication
ACMX
Lenel Multiplexer LNL
Telecommunication
Telecommunication
Telecommunication
LCP
LAN
LNB
Light control processor (Lutron)
Local Area Network
Low Noise Amplifier
Telecommunication
ACML
Magnetic Lock
Telecommunication
Telecommunication
MDF
VHF
Main Distribution Frame
Marine VHF Equipment
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 97 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Telecommunication
MXSW
Matrix Switcher
Telecommunication
Telecommunication
Telecommunication
MST
MET
MIC
Message Filter
Meteorological Equipment
Microphone
Telecommunication
AVMIC
Microphone Boundry Layer
Telecommunication
MICGN
Microphone Goose Neck
Telecommunication
Telecommunication
MICW
MWU
Microphone wireless Hand Held
Microwave Unit
Telecommunication
TXX
Miscellaneous Telecom
Telecommunication
MDM
Modem
Telecommunication
Telecommunication
MOD
MUX
Modulator
Multiplexer (other than OTN)
Telecommunication
NEON
Neon
Telecommunication
Telecommunication
Telecommunication
RCK
GTW
NMS
Network / Telecom Rack
Network Gateway
Network Management System
Telecommunication
NION
Nion
Telecommunication
Telecommunication
Telecommunication
NDB
OTN
OLT
Non Direct Beacon Equipment
Open Transport Network
Optical Line Term Equipment
Telecommunication
PAAMP
PA/GA Amplifier
Telecommunication
PAAXT
PA/GA Access unit
Telecommunication
PABC
PA/GA Beacon
Telecommunication
PAETP
PA/GA Engineers Test Panel
Telecommunication
PANC
PA/GA Network Controller
Telecommunication
PASPK
PA/GA Speaker
Telecommunication
PBX
PABX
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 98 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Telecommunication
Telecommunication
Telecommunication
Telecommunication
PAC
PATB
PAG
PIM
PA/GA Central Equipment
PA/GA Terminal Box
Paging Equipment
Panel Interface Module
Telecommunication
PLSCN
Plasma Screen
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
PDP
PIR
PSAC
PSDC
PSSL
PSFS
PSGT
PSU
PWP
PRI
Power Distribution Panel
Passive Infrared Detector
Power Supply AC
Power Supply DC
Power Supply Module
Power Supply Unit
Power Supply Unit
Power Supply Unit
Power Supply Unit
Printer
Telecommunication
PNWF
Processor Network
Telecommunication
PRJ
Projector
Telecommunication
PRJSC
Projector Screen
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
QTX
TET
ACRI
RE
RG48
RDSL
RS485
RSXM
Q-Tel
Radio
Reader Interface
Recorder
RING GENERATOR 48V/25H2
Ringdown Module
RS 485
RSXMM
Telecommunication
SART
Search and Rescue Transponder
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 99 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Telecommunication
SRV
Server
Telecommunication
OTSFP
SFP/TRM - OTN600 - I (Code A)
Telecommunication
Telecommunication
TS
TXS
Access Control Turnstiles
Sounder
Telecommunication
SPKPT
Speaker - Portable
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
SPK
SMIF
SPL
SWT
ACLK
Speaker Ceiling Mount
Speaker Monitor ISMT
Splitter
All switches
Strike Lock
Telecommunication
SSMD
System Selector Module
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
TES
TCB
TED
TEL
TLR
TAH
TELA
TIFM
TOL
TTB
TEQ
TTRD
TTRH
TTRV
TTRA
AVTP
Tel Sounder
Telecom Cabinet / Panel
Telecom Dish
Telephone
Telephone & Line Recorder
Telephone Acoustic Hood
Telephone Indoor Analogue
Telephone Interface Module
Telephone Outlet
Telephone Terminal Box
Test Equipment
TETRA Radio Desk Top
TETRA Radio Hand Held
TETRA Radio Vehicle
TETRA. Terrestrial Trunked Radio
Touch Panel
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 100 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Telecommunication
Telecommunication
Telecommunication
TSPC
THL
TMR
Touch screen pc (CPU )
Trans Horizon Link
Trunked Mobile Radio
Telecommunication
UHFDT
UHF Radio Desk Top
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
Telecommunication
UHF
UHFH
ULM
UPS
VMX
VMO
VAL
VHFA
UHF Radio Equipment
UHF Radio Hand Held
ULM 8 port
UPS
VCL Mux.
VCL Optimux
VCL Remote Alarm Device
VHF Aeronautical Radio
Telecommunication
VHFDT
VHF Marine Radio Desk Top
Telecommunication
Telecommunication
VHFH
VCON
VHF Marine Radio Hand Held
Video Conference
Telecommunication
VCU
Video Conference Unit
Telecommunication
VIDW
Video Wall
Telecommunication
Telecommunication
VML
WAP
VoiceMail
Access point
Telecommunication
WDM
Wave Division Mux
Telecommunication
MICCN
Wired Mic Condencer
Telecommunication
WST
Workstation
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 101 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
APPENDIX 4 – PACKAGE NUMBERS
Package Letter Number A B C D E F G G H H H R R R S S S J K L M N Q P
Item Suffix
Sequence Number
Number For Piping
A B A B C A B C A B C
K0601 K0602 K0603 K0604 K0605 K0801 K0901A K0901B P0201A P0201B P0201 C P0202A P0202B P0202C P0203A P0203B P0203C XZ8301 XZ8302 XZ8303 XZ8304 Y0202 Y0203 Y0903
01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 50 51 through 99 01 through 33 34 through 66 67 through 99 01 through 33 34 through 66 67 through 99 01 through 33 34 through 66 67 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99
System Numbers: 07 and 27
Package Letter Number A A B C D D D E F
Item Suffix
Sequence Number
Number For Piping
A B
K0701A K0701B Y7301 Y7401 T7101 T7102 T7103 T7104 XC702
01 through 50 51 through 99 01 through 99 01 through 99 01 through 50 51 through 75 71 through 99 01 through 99 01 through 99
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 102 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
System Numbers: 08 and 28
Number For Piping
Item Suffix
A B A B C A B C D A B C D A B C D E A B A B A B
Package Letter Number A A B B B C C C C D D D D I I I I I E E F F G G H Y J J K L M N Z P Q R S T U U
Sequence Number
P8301A P8301B P8303A P8303B P8303C S8201A S8201B S8201C S8201D S8202A S8202B S8202C S8202D P8201A P8201B P8201 C P8201 D P8201E XZ8301A XZ8301B XZ8302A XZ8302B XZ8303A XZ8303B XZ8304 XZ8305 XZ8306A XZ8306B XZ8307 XZ8311 XZ8312 XZ8313 XZ8314 XZ8315 Y8101 Y8201 Y8403 Y8404 Y8406 LB8404A/B, AND 8408
01 through 50 51 through 99 01 through 33 34 through 66 67 through 99 01 through 25 26 through 50 51 through 75 76 through 99 01 through 25 26 through 50 51 through 75 76 through 99 01 through 20 21 through 40 41 through 60 61 through 80 81 through 99 01 through 50 51 through 99 01 through 50 51 through 99 01 through 50 51 through 99 01 through 99 01 through 99 01 through 50 51 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 99 01 through 49 50 through 99
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 103 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Package Letter Number V V
X X X X X X X X Y Y Y Y Y
Item Suffix
Sequence Number
Number For Piping
A B
Y8601 Y8602 and Sulphur Handling System Y8707A Y8707B Y8705 Y8701 Y8702 Y8708 Y8709 Y8710 A8723 A8726 A8727 A8728 A8729
01 through 49 50 through 99
A01 through A20 B01 through B20 21 through 40 (For Piping and Instrument) 41 through 50 (For Piping and Instrument) 51 through 60 (For Piping and Instrument) 61 through 70 (For Piping and Instrument) 71 through 80 (For Piping and Instrument) 81 through 90 (For Piping and Instrument) 01 through 10 11 through 20 21 through 30 31 through 40 41 through 50
System Numbers: 09 and 29
Package Letter Number A A A A B B B C C C C D D D D D D E E
Item Suffix
Sequence Number
Number For Piping
A B C D A B C A B C D A B C D E F A B
K9501A K9501B K9501C K9501D P9202A P9202B P9202C B9201 B9202 B9203 B9204 69101 69102 69103 69104 69105 69106 P9402A P9402B
A01 through A99 B01 through B99 C01 through C99 D0I through D99 01 through 33 34 through 66 67 through 99 01 through 25 26 through 50 51 through 75 76 through 99 A01 through A99 B01 through B99 C01 through C99 D01 through D99 E01 through E99 F01 through F99 01 through 33 34 through 66
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 104 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Package Letter Number E F F F J J K P Q R S S S S S T U V W X X X X Y Z
Z
Z
Item Suffix
Sequence Number
Number For Piping
C A B C A B
A B C D
A B C D
A
B
P9402C P9405A P9405B P9405C G9110 G9111 69115 Y9201 Y9202 Y9203 Y9401A Y9401B Y9401 C Y9401D Y9407 Y9402 Y9403 Y9405 Y9406 Y9501A Y9501B Y9501C Y9501D Y9502 Y9602A/ Y9603A Y9602B/ Y9603B Y9602AB Y9603AB
67 through 99 01 through 33 34 through 66 67 through 99 A01 through A99 B01 through B99 01 through 99 01 through 99 01 through 99 01 through 99 A01 through A80 B01 through B80 C01 through C80 D01 through D80 81 through 99 (For Piping and Instrument 01 through 99 01 through 99 01 through 99 01 through 99 A01 through A99 B01 through B99 C01 through C99 D01 through D99 01 through 99 A01 through A199
B01 through B199
01 through 199 (For Piping between each skid)
Package Numbers - QG2 Project Specific - Package Numbers to be developed by Project. For numbering methodology refer to
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 105 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
For non-package items 0 should be placed in the Package Number field to retain tag structure integrity. System Numbers:
Item Suffix
Sequence Number
Number For Piping
01 through 99
Package Letter Number A B C D
Package Numbers – QG3 Project Specific - Package Numbers to be developed by Project. For numbering methodology refer to.
For non-package items 0 should be placed in the Package Number field to retain tag structure integrity. System Numbers:
Item Suffix
Sequence Number
Number For Piping
01 through 99
Package Letter Number A B C D
Package Numbers – QG4 Project Specific - Package Numbers to be developed by Project. For numbering methodology refer to
For non package items 0 should be placed in the Package Number field to retain tag structure integrity. System Numbers:
Item Suffix
Sequence Number
Number For Piping
01 through 99
Package Letter Number A B C D
Package Numbers - Refinery Project Specific - Package Numbers to be developed by Project. For numbering methodology refer to.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 106 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
For non-package items 0 should be placed in the Package Number field to retain tag structure integrity. System Numbers:
Item Suffix
Sequence Number
Number For Piping
01 through 99
Package Letter Number A B C D
Package Numbers - Helium Project Specific - Package Numbers to be developed by Project. For numbering methodology refer to.
For non-package items 0 should be placed in the Package Number field to retain tag structure integrity. System Numbers:
Item Suffix
Sequence Number
Number For Piping
01 through 99
Package Letter Number A B C D
APPENDIX 5 – VOLTAGE LEVELS ADDITIONS OR CHANGES TO THIS TABLE MUST BE APPROVED BY QATARGAS BUSINESS & PROCEDURES BEFORE IMPLEMENTATION.
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 107 of 115
Code
Description
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
1 2 3 4 5 6 7 8 9
High Voltage (HV) – 33 kV High Voltage (HV) - 6.6 kV Low Voltage – (LV) 690V / 415V / 400V / 240 V AC UPS - 120V / 230V AC UPS - 125V / 48V / 24V DC High Voltage (HV) – 11 kV High Voltage (HV) – 22 kV High Voltage (HV) – 66 kV High Voltage (HV) – 132 kV / 220 kV
APPENDIX 6 – TELECOMMUNICATIONS LOCATION CODES
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 108 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Location Description
Boil of Gas
Bridge Support 1 Platform
Bridge Support 2 Platform
Canteen
Cellar Deck
Condensate Loading Area
Condensate Storage Area
Control and Auxiliary Model (Telecom Equip Cabin)
Code
BOG
BS1
BS2
CA
CD
CL
CS
Location Description
LNG Storage Tank 3 Area
Lower Deck
NG Storage Tank 4 Area
Main Control Building
Main Deck
Main Gate House
Main Sub Station Area
Code
ST3
LD
ST4
MCB
MD
MGH
MSU
CAM
Maintenance Workshop Area
MWA
Crisis Management Centre
CMC
Marine Terminal Building
Downstream Flare
Emergency Control Centre
Emergency Diesel Gen 1
Emergency Diesel Gen 2
Fabrication Workshop Area
Fire Station
Flare Platform
Garage Area
Gas Turbine Generator Area 1
Gas Turbine Generator Area 2
Gas Turbine Generator Area 3
Gas Turbine Generator Area 4
Gas Turbine Generator Area 5
Headquarters Admin Area Level 1
Headquarters Admin Area Level 2
Headquarters Admin Area Level 3
Headquarters Admin Area Level 4
Helideck
HVAC Utility
Instrument Technical Room
Intermediate Platform
Jacket Top
Laboratory Area
Level 1
FLD
ECC
ED1
ED2
FA
FS
FLP
GA
GT1
GT2
GT3
GT4
GT5
HQ1
HQ2
HQ3
HQ4
HD
HU
ITR
IP
JT
LAB
L1
Medical Centre
Mezzanine Deck
Plant Gate House
Power Control Centre
Process and Utility Platform
Process Platform
Radio Tower
Receiving/ Control Building Area
Receiving/ Process Area
Receiving/ Slug Catcher Area
Receiving/ Utility Area
Receiving/Flare & KO Drums Area
Roof Deck
Sea Water Intake
Sub-Station
Sulphur Handling and Recovery Area
Sulphur Loading Area
Training Centre
Upper Deck
Utility Area Downstream
Warehouse Area A
Warehouse Area B
Warehouse Area C
Warehouse Area D
MTB
MC
MEZ
PGH
PCC
PU
PR
RT
UCB
UPR
SL
UTU
FLU
RD
SWI
SS
SH
SL
TC
UD
UTD
WHA
WHB
WHC
WHD
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 109 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
Location Description
Code
Location Description
Level 2
Level 3
Living Quarters Platform
LNG Storage Tank 1 Area
LNG Storage Tank 2 Area
Wellhead access deck
L2
L3
LQ
ST1
ST2
AD
Wellhead Platform 1
Wellhead Platform 2
Wellhead Platform 3
Wellhead Platform 4
Wellhead Platform 5
Wellhead Platform 6
Code
WH1
WH2
WH3
WH4
WH5
WH6
APPENDIX 7 – ONLY FOR QG1 UPSTREAM MINOR BROWN FIELD: CODE TABLES
Equipment Type Codes
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 110 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
DESCRIPTION
CODE
Air Cooler
Boiler
Column
Drum
Diesel Engine
Heat Exchanger
Filter
Flare
Electric Generator
Gas Generator
Heater
Ejector
Compressor or Blower
Turbo-Expander
Pig Launcher/Receiver
Mixer, Agitator
Electric Motor
Pump
Reactor
Sampling Connection/Point
Steam Turbine
Tank
Gas Turbine
Package Unit
Miscellaneous Equipment, Cranes
A
B
C
D
Suffix
xD
Suffix
E
F
FL
G
xG
H
J
K
KT
L
M
Suffix
xM
P
R
SC
xS
T
xT
U
X
Suffix
Suffix
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 111 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
AREAS
UNITS
DESCRIPTION
Common Unit Numbers
CF
OF
ON
DC
TE
00
01
02
03
04
Overall Project
Common Facilities Offshore
Common Facilities Onshore
Control Systems
Telecommunications
AREAS
UNITS
DESCRIPTION
Onshore Unit Numbers
UP
ST
CL
IF
CT
IR
80
81
82
83
84
85
86
87
88
89
90
91
93
78
Common Facilities, Receiving Facilities and Condensate Stabilization Plant
Condensate Stabilization and Gas Transfer Unit 1
Condensate Stabilization and Gas Transfer Unit 2
Condensate Stabilization and Gas Transfer Unit 3
Common Unit, Condensate Stabilization, Off-Gas Compression and Flares
Utilities Production and Off-sites
Main Power Generation (Future)
Onshore Pipelines
Condensate Storage Facilities
Condensate Loading Facilities
NF1/NF2 Interconnection
Condensate Treatment Facilities (Process)
Condensate Treatment Facilities (Utilities)
Ragas Interconnection
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 112 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
AREAS
UNITS
DESCRIPTION
Offshore Unit Numbers
WH
PR
PC
IN
PU
JA
FL
LQ
10
11
12
13
15
19
20
23
25
26
27
28
29
30
40
50
51
52
53
54
55
56
57
58
59
60
61
62
69
70
71
Common Facilities Wellhead Platform
Wellhead Platform No. 1
Wellhead Platform No. 2
Wellhead Platform No. 3
Utilities
Jackets
Common Facilities including Flares, Production Platform
Closed/Open Drains
Utilities Distribution
Power Distribution
Sea Water Cooling
Fuel Gas Distribution
Jacket PR Platform
Process/Compression Platform (future)
Injection Platform (future)
Common Facilities Inc. Flares, Process & Utilities Platform
Process Train No. 1
Process Train No. 2
Closed/Open Drains
Oily Water Treatment
Utilities Production
Power Generation
Sea Water Cooling
Fuel Gas/Diesel
Jacket PU Platform
Common Facilities Flare, Bridges & Support
Flare Tower Topsides
Bridges, Supports
Flare Tripod
Common Facilities Accommodation Platform Topside.
Common Facilities Accommodation Platform Topside.
Qatargas Equipment Numbering Philosophy
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 113 of 115
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
AREAS
UNITS
DESCRIPTION
72
73
75
76
79
65
JA
SL
Common Facilities Accommodation Platform Topside.
Closed/Open Drains/Distribution
Utilities
Power Generation/Distribution
Jacket Accommodation Platform
Sealine
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 114 of 115
Qatargas Equipment Numbering Philosophy
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-008 Procedure
APPENDIX 8 – LIST OF PROJECT SPECIFICATIONS FOR REFERENCE
SL
Number
Title
Old project numbering procedures
003-00-51-IN-DP-00-002 010-00-00-EL-TS-00-102 010-00-00-PE-PC-00-002 010-00-51-IN-TS-00-205 218-20-00-EL-PC-NA-001 218-20-00-IN-PC-NA-002 218-20-00-PE-PC-NA-303
Instrument Numbering System, and Signal Tagging Philosophy 1 Electrical Numbering System 2 Equipment Numbering Procedure 3 Numbering and Identification Procedure for Instrument 4 Equipment Numbering Procedure - Berth 6 5 Instrument Numbering Procedure and P&ID Symbols - Berth 6 6 7 Equipment / Line/ Instrument Numbering Procedure - Berth 6 8 DB-T041-ST-U-88-00-00-0012 QG upstream 4th Storage tank project Equipment numbering 9 DB-V001-ON-U-02-00-00-0012 Train 3 equipment and numbering procedure 10 QCS-50-00-EL-PC-NA-001 11 QCS-50-00-IN-PC-NA-002 12 QCS-50-00-PE-PC-NA-303 13 QCS-50-83-CS-PC-NA-001 14 QCS-50-83-CS-PC-NA-001 15 QCS-50-83-CS-PC-NA-001 16 QCS-50-83-CS-PC-NA-001 17 QCS-50-83-CS-PC-NA-001 18 210-30-20-PE-PC-NA-024 19 QGX-20-00-EL-PC-NA-001 20 QGX-20-00-IN-PC-NA-002 21 QGX-20-00-PE-PC-NA-303 22 RP-C005-PU-U-00-60-46-0001 QG upstream PU top electrical identification and numbering. 23 RP-V001-CF-U-00-60-46-0001 QG upstream 3rd train development Electrical equipment 24 RP-C004-CF-U-00-60-46-0001 QG upstream Electrical equipment numbering
Electrical Numbering System Instrument Numbering Procedure and P&ID Symbols Equipment / Line / Instrument Numbering Procedure Procedure for Numbering Fire Fighting Equipment at QG 3&4 PLANT LOCATION CODES for QG3&4 Plant Location Code for QG3&4 Fire Fighting Equipment EQUIPMENT CODES for QG3&4 Equipment Code for QG3&4 Fire Fighting Equipment QG2 Offshore numbering procedure Electrical Numbering Procedure Instrument Numbering Procedure and P&ID Symbols Equipment / Line / Instrument Numbering Procedure
Effective Date 04 Aug 2022
Rev 16 Criticality Level: Medium Classification: Internal
Page 115 of 115
Qatargas Equipment Numbering Philosophy
Project: Q-21699 - Saipem COMP2 Folder: RFQ Files