Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
FACILITIES DOCUMENTATION METADATA REQUIREMENTS PROCEDURE
APPROVAL
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 1 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
REVISION HISTORY
Rev No.
Issue Date
Revision Description
00
18 JUN 2019
First Issue The following documents have been combined into this procedure and withdrawn: • 01.50.08.10: Final Documentation Electronic
Data
• RG-DFO-002: RasGas Facilities Document Metadata and Numbering Procedure
Valid Until Date
17 JUN 2022
01
02
25 AUG 2019 Minor changes to Appendix 4 and 8 to reflect latest
24 AUG 2022
30 DEC 2019
requirements
Attribute “Category” added Changes applied to Metadata Matrix (Section 2.1) to reflect latest requirements Appendix 3 - Engineering Document Type and SubType Codes - added Appendix 9 - Changes applied to all Templates to reflect latest requirements
29 DEC 2022
03
31 MAY 2020 Appendix 4 - combination Vendor Document Type
08 JUN 2023
04
16 AUG 2020
DIG, SubType NWD added Appendix 8 - Contractor Code / Description QCTC - QATAR CONSTRUCTION TECHNIQUE COMPANY WLL added Appendix 9 - Changes applied to all Templates to reflect latest metadata requirements
Changes applied to Metadata Matrix (Section 2.1) to reflect latest requirements for Engineering and Vendor Document Numbering requests Appendix 6 - Asset Codes updated to reflect latest changes Appendix 9 - Changes applied to all Templates to reflect latest metadata requirements
30 AUG 2023
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 2 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
05
04 OCT 2020
06
15 NOV 2020
Appendix 4 - combination Vendor Document Type ITP, SubType NA added Appendix 9 - Changes applied to all Templates to reflect latest metadata requirements
Appendix 3 - combination Engineering Document Type LIS, SubTypes PSS and TIL added Appendix 8 - Contractor Codes BHU, DEW and NOC added Appendix 9 - Changes applied to all Templates to reflect latest metadata requirements
Rev No.
Issue Date
Revision Description
07
17 JAN 2021
Section 2.1.3 - Note added Section 2.1.7 - Table 4 updated to reflect latest metadata requirements Appendix 4 - combination Vendor Document Type DAT, SubType SWD added Appendix 9 - Changes applied to all Templates to reflect latest metadata requirements
11 OCT 2023
29 NOV 2023
Valid Until Date
01 FEB 2024
08
19 MAY 2021 Appendix 8 - Contractor Code CTC added
30 MAY 2024
09
29 AUG 2021
10
14 DEC 2021
Appendix 9 - Changes applied to all Templates to reflect latest metadata requirements
Appendix 3 - combination Engineering Document Type LIS, SubType MDR removed Appendix 3 - Engineering Document Type REQ removed Appendix 8 - Contractor Codes MGW and TRSA added Appendix 9 - Changes applied to all Templates to reflect latest metadata requirements
Appendix 8 - Contractor Code MCD added Appendix 9 - Changes applied to all Templates to reflect latest metadata requirements
11 SEP 2024
11 JAN 2025
11
25 MAY 2022 Appendix 8 - Contractor Codes MIC, SPS and TWJV
09 JUN 2025
added Appendix 9 - Changes applied to all Templates to reflect latest metadata requirements
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 3 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
CONTENTS
1 GENERAL …6
1.1 Purpose… 6 1.2 Scope … 6 1.3 Criticality… 6 1.4 Key Risks and Controls … 6 1.5 Classification … 6 1.6 Compliance … 7 1.7 Roles and Responsibilities … 7 2 METADATA …8
2.1 Metadata Matrix and requirements … 8 2.1.1 Category … 9
2.1.2 Number … 10
2.1.3 Part … 10
2.1.4 Revision … 10
2.1.5 Working Copy Number … 10
2.1.6
Title … 10
2.1.7
Issue Reason … 11
2.1.8
Issue Date … 11
2.1.9 Document Type … 11
2.1.10 Document SubType … 11
2.1.11 Discipline … 11
2.1.12 SubDiscipline … 11
2.1.13 Location… 12
2.1.14 Facility … 12
2.1.15 Asset … 12
2.1.16 Train / Area … 12
2.1.17 System … 12
2.1.18 Unit / Wellhead … 12
2.1.19 Line Number … 13
2.1.20 Loop Number … 13
2.1.21 Tags … 13
2.1.22 Buildings … 13
2.1.23 Contract / Project Code … 13
2.1.24 PO Number … 13
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 4 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
2.1.25 Vendor … 13
2.1.26 External Reference Number … 13
2.1.27 Number of Pages… 13
2.1.28 Size … 14
2.1.29 PDF File … 14
2.1.30 Native File … 14
2.1.31 Contractor … 14
2.1.32 Contractor Transmittal Number … 14
2.1.33 Additional Template Attributes … 15
2.2 Tag Number Link-Level … 16 2.3 Addition and Changes … 16 APPENDICES … 17
Appendix 1 - References and Relevant Documents … 17 Appendix 2 - Glossary of Terms: Definitions, Acronyms and Abbreviations … 18 Appendix 3 - Engineering Document Type and SubType Codes … 19 Appendix 4 - Vendor Document Type and SubType Codes … 22 Appendix 5 - Discipline - SubDiscipline Codes … 24 Appendix 6 - Asset Codes … 26 Appendix 7 - Train / Area Codes … 29 Appendix 8 - Contractor … 32 Appendix 9 - List of Templates … 35
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 5 of 35
Classification: Internal
1 GENERAL
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
1.1 PURPOSE The objective of this procedure is to define rules for the creation of metadata as part of the handover of Project Information to Company which is required for the operation and maintenance of the plant / facility throughout its entire operational life cycle.
1.2 SCOPE This procedure defines the metadata requirements and taxonomies for the project technical information deliverables.
This procedure shall be applied for the metadata provision of the technical information deliverables produced and / or modified for all project categories.
In the context of this procedure, “Information Deliverables” refers to Engineering Documents, Vendor Documents, Manufacturer Documents, Construction Documents and Fabrication Documents produced by Contractors, their Subcontractors, Vendors and Manufacturers.
1.3 CRITICALITY This Procedure has been determined to be a Medium Criticality document.
Criticality Level : Medium
1.4 KEY RISKS AND CONTROLS The key risks and controls associated with this procedure are listed below. This is not intended to be an exhaustive list of all possible risks and controls, but highlights the most common inherent risks and most basic controls which need to work to deliver the intended objective of the process.
Key Risks
Key Controls
• Metadata provided as per defined taxonomies in the procedure.
• Documents with incorrect or
incomplete metadata
• Documents without associated file(s) • Documents cannot be uploaded into
Company EDMS
• Users are unable to retrieve
documents from Company EDMS
Table 1 - Key Risks and Controls
1.5 CLASSIFICATION This Procedure has been classified as Internal based on INF-ISG-POL-001 Information Classification Policy.
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 6 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
1.6 COMPLIANCE All projects shall comply with the requirements as defined in this procedure for the effective handover of Project Information to Company.
Compliance with this procedure is verifiable by Company Technical Documentation section at any time during project execution.
1.7 ROLES AND RESPONSIBILITIES Roles and responsibilities related to this procedure are as defined in Section 1.6 of Procedure PRJ-PJL-PRC-006 (Project Information Handover).
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 7 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
2 METADATA Metadata is a set of data that describes and gives information about other data. Metadata contain information needed to understand and effectively use the data. In other words, it’s information that is used to describe the data that is contained in a document and / or file.
This section describes the detailed metadata requirements and taxonomies for the project technical information deliverables.
2.1 METADATA MATRIX AND REQUIREMENTS This section provides the matrix and describes the detailed Engineering Document Register (EDR) and Vendor Document Register (VDR) metadata requirements and taxonomies for the project technical information deliverables.
Attribute Name
Category
Number
Part
Revision
Working Copy Number
Title
Issue Reason
Issue Date
Document Type
Document SubType
Discipline
SubDiscipline
Location
Facility
Asset
Train / Area
Engineering
Vendor
Documents
Documents
(O)ptional / (M)andatory
(O)ptional / (M)andatory
M ¹
M
M
M
M *
M ¹
M
M
M ¹
M ¹
M ¹
M ¹
M ¹
M ¹
M ¹
M ¹
M ²
M
M
M
M *
M ²
M
M
M ²
M ²
M ²
M ²
M ²
M ²
M ²
M ²
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 8 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Attribute Name
System
Unit / Wellhead
Line Number
Loop Number
Tags
Buildings
Contract / Project Code
PO Number
Vendor
External Reference Number
Number of Pages
Size
PDF File
Native File
Contractor
Contractor Transmittal Number
Engineering
Vendor
Documents
Documents
(O)ptional / (M)andatory
(O)ptional / (M)andatory
M ¹
M ¹
M *
M *
M *
M *
Not Applicable
Not Applicable
Not Applicable
O
M
M
M
M *
M ¹
O
M ²
M ²
M *
M *
M *
M *
M ²
M ²
M ²
M
M
M
M
M *
M ²
O
-
- refer to specific Section within the Procedure for detailed requirements ¹ - required attributes for Engineering Document Number request ² - required attributes for Vendor Document Number request
Table 2 - EDR and VDR Metadata Matrix
2.1.1
CATEGORY
Category indicates the category to which a Document belongs, in relation to the allowable Document Type / SubType (refer to Section 2.1.9 and 2.1.10), and should contain one of the following values:
Code
Description
ENG
VEN
Engineering Document
Vendor Document
Table 3 - Category
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 9 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
2.1.2
NUMBER
Number identifies the Document Number assigned to a document or drawing. For the assignment of Document Numbers, refer to Procedure PRJ-PJL-PRC-004 (Facilities Engineering and Vendor Document Numbering).
2.1.3
PART
Part is the main sheet number of the Document and consist of four (4) digits and shall be 0001 for all new technical information deliverables.
In the case of Drawings where a single Document consists of multiple sheets, refer to Section 2.4 of Procedure PRJ-PJL-PRC-004 (Facilities Engineering and Vendor Document Numbering) for related requirements. PDF file for multi-sheet documents shall be a single representation of the complete document and Native Files shall be combined together into a .ZIP file.
Note: only for Final Deliverables related to Document Type “BOK”, i.e. Fabrication Records Book (FRB), Manufacturing Records Book (MRB) and Ready for Commissioning / Ready for Start-up Dossier (CMD), Document can have one or more Parts. Part number shall start from 0001 and can continue up to Part number 9999.
2.1.4
REVISION
Revision is the number defining current version of the Document.
The first revision of a newly created deliverable Document by Contractor to be delivered to Company at final handover should be 50.
Any existing Document requested by Contractor “For Update” and submitted to Company at final handover should follow:
- Revision number +1 to the Document issued to Contractor “For Update” where current
revision of the Document equals 50 or higher.
- Revision number 50 where current revision of the Document issued to Contractor “For
Update” <50.
2.1.5 WORKING COPY NUMBER
Working Copy Number is the number generated by the system identifying Document is checked- out “For Update”.
Working Copy Number is generated upon the creation of a new Document Number or when an existing Document is checked-out.
Working Copy Number is a mandatory attribute for uploading Early and Final Deliverables into Company system.
2.1.6
TITLE
Title is the actual subject of the Document.
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 10 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
2.1.7
ISSUE REASON
Issue Reason indicates the reason for which a Document is issued and should contain one of the following values:
Code
Description
AB
CN
FN
As-Built
Cancelled
Final
Table 4 - Issue Reason
2.1.8
ISSUE DATE
Issue Date indicates the date when the applicable revision of the Document is issued.
The following date format shall be followed: DD-Mmm-YYYY.
2.1.9
DOCUMENT TYPE
Document Type identifies the type related to the Document
For Engineering Documents (Category = ENG) the Document Type should contain one of the values as defined in Appendix 3.
For Vendor Documents (Category = VEN) the Document Type should contain one of the values as defined in Appendix 4.
2.1.10 DOCUMENT SUBTYPE
Document SubType identifies the subtype related to the Document Type.
For Engineering Documents (Category = ENG) the Document SubType should contain one of the values as defined in Appendix 3 in relation to defined Document Type.
For Vendor Documents (Category = VEN) the Document Type should contain one of the values as defined in Appendix 4 in relation to defined Document Type.
2.1.11 DISCIPLINE
Discipline identifies the discipline code related to the Document and should contain one of the values as defined in Appendix 5, in line with Appendix 14 in Procedure PRJ-PJL-PRC-004 (Facilities Engineering and Vendor Document Numbering).
2.1.12 SUBDISCIPLINE
Sub Discipline identifies the sub discipline code related to the discipline of the Document and should contain one of the relationship values as defined in Appendix 5.
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 11 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
2.1.13
LOCATION
Location indicates the relation of a Document to Offshore or Onshore facility and should contain one of the following values:
Code
Description
OF
ON
Offshore
Onshore
2.1.14 FACILITY
Table 5 - Location
Facility indicates the relation of a Document to the specific facility and should contain one of the following values:
Code
Description
BZ
LR
QG
QN
QS
TO
Barzan
Laffan Refinery
Qatargas (new Qatargas facilities post integration)
Qatargas North (existing Qatargas North facilities prior integration)
Qatargas South (existing Qatargas South facilities prior integration)
Ras Laffan Terminal Operations
Table 6 - Facility
2.1.15 ASSET
Asset is a group of trains / areas and identifies the asset related to the Document and should contain one of the values as defined in Appendix 6.
2.1.16 TRAIN / AREA
Train / Area is a part of an asset and identifies the train / area related to the Document and should contain one of the values as defined in Appendix 7.
2.1.17 SYSTEM
System number code identifies the system to which a document or drawing belongs. For system numbers, refer to Procedure PRJ-PJL-PRC-005 (System Number and Unit Number Codes and Descriptions).
2.1.18 UNIT / WELLHEAD
Unit / Wellhead number code identifies the unit to which a document or drawing belongs. For Unit numbers refer to Procedure PRJ-PJL-PRC-005 (System Number and Unit Number Codes and Descriptions).
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 12 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
2.1.19
LINE NUMBER
Line Number identifies the line number(s) related to the Document and is mandatory to be populated only for Isometrics and P&IDs.
2.1.20
LOOP NUMBER
Loop Number identifies the loop number(s) related to the Document and is mandatory to be populated for Instrument Loop Diagrams only.
2.1.21 TAGS
Tags identifies the tag number(s) related to the Document.
2.1.22 BUILDINGS
Buildings identifies the building tag number(s) related to the Document and is mandatory to be populated for documents related to Buildings only. For existing building numbers, refer to building list as identified in the data dictionary IM-DD-T001.
2.1.23 CONTRACT / PROJECT CODE
Qatargas Contract Number as part of the Vendor Document Number as defined in Section 2.2.1 in Procedure PRJ-PJL-PRC-004 (Facilities Engineering and Vendor Document Numbering). Contract Number and is applicable to Vendor Documents only.
2.1.24 PO NUMBER
PO Number is the Purchase Order Number as part of the Vendor Document Number as defined in Section 2.2.2 in Procedure PRJ-PJL-PRC-004 (Facilities Engineering and Vendor Document Numbering). PO Number is applicable to Vendor Documents only.
2.1.25 VENDOR
Vendor identifies the Vendor and / or Manufacturer Name and is applicable to Vendor Documents only. In case the Manufacturer is not the same as the Vendor, Manufacturer Name shall be populated.
2.1.26 EXTERNAL REFERENCE NUMBER
External Reference Number for Engineering Documents identifies the Contractor internal Document Number and is optional to be populated.
External Reference Number for Vendor Documents identifies the Vendor internal Document Number and is mandatory to be populated.
2.1.27 NUMBER OF PAGES
Number of Pages identifies the total number of pages / sheets of the Document.
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 13 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
2.1.28 SIZE
Size indicates the original ISO Standard A size of a Document and should contain one of the following values:
Code
Description
A0
A1
A2
A3
A4
A5
ISO Standard Size A0 (to be used in exceptional cases only)
ISO Standard Size A1
ISO Standard Size A2
ISO Standard Size A3
ISO Standard Size A4
ISO Standard Size A5 (to be used in exceptional cases only)
Table 7 - Size
2.1.29 PDF FILE
For detailed PDF File requirements, refer to Section 7.1.1 and Section 7.1.2 in Procedure PRJ-PJL- PRC-006 (Project Information Handover).
2.1.30 NATIVE FILE
For detailed Native File requirements, refer to Section 7.1.1 and Section 7.1.2 in Procedure PRJ- PJL-PRC-006 (Project Information Handover).
2.1.31 CONTRACTOR
Contractor identifies the Contractor Name and should contain one of the values as defined in Appendix 9.
2.1.32 CONTRACTOR TRANSMITTAL NUMBER
Transmittal Number is the number reflected on the transmittal sheet used by Contractor or PMT to handover documentation to Company.
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 14 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
2.1.33 ADDITIONAL TEMPLATE ATTRIBUTES
Additional metadata fields used to identify multiple relations of a document to a specific attribute are identified in the templates by [R]. Multiple values in these fields shall be separated by a semicolon “;” and no spaces shall be there in front and after the semicolon.
The above applies to the following metadata fields:
• Additional Facilities [R] • Additional Assets [R] • Additional Trains/Areas [R] • Additional Systems [R] • Additional Units/Wellheads [R] • Line Number [R] • Loop Number [R] • Tags [R] • Buildings [R]
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 15 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
2.2 TAG NUMBER LINK-LEVEL Tag Numbers to be populated in the EDR and VDR are Line Numbers, Loop Numbers, Tags and Buildings as described in Section 2.1.19 to Section 2.1.22 and should be in compliance with Company Equipment Numbering Philosophy.
Detailed link-level requirements for Engineering Documents are defined in Template QG-PIH-IM- 03-T002 - Engineering IM Deliverables as part of Procedure PRJ-PJL-PRC-006 (Project Information Handover). All Vendor Documents shall be linked to relevant Tag Numbers.
2.3 ADDITION AND CHANGES Qatargas Head of Technical Documentation & Drafting Services shall approve any addition or change to the valid value entries before implementation.
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 16 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
APPENDICES
APPENDIX 1 - REFERENCES AND RELEVANT DOCUMENTS
Number
Title
PRJ-PJL-PRC-004
Facilities Engineering and Vendor Document Numbering
PRJ-PJL-PRC-005
Facilities System and Unit Number Codes and Descriptions
PRJ-PJL-PRC-006
Project Information Handover
PRJ-PJL-PRC-008
Qatargas Equipment Numbering Philosophy
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 17 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
APPENDIX 2 - GLOSSARY OF TERMS: DEFINITIONS, ACRONYMS AND ABBREVIATIONS
Term
Description
COMPANY
Qatargas Operating Company Limited
EDR
PO
P&ID
VDR
Engineering Document Register
Purchase Order
Piping and Instrumentation Diagram
Vendor Document Register
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 18 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
APPENDIX 3 - ENGINEERING DOCUMENT TYPE AND SUBTYPE CODES
Engineering Type
Engineering Type Description
ANL
Analysis
BLD
Block Diagram
BOK
Book
CAL
CED
Calculation
Cause & Effect Diagram
DEC
Design Criteria
DID
Ducting & Instrument Diagram (HVAC)
DIG
Diagram
DTS
Data Sheet
DWG
Drawing
Engineering SubType SSA STA
NA
CMD
FRB
MRB
NA
NA DEB
DEP
OPP
PRD
NA
ISD
LGD
LPD
NWD
SAD
TSD
WRD
IDS
MDS
PDS
PRV
PSV
RPD
SDS
CLD
DET
DIM
ELD
Engineering SubType Description
Stress Analysis Structural Analysis
Not Applicable Ready for Commissioning (RFC) and Ready for Start-up (RFSU) Dossier Fabrication Records Book
Manufacturing Records Book Not Applicable
Not Applicable
Design Basis
Design Philosophy
Operating Philosophy
Process Description
Not Applicable
ICS Security Diagram
Logic Diagram
Loop Diagram
Network Diagram (ICS) System Architectural Diagram (ICS) Trouble Shooting Diagram
Wiring Diagram
Instrument Data Sheet
Mechanical Data Sheet
Process Data Sheet
Pressure Relief Valve Data Sheet
Pressure Safety Valve Data Sheet
Rupture Disc Data Sheet
Material Safety Data Sheet
Cladding Drawing
Detail Drawing
Dimensional Drawing
Elevation Drawing
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 19 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Engineering Type
Engineering Type Description
Engineering SubType FND
DWG
Drawing
GAD
General Arrangement Drawing
HDZ
HUD
ISO
ITP
Hazardous Area Classification
Hook-Up Drawing
Isometric
Inspection Test Plan
LIS
List
FRD
SED
STD
ASD
GEA
NA
NA
NA
NA
BOM BUL CHL
CSC
EQL INI IOL
LLI
LOS
MLI
PSS
SET
SPL
TIL
ULL
Engineering SubType Description
Foundation Drawing
Framing Drawing
Section Drawing
Standard Drawing
Assembly Drawing
General Arrangement (Piping) Not Applicable
Not Applicable
Not Applicable
Not Applicable
Bill of Material Building List Chemical List
Cable Schedule
Equipment List Instrument Index IO List
Line List
Load Summary
Motor List
Pipe Support Schedule
Alarm Set Point List
Spare Parts List
Tie-In List
Utility Line List
MAB
Mass Balance Heat & Material Balance Utility Balance
NA
Not Applicable
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 20 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Engineering Type
Engineering Type Description
Engineering SubType EUM
MAN
Manual
MSD
MTO
PFD
PID
Material Selection Diagram
Material Take Off
Process Flow Diagram Piping & Instrumentation Diagram
PLN
Plan (Drawings)
PLP
POR
PRC
PSD
REP
REQ
SCD
SLD
SOW
SPC
UFD
UGD
Plot Plan
Purchase Order
Procedure
Pipe Support Drawing
Report
Requisition
Schematic Drawing
Single Line Diagram
Scope of Work
Specification
Utility Flow Diagram
Underground Drawing
FPD
IOM
MTM
OMI
NA
NA
NA
NA
ALD
KPL
LYD
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Engineering SubType Description
Equipment User Manual Facilities Process Description Manual Installation, Operation and Maintenance Manual Marine Transportation and Installation Manual Operation and Maintenance Instructions Manual Not Applicable
Not Applicable
Not Applicable
Not Applicable
Alignment Drawing
Key Plan
Layout Drawing Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 21 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
APPENDIX 4 - VENDOR DOCUMENT TYPE AND SUBTYPE CODES
Vendor Type ANL BLD BOK CAL CED CRT
Vendor Type Description
Analysis Block Diagram Book Calculation Cause & Effect Diagram Certificate
DAT
Data
DIG
Diagram
DTS
Data Sheet
DWG
Drawing
GAD
General Arrangement Drawing
HUD ISO ITP
Hook-Up Drawing Isometric Inspection Test Plan
Vendor SubType Description
Not Applicable Not Applicable
Logic Diagram Loop Diagram Network Diagram (ICS)
Not Applicable Not Applicable Not Applicable Consumption Data Load Data Noise Data Performance Data Software Data
Vendor SubType NA NA MRB Manufacturing Records Book NA NA NA CDT LDT NDT PDT SWD WDT Weight Data LGD LPD NWD WRD Wiring Diagram Not Applicable NA Cross Sectional Drawing CSD Detail Drawing DET Dimensional Drawing DIM Elevation Drawing ELD Installation Drawing IDR Nozzle Drawing NOD Name Plate Drawing NPD Section Drawing SED Standard Drawing STD Support Drawing SUD Assembly Drawing ASD General Arrangement (Piping) GEA Not Applicable NA Not Applicable NA Not Applicable NA
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 22 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Vendor Type
Vendor Type Description
LIS
List
MAN Manual
PFD PID PLN POR PRC REP REQ SLD SPC
Process Flow Diagram Piping & Instrumentation Diagram Plan (Drawings) Purchase Order Procedure Report Requisition Single Line Diagram Specification
Vendor SubType BOM CSC EQL INI LLI LUS SPL VDR NA CTL EUM
IOM
NA NA NA LYD NA NA NA NA NA NA
Vendor SubType Description
Bill of Material Cable Schedule Equipment List Instrument Index Line List Lubrication Schedule Spare Parts List Vendor Document Register Not Applicable Catalogue Equipment User Manual Installation, Operating and Maintenance Manual Not Applicable Not Applicable Not Applicable Layout Drawing Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 23 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
APPENDIX 5 - DISCIPLINE - SUBDISCIPLINE CODES
Discipline Code
AB
CC
CE CL DR EL GS HV IC
Discipline Description
Architectural Construction and Commissioning Corrosion Engineering Civil Drilling Electrical Geosciences HVAC ICS Security
IN
Instrumentation
ME
Mechanical
MO
Marine Operations
PE
Administrative, Engineering Management
PI
PL
PR QM
Piping
Pipelines
Process Quality Management
SH
HSE&Q
SubDiscipline Code
SubDiscipline Description
NA NA
NA NA NA NA NA NA NA CS FG IS MS NA RO SC NA NA CR FN IT PM PN PO NA PL SS NA NA EM EN LP NA
Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Control Systems Fire & Gas Instruments Measurement Not Applicable Rotary Static Not Applicable Not Applicable Contracts Finance Information Technology Project Management Planning Procurement Not Applicable Pipelines Subsea Not Applicable Not Applicable Emergency Management Services Environmental Loss Prevention Not Applicable
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 24 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Discipline Code
Discipline Description
SubDiscipline Code
SubDiscipline Description
ST TC
Structural Telecommunications
NA NA
Not Applicable Not Applicable
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 25 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
APPENDIX 6 - ASSET CODES
Barzan Onshore
Asset Code
Asset Description
BA1 BA4 BA5 GEN
Trains 1 & 2 Offsite & Offplot Utilities General
Asset Code
Asset Description
Qatargas South Onshore
RA1 RA2 RA3 RA4 RA5 RA6 GEN
Trains 1, 2 & Helium Trains 3, 4, 5 & AGI Trains 6 & 7 AKG 1 & 2 Offsite & Offplot Utilities General
Qatargas North Onshore
Asset Code
Asset Description
QG1 QG2 QG3 QGN SNL
QG1 - Trains 1, 2 & 3 QG2 - Trains 4 & 5 QG3&4 - Trains 6 & 7 QG North - Common CLNG Storage & Loading
North Field East (NFE) Onshore
Asset Code
Asset Description
NFE
North Field East
North Field South (NFS) Onshore
Asset Code
Asset Description
NFS
North Field South
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 26 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Refinery
Asset Code
Asset Description
LR
Laffan Refinery
Ras Laffan Terminal Operations (RLTO)
Asset Code
Asset Description
TO1 TO2 TO3 TO4 TO5 TO6 TO7 TO8 TO9 TO10 TO11 TO12 TO13 NFE
RLTO Common CCSL CLPG CLSC CCSL / CLPG CLSC / CLPG Laffan Refinery Tank Farm QSGTL RLOC (Pygas) ORYX GTL CSP RLIC Common Facilities VOC North Field East
Barzan Offshore
Asset Code
Asset Description
OF
Offshore
Qatargas South Offshore
Asset Code
Asset Description
OF
Offshore
Qatargas North Offshore
Asset Code
Asset Description
QG1 QG2 QG3
QG1 QG2 - WHP 4, 5 and 6 QG3&4 - WHP 7, 8 and 9
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 27 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
North Field East (NFE) Offshore
Asset Code
Asset Description
NFE
North Field East
North Field Production Sustainability (NFPS)
Asset Code
Asset Description
NFPS
North Field Production Sustainability
North Field South (NFS) Offshore
Asset Code
Asset Description
NFS
North Field South
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 28 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
APPENDIX 7 - TRAIN / AREA CODES
Train / Area Code Train / Area Description
Qatargas South Onshore
AGI AK1 AK2 HE1 HE2 HE3 HERU HEXU OFSP TR1 TR2 TR3 TR4 TR5 TR6 TR7 UTL GEN
AGI AKG-1 AKG-2 Helium-1 Helium-2 Helium-3 HERU HEXU Offsite & Offplot Train-1 Train-2 Train-3 Train-4 Train-5 Train-6 Train-7 Utilities General
Train / Area Code Train / Area Description
Barzan Onshore
HE3 OFSP TR1 TR2 UTL GEN
Helium-3 Offsite & Offplot Train-1 Train-2 Utilities General
Refinery / Qatargas North Onshore
Train / Area Code Train / Area Description
ON ONR
Onshore Onshore Receiving (to be used for QG1 Upstream only)
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 29 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Ras Laffan Terminal Operations (RLTO)
Asset Code
Asset Description
RLTO01 RLTO02 RLTO03 RLTO04 RLTO05 RLTO06 RLTO07 RLTO08 RLTO09 RLTO10 RLTO11 RLTO12 RLTO13 RLTO14 RLTO15 RLTO16 RLTO17 RLTO18 RLTO20 RLTO21 RLTO22 RLTO23 RLTO24 RLTO25 RLTO26 RLTO27 RLTO28 RLTO29 RLTO30 RLTO31 RLTO32 RLTO33 RLTO34 RLTO35
RLTO Common SCCB Jetties (Common) Jetty 1 Jetty 2 Jetty 3 Berth 20 (Common Documents) Berth 21 (Common Documents) Berth 22 (Common Documents) Berth 23 (Common Documents) Berth 24 (Common Documents) Berth 25 (Common Documents) Berth 25 / 30 Berth 30 (Common Documents) Berth 31 (Common Documents) Berth 30 / 31 Fire Water System VOC Combustion Area CCSL Tank Farm CLPG Tank Farm CLSC Tank Farm CCSL / CLPG Tank Farm QSGTL Tank Farm Keroblending ORYX Tank Farm LR New Tanks (LR Tank Farm) QG South Tanks QG North Tanks RALF CCSPM (Buoy 1 & 2, Onshore & Offshore Pipelines) CSP RLTO Utilities Corridor Gas Oil Blending
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 30 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Offshore
Train / Area Code Train / Area Description
OF
Offshore
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 31 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
APPENDIX 8 - CONTRACTOR
Contractor Code - Description
ABB - ABB AGW - AGWED AL - AIR LIQUIDE APCI - APCI ARC - ARCHIRODON ASL - ALDERLEY SYSTEMS LTD BHU - BAKER HUGHES BKR - BAKER RISK BLC - BLACK CAT BLW - BLUEWATER CAEL - CHIYODA ALMANA ENGINEERING LIMITED CBI - CB&I CCC - CCC CCJV - CHIYODA CTCI JOINT VENTURE (CCJV) CCT - CONTROL CONTRACTING & TRADING COMPANY CEC - CONSOLIDATED ENGINEERING CONSTRUCTION COMPANY CHI - CHIYODA CMSA - CMS&A CNP - CONDOTTE & PARTNERS COWI - COWI CTC - CCC / TCC / COMO JOINT VENTURE CTJV - CHIYODA / TECHNIP JOINT VENTURE (CTJV) DEL - DOLPHIN (DEL) DES - DESCON DEW - DANEM ENGINEERING WORKS WLL DOP - DOPET EMCO - EMCO EME - EMERSON ERW - ELECTROWATT FLR - FLUOR FOW - FOSTER WHEELER GE - GENERAL ELECTRIC GEG - GITIC ENGINEERING GFR - GALFAR GLG - GULF GLASS GSE - GS ENGINEERING GUT - GUTOR HHI - HYUNDAI HEAVY INDUSTRIES HRC - HHI / RWP / CAEL
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 32 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Contractor Code - Description HWL - HONEYWELL INV - INVENSYS JGC - JGC JKB - JGC KBR JKJV - JGC-KELLOGG JOINT VENTURE JRM - J RAY MCDERMOTT KBR - KBR MCD - MCDERMOTT MIDDLE EAST INC MEG - MEDGULF MGW - MADINA GROUP WLL MIC - MIC CONSTRUCT MKL - M W KELLOGG LIMITED MKT - M W KELLOGG LIMITED / TECHNIP NOC - NORTH OIL COMPANY NP - NUOVO PIGNONE INTERNATIONAL NPT - NPCC / TECHNIP OND - ONDEO PAN - PANORAMA PAS - PLANT AUTOMATIC SERVICES INC PRT - PROTEC PTC - PETROTEC PTD - PETRA DESIGN PTF - PETROFAC PTS - PETROSERV PTT - PETROLEUM TECHNOLOGY QCON - QCON QCTC - QATAR CONSTRUCTION TECHNIQUE COMPANY WLL QEC - QATAR ENGINEERING AND CONSTRUCTION COMPANY QG - QATARGAS QKZ - QATAR KENTZ RAM - RAMBOLL SBT - SAYBOLT SEA - SEASHORE SEL - SCHNEIDER ELECTRIC SLM - SALAM SMK - SPACEMAKER SNC - SNC LAVALIN SNI - SNAMPROGETTI SNK - SANKO SPM - SAIPEM SPS - STATS PIPELINE SERVICES LLC SSG - SAMSUNG
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 33 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
Contractor Code - Description SSP - SEVEN SEAS PETROLEUM WLL STO - STOLZ TBD - TEBODIN TCJV - TECHNIP / CHIYODA JOINT VENTURE (TCJV) TOYO - TOYO TP - TECHNIP TPD - TECHNIP DOHA TPF - TECHNIP FMC TRG - TRAGS TRSA - TECHNICAS REUNIDAS S.A. TWJV - TECHNICAS REUNIDAS S.A. / WISON ENGINEERING LTD JOINT VENTURE (TWJV) WGI - WGI WP - WORLEY PARSONS YGW - YOKOGAWA MIDDLE EAST & AFRICA B.S.C.
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 34 of 35
Classification: Internal
UNCONTROLLED IF PRINTED PRJ-PJL-PRC-048 Procedure
APPENDIX 9 - LIST OF TEMPLATES
Template Name
Template Description
IM-EDR-T001
IM-VDR-T001
IM-DD-T001
Engineering Document Register - Engineering Document Numbering Request Vendor Document Register - Vendor Document Numbering Request Data Dictionary for EDR and VDR
Rev.
11
11
11
Effective 09 JUN 2022
• Facilities Documentation Metadata Requirements • Rev 11 • Criticality Level: Medium • Classification: Internal •
Page 35 of 35
Project: Q-21699 - Saipem COMP2 Folder: RFQ Files