Unnamed: 0 | Unnamed: 1 | APPENDIX 3 - TECHNICAL CLARIFICATION LIST | Unnamed: 3 | Unnamed: 4 | Unnamed: 5 | Unnamed: 6 |
---|---|---|---|---|---|---|
PROJECT : | NaN | NFPS Offshore Compression Complexes Project COMP2 | NaN | NaN | NaN | Status: |
SAIPEM PURCHASE REQUEST : | NaN | NaN | NaN | NaN | NaN | Open |
MATERIAL REQUISITION : | NaN | COMP2-SPM-LP-REQ-00007_Safety and Life Saving Equipment | NaN | NaN | NaN | Closed |
REVISION : | NaN | 1 | NaN | NaN | NaN | NaN |
ITEM Description: | NaN | SAFETY SHOWER AND EYEWASH SYSTEM & PORTABLE EYEWASH UNIT | NaN | NaN | NaN | NaN |
ITEM Tag: | NaN | HOLD 2 | NaN | NaN | NaN | NaN |
VENDOR to fill in with any clarification required to the Material Requisition and applicable documents and submit to CONTRACTOR in native along with VENDOR’s proposal. | NaN | NaN | NaN | NaN | NaN | NaN |
Pos. | Document, Code and Standard Paragraph | Document Requirement | Clarification Description\n | CONTRACTOR Response | NaN | STATUS |
C01 | PAINTING SPECIFICATION FOR CP6S AND CP7S COMPLEXES / 200-20-CE-SPC-00015 / 5 - SCOPE | As per project painting specification “non-pressurised SS316/SS316L components shall not be painted”. | Safety shower frame is 316SS & therefore will be supplied unpainted. | Noted | NaN | NaN |
C02 | SPECIAL TERMS AND CONDITIONS & AMENDMENTS | WARRANTY PERIOD - To be aligned with Main Contract Warranty Period forecast to be ending on 31st October 2029 | Hughes Standard Warranty Terms Apply (12 Months Warranty from Date of Despatch). | BIDDER shall follow the warranty requirement as per SPECIAL TERMS AND CONDITIONS & AMENDMENTS. | NaN | NaN |
C03 | PB- FORM_GR-GROUP-SC-PRO_MOD-101-E | Performance Bond | Bank Guarantees (Bonds) are not included in our offer. | Please cover only technical clarification in this sheet. Commercial to be separate. | NaN | NaN |
C04 | 570-20-SH-DTS-00015 | Pressure Reducing Valve has not been offered. | Reason is the safety shower (& eyebath) unit comprises of an overhead water tank, which is non-pressurised & provides gravity-fed water to the shower rose & eyebath nozzles. The mains water inlet connection (to the water tank) can accept a water pressure of up-to 7 bar g. If the inlet water pressure is higher than 7 bar g please inform us. | The system shall be designed for pump shut-off pressure. The pump vendor data is currently not available. Hence BIDDER shall cnsider the PRV. | NaN | NaN |
NaN | NaN | NaN | NaN | NaN | NaN | NaN |
NaN | NaN | NaN | NaN | NaN | NaN | NaN |
NaN | NaN | NaN | NaN | NaN | NaN | NaN |
NaN | NaN | NaN | NaN | NaN | NaN | NaN |
NaN | NaN | NaN | NaN | NaN | NaN | NaN |
NaN | NaN | NaN | NaN | NaN | NaN | NaN |
NaN | NaN | NaN | NaN | NaN | NaN | NaN |
NaN | NaN | NaN | NaN | NaN | NaN | NaN |
END | NaN | NaN | NaN | NaN | NaN | NaN |