Unnamed: 0Unnamed: 1APPENDIX 3 - TECHNICAL CLARIFICATION LISTUnnamed: 3Unnamed: 4Unnamed: 5Unnamed: 6
PROJECT :NaNNFPS Offshore Compression Complexes Project COMP2NaNNaNNaNStatus:
SAIPEM PURCHASE REQUEST :NaNNaNNaNNaNNaNOpen
MATERIAL REQUISITION :NaNCOMP2-SPM-LP-REQ-00007_Safety and Life Saving EquipmentNaNNaNNaNClosed
REVISION :NaN1NaNNaNNaNNaN
ITEM Description:NaNSAFETY SHOWER AND EYEWASH SYSTEM & PORTABLE EYEWASH UNITNaNNaNNaNNaN
ITEM Tag:NaNHOLD 2NaNNaNNaNNaN
VENDOR to fill in with any clarification required to the Material Requisition and applicable documents and submit to CONTRACTOR in native along with VENDOR’s proposal.NaNNaNNaNNaNNaNNaN
Pos.Document, Code and Standard ParagraphDocument RequirementClarification Description\nCONTRACTOR ResponseNaNSTATUS
C01PAINTING SPECIFICATION FOR CP6S AND CP7S COMPLEXES / 200-20-CE-SPC-00015 / 5 - SCOPEAs per project painting specification “non-pressurised SS316/SS316L components shall not be painted”.Safety shower frame is 316SS & therefore will be supplied unpainted.NotedNaNNaN
C02SPECIAL TERMS AND CONDITIONS & AMENDMENTSWARRANTY PERIOD - To be aligned with Main Contract Warranty Period forecast to be ending on 31st October 2029Hughes Standard Warranty Terms Apply (12 Months Warranty from Date of Despatch).BIDDER shall follow the warranty requirement as per SPECIAL TERMS AND CONDITIONS & AMENDMENTS.NaNNaN
C03PB- FORM_GR-GROUP-SC-PRO_MOD-101-EPerformance BondBank Guarantees (Bonds) are not included in our offer.Please cover only technical clarification in this sheet. Commercial to be separate.NaNNaN
C04570-20-SH-DTS-00015Pressure Reducing Valve has not been offered.Reason is the safety shower (& eyebath) unit comprises of an overhead water tank, which is non-pressurised & provides gravity-fed water to the shower rose & eyebath nozzles. The mains water inlet connection (to the water tank) can accept a water pressure of up-to 7 bar g. If the inlet water pressure is higher than 7 bar g please inform us.The system shall be designed for pump shut-off pressure. The pump vendor data is currently not available. Hence BIDDER shall cnsider the PRV.NaNNaN
NaNNaNNaNNaNNaNNaNNaN
NaNNaNNaNNaNNaNNaNNaN
NaNNaNNaNNaNNaNNaNNaN
NaNNaNNaNNaNNaNNaNNaN
NaNNaNNaNNaNNaNNaNNaN
NaNNaNNaNNaNNaNNaNNaN
NaNNaNNaNNaNNaNNaNNaN
NaNNaNNaNNaNNaNNaNNaN
ENDNaNNaNNaNNaNNaNNaN