NFPS Offshore Compression Complexes Project COMP2
COMPANY Contract No.: LTC/C/NFP/5128/20
CONTRACTOR Project No.: 033734
Document Title
:
DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
COMPANY Document No.
: 560-20-SH-DTS-00001
Saipem Document No.
: 033734-C-D-16-SPM-LP-B-10001
Discipline
: HSE&Q
Document Type
: DATA SHEET
Document Category/Class
: 2
Document Classification
: INTERNAL
00
20-Dec-2023
26-Sep-2023
B
A
Approved for Construction Issued for Approval
Azran Shariman
Rama Krishna K
Luminita Oprescu
Maria Fransisca
Rama Krishna K
Luminita Oprescu Vijayakumar Rajaram
09-Aug-2023
Issued for Review
Maria Fransisca
Rama Krishna K
REV.
DATE
DESCRIPTION OF REVISION
PREPARED BY
CHECKED BY
APPROVED BY
Saipem S.p.A.
THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.
Company No._Rev. 560-20-SH-DTS-00001_00
1 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
REVISION HISTORY
Revision
Date of Revision
Revision Description
A1
A
B
00
20-Jul-2023
Issued for Inter-Discipline Check
09-Aug-2023
26-Sep-2023
20-Dec-2023
Issued for Review
Issued for Approval
Approved for Construction
HOLDS LIST
Hold No
Hold Description
Company No. Rev. 560-20-SH-DTS-00001_00
2 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
TABLE OF CONTENTS
1
2
3
4
5
INTRODUCTION … 4
1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4
DEFINITIONS AND ABBREVIATIONS … 6
2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7
REGULATIONS, CODES AND STANDARDS … 9
3.1 COMPANY DOCUMENTS … 9 3.2 PROJECT DOCUMENTS … 9 INTERNATIONAL CODES AND STANDARDS … 10 3.3
PURPOSE … 11
DATA SHEET … 12
Company No. Rev. 560-20-SH-DTS-00001_00
3 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
1
INTRODUCTION
The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.
Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.
1.1 Project Objective
The objective of this Project includes:
• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.
• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,
and efficient throughout their required life.
• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality
performance.
1.2 Project Scope
The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit
purpose in all respects.
for
Offshore
‐
‐
CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:
• CP6S Compression Complex
• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S
• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5
• Bridge linked Tie-in to RP6S
Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.
• CP7S Compression Complex
• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S
• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5
• Bridge linked Tie-in to RP7S
Company No. Rev. 560-20-SH-DTS-00001_00
4 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.
RGA Complex Destressing
Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:
• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex
• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex
Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.
Onshore
An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.
Figure 1.2.1: NFPS Compression Project COMP2 Scope
Company No. Rev. 560-20-SH-DTS-00001_00
5 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
2 DEFINITIONS AND ABBREVIATIONS
2.1 Definitions
Definition
Description
COMPANY
Qatargas Operating Company Limited.
CONTRACTOR
Saipem S.p.A.
DELIVERABLES
FACILITIES
All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract.
All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.
fabricated,
MILESTONE
A reference event splitting a PROJECT activity for progress measurement purpose.
PROJECT
NFPS Offshore Compression Complexes Project COMP2
SITE
(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.
SUBCONTRACT
Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.
SUBCONTRACTOR
Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.
WORK
Scope of Work defined in the CONTRACT.
WORK PACKAGE
The lowest manageable and convenient level in each WBS subdivision.
VENDOR
The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.
Company No. Rev. 560-20-SH-DTS-00001_00
6 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
2.2 Abbreviations
Code
Definition
BR
CP
ELICS
EPC
EPIRB
FL
Bridge
Compression Platform
Electrical Integrated Control System
Engineering, Procurement and Construction
Emergency Position Indicating Radio Beacon
Flare Platform
GMDSS
Global Maritime Distress and Safety System
HFE
IMO
LQ
MICC
NFPS
OCC
QG
RGA
RGE
RL
RLIC
RP
SART
SOLAS
USCG
UV
Human Factor Engineering
International Maritime Organization
Living Quarter Platform
Main Instrumentation & Control Contractor
North Field Production Sustainability
Onshore Collaborative Center
Qatargas Operating Company Limited
Ras Gas Alfa
Ras Gas Expansion
Ras Lafan
Ras Lafan Industrial City
Riser Platform
Search and Rescue Transponder
Safety of Life at Sea
United States Coast Guard
Ultraviolet
Company No. Rev. 560-20-SH-DTS-00001_00
7 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
Code
Definition
VHF
WHP
Very High Frequency
Wellhead Platform
Company No. Rev. 560-20-SH-DTS-00001_00
8 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
3 REGULATIONS, CODES AND STANDARDS
In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.
In general, the order of precedence shall be followed:
a) Qatari Governmental and Regulatory Requirements
b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)
c) Project Specifications.
d) Industry Codes and Standards
e) COMPANY and CONTRACTOR’s Lessons Learned
If CONTRACTOR/ SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/ SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.
The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.
3.1 Company Documents
S. No
Document Number
Title
PRT-PRS-PRC-014
Offshore Loss Prevention Philosophy
COMP-QG-PR-REP- 00008
North Field Production Sustainability Compression Project: EPC-2 – Basis of Design EPC2
(NFPS), NFPS
PRT-ENV-PRC-013
Environmental Aspects and Impacts Procedure
3.2 Project Documents
S. No
Document Number
Title
200-20-SH-DEC-00005
200-20-SH-DEC-00008
200-20-SH-SPC-00006
200-20-ME-DEC-00003
200-20-PI-SPC-00015
200-51-IN-SPC-00021
200-20-EL-SPC-00002
Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Safety & Life Saving Equipment for CP6S and CP7S Complexes Material Handling Philosophy Complexes Piping Material Specification Complexes Instrument Specification for Packaged Equipment for CP6S and CP7S Complexes Specification For Electrical Packaged Equipment for CP6S and CP7S Complexes
for CP6S and CP7S
for CP6S and CP7S
Company No. Rev. 560-20-SH-DTS-00001_00
9 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
S. No
Document Number
Title
200-20-SH-SPC-00011
200-20-CE-DEC-00003
HFE Workplace Design Specification for CP6S and CP7S Complexes Material Selection Philosophy Complexes
for CP6S and CP7S
200-20-CE-SPC-00015
Painting Specification for CP6S and CP7S Complexes
200-21-ST-DEC-00001
200-52-TC-DEC-00003
560-20-SH-PLN-00007
Greenfield Structural Design Basis for Substructure of CP6S and CP7S Complexes Telecommunication Systems Basis of Design for CP6S and CP7S Complexes Escape Route, Life Saving and Fire Fighting Equipment Layout – Production Deck for Compression Platform CP6S
560-20-SH-LIS-00001
Safety Equipment List for CP6S Complex
3.3
International Codes and Standards
S. No
Document Number
Title
IMO IE110E
International Convention for the Safety of Life at Sea (SOLAS)
IMO ID982E
Life Saving Appliances (LSA) Code
Company No. Rev. 560-20-SH-DTS-00001_00
10 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
4 PURPOSE
The purpose of this data sheet is to cover the technical requirements for the Life Raft for CP6S Compression Platform Production Deck in the NFPS Offshore Compression Complexes Project, COMP2. This data sheet shall be read in conjunction with Specification for Safety & Life Saving Equipment for CP6S And CP7S Complexes [Ref.6]. VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this data sheet and referred specifications.
Company No. Rev. 560-20-SH-DTS-00001_00
11 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
5 DATA SHEET
LIFE RAFT
DATA SHEET IDENTIFICATIONS
DOCUMENT NO
560-20-SH-DTS-00001
ADMINISTRATIVE IDENTIFICATIONS
PROJECT NUMBER
033734
PROJECT
QUANTITY
NFPS OFFSHORE COMPRESSION COMPLEXES PROJECT COMP2
4 NOS (LOCATED AT CP6S PRODUCTION DECK)
EQUIPMENT IDENTIFICATION
TAG NUMBER
SERVICE
560-XZ2001 / 560-XZ2002 / 560-XZ2003 / 560-XZ2004
LIFE SAVING
OPERATION DATA
ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
ENVIRONMENTAL / SITE CONDITIONS
MINIMUM
NORMAL
MAXIMUM
BLACK BULB
UNITS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
8.3
37.0
45.6
100.0
84
°C
%
ATMOSPHERE
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
TECHNICAL SPECIFICATION
EQUIPMENT DESIGN CRITERIA
LIFERAFT CRITERIA:
A
1
B
1
2
3
C
1
2
D
1
2
3
E
1
1.1
CAPACITY
25 MEN (INDIVIDUAL WEIGHTS FOR THE DESIGN OF LIFE RAFTS SHALL BE A MINIMUM OF 90 KG)
1.9
LIFERAFTS SHALL HAVE A CANOPY FOR WEATHER PROTECTION OF THE OCCUPANTS.
REQUIRED
1.2 MATERIAL
DURABLE POLYURETHANE COATED FABRIC
1.10
1.3
LIFERAFTS SHALL BE HOUSED IN A RIGID CONTAINER (GRP) AND SHALL AUTOMATICALLY INFLATE WHEN LAUNCHED / PAINTER LINE IS PULLED.
BUOYANCY CHAMBERS (COMPRISING SUPERIMPOSED AND INDEPENDENT AIRTIGHT MATERIAL COMPARTMENTS) SHALL BE MANUFACTURED FROM MATERIAL(S) THAT IS HIGHLY ABRASIVE RESISTANT AND IMPERVIOUS TO CORROSION IN A HUMID MARINE ENVIRONMENT.
LIFERAFTS SHALL HAVE RIGHTENING STRAP ACROSS THE UNDERSIDE OF THE FLOOR TO ASSIST A SINGLE SURVIVOR IN RIGHTENING THE LIFE RAFT SHALLIT BE INVERTED.
STORAGE CRADLE SHALL BE MADE OF STAINLESS-STEEL (SS316) GRADE. THE CRADLE SHALL ALLOW EASY DEPLOYMENT OF THE RAFT INTO THE SEA BY ONE PERSON.
1.4
1.5
1.6
REQUIRED
1.11
REQUIRED
1.12
REQUIRED
1.13
SELF INFLATING AND ENCAPSULATED JETTISON TYPE COMPLETE WITH A SPLIT FIBRE GLASS UV PROTECTED CAPSULE, STORAGE CRADLE, TILTABLE PAINTER LINE (NOT LESS THAN 30m) FOR INFLATING.
THE PLATFORM IDENTIFICATION NAME SHALL BE MARKED ON LIFERAFT AND PADDLES IN BLACK LETTERING. TYPE AND SIZE AND PRINTING ON THE LIFERAFT SHALL FULFILL THE REQUIREMENTS OF SOLAS/LSA.
ALL LIFE RAFTS TOGETHER WITH PADDLES SHALL BE CONSPICUOUSLY MARKED WITH NAME OF THE PLATFORM. THE NUMBER OF PERSONS ALLOWED ON EACH RAFT SHALL BE MARKED WITH LETTERS AND NUMBERS AT LEAST 100 MM HIGH OF A COLOR CONTRASTING WITH THAT OF THE LIFE RAFT.
THE LIFE RAFT ASSEMBLY SHALL BE CONSTRUCTED TO WITHSTAND IMPACT WITH THE WATER (WITHOUT DAMAGE) FROM THE INSTALLED HEIGHT.
REQUIRED
REQUIRED
REQUIRED
REQUIRED
REQUIRED
1.14
LIFT RAFT SYSTEM
INCLINED LAUNCHING RACKS
1.7
CRADLE INSTALLATION METHOD (NOTE 10)
DECK MOUNTED (VENDOR TO PROVIDE MOUNTING ACCESSORIES)
1.15
LIFERAFT SHALL BE ABLE TO BE TOWED AT A SPEED OF 3 KNOTS IN CALM WATER WHEN LOADED
REQUIRED
1.8
LIFERAFTS SHALL BE EASILY CLIMBED INTO BY SURVIVOR FULLY CLOTHED AND WEARING A LIFEJACKET.
REQUIRED
2
CANOPY CRITERIA:
2.1
THE LIFERAFT CANOPY SHALL BE INTERNATIONAL ORANGE. ALSO, A LARGE CROSS (X) TO BE MARKED ON THE CANOPY WITH REFLECTIVE TAPES.
REQUIRED
2.6
IT SHALL BE PROVIDED WITH AT LEAST ONE VIEWING PORT.
REQUIRED
Company No. Rev. 560-20-SH-DTS-00001_00
12 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
2.2
IT SHALL PROVIDE INSULATION AGAINST HEAT AND COLD BY MEANS OF EITHER TWO LAYERS OF MATERIAL SEPARATED BY AN AIR GAP OR OTHER EQUALLY EFFICIENT MEANS. MEANS SHALL BE PROVIDED TO PREVENT ACCUMULATION OF WATER IN THE AIR GAP.
LIFE RAFT
REQUIRED
2.7
IT SHALL BE PROVIDED WITH MEANS FOR COLLECTING RAINWATER.
REQUIRED
2.3
ITS INTERIOR SHALL BE OF A COLOUR THAT DOES NOT CAUSE DISCOMFORT TO THE OCCUPANTS.
REQUIRED
2.8
IT SHALL BE PROVIDED WITH MEANS TO MOUNT A SURVIVAL CRAFT RADAR TRANSPONDER AT A HEIGHT OF AT LEAST 1 M ABOVE THE SEA.
REQUIRED
EACH ENTRANCE SHALL BE CLEARLY INDICATED AND BE PROVIDED WITH EFFICIENT ADJUSTABLE CLOSING ARRANGEMENTS WHICH CAN BE EASILY AND QUICKLY OPENED BY PERSONS CLOTHED IN IMMERSION SUITS FROM INSIDE AND OUTSIDE AND CLOSED FROM INSIDE. THE LIFERAFT SO AS TO PERMIT VENTILATION BUT EXCLUDE SEAWATER, WIND AND COLD. LIFERAFTS SHALL HAVE AT LEAST TWO DIAMETRICALLY OPPOSITE ENTRANCES.
IT SHALL ADMIT SUFFICIENT AIR FOR THE OCCUPANTS AT ALL TIMES, EVEN WITH THE ENTRANCES CLOSED.
REQUIRED
2.9
IT SHALL HAVE SUFFICIENT HEADROOM FOR SITTING OCCUPANTS UNDER ALL PARTS OF THE CANOPY.
REQUIRED
REQUIRED
3.0
GMDSS COMPLIANT PORTABLE VHF MARINE HANDHELD RADIOS, EPIRBs OPERATING ON THE INTERNATIONAL SATELLITE DISTRESS FREQUENCY OF 406 MHZ, SARTs (AIS) AND SARTs (RADAR) OPERATING ON THE 9 GHZ MARINE RADAR FREQUENCY BAND.
REQUIRED
MARKINGS
MARKING ON THE LIFERAFT CONTAINER:
2.4
2.5
F
1
1.1 MAKER’S NAME AND TRADEMARK
VENDOR TO ADVISE
1.6
DATE WHEN LAST SERVICED
REQUIRED
1.2
SERIAL NUMBER
VENDOR TO ADVISE
1.7
LENGTH OF PAINTER
VENDOR TO ADVISE
1.3
NAME OF APPROVING AUTHORITY AND THE NUMBER OF PERSONS IT IS PERMITTED TO CARRY
VENDOR TO ADVISE
1.8
MAXIMUM PERMITTED HEIGHT OF STOWAGE ABOVE WATERLINE (DEPENDING ON DROP-TEST HEIGHT AND LENGTH OF PAINTER)
VENDOR TO ADVISE
1.4
SOLAS
VENDOR TO ADVISE
1.5
2
TYPE OF EMERGENCY PACK ENCLOSED
MARKING ON THE LIFERAFT:
VENDOR TO ADVISE
1.9
LAUNCHING INSTRUCTIONS IN ENGLISH
1.10
FACILITY/ PLATFORM IDENTIFICATION
REQUIRED
REQUIRED
2.1 MAKER’S NAME OR TRADEMARK;
VENDOR TO ADVISE
2.4
NAME OF APPROVING AUTHORITY;
VENDOR TO ADVISE
2.2
SERIAL NUMBER;
VENDOR TO ADVISE
2.3
DATE OF MANUFACTURE (MONTH AND YEAR)
VENDOR TO ADVISE
2.5
2.6
NAME AND PLACE OF SERVICING STATION WHERE IT WAS LAST SERVICED;
NUMBER OF PERSONS IT IS PERMITTED TO ACCOMMODATE OVER EACH ENTRANCE IN CHARACTERS NOT LESS THAN 100 MM IN HEIGHT OF A COLOUR CONTRASTING WITH THAT OF THE LIFERAFT.
VENDOR TO ADVISE
VENDOR TO ADVISE
G
1
EQUIPMENT ACCESSORIES
TWO (2) SETS OF EPIRBs, SARTs (AIS), SARTs (RADAR) AND VHF MARINE HANDHELD RADIOS SHALL BE STORED IN AN UV RESISTANT, Ex ‘E’ SS 316 ENCLOSURE READILY ACCESSIBLE FROM LIFERAFT LOCATION AND SECURED WITH A BREAK-GLASS PROTECTED LOCK.
Company No. Rev. 560-20-SH-DTS-00001_00
13 of 14
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP6S COMPRESSION PLATFORM PRODUCTION DECK
CONTENTS IN LIFERAFT AS PER SOLAS “A” PACK:
LIFE RAFT
NO ITEM (NOTE 1)
1 TOPPING-UP PUMP
2 SEA ANCHOR
3 BAILER
4 REPAIR KIT
5 KNIFE
6 SIGNAL MIRROR
7 SET OF LEAK STOPPERS
2
8 WHISTLE
9 SPONGES
10 PADDLES
11 PRESSURE RELIEVE PLUGS
12 SEA SICKNESS BAG (1/PERSON)
13 LIFE SAVING SIGNALS
14 FIRST AID KIT
15 PARACHUTE ROCKET
16 HAND FLARES
17 SMOKE FLOATS
SPECIAL REQUIREMENTS
COMPLIANCE STANDARD
SOLAS, LSA
CERTIFICATION
USCG / SOLAS
QUANTITY
NO
ITEM (NOTE 1)
QUANTITY
RADAR REFLECTOR
ANTI-SEASICK PILLS (6/PERSON)
RESCUE QUOIT AND LINE OF NOT LESS THAN 30m
LIFE RAFT MANUAL (WATERPROOF)
THERMAL PROTECTIVE AIDS (TPA’S)
CAN OPENER
DRINKING CUP
WATER (1.5 LITER/PERSON)
EMERGENCY RATIONS (0.5kg = 10,000 kJ/PERSON)
FISHING KIT
FLASHLIGHTS
1
150
1
1
2
3
1
37.5 LITER
12.5 kg
1
1
18
19
20
21
22
23
24
25
26
27
28
1
2
2
1
2 (NOTE 2 & 5)
1
1
1
2
1 PAIR
1 SET
25
1
1
4
6 (NOTE 2)
2
ENVIRONMENTAL REQUIREMENT
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
HAZARDOUS AREA CLASSIFICATION MINIMUM ZONE 1, IIB, T3
PHYSICAL DATA
1 WEIGHT OF EQUIPMENT
VENDOR TO ADVISE
2 WEIGHT OF CRADLE
VENDOR TO ADVISE
PAINT Q LINE LENGTH (MIN)
VENDOR TO ADVISE
EQUIPMENT IDENTIFICATIONS
EQUIPMENT TYPE
LIFE RAFT
MANUFACTURER NAME
VENDOR TO ADVISE
NOTES
ITEM TO BE PROVIDED IN SEALED WATERPROOF CONTAINER.
4
5
3
4
DIMENSION OF EQUIPMENT
VENDOR TO ADVISE
DIMENSION OF CONTAINER
VENDOR TO ADVISE
MODEL NUMBER
VENDOR TO ADVISE
MANUFACTURER COUNTRY
VENDOR TO ADVISE
SURVIVAL KNIVES AND FLARES SHALL BE PACKED INSIDE THE LIFERAFT CONTAINER & CANNOT BE SHIPPED SEPARATELY AS THIS FORMS THE PART OF SOLAS “A” PACK REQUIREMENT.
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT DESIGN SPECIFICATION [REF.2].
ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
MAIN KNIFE SHALL BE OF THE NON-FOLDING TYPE. THE SECOND KNIFE CAN BE OF THE FOLDABLE TYPE.
LIFE RAFT SHALL BE CARTON PACKING AS PER MANUFACTURER STANDARD.
THIS DATA SHEET SHALL BE READ IN CONJUCTION WITH SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6] AND SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATA SHEETS.
SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6] SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATA SHEETS.
COMPLIANCE CERTIFICATES, THIRD PARTY VERIFICATION CERTIFICATES, TESTS AND TEST CERTIFICATES SHOULD BE PROVIDED BY THE VENDOR.
VENDOR SHALL PROVIDE THE FIXING ASSESSORIES FOR MOUNTING CRADLE TO THE PLATFORM DECK.
THIS DATASHEET SHALL BE UPDATED BY VENDOR WITH VENDOR/ MANUFACTURER’S DATA POST PURCHASING.
H
1
2
3
4
I
3
J
1
2
K
1
2
3
4
5
6
7
8
9
10
11
Company No. Rev. 560-20-SH-DTS-00001_00
14 of 14
Project: Q-21699 - Saipem COMP2 Folder: PDF