NFPS Offshore Compression Complexes Project COMP2

COMPANY Contract No.: LTC/C/NFP/5128/20

CONTRACTOR Project No.: 033734

Document Title

:

DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

COMPANY Document No.

: 570-20-SH-DTS-00012

Saipem Document No.

: 033734-D-D-16-SPM-LP-B-10001

Discipline

: HSE&Q

Document Type

: DATA SHEET

Document Category/Class

: 2

Document Classification

: INTERNAL

00

20-Dec-2023

20-Sep-2023

B

A

Approved for Construction Issued for Approval

Azran Shariman

Rama Krishna K

Luminita Oprescu

Maria Fransisca

Rama Krishna K

Luminita Oprescu Vijayakumar Rajaram

15-Aug-2023

Issued for Review

Maria Fransisca

Rama Krishna K

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

CHECKED BY

APPROVED BY

Saipem S.p.A.

THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.

Company No._Rev. 570-20-SH-DTS-00012_00

1 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

REVISION HISTORY

Revision

Date of Revision

Revision Description

A1

A

B

00

20-Jul-2023

Issued for Inter-Discipline Check

15-Aug-2023

20-Sep-2023

20-Dec-2023

Issued for Review

Issued for Approval

Approved for Construction

HOLDS LIST

Hold No

Hold Description

Company No. Rev. 570-20-SH-DTS-00012_00

2 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

TABLE OF CONTENTS

1

2

3

4

5

INTRODUCTION … 4

1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4

DEFINITIONS AND ABBREVIATIONS … 6

2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7

REGULATIONS, CODES AND STANDARDS … 9

3.1 COMPANY DOCUMENTS … 9 3.2 PROJECT DOCUMENTS … 9 INTERNATIONAL CODES AND STANDARDS … 10 3.3

PURPOSE … 11

DATA SHEET … 12

Company No. Rev. 570-20-SH-DTS-00012_00

3 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.

Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.

1.1 Project Objective

The objective of this Project includes:

• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,

and efficient throughout their required life.

• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality

performance.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit

purpose in all respects.

for

Offshore

‐

‐

CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:

• CP6S Compression Complex

• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S

• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5

• Bridge linked Tie-in to RP6S

Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.

• CP7S Compression Complex

• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S

• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5

• Bridge linked Tie-in to RP7S

Company No. Rev. 570-20-SH-DTS-00012_00

4 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.

RGA Complex Destressing

Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:

• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex

• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex

Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.

Onshore

An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.

Figure 1.2.1: NFPS Compression Project COMP2 Scope

Company No. Rev. 570-20-SH-DTS-00012_00

5 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

Qatargas Operating Company Limited.

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract.

All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

MILESTONE

A reference event splitting a PROJECT activity for progress measurement purpose.

PROJECT

NFPS Offshore Compression Complexes Project COMP2

SITE

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Scope of Work defined in the CONTRACT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

VENDOR

The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.

Company No. Rev. 570-20-SH-DTS-00012_00

6 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

2.2 Abbreviations

Code

Definition

BR

CP

ELICS

EPC

EPIRB

FL

Bridge

Compression Platform

Electrical Integrated Control System

Engineering, Procurement and Construction

Emergency Position Indicating Radio Beacon

Flare Platform

GMDSS

Global Maritime Distress and Safety System

HFE

IMO

LQ

MICC

NFPS

OCC

QG

RGA

RGE

RL

RLIC

RP

SART

SOLAS

USCG

UV

VHF

Human Factor Engineering

International Maritime Organization

Living Quarter Platform

Main Instrumentation & Control Contractor

North Field Production Sustainability

Onshore Collaborative Center

Qatargas Operating Company Limited

Ras Gas Alfa

Ras Gas Expansion

Ras Lafan

Ras Lafan Industrial City

Riser Platform

Search and Rescue Transponder

Safety of Life at Sea

United States Coast Guard

Ultraviolet

Very High Frequency

Company No. Rev. 570-20-SH-DTS-00012_00

7 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

Code

Definition

WHP

Wellhead Platform

Company No. Rev. 570-20-SH-DTS-00012_00

8 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

3 REGULATIONS, CODES AND STANDARDS

In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.

In general, the order of precedence shall be followed:

a) Qatari Governmental and Regulatory Requirements

b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)

c) Project Specifications.

d) Industry Codes and Standards

e) COMPANY and CONTRACTOR’s Lessons Learned

If CONTRACTOR/ SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/ SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.

The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.

3.1 Company Documents

S. No

Document Number

Title

PRT-PRS-PRC-014

Offshore Loss Prevention Philosophy

COMP-QG-PR-REP- 00008

North Field Production Sustainability Compression Project: EPC-2 – Basis of Design EPC2

(NFPS), NFPS

PRT-ENV-PRC-013

Environmental Aspects and Impacts Procedure

3.2 Project Documents

S. No

Document Number

Title

200-20-SH-DEC-00005

200-20-SH-DEC-00008

200-20-SH-SPC-00006

200-20-ME-DEC-00003

200-20-PI-SPC-00015

200-51-IN-SPC-00021

200-20-EL-SPC-00002

Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Safety & Life Saving Equipment for CP6S and CP7S Complexes Material Handling Philosophy Complexes Piping Material Specification Complexes Instrument Specification for Packaged Equipment for CP6S and CP7S Complexes Specification For Electrical Packaged Equipment for CP6S and CP7S Complexes

for CP6S and CP7S

for CP6S and CP7S

Company No. Rev. 570-20-SH-DTS-00012_00

9 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

S. No

Document Number

Title

200-20-SH-SPC-00011

200-20-CE-DEC-00003

HFE Workplace Design Specification for CP6S and CP7S Complexes Material Selection Philosophy Complexes

for CP6S and CP7S

200-20-CE-SPC-00015

Painting Specification for CP6S and CP7S Complexes

200-21-ST-DEC-00001

200-52-TC-DEC-00003

570-20-SH-PLN-00010

Greenfield Structural Design Basis for Substructure of CP6S and CP7S Complexes Telecommunication Systems Basis of Design for CP6S and CP7S Complexes Escape Route, Life Saving and Fire Fighting Equipment Layout – Production Deck for Compression Platform CP7S

570-20-SH-LIS-00001

Safety Equipment List for CP7S Complex

3.3

International Codes and Standards

S. No

Document Number

Title

IMO IE110E

International Convention for the Safety of Life at Sea (SOLAS)

IMO ID982E

Life Saving Appliances (LSA) Code

Company No. Rev. 570-20-SH-DTS-00012_00

10 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

4 PURPOSE

The purpose of this data sheet is to cover the technical requirements for the Life Raft for CP7S Compression Platform Production Deck in the NFPS Offshore Compression Complexes Project, COMP2. This data sheet shall be read in conjunction with Specification for Safety & Life Saving Equipment for CP6S And CP7S Complexes [Ref.6]. VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this data sheet and referred specifications.

Company No. Rev. 570-20-SH-DTS-00012_00

11 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

5 DATA SHEET

LIFE RAFT

DATA SHEET IDENTIFICATIONS

DOCUMENT NO

570-20-SH-DTS-00012

ADMINISTRATIVE IDENTIFICATIONS

PROJECT NUMBER

033734

PROJECT

QUANTITY

NFPS OFFSHORE COMPRESSION COMPLEXES PROJECT COMP2

4 NOS (LOCATED AT CP7S PRODUCTION DECK)

EQUIPMENT IDENTIFICATION

TAG NUMBER

SERVICE

570-XZ2001 / 570-XZ2002 / 570-XZ2003 / 570-XZ2004

LIFE SAVING

OPERATION DATA

ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

ENVIRONMENTAL / SITE CONDITIONS

MINIMUM

NORMAL

MAXIMUM

BLACK BULB

UNITS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

8.3

37.0

45.6

100.0

84

°C

%

ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

TECHNICAL SPECIFICATION

EQUIPMENT DESIGN CRITERIA

LIFERAFT CRITERIA:

A

1

B

1

2

3

C

1

2

D

1

2

3

E

1

1.1

CAPACITY

25 MEN (INDIVIDUAL WEIGHTS FOR THE DESIGN OF LIFE RAFTS SHALL BE A MINIMUM OF 90 KG)

1.9

LIFERAFTS SHALL HAVE A CANOPY FOR WEATHER PROTECTION OF THE OCCUPANTS.

REQUIRED

1.2 MATERIAL

DURABLE POLYURETHANE COATED FABRIC

1.10

1.3

LIFERAFTS SHALL BE HOUSED IN A RIGID CONTAINER (GRP) AND SHALL AUTOMATICALLY INFLATE WHEN LAUNCHED / PAINTER LINE IS PULLED.

BUOYANCY CHAMBERS (COMPRISING SUPERIMPOSED AND INDEPENDENT AIRTIGHT MATERIAL COMPARTMENTS) SHALL BE MANUFACTURED FROM MATERIAL(S) THAT IS HIGHLY ABRASIVE RESISTANT AND IMPERVIOUS TO CORROSION IN A HUMID MARINE ENVIRONMENT.

LIFERAFTS SHALL HAVE RIGHTENING STRAP ACROSS THE UNDERSIDE OF THE FLOOR TO ASSIST A SINGLE SURVIVOR IN RIGHTENING THE LIFE RAFT SHALLIT BE INVERTED.

STORAGE CRADLE SHALL BE MADE OF STAINLESS-STEEL (SS316) GRADE. THE CRADLE SHALL ALLOW EASY DEPLOYMENT OF THE RAFT INTO THE SEA BY ONE PERSON.

1.4

1.5

1.6

REQUIRED

1.11

REQUIRED

1.12

REQUIRED

1.13

SELF INFLATING AND ENCAPSULATED JETTISON TYPE COMPLETE WITH A SPLIT FIBRE GLASS UV PROTECTED CAPSULE, STORAGE CRADLE, TILTABLE PAINTER LINE (NOT LESS THAN 30m) FOR INFLATING.

THE PLATFORM IDENTIFICATION NAME SHALL BE MARKED ON LIFERAFT AND PADDLES IN BLACK LETTERING. TYPE AND SIZE AND PRINTING ON THE LIFERAFT SHALL FULFILL THE REQUIREMENTS OF SOLAS/LSA.

ALL LIFE RAFTS TOGETHER WITH PADDLES SHALL BE CONSPICUOUSLY MARKED WITH NAME OF THE PLATFORM. THE NUMBER OF PERSONS ALLOWED ON EACH RAFT SHALL BE MARKED WITH LETTERS AND NUMBERS AT LEAST 100 MM HIGH OF A COLOR CONTRASTING WITH THAT OF THE LIFE RAFT.

THE LIFE RAFT ASSEMBLY SHALL BE CONSTRUCTED TO WITHSTAND IMPACT WITH THE WATER (WITHOUT DAMAGE) FROM THE INSTALLED HEIGHT.

REQUIRED

REQUIRED

REQUIRED

REQUIRED

REQUIRED

1.14

LIFT RAFT SYSTEM

INCLINED LAUNCHING RACKS

1.7

CRADLE INSTALLATION METHOD (NOTE 10)

DECK MOUNTED (VENDOR TO PROVIDE MOUNTING ACCESSORIES)

1.15

LIFERAFT SHALL BE ABLE TO BE TOWED AT A SPEED OF 3 KNOTS IN CALM WATER WHEN LOADED

REQUIRED

1.8

LIFERAFTS SHALL BE EASILY CLIMBED INTO BY SURVIVOR FULLY CLOTHED AND WEARING A LIFEJACKET.

REQUIRED

2

CANOPY CRITERIA:

2.1

THE LIFERAFT CANOPY SHALL BE INTERNATIONAL ORANGE. ALSO, A LARGE CROSS (X) TO BE MARKED ON THE CANOPY WITH REFLECTIVE TAPES.

REQUIRED

2.6

IT SHALL BE PROVIDED WITH AT LEAST ONE VIEWING PORT.

REQUIRED

Company No. Rev. 570-20-SH-DTS-00012_00

12 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

2.2

IT SHALL PROVIDE INSULATION AGAINST HEAT AND COLD BY MEANS OF EITHER TWO LAYERS OF MATERIAL SEPARATED BY AN AIR GAP OR OTHER EQUALLY EFFICIENT MEANS. MEANS SHALL BE PROVIDED TO PREVENT ACCUMULATION OF WATER IN THE AIR GAP.

LIFE RAFT

REQUIRED

2.7

IT SHALL BE PROVIDED WITH MEANS FOR COLLECTING RAINWATER.

REQUIRED

2.3

ITS INTERIOR SHALL BE OF A COLOUR THAT DOES NOT CAUSE DISCOMFORT TO THE OCCUPANTS.

REQUIRED

2.8

IT SHALL BE PROVIDED WITH MEANS TO MOUNT A SURVIVAL CRAFT RADAR TRANSPONDER AT A HEIGHT OF AT LEAST 1 M ABOVE THE SEA.

REQUIRED

EACH ENTRANCE SHALL BE CLEARLY INDICATED AND BE PROVIDED WITH EFFICIENT ADJUSTABLE CLOSING ARRANGEMENTS WHICH CAN BE EASILY AND QUICKLY OPENED BY PERSONS CLOTHED IN IMMERSION SUITS FROM INSIDE AND OUTSIDE AND CLOSED FROM INSIDE. THE LIFERAFT SO AS TO PERMIT VENTILATION BUT EXCLUDE SEAWATER, WIND AND COLD. LIFERAFTS SHALL HAVE AT LEAST TWO DIAMETRICALLY OPPOSITE ENTRANCES.

IT SHALL ADMIT SUFFICIENT AIR FOR THE OCCUPANTS AT ALL TIMES, EVEN WITH THE ENTRANCES CLOSED.

REQUIRED

2.9

IT SHALL HAVE SUFFICIENT HEADROOM FOR SITTING OCCUPANTS UNDER ALL PARTS OF THE CANOPY.

REQUIRED

REQUIRED

3.0

GMDSS COMPLIANT PORTABLE VHF MARINE HANDHELD RADIOS, EPIRBs OPERATING ON THE INTERNATIONAL SATELLITE DISTRESS FREQUENCY OF 406 MHZ, SARTs (AIS) AND SARTs (RADAR) OPERATING ON THE 9 GHZ MARINE RADAR FREQUENCY BAND.

REQUIRED

MARKINGS

MARKING ON THE LIFERAFT CONTAINER:

2.4

2.5

F

1

1.1 MAKER’S NAME AND TRADEMARK

VENDOR TO ADVISE

1.6

DATE WHEN LAST SERVICED

REQUIRED

1.2

SERIAL NUMBER

VENDOR TO ADVISE

1.7

LENGTH OF PAINTER

VENDOR TO ADVISE

1.3

NAME OF APPROVING AUTHORITY AND THE NUMBER OF PERSONS IT IS PERMITTED TO CARRY

VENDOR TO ADVISE

1.8

MAXIMUM PERMITTED HEIGHT OF STOWAGE ABOVE WATERLINE (DEPENDING ON DROP-TEST HEIGHT AND LENGTH OF PAINTER)

VENDOR TO ADVISE

1.4

SOLAS

VENDOR TO ADVISE

1.5

2

TYPE OF EMERGENCY PACK ENCLOSED

MARKING ON THE LIFERAFT:

VENDOR TO ADVISE

1.9

LAUNCHING INSTRUCTIONS IN ENGLISH

1.10

FACILITY/ PLATFORM IDENTIFICATION

REQUIRED

REQUIRED

2.1 MAKER’S NAME OR TRADEMARK;

VENDOR TO ADVISE

2.4

NAME OF APPROVING AUTHORITY;

VENDOR TO ADVISE

2.2

SERIAL NUMBER;

VENDOR TO ADVISE

2.3

DATE OF MANUFACTURE (MONTH AND YEAR)

VENDOR TO ADVISE

2.5

2.6

NAME AND PLACE OF SERVICING STATION WHERE IT WAS LAST SERVICED;

NUMBER OF PERSONS IT IS PERMITTED TO ACCOMMODATE OVER EACH ENTRANCE IN CHARACTERS NOT LESS THAN 100 MM IN HEIGHT OF A COLOUR CONTRASTING WITH THAT OF THE LIFERAFT.

VENDOR TO ADVISE

VENDOR TO ADVISE

G

1

EQUIPMENT ACCESSORIES

TWO (2) SETS OF EPIRBs, SARTs (AIS), SARTs (RADAR) AND VHF MARINE HANDHELD RADIOS SHALL BE STORED IN AN UV RESISTANT, Ex ‘E’ SS 316 ENCLOSURE READILY ACCESSIBLE FROM LIFERAFT LOCATION AND SECURED WITH A BREAK-GLASS PROTECTED LOCK.

Company No. Rev. 570-20-SH-DTS-00012_00

13 of 14

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR LIFE RAFT FOR CP7S COMPRESSION PLATFORM PRODUCTION DECK

CONTENTS IN LIFERAFT AS PER SOLAS “A” PACK:

LIFE RAFT

NO ITEM (NOTE 1)

1 TOPPING-UP PUMP

2 SEA ANCHOR

3 BAILER

4 REPAIR KIT

5 KNIFE

6 SIGNAL MIRROR

7 SET OF LEAK STOPPERS

2

8 WHISTLE

9 SPONGES

10 PADDLES

11 PRESSURE RELIEVE PLUGS

12 SEA SICKNESS BAG (1/PERSON)

13 LIFE SAVING SIGNALS

14 FIRST AID KIT

15 PARACHUTE ROCKET

16 HAND FLARES

17 SMOKE FLOATS

SPECIAL REQUIREMENTS

COMPLIANCE STANDARD

SOLAS, LSA

CERTIFICATION

USCG / SOLAS

QUANTITY

NO

ITEM (NOTE 1)

QUANTITY

RADAR REFLECTOR

ANTI-SEASICK PILLS (6/PERSON)

RESCUE QUOIT AND LINE OF NOT LESS THAN 30m

LIFE RAFT MANUAL (WATERPROOF)

THERMAL PROTECTIVE AIDS (TPA’S)

CAN OPENER

DRINKING CUP

WATER (1.5 LITER/PERSON)

EMERGENCY RATIONS (0.5kg = 10,000 kJ/PERSON)

FISHING KIT

FLASHLIGHTS

1

150

1

1

2

3

1

37.5 LITER

12.5 kg

1

1

18

19

20

21

22

23

24

25

26

27

28

1

2

2

1

2 (NOTE 2 & 5)

1

1

1

2

1 PAIR

1 SET

25

1

1

4

6 (NOTE 2)

2

ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

HAZARDOUS AREA CLASSIFICATION MINIMUM ZONE 1, IIB, T3

PHYSICAL DATA

1 WEIGHT OF EQUIPMENT

VENDOR TO ADVISE

2 WEIGHT OF CRADLE

VENDOR TO ADVISE

PAINT Q LINE LENGTH (MIN)

VENDOR TO ADVISE

EQUIPMENT IDENTIFICATIONS

EQUIPMENT TYPE

LIFE RAFT

MANUFACTURER NAME

VENDOR TO ADVISE

NOTES

ITEM TO BE PROVIDED IN SEALED WATERPROOF CONTAINER.

4

5

3

4

DIMENSION OF EQUIPMENT

VENDOR TO ADVISE

DIMENSION OF CONTAINER

VENDOR TO ADVISE

MODEL NUMBER

VENDOR TO ADVISE

MANUFACTURER COUNTRY

VENDOR TO ADVISE

SURVIVAL KNIVES AND FLARES SHALL BE PACKED INSIDE THE LIFERAFT CONTAINER & CANNOT BE SHIPPED SEPARATELY AS THIS FORMS THE PART OF SOLAS “A” PACK REQUIREMENT.

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT DESIGN SPECIFICATION [REF.2].

ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

MAIN KNIFE SHALL BE OF THE NON-FOLDING TYPE. THE SECOND KNIFE CAN BE OF THE FOLDABLE TYPE.

LIFE RAFT SHALL BE CARTON PACKING AS PER MANUFACTURER STANDARD.

THIS DATA SHEET SHALL BE READ IN CONJUCTION WITH SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6] AND SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATA SHEETS.

SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6] SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATA SHEETS.

COMPLIANCE CERTIFICATES, THIRD PARTY VERIFICATION CERTIFICATES, TESTS AND TEST CERTIFICATES SHOULD BE PROVIDED BY THE VENDOR.

VENDOR SHALL PROVIDE THE FIXING ASSESSORIES FOR MOUNTING CRADLE TO THE PLATFORM DECK.

THIS DATASHEET SHALL BE UPDATED BY VENDOR WITH VENDOR/ MANUFACTURER’S DATA POST PURCHASING.

H

1

2

3

4

I

3

J

1

2

K

1

2

3

4

5

6

7

8

9

10

11

Company No. Rev. 570-20-SH-DTS-00012_00

14 of 14