Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 21699 Saipem COMP2

❯

TQs

❯

TC 01

❯

Document Set 1

❯

03 CHSK

❯

PDF

❯

570 20 SH DTS 00007_00

NFPS Offshore Compression Complexes Project COMP2

COMPANY Contract No.: LTC/C/NFP/5128/20

CONTRACTOR Project No.: 033734

Document Title

:

DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

COMPANY Document No.

: 570-20-SH-DTS-00007

Saipem Document No.

: 033734-D-D-30-SPM-LP-B-10006

Discipline

: HSE&Q

Document Type

: DATA SHEET

Document Category/Class

: 2

Document Classification

: INTERNAL

00

06-Dec-2023

20-Sep-2023

Approved for Construction Issued for Approval

Azran Shariman Rama Krishna K. Luminita Oprescu

Maria Fransisca Rama Krishna K

Luminita Oprescu

15-Aug-2023

Issued for Review

Maria Fransisca

Vijayakumar Rajaram

Luminita Oprescu

B

A

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

CHECKED BY

APPROVED BY

Saipem S.p.A.

THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.

Company No._Rev. 570-20-SH-DTS-00007_00

1 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

REVISION HISTORY

Revision

Date of Revision

Revision Description

A1

A

B

00

20-Jul-2023

Issued for Inter-Discipline Check

15-Aug-2023

20-Sep-2023

Issued for Review

Issued for Approval

06-Dec-2023

Approved for Construction

HOLDS LIST

Hold No

Hold Description

Company No._Rev. 570-20-SH-DTS-00007_00

2 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

TABLE OF CONTENTS

1

2

3

4

5

INTRODUCTION … 4

1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4

DEFINITIONS AND ABBREVIATIONS … 6

2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7

REGULATIONS, CODES AND STANDARDS … 8

3.1 COMPANY DOCUMENTS … 8 3.2 PROJECT DOCUMENTS … 8 INTERNATIONAL CODES AND STANDARDS … 9 3.3

PURPOSE … 10

DATASHEET … 11

Company No._Rev. 570-20-SH-DTS-00007_00

3 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.

Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.

1.1 Project Objective

The objective of this Project includes:

• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,

and efficient throughout their required life.

• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality

performance.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit

purpose in all respects.

for

Offshore

‐

‐

CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:

• CP6S Compression Complex

• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S

• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5

• Bridge linked Tie-in to RP6S

Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.

• CP7S Compression Complex

• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S

• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5

• Bridge linked Tie-in to RP7S

Company No._Rev. 570-20-SH-DTS-00007_00

4 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.

RGA Complex Destressing

Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:

• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex

• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex

Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.

Onshore

An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.

Figure 1.2.1: NFPS Compression Project COMP2 Scope

Company No._Rev. 570-20-SH-DTS-00007_00

5 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

Qatargas Operating Company Limited.

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

MILESTONE

A reference event splitting a PROJECT activity for progress measurement purpose.

PROJECT

NFPS Offshore Compression Complexes Project COMP2

SITE

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Scope of Work defined in the CONTRACT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

VENDOR

The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.

Company No._Rev. 570-20-SH-DTS-00007_00

6 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

2.2 Abbreviations

Code

Definition

BR

CP

ELICS

EPC

EPCOL

FL

HFE

LQ

NFPS

OCC

OSHA

QG

RGA

RGE

RL

RLIC

RP

UV

WBS

Bridge

Compression Platform

Electrical Integrated Control System

Engineering, Procurement and Construction

Offshore and Pipelines Project

Flare Platform

Human Factors Engineering

Living Quarter Platform

North Field Production Sustainability

Onshore Collaborative Center

Occupational Safety and Health Administration

Qatargas Operating Company Limited

Ras Gas Alfa

Ras Gas Expansion

Ras Laffan

Ras Laffan Industrial City

Riser Platform

Ultraviolet

Work Breakdown Structure

Company No._Rev. 570-20-SH-DTS-00007_00

7 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

3 REGULATIONS, CODES AND STANDARDS

In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.

In general, the order of precedence shall be followed:

a) Qatari Governmental and Regulatory Requirements

b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)

c) Project Specifications.

d) Industry Codes and Standards

e) COMPANY and CONTRACTOR’s Lessons Learned

If CONTRACTOR/SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.

The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.

3.1 Company Documents

S. No

Document Number

Title

PRT-PRS-PRC-014

Offshore Loss Prevention Philosophy

COMP-QG-PR-REP- 00008

North Field Production Sustainability Compression Project: EPC-2 – Basis of Design EPC2

(NFPS), NFPS

PRT-ENV-PRC-013

Environmental Aspects and Impacts Procedure

3.2 Project Documents

S. No

Document Number

Title

200-20-SH-DEC-00005

200-20-SH-DEC-00008

200-20-SH-SPC-00006

200-20-ME-DEC-00003

200-20-PI-SPC-00015

200-20-SH-SPC-00011

200-20-CE-DEC-00003

Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Safety and Lifesaving Equipment for CP6S and CP7S Complexes Material Handling Philosophy Complexes Piping Material Specification Complexes HFE Workplace Design Specification for CP6S and CP7S Complexes Material Selection Philosophy Complexes

for CP6S and CP7S

for CP6S and CP7S

for CP6S and CP7S

Company No._Rev. 570-20-SH-DTS-00007_00

8 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

S. No

Document Number

Title

200-20-CE-SPC-00015

Painting Specification for CP6S and CP7S Complexes

200-21-ST-DEC-00001

Note 1

Note 1

Greenfield Structural Design Basis for Substructure of CP6S and CP7S Complexes Escape Route, Life Saving and Fire Fighting Equipment Layout – Main Deck for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Production Deck for Compression Platform CP7S

570-20-SH-LIS-00001

Safety Equipment List for CP7S Complex

Note 1: Document numbers shall be updated in next submission of Datasheet for Chemical Handling Safety Kit for CP7S Compression Platform.

3.3

International Codes and Standards

S. No

Document Number

Title

OSHA 1926.95

Criteria for Personal Protective Equipment

Company No._Rev. 570-20-SH-DTS-00007_00

9 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

4 PURPOSE

The purpose of this data sheet is to covers the technical requirements for the Chemical Handling Safety Kit for CP7S Platform in the NFPS Offshore Compression Complexes Project, COMP2. This data sheet shall be read in conjunction with Specification for Safety & Life Saving Equipment for CP6S And CP7S Complexes [Ref. 6]. VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this data sheet and referred specifications.

Company No._Rev. 570-20-SH-DTS-00007_00

10 of 11

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR CHEMICAL HANDLING SAFETY KIT FOR CP7S COMPRESSION PLATFORM

5 DATASHEET

CHEMICAL HANDLING SAFETY KIT

DATASHEET IDENTIFICATIONS

DOCUMENT NO

570-20-SH-DTS-00007

ADMINISTRATIVE IDENTIFICATIONS

PROJECT NUMBER

033734

PROJECT

QUANTITY

EQUIPMENT IDENTIFICATION

TAG NUMBER

SERVICE

NFPS OFFSHORE COMPRESSION COMPLEXES PROJECT COMP2

2 NOS.

570-XZ20161 (MAIN DECK), 570-XZ20162 (PRODUCTION DECK)

SAFETY

OPERATION DATA

ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

ENVIRONMENTAL / SITE CONDITIONS

MINIMUM

NORMAL

MAXIMUM

BLACK BULB

UNITS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

8.3

37.0

45.6

100.0

84

°C

%

ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

TECHNICAL SPECIFICATION

CHEMICAL HANDLING SAFETY KIT CONTENT

FACE MASK

CHEMICAL SPLASH PROTECTION APRON

REQUIRED

REQUIRED

CHEMICAL HANDLING GLOVES

REQUIRED

CHEMICAL RESISTANT COVERALL

REQUIRED

CHEMICAL RESISTANT GOGGLES

REQUIRED

CABINET DESIGN CRITERIA

CAPACITY

ABLE TO FIT ALL THE ITEMS IN ‘SECTION E’

CABINET MATERIAL

UV RESISTANT FIRE-RETARDANT GRP

COLOUR

VENDOR TO ADVISE

6

7

8

9

8

9

10

CHEMICAL SPLASH SHIELD

REQUIRED

CHEMICAL PROTECTIVE BOOTS

REQUIRED

FILTER RESPIRATORS

REQUIRED

PORTABLE EYE WASH BOTTLES/EAR PLUGS

REQUIRED

VENTILATION / DRAINAGE

REQUIRED

COUNTRY OF ORIGIN

VENDOR TO ADVISE

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

STAINLESS STEEL SS316

A

1

B

1

2

3

C

1

2

D

1

2

3

E

1

2

3

4

5

F

1

2

3

4

LABELLING

5

MOUNTING/ / INSTALLATION

“CHEMICAL HANDLING SAFETY KIT” IN ENGLISH

FREE STANDING, WITH PROVISION OF ADEQUATE BOTTOM AND BACK FRAMES TO PERMIT DECK OR BULKHEAD MOUNTING

11

MANUFACTURER NAME

VENDOR TO ADVISE

12

MODEL

VENDOR TO ADVISE

6

7

G

1

2

H

1

2

I

1

2

3

4

5

6

7

8

IP RATING

IP 56

13

CABINET DOOR TYPE

FRONT OPEN (DOUBLE OR SINGLE DOOR)

CABINET PAINT FINISH

SPECIAL REQUIREMENTS

REFER PAINTING SPECIFICATION [REF. 11]

COMPLIANCE STANDARD

OSHA

ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

PHYSICAL DATA

WEIGHT OF FILLED CABINET

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

NOTES

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT DESIGN SPECIFICATION [REF. 2]

ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

CHEMICAL HANDLING SAFETY KIT SHALL BE PROVIDED NEARBY HAZARDOUS CHEMICALS HANDLING AREA. REFER ESCAPE ROUTE, LIFE SAVING AND FIRE FIGHTING EQUIPMENT LAYOUTS

THIS DATASHEET SHALL BE READ IN CONJUCTION WITH SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6].

SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6] SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATA SHEETS.

COMPLIANCE CERTIFICATES, THIRD PARTY VERIFICATION CERTIFICATES, TESTS AND TEST CERTIFICATES SHOULD BE PROVIDED BY THE VENDOR.

THE CABINET SHALL HAVE CLEAR LEGEND LISTING CONTENTS WITH AN APPROPRIATE DESCRIPTION

THIS DATASHEET SHALL BE UPDATED BY VENDOR WITH VENDOR/ MANUFACTURER’S DATA POST PURCHASING.

Company No._Rev. 570-20-SH-DTS-00007_00

11 of 11

Project: Q-21699 - Saipem COMP2 Folder: PDF


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further