560 20 SH DTS 00010_00

NFPS Offshore Compression Complexes Project COMP2

COMPANY Contract No.: LTC/C/NFP/5128/20

CONTRACTOR Project No.: 033734

Document Title

:

DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

COMPANY Document No.

: 560-20-SH-DTS-00010

Saipem Document No.

: 033734-C-D-30-SPM-LP-B-10033

Discipline

: HSE&Q

Document Type

: DATA SHEET

Document Category/Class

: 2

Document Classification

: INTERNAL

00

06-Dec-2023

20-Sep-2023

B

A

Approved for Construction Issued for Approval

Azran Shariman

Rama Krishna K.

Luminita Oprescu

Maria Fransisca

Rama Krishna K

Luminita Oprescu Vijayakumar Rajaram

09-Aug-2023

Issued for Review

Maria Fransisca

Rama Krishna K

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

CHECKED BY

APPROVED BY

Saipem S.p.A.

THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.

Company No._Rev. 560-20-SH-DTS-00010_00

1 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

REVISION HISTORY

Revision

Date of Revision

Revision Description

A1

A

B

00

20-Jul-2023

Issued for Inter-Discipline Check

09-Aug-2023

20-Sep-2023

06-Dec-2023

Issued for Review

Issued for Approval

Approved for Construction

HOLDS LIST

Hold No

Hold Description

Company No._Rev. 560-20-SH-DTS-00010_00

2 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

TABLE OF CONTENTS

1

2

3

4

5

INTRODUCTION … 4

1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4

DEFINITIONS AND ABBREVIATIONS … 6

2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7

REGULATIONS, CODES AND STANDARDS … 9

3.1 COMPANY DOCUMENTS … 9 3.2 PROJECT DOCUMENTS … 9 INTERNATIONAL CODES AND STANDARDS … 10 3.3

PURPOSE … 11

DATA SHEET … 12

Company No._Rev. 560-20-SH-DTS-00010_00

3 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.

Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.

1.1 Project Objective

The objective of this Project includes:

• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,

and efficient throughout their required life.

• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality

performance.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit

purpose in all respects.

for

Offshore

‐

‐

CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:

• CP6S Compression Complex

• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S

• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5

• Bridge linked Tie-in to RP6S

Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.

• CP7S Compression Complex

• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S

• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5

• Bridge linked Tie-in to RP7S

Company No._Rev. 560-20-SH-DTS-00010_00

4 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.

RGA Complex Destressing

Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:

• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex

• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex

Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.

Onshore

An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.

Figure 1.2.1: NFPS Compression Project COMP2 Scope

Company No._Rev. 560-20-SH-DTS-00010_00

5 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

Qatargas Operating Company Limited.

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

MILESTONE

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, tested and manufactured, constructed, supplied, permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

A reference event splitting a PROJECT activity for progress measurement purpose.

PROJECT

NFPS Offshore Compression Complexes Project COMP2

SITE

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Scope of Work defined in the CONTRACT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

VENDOR

The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.

Company No._Rev. 560-20-SH-DTS-00010_00

6 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

2.2 Abbreviations

Code

Definition

BR

CP

ELICS

EN

EPC

EPCOL

FEED

FL

GRP

HFE

IMO

LQ

LSA

NFPS

OCC

OSHA

QG

RGA

RGE

RL

RLIC

RP

UV

WBS

Bridge

Compression Platform

Electrical Integrated Control System

European Norm

Engineering, Procurement and Construction

Offshore and Pipelines Project

Front End Engineering Design

Flare Platform

Glass Reinforced Plastic

Human Factors Engineering

International Maritime Organizatoin

Living Quarter Platform

Life Saving Appliance

North Field Production Sustainability

Onshore Collaborative Center

Occupational Safety and Health Standard

Qatargas Operating Company Limited

Ras Gas Alfa

Ras Gas Expansion

Ras Laffan

Ras Laffan Industrial City

Riser Platform

Ultraviolet

Work Breakdown Structure

Company No._Rev. 560-20-SH-DTS-00010_00

7 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

Code

Definition

WHP

Wellhead Platform

Company No._Rev. 560-20-SH-DTS-00010_00

8 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

3 REGULATIONS, CODES AND STANDARDS

In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.

In general, the order of precedence shall be followed:

a) Qatari Governmental and Regulatory Requirements

b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)

c) Project Specifications.

d) Industry Codes and Standards

e) COMPANY and CONTRACTOR’s Lessons Learned

If CONTRACTOR/SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.

The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.

3.1 Company Documents

S. No

Document Number

Title

PRT-PRS-PRC-014

Offshore Loss Prevention Philosophy

COMP-QG-PR-REP- 00008

North Field Production Sustainability Compression Project: EPC-2 – Basis of Design EPC2

(NFPS), NFPS

PRT-ENV-PRC-013

Environmental Aspects and Impacts Procedure

3.2 Project Documents

S. No

Document Number

Title

200-20-SH-DEC-00005

200-20-SH-DEC-00008

200-20-SH-SPC-00006

200-20-ME-DEC-00003

200-20-PI-SPC-00015

200-20-SH-SPC-00011

200-20-CE-DEC-00003

Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Safety and Lifesaving Equipment for CP6S and CP7S Complexes Material Handling Philosophy Complexes Piping Material Specification Complexes HFE Workplace Design Specification for CP6S and CP7S Complexes Material Selection Philosophy Complexes

for CP6S and CP7S

for CP6S and CP7S

for CP6S and CP7S

Company No._Rev. 560-20-SH-DTS-00010_00

9 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

S. No

Document Number

Title

200-20-CE-SPC-00015

Painting Specification for CP6S and CP7S Complexes

200-21-ST-DEC-00001

560-20-SH-PLN-00008

562-20-SH-PLN-00002

562-83-SH-PLN-00003

562-83-SH-PLN-00002

Greenfield Structural Design Basis for Substructure of CP6S and CP7S Complexes Escape Route, Life Saving and Fire Fighting Equipment Layout – PSV Service Platform for Compression Platform CP6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Roof Deck for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 3 for LQ6S Escape Route, Life Saving and Fire Fighting Equipment Layout – Level 2 for LQ6S

560-20-SH-LIS-00001

Safety Equipment List for CP6S Complex

560-20-SH-DTS-00012

Data Sheet for Life Jackets with Cabinet for CP6S Complex

560-20-SH-DTS-00011

Data Sheet for First Aid Kit for CP6S Complex

560-20-SH-DTS-00021

562-20-SH-DTS-00005

560-20-SH-DTS-00022

Data Sheet for Emergency Escape Breathing Device (EEBD) and Cabinet for CP6S Complex Data Sheet for Smoke Hood with Cabinet for LQ6S Living Quarter Data Sheet for Breathing Apparatus (BA) Escape Set and Cabinet for CP6S Complex

3.3

International Codes and Standards

S. No

Document Number

Title

BS EN 403: 2004

EN 403

Respiratory protective devices for self-rescue. Filtering devices with hood for escape from fire Respiratory protective devices for self-rescue. Filtering devices with hood for escape from fire. Requirements, testing, marking

IMO ID982E

Life Saving Appliances (LSA) Code

OSHA 1910.266

Occupational Safety and Health Standard - Special Industries - First-aid Kits

Company No._Rev. 560-20-SH-DTS-00010_00

10 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

4 PURPOSE

The purpose of this data sheet is to cover the technical requirements for the Safety Cabinet Inside Bed Space and Safety Cabinet Inside Crane Cabin for CP6S Complex in the NFPS Offshore Compression Complexes Project, COMP2. This data sheet shall be read in conjunction with Specification for Safety & Life Saving Equipment for CP6S And CP7S Complexes [Ref. 6]. VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this data sheet and referred specifications.

Company No._Rev. 560-20-SH-DTS-00010_00

11 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

5 DATA SHEET

COMMON SAFETY CABINET

A

1

B

1

2

DATA SHEET IDENTIFICATIONS

DOCUMENT NO

560-20-SH-DTS-00010

ADMINISTRATIVE IDENTIFICATIONS

PROJECT NUMBER

033734

PROJECT

NFPS OFFSHORE COMPRESSION COMPLEXES PROJECT COMP2

3

QUANTITY & LOCATION

C

EQUIPMENT IDENTIFICATION

1

TAG NUMBER

LQ6S CRANE CABIN SAFETY CABINET (TO FIT 1 BA ESCAPE SET, 1 LIFE JACKET, 1 FIRST AID KIT): 1 NO CP6S CRANE CABIN SAFETY CABINET (TO FIT 1 BA ESCAPE SET, 1 LIFE JACKET, 1 FIRST AID KIT): 2 NOS LQ6S BED SPACE SAFETY CABINET (TO FIT 1 EEBD, 1 LIFE JACKET, 1 SMOKE HOOD): 105 NOS

LQ6S CRANE CABIN SAFETY CABINET: 562-XZ20131 CP6S CRANE CABIN SAFETY CABINET: 560-XZ20151 ~ 560-XZ20152 LQ6S BED SPACE SAFETY CABINET: 562-XZ20201 ~ 562-XZ20305

2

SERVICE

LIFE SAVING

OPERATION DATA

ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

ENVIRONMENTAL / SITE CONDITIONS

MINIMUM

NORMAL

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

8.3

37.0

MAXIMUM

45.6

100.0

UNITS

°C

%

ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

LIFE JACKET DESIGN CRITERIA

REFER TO DATA SHEET FOR LIFE JACKET WITH CABINET FOR CP6S COMPLEX [REF. 18] FOR DETAILS.

EEBD DESIGN CRITERIA

REFER TO DATA SHEET FOR EMERGENCY ESCAPE BREATHING DEVICE (EEBD) AND CABINET FOR CP6S [REF. 20] FOR DETAILS.

FIRST AID KIT DESIGN CRITERIA

REFER TO DATA SHEET FOR FIRST AID KIT FOR CP6S COMPLEX [REF.19] FOR DETAILS.

SMOKE HOOD DESIGN CRITERIA

REFER TO DATA SHEET FOR SMOKE HOOD WITH CABINET FOR LQ6S [REF.21] FOR DETAILS.

BREATHING APPARATUS (BA) ESCAPE SET DESIGN CRITERIA

REFER TO DATA SHEET FOR BREATHING APPARATUS (BA) ESCAPE SET AND CABINET FOR CP6S COMPLEX [REF. 22] FOR DETAILS.

CABINET DESIGN CRITERIA

D

1

2

3

E

1

F

1

G

1

H

1

I

1

J

COLOUR

LABELLING

MOUNTING

2

3

4

5

6

K

1

2

L

1

2

1

CAPACITY

CRANE CABIN SAFETY CABINET SHALL FITS 1 BA ESCAPE SET, 1 LIFE JACKET AND 1 FIRST AID KIT.

BED SPACE SAFETY CABINET SHALL FITS 1 EEBD, 1 LIFE JACKET AND 1 SMOKE HOOD.

CABINET MATERIAL

UV RESISTANT FIRE-RETARDANT GRP

OSHA SAFETY GREEN/ RAL 1705035

7

VENTILATION / DRAINAGE

VENTILATION LOUVERS AND DRAINAGE HOLES

8

9

COUNTRY OF ORIGIN

VENDOR TO ADVISE

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

STAINLESS STEEL SS316

“SAFETY EQUIPMENT” IN ENGLISH

10

MANUFACTURER NAME

VENDOR TO ADVISE

WALL MOUNTED

11

MODEL

VENDOR TO ADVISE

CABINET PAINT FINISH

VENDOR TO ADVISE

12

CABINET DOOR TYPE

FRONT OPEN (DOUBLE OR SINGLE DOOR)

SPECIAL REQUIREMENTS

COMPLIANCE STANDARD

OSHA / LIFE SAVING APPLIANCES (LSA) CODE

ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

PHYSICAL DATA

WEIGHT OF FILLED CABINET

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

M

NOTES

1

2

3

4

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT DESIGN SPECIFICATION [REF. 2].

ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

COMMON SAFETY CABINET SHALL BE PROVIDED IN THE CRANE CABINS. REFER ESCAPE ROUTE, LIFE SAVING AND FIRE FIGHTING EQUIPMENT LAYOUTS [REF. 13, 14, 15, 16].

THIS DATA SHEET SHALL BE READ IN CONJUCTION WITH SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6].

Company No._Rev. 560-20-SH-DTS-00010_00

12 of 13

NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR COMMON SAFETY CABINET FOR CP6S COMPLEX

SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6] SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATA SHEETS.

COMPLIANCE CERTIFICATES, THIRD PARTY VERIFICATION CERTIFICATES, TESTS AND TEST CERTIFICATES SHOULD BE PROVIDED BY THE VENDOR.

COMMON SAFETY CABINET

THE CABINET SHALL HAVE CLEAR LEGEND LISTING CONTENTS WITH AN APPROPRIATE DESCRIPTION

THIS DATA SHEET SHALL BE UPDATED BY VENDOR WITH VENDOR/ MANUFACTURER’S DATA POST PURCHASING.

5

6

7

8

Company No._Rev. 560-20-SH-DTS-00010_00

13 of 13

Project: Q-21699 - Saipem COMP2 Folder: PDF


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further