NFPS Offshore Compression Complexes Project COMP2
COMPANY Contract No.: LTC/C/NFP/5128/20
CONTRACTOR Project No.: 033734
Document Title
:
DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
COMPANY Document No.
: 570-20-SH-DTS-00015
Saipem Document No.
: 033734-D-D-30-SPM-LP-B-10005
Discipline
: HSE&Q
Document Type
: DATA SHEET
Document Category/Class
: 2
Document Classification
: INTERNAL
00
28-Dec-2023
26-Sep-2023
B
A
Approved for Construction Issued for Approval
15-Aug-2023
Issued for Review
Maria Fransisca
Azran Shariman
Rama Krishna K
Luminita Oprescu
Maria Fransisca
Rama Krishna K Vijayakumar Rajaram
Luminita Oprescu
Luminita Oprescu
REV.
DATE
DESCRIPTION OF REVISION
PREPARED BY
CHECKED BY
APPROVED BY
Saipem S.p.A.
THIS DOCUMENT IS PROPERTY OF QATARGAS. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARGAS.
Company No._Rev. 570-20-SH-DTS-00015_00
1 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
REVISION HISTORY
Revision
Date of Revision
Revision Description
A1
A
B
00
20-Jul-2023
Issued for Inter-Discipline Check
15-Aug-2023
26-Sep-2023
28-Dec-2023
Issued for Review
Issued for Approval
Approved for Construction
HOLDS LIST
Hold No
Hold Description
Company No._Rev. 570-20-SH-DTS-00015_00
2 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
TABLE OF CONTENTS
1
2
3
4
5
6
INTRODUCTION … 4
1.1 PROJECT OBJECTIVE … 4 1.2 PROJECT SCOPE … 4
DEFINITIONS AND ABBREVIATIONS … 6
2.1 DEFINITIONS … 6 2.2 ABBREVIATIONS … 7
REGULATIONS, CODES AND STANDARDS … 8
3.1 COMPANY DOCUMENTS … 8 3.2 PROJECT DOCUMENTS … 8 INTERNATIONAL CODES AND STANDARDS … 9 3.3
PURPOSE … 10
DATA SHEET … 11
SCHEMATIC (EXAMPLE) … 13
Company No._Rev. 570-20-SH-DTS-00015_00
3 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
1
INTRODUCTION
The North Field is the world’s largest natural gas field and accounts for nearly all of the state of Qatar’s gas production. The reservoir pressure in the North Field has been declining due to continuous production since the early 1990s. The principal objective of the NFPS Project is to sustain the plateau from existing QG South Operation (RL Dry Gas, RGE Wet gas) and existing QG North Operation (QG1 & QG2) production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression. Refer to the figure below for a schematic of the North Field.
Qatargas Operating Company Limited is leading the development of the North Field Production Sustainability (NFPS) Project.
1.1 Project Objective
The objective of this Project includes:
• Sustain the Qatargas North Field Production Plateau by installing new Compression Complex facilities CP6S & CP7S in QG south with integration to the existing facilities under Investment #3 program.
• Facility development shall be safe, high quality, reliable, maintainable, accessible, operable,
and efficient throughout their required life.
• Achieve standards of global excellence in Safety, Health, Environment, Security and Quality
performance.
1.2 Project Scope
The Project Scope includes detailed engineering, procurement, construction, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start- up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit
purpose in all respects.
for
Offshore
‐
‐
CP6S and CP7S Compression Complexes that are part of QG-S RGE facilities as follows:
• CP6S Compression Complex
• Compression Platform CP6S, Living Quarters LQ6S, Flare FL6S
• Bridges BR6S-2, BR6S-3, BR6S-4, BR6S-5
• Bridge linked Tie-in to RP6S
Production from existing wellheads (WHP6S & WHP10S) and new wellhead (WHP14S) are routed via riser platform RP6S to compression platform CP6S to boost pressure and export to onshore via two export lines through the existing WHP6S pipeline and a new 38” carbon steel looping trunkline from RP6S (installed by EPCOL). CP6S is bridge-linked to RP6S.
• CP7S Compression Complex
• Compression Platform CP7S, Living Quarters LQ7S, Flare FL7S
• Bridges BR7S-2, BR7S-3, BR7S-4, BR7S-5
• Bridge linked Tie-in to RP7S
Company No._Rev. 570-20-SH-DTS-00015_00
4 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
CP7S shall receive production from existing wellheads (WHP5S & WHP7S) and new wellhead (WHP13S). There is only one export line for CP7S through the existing export pipeline from WHP7S. CP7S is bridge-linked to RP7S.
RGA Complex Destressing
Migration of the Electrical power source, Telecoms, Instrumentation and Control systems from WHPs and RPs hosted by RGA to the respective Compression Complexes listed below:
• WHP6S, WHP10S, WHP14S, RP6S and RP10S to CP6S Compression Complex
• WHP5S, WHP7S, WHP13S and RP7S to CP7S Compression Complex
Destressing of Telecoms, Instrumentation and Control system in RGA Complex Control Room, which would include decommissioning and removal of telecom system devices and equipment that would no longer be required post migration and destressing activity.
Onshore
An Onshore Collaborative Center (OCC) will be built under EPC-9, which will enable onshore based engineering teams to conduct full engineering surveillance of all the offshore facilities. The OCC Building will be located in Ras Laffan Industrial City (RLIC) within the Qatar Gas South Plot. MICC & Telecommunication, ELICS related scope will be performed in the OCC building.
Figure 1.2.1: NFPS Compression Project COMP2 Scope
Company No._Rev. 570-20-SH-DTS-00015_00
5 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
2 DEFINITIONS AND ABBREVIATIONS
2.1 Definitions
Definition
Description
COMPANY
Qatargas Operating Company Limited
CONTRACTOR
Saipem S.p.A.
DELIVERABLES
FACILITIES
All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.
fabricated,
MILESTONE
A reference event splitting a PROJECT activity for progress measurement purpose.
PROJECT
NFPS Offshore Compression Complexes Project COMP2
SITE
(i) any area where Engineering, Procurement, Fabrication of the FACILITIES related to the CP6S and CP7S Compression Complexes are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar.
SUBCONTRACT
Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.
SUBCONTRACTOR
Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.
WORK
Scope of Work defined in the CONTRACT.
WORK PACKAGE
The lowest manageable and convenient level in each WBS subdivision.
VENDOR
The person, group, or organization responsible for the design, manufacture, testing, and load-out/shipping of the Equipment/ Material.
Company No._Rev. 570-20-SH-DTS-00015_00
6 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
2.2 Abbreviations
Code
Definition
American National Standards Institute
Bridge
Compression Platform
Electrical Integrated Control System
Engineering, Procurement and Construction
Flare Platform
Glass Reinforced Plastic
Human Factor Engineering
International Safety Equipment Association
Living Quarter Platform
Main Instrumentation & Control Contractor
North Field Production Sustainability
Onshore Collaborative Center
Qatargas Operating Company Limited
Ras Lafan
Ras Lafan Industrial City
Ras Gas Alfa
Ras Gas Expansion
Riser Platform
Work Breakdown Structure
Wellhead Platform
ANSI
BR
CP
ELICS
EPC
FL
GRP
HFE
ISEA
LQ
MICC
NFPS
OCC
QG
RL
RLIC
RGA
RGE
RP
WBS
WHP
Company No._Rev. 570-20-SH-DTS-00015_00
7 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
3 REGULATIONS, CODES AND STANDARDS
In general, all design activities shall confirm to legal and statutory regulations and recognized industry best practices. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented. The latest editions of codes and specification effective as on date of contract shall be followed.
In general, the order of precedence shall be followed:
a) Qatari Governmental and Regulatory Requirements
b) COMPANY Procedures, Policies and Standards (Exhibit 5 Appendix I)
c) Project Specifications.
d) Industry Codes and Standards
e) COMPANY and CONTRACTOR’s Lessons Learned
If CONTRACTOR/SUBCONTRACTOR deems any deviations from the specifications will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR/SUBCONTRACTOR shall not proceed with any deviation to the specifications without prior COMPANY approval.
The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.
3.1 Company Documents
S. No
Document Number
Title
PRT-PRS-PRC-014
Offshore Loss Prevention Philosophy
COMP-QG-PR-REP- 00008
North Field Production Sustainability Compression Project: EPC-2 – Basis of Design EPC2
(NFPS), NFPS
PRT-ENV-PRC-013
Environmental Aspects and Impacts Procedure
3.2 Project Documents
S. No
Document Number
Title
200-20-SH-DEC-00005
200-20-SH-DEC-00008
200-20-SH-SPC-00006
200-20-ME-DEC-00003
200-20-PI-SPC-00015
200-51-IN-SPC-00021
200-20-EL-SPC-00002
Technical Safety and Loss Prevention Design Philosophy for CP6S and CP7S Complexes Escape, Evacuation & Rescue Design Philosophy for CP6S and CP7S Complexes Specification for Safety & Life Saving Equipment for CP6S and CP7S Complexes Material Handling Philosophy Complexes Piping Material Specification Complexes Instrument Specification for Packaged Equipment for CP6S and CP7S Complexes Specification For Electrical Packaged Equipment for CP6S and CP7S Complexes
for CP6S and CP7S
for CP6S and CP7S
Company No._Rev. 570-20-SH-DTS-00015_00
8 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
S. No
Document Number
Title
200-20-SH-SPC-00011
200-20-CE-DEC-00003
HFE Workplace Design Specification for CP6S and CP7S Complexes Material Selection Philosophy Complexes
for CP6S and CP7S
200-20-CE-SPC-00015
Painting Specification for CP6S and CP7S Complexes
200-21-ST-DEC-00001
570-20-SH-PLN-00009
570-20-SH-PLN-00010
572-20-SH-PLN-00003
Greenfield Structural Design Basis for Substructure of CP6S and CP7S Complexes Escape Route, Life Saving and Fire Fighting Equipment Layout – Main Deck for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Production Deck for Compression Platform CP7S Escape Route, Life Saving and Fire Fighting Equipment Layout – Cellar Deck for LQ7S
570-20-SH-LIS-00001
Safety Equipment List for CP7S Complex
3.3
International Codes and Standards
S. No
Document Number
Title
ANSI / SEA Z358.1
American National Standard - Emergency Eyewash and Shower Equipment
Company No._Rev. 570-20-SH-DTS-00015_00
9 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
4 PURPOSE
The purpose of this data sheet is to cover the technical requirements for the Safety Shower and Eyewash for CP7S Compression Platform in the NFPS Offshore Compression Complexes Project, COMP2. This data sheet shall be read in conjunction with Specification for Safety & Life Saving Equipment for CP6S And CP7S Complexes [Ref.6]. VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this data sheet and referred specifications.
Company No._Rev. 570-20-SH-DTS-00015_00
10 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
5 DATA SHEET
COMBINED SAFETY SHOWER AND EYE WASH STATION WITH CHILLER
A
DATA SHEET IDENTIFICATIONS
1
B
1
2
3
DOCUMENT NO
570-20-SH-DTS-00015
ADMINISTRATIVE IDENTIFICATIONS
PROJECT NUMBER
033734
PROJECT
NFPS OFFSHORE COMPRESSION COMPLEXES PROJECT COMP2
QUANTITY & LOCATION
TOTAL UNIT AT CP7S: 3 NOS. -1 NO LOCATED AT MAIN DECK -2 NOS LOCATED AT PRODUCTION DECK
TOTAL UNIT AT LQ7S: 1 NOS -1 NO LOCATED AT CELLAR DECK
C
EQUIPMENT IDENTIFICATION
1
TAG NUMBER
AT CP7S: -1 NO LOCATED AT MAIN DECK: 570-SEW2001 -2 NOS LOCATED AT PRODUCTION DECK: 570-SEW2002, 570-SEW2003
AT LQ7S: -1 NO LOCATED AT CELLAR DECK: 572-SEW2001
2
D
1
2
3
E
1
2
3
4
5
6
7
SERVICE
SAFETY
OPERATION DATA
ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
ENVIRONMENTAL / SITE CONDITIONS
MINIMUM
NORMAL
MAXIMUM
BLACK BULB
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
8.3
37.0
45.6
100.0
84
ATMOSPHERE
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
UNITS
°C
%
TECHNICAL SPECIFICATION
EQUIPMENT DESIGN CRITERIA
TYPE
POTABLE WATER
11
MARKING
AREA (MINIMUM)
(48 IN) 1,200 MM IN DIAMETER
SAFETY SHOWER FLOW
EYE WASH STATION FLOW
DURATION
75.7 LPM (20 USgpm), AS PER ANSI/ISEA Z358.1 11.4 LPM (3 USgpm), AS PER ANSI/ISEA Z358.1 15 MINUTES (MINIMUM), AS PER ANSI/ISEA Z358.1
12
13
14
COLOUR
DRAIN OUTLET CONNECTION
2” (VENDOR TO CONFIRM)
TIE-IN FLANGE MATERIAL FOR WATER SUPPLY AND DRAIN
VENDOR TO ADVISE
15
CHILLER
REQUIRED (NOTE 11, 12)
OPERATING METHOD
FOOT PANELS & PULL ROD
16
MIN/ MAX TEMPERATURE AT USER
16/38 OC, AS PER ANSI/ISEA Z358.1
FLUID HANDLED
POTABLE WATER QUALITY
17
MIN/ MAX PRESSURE AT USER
30/ 80 PSI, AS PER ANSI/ISEA Z358.1
AS PER BS EN5499
AS PER BS EN5499
8
TANK
REQUIRED
18
MATERIAL
PIPE AND FITTINGS: SS316L VALVES: SS316L TANK AND SIDE PANELS: GRP, FRAME: GALVANIZED STEEL
9
SHOWER SPRAY ANGLE
VENDOR TO ADVISE
19
PIPING CLASS
VENDOR TO ADVISE
10
INLET CONNECTION TO POTABLE WATER
F
EQUIPMENT ACCESSORIES
2” (VENDOR TO CONFIRM)
20
MOUNTING METHOD (NOTE 16)
DECK MOUNTED (VENDOR TO PROVIDE MOUNTING ACCESSORIES)
ANTI-SURGE HEADS WITH INTEGRAL FLOW CONTROL FOR SHOWER AND EYEWASH
REQUIRED
PANIC BAR OPERATION
REQUIRED
WATER TREATMENT ADDITIVE
REQUIRED
7
8
9
DRAIN SUMP
REQUIRED
PRESSURE REDUCING AND ISOLATION VALVE
HIGH- AND LOW-LEVEL AND ACTIVATION SWITCHES
REQUIRED
REQUIRED (NOTE 13)
SELF DRAINING VALVE FOR EYEWASH
REQUIRED
10
DUST COVER
REQUIRED
LEVEL MONITORING SIGNAL TO BE PROVIDED
REQUIRED
LOCAL INDICATION / ALARM AND LIMIT SWITCH
REQUIRED
PHYSICAL DATA
11
OTHER ACCESSORIES
VENDOR TO ADVISE
WEIGHT (DRY/ WITH WATER)
VENDOR TO ADVISE
2
DIMENSION
VENDOR TO ADVISE
EQUIPMENT IDENTIFICATIONS
1
2
3
4
5
6
G
1
H
Company No._Rev. 570-20-SH-DTS-00015_00
11 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
COMBINED SAFETY SHOWER AND EYE WASH STATION WITH CHILLER
MODEL NUMBER
VENDOR TO ADVISE
3
MANUFACTURER COUNTRY
VENDOR TO ADVISE
MANUFACTURER NAME
VENDOR TO ADVISE
SPECIAL REQUIREMENTS
COMPLIANCE STANDARD
ANSI STANDARD AND REGULATIONS REQUIREMENTS (ANSI/ISEA Z358.1)
ENVIRONMENTAL REQUIREMENT
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
NOTES
STRAINERS FOR EYEWASH SHOWER SHALL BE PROVIDED.
SELF SUPPORTING SHOWER UNIT WITH INTEGRAL FACEWASH, EYEWASH UNITS AND OVERHEAD TANK
INSULATION SHALL BE FITTED TO ENSURE THE WATER IS MAINTAINED AT A TEPID TEMPERATURE REGARDLESS OF THE ENVIRONMENT.
THERMOSTATIC MIXING VALVE SHALL BE PROVIDED TO ENSURE WATER IN CORRECT TEMPERATURE.
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT DESIGN SPECIFICATION [REF.2].
ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
DRAIN SUMP SHALL BE PROVIDED ALONG WITH SAFETY SHOWER AND EYEWASH SYSTEM.
GRP SIDE PANELS SHALL BE PROVIDED TO PROTECT THE SPLASHING OF WATER OUTSIDE THE SAFETY SHOWER.
THIS DATA SHEET SHALL BE READ IN CONJUCTION WITH SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6].
SPECIFICATION FOR SAFETY & LIFE SAVING EQUIPMENT FOR CP6S AND CP7S COMPLEXES [REF. 6] SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATA SHEETS.
COMPLIANCE CERTIFICATES, THIRD PARTY VERIFICATION CERTIFICATES, TESTS AND TEST CERTIFICATES SHOULD BE PROVIDED BY THE VENDOR.
SET POINT OF CHILLER IS 16/38 OC TO ENSURE TEPID WATER TEMPERATURE DELIVERED FOR 15 MINUTES CONTINUOUS OPERATION OF SAFETY SHOWER HEAD AND EYEWASH.
POWER FOR CHILLER SHALL BE FROM NORMAL AND EMERGENCY POWER SUPPLY. VENDOR TO ADVISE POWER CONNECTION DETAILS OF THE CHILLER UNIT.
HIGH LEVEL SWITCH SHALL BE PROVIDED TO AUTOMATICALLY STOP WATER SUPPLY TO SAFETY SHOWER TANK, LOW LEVEL SWITCH SHALL AUTOMATICALLY REFILL THE SAFETY SHOWER TANK, ACTIVATION SWITCH SHALL GIVE LOCAL INDICATION/ ALARM AND SIGNAL TO DCS (CCR) WHEN SAFETY SHOWER IS ACTIVATED/ USED. ALL INSTRUMENTATIONS SHALL BE CERTIFIED FOR ZONE 1, GAS GROUP IIB, AND TEMPERATURE CLASS T3 AS MINIMUM. ALL ELECTRICAL DEVICES SHALL BE CERTIFIED FOR ZONE 2, GAS GROUP IIB AND TEMPERATURE CLASS T3 AS MINIMUM.
VENDOR SHALL PROVIDE THE FIXING ASSESSORIES FOR MOUNTING TO THE PLATFORM DECK.
THIS DATA SHEET SHALL BE UPDATED BY VENDOR WITH VENDOR/ MANUFACTURER’S DATA POST PURCHASING.
1
2
I
1
2
J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Company No._Rev. 570-20-SH-DTS-00015_00
12 of 13
NFPS Offshore Compression Complexes Project COMP2 DATA SHEET FOR SAFETY SHOWER AND EYEWASH FOR CP7S COMPRESSION PLATFORM
6 SCHEMATIC (EXAMPLE)
Company No._Rev. 570-20-SH-DTS-00015_00
13 of 13
Project: Q-21699 - Saipem COMP2 Folder: PDF