Engineering Standard SAES-A-202 Saudi Aramco Engineering Drawings Preparation
11 August 2021
Document Responsibility: Engineering Data & Drawing Systems Stds. Committee
Contents
Summary of Change(s) (rev. 29 Oct. 2019) … 2 1 Scope … 3 2 Conflicts and Deviations … 3 3 References … 3 4 Terminology … 5 5 Drawing Name … 11 6 Title Block Information (Refer to Appendix A) . 11 7 Drawing Cancellation … 20 8 Demolition Drawing … 20 9 As-built Drawing … 20 10 Tag Number … 21 11 Drafting Requirements … 25 12 CADD Standards … 26 Appendix A – Saudi Aramco Engineering
Drawing Title Block … 29 Appendix B – Saudi Aramco Drawing Types … 30 Appendix C – Saudi Aramco Borders
and Seed Files … 39
Appendix D – Data-Centric Piping and
Instrumentation Diagram (P&ID) Specification … 42
Appendix E – Data Centric 3D Model
Specification … 64
Appendix F – Data-Centric Instrumentation
Specification … 83
Appendix G – Data-Centric Electrical
Specification … 120
Appendix H – Building Information Modeling
(BIM) Specification … 132 Revision History … 156
Previous Issue: 26 March 2020 Contacts: Drawing Management Unit Supervisor
Next Revision: 29 October 2024 Page 1 of 156
©Saudi Aramco 2019. All rights reserved.
Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Summary of Change(s) (rev. 29 October 2019)
No.
Paragraph Number
Change Type (New, Modification,..)
Technical Change(s)
Appendix H
New
Added a new Appendix (H) to include the specifications for developing Building Information Modeling (BIM)
General
Modify
Comply with content confirmation requirements
1
2
©Saudi Aramco 2020. All rights reserved.
Page 2 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
1
Scope
This standard establishes a uniform means of Computer Aided Design & Drafting (CADD) standards used, in producing and modifying Saudi Aramco engineering drawings in electronic format.
2
Conflicts and Deviations
Any conflicts between this document and other applicable Mandatory Saudi Aramco Engineering Requirements (MSAERs) shall be addressed in writing to the EK&RD Coordinator.
Any deviation from the requirements herein shall follow internal company procedure SAEP-302, Waiver of a Mandatory Saudi Aramco Engineering Requirement.
3
References
Engineering Drawings shall be prepared and revised in accordance with all applicable Saudi Aramco standards, procedures and practices as well as those applicable international standards and practices approved by Saudi Aramco.
3.1
Saudi Aramco Documents
➢ Saudi Aramco Engineering Procedures
SAEP-148
Mandatory Engineering Standards and Codes for
Non-industrial, Public, and Government Facilities
SAEP-301
Instructions for Establishing and Maintaining Mandatory
Saudi Aramco Engineering Requirements
SAEP-302
Waiver of a Mandatory Saudi Aramco Engineering
Requirement
SAEP-334
Saudi Aramco Engineering Drawings
➢ Saudi Aramco Engineering Standards
SAES-A-100
Survey Coordinates, Datum, and Data Format
SAES-A-503
Energy Efficiency for Non-industrial Buildings- Except
Low-rise Residential
SAES-A-504
Energy Efficiency for Low-rise Residential
SAES-J-003
Instrumentation and Control Buildings - Basic Design
Criteria
SAES-J-904
FOUNDATION™ fieldbus (FF) Systems
©Saudi Aramco 2020. All rights reserved.
Page 3 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024 SAES-L-105
Piping Material Specifications
Saudi Aramco Engineering Drawings
SAES-A-202
SAES-M-006
Saudi Aramco General Purpose Fencing
SAES-M-100
Saudi Aramco Building Code
SAES-P-104
Wiring Methods and Materials
SAES-P-107
Overhead Distribution Systems
SAES-P-116
Switchgear and Control Equipment
SAES-S-010
Sanitary Sewers
SAES-S-020
Oily Water Drainage Systems
SAES-S-030
Storm Water Drainage Systems
SAES-T-018
Telecommunications -Symbols, Abbreviations, and
Definitions
➢ Saudi Aramco Standard Drawings
AA-036194, sheet 001 Measurement Symbols
AA-036196, sheet 001
Final Control Element Symbols
AB-036195, sheet 001
Instrument Line Symbols
AB-036204, sheet 001
Letter Designation for Line Numbers
AB-036227, sheet 001
Standard Symbol for Piping Orthographic Drawings
AB-036305, sheet 001
Standard Equipment Symbols
AB-036492, sheets 001-2 Local Instrument Symbols for ILDs
AB-036493, sheets 001-2 ILDs, Panel Instrument Symbols
AB-036766, sheets 001-3 Standard Electrical Symbols - One Line Diagram
AB-036766, sheet 004
Standard Electrical Symbols – Plan Layout
AC-036950, sheet 001
Instrument Symbols
AD-036491, sheet 001
In-line Instrument Symbols for ILDs
AD-036785, sheet 001
Symbols Cathodic Protection
AE-036193, sheet 001
Instrument Device and Function Symbols
AE-036411, sheet 001 Drawing Indices
AE-036411, sheet 002 Mechanical Equipment Marking
AE-036411, sheet 003
Electrical Equipment Marking
AE-036625, sheet 001
Engineering Drawing Forms Layout
➢ Saudi Aramco General Instructions
©Saudi Aramco 2020. All rights reserved.
Page 4 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
GI-0710.002
Classification of Sensitive Documents
➢ Saudi Aramco Forms and Datasheets
SA-6078
SA-8009
Instrument Specification Sheet - Flow Instruments
Data Sheet - Fired Heater
SA-8020-419
Instrument Specification Sheet - Temperature
Monitor
3.2
Auto-SACS
3.2.1 Engineering Drawings must be prepared and revised using the latest
approved version of Saudi Aramco Automated CADD Standard (Auto-SACS). Auto-SACS can be requested from EK&RD/Drawing Management Unit.
3.2.2 When certain standards are not available in Auto-SACS and/or
contradicting to Saudi Aramco CADD Standards, prior approval must be obtained from the EK&RD/Drawing Management Unit Supervisor.
3.3
Industry Codes and Standards
American Institute of Architects
AIA E202
Building Information Modeling Protocol
International Organization for Standardization
ISO 19650
Information Management Using Building
4
Terminology
4.1
Acronyms
BEP: BIM Execution Plan
BIM: Building Information Modeling
CADD: Computer Aided Design and Drafting
CCS: Cable and Conduit Schedule
CDE: Common Data Environment
COBie: Construction Operations Building Information Exchange
DCC: Drawing Completion Certificate
DMU: Drawing Management Unit
EK&RD: Engineering Knowledge & Resources Division
©Saudi Aramco 2020. All rights reserved.
Page 5 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
EWO: Engineering Work Order
GIS: Geographic Information Systems
GSD: Geomatics Services Division
IIS: Instrument Installation Schedule
JO: Job Order
LOD: Level of Development
OEO: Operating Engineering Organization
MIDP: Master Information Delivery Plan
PIP: Project Implementation Plan
REO: Responsible Engineering Office
SDS: Smart Data Sheets
4.2
Definitions
3D Model: The spatial three dimensions containing graphical and non-graphical information about the model.
4D Simulation: A 3D representation geared with a fourth dimension being schedule or construction sequencing. The 4D simulation mimics the exact construction progress in 3D against the exact schedule items showing decencies, predecessors, successor, and lead time.
5D Simulation: The fifth dimension is cost where all model elements and components generate cost figures at any given time in the project. Cost includes procurement, field engineering, and construction. The accuracy of cost matches the accuracy of the level of details (LOD).
Abbreviations and Letter Symbols: Shall be used where physical space prevents complete spellings as in title blocks and in small drawings. Abbreviations shall only be used when absolutely necessary and never be used when the meaning will not be clear. Saudi Aramco Standard Abbreviations and Letter Symbols must be used to maintain consistency within the Saudi Aramco documents. Abbreviations and Letter Symbols are listed in Saudi Aramco eStandards website under other documents. Other standard abbreviations commonly used in petroleum industry shall be used if an appropriate abbreviation is not found on the referred list.
As-built Drawing: An engineering drawing that has been revised to reflect actual field conditions after the completion of construction. Additions or changes to a drawing resulting from facility modification must also be verified as ‘As-built’
©Saudi Aramco 2020. All rights reserved.
Page 6 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
and referenced to the Job Order (JO) in case of PMT, Engineering Work Order (EWO) in case of Design office and organization code in case of operation.
Auto-SACS: The automated tool that provides a unique method to apply Saudi Aramco CADD standards.
BIM Execution Plan: A document prepared by the CONTRACTOR at early stage of the project that outlines the overall framework along with implementation details of the scope implementation of the project. It is a living document continue to mature over the course of the projects deliverables and milestones. It usually collates/references a number of other documents including the Master Information Delivery Plan (MIDP) and the Project Implementation Plan (PIP).
Building Information Modeling (BIM): A digital representation of physical and functional characteristics of a facility. A BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from earliest conception to demolition.
BIM Model: An object-oriented parametric 3D model representing physical, functional and other characteristics of the project (or its specific parts) in 3D as a complex of digital rich data elements.
CADD Drawings: Are engineering drawings generated electronically using software approved by Saudi Aramco as its standard medium for development and permanent retention as per the requirement of this standard and SAEP-334.
CDE (Common Data Environment): Software/hardware environment which enables the design data sharing. CDE is based on rules and procedures that facilitate management of BIM model creation and use, as well as collaboration between team members.
Construction Operations Building Information Exchange: Information exchange standard/protocol for BIM projects.
Collision Detection (Clash Detection): The process of identification, analysis and resolving design errors that emerge due to geometric intersections between model elements, violation of tolerances between model elements and/or overlap (spatial or chronometric) of resources in the construction schedule.
Data-Centric Systems: Are design systems used to develop Instrumentation, Electrical, Mechanical, Piping, or 3D drawings and engineering information in a database format. These formats will be used to generate 2D/3D drawings that are derived from these databases.
Demolition Drawing: Any existing drawing that shows the extent of the demolition work to be done. For details refer to SAEP-334 Section 12.
©Saudi Aramco 2020. All rights reserved.
Page 7 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Drawing Completion Certificate: A document bearing the names and signatures of authorized persons accepting responsibility that the associated engineering drawings meet the applicable Saudi Aramco Engineering Standards and procedures. The DCC fulfills the approval/certification requirement in lieu of signing the title block of each drawing individually. Refer to SAEP-334 Section 14.
Drawing Number: An arrangement of eight alpha/numeric characters [prefix + size (separated by dash ‘-ʼ) + number] used to provide the unique identity for individual engineering drawings. Refer to Section 6.4 of this standard.
Drawing Name: is file system name of the engineering drawing in a standard Saudi Aramco format. The name format is used when transferring drawings to or from EK&RD. Refer to Section 5 of this standard for more details.
Engineering Knowledge & Resources Division: Of Engineering Services (ES) charged with the responsibility of analyzing and setting drawing related standards and procedures, ensuring the compliance of these standards, and having the custody and management of all Saudi Aramco Engineering and Vendor Drawings defined in, and governed by this standard and Saudi Aramco Engineering Procedure SAEP-334.
Emergency Drawing: An engineering drawing that has been designated by the Operating Engineering Organization (OEO) as being critical to the plant’s operations during a disaster situation. These drawings are given top priority in every case.
Engineering Drawing: As used throughout in this standard, is a document produced on an approved Saudi Aramco engineering form, by Saudi Aramco (or for Saudi Aramco by approved sources) which bears a Saudi Aramco engineering drawing number and which was prepared for the purpose of identifying engineering related information to be used for the construction, operation, or maintenance of a Saudi Aramco plant and facility.
Engineering Forms: Are the approved forms used for the presentation of engineering information which bears an official Saudi Aramco form number followed by “ENG” abbreviation for Engineering and the latest date of form revision. Forms may vary in size depending upon the information being presented. The latest approved Engineering forms are available on the eStandards website.
Engineering Drawing File Types:
File Type
Status
Raster
No longer accepted
Hybrid PDF (Portable Document Format) only accepted if generated from the data-centric
No longer accepted
©Saudi Aramco 2020. All rights reserved.
Page 8 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
File Type
Status
Vector
Spreadsheet
Document
systems
acceptable
acceptable
acceptable
iPlant: The sole corporate Saudi Aramco Engineering Drawing, Tags, and Data Management System that contains all approved and certified engineering data that are collected from the inception of the company. It is an automated system designed for administration and control of Saudi Aramco engineering drawings, tags, and data in a centralized library. It allows the users to query, view, print, retrieve, and submit engineering and vendor drawings in addition of allowing them to retrieve new engineering drawing numbers, tag numbers, create new sheet numbers, and to perform job tracking/creation functions. Refer to iPlant Users Guide for operational details.
Key Drawings: Are engineering drawings designated as essential for continued facility operation and maintenance. The Proponent Organization and Project Management jointly determine Key Drawing status. Refer to item 6.13 in this standard for list of key drawings.
Library Drawings: Are drawings of designs previously used or developed to be used as guidelines for new projects in Saudi Aramco facilities. Use of these drawings in future similar projects shall be considered. Library drawings provide “pre-designed” information that can be used on a repetitive basis. The utilization of Library Drawings can improve the use of stock material and eliminate the need for individual or unique designs. In addition, the use of Library Drawings provides savings by directly reducing drafting, design and engineering time in new projects. Library Drawings are archived on Plant M88 and governed by SAEP-334. They are available from the Saudi Aramco eStandards website.
LOD (Level of Development): The level of detail of a BIM element. LOD sets the minimum amount of geometric, spatial, quantitative, as well as any attribute information necessary for modeling at a particular stage of the object life cycle. The below LODs are standard definitions for Saudi Aramco projects:
• LOD 100 (Conceptual Design): The model is conceptual where elements
have basic symbolic and geometric representations with approximate shape and orientation, but with no spatial and quantified accuracy.
• LOD 200 (Preliminary Design Development): Elements are graphically
represented with a generic assembly where quantities, locations, and shapes are rough preliminary measures. The model may help in preliminary cost and scheduling estimates.
©Saudi Aramco 2020. All rights reserved.
Page 9 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings • LOD 300 (Tender Design): Elements have graphical representation where all objects are specified with accurate assembly. All quantities, size, shapes, locations, elevations, and orientation are actual representations. The model is at 10% accuracy in cost, scheduling, and construction.
• LOD 400 (Construction): Elements have the highest specified graphical representation with respect to assemblies, spatial locations, quantities, orientation of objects, and elevation details. The model is clash free with well maturity for cost, scheduling, fabrication, and installation at 5% accuracy.
• LOD 500 (As-built): The model reflects the verified As-built site conditions.
Responsible Engineering Office (REO): A Saudi Aramco “office” that has been entrusted with the production or revision of an Engineering Drawing. Non-Saudi Aramco firms or companies are not allowed to be the designated REO. Certain individuals within the REO shall be authorized to track issued existing Engineering Drawings and Facility Data.
Revision Status:
a) As-built: refers to all contents of the drawing that have been certified as
representing existing conditions based on site verification.
b) Developmental: refers to a drawing in the process of being changed.
While in a changing state the design agency may assign increment revisions at each review milestone.
c) Design Revision: refers to a drawing revised to incorporate new proposed
changes, but which has not been As-built.
d) Partial As-built: refers to an existing drawing formerly certified as As-built but partially revised for new construction. The un-revised portions of the drawing continue to represent previous As-built condition.
Saudi Aramco: Shall mean Saudi Arabian Oil Company and its affiliated companies, including, but not limited to Aramco Overseas Company (AOC) and Aramco Services Company (ASC).
Standard Drawings: Are specially prepared engineering drawings that have been pre-approved by responsible Saudi Aramco organization for mandatory application in the design of Saudi Aramco facilities when the information they contain applies and is appropriate during design. The production of a Standard Drawing follows the normal production requirements presented in this Standard. Standard Drawings are archived in Plant 990 and governed by SAEP-334. They are available from the Saudi Aramco eStandards website.
©Saudi Aramco 2020. All rights reserved.
Page 10 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Title Block: is the reserved portion of a drawing containing information about the drawing, project and plant. (See item 5 and Appendix “A” of this document).
Vendor drawing: Any document developed by a manufacturer that supports the technical requirements of material or equipment and received as part of a purchase order. The vendor drawings are also governed by SAEP-334 Section 21.
5
Drawing Name
Drawing Name must comply with the file naming convention. For example, files shall have a naming format for drawing BA-123456, sheet 001, revision 01 or 01A as follows:
5.1
Vector Drawings
Prefix + Number + Sheet +V + Revision
Example: B123456001V01 or B123456001V01A
5.2
Spreadsheet
Prefix + Number + Sheet + X + Revision
Example: B123456001X01 or B123456001X01A
5.3
Document
Prefix + Number + Sheet + W + Revision
Example: B123456001W01 or B123456001W01A
5.4
PDF (for Data-Centric Drawings only).
Prefix + Number + Sheet + P + Revision
Example: B123456001P01 or B123456001P01A
6
Title Block Information (Refer to Appendix A)
6.1
Title Block Data Entry
Saudi Aramco drawing Title Block Automation (TBA) is a system designed to auto-generate the text box information within engineering drawing files. The same information is also automatically written into the design file within an element that is normally hidden to the user. It can validate whether the Title Block information contained within each Design File contains errors, and report them when detected. The TBA includes three modules; Data Entry/Edit, Validation and Reporting. Refer to Auto-SACS Read-me file for details. All date entries shall follow the format MM/DD/YYYY.
©Saudi Aramco 2020. All rights reserved.
Page 11 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Uniqueness:
6.1.1 The drawing number uniquely identifies a drawing.
6.1.2
If a drawing is part of a set, the drawing number plus the sheet uniquely identify the sheet in a set of drawings.
6.1.3
If a drawing has been revised, the drawing number, plus the sheet, plus the specific revision uniquely identify the drawing.
6.2
Drawing Index
6.2.1 The Drawing Index is a single character in the range of A to Z (excluding I). For complete listing, refer to Standard Drawing AE-036411, sheet 001.
6.2.2 The Index is shown on Engineering Drawings in the title block.
A maximum of two index letters are acceptable on a drawing, arranged by order of importance (not in alphabetic sequence) only the first index will be recorded in IPlant.
6.2.3 The Index implies, but does not determine, a group of associated types.
6.3
Drawing Type
6.3.1 Type is a three-character code.
6.3.2 Type implies, but does not determine, a group of closely related drawing titles. One of the associated titles may be used to develop the first line of the drawing title. For a complete listing of drawing types refer to Appendix B.
6.4
Drawing Number
6.4.1 The Drawing Number provides one part of the “unique” identification code for each Engineering Drawing. It is comprised of a single alpha character Prefix Letter, a single alpha character Sheet Size Code, and six (6) alphanumeric characters identifying Number separated by a dash.
6.4.2 Typical Drawing Number that is entered in the engineering drawing.
Refer to SAEP-334 for drawing number assignment.
Example: DB-765432
©Saudi Aramco 2020. All rights reserved.
Page 12 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.4.3 Prefix Letter: is a single character alpha code. The following Prefix
Letters are currently used with new drawing numbers.
A
D
Standard Drawings only.
Library Drawings only.
B or T
Southern Area (Eastern Arabia).
H
Central Area (Eastern Arabia).
R or C
V or X
Northern Area (Eastern Arabia).
(Central and Western Arabia).
The following prefix letters appear on some of the existing Engineering Drawings but are no longer used on new drawing production. New sheets, however, can be added to the existing drawings using these prefixes.
A
G
K
L
N
X
D
Drawing numbers assigned by Aramco San Francisco or New York, AOC at Rome or London (except for Standard Drawing). SOCAL
SCECO
Aramco Overseas Company, Beirut.
AOC, The Hague assigned drawing number.
ASC, Houston assigned drawing number. Dhahran assigned drawing numbers (except for Library Drawings).
6.4.4 Drawing Sizes: is a single alpha character that defines the cut size of the
drawing when printed or plotted. The following table shows the only acceptable sizes for Saudi Aramco Engineering Drawings.
SIZE CODE
A
B
C
D
E
O V E R A L L D I M E N S I O N S
mm
711 x 1016
508 x 711
356 x 508
279 x 432
216 x 279
Inches
28 x 40
20 x 28
14 x 20
11 x 17
8½ x 11
(Refer to Saudi Aramco Auto-SACS)
6.5
Sheet Number
6.5.1 The Sheet Number is a three (3) digit numeric number ranging from 001
to 999 except for index/face sheets.
6.5.2 Values for Sheet Numbers are as follows:
©Saudi Aramco 2020. All rights reserved.
Page 13 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Type of sheet
Drawing sheet
Face/Index Sheet
Lowest
Highest
001
FS1
999
FS9
6.5.3 Drawing Sets: When an Engineering Drawing has more than one sheet, it’s called a set. Most Engineering Drawings of the same Drawing Type are grouped as Sets. Example: P&ID, ILD, and E1L, etc. Rules governing the use are as follows:
6.5.3.1 Sets must be made for a common engineering subject, the
subject may be: Design, Process or Service within a specific engineering discipline. For Example:
DESIGN: such as Plot Plans, Structural Details, Equipment
Layouts, Hazardous Area Classifications, etc.
PROCESS: such as Process Flow Diagrams, Piping and
Instrument Diagrams, Instrument Loop Diagrams, etc.
SERVICE: such as Piping Isometrics of same product (e.g., Air, Steam, Fuel Gas, etc.) Electrical Drawings (e.g., One Line Diagram, Connection Diagram, Elementary Diagram., Electrical Layout, etc.), Instrument Points and Lines, etc.
6.5.3.2 For new construction, all sheets in a common set must be numbered sequentially without number gaps for ‘Unused’ sheets. If gaps are unavoidable, then an index sheet may be utilized to indicate “spare” in lieu of the unused sheet number.
6.5.3.3 A set of pre-numbered sheets (Engineering Forms) pertaining
to one piece of equipment or instrument (e.g., Instrument Specification Sheets or Equipment Data Sheets, etc.), shall make up one drawing set. A drawing set shall not contain more than one equipment or instrument.
SA-6078 (set consists of one sheet)
SA-8009 (set consists of six sheets)
SA-8020-419 (set consists of two sheets)
6.5.3.4 Face/index Sheets may be provided for all size drawing sets
having the same Drawing Numbers and more than ten sheets.
©Saudi Aramco 2020. All rights reserved.
Page 14 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.5.3.5 The first Face Sheet is numbered FS1. The subsequent Face
sheets will be designated as FS2, FS3…FS9. When required to be revised, Face Sheets shall only have full numeric revision numbers (i.e., 01, 02, etc.).
6.5.3.6 Numbering sequences containing alpha characters are
unacceptable.
Exceptions:
Face/Index sheet (FS1 to FS9).
Existing drawings bearing alpha/numeric sheet identification will be issued a new revision by the corporate drawing management system (iPlant).
6.5.3.7 Cover sheets or title sheets of a drawing or project shall not be
assigned engineering drawing numbers.
6.5.3.8 As an example, a good practice for developing sets for
Instrument Installation Schedules is by grouping them based on category of instruments like pressure, temperature, flow, level, relief valve, MOV/AOV/GOV/ZV, and miscellaneous by unit.
6.5.3.9 The second line title of individual sheets within a set may vary
slightly, if so required for clarification and definition of location. However, plant number, unit, drawing index, and drawing type must be the same on all sheets.
6.5.3.10 Engineering forms except Scope of Work and List of Material
must be a single file for each sheet. Data-Centric drawings like ISS, ILD, ECD, and ISD single file for multiple sheets.
6.6
Drawing Titles
The title is written on four (4) lines in the standard Title Block.
6.6.1 Line 1, Content of the Drawing: the general content of the drawing and the Drawing Type shall be entered on the first line. Use the appropriate approved descriptions as listed in Auto-SACS and shall not exceed 30 characters. The users may edit the first line based on the drawing contents as listed on TBA (Title Block Automation). However, this title shall match the drawing type. Loop number and line number shall be entered on first line for ILD and isometric piping details respectively. Similarly, equipment, instrument tag, or line number shall be mentioned on Safety Instruction Sheet (SIS), Data, or specification sheets for SMART DATA Sheets (SDS). TBA program matches this provision.
©Saudi Aramco 2020. All rights reserved.
Page 15 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Type
First Line Title
ILD, ISO
ILD or ISO + the assigned loop or line number
SIS
SIS + the assigned line, equipment or instrument tag number
6.6.2 Line 2, Subject or Service: the main subject being covered by the
drawing must be written here. This could be a process system, substation, service line, equipment number, building number, circuit or loop, etc. Use maximum of 35 characters as necessary to clearly explain the subject matter. Drawings concerning electrical substations shall have the substation number listed.
6.6.3 Line 3, Plant Description: the plant description of the plant corresponding
with the plant number is written on this line. Use only the approved listing of plant descriptions. If two or more plants are covered, then only the description of the major plant covered by the drawing shall be on line 3. Other plants covered shall be specified as part of the note section.
Exception:
Offshore wellhead platforms where the platform name may be used.
6.6.4 Line 4, Geographical Location: The name of the Saudi Aramco
geographic area where the facility is located. Geographic locations are shown in the plant list for each plant. The plant list is available in the title block data entry of Auto-SACS, IPlant and EK&RD web site. Any exception to this list must be approved by the Drawing Management Unit Supervisor. Abbreviations are not allowed on line 4.
6.7
Revision Number
6.7.1 Revision number is a two digit (in case of 100% field verified As-built) or three alpha-numeric characters (in case of design or partial As-built) number assigned per SAEP-334.
6.7.2 Full numeric revision numbers (i.e., 01, 02, 03, etc.) are assigned to 100% field verified As-built, cancelled drawings, face sheets and the drawings whose Plant number has been changed.
Commentary Note:
Not all full numeric revisions indicate As-built status. Revision 00 may enter the Engineering Drawing Library without being in the As-built state. Drawings whose Plant has changed or the drawings that are cancelled are promoted to the next full numeric revision, regardless of the As-built status of the original drawing. The drawing user must evaluate the drawing and its revision history to determine As-built status.
©Saudi Aramco 2020. All rights reserved.
Page 16 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.7.3 Design and partial As-built revisions are indicated by two numbers followed by an alpha character (A-Z, excluding I and O).
6.7.4 Each revised drawing must include information such as date, description,
associated job number, and revision number in the drawing revision block.
6.7.5 Revisions to non-certified drawings are considered developmental. Alpha characters for new drawings, i.e., A, B, C, D, etc., and alpha/numeric for existing drawings, i.e., 1A1, 1A2, 1A3, etc., may be used as developmental revisions. Once it is determined that the drawing will be issued for construction, REO must assure that developmental revisions are removed and that the issued revision is reflected prior to certification and submittal to EK&RD.
6.7.6 This table provides sample revision numbers, with descriptions and
indicates if the revision is allowed to exist in IPlant.
Revision
iPlant
Meaning
00
03
A, B,C,
0A1, 0A2
YES
YES
NO
NO
Drawings entering the iPlant as new drawings (Issued For Construction) are all revision 00.
As-built for existing drawing (see notes in 6.7.2)
Development Revision for new drawing
Developmental revision for existing drawing
03C
YES
Design or partial As-built revision to revision 03.
6.8
Plant Numbers
A three character code that indicating a facility, process or system. Plant codes are issued and controlled by EK&RD.
6.8.1 Plant numbers are three alpha/numeric characters in length.
6.8.2 Only one active Plant Number shall be assigned to an Engineering Drawing.
Exception:
More than one plant number may be allowed under certain circumstances (Only the primary plant number will be recorded in corporate system). Approval must be obtained from Standard and Compliance Group Leader if multiple plants are required.
Example:
When the drawing contains interrelated information for more than one plant: continuation of lines, interface points, jumpers, tie-in points, etc., and all such plants fall under the responsibility of the same operating organization.
©Saudi Aramco 2020. All rights reserved.
Page 17 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.8.3 When an Engineering Drawing is ‘typical’ for more than one plant, then
a separate drawing must be produced for each plant.
6.8.4 While changing the plant number of an existing drawing, revise the
drawings that involve changing the plant number and plant description in the title block and state in the revision description “CHANGED PLANT NO. FROM XXX to YYY” along with As-built revision, if any.
6.9
Job Order/EWO Numbers: The Job Order (JO) Number assigned from the ERP System or the Engineering Work Order (EWO) Number shall be shown on Engineering Drawings in the title block. Below are samples of JO numbers:
OEO JO number = 765200 (Department ORG Code)
IDO JO number = 04C123 (EWO number)
PMT JO number = 10-12345-1234 (BI number + 4 digits)
6.10 Drawing File Type: The rectangular box provided at the bottom right corner of
the border must indicate file type.
6.11 Emergency Drawings: See item 2 for definition. Ensure that all drawings are
properly stamped for quick identification.
6.12
Information Sensitivity: All Saudi Aramco engineering drawings are classified as per GI-0710.002.
6.13 Key Drawings: The following drawing types are required but not limited to be
designated as Key Drawings:
DWG TYPE
DESCRIPTION
DWG Index
PID
PFD
VOD
EQA
FPP
PPL
PPL
E1L
LOG
ILD
HAZ
ARC
DAT
Piping and Instrument Diagrams
Process Flow Diagram
Valve Operating Diagram Equipment Arrangement / Layout / Location / Legend / Marine Equipment Facility Plot Plan
Underground / above ground Piping Installation Plans
Piping Plan / Layout / Arrangement
Electrical One / Three Line Diagrams
ESD Logic Diagrams
Instrument Loop Diagrams
Area Classification Plans
Building Floor Plans and Elevations
A
A
A
A/C/R/T/V
A
L
L
P
J
J
B
R
Equipment Data Sheets
C/D/E/F/G/K/L/M
©Saudi Aramco 2020. All rights reserved.
Page 18 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DWG TYPE
DESCRIPTION
DWG Index
SIS
IIS
ISS
CBL
LDT
Safety Instruction Sheets
Instrument Installation Schedules
Instrument Specification Sheets
Cable Schematics
Line Designation Table
A
J
J
T/P*
A
Other engineering drawings may be designated as Key drawings by the Proponent Organizations or the Project Management Team jointly with the Proponent Organization as appropriate for their specific projects prior to the start of project detail design. P* index for Offshore Projects
6.14 Review for Key Drawing: Review required box in the title block shall be marked to indicate the requirement for review of key drawings by Saudi Aramco PMT and Operations.
6.15 Design Certification, Review for Key Drawing, and Revision Validation: shall be completed as required by filling in the designated box in the drawing title block as per SAEP-334 Section 14.
6.16 Drawing Scales
6.16.1 Graphic Scale, a line scale reference shall be included on both new and
existing drawing just over the title block on scale drawings. The line scale shall be divided into units of length as determined by the scale of the drawing. Refer to Auto-SACS for a list of graphic scales symbols.
6.16.2 The seed files and attached borders are created at 1:1 scale. To create a new drawing to any desired scale, the seed file and attached border must be enlarged to that specified scale. In the title block program menu, the correct scale must be placed in the field “SCALE” for the correct placement of title block attributes.
6.16.3 Scale symbols MUST match the border scale.
6.16.4 PID, E1L, VOD, ILD, and PFD products do not support scale drawings.
6.16.5 For scaled drawings, use the auto-dimensioning command where
applicable and don’t drop it.
6.16.6 Do not scale down drawings, instead, rearrange the drawing or split the
drawing into two drawings.
6.16.7 The setting of all Saudi Aramco border files are set at (Global Origin) GO=0, 0. This ‘GO’ is defined at the left bottom corner of the border. No changes are allowed in the GO setting for all drawing types including scaled drawings.
©Saudi Aramco 2020. All rights reserved.
Page 19 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings 6.17 Reference drawings and notes shall be placed in the area provided above the title
SAES-A-202
block. Reference drawings listed shall be the necessary minimum engineering drawings only. Do not include Standard Drawings and do not inlcude Plant, Index nor Revision Number reference of the referenced drawings.
6.18 Unit Number
6.18.1 Unit number is a 2 to 4 alphanumeric code that indicates a process or
system. All unit codes shall be requested from iPlant. For small plants, which are not required to be segregated into multiple units, the plant shall have at least one unit number which preferably be the same as the plant number.
6.18.2 Unit number is 2 to 4 alphanumeric in length.
Exception:
For offshore and onshore wellhead platforms, wellheads, trains, units, etc., where units are not uniquely defined each platform shall be prefixed by the abbreviation of location to make each unit unique. Location abbreviation shall be of 4 alpha characters and sequence numbers shall be of 4 numeric digits.
7
Drawing Cancellation
Engineering Drawings must be cancelled under the circumstances identified below; as per SAEP-334.
7.1
A facility, plant, installation, or a piece of equipment has been abandoned, removed, dismantled, or transferred.
7.2
The drawing has been superseded by another drawing.
8
Demolition Drawing
8.1
Cloud and crosshatch the areas to be demolished without obscuring the information in the area being crosshatched.
8.2
Describe in the revision block against the demolition revision.
8.3
For further design, obtain a new revision number per SAEP-334.
9
As-built Drawing
All key and emergency drawing must be updated to AS-BUILT condition. Non-key drawings shall be brought to AS-BUILT condition whenever change happened in the field. Revision description shall be described in the revision block for the As-built condition as follows:
©Saudi Aramco 2020. All rights reserved.
Page 20 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
9.1
As-built; when a drawing is certified as field verified with no changes.
9.2
Revised As-built; when a drawing is certified as field verified with changes. Description shall be clearly identified. Refer to item 3.8 for more details.
10
Tag Number
Tag numbers are assigned and managed through iPlant by order of numerical sequence within each category or type within the designated plant. All tag numbers, except piping, shall be prefixed by Plant Number separated by a single dash. All Instruments tags shall be prefixed by both Plant Number and Unit Number separated by a single dash.
Exception:
For offshore and onshore wellhead platforms, wellheads, trains, units, etc., where tags are not uniquely defined, the tag shall be prefixed by a unit number to make each tag unique.
10.1 Cable and Conduit Tag Numbers: The tag number shall be unique for each plant.
Each cable and conduit tag shall consist of 4 parts separated by single dashes:
-
Plant Number
-
Unit Number
-
Cable/Conduit Marking
-
Sequence Number (5 numeric digits)
Example #1: K85-001-C-00036
Example #2: K85-100-PC-01281
Cable/Conduit Markings
C
CC
PC
IC
Conduit
Electrical Control Cable
Power Cable
Instrument Cable
10.1.1 The cable/conduit marking letter designations are 1 to 2 alpha characters
signifying the type of service.
10.1.2 Cable and Conduit Numbers shall be assigned in strict numerical
sequence starting from 00001, for each particular plant regardless of the size, type or service. Alpha suffix is not allowed.
10.1.3 Information related to each Cable and Conduit shall be entered in the
Cable and Conduit Schedule (CCS).
©Saudi Aramco 2020. All rights reserved.
Page 21 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings 10.2 Mechanical Equipment Tag Numbers: Each mechanical equipment tag number is unique for a specific piece of equipment or an associated item within each plant. Each mechanical tag shall consist of 3 parts separated by single dashes:
SAES-A-202
-
Plant Number
-
Mechanical Equipment Marking
-
Sequence Number (4 numeric digits) + Suffix (1 letter – when applicable):
Example #1: D31-G-0012
Example #2: D31-GM-0012A
9.2.1 The mechanical equipment marking letter designations are 1 to 2 alpha
characters as per Standard Drawing AE-036411 Sheet 002.
9.2.2 Data sheets and Safety Instruction Sheets (if applicable) must be
developed for each piece of mechanical equipment per SAEP-334.
10.3 Electrical Equipment Tag Number: Each electrical equipment tag number is unique for a specific piece of equipment within each plant. Each electrical tag shall consist of 4 parts separated by single dashes:
-
Plant Number
-
Power Source
-
Electrical Equipment Marking + (POD Code)
Commentary Note:
PDD code when Applicable, enclosed within parenthesis.
- Voltage Code + Sequence Number (3 numeric digits)
Example #1: D31-012-GSW(K)-5002
Grounding Switch # 002 has 69 kV voltage from substation #12 and PDD code K in plant number D31.
Example #2: D31-012-BC-3001
Battery Charger # 001 has 13.8 kV voltage from substation #12. No POD code in plant number D31.
10.3.1 POD codes are required only with the below Electrical Equipment
Markings.
Description
Standard Marking
POD
Circuit Switcher Circuit Breaker (Power) Circuit Breaker (Switchgear)
CSW CB CB
S A B
©Saudi Aramco 2020. All rights reserved.
Page 22 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Description Disconnecting Switch Fuse Fuse Disconnect Grounding Switch Grounding Resistor Grounding Transformer Relay Switch Transformer
Standard Marking DSW FS FSD GSW GR GT RY SW XFR
POD D F J K Y X P E T
10.3.2 The following are the approved voltage codes:
Voltage Codes
Voltage Description
0 1 2 3 4 5 6 7 8
600 V and below AC or DC 2.4 kV 4.16 kV 13.8 kV 34.5 kV 69 kV 115 kV 230 kV 380 kV
10.3.3 The electrical equipment marking letter designations are 1 to 3 alpha characters as per Standard Drawing AE-036411 Sheet 003.
10.4
Instrument Tag Number: Each instrument tag is unique within a plant. Each instrument tag shall consist of 4 parts separated by single dashes.
Plant Number
-
Unit Number
Instrument marking (2 to 5 letters)
Sequence Number (5 numeric digits) + Suffix (1 letter – when applicable)
Example #1: K85-100-PCV-00159
Example #2: B22-001-LT-00054
Example #3: H46-020-MOV-10010A
10.4.1 Information related to each instrument shall be entered in the Instrument
Installation Schedule (IIS).
10.4.2 The instrument marking letter designations are 2 to 5 alpha characters as
per SAES-J-003.
©Saudi Aramco 2020. All rights reserved.
Page 23 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings 10.5 Loop Tag Number: Each loop tag is unique within a plant. Each loop tag shall
SAES-A-202
consist of 4 parts separated by single dashes.
Plant Number
-
Unit Number
Loop Marking (1 letter)
Sequence Number (5 numeric digits)
Example #1: K85-100-P-00005
Example #2: B22-001-L-00002
Example #3: H46-020-T-10001
10.5.1 The instrument marking letter designations are 2 to 5 alpha characters as
per SAES-J-003.
10.5.2 Instrument Loop Diagram shall be prepared as per SAES-J-003.
10.6 Line Tag Number: Each line tag is unique within a plant.
Each line tag shall consist of 4 parts separated by single dashes.
-
Nominal Diameter
Fluid Codes
Sequence Number (5 numeric digits)
Piping Material Class
Example: 2-1/2”-CWS-12345-1CS1P1
10.6.1 The nominal diameter consists of up to five characters followed by the
inch symbol. All nominal line sizes are expressed in inches even on metric drawings.
10.6.2 The fluid codes are as per Standard Drawing AB-036204.
10.6.3 Piping material class codes are as per SAES-L-105.
10.6.4 Information related to each pipeline shall be entered in the Line
Designation Table (LDT).
10.7 Tag To Drawing Association
A spreadsheet file shall be delivered with a list of all used tags associated with their respective drawings. The list shall include all engineering tags and all types of submitted drawings. Each row shall represent one tag to its drawing
©Saudi Aramco 2020. All rights reserved.
Page 24 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
association. The list shall be submitted under the following standard headings: Plant, Unit, Drawing, Tag as shown in the below example.
PLANT
UNIT
Drawing
TAG
B22
B22
B22
001
001
002
BA-123456001
BE-323432001
B22-G-1005A
B22-G-1005A
BA-654321001
4”-P-04362-1CS1P
11
Drafting Requirements
11.1 Existing drawings must be utilized for any modification of a facility. Creation
of new drawings to indicate a change in an existing facility will not be accepted. If, however, this is unavoidable for some reason such as being too crowded or major revision changes, then a new sheet shall be added to the existing drawing.
11.2 New drawings that are created as a continuation of an existing design are
considered as continuation drawings of that design bearing the next sequential (numeric) sheet number of that drawing set.
11.3 When revising an existing drawing, the incorrect and unreadable information on the title block including plant description and drawing type shall be corrected or completed.
11.4 Revision diamonds shall be placed in the drawing area in such a way as to make
it possible to locate revisions quickly.
11.5 Old revision diamonds, clouds and related notes must be removed from the
drawing.
11.6
If a drawing is completely redrawn, the words “Completely redrawn and incorporated revisions (indicate the revision number incorporated)” are put in the revision block.
11.7 When revising some pages of bulk drawings that have a single electronic file of
the complete set such as list of material, the revision block of only first sheet shall indicate the changes and revision number change. Complete set shall be submitted.
11.8 The standard north arrow symbol shall be drawn in a prominent place for all plan
view drawings preferably in the upper left region of the drawing. It must be drawn pointing upward, or if unavoidable, pointing left or right, but shall never point down.
Exception:
©Saudi Aramco 2020. All rights reserved.
Page 25 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings For new generated drawing that has continuation link to the existing drawings that have north arrow symbol pointing down and Plan & Profile (PRF) of pipelines will remain the same.
11.9
Information covered by Standard Drawings, elaborated details, unnecessary views, and repetitions, which add no value to the drawings, shall be omitted.
11.10 All non-essential items (such as Logo’s) from design which add nothing to the accuracy, completeness, and clarity of the drawing shall be eliminated.
11.11 Drawing shading is not allowed on drawings. Hatching may be used as an
alternative to shading. Auto-SACS cells are an exception.
11.12 Revisions on drawings may be encircled or clouded on the prescribed layer for easy identification of the revised portion during certification and review cycle. However, for 100% As-built drawings, all revision encirclement or clouding must be either removed or the level turned off prior to submitting the drawings to EK&RD.
11.13 The letters “O” and “I” shall not be used for identification symbols on the
drawings, as they are often confused with Zero and One.
Exception:
Exceptions are instrument symbols as shown in SAES-J-003.
11.14 Text on drawings shall always be uppercase.
11.15 Engineering drawings shall not be developed for any purpose in lieu of Standard
Drawings and neither shall they be copied from Standard Drawings under any circumstances without the written permission by the committee chairman of that Standard Drawing.
11.16 Drawings that are not generated from the Data-Centric Systems must be 100%
vector.
11.17 Existing Raster/ Hybrid drawings issued by the COMPANY for revision
purposes shall be upgraded to vector.
11.18 Existing data sheets that are in Raster (scanned) format MUST be converted to
Saudi Aramco approved spreadsheet forms or PDF files in case of Data-Centric. Refer to SAEP-334 Section 15.2 for Data-Centric drawings.
12
CADD Standards
12.1 General
©Saudi Aramco 2020. All rights reserved.
Page 26 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Saudi Aramco CADD standards and Auto-SACS were developed to maintain the consistency of drawings. Auto-SACS contains collections of seed files, cell libraries, border files, levels, line weights, font, line codes and Title Block Automation (TBA).
12.1.1 Version
Contractor shall submit the drawings in the latest software version approved by Saudi Aramco at the time of submittal.
12.1.2 Seed and Border Files
The Saudi Aramco seed and border files are available in the latest version of Auto-SACS. Refer to Appendix C of this standard for more details.
12.1.3 Data-Centric Templates
12.1.3.1 All drawings created using the Data-Centric systems shall
be created using the latest approved Saudi Aramco Data- Centric templates.
12.1.3.2 The final submittal of the data-centric databases shall be
upgraded by Contractor to the latest approved software version by EK&RD at the time of submittal.
12.2 Requirements
To ensure maximum productivity from Saudi Aramco CADD systems, the CADD standards parameters must be followed.
12.2.1 All design files must be created from the applicable Saudi Aramco
seed file.
12.2.2 Do not override or change the seed file setups and working units.
12.2.3 Saudi Aramco forms (borders) must be referenced only. Do not
include forms as part of the design file. A border must be attached with the CADD drawing.
12.2.4 The drawings submitted to iPlant shall have no reference files attached,
except for the Saudi Aramco border files which must be attached in accordance to this Standard and Saudi Aramco Engineering Procedure SAEP-334. The DESIGN CONTRACTOR shall ensure that all reference drawings are merged with the submitted drawing.
12.2.5 Do not drop or change Standard Cells. In case it is necessary to add or
modify cells, a prior approval is required from EK&RD.
©Saudi Aramco 2020. All rights reserved.
Page 27 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
12.2.6 All elements in schematic type drawings (non-scale) must be placed
with grid/unit lock set to ON position.
12.2.7 File design to display the drawing such as that view 1 (maximized) showing the title block with data fields turned on position. View 5 (maximized) showing the entire drawing with data fields turned off position.
12.2.8 Remove all contents outside drawing border.
©Saudi Aramco 2020. All rights reserved.
Page 28 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Appendix A – Saudi Aramco Engineering Drawing Title Block
Refer to the latest version of INDEX.CFG file in Auto-SACS
©Saudi Aramco 2020. All rights reserved.
Page 29 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Appendix B – Saudi Aramco Drawing Types
Refer to the latest version of INDEX.CFG file in Auto-SACS
HYDROSTATIC TEST DIAGRAM
A-B-C-D
DRAWING TYPE INDEX ‘A’
DESCRIPTION
ABB
DOC
DSC
EQA
FPP
FPP
FPP
FPP
FPP
FPP
FPP
FPP
FPP
FPP
HGR
HYD
HYD
LDT
MSD
PFD
PFD
PID
PRF
SIS
VOD
MARKERS & SIGNAGE
SCOPE OF WORK
DRAWING CONTROL SHEET EQUIPMENT ARRANGEMENT/LAYOUT/ LOCATION/LEGEND AREA MAPS
FACILITY INDEX MAP
FACILITY PLOT PLAN
GENERAL LAYOUT PLAN
GRID MAP
MASTER PLOT PLAN
OVERALL PLAN
SITE PLAN/LOCATION PLAN
TOPOGRAPHIC & CONTOUR MAP
VICINITY MAP
HYDROGRAPHIC MAP
SYSTEM LEAK TEST
LINE DESIGNATION TABLE
MATERIAL SELECTION DIAGRAM
PROCESS FLOW DIAGRAM
UTILITY FLOW DIAGRAM
PIPING & INSTRUMENT DIAGRAM
PLAN & PROFILE/PIPELINE ALIGNMENT SAFETY INSTRUCTION SHEETS (EQUIPMENTS/CRITICAL PIPING) VALVE OPERATING DIAGRAM
INDEX ‘B’
FPS
FPS
FPS
FPS
FPS
FPS
FPS
FPS
HAZ
AUTOMATIC SPRINKLER LAYOUT/DETAIL
BLOCK DIAGRAM FIRE ALARM SYSTEM
FIRE PROOFING/FIRE BREAKS & FIRE WALLS
INSTALLATION DETAIL
LAYOUT/PLAN/SECTION/DETAIL
PLAN/LAYOUT/DETAIL
PLAN/LAYOUT/DETAIL
PLAN/LAYOUT/RISER DIAGRAM
AREA CLASSIFICATION
DRAWING SIZE
COMMENTS
A-B-C-D
ROAD SIGNS, PIPELINE MARKER, etc.
E
D
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B
A-B
A-B
A=B
A-B
A-B
A-B
D
A
A-B-C-D
A-B-C-D
A-B
A-B-C
E
A-B-C-D
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C-D
GAS
Line #1 shall also include Equip Tag or Line No.
FIRE PROTECTION SYSTEM
FIRE FIGHTING SYSTEM PORTABLE SAFETY EQUIPMENT
FIRE PROTECTION SYSTEM
HALON FIRE PROTECTION SYSTEM
FIRE ALARM SYSTEM
©Saudi Aramco 2020. All rights reserved.
Page 30 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DRAWING TYPE HAZ
HAZ
HAZ
HAZ
HAZ
INDEX ‘C’
DAT
SDS
EQD
MDT
MDT
INDEX ‘D’
APP
DAT
SDS
EQD
EQD
EQD
INDEX ‘E’
DAT
SDS
EQD
INDEX ‘F’
APP
DAT
SDS
EQD
MDT
INDEX ‘G’
DAT
EQD
SDS
INDEX ‘H’
SCH
INDEX ‘J’
ECD
EWD
IDT
IIS
ILD
COMMENTS
DESCRIPTION
ELECTRICAL AREA CLASSIFICATION
FIRE HAZARDOUS AREA
HAZARD IDENTIFICATION CHECK LIST
HAZARDOUS AREA CLASSIFICATION
LIGHTNING PROTECTION LAYOUT / DETAILS
DATA SHEET
SMART DATA SHEET
PLAN & DETAILS
SCRUBBER ASSEMBLY DETAILS
STRIPPER ASSEMBLY DETAILS
LAYOUT OF APPURTENANCES
PRESSURE VESSEL DATA SHEET
SMART DATA SHEET
DRAWING SIZE A-B-C-D
A-B-C-D
E
AB-C-D
A-B-C-D
D-E
D-E
A-B-C
A-B-C-D
A-B-C-D
B-C-D
D
D
ASSEMBLY/DETAILS (VESSELS, TANKS COLUMNS, SPHEROIDS)
A-B-C-D
ASSEMBLY/DETAILS EQUIPMENT NO.
FABRICATION DETAILS
DATA SHEET - SHELL & TUBE HEAT EXCHANGER
SMART DATA SHEET
DETAILS
LAYOUT OF APPURTENANCES & ASSOCIATED STACKS DATA/SPECIFICATION SHEET - (FLARES/EQUIPMENTS) SMART DATA SHEET
DETAILS
BURNER PIT PLAN/DETAIL
DATA SHEET – PUMP
ASSEMBLY DETAIL
SMART DATA SHEET
Add equipment number in Line #1.
D
A-B-C
D
D
A-B-C-D
EQUIPMENTS
A-B-C
D-E
D-E
A-B-C-D
A-B-C-D
D-E
D-E
D-E
PAINTING/COATING SCHEDULE
B-C-D
INSTRUMENT CONNECTION/ INTERCONNECTION DIAGRAM
INSTRUMENT WIRING DIAGRAM INSTRUMENT LAYOUT/PLAN/SECTION/ DETAIL/ASSEMBLY/INSTALLATION OR MOUNTING DETAILS INSTRUMENT INSTALLATION SCHEDULE
A-B-C-D
A-B-C-D
A-B-C-D-E
D
INDEX SHEET (INSTRUMENT LOOP DIAGRAM)
B-C-D
©Saudi Aramco 2020. All rights reserved.
Page 31 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DRAWING TYPE
DESCRIPTION
DRAWING SIZE
COMMENTS
Loop Number shall also be entered in Line #1.
Line #1 shall also include Instrument Tag Number.
INSTRUMENT PANEL/ LOCAL CONTROL PANEL/ ANNUNCIATOR BOARD/GRAPHIC PANEL INSTRUMENT PANEL/ LOCAL CONTROL PANEL/ ANNUNCIATOR BOARD/GRAPHIC PANEL
ILD
IPD IPL IPL IPL ISD
ISS
ISS LOG LOG LOG LOG MTL
PNL
PNL
RAK RAK SCH SCH
SCH
SCH
SCM INDEX ‘K’
DAT
SDS HVA
HVA
INSTRUMENT LOOP DIAGRAM
INSTRUMENT PIPING/INSTALLATION DETAIL INSTRUMENT CABLE/CONDUIT PLAN INSTRUMENT LOCATION PLAN INSTRUMENT POINTS & LINES INSTRUMENT SEGMENT DIAGRAM
INSTRUMENT SPECIFICATION SHEET
ORIFICE PLATE DETAIL CAUSE & EFFECT DIAGRAM ESD/PLC LOGIC DIAGRAM FUNCTIONAL DIAGRAM LOGIC DIAGRAM INSTRUMENT MATERIAL SUMMARY SHEET
INSTRUMENT PANEL LAYOUT/SECTION ARRANGEMENT/DETAIL
B-C-D
A-B-C-D A-B-C A-B-C A-B-C B-C-D
E
E A-B-C-D A-B-C A-B-C A-B-C E
A-B-C-D
LAYOUT/DETAIL/ARRANGEMENT/SECTION
A-B-C-D
INSTRUMENT RACK LAYOUT/DETAIL RACK LAYOUT INSTRUMENT CONNECTION/WIRING SCHEDULE LIST OF NAMEPLATES FOR INSTRUMENTS PANEL SCHEDULE/PANEL INTERCONNECTION SCHEDULE INPUT/OUTPUT DISTRIBUTED CONTROL SYSTEM (DCS) INSTRUMENT BLOCK DIAGRAM
DATA SHEET - (EQUIPMENTS)
SMART DATA SHEET AC DUCT FABRICATION LAYOUT/DETAIL
A-B-C A-B-C A-B-C-D D
A-B-C-D
D-E
A-B-C-D
E
E A-B-C
COMPRESSOR LAYOUT/PLAN/ ASSEMBLY/DETAIL
A-B-C
HVA HVA HVA HVA HVA HVA SCH INDEX ‘L’ Process Piping DAT
HVAC CHILLED WATER PIPING HVAC CONTROL DIAGRAM HVAC EQUIPMENT ASSEMBLY/LAYOUT/DETAIL HVAC LAYOUT/PLAN/DETAIL/DIAGRAM HVAC SYMBOLS/LEGEND VENTILATION SYSTEM EQUIPMENT SCHEDULE
VALVE DATA SHEET
ISO
OSI
PDT
PDT PDT
ISOMETRIC PIPING DETAIL
ON-STREAM INSPECTION
PIPING DETAIL - PROPORTIONING PUMP
PIPING DETAIL SHEET PIPING SECTION/DETAIL/ELEVATION
A-B-C A-B-C A-B-C A-B-C A-B-C A-B-C A-B-C-D
E
B-C-D
B
D
D-E A-B-C
Line # 1 shall include the Line Number.
©Saudi Aramco 2020. All rights reserved.
Page 32 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DESCRIPTION
DRAWING SIZE
COMMENTS
PIPELINE ROUTING (ABOVE/UNDER GROUND/SUB MARINE)
A-B-C
RACEWAY/CORRIDOR
PIPING DRAWING INDEX PIPING PLAN/LAYOUT/ARRANGEMENT TIE-IN SCHEDULE PIPING SCHEMATIC DIAGRAM
DATA SHEET FOR OFFSHORE PLATFORM
SMART DATA SHEET ANCHOR BOLT SCHEDULE FENCE PLAN/DETAIL/LAYOUT LADDER/HANDRAIL DETAILS, ASSEMBLY OFFSHORE PLATFORM PLAN/SECTION/ ELEVATION/DETAIL PIPE RACK DETAIL PIPE SUPPORT DETAIL/SCHEDULE/ ELEVATION PIPEWAY SLEEPER PLAN/SECTION/ ELEVATION/DETAIL ROOF FRAMING PLAN/SECTION/DETAIL/ELEVATION
A-B-C-D A-B-C-D B-C-D A-B-C-D
D
D B-C-D A-B-C A-B-C
A-B-C
A-B-C A-B-C-D
A-B-C-D
A-B-C-D
STRUCTURAL DETAILS/ELEVATION/LAYOUT/PLAN
A-B-C
INCLUDES STEEL PILES/STEEL STAIRS
STRUCTURAL PLATFORMS
TRUSS DETAIL/SECTION/ELEVATION
WALKWAY PLAN/SECTION/ ELEVATION/DETAIL
INSULATION DETAIL
A-B-C
A-B-C
A-B-C
A-B-C-D
A-B
INDEX ‘O’ Security Drawings
AREA MAP
A-B OVERALL PLAN A-B FACILITY LAYOUT A-B TOPOGRAPHIC & CONTOUR MAP A-B VICINITY MAP A-B-C SECURITY FENCE PLAN/LAYOUT/DETAIL A-B-C SECURITY PATROL ROAD PLAN/LAYOUT/DETAIL SECURITY FENCE LIGHTING PLAN/LAYOUT/DETAIL A-B-C
SECURITY LIGHTING COVERAGE/LIGHT INTENSITY/DISTRIBUTION
SECURITY FENCE ELECTRICAL PLAN/LAYOUT/DETAIL
GATE PLAN/LAYOUT/DETAIL GATEHOUSE PLAN/LAYOUT/DETAIL GATEHOUSE LIGHTING PLAN/LAYOUT/DETAIL GATEHOUSE ELECTRICAL PLAN/LAYOUT/DETAIL GATEHOUSE NETWORK PLAN/LAYOUT/DETAIL
GATEHOUSE BALLISTISTIC PROTECTION PLAN/LAYOUT/DETAIL
IDAS NETWORK PLAN/LAYOUT/DETAIL IDAS CAMERA FIELD OF VIEW/LAYOUT/DETAIL IDAS SENSORS PLAN/LAYOUT/DETAIL
A-B-C
A-B-C
A-B-C A-B-C A-B-C A-B-C A-B-C
A-B-C
A-B-C A-B-C A-B-C
DRAWING TYPE
PPL
PPL PPL SCH SCM INDEX ‘M’
DAT
SDS SCH SDT SDT
SDT
SDT SDT
SDT
SDT
SDT
SDT
SDT
SDT INDEX ‘N’ INS
SPP
SPP SPP SPP SPP PER PER PER
PER
PER
GAT GAT GAT GAT GAT
GAT
SCE SCE SCE
©Saudi Aramco 2020. All rights reserved.
Page 33 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DRAWING TYPE
DESCRIPTION
DRAWING SIZE
COMMENTS
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
SCE
SCE
SCE
SCE
SCE
RADAR COVERAGE PLOT ON TOPOGRAPHIC/CONTOUR MAP
ACCESS/ALARM ENTRY CONTROL SYSTEM PLAN/LAYOUT/DETAIL
SECURITY SURVEILLANCE CCTV CAMERAS PLAN/LAYOUT/DETAIL
AUTOMATED BARRIER PLAN/LAYOUT/DETAIL
SECURITY EQUIPMENT ELECTRICAL PLAN/DETAIL/LAYOUT
SPP = SECURITY PLOT PLAN PER = PERIMETER GAT = GATEHOUSE SCE = SECURITY EQUIPMENT INDEX ‘P’ CBL
CABLE ROUTING PLAN
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CCS
DAT
E1L
E1L
ECD
EDT
EDT
ELM
EPD
EPD
EWD
LTG
LTG
LTG
MCC
PNL
RAK
SCH
SCH
SCH SCH SCH SCH
CABLE TRAY/RACEWAY PLAN/LAYOUT
CABLE/CONDUIT LAYOUT
CABLE/CONDUIT RACEWAY PLAN/LAYOUT
CONDUIT & JUNCTION BOX ARRANGEMENT
CONDUIT PLAN/DETAIL/INSTALLATION
DUCT BANK/CABLE TRENCH LAYOUT
GROUNDING PLAN/LAYOUT/DETAIL
OVERHEAD POWER LINE LAYOUT
A-B-C-D
SUBMARINE CABLE/UMBILICAL ALIGNMENT SHEET A-B-C
CABLE & CONDUIT SCHEDULE
ELECTRICAL EQUIPMENT DATA SHEET
ELECTRICAL ONE LINE DIAGRAM
ELECTRICAL THREE LINE DIAGRAM ELECTRICAL CONNECTION/ INTERCONNECTION DIAGRAM ELECTRICAL PLAN/LAYOUT/DETAIL JUNCTION BOX ARRANGEMENT/DETAIL/ LAYOUT/ELEVATION ELEMENTARY DIAGRAM
POWER DISTRIBUTION/WIRING DIAGRAM
POWER PLAN/GROUNDING LAYOUT
ELECTRICAL WIRING DIAGRAM
LIGHTING PLAN/LAYOUT/DETAIL
POWER LIGHTING LAYOUT/PLAN/DETAIL STREET LIGHTING LAYOUT/PLAN/DETAIL AREA LIGHTING ELEVATION/DETAIL MOTOR CONTROL CENTER
PANEL LAYOUT/ARRANGEMENT/ DETAIL/SECTION
RACK LAYOUT
CABLE TRAY LOADING SCHEDULE
ELECTRICAL LOAD TABULATION
LIGHTING & POWER SCHEDULE PANEL SCHEDULE LIGHTING PANEL SCHEDULE STRUCTURAL LIST OVERHEAD POWER LINE
D
D-E
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C-D
A-B-C-D
A-B-C-D B-C-D C-D C-D
©Saudi Aramco 2020. All rights reserved.
Page 34 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DRAWING TYPE SCM
SWG
TRM INDEX ‘Q”
FDN
FDN
FDN
FDN
FDN
STL
STL
STL
INDEX ‘R’
ARC
ARC
ARC
ARC
ARC
ARC
ARC
ARC
EQA
SCH
SCH
SDT
INDEX ‘S’
GAP
GAP
GAP
GAP
GAP
GAP
GAP
PLB
PLB
PLB
PLB
UTI
UTI
UTI
DESCRIPTION
SCHEMATIC DIAGRAM
SWITCHGEAR ELEVATION/DETAIL/ SPECIFICATION/ARRANGEMENT
TERMINAL LAYOUT
CONCRETE RETAINING WALL/SLEEPER (PLAN/LAYOUT/SECTION/DETAIL) FOUNDATION PLAN/LAYOUT/ SECTION/DETAIL
SEWER MANHOLE PLAN/SECTION/DETAIL
TRENCH LAYOUT/DETAIL
VALVE BOX LAYOUT/SECTION/DETAIL
REBAR/REINFORCING BAR DETAIL
REBAR/REINFORCING BAR SCHEDULE
STEEL BENDING DETAIL
BEAM SECTION/DETAIL
DOOR/WINDOW DETAIL
FLOOR PLAN
INTERIOR/EXTERIOR FINISH DETAIL
PERSPECTIVE VIEW
PLAN/LAYOUT/ELEVATION/SECTION/DETAIL (CONCRETE & WOODEN FRAME BUILDINGS)
ROOF FRAMING PLAN
WALL SECTION/DETAIL
EQUIPMENT LAYOUT/LEGEND
DOOR/WINDOW SCHEDULE
SCHEDULE OF FINISHES/FURNISHING
ROOF & CEILING PLAN/ELEVATION/SECTION
BERMS PLAN/LOCATION/ELEVATION/ DETAILS
GRADING/PAVING/EARTHWORK
LANDSCAPING PLAN/LAYOUT/DETAIL
MONUMENT REFERENCE
ROAD CROSSING DETAILS
ROADS/TRAFFIC ISLAND/PARKING LOT
SITE DEVELOPMENT PLAN PLUMBING DRAIN/WASTE & VENT PIPING DETAIL/LAYOUT PLUMBING FLOOR PLAN
PLUMBING PLAN/LAYOUT/DETAIL
PLUMBING RISER DIAGRAM
UTILITY ISOMETRIC PIPING DETAIL
UTILITY PIPING ELEVATION/SECTION/DETAIL UTILITY PIPING PLAN/LAYOUT/ROUTING (RAW WATER/DRINKING WATER/FIREWATER / IRRIGATION/STEAM/SPRINKLER/GAS/ SEWER/DRAIN/WASTE/VENT)
DRAWING SIZE A-B-C
COMMENTS
A-B-C
A-B-C
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C-D
B-C-D
B-C-D
A-B-C-D
A-B-C-D
A-B-C
A-B-C-D
A-B-C-D
A-B-C-D
ARCHITECTURAL
BUILDINGS
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C
©Saudi Aramco 2020. All rights reserved.
Page 35 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DRAWING TYPE INDEX ‘T’
DESCRIPTION
DRAWING SIZE
COMMENTS
ANT
ANT
ANT
ANT
ANT
ANT
ANT
ANT
ANT
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CBL
CCS
ANTENNA & FEEDER MOUNTING DETAILS
ANTENNA & TOWER FOUNDATION
ANTENNA & TRANSMISSION LINE LAYOUT
ANTENNA &TOWER INSTALLATION DETAILS
ANTENNA COMMUNICATION TOWER (PLAN/LAYOUT/ELEVATION/DETAIL)
ANTENNA MOUNTING DETAILS
TOWER FOUNDATION LAYOUT
TRANSMISSION LINE LAYOUT
WAVEGUIDE FEEDER BRIDGE/DETAILS (CONDUIT/CABLE) INSTALLATION LAYOUT/DETAILS CABLE & CONDUIT LAYOUT
CABLE (RUNWAY/WAY) & STRUCTURES/DETAILS
CABLE (TRAY/VAULT) RACKING DETAIL
CABLE ENTRANCE DETAIL
CABLE IDENTIFICATION
CABLE PULLING & REEL SET-UP
CABLE ROUTE (STRAIGHT LINE DIAGRAM/DC POWER SYSTEM/SOLAR ARRAY)
CABLE SCHEMATIC LAYOUT/DETAIL
CABLE SPLICING DETAILS
CABLE TERMINATION
CABLE TRAY LAYOUT/DETAIL
CEILING CHANNEL SUPPORT
CONDUIT ELEVATION & DETAILS
CROSSING & MISCELLANEOUS DETAILS
FIBER OPTIC BACKBONE DETAILS
FIBER OPTIC BYPASS
FIBER OPTIC TRUCK CABLE INSTALLATION
GROUNDING PLAN (LAYOUT/DETAILS/MISC)
HORIZONTAL DATA & VOICE CABLE WAY PLAN
HORIZONTAL DATA & VOICE OUTLET
MANHOLE & CONDUIT LAYOUT/DETAILS
MANHOLE FOLDOUT/DETAILS
EQUIPMENT & CABLE LAYOUT/DETAILS
RADIO RF FEED LINE CABLE
SUBDUCT INSTALLATION DETAIL
TELEPHONE CABLE (PLAN/LAYOUT/ROUTING/DETAIL/ELEVATION)
TELEPHONE FACILITY (PLAN/LAYOUT/ROUTING/DETAIL/ELEVATION)
TELEPHONE LAYOUT/SWITCHING SYSTEM
TRENCH LAYOUT (CABLE/CONDUIT)
CABLE & CONDUIT SCHEDULE
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
D
©Saudi Aramco 2020. All rights reserved.
Page 36 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DRAWING TYPE
DESCRIPTION
DRAWING SIZE
COMMENTS
COM
COM
COM
DTA
DTA
DTA
ECD
EDT
EQA
EQA
EQD
EWD
EWD
EWD
EWD
EWD
EWD
RAK
RAK
RAK
RPF
RPF
RPF
SCH
SCH
SCH
SCH
SCH
SCH
SCM
SCM
SCM
SCM
SCM
SCM
SCM
CABLE & VIDEO SYSTEM, MATV, CCTV, PUBLIC ADDRESS SYSTEM, MICROWAVE SYSTEM, RADAR SYSTEM, VIDEO CONFERENCING, LAN, WIRELESS SYSTEM CONNECTOR/INTERFACE DETAIL
GENERAL NOTES/LEGEND/ABBREVIATION
DATA/VOICE COMMS FACILITIES
DATA NETWORK
VOICE/DATA SYSTEM LAYOUT
CONNECTION/INTERCONNECTION DIAGRAM
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
ELECTRICAL DETAILS (PLAN/LAYOUT/ASSEMBLY)
A-B-C
EQUIPMENT LAYOUT/DETAIL/LOCATION
EQUIPMENT/CONSOLE ARRANGEMENT
EQUIPMENT ASSEMBLY (PLAN/DETAILS)
ALARM DIAGRAM
BLOCK & LEVEL DIAGRAM
CIRCUIT DIAGRAM
DC POWER DISTRIBUTION
TELEPHONE/COMMS/DIGITAL SIGNAL WIRING
WIRING DIAGRAM
RACK FACE ELEVATION
RACK INTERFACE DETAIL
RACK LAYOUT
RADIATION PROFILE
RADIO COVERAGE
RADIO PATH PROFILE
CABLE RUNNING LIST
CROSS-CONNECT WIRE SCHEDULE
PANEL INTERCONNECTION SCHEDULE
PANELBOARD LOAD SCHEDULE
WIRING LIST
WIRING TABLE
BLOCK & LEVEL DIAGRAM
CABLE IDENTIFICATION TABLE
CIRCUIT DIAGRAM
INTERCONNECTION WIRING DIAGRAM
RISER DIAGRAM
SCHEMATIC DIAGRAM
SYSTEM BLOCK DIAGRAM
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C-D
A-B-C-D
A-B-C-D
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
INDEX ‘U’
ARC
HOSPITAL/LABORATORY/OFFICE (PLAN/LAYOUT)
A-B-C
INDEX ‘V’
EQA
MARINE EQUIPMENTS
INDEX ‘X’
CAT
ANODE BED DATA SCHEDULE
A-B-C
A-B-C-D
©Saudi Aramco 2020. All rights reserved.
Page 37 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DRAWING TYPE CAT
CAT
CAT
CAT
INDEX ‘Z’
DTA
LOG
MDF
MDF
MDF
SCM
SCM
DESCRIPTION
ANODE BED IN-PLANT LOCATION PLAN
ANODE BED LOCATION PLAN/LAYOUT/ INSTALLATION/DETAIL
BLOCK DIAGRAM ANODE BED
CATHODIC PROTECTION PLAN/LAYOUT/DETAIL
DRAWING SIZE A-B-C
A-B-C-D
A-B-C-D
A-B-C-D
COMMENTS
DATA COMMUNICATIONS
PROCESS COMPUTER TERMINAL MANAGEMENT
DIGITAL DISTRIBUTION FRAME
MAIN DISTRIBUTION FRAME
MAIN/INTERMEDIATE DISTRIBUTION FRAME
NETWORK CONFIGURATION
NETWORK EQUIPMENT CONFIGURATION
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
A-B-C
©Saudi Aramco 2020. All rights reserved.
Page 38 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Appendix C – Saudi Aramco Borders and Seed Files
FORMS, SEED FILES AND BORDERS TABLE PRODUCT (Logical Name) APP
LAYOUT OF APPURTENANCES
FORM NO.
DWG. SIZE
TITLE
2696
B
2696-1 LAYOUT OF APPURTENANCES
2696-2 LAYOUT OF APPURTENANCES
SEED FILE NAME 2696.b
2696.c
2696.d
arc.a
arc.b
arc.c
arc.d
civ.a
civ.b
civ.c
civ.d
com.a
com.b
com.c
com.d
BORDER FILE NAME
CADD VERSION
2696b03.bor
CADD-03
2696c00.bor
CADD-00
2696d00.bor
CADD-00
arca01.bor
arcb00.bor
arcc00.bor
arcd00.bor
civa01.bor
civb00.bor
civc00.bor
civd00.bor
CADD-01
CADD-00
CADD-00
CADD-00
CADD-01
CADD-00
CADD-00
CADD-00
coma01.bor
CADD-01
comb00.bor
CADD-00
comc00.bor
CADD-00
comd00.bor
CADD-00
def.a
def.b
def.c
def.d
def.e
e1l.a
e1l.b
e1l.c
edt.a
edt.b
edt.c
defa05.bor
defb05.bor
defc05.bor
defd04.bor
defe04.bor
e1la05.bor
e1lb00.bor
e1lc00.bor
CADD-05
CADD-05
CADD-05
CADD-04
CADD-04
CADD-05
CADD-00
CADD-00
edta01.bor
CADD-01
edtb00.bor
CADD-00
edtc00.bor
CADD-00
2615
2634
2635
2636
2615
2634
2635
2636
2615
2634
2635
2636
9527
2615
2634
2635
2636
2616
2615
2634
2635
ARCHITECTURAL & LANDSCAPING
ARCHITECTURAL & LANDSCAPING
ARCHITECTURAL & LANDSCAPING
ARCHITECTURAL & LANDSCAPING
CIVIL & STRUCTURAL
CIVIL & STRUCTURAL
CIVIL & STRUCTURAL
CIVIL & STRUCTURAL
COMMUNICATION
COMMUNICATION
COMMUNICATION
COMMUNICATION
STANDARD “A” SIZE
STANDARD “B” SIZE
STANDARD “C” SIZE
STANDARD “D” SIZE
STANDARD “E” SIZE
ELECTRICAL ONE LINE DIAGRAM
ELECTRICAL ONE LINE DIAGRAM
ELECTRICAL ONE LINE DIAGRAM
2615
MISCELLANEOUS ELECTRICAL
2634
MISCELLANEOUS ELECTRICAL
2635
MISCELLANEOUS ELECTRICAL
PRESSURE VESSEL DATA SHEET
9527.d
9527d02.bor
CADD-02
2527
EQUIPMENT ASSEMBLY AND DETAILS
2527.b
2527b03.bor
CADD-03
2527-1 EQUIPMENT ASSEMBLY AND DETAILS
2527.c
2527c00.bor
CADD-00
2615
2634
2635
FACILITY PLOT PLAN
FACILITY PLOT PLAN
FACILITY PLOT PLAN
2615-1 FACE SHEET
2634-1 FACE SHEET
2635-1 FACE SHEET
2636-1 FACE SHEET
2616-1 FACE SHEET
fpp.a
fpp.b
fpp.c
fppa05.bor
fppb00.bor
fppc00.bor
CADD-05
CADD-00
CADD-00
deffsh.a
2615-1a02.bor
CADD-02
deffsh.b
2634-1b02.bor
CADD-02
deffsh.c
2635-1c02.bor
CADD-02
deffsh.d
2636-1d02.bor
CADD-02
deffsh.e
2616-1e02.bor
CADD-02
APP
APP
ARC
ARC
ARC
ARC
CIV
CIV
CIV
CIV
COM
COM
COM
COM
DAT
DEF
DEF
DEF
DEF
DEF
E1L
E1L
E1L
EDT
EDT
EDT
EQD
EQD
FPP
FPP
FPP
FSH
FSH
FSH
FSH
FSH
C
D
A
B
C
D
A
B
C
D
A
B
C
D
D
A
B
C
D
E
A
B
C
A
B
C
B
C
A
B
C
A
B
C
D
E
©Saudi Aramco 2020. All rights reserved.
Page 39 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
FORMS, SEED FILES AND BORDERS TABLE PRODUCT (Logical Name) GAT
FORM NO.
DWG. SIZE
GATEHOUSE
TITLE
2615
A
GAT
GAT
HVA
HVA
HVA
ILD
ILD
ILD
ILD
ILD
ILD
ISD
ISO
ISO
ISO
LOG
LOG
LOG
OSI
PER
PER
PER
PFD
PFD
PFD
PFD
PID
PID
PPL
PPL
PPL
PPL
PRF
SCE
SCE
SCE
SCH
SPP
SPP
STL
B
C
A
B
C
B
C
D
B
C
D
B
B
C
D
A
B
C
B
A
B
C
A
B
C
D
A
B
A
B
C
D
A
A
B
C
C
A
B
B
2634
2635
2615
2634
2635
7460
GATEHOUSE
GATEHOUSE
HVAC
HVAC
HVAC
INSTRUMENT LOOP DIAGRAM
7460-1
INSTRUMENT LOOP DIAGRAM
7460-2
INSTRUMENT LOOP DIAGRAM
8111
INDEX SHEET INSTRUMENT LOOP DIAG.
8111-1
INDEX SHEET INSTRUMENT LOOP DIAG.
8111-2
INDEX SHEET INSTRUMENT LOOP DIAG.
7460A
INSTRUMENT SEGMENT DIAGRAM
2825
ISOMETRIC PIPING DETAIL
2825-1
ISOMETRIC PIPING DETAIL
2825-2
ISOMETRIC PIPING DETAIL
8110
LOGIC DIAGRAM
8110-1 LOGIC DIAGRAM
8110-2 LOGIC DIAGRAM
9872
2615
2634
2635
2615
2634
2635
2636
5994
ON-STREAM INSPECTION
SECURITY FENCE
SECURITY FENCE
SECURITY FENCE
PROCESS FLOW DIAGRAM
PROCESS FLOW DIAGRAM
PROCESS FLOW DIAGRAM
PROCESS FLOW DIAGRAM
PIPING & INSTRUMENT DIAGRAM
5994-1 PIPING & INSTRUMENT DIAGRAM
PIPING PLAN
PIPING PLAN
PIPING PLAN
PIPING PLAN
PLAN AND PROFILE
SECURITY EQUIPMENT
SECURITY EQUIPMENT
SECURITY EQUIPMENT
2615
2634
2635
2636
6285
2615
2634
2635
6232
2615
2634
2871
SEED FILE NAME def.a
def.b
def.c
hva.a
hva.b
hva.c
ild.b
ild.c
ild.d
8111.b
8111.c
8111.d
isd.b
2825.b
2825.c
2825.d
8110.a
8110.b
8110.c
9872.b
def.a
def.b
def.c
pfd.a
pfd.b
pfd.c
pfd.d
pid.a
pid.b
ppl.a
ppl.b
ppl.c
ppl.d
BORDER FILE NAME
CADD VERSION
defa05.bor
defb05.bor
defc05.bor
hvaa01.bor
hvab00.bor
hvac00.bor
ildb05.bor
ildc00.bor
ildd00.bor
CADD-05
CADD-05
CADD-05
CADD-01
CADD-00
CADD-00
CADD-05
CADD-00
CADD-00
8111b03.bor
CADD-03
8111c00.bor
CADD-00
8111d00.bor
CADD-00
isdb02.bor
CADD-02
2825b03.bor
CADD-03
2825c00.bor
CADD-00
2825d00.bor
CADD-00
8110a03.bor
CADD-03
8110b00.bor
CADD-00
8110c00.bor
CADD-00
9872b00.bor
CADD-00
defa05.bor
defb05.bor
defc05.bor
pfda05.bor
pfdb00.bor
pfdc00.bor
pfdd00.bor
pida06.bor
pidb00.bor
ppla01.bor
pplb00.bor
pplc00.bor
ppld00.bor
CADD-05
CADD-05
CADD-05
CADD-05
CADD-00
CADD-00
CADD-00
CADD-06
CADD-00
CADD-01
CADD-00
CADD-00
CADD-00
6285.a
6285a02.bor
CADD-02
def.a
def.b
def.c
defa05.bor
defb05.bor
defc05.bor
CADD-05
CADD-05
CADD-05
LIGHTING PANEL SCHEDULE
6232.c
6232c03.bor
CADD-03
SECURITY PLOT PLAN
SECURITY PLOT PLAN
fpp.a
fpp.b
fppa05.bor
fppb00.bor
CADD-05
CADD-00
STEEL BENDING DETAILS
2871.b
2871b03.bor
CADD-03
©Saudi Aramco 2020. All rights reserved.
Page 40 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
FORMS, SEED FILES AND BORDERS TABLE PRODUCT (Logical Name) TAB
ELECTRICAL LOAD TABULATION
FORM NO.
DWG. SIZE
TITLE
8114
A
UTI
VOD
A
A
2615
2615
PLUMBING & UTILITY
VALVE OPERATING DIAGRAM
SEED FILE NAME 8114.a
uti.a
vod.a
BORDER FILE NAME
CADD VERSION
8114a03.bor
CADD-03
utia01.bor
CADD-01
voda05.bor
CADD-05
©Saudi Aramco 2020. All rights reserved.
Page 41 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Appendix D – Data-Centric Piping and Instrumentation Diagram (P&ID) Specification
INTRODUCTION
This appendix defines the requirements for preparing the Data-Centric P&IDs for Saudi Aramco using the Data-Centric P&ID design software approved by Saudi Aramco. It is Contractor responsibility to request the approved Data-Centric P&ID design software name and version, database software name and version, and approved P&ID Template from EK&RD.
CONFLICTS AND DEVIATIONS
Any conflicts between this appendix and other applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs) shall be resolved in writing with EK&RD.
REFERENCES
Refer to applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs), and Standard Drawings (SASDs).
SCOPE
4.1 General
4.1.1
Contractor shall follow this appendix as the basis for preparing Data-Centric P&IDs and PFDs. Included in this appendix are the requirements, guidelines, list of deliverables, the minimum data to be populated in the database and the requirements for Project delivery to EK&RD.
4.1.2 When requested, EK&RD will provide Contractor the Data- Centric P&ID Template comprising Reference Data and Data Dictionary, which shall be used for the database set-up and P&ID creation. It is presumed that the Data-Centric P&ID Template provided may not be comprehensive enough for any specific project and modifications/additions to it will be required in order to meet project requirements.
4.1.3
Use of the Data-Centric P&ID Template does not release the engineering contractor from the responsibility of submitting the deliverables meeting COMPANY Data-Centric P&ID
©Saudi Aramco 2020. All rights reserved.
Page 42 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
4.1.4
4.1.5
4.1.6
4.1.7
4.1.8
requirements, as defined in Section 3 of this standard.
All changes and/or additions to the Reference Data and Data Dictionary must be documented and submitted to EK&RD for approval, prior to use. Refer to Attachment 4 for a sample issue log to be used for requesting any customization or clarification during the project.
The document with descriptive list of changes and additions as mentioned above, with EK&RD approval shall be included as part of deliverables, which are defined later in this appendix.
The Data-Centric P&IDs shall be submitted to Saudi Aramco as per Section 16.11 of SAEP-334.
The final Data-Centric database delivered to Saudi Aramco shall have all the drawings and data in ‘As-built’ stage.
Contractor shall upgrade the database to conform to the latest approved Data-Centric P&ID version at the time of final delivery.
4.1.9
Contractor shall provide to EK&RD the Data-Centric P&ID project data as well as all supporting documentation.
4.1.10 The final Data-Centric P&ID delivery shall be one combined (merged/consolidated) database for the entire project/facility, regardless whether one or multiple contractors are working on the project.
4.2
Reference Data & Data Dictionary customizations
4.2.1
The Reference Data within the Data-Centric P&ID Template consists of:
• Approved Symbols • COMPANY approved P&ID Borders • Rule File • Format File •
Insulation Specification File
4.2.2
The Data Dictionary template within the Data-Centric P&ID Template consists of:
• Data Attributes (Properties) • Select Lists
©Saudi Aramco 2020. All rights reserved.
Page 43 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
4.2.3
4.2.4
4.2.5
4.2.6
Saudi Aramco Engineering Drawings It is COMPANY direction to use delivered ANSI/ISA standard Reference Data to the maximum extent possible for P&ID production. Additional symbols shall be defined by the contractor as required, but must be approved by the COMPANY prior to use on the project.
Any additional attributes, select lists and select list entries, which do not exist in the Data Dictionary and are required by the project, shall be created by the contractor and get them approved by EK&RD prior to use.
Forms, templates, rules and insulation specs customization shall be done by the contractor as required with prior approval from EK&RD.
Additional forms and documents created by the contractor shall adhere to the requirements specified in this standard and must be approved by EK&RD prior to use in the project.
4.3 Quality Assurance
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
All inconsistencies indications must be resolved in the P&IDs. Any inconsistency that can’t be resolved shall be documented and submitted to Saudi Aramco for approval.
Check List in Attachment 2 of this appendix shall be followed while creating the P&IDs.
Symbols (based on ANSI & ISA), fonts and rules approved by EK&RD shall be used for the creation of P&IDs.
All Drawings and Reports submitted to EK&RD shall have customized title block as per Section 6 of this standard.
The latest Saudi Aramco border file available at project commencement shall be used.
4.3.6
Arial Font shall be used for all textual elements of the drawing.
©Saudi Aramco 2020. All rights reserved.
Page 44 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Data-Centric P&ID SET-UP
5.1 General
5.1.1
Latest versions approved by Saudi Aramco shall be used. Prior approval of EK&RD shall be obtained for using other versions of the Data-Centric P&ID software. Contractor shall use the database software and version approved by Saudi Aramco and compatible with the approved Data-Centric P&ID software.
5.1.2
The final submittal of the Data-Centric P&ID shall be upgraded to the latest approved version by EK&RD at the time of submittal.
5.1.3
The Data-Centric P&ID Template provided by EK&RD shall be used while setting up the Data-Centric P&ID Project.
5.2
Data-Centric P&ID Set-up
The Data-Centric P&ID project shall be created and configured as follows:
Name: Database Type: Data Storage Name: Temporary Storage Name: Database User Name: Database Password:
Facility Name approved database TS_XXX_DATA_01* TEMP_XXX* XXXSITE* XXXSITE123*
- Where XXX = Plant\Org abbreviation from iPlant, “e.g., HGP for Hawiyah Gas Plant”
5.3
Plant Set-up
5.3.1
See Attachment 3 of this appendix for a sample of the list of Plants, Units, and Areas and their associated data. This shall be prepared by the plant owner (proponent).
5.3.2
Plant Setup shall be defined and configured as follows:
Template Path Hierarchy Plant Name Format File location Database Storage Name Temp Database Storage Name Database Username
Company Template path Plant/Area/Unit Facility Name Company Reference Data path TS_XXX_DATA_01* TEMP_XXX* XXXPLANT*
©Saudi Aramco 2020. All rights reserved.
Page 45 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Database Password
XXXPLANT123*
- Where XXX = Plant\Org abbreviation from iPlant, “e.g., HGP for Hawiyah
Gas Plant”
5.3.3
Following table lists the required data for each plant (Facility Name):
Description
Value
Name
Description
5.4
Data-Centric P&ID Application Association
When establishing Application Association, the following configuration shall be followed:
P&ID Reference Data path
Company Reference Data path
Data Dictionary Source
Use Custom Template
Template Path
Company Data Dictionary path
Database Storage Name
TS_XXX_DATA_01
Temp Database Storage Name
TEMP_XXX
Database Username
Database Password
XXXPLANTPID
XXXPLANTPID123
- Where XXX = Plant\Org abbreviation from iPlant, “e.g., HGP for Hawiyah Gas Plant”
5.5
Plant Hierarchy Structure
5.3.1
The project plant structure must be Plant/Area/Unit.
5.3.2
All drawings shall be created at the Unit level only.
5.3.3
The following shall be applied to all project data:
5.3.3.1
Plant shall be the Facility Name
5.3.3.2
Area shall be the plant number (As created in iPlant).
For example: Plant number “H46” in Hawiyah Gas Plant
5.3.3.3
Unit number and Unit Code shall be the unit as created in iPlant
©Saudi Aramco 2020. All rights reserved.
Page 46 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Where www = the unit number, “e.g., unit 100 for Hawiyah Gas Plant under plant number H46”
5.3.4
Following tables list the required data:
Plant
Description
Data entry
Value
Plant Name
Description
Yes
Yes
iPlant Facility Name
iPlant Facility Name
Area
Description
Data entry
Value
Area Name
Description
Yes
Yes
iPlant Plant number
iPlant Area Location
Unit
Description
Data entry
Value
Unit Name
Unit Description
Unit Code
Yes
Yes
Yes
iPlant Unit number
iPlant Description
iPlant Unit number
5.3.5
See Attachment 3 of this appendix for a sample of the list of the Plants, Areas, and Units and their associated data for the XXX Project. This list shall be prepared by the proponent.
NAMING CONVENTIONS
6.1
Drawing Naming Convention
P&ID drawing name property shall comply with Section 5 (Drawing Name) of this standard and drawing number property shall comply with Section 6 (Title Block Information) of this standard.
6.2
Pipe Run Tag Naming Convention
All pipe tags shall be according to Section 10 of this standard.
Example: 2-1/2”-CWS-1234-1CS1P1
The pipe tag mapping to the equivalent properties is as shown below:
Property
Property Type
Example
Nominal Diameter
Select list
2-1/2”
©Saudi Aramco 2020. All rights reserved.
Page 47 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Fluid Code
Tag Seq No
Select List
Integer
Piping Materials Class
String
CWS
1234
1CS1P
6.3
Equipment Tag Naming Convention
All equipment tags shall be according to Section 10 of this standard.
Example: D31-GM-0012A
The equipment tag mapping to the equivalent properties is as shown below:
Property
Property Type
Example
Plant Number
Tag Prefix
Tag Seq No
Tag Suffix
String
String
Integer
String
D31
G
0012
A (When Applicable)
6.4
Instrument and Loop Tag Naming Convention
6.4.1 All loop tags shall be according to Section 10 of this standard.
Example: K84-100-P-0012
The loop tag mapping to the equivalent properties is as shown below:
Property
Property Type
Example
Plant Number
Unit Name
Loop Function
String
String
String
Tag Seq No
Integer
K84
100
P
0012
6.4.2 All instrument tags shall be according to Section 10 of this standard:
Example: K84-100-PIT-0012A
The instrument tag mapping to the equivalent properties is as shown below:
©Saudi Aramco 2020. All rights reserved.
Page 48 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Property
Plant Number
Unit Name
String
String
Property Type Example
K84
100
P
IT
0012
A(When Applicable)
Measured Variable Code String
Inst Type Modifier
Tag Seq No
Tag Suffix
String
Integer
String
All instruments shall be assigned to loops.
P&ID Labels
7.1
Piping Component Labels
Piping Components - Valves
Label Name
Category
Detailed Label
Nominal Diameter & Opening Action
Piping
Piping Components
Piping Components - Reducers
Label Name
Category Detailed Label
Red Nominal Diameter
Piping Piping Components
Piping OPC’s
Label Name
Category
Detailed Label
Off-Drawing_1From\To attributes shall be entered and displayed for each OPC
©Saudi Aramco 2020. All rights reserved.
Page 49 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
7.2
Equipment Description Labels
Equipment Detailed or Description Labels are placed on the top or the bottom of the P&ID. The delivered equipment descriptive labels with Saudi Aramco reference data shall be used to the maximum extent unless addition is required by the projects. The following are examples and not limitations.
Vessels
Label Name
Category
Detailed Label
Vessel Description
Equipment
Labels Equipment
Pumps
Label Name
Category
Detailed Label
Pump Description
Equipment
Labels Equipment
Heat Exchangers
Label Name
Category
Detailed Label
Heat Exchanger Description
Equipment
Labels Equipment
©Saudi Aramco 2020. All rights reserved.
Page 50 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Compressors
Label Name
Category
Detailed Label
Compressor Description
Equipment
Labels Equipment
Drivers
Label Name
Category
Detailed Label
Driver Description
Equipment
Labels Equipment
7.3
Instrument Label
Instruments
Label Name
Embedded with the Instrument Symbol
Category
Detailed Label
7.4
Pipe Run Label
“Tag number with balloon”
Instrumentation
Labels - General Instrument
Pipe Run
Label Name
Category
Detailed Label
Line No wo Insulation
Pipe Run
Labels Piping Segments
©Saudi Aramco 2020. All rights reserved.
Page 51 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
REQUIRED ATTRIBUTES
8.1
Equipment Attributes
The following table lists all the required attributes or properties which shall be filled in Other attributes may be filled or used as per the project requirements:
the Data-Centric database for all equipment.
EQUIPMENT
DRAWING INDEX
EQUIPMENT MARKING
VESSELS
D
D
DRUMS
D
D
TANKS
D
D
PUMPS
GEAR UNIT
HYDRAULIC COUPLING
ELECTRIC MOTOR DRIVER
TURBINE DRIVER
DIESEL ENGINE DRIVER COMPRESSORS
G
G
G
P
K
K K
G
GG
GH
GM
GT
GD K
REQUIRED FIELDS
Internal Diameter Length T-T Capacity Maximum Design Pressure Maximum Design Temperature Maximum Operating Pressure Maximum Operating Temperature Trim Internal Diameter Length T-T Capacity Maximum Design Pressure Maximum Design Temperature Maximum Operating Pressure Maximum Operating Temperature Trim Length Width Height Capacity Maximum Design Pressure Maximum Design Temperature Maximum Operating Pressure Maximum Operating Temperature Trim Capacity Differential Pressure Driver Power Trim
Define as per project requirements
Define as per project requirements Driver Power Speed Frequency Voltage Phase
Define as per project requirements
Define as per project requirements Capacity
©Saudi Aramco 2020. All rights reserved.
Page 52 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
EQUIPMENT
DRAWING INDEX
EQUIPMENT MARKING
GEAR UNIT
HYDRAULIC COUPLING
ELECTRIC MOTOR DRIVER
TURBINE DRIVER
DIESEL ENGINE DRIVER
CENTRIFUGE
VACUUM PUMPS
MIXERS
GENERATORS
DIESEL ENGINE DRIVER
TURBINE DRIVER
HEAT EXCHANGERS
EXCHANGER FIN FAN
EXCHANGER FIN FAN GEARBOX
K
K
P
K
K
K
K
K
P
K
K
E
E
E
KG
KH
KM
KT
KD
KC
K
K
P
PD
PT
E
E
EG
EXCHANGER FIN FAN MOTOR
E
EM
EXCHANGER (TUBE/SHELL)
E
E
REQUIRED FIELDS
Differential Pressure Discharge Pressure Maximum Design Pressure Maximum Design Temperature Trim
Define as per project requirements
Define as per project requirements Driver Power Speed Frequency Voltage Phase Define as per project requirements
Define as per project requirements
Define as per project requirements
Define as per project requirements
Define as per project requirements
Define as per project requirements
Define as per project requirements
Define as per project requirements
Duty
Surface Area
Maximum Design Pressure
Maximum Design Temperature
Maximum Operating Pressure
Maximum Operating Temperature Trim Define as per project requirements
Define as per project requirements
Driver Power
Speed
Frequency
Voltage
Phase
Duty
Surface Area
Shell Maximum Design Pressure
Shell Maximum Design Temperature
Shell Maximum Operating Pressure
Shell Maximum Operating Temperature
Shell Trim
Tube Maximum Design Pressure
Tube Maximum Design Temperature
Tube Maximum Operating Pressure
©Saudi Aramco 2020. All rights reserved.
Page 53 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
EQUIPMENT
DRAWING INDEX
EQUIPMENT MARKING
REQUIRED FIELDS
BOILERS
F
F
COLUMNS
C
C
SPECIAL EQUIPMENTS JIB CRANE
ESCAPE CAPSULE
U M
U
U U
U
8.2
Instrument Attributes
Tube Maximum Operating Temperature Tube Trim
Internal Diameter
Maximum Design Pressure
Maximum Design Temperature
Maximum Operating Pressure
Maximum Operating Temperature
Internal Diameter
Length T-T
Capacity
Maximum Design Pressure
Maximum Design Temperature
Maximum Operating Pressure
Maximum Operating Temperature Trim Define as per project requirements Define as per project requirements Define as per project requirements
The following table lists the required attribute or properties that are required to be filed for each instrument type. Other attributes may be filled or used as per the project requirements.
Instrument Type Pressure High
Pressure Low
Pressure High
Pressure Low
Set Point
Range
PZV
PCV
PI “Field Inst.”
PI “DCS Inst.”
PDT
PIT
PT
PA PIC
Instrument Type
TI “Field Inst.”
TI “DCS Inst.”
TIC
√
√
X
√
√
√
√
X
X
X
√
√
√
√
X
X
√
X
√
√
√
X
X
√
X
√
√
√
√ √ Temperature High
√ √ Temperature Low
X √ Temperature High
X √ Temperature Low
X
√
√
X
√
√
√
X
√
√
X
√
Pressure
Temperature
Flow
TIT Instrument Type
√ Flow High
FI “Field Inst.”
X
√ Flow Low
X
√ Flow High
√
√ Flow Low
√
©Saudi Aramco 2020. All rights reserved.
Page 54 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Set Point
Range
FI “DCS Inst.”
FIC
√
√
√
√
X
√
X
√
FIT FT Instrument Type
√ √ Level High
√ √ Level Low
√ √ Level High
√ √ Level Low
LG
LT
LI “Field Inst.”
LI “DCS Inst.”
LIT LIC
X
√
X
√
√ √
X
√
X
√
√ √
Note: √ means required X means optional
√
√
√
X
√ √
√
√
√
X
√ √
Level
DATA HANDOVER
9.1
Pre-Project Enabled Data-Centric P&ID plant backup
A complete Data-Centric P&ID plant backup shall be generated before enabling the project environment including the P&ID Reference Data (symbols, templates, assemblies, report templates, rules, insulation spec, modified dlls, etc.) used in the Data-Centric P&ID creation.
9.2
Post-Project Enabled Data-Centric P&ID plant backup
A complete Data-Centric P&ID plant backup in As-built stage after enabling the project environment including the P&ID Reference Data (symbols, templates, assemblies, report templates, rules, insulation spec, modified dlls, etc…) used in the Data-Centric P&ID creation.
9.3
Deviations Compliance Table
Compliance table highlighting all approved deviations from this appendix shall be delivered.
9.4
Customizations Approval Package
Document specifying customizations carried out in reference data, symbols, data dictionary, formats, rules, and reports along with their approvals.
9.5 Modified Code Package
Contractor shall highlight the modified versus delivered code for any modified DLL source code that were created for the Data-Centric P&ID project.
©Saudi Aramco 2020. All rights reserved.
Page 55 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
9.6
P&ID PDF Drawings Package
PDF files of all the P&IDs as generated from Data-Centric P&ID.
9.7
P&ID Hard Copy Package
Hard copy of all the P&IDs as generated from Data-Centric P&ID.
9.8
Data-Centric P&ID submittal form shall be delivered with every submittal. It shall contain complete information about the delivery and list of all generated drawings.
DATA HANDOVER QUALITY REQUIREMENTS
10.1 Drawings
10.1.1 All the P&IDs in the Data-Centric P&ID database must be
As-built before the final delivery.
10.1.2 Forced recreation must be successfully applied to all the
drawings before the final delivery.
10.1.3 Prior
to generating
the Data-Centric P&ID Backup, CONTRACTOR shall cleanup any reported exceptions and submit error-free reports from the Data-Centric P&ID software.
10.2 Project
10.2.1 Prior to database delivery, all subprojects must be collapsed and
deleted.
10.2.2 All temporary drawings, test drawings, test symbols and assemblies, test units, temporary filters, reports, etc. must be removed from the Data-Centric P&ID database before delivery.
10.2.3 Data-Centric P&ID database must be free of any database exceptions and orphan entries. The applicable Data-Centric P&ID utilities shall be run to clean up all database exceptions.
10.2.4 Contractor shall upgrade the Data-Centric P&ID database to the
latest approved version at the time of delivery.
10.2.5 All the revisions or versions that are created during the design
stages shall be deleted.
©Saudi Aramco 2020. All rights reserved.
Page 56 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Attachment 1 - Title Block
Title Block Field Name
Display Name
Remarks
Must match title block revision
PLANT NO
INDEX
DRAWING NUMBER
SHT. NO.
REV.NO.
Location
Drawing Title - Line 1
Drawing Title - Line 2
Drawing Title - Line 3
DRAWING TYPE
Area Name
Drawing Index
Drawing Number
Sheet No
Revision
Area Description
Hard Coded
Description
Unit Description
Hard Coded
JOB ORDER/EWO NO.
Job Order EWO No
Revision DATE
REVISION DESCRIPTION
Rev Date
Rev Desc
Design Certification: ENGG.
Engineering By
Design Certification: DATE
Engineering Date
Design Certification: CERTIFIED BY
Certified By
Design Certification: CERTIFIED DATE Certified Date
Review: CONST. AGENCY
Construction Agency
Review: CONST. DATE
Review: OPERATIONS
Construction Agency Date
Operations
Review: OPERATIONS DATE
Operations Date
Other: BY
Other: DATE
Other
Other Date
Key Drawings Review: REQUIRED
Hard Coded
DCC Number
DCC No
EMERGENCY DRAWING
Emergency Drawing
Drawing Sensitivity
Drawing Confidentiality
Drawing File Format Type
Hard Coded
©Saudi Aramco 2020. All rights reserved.
Page 57 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Reference Drawings
Title Block Field Name
Display Name
Remarks
Reference Drawing 1_No
Reference Drawing No 1
Reference Drawing 2_No
Reference Drawing No 2
Reference Drawing 3_No
Reference Drawing No 3
Reference Drawing 4_No
Reference Drawing No 4
Reference Drawing 5_No
Reference Drawing No 5
Reference Drawing 6_No
Reference Drawing No 6
Reference Drawing 7_Desc
Reference Drawing Desc 7
Reference Drawing 7_No
Reference Drawing No 7
Reference Drawing 7_Desc
Reference Drawing Desc 8
Reference Drawing 7_No
Reference Drawing No 8
Drawing Note
Title Block Field Name
Display Name
Remarks
NOTES
Drawing Notes
©Saudi Aramco 2020. All rights reserved.
Page 58 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Attachment 2 – P&ID Quality Assurance Check Lists
General Check List
1
2
3
4
5
6
7
8
The Special character apostrophe ’ shall not be used to comment values of any attributes with unit of measure. i.e., united attribute values shall not be commented. Tags and associated data shall be entered in consistent manner as defined by this specification.
Saudi Aramco Abbreviation conventions shall be followed as per SAES.
Comments must be placed using Annotation Symbols.
Dumb text shall be used only with EK&RD approval. Dumb labels used shall be documented.
All symbols shall be parametric. Customized symbols shall be pre-approved.
All symbols shall have Class and Sub-class defined. The naming convention of the new symbols or labels shall be similar to the Saudi Aramco customized labels. The symbol name shall be descriptive where it represents the symbol name.
Drawing Check List
1
2
3
4
5
Drawing title block entries must follow this standard and have corresponding user-defined attributes as defined in this appendix. P&ID detail sketches shall be placed as intelligent items or Auxiliary Graphics.
Nothing shall be placed outside the drawing border.
Only approved Saudi Aramco Data-Centric P&ID templates shall be linked with drawings. No P&IDs shall have any information, except border as a linked document, intelligent labels, intelligent symbols and auxiliary graphics. The forced re-creation of P&ID (with P&ID file renamed) must fetch the P&ID from the database without any loss of information.
Equipment Check List
1
2
3
4
5
6
7
8
9
10
11
12
13
All Equipment shall be TAGGED
Equipment Name Attribute shall be defined for all the equipment.
All applicable data attributes must be filled to the fullest extent in accordance with SAES. Package equipment shall have full equipment features shown on the main plant P&ID along with all instrumentation and shall not be shown as a ‘Black Box’
Equipment Class shall be the selection criteria for placement.
In cases where a single equipment-graphic is displayed on the face of the drawing and the equipment labels indicate existence of multiple equipment, multiple equipment graphics shall be placed as overlapped graphics. All the required attributes shall be populated for all the overlapped equipment. In cases where data for multiple equipment of same category are displayed in single label, e.g., E-11150 A/B/C the label is to be placed selecting E-11150A and the tag suffix label is to be used to place the labels for remaining equipment. Equipment Tag Prefix, Tag Sequence Number, Tag Suffix, etc. shall be entered properly for each equipment. Use of space or other characters to overcome the Duplicate Tag situation is not acceptable. Equipment label shall be standardized. If the Data-Centric P&ID doesn’t have requisite properties, they shall be added, but with prior approval from EK&RD. If labels have units that are not available in the Data-Centric P&ID, a new label shall be created with the right unit. All new Equipment symbols shall be customized as Parametric. Prior approval shall be obtained for the customization of Equipment Descriptions labels with more information, than in the available labels. The Equipment level labels like HHLL (High High Liquid Level), LLL (Low Liquid Level) in the Data- Centric P&ID corresponds to HHL, LL in the source P&ID.
Multiple representations can be used in cases where the equipment is displayed in multiple drawings.
©Saudi Aramco 2020. All rights reserved.
Page 59 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Instrument Check List
1
2
3
4
5
6
7 8
9
10
11
12
13
14
15
16
17
18
All Instruments must be TAGGED
All applicable instrument data-attributes must be filled in to the fullest extent possible.
Instrument Loops shall be created.
Instrument Loop must be defined for all the instruments Instrument Measured Variable Code, Instrument Type Modifier, Instrument Tag Sequence Number and Instrument Tag Suffix to be entered properly for every Instrument.
All instruments that do not appear in any pipeline are to be placed offline.
Offline Instruments with implied components shall not be used. All Inline instruments shall have the tag number represented on the P&ID as balloon. Use signal point for instruments having RUN, CLOSED, FAH, FAL, START, STOP, RUNNING, LAH, etc. Set points must be defined for all DCS instruments. Set Point labels must be used to display the set point value on the face of the P&ID. Pressure High & Pressure Low attributes shall be used to represent high & low set points and similarly for Temperature, Flow, Level, etc. The following format shall be used to represent instrument set point on the face of the P&ID: • H Set @ High Unit • L Set @ Low Unit Instrument Range must be defined for all field instruments. Instrument range labels must be used to display the range value on the face of the P&ID. Pressure High & Pressure Low attributes shall be used to represent instrument range and similarly for Temperature, Flow, Level, etc. The following format shall be used to represent instrument range on the face of the P&ID: • Low - High unit TSO for control valve shall be put as Option code label NC for control valve shall be put as Opening Action label. FC for control valve shall be put as Fail Action label. Instrument Control Case shall not be used to represent the high and low values for instrument range and set points
Rating Ratio Label shall be used to represent the rating ratio for the control valve.
ISA standard shall be used to represent the Signal Line on the face of the P&ID. All the instruments which are listed in a Table within the P&ID drawing must be represented as an intelligent instrument, “i.e., an instrument symbol that represent the Tag Number without any graphical representation shall be placed in the table”. This type of instruments shall be defined in the right category with correct class and subclass and the appropriate symbol shall be placed on the drawing.
©Saudi Aramco 2020. All rights reserved.
Page 60 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Pipe Run Check List
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
All Pipe Runs must be TAGGED
All applicable pipe-run data attributes must be filled in to the fullest extent possible. Pipe Run shall be placed as continuous line, “i.e., segmented or fragmented pipe run for the same tag are not allowed”. (exception: Equipment trim)
Pipe runs to be placed as straight runs & care shall be taken to eliminate unwanted ‘steps / vertices’ in straight pipe run.
Primary Piping to be placed for Lines with Fluid Code P and Secondary Piping for other fluid codes.
Proper Flow Direction shall be defined for all the pipe runs.
Pipe Line material class and Pipe class service/fluid codes shall comply with SAES-L-105 All the Pipe Runs must have the full information Nominal Diameter, Fluid Code, Tag Sequence Number and Piping Material Class.
Pipe run properties shall be propagated to all the pipe run branches, unless otherwise specified. Insulation and PMC shall be passed from pipe run to nozzle, but if equipment has different Insulation than the nozzle, then the equipment insulation shall be passed to the nozzle & segment break shall be placed between piping flange & the nozzle. Pipe Run Labels for horizontal lines to be placed above it and for vertical lines it has to be on left side. Leader line can be placed for Pipe Run Label if it cannot be placed as mentioned above due to space restrictions An appropriate segment break label shall be used where it is required, “i.e. placing a group break label where only nominal diameter break is required is not acceptable.
All piping labels shall be aligned properly. Use Flange Blind without Tap to represent blind flange. ‘Flange Blind’ symbol is used only when some tapping is required. End 1 Nominal Diameter shall be greater than the End 2 Nominal Diameter for Reducers and Flange Reducing. Flanges are to be placed on either side of the Pipe run crossing the Area Break / Package. Package Item Tag shall be given to Area break & propagated to all the components within the Area Break / Package boundary.
Description label to be used to represent the V (Vent), D (Drain) for valves.
Rating label shall be used to represent the Rating for piping components (e.g., 300#). Pipe Run continuation referencing other P&IDs must be appropriately defined as an intelligent OPC “Off Page Connector”. OPC pairs must be connected to the same pipe run, “i.e., same tag number”
All the OPC’s must be connected.
©Saudi Aramco 2020. All rights reserved.
Page 61 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Attachment 3 – Plants/Areas/Units
The following table shows an example of the Plant hierarchy that will be prepared by the proponent. Plant – Area - Unit for the XXX project
Facility Name
Area Name
Area Description
Unit Number
Unit Description
Hawiyah Gas Plant
H46
HAWIYAH
20
INLET AREA FACILITY
©Saudi Aramco 2020. All rights reserved.
Page 62 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Attachment 4 – Sample Issue Log
©Saudi Aramco 2020. All rights reserved.
Page 63 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Appendix E – Data Centric 3D Model Specification
INTRODUCTION
This appendix defines the requirements for preparing the 3D Models and related Data- Centric Engineering Drawings for Saudi Aramco using the 3D design software approved by Saudi Aramco. It is Contractor responsibility to request the approved Data-Centric 3D design software name and version, database software name and version, and the approved 3D Template from EK&RD.
CONFLICTS AND DEVIATIONS
Any conflicts between this appendix and other applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs) shall be resolved in writing with EK&RD.
REFERENCES
Refer to applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs).
SCOPE
4.1
4.2
4.3
4.4
4.5
4.6
Contractor shall follow this appendix as the basis for 3D modeling and generating the applicable drawings, as listed in Section 8 of this appendix, using the approved 3D software by Saudi Aramco.
This appendix defines the software version, project set up, guidelines for modeling, the minimum data to be populated in the database and the types of drawings to be generated.
Contractor shall carry out the necessary customizations required for modeling and subsequent drawing generation.
The technical contents of the engineering drawings including engineering data properties, attachments and any other engineering information related to piping, equipment, structural, instrumentation, electrical cable trays shall follow SAESs and SAEPs.
All Drawings & Reports submitted to Saudi Aramco shall have customized title block as per Section 6 of this standard.
The drawings generated using the approved software shall be submitted to Saudi Aramco as per Section 16.2 of SAEP-334.
©Saudi Aramco 2020. All rights reserved.
Page 64 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings The project delivery to Saudi Aramco shall be done according to this appendix.
SAES-A-202
The final Project backup delivered to EK&RD shall have all the models and related drawings in ‘As-built’ stage.
Contractor shall upgrade the 3D model to the latest versions of the Data-Centric 3D software and database approved Saudi Aramco at the time of final delivery.
4.7
4.8
4.9
PROJECT SET-UP FOR 3D MODELING
5.1 General
5.1.1
It is Contractor responsibility to request the approved Data-Centric 3D Design software name and version, database name and version, and the 3D Database Template from EK&RD.
5.1.2
Contractor shall perform the project setup as per this appendix.
5.2
Project Set up
A project is the fundamental structure for working in 3D modeling software; each project contains all the information required to work.
Design Contractor shall consult with EK&RD before setting up the specific project hierarchy and naming convensions.
5.2.1
The project plant “Plant/Area/Unit.” as defined in iPlant.
structure must
comply with Hierarchy
• Plant shall be Saudi Aramco’s Facility Abbreviation (e.g., HGP, KGP). Its description shall be the facility name (e.g., “Hawiyah Gas Plant” for HGP)
• Area shall be Saudi Aramco’s Plant Name (e.g., X89, H46)
• Unit shall be Saudi Aramco’s Unit Name (e.g., 611, 010)
5.2.2.
The Project, Design Area and Model Naming conventions, criteria for deciding the Design Area and models are defined below.
When initializing the project, contractor shall use the following, as applicable:
Project Name: This shall be the facility name, e.g., HGP or KGP, if the entire Plants under this facility are covered in a single project. Project naming shall be coordinated with EK&RD.
Project Description: A brief description such as Khursaniyah Gas Plant Project, Hawiyah Gas Plant Project, etc.
©Saudi Aramco 2020. All rights reserved.
Page 65 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Company/Owner: Saudi Aramco
Site: BI Number
Plant Name: Expanded form of the facility name if Project number is facility name. Otherwise, Plant Descriptions can be used.
It is vital that Piping, Equipment, Civil, Instrument, and Electrical disciplines designers liaise at project commencement to agree on global origin and coordinate system. If a plant coordinate system is specified by Saudi Aramco for the project, it shall be used.
5.2.3
Project Hierarchy Based on Design Areas
The Design Areas & Models under each Discipline shall be created as per the following guidelines:
Design Area: Design areas shall be created for each Plant discipline wise.
Design Area Name: The design area naming shall be done as per the following naming convention:
Discipline Code – 1 char as per below table
Code
Discipline
A
C
E
F
G
I
M
P
R
S
Architecture
Civil
Electrical Equipment
Fire Protection and Safety
General
Instrumentation
Mechanical Equipment
Piping
Raceway Cable Trays
Structural
Area name – 3 to 4 characters. (Consistency to be maintained in the number of characters)
Design Area sequence no – two digit integer like 01, 02. As examples Piping Design Areas in Plant K45 will be P_K4501, P_K4502 etc. Similarly, Equipment Design Areas in Plant K45 will be M_K4501, M_K4502, etc.
©Saudi Aramco 2020. All rights reserved.
Page 66 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Design Area Description: Suitable description to be given. The area descriptions given below for the design areas P_K4501 & P_K4502 can be taken as guidelines.
LAUNCHER & RECEIVER PIPING 15 M to 20M LAUNCHER & RECEIVER PIPING 20M to 25M
Model: The models shall be created in respective disciplines under respective Design Areas. The model number & model descriptions shall be done in such a way that a user can locate a plant item from the correct model and the correct design area with ease.
Model Number: The Model number shall reflect the Discipline, Design Area & Sequence number. The model naming shall be done as per the following naming convention.
Design Area name – As specified above.
Model sequence no- a two digit integer as 01, 02.
For example: the piping models in P_K4501 design area shall be P_K450101, P_K450102, etc. Similarly first Equipment Model in Design Area M_K4502 shall be M_K450201. The second equipment model in the same Design Area shall be M_K450202.
Model Description: Two ways can be adopted to give the Model Description and the suitable one shall be used consistently. If it is not specific to certain volume within the design area, Description, Discipline & Model no. (E.g., WATER INJECTION PLANT PIPING MODEL #1) shall be used. If the model is specific to certain volume within the design area, the model name shall reflect the same, e.g., K44 FEED SURGE DRUM PIPING.
©Saudi Aramco 2020. All rights reserved.
Page 67 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
5.2.4
Systems Based Project Hierarchy
5.2.4.1 Alternatively, if the project is based on systems hierarchy, the systems shall be a concatenation of following with an underscore between the third and fourth items:
• Discipline Type Name
• Saudi Aramco Plant Name (X88)
• Saudi Aramco Unit Name (100)
• Two Digit Sequence Number or Logical Naming
Convention per Contractor
Example when Plant and Unit are different:
System Type
Default Name
Piping System
PipngX88100_01
Equipment System
EqpX88100_01
Electrical System
ElecX88100_01
Conduit System
CndtX88100_01
Structure System
StrctX88100_01
Generic System
OfflinstrX88100_01
Example when Plant and Unit are same:
System Type
Default Name
Piping System
PipngX88_01
Equipment System
Electrical System
Conduit System
Structure System
EqpX88_01
ElecX88_01
CndtX88_01
StrctX88_01
Generic System
OfflinstrX88_01
5.2.4.2
5.2.4.3
All disciplines (Piping, Equipment, Electrical, Conduit, Instrumentation, and Structural) shall be created under the unit level only.
Pipeline Systems shall be created under the piping system of the applicable unit. The name of the Pipeline system shall consist of two parts separated by a single dash (e.g., CWS-0001):
• Fluid Code (e.g., CWS) • Piping System Sequence Number (e.g., 0001)
©Saudi Aramco 2020. All rights reserved.
Page 68 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024 5.2.4.4
Saudi Aramco Engineering Drawings
SAES-A-202
Pipe runs shall be created under the appropriate Pipeline System and both shall have the same sequence number. The name of a pipe run shall be the tag number as specified in Section 10 of this standard.
5.2.4.5
5.2.4.6
Contractor shall share with EK&RD the philosophy of starting and ending Pipe Runs prior to commencement of 3D Modeling.
Contractor shall share with EK&RD the philosophy of starting and ending Pipelines prior to commencement of 3D Modeling.
5.2.4.7
The Equipment Discipline shall have the following sub-systems (Mechanical, Vessel, Heat Transfer, and Miscellaneous).
5.2.4.8
5.2.4.9
The Electrical, Conduit, and the Structural sections do not require subdivisions; however, Contractor may subdivide them as per project requirements and best practices.
Contractor may further organize the subsystems of the disciplines other than Piping (Equipment, Electrical, Instrumentation, and Structural) into further logical subsystems according to the Contractor’s best engineering practices. However, this organization structure must remain consistent for the entire project.
5.3
3D Database Template
5.3.1
If available, Contractor shall create the 3D design using the Saudi Aramco 3D Database Template. It is contractor’s responsibility to ensure that all information in the template complies with the latest applicable Saudi Aramco standards.
5.3.2 The 3D Database Template consists of a Catalog, Naming Rules, and Drawing Borders. The Catalog is a comprehensive computer specification that lists the Piping Material Classes of the SAES-L-105 (Saudi Aramco Piping Specification). The Naming Rules applies Saudi Aramco Standard naming convention to Pipe Runs, Mechanical Equipment, Electrical Equipment, Instruments, Cables and Conduits, and Drawings.
5.3.3 To maintain uniqueness of Line Class names in the template, suffix “_1” shall be added to Line Classes of Part-I of SAES-L-105 in case of duplication with Part-II, i.e., (1CA1P_1 for Part I, and 1CA1P for Part II).
©Saudi Aramco 2020. All rights reserved.
Page 69 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings 5.3.4 Contractor shall add any customizations that do not exist in the template but are required for the project after obtaining approval from EK&RD. Examples of these customizations include but are not limited to:
SAES-A-202
• Adding or modifying Piping Line Classes • Adding or modifying components • Creating or modifying Drawing Borders
5.3.5 Contractor shall populate all title block attributes in the applicable
properties as set in the template. It is the Contractor’s responsibility to ensure that any of these automatically populated values are correct.
5.3.6 Contractor shall configure the requested numbers for tags and drawings
prior to loading the Template. It is the Contractor’s responsibility to ensure that the automatically generated Tag and Drawing Numbers are correct and comply with the naming convention of this standard.
5.3.7 For calculated wall thicknesses, the Design Engineering team is required
to submit a Safety Instruction Sheet per the appropriate Saudi Aramco Standards and submit it for verification as part of the design package.
5.3.8 Contractor acknowledges that the Template is provided as a design
reference tool only and is not a substitute for Engineering Design. For example the template automatically selects materials for a given pipe and assigns wall thicknesses based on inputted temperature and pressure. These are provided as a reference only and it is the Contractor responsibility to make them appropriate for the project design.
5.3.9 Contractor shall ensure that all automatically calculated properties,
placed components and derived attributes are appropriate for the project design and comply with all applicable Saudi Aramco standards. A procedure for modifying automatically placed wall thickness is available upon request.
5.3.10 Contractor shall record all modifications to the Template by logging
them in the issue log form.
5.3.11 Contractor shall highlight any add, modify, delete changes.
5.3.12 Contractor shall submit the modified Catalog in its final form as part of
the deliverables.
NAMING CONVENTIONS
The following naming conventions for the plant items shall be followed wherever applicable.
©Saudi Aramco 2020. All rights reserved.
Page 70 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.1
Pipe Run (Line Number) Label
Refer to Section 10 of this standard for the Saudi Aramco pipe tag naming convention. An Example is provided below for your reference:
Example: 2-1/2”-CWS-1234-1CS1P1
The default definition shall be followed for the line id (Fluid Code + Line Sequence Number).
6.2
Equipment Tag Naming Convention
Populate the Equipment Number in the following format, ensuring that the Equipment Tag matches the Data-Centric P&ID Equipment Tag.
Refer to Section 10 of this standard for the Saudi Aramco equipment tag naming convention. An Example is provided below for your reference:
Example: K45-GM-0001
6.3
Instrument Tag Naming Convention
Populate the Instrument Tag Number in the following format, ensuring that the tag number matches the Data-Centric P&ID and Data-Centric Instrumentation databases.
Refer to Section 10 of this standard for the Saudi Aramco instrument tag naming convention. An Example is provided below for your reference:
Example: H46-21-FIT-0001
MODELING
7.1
Equipment Modeling
The main purpose of equipment modeling is to provide 3D shapes with intelligent tags, for extracting plot plans, space reservation for clash detection, provide nozzle orientation drawings and reports, inter- discipline reference and to be indicative of the actual shape for design review purposes.
Equipment items shall be built using the parametric equipment available wherever possible, e.g., for horizontal and vertical vessels, pumps, air coolers, and exchangers. Primitive shapes shall only be used if no parametric equipment is available.
All items modeled must have a datum point.
©Saudi Aramco 2020. All rights reserved.
Page 71 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings The following items are required to be modeled using the approved 3D design software:
7.1.1
7.1.2
7.1.3
All Equipment (new, future and existing) as applicable and above grade portion of foundations shall be modeled.
Packages such as Air compressors and Lube oil consoles shall be modeled with sufficient detail.
Platforms (Slabs) and ladders attached to equipment and supplied by vendor (such as for dressed vessels or fin fan motor access)
7.1.4
All nozzles.
7.1.5
Equipment withdrawals drop out zones, manway and hatch access shall be modeled with the correct aspects and shall be associated to the equipment.
7.1.6
Buildings (use block shapes) including all entrances and exits.
7.1.7
Safety, maintenance and access ways (including corrosion probe withdrawal areas), main escape routes and vehicle access shall be modeled with the correct aspects and shall be associated to the equipment.
7.1.8 Miscellaneous steel and platforms.
7.1.9 Major electrical equipment, control panels and junction boxes
(by Electrical).
7.1.10 Foundations supporting horizontal vessels and exchangers from
grade.
7.1.11 Skid mounted equipment shall be modeled in the same level of detail as non-skid mounted equipment and in sufficient detail to enable interface connections, lifting and handling requirement.
and maintenance
clearances,
access
7.1.12 Level instruments.
7.1.13 Bases for models, vehicles, personnel and operators.
7.1.14 Minimum properties to be keyed in for Equipment are Equipment Tag Number, Equipment Name, and insulation thickness. All these values shall match the P&ID.
©Saudi Aramco 2020. All rights reserved.
Page 72 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings 7.1.15 The minimum required nozzle attributes shall be Tag Number, and End
Size, Pressure Rating, Piping Material Class Preparation.
7.1.16 All Tagged Items shall be modeled and match with the
corresponding Tag in the P&ID.
7.2
Piping Modeling
Piping design shall take responsibility for plot space management, but all disciplines are equally responsible in a clash free design. Civil, Instrument and Electrical shall reference Equipment and piping models at all times.
No hand annotation of isometric dimension or Bill of material is acceptable.
7.2.1
All above ground piping larger than ½” & all underground piping shall be modeled. This includes all in-line items, instrumentation such as pressure points and thermowells, vessel trim piping including level Instruments, pipe supports, and firefighting systems.
7.2.2
The slope of pipelines, flare lines, sewer lines, airlines, and other lines which are sloped shall be modeled.
7.2.3
All pipe fittings shall be modeled.
7.2.4
All valves used in P&IDs shall be modeled. The model shall incorporate, but not limited to, the following:
Instrument Root valves
• • Chain operators • Valve extension stems • Motor Operators • Gear operators • Control valve operators
7.2.5
7.2.6
All branch connections for in-line instruments shown on the P&ID shall be modeled.
Level instruments forming part of vessel trim shall be modeled and shall be shown on the isometric drawings. In order to overcome disjointed isometrics resulting from trim line numbers, each separate portion of the line shall be given a suffix after the
©Saudi Aramco 2020. All rights reserved.
Page 73 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings main line number, i.e., line number 100 shall have suffix 100A, 100B, etc.
7.2.7
Pipe supports for lines larger than 2” shall be shown in the 3D model.
7.2.8
Pipe Run/Piping Segment Data shall be in sync with P&IDs.
7.2.9
Pipe Run/Active Segment shall have all the applicable data properly filled. Normal Operating Pressure & Temperature, Normal Design Pressure & Temperature shall be available for each pipe run/segment.
7.2.10 Unit Code shall have the Plant Numbers such as K81, K82, etc. Unit Number shall bear the Unit numbers such as 21, 22, etc., if applicable. It is mandatory to correlate the lines with the P&IDs, where Plant/Area/Unit (PAU) hierarchy shall be followed.
7.2.11 Tags and associated data shall be entered in consistent manner
as defined by this appendix.
7.2.12 Pipe/Line material class shall comply with SAES-L-105.
7.2.13 Pipe class service/fluid codes shall comply with SAES-L-105.
7.2.14 Piping Spec Customization shall follow SAES-L-105. Required customization shall be done to have the correct tables in the relevant Library. Ensure that each ‘PMC’ refers to the correct Diameter Table, Fluid Code, Service Limit Table, Branch Tables, Thickness Tables, etc., and each of these have the entries as per SAES-L-105 only.
7.2.15 Piping designers must continually monitor the P&IDs and Steelwork for changes and take corrective actions to ensure consistency.
7.2.16
If specification (spec) change occurs, it is often better to remodel than attempt to revise existing segment and pipe.
7.2.17 Due to potential of creating overlapping segments, the use of isolated,
for very simple,
automatic placement, except configurations is discouraged.
7.2.18 Piping shall carry all attributes required in accordance with the piping line lists and additional attributes associated with construction, commissioning, inspection and testing.
©Saudi Aramco 2020. All rights reserved.
Page 74 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings Insulation shall be dimensionally correct around all components.
7.2.19
SAES-A-202
7.2.20 Process, Utility and drain piping of all sizes as shown on the
P&ID shall be modeled.
7.3
Structural Modeling
This section describes the general model requirements and the procedure for correct modeling.
7.3.1
All structural steel and concrete structures shall be modeled including columns, beams, platforms, floors, ladders and stairs, bracing, pipe racks and pipe supports. All structural objects must have proper relationships with each other.
7.3.2
Large connection plates, base plate stiffeners and bracing gusset plates shall be included in the model.
7.3.3 Miscellaneous materials such as small gusset plates, stiffener
plates, angle plates, etc., can be exempted from modeling.
7.3.4
The model must be at the correct plant co-ordinates.
7.3.5
The model shall be dimensionally 100% accurate.
7.3.6
The physical members of the model must exactly correspond to the intended individual members of the erected structure.
7.3.7 When horizontal bracing passes below platform beams neither
the beams nor the braces shall be split.
7.3.8
Column splices must be in the correct location, separating individual physical members.
7.3.9 Member orientations must be correct especially vertical braces.
7.3.10 Fireproofing type, thickness, etc., shall be applied to all
structural members that are fireproofed.
7.3.11 Anchor bolt chairs and anchor bolt projection above the base plate shall be modeled if there is any potential for interference with equipment, piping, electrical items.
7.3.12 Members must be modeled to the proper work points’ Horizontal bracing and members used for lateral restraint must be at the correct T.O.S. elevation. Vertical bracing must be modeled to the actual work points.
©Saudi Aramco 2020. All rights reserved.
Page 75 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
7.3.13 The model must match
Saudi Aramco Engineering Drawings drawings. relevant When modifications are necessary, the model must be changed, the frozen views updated, and the drawings revised.
all
7.3.14 Beam lengths shall account for framing clearances. e.g., when beams are connected at the outside of a cantilever portion of a structure, the beam that is being framed into shall be modeled to the outer flange of the connecting beam.
7.3.15 The structural model shall be based on the American Institute of
Steel Construction (AISC) Section Table.
7.3.16 All members must be placed with the correct orientation.
Braces must be placed with correct work points and orientation, such that the model matches the planned structure, as it will be erected. When braces cross members to which they are not connected, the braces must be placed such that they are continuous and not overlapping.
7.3.17 Braces shall be moved to the correct work points.
7.3.18 Offsets are used for moving the member cross-section relative to the member line. This is required when the section is offset to a point Offsets are used to offset members (horizontally and vertically) from their placement point, whilst retaining their integrity with the member they were placed on, for example:
represented with a cardinal point.
is not
that
a) Horizontal Braces
The brace member line is placed at the same elevation as the other members at that level, and then the brace is lowered to avoid overlapping.
b) Girts
Girt member lines are in the same plane as the column centroid. The cross-section is rotated and the cardinal point is set such that the cross-section extends from the centerline of the column outwards.
c) Members that are placed above or below other members,
but are in contact with these members.
Note. The place beam and place horizontal brace commands
include a field (delta TOS) for vertically offsetting the member from the given elevation. Alternatively, ‘the
©Saudi Aramco 2020. All rights reserved.
Page 76 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
modify offset’ command from the manipulate tool palette may be used.
7.3.19 Double angle channels shall be modeled as individual physical members and include the separation distance between the angles to accommodate the connection plate thicknesses.
7.3.20 All models shall have a propagated (frozen) data to enable access by other disciplines. This is a solid model showing the true representation of all structural elements and therefore the preferred data for reference. Generation of subsequent update of the frozen model is the responsibility of the structural modeler.
7.3.22 Finalize the paving and grading plan, obtain the (Finished Grade Level (FGL) elevations, and reflect that in the model. If you are working in existing facility, verify that the model matches existing FGL.
7.4
Electrical Raceway Modeling
All above ground cable trays 150 mm wide and over shall be modeled, including risers from underground ducts. In congested areas or where a number of trays less than 150 mm wide run side by side, smaller trays may be placed for space reservation purposes. Cable trays and ladder racks less than150 mm wide shall also be shown where routed to motors and control stations.
Electrical Junction boxes (with a length greater than 250 mm in any direction), Light Fittings and Control Stations shall be modeled for space reservation by placing a Manual Fitting.
7.5
Volumes and Groupings
7.5.1
7.5.2
Contractor shall create the necessary Drawing Volumes. The hierarchy and naming of the Drawing Volumes shall match the hierarchy of the applicable Drawings.
Contractor shall, at least, create groupings (or ability to search/filter) the 3D components in the 3D model by Saudi Aramco Plant. This shall enable the generation of a 3D model review for each plant separately.
DRAWINGS AND REPORTS
8.1
The drawing types that can be generated from the approved software include, but not limited, the types mentioned in the below table.
©Saudi Aramco 2020. All rights reserved.
Page 77 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings Any drawing type required by the plant operation from the below table shall be generated by Contractor using the approved software.
INDEX
DRAWING TYPE
DESCRIPTION
A
L
M
J
P
EQA
FPP
ISO
PDT
PPL
PPL
SDT
SDT
SDT
SDT
SDT
SDT
SDT
RAK
RAK
CBL
CBL
CBL
CBL
EQUIPMENT ARRANGEMENT/LAYOUT/ LOCATION/LEGEND
FACILITY PLOT PLAN
ISOMETRIC PIPING DETAIL/ISOM
PIPING SECTION/DETAIL/ELEVATION
PIPING PLAN/LAYOUT/ARRANGEMENT
PIPELINE ROUTING (ABOVE /UNDER GROUND/SUB MARINE)
OFFSHORE PLATFORM PLAN/SECTION/ELEVATION/DETAIL
PIPE RACK DETAIL
PIPEWAY SLEEPER PLAN/SECTION/ELEVATION
ROOF FRAMING PLAN/SECTION/ELEVATION
STRUCTURAL ELEVATION/LAYOUT/PLAN
STRUCTURAL PLATFORMS
WALKWAY PLAN/SECTION/ ELEVATION
INSTRUMENT RACK LAYOUT
RACK LAYOUT
CABLE TRAY/RACEWAY PLAN/LAYOUT
CONDUIT LAYOUT
CONDUIT RACEWAY PLAN/LAYOUT
CONDUIT & JUNCTION BOX ARRANGEMENT
8.2 When modifications are necessary, Contractor shall update the 3D model and regenerate any affected drawings. Drawings shall always reflect the current status of the 3D model. The final 3D model and drawings shall be revised to reflect the As-built status of the plant.
8.3
8.4
8.5
Drawings Hierarchy Structure shall match the hierarchy in the 3D model, which is comprised of Saudi Aramco Facility, Plants, and Units.
Contractor shall generate drawings under the applicable parent directories to which they belong (i.e., the Piping Plan of a unit shall be placed under the parent unit and the Facility Plot Plan of a plant shall be placed under the parent plant).
A folder containing Facility Plot Plans (FPP) of Saudi Aramco Plants shall be created under the respective Saudi Aramco Plant level. All other drawing types (ie ISO, EQA, PPL, etc.) shall be placed under their respective folder created under the Unit level. The drawing folder name shall be the drawing type as per the table in 8.1 of this appendix above.
©Saudi Aramco 2020. All rights reserved.
Page 78 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings Drawing Names shall follow the Saudi Aramco Drawing Number format.
SAES-A-202
8.6
8.7
8.8
8.9
Drawings and Reports submitted to Saudi Aramco shall have customized Title Block as per Section 6 of this standard.
Contractor shall add the Facility Key Plan to each drawing type except isometric and ensure that the arrow is pointing to the correct location.
Add the Key Map to each Drawing Border except isometric and ensure that the arrow is pointing to the correct location in the Key Map (Saudi Aramco Plant or Unit).
8.10
Isometric Drawings shall have the Saudi Aramco Drawing Number of the continuation isometric drawing, when applicable (i.e., CONT ON BA- 123456001).
8.11 The minimum isometric drawings data requirements are:
• Standard Detail Reference Drawings • Notes • Spools to be fabricated by Vendor • Spools to be fabricated by Saudi Aramco • Reference Drawings • • Revision Validation • Bill of Materials • Shop Materials • Pipe Support Details • Other than Shopping Materials
Issued for Construction Stamp
13.2 Required Data at the bottom of isometric drawing:
• General Notes • Piping Material Class • Design Temperature • Design Pressure • Operating Temperature • Operating Pressure • Test Pressure • Test Medium • Radiography %
o Shop o Field Insulation o Thickness
•
©Saudi Aramco 2020. All rights reserved.
Page 79 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
o Type
• Stress Analysis Required Y/N
o If Yes provide Drawing Number ie Safety Instruction Sheet
• Line ID
DATA CHECKS & CLEANUP
9.1
General
• All temporary areas, models, files and directories, systems, drawings,
volumes and WBS items shall be removed prior to delivery.
• All Equipment and Electrical Raceway models shall be loaded to
Database.
• All hierarchies must be clean and accurate. There should be no design objects at the root level, including but not limited to, Equipment, Pipelines, Member systems, etc.
• The 3D Database shall be clean of errors and has no pending actions.
• The complete model shall be free of clashes. Interference checking shall be run periodically to ensure clash free environment. The model shall be capable of executing interference checks and generating reports of “hard” and “soft” clashes, for resolution. “Hard” clashes refer to actual physical interference of equipment, while “soft” clashes refer to interference with space required for maintenance and operation purposes. Equipment and other components and the space allocated shall be modeled to the extent necessary, and to ensure the validity of the clash check. Construction tolerances shall be included in interference checks.
9.2
Piping
• Piping isometrics must be generated successfully for all pipelines. Lines that fail to extract correctly need to be modified prior to delivery.
• Piping Design Database shall be without errors for all Piping Models.
• The model shall be up-to-date with the reference data. All applicable verification reports shall be run and sent to Saudi Aramco as part of the submittal.
9.3
Structural
• The Structural Model shall be without errors. • Temporary views and objects shall be removed. • Propagated model shall be updated.
©Saudi Aramco 2020. All rights reserved.
Page 80 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
PROJECT DELIVERABLES
Contractor shall ensure that all the models & the data in the backup are in As-built state. The final 3D model submittal shall be one combined (merged/consolidated) for the entire project\facility, regardless whether one or multiple contractors are working on the project. The deliverables submitted shall contain, but not limited to, the following:
10.1 Complete backup of the plant 3D model and all its associated drawings and data using the approved version of the 3D design and database software.
10.2 Complete file structure of the Project including all models, reference data, drawings, the project seed, configuration, Drawing Border files, etc.
10.3 Review models/files for the whole project shall be generated and submitted to Saudi Aramco. Review models/files shall also be generated for each plant individually if the project covers multiple Saudi Aramco Plants. The review models/files shall reflect the latest and most updated models and it shall be generated prior to submittal.
10.4 Complete Project archival backup.
10.5 Complete Reference Data.
10.6 All the forms including customized forms and files used in the project.
10.7 All Piping Component Data and Piping Material Class data used in the
project.
10.8 All Isometric seed used for extracting Piping Isometrics.
A text file containing clear instructions of the used seed files (border, definition file, etc.) for restoring and generating Isometrics.
10.9 All report formats used for report extraction.
10.10 Following Reports shall be generated before data handover and made
available in the reports folder under the file structure:
• Final interference Check Report. • Final verification report for all the models. • Reference data conflict report for all the models. • Equipment report. • Model list report. • Line list report.
©Saudi Aramco 2020. All rights reserved.
Page 81 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
• Material Take-Off Report • Hierarchy Report
10.11 Piping Isometric drawings, piping plan & other orthographic drawings as per Section 8 of this appendix. Drawings submitted to iPlant and the drawings generated from 3D modeling system shall be the same in the native format of the generation tool.
10.12 Submittal form shall be delivered with every submittal. It shall contain complete information about the delivery and list of all generated drawings.
10.13 All customized and external reference files and programs required to
utilize the full functionality of the submitted 3D model.
©Saudi Aramco 2020. All rights reserved.
Page 82 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Appendix F – Data-Centric Instrumentation Specification
INTRODUCTION
This appendix defines the requirements for preparing the Data-Centric Instrumentation Drawings and other related documents for Saudi Aramco using the Data-Centric Instrumentation design software approved by Saudi Aramco. It is Contractor responsibility to request the approved Data-Centric Instrumentation design software name and version, database name and version, and the Instrumentation Template from EK&RD.
CONFLICTS AND DEVIATIONS
Any conflicts between this appendix and other applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs) shall be resolved in writing with EK&RD.
REFERENCES
Refer to applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs).
SCOPE (General)
4.1
4.2
4.3
4.4
Contractor shall follow this appendix as the basis for building the Data- Centric Instrumentation drawings to be submitted to EK&RD.
All documents associated with instrumentation data shall be generated automatically from the Data-Centric Instrumentation software without any post-modification as per Section 16 of this appendix. The generated documents shall comply with (SAESs and SAEPs).
This appendix defines the set-up, design and instrument tag naming conventions, and required data.
Contractor shall obtain the approved Data-Centric Instrumentation Template from EK&RD in order to develop SAES-compliant instrumentation drawings. Any additional customizations required by the project shall be carried out by the contractor after obtaining EK&RD approval.
4.5
The drawings and documents generated shall be submitted to Saudi Aramco in compliance with this standard and SAEP-334.
©Saudi Aramco 2020. All rights reserved.
Page 83 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings The final Data-Centric Instrumentation database delivered to EK&RD shall have the entire drawings and data in ‘As-built’ stage.
Contractor shall upgrade the Data-Centric Instrumentation database to the latest approved version at the time of final data delivery.
The final Data-Centric Instrumentation delivery shall be one combined (merged/consolidated) database for the entire project\facility, regardless whether one or multiple contractors are working on the project.
4.6
4.7
4.8
DATA-CENTRIC INSTRUMENTATION SET-UP
5.1 General
5.1.1
Contractor shall use the latest approved version of the Data- Centric the instrumentation design database.
Instrumentation Template
setting up
for
5.1.2
Contractor shall perform the initial setup in-line with EK&RD design convention as per this appendix.
5.2
Data-Centric Instrumentation Project Initialization
Contractor shall request EK&RD for the parameters that he shall use for initializing the Data-Centric Instrumentation for the project.
5.3
Plant Hierarchy Structure (PAU)
The project plant structure shall be defined as “Plant – Area – Unit”. The values of facility name, plant number, plant description, unit number and unit name shall be used as defined in iPlant.
Data Hierarchy Format:
PAU
Plant
Area
Unit
Required
Values
Yes
Yes
Yes
Facility Name/Description
Plant Number/Description
Unit Number/Description
5.4
Naming Conventions
The naming format of Instrument, Loops, Cables Equipment’s and Lines tags shall comply with Section 10 of this standard. The template database is pre-configured with these naming conventions.
©Saudi Aramco 2020. All rights reserved.
Page 84 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings Drawing Numbers naming format shall comply with Section 6 of the standard.
5.5
Units of Measure (UOM)
Unit of measures (UOM) shall comply with SAES-J-003 and SAEP-301.
INSTRUMENT INDEX DATA
The instrument index shall be developed in conjunction with the P&IDs. The index serves as the indices to each individual instrument (hard or soft tag) and supporting documents and drawings.
The tags to be added to the database include:
Implied instrument tags on the P&ID, based on project requirements
• All visible instrument tags on the P&ID, including soft tags • • Vendor tags, based on project requirements • Control Systems tags
Tags and associated data are to be entered in full and consistent manner. This shall aid in future sort and reports developed as the project progresses. All entries into the index shall be in upper case.
Tags shall be delivered with the following associations: Loop data, manufacturer data, P&ID references, line number details, process data, calibration data and required fields as specified in this appendix. All face data appears on Saudi Aramco Instrument Installation Schedule (IIS) shall be filled in.
Legend:
Min – This data must be filled when entering any new tag as a minimum. IIS – This data appear on the Installation Schedules
No
Required Data
Remarks
Min IIS
Tag Number Tag Class Instrument Type Tag Service Description Loop Number Loop Measured Variable Loop Type Loop Function Loop P&ID Loop Note Internal Loop Order
1 2 3 4 5 6 7 8 9 10 11 12 Status
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
✓ ✓
©Saudi Aramco 2020. All rights reserved.
Page 85 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Remarks
Min IIS
Required Data
No 13 Supply Responsibility 14 Operating Area 15 Risk Area 16 Parallel Area Location 17 I/O Type 18 19 Signal Type 20 System Type 21 I/O Location 22 Device Protocol 23 Equipment 24 Line 25 P&ID 26 Manufacturer 27 Model 28 Power Supply 29 Package Vendor 30 Aramco MR Number 31 MR Number 32 MR Item Number 33 34 35 Mounting Type
ISS Drawing Number ILD/ISD Number
(Instrument Points & Lines Layout) (Piping Isometric)
Applicable to MOV/AOV/HOV/GOV IIS drawings Applicable to Relief Valves IIS dwg
Lower Range Limit Upper Range Limit Engineering Unit
36
Instrument Mounting Drawing No.
Instrument Piping Detail Drawing No.
37 38 Remark - IIS 39 Remark - Design 40 Remark - Engineering 41 Remark - Vendor 42 Remark - PCS Group 43 Remark - Domain Admin 44 Remark - PCS Vendor
45 VOD Tag No.
46
Insp. Mark No.
47 Control System Tag 48 Service Descriptor 1 49 Service Descriptor 2 50 Min DCS Range 51 Max DCS Range 52 DCS Range UOM 53 Alarm High 54 Alarm High High 55 Alarm Low 56 Alarm Low Low 57 High Trip
✓ ✓
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
✓ ✓
✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
✓ ✓
✓ ✓ ✓
✓
✓
✓ ✓ ✓
©Saudi Aramco 2020. All rights reserved.
Page 86 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Remarks
Min IIS
FF Segment Name
I/O Address
Required Data
No 58 High High Trip Low Trip 59 60 Low Low Trip 61 Alarm Priority 62 Sequence Of Events (SOE) 63 64 Valve Action on Power Failure 65 Control Action 66 Valve Critical Level 67 Contact Open 68 Contact Close 69 State 0 Descriptor 70 State 1 Descriptor 71 State 2 Descriptor 72 Redundancy 73 Simple PID Controller 74 Switch Label 75 Scan Type 76 Input Type 77 Pulse Rate 78 79 Modbus Address 80 Modbus Station 81 Modbus Alias 82 Modbus Signal Data Type FF Segment 83 FF Device Tag 84 FF Device Address 85 86 FF Device Type 87 Deviation Alarm 88 Deviation Comparison F&G Zone 89 90 Lower Transducer Range Limit 91 Upper Transducer Range Limit 92 Transducer Engineering Units 93 Substation 94 Logic System No 95 Bench Condition
Totaliser Timebase
96 MOS Required
97 MOS Group Number 98 MOS Alarm 99 Damper Required
100 ATFO Required
101 Signal Repeater Required 102 Surge Arrestor Required 103 Low Scale (mA) 104 High Scale (mA)
Maintenance Override Switch
Automatic Transfer Fault Override Criteria
©Saudi Aramco 2020. All rights reserved.
Page 87 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
No
Required Data
Remarks
Min IIS
105 Under Range 1
106 Under Range 2
107 Over Range 1
108 Over Range 2
109 LAS Function
110 ITK Revision 111 DD Revision 112 CFF Revision
113 PFD Drawing Number
114 Valve Type
115 Valve Size
116 Rating
117
INLET Size
118
INLET Rating
119
INLET Facing
120 OUTLET Size
121 OUTLET Rating
122 OUTLET Facing
123 Orifice Area
124 Set Pressure
6.1
Tag Number
Transmitter Under Range Position 1 Transmitter Under Range Position 2 Transmitter Over Range Position 1 Transmitter Over Range Position 2 Device Class Basic or Link Master Device Revision DD File Revision Capability File Revision Applicable to (Relive Valve) IIS drawings. Applicable to MOV/AOV/HOV/GOV IIS drawings Applicable to MOV/AOV/HOV/GOV IIS drawings Applicable to MOV/AOV/HOV/GOV IIS drawings Applicable to Relief Valves IIS drawings Applicable to Relief Valves IIS drawings Applicable to Relief Valves IIS drawings Applicable to Relief Valves IIS drawings Applicable to Relief Valves IIS drawings Applicable to Relief Valves IIS drawings Applicable to Relief Valves IIS drawings Applicable to Relief Valves IIS drawings
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
This field provides the alphanumeric identification of all instruments, including soft tags.
6.2
Tag Class
©Saudi Aramco 2020. All rights reserved.
Page 88 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Tag Class
Description
Conventional
Foundation Fieldbus
Profibus-DP
Profibus-DA
HART
A tag number that does not belong to the Fieldbus, telecom, electrical, or typical class. An instrument associated with a Foundation Field segment. An instrument associated with a Profibus DP (Decentralized Periphery) segment. An instrument associated with a Profibus PA (Process Automation) segment. A ‘Highway Addressable Remote Transducer’ instrument.
6.3
Instrument Type
Denotes the instrument type. Examples: PRESSURE TRANSMITTER, PRESSURE GAUGE, etc. These descriptions shall be defined in instrument type supporting table as per SAES-J-003 and duplicate instrument types shall be avoided. .
6.4
Tag Service Description
This field is used to define the overall use or service for an instrument. It is normally referenced on data sheets, nameplates, loop drawing titles, and the IIS. It shall be concise and precisely describes the process service of the instrument.
6.5
Loop Number
This field indicates the tag’s associated loop identification number. It is important to get this association correct to facilitate correct loop generation.
All tag numbers in the index shall have a Loop Number except for the gauges, test wells and relive valves.
The following table lists the minimum required data against a Loop Number that has to be populated:
Field
Required
Remarks
Loop Number
✓
Loop Measure Variable
✓ i.e., FLOW (F), LEVEL (L), etc.
Loop Type
Loop Function
Loop P&ID
✓ Typical Loop Number Ref
✓
i.e., CONTROL INDICATING, RECORDING, etc.
✓
©Saudi Aramco 2020. All rights reserved.
Page 89 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Field
Required
Remarks
Loop Note
✓
6.6
Internal Loop Order
The order of the tags within the loop is normally in the order in which they have been entered into the loop number. Usually, they are sorted by physical order from primary to final element.
This determines the order in which they appear on the ILD’s and how the IIS is sorted.
6.7
Status
This field is used to determine whether an instrument is new, old, to be relocated, existing, deleted, etc. This data is used to identify the status of the instrument and to help filter the data. The status value is selected from the Status Support Table. A null entry is default in this field and it is intended on the Project that this represents a new instrument.
Status
Description
blank
DEL
EIP
ER
FN
OLD
REL
Current Tag (Default)
Deleted Tag Number
Existing Device to be reused in place
Existing Device to be relocated and reused
Furnished by others
Old device not to be revamped
Relocated Device
6.8
Supply Responsibility
Used to define the instrument supply responsibility such as:
Name
Description
blank
Supplied by Contractor (Default)
Not Applicable (i.e., Software Tags)
BY VENDOR
Supplied by Vendor
BY ELECTRICAL Supplied by Electrical
BY PIPING
Supplied by Piping
- Supply Responsibility Table to be updated as needed.
6.9 Operating Area
©Saudi Aramco 2020. All rights reserved.
Page 90 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings The following Acronyms are examples of Operating Areas: OA-1, OA-2, OA-3, OA-4, OA-5 and for Plant Interface Buildings: PIB-01, PIB-02, PIB-03, PIB-04, PIB-05, CCR, ECC (Emergency Control Center), etc.
- Operating Area to be updated as needed.
6.10 Risk Area
- Risk Area to be updated as needed.
6.11 Parallel Area
Parallel equipment number can be indicated in case of parallel process area or instrumentation, i.e., K00-G-001A and K00-G-001B.
6.12 Location
This denotes the device’s physical location. For interconnecting signals between two systems it must represent the second connected system to the tag.
The following Acronyms can be used.
Acronym
Description
BMS
CCR
CCS
CRMS
DCS
ESD
FAS
FIELD
HVAC
LP
MCC
MPP
PLC
PMS
SDS
TCS
VMS
Software Tag
Burner Management System
Central Control Room
Compressor Control System
Corrosion Monitoring System
Distributed Control System
Emergency Shutdown System
Fire Alarm System
Field Instrument
Heating, Ventilation and Air Conditioning
Local Panel
Motor Control Center
Motor Protection Panel
Vendor PLC
Power Management System
Smoke Detection System
Turbine Control System
Vibration Monitoring System
©Saudi Aramco 2020. All rights reserved.
Page 91 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Acronym
Description
WS
Weather Station
- Location Table to be updated as needed.
6.13
I/O Type
This field represents the I/O type of the Instrument. The I/O is associated to the system within the ‘System Type’ field.
I/O Type
I/O Type Description
AI
AIS
AO
AOS
DI
DIS
DO
DOS
DN
FF
PI
RTD
SDI
SDO
SIA
SID
SW
TC
No I/O
Analog Input
Analog Input Soft
Analog Output
Analog Output Soft
Digital Input
Digital Input Soft
Digital Output
Digital Output Soft
Device Net
Foundation Fieldbus
Pulse Input
Resistance Temperature Device
Digital Input with Line Monitoring
Digital Output with Line Monitoring
Serial Interface - Analogue
Serial Interface - Digital
Software
Thermocouple
- I/O Type Table to be updated as needed.
6.14 Signal Type
Signal Type associated with the IO Type can be:
Signal Type
Description
4-20mA
4-20mA
4-20mA EXT
4-20mA Externally Powered
1-5V
©Saudi Aramco 2020. All rights reserved.
Page 92 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
24 Volts DC
48 Volts DC
Free Voltage
120Vac
120VDC
24VDC
48VDC
FREE
TYPE K
PT100
JPT100
PULSE -2V/-18V
PULSE 3V/12V
RTD
- Signal Type Table to be updated as needed.
6.15 System Type
System type code for what system the tag is linked with:
System
Description
BMS
ACS
CCS
DAHS
DCS
ESD
LCP
FAS
MCC
MDVMS
OTS
PGCDS
PLC
VMS
No System
Burner Management System
Advanced Control System
Compressor Control System
Data Acquisition and Historisation System
Distributed Control System
Emergency Shutdown System
Local Control Panel
Fire Alarm System Communication module of MCC Temperature
Multi Drop Vibration Monitoring System
Operator Training Simulator
for Winding
Process Gas Chromatograph Data System
Programmable Logic Controller
Vibration Monitoring System
- System Type Table to be updated as needed.
6.16
I/O Location
©Saudi Aramco 2020. All rights reserved.
Page 93 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings This field is required to enable the PCS vendor to determine which I/O points are associated with each building. For Example:
Building
Description
AB-000
CCR
ECC
LB-000
MS-000
PIB-00
SS-000
No I/O Location
Analyzer Building
Central Control Room
Emergency Control Center
Laboratory Building
Maintenance Shop
Process Interface Building
Substation
- I/O Location Table to be updated as needed.
6.17 Device Protocol
Protocol
Description
C
F
H
M
P
6.18 Equipment
Conventional (e.g., 4-20mA)
Foundation Fieldbus
HART
Modbus
Proprietary Protocol (e.g., Profibus, etc.)
This identifies the major piece of equipment that the tag is associated to. The Equipment Number and Equipment Description shall be updated for each piece of equipment.
©Saudi Aramco 2020. All rights reserved.
Page 94 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Data
Required
Remarks
Equipment Number
Equipment Description
Equipment Type
✓
✓
✓
6.19 Line
This field denotes the Line Number on which the instrument is associated with. This number will generally match with line numbers from the LDT and is selected from the Line Number support table.
In the Line Number Support Table the following fields are required to be filled in:
Data
Required
Remarks
Line Number
P&ID
Stream
Pipe Spec
Pipe Standard
Pipe Material
Size
Unit
Schedule/PN
Internal Diameter
Wall thickness
✓
✓
✓
✓
✓
✓
✓
✓
6.20 P&ID
This field indicates the P&ID drawing number reference for each instrument. The P&ID is selected from the P&ID Drawing support table. This field shall have the complete drawing number along with the sheet number.
6.21 Manufacturer
This field represents the Manufacturer of the instrument. This field is selected from the Manufacturer support table and is normally specified during the preparation of the instrument data sheets. Manufacturers shall comply with SAES-J-003.
©Saudi Aramco 2020. All rights reserved.
Page 95 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings The following information has to be populated in the Manufacturer support table:
Data
Required
Remarks
Instrument Manufacturer
Description Manufacturer Identification
✓
✓
✓
Vendor/Plant ID (refer to SAES-J-003)
6.22 Model
This field represents the Model Number of the instrument. This field is selected from the Model support table and is normally selected during the preparation of the instrument data sheets.
The following information has to be populated in the Model support table:
Data
Required
Remarks
Instrument Model
Description
Model Identification
Process Function
✓
✓
✓
✓
6.23 Power Supply
If a power supply is required then the following information must be filled:
Data
Required
Remarks
Rated Voltage
Type
Frequency
Number of Phases
✓
✓
✓
✓
6.24 Package Vendor
Name of the instrument package, vendor is supplying.
6.25 Aramco MR Number
Saudi Aramco MR Number.
©Saudi Aramco 2020. All rights reserved.
Page 96 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.26 MR Number
This field denotes This field can be auto-populated from procurement system used by the contractor.
instrument Material Requisition Number.
the
6.27 MR Item Number
This field denotes the MR Item Number assignment. After an instrument has been assigned to an MR and given an item number assignment in procurement system.
6.28
ISS Drawing Number
This field indicates the Instrument Specification Sheet Number and it is assigned when preparing an instrument data sheet. While this field is listed as part of the instrument index, it is actually assigned and edited from the Specification Sheet module, not the Index module.
This field shall have the complete drawing number along with the sheet number.
6.29
ILD/ISD Number
This field indicates the Loop Drawing Number for an instrument assigned to a loop that requires a loop drawing. While this field is listed as part of the instrument index, it is actually assigned from the Loop module when assigning a loop drawing to a loop. Any tag assigned to the loop inherits the loop drawing number assignment.
This field shall have the complete drawing number along with the sheet number.
6.30 Mounting Type
Mounting types appears on IIS:
Mounting
Description
F
P
H
V
Field Mounted
Panel Mounted
Horizontal Mounted
Vertical Mounted
F/P is applicable for Flow/Level/Pressure/Temperature field instruments.
©Saudi Aramco 2020. All rights reserved.
Page 97 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
H/V is applicable for all Valves that are not in F/L/P/T loop.
6.31
Instrument Mounting Drawing No.
Instrument Points and Lines Layout Drawing Number.
6.32
Instrument Piping Detail Drawing No.
Piping Detail Drawing Number.
6.33 Remark - IIS
This field appears on the Instrument Installation Schedules.
6.34 Remark – Design
This field is used by Design to make any remarks regarding an instrument.
6.35 Remark – Engineering
This field is used by engineering to make any remarks regarding an instrument.
6.36 Remark – Vendor
This field is used by any 3rd party Vendors to make any remarks regarding an instrument.
6.37 Remark – PCS Group
This field is used by the PCS group to make any remarks regarding an instrument.
6.38 Remark – Domain Administrator
Control System Remarks by Domain Administrator.
6.39 Remark – PCS Vendor
Control System Remarks by PCS Vendor.
6.40 VOD Tag Number
This field indicates the Valve Operating Diagram Tag Number which appears on the IIS for the miscellaneous valves.
©Saudi Aramco 2020. All rights reserved.
Page 98 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.41
Insp. Mark No.
This field indicates the Inspection Mark No which appears on the IIS for Relief Valves.
6.42 Control System Tag
Shall be generated as defined in the naming convention. Contractor shall be responsible of the accuracy and matching between the CS tags and the PCS tags.
6.43 Service Descriptor 1
Based on the Tag Service.
6.44 Service Descriptor 2
Based on the Tag Service.
6.45 Min DCS Range
Lower Range Limit.
6.46 Max DCS Range
Upper Range Limit
6.47 DCS Range UOM
Range Unit of Measure.
6.48 Alarm High
Alarm High Set point. For non-Process instruments.
6.49 Alarm High High
Alarm High High Set point. For non Process instruments.
6.50 Alarm Low
Alarm Low Set point. For non Process instruments.
6.51 Alarm Low Low
Alarm Low Low Set point. For non Process instruments.
©Saudi Aramco 2020. All rights reserved.
Page 99 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.52 High Trip
Trip Set point. Applicable to Software Alarm coming from Logic.
6.53 High High Trip
Trip Set point. Applicable to Software Alarm coming from Logic.
6.54 Low Trip
Trip Set point. Applicable to Software Alarm coming from Logic.
6.55 Low Low Trip
Trip Set point. Applicable to Software Alarm coming from Logic.
6.56 Alarm Priority
Alarm priority can be:
Alarm Priority
Description
LOW
HIGH
For High/Low Alarms
For High High/Low Low
HIGH HIGH
For High High/Low Low Trip Alarm
- Alarm Priority to be updated as needed.
6.57 Sequence of Events
SOE
Blank
Y
Description
No Sequence of Events
Sequence of Events
6.58
I/O Address
Sequential No. for each I/O Type module to identify the I/O segregation
6.59 Valve Action on Power Failure
Controller Output
Description
DIR
REV
Direct
Reverse
- Some companies refer to this as ‘Output Action’
©Saudi Aramco 2020. All rights reserved.
Page 100 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.60 Control Action
Control Action can be:
Control Action
Description
D
R
0
1
2
3
Direct (Analogue)
Reverse (Analogue – Default)
Direct (Digital – Default)
Reverse (Digital)
Inverted connect direct action (Digital)
Inverted connect reverse action (Digital)
6.61 Valve Critical Level
Critical Valve
Description
Yes
No
Critical Valve
Not a Critical Valve
6.62 Contact Open
Di/Do signal status when contact open/de-energized.
6.63 Contact Close
Di/Do signal status when contact closed/energized.
6.64 State 0 Descriptor
This field is applicable only for some software signals.
6.65 State 1 Descriptor
This field is applicable only for some software signals.
6.66 State 2 Descriptor
This field is applicable only for some software signals.
6.67 Redundancy
Module Redundancy
Description
Y
N
Redundant
Not Redundant
©Saudi Aramco 2020. All rights reserved.
Page 101 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.68 Simple PID Controller
This field may be used to specify if the controller in the field or in the Host.
FF_PID
Description
Y
N
PID in Field Device (e.g., simple control, one transmitter and one valve) PID in Host (e.g., more than one valve for split range, cascade, compensation control, etc.
6.69 Switch Label
Instrument Label Number for switch or digital I/O.
Label
ON
RUN
OPEN
HIGH
RIGHT
DIRECT
START
STOP
UP
START
Description
Off, On
Stop, Run
Close, Open
Middle, Low, High
Middle, Left, Right
Stop, Revers, Direct
Hold, Stop, Start
Pause, Start, Stop
Down, Up
Pause, Restart, Start2
6.70 Scan Type
Scan Type
Description
0
1
2
Std/Basic (Default)
Medium/High
High (CS3000 only)
©Saudi Aramco 2020. All rights reserved.
Page 102 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.71
Input Type
Input Type
Description
LINEAR
SQRT
2ST
3ST
BTHPUL
CODE
SUBSYS
PULSE
QTPUL
Default
Square Root
2 position status
3 position status
Pulse Train
Code conversion
Subsystem communication
Control priority type pulse train
Exact totalisation pulse train
Input Type for FF-AI block
Description
1
2
3
Direct (Default)
Indirect
Ind Sqr Root
6.72 Pulse Rate
6.73 Totaliser Timebase
Totaliser Timebase
Description
SS SM SH SD PR
Sec totalise Min totalise Hour totalise Day totalise PRn (n=Pulse Rate)
6.74 Modbus Address
Subsystem Modbus Address/OPC item name.
6.75 Modbus Station
Subsystem Modbus Station No/OPC IP addresses.
6.76 Modbus Alias
Modbus Alias Number.
©Saudi Aramco 2020. All rights reserved.
Page 103 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.77 Modbus Signal Data Type
Comm. Signal Data Type.
Data Type
Description
16/32
32/64
DI/DO
VT_UI2/4/8
VT-R4/R8
VT-I2/4
VT-BOOL
Modbus – 16/32 bits signed/unsigned integer
Modibus – 32/64 bits floating
Modibus – Discrete Input / Output
OPC
OPC
OPC
OPC
6.78 FF Segment
Foundation Fieldbus Segment Name.
6.79 FF Device Tag
Foundation Fieldbus Device Tag Number.
6.80 FF Device Address
Foundation Fieldbus Node Address.
6.81 FF Device Type
Foundation Fieldbus Device Type Number.
6.82 Deviation Alarm
DCS Deviation Alarm (By Process).
6.83 Deviation Comparison
DCS Deviation Comparison.
6.84 F&G Zone
Zone Level of the Fire & Gas Protection.
6.85 Lower Transducer Range Limit
Normally 5% of the DCS Range.
©Saudi Aramco 2020. All rights reserved.
Page 104 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.86 Upper Transducer Range Limit
Normally 5% of the DCS Range
6.87 Transducer Engineering Units
Same Engineering Units as the DCS Range.
6.88 Substation
Substation Number.
6.89 Logic System No.
ESD Interlock System for Loop Diagrams.
6.90 Bench Condition
For digital signal only.
Bench Condition
Description
OPEN
CLOSE
TRIPPED
NORMAL
6.91 MOS Required
Maintenance Override Switch.
MOS Required
Description
Blank
Y
Does Not Require MOS
Requires MOS
This can be used by CS vendor to generate the serial tag according to the MOS. Example:
• MOS activated from DCS to ESD can end with a “BP” suffix. • MOS activated from ESD to DCS can end with a “BY” suffix. • MOS alarm on DCS can end with a “BA” suffix.
6.92 MOS Group Number
Maintenance Override Switch Group Number.
©Saudi Aramco 2020. All rights reserved.
Page 105 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
6.93 MOS Alarm
Maintenance Override Switch Alarm.
6.94 Damper Required
6.95 ATFO Required
Automatic Transfer Fault Override Criteria.
Air Connection
Description
Y
Blank
Yes
No
6.96 Signal Repeater Required
6.97 Surge Arrestor Required
6.98 Low Scale (mA)
6.99 High Scale (mA)
6.100 Under Range 1
Transmitter Under Range Position 1.
6.101 Under Range 2
Transmitter Under Range Position 2.
6.102 Over Range 1
Transmitter Over Range Position 1.
6.103 Over Range 2
Transmitter Over Range Position 2.
6.104 LAS Function
Device Class Basic or Link Master.
6.105 ITK Revision
Device Revision.
6.106 DD Revision
©Saudi Aramco 2020. All rights reserved.
Page 106 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DD File Revision
6.107 CFF Revision
Capability File Revision
6.108 PFD Drawing Number
The Process Flow Diagram that the valve appears on. Applicable to (Relief Valves) IIS drawings.
6.109 Valve Type
Applicable to (MOV/AOV/HOV/GOV) IIS drawings.
6.110 Valve Size
Applicable to (MOV/AOV/HOV/GOV) IIS drawings.
6.111 Rating
Applicable to (MOV/AOV/HOV/GOV) IIS drawings.
6.112 INLET Size
Applicable to (Relief Valves) IIS drawings.
6.113 INLET Rating
Applicable to (Relief Valves) IIS drawings.
6.114 INLET Facing
Applicable to (Relief Valves) IIS drawings.
6.115 OUTLET Size
Applicable to (Relief Valves) IIS drawings.
6.116 OUTLET Rating
Applicable to (Relief Valves) IIS drawings.
6.117 OUTLET Facing
Applicable to (Relief Valves) IIS drawings.
6.118 Orifice Area
©Saudi Aramco 2020. All rights reserved.
Page 107 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Applicable to (Relief Valves) IIS drawings.
6.119 Set Pressure
Applicable to (Relief Valves) IIS drawings.
INSTRUMENT SPECIFICATION DATA
7.1
7.2
Instrument Specification sheets (ISS) format shall comply with Saudi Aramco Engineering Standards and procedures.
Standard ISS forms shall be used according to the list in SAES-J-003. The required forms are available in Data-Centric Instrumentation Database template. There shall be no modifications to the standard forms unless it is approved in writing by the Supervisor, EK&RD/Drawing Management Unit. Any SAES-J-003 forms that are not available in the template database shall be developed by the contractor and submitted to EK&RD for approval prior to use.
If no form is available for a special instrument application, a new form can be developed by the contractor after P&CSD approval. The new form is to follow the same pattern as the standard instrument specification sheets and the form shall be submitted to EK&RD for approval.
7.3
All required Saudi Aramco Title Block data shall be entered in accordance with Section 6 of this standard.
7.4
A single tag specification sheets shall be used.
PROCESS DATA
All process data fields that appear on the ISS for each instrument and line shall be filled in.
INSTRUMENT INSTALLATION SCHEDULE (IIS) DATA
All Instrument Installation Schedule data fields that appear on Saudi Aramco’s IIS drawing for each instrument shall be filled in. Field of all IIS fields are marked with “✓” in Section 6 of this appendix.
CALCULATIONS DATA
All required calculation attributes along with other process data shall be filled for all instrument tags.
©Saudi Aramco 2020. All rights reserved.
Page 108 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings Preliminary in-house sizing calculations for flow meters, control valves, thermowells and relief valves can be used. However, the final calculations shall be performed using the vendor sizing programs or project-approved methods.
SAES-A-202
- WIRING DATA
11.1 General
11.1.1
Instrument device panels, system panels and junction boxes with terminal details shall be created within the Domain area. Standard junction boxes and instrument devices shall be set up in the Reference area initially.
11.1.2 Standard single pair/triad and multi-pair/multi-triad cables shall be created from the details in the Instrument Wire and Cable Specification.
11.1.3 All connection types shall be created to ensure the correct
termination of all types of cables to the various panel types.
11.1.4 All Instrument Type Profiles shall be defined.
11.2 Panels
11.2.1 All standard panels including their strips, terminals, I/O terminations, and I/O cards shall be created to serve as the plant panel typical configurations to facilitate rapid creation of various panels in the domain.
11.2.2 All plant panels
including
their strips,
terminals,
I/O
terminations, and I/O cards shall be created.
11.2.3 All panels and their strips and terminals details shall be filled in
with the following details:
Panel Type
Data
Required
Remarks
Name
Type
Area Classification
Conventional Device Panels
Strip Name
Strip Type
Strip Sequence
Terminal Number
Terminal Sequence
Multi-Input Device
Name
✓
✓
✓
✓
✓
✓
✓
✓
©Saudi Aramco 2020. All rights reserved.
Page 109 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Panel Type
Data
Required
Remarks
Panels
FF Device Panels
Type
Strip Name
Strip Type
Strip Sequence
Terminal Number
Terminal Sequence
Apparatus
No. of Left side connections
No. of Right side connections
Port Name
Port Function
Male/Female
Connectors
Name
Type
Strip Name
Strip Type
Strip Sequence
Terminal Number
Terminal Sequence
Port/Spur Name
Male/Female
Connectors
Name
Type
Manufacturer
Model
Location
General Panels: Junction Boxes, Marshalling Cab., Local Panels, etc.
Drawing Number (Area Classification)
Strip configuration name
Strip total number of terminal
Strip First terminal number
Terminal numbering details.
Strip Rail Strip Type
Strip Manufacturer Strip Model
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓ ✓
✓ ✓
Ex. 24 VDC, 4-20 ma, RTD …etc.
©Saudi Aramco 2020. All rights reserved.
Page 110 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Panel Type
Data
Required
Remarks
Name
Type
Manufacturer
Model
Location
Drawing Number (Area Classification)
Segment in
FF Junction Boxes
Segment out
No of left spur connectors
No of right spur connectors
Internal Terminator
Segments Name
Spur Name
Port Name
Connector Type
Male/Female
Name
Network/Address1
Node/Address2
Type
Manufacturer
Model
Location
Drawing Number (Area Classification)
Rack name
Number of Slots
Rack Sequence
Strip Name
Terminal Number
Number of terminals per channel
First channel
Strip Rail
Strip Type
Strip Manufacturer
Strip Model
Panel Name
Rack Name
Control System Cabinet
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
©Saudi Aramco 2020. All rights reserved.
Page 111 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Panel Type
Data
Required
Remarks
Slot Number
I/O Card Name
I/O Card Type
I/O Card Manufacturer
I/O Card Model
I/O Card System I/O Type
I/O Card Module
I/O Card Controller/Processor
Redundant Cabinet
Redundant Rack
Redundant Slot
Redundant I/O Card
Channel
FF Segment Channel
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
If Applicable
If Applicable
If Applicable
If Applicable
11.2.4 Panels, strips, and terminal numbering will be as per the project
Instrumentation Numbering Philosophy.
11.3 Cables
11.3.1 Standard cables, sets and wires shall be created from the details of the Instrument Cable Specifications and the Electrical Cable Specifications, which will serve as the plant cable typical configurations to facilitate rapid creation of various cables in the domain.
11.3.2 Create all cables, sets and wires.
11.3.3 All cables and wire details shall be filled in with the following
details:
©Saudi Aramco 2020. All rights reserved.
Page 112 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Data
Required CCS
Remarks
Cable Name
Cable Description
Cable Type
Manufacturer
Model Name
Model Description
Model Insulation
Color
Length
UOM
Cable Harness
End 1 Location
End 2 Location
Glands End 1
Glands End 2
Connector for End1
Connector for End2
Cable Load HP/KVA
Cable Load Volts
Conductor Type
Cable Remarks
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
CCS: Service name
CCS: Conductors No. & Size
CCS: Conductors Type + “-” + Volts
✓
✓
✓
✓
✓
✓
✓
✓
✓ To be used for CCS drawings
✓ To be used for CCS drawings
✓ To be used for CCS drawings
✓ To be used for CCS drawings
11.4 Cable Routing Data
11.4.1 Cable routings for cable conduits and trays shall be created as per the project specifications. Cable routing sections shall be associated with all applicable CCS drawings can be generated.
11.4.2 All cable routings details shall be filled in with the following
details:
Data
Required
Min. CCS
Remarks
Routing Standards Width
Routing Standards Position
Max. cables per Position
Routing Section Name
✓
✓
✓
✓
✓
©Saudi Aramco 2020. All rights reserved.
Page 113 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Data
Routing Section Description*
Routing Section Length
Routing Section Category
Required
Min. CCS
✓
✓
✓
✓
✓
✓
Remarks
CCS: Conduits Type + “-” + Bends
- Routing section Description can be edited through SA_Conduit_Info.
PCS DATA
The data transfer between the Data-Centric Instrumentation system and the PCS Vendor is the responsibility of the contractor.
The following PCS data shall be entered into the Data-Centric Instrumentation System:
• Hardwired I/O information for DCS system, including Foundation Fieldbus
signals.
• Hardwired I/O information for ESD/VMS/CCS systems, including HART
signals.
• Hardwired I/O information for MDF cabinets.
• System Cables information.
• MDF signal termination details.
• All cross wiring.
• Control System tags.
CALIBRATION DATA
Calibration data for all instruments that requires calibration shall be entered into the system with full detail.
Ranges and Output Signals
Data
Required
Remarks
Variable min
Variable min UOM
Variable max
Variable max UOM
Output Signal min
Output Signal max
Output Signal UOM
✓
✓
✓
✓
✓
✓
✓
©Saudi Aramco 2020. All rights reserved.
Page 114 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Data
Required
Remarks
Output Type
✓
Errors/Points
Data
Required
Remarks
Error Calculation Type
Number of points
Measuring points
Error Type
Set Values
Tolerance Data
Display Scales
✓
✓
✓
✓
✓
✓
Data
Required
Remarks
Minimum
Maximum
UOM
Alarm/Trips
✓
✓
✓
Data
Required
Remarks
Point Type
Description
Point Level
Direction
Point Value
UOM
Min low
Max High
✓
✓
✓
✓
✓
✓
✓
✓
SUPPORTING DATA
Supporting data shall be updated with all required information as per the project specification, including:
Instrument Types; System I/O Types; Foundation Fieldbus Function Blocks; Locations;
©Saudi Aramco 2020. All rights reserved.
Page 115 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
- Manufacturers;
Instrument Models; and Loop Types and Functions.
DATA-CENTRIC INSTRUMENTATION DELIVERABLES
The following instrumentation drawings shall be generated from the Data-Centric Instrumentation system as per SAES-J-003:
• • • • •
Instrument Installation Schedules (IIS) Instrument Specification Sheets (ISS) with Instrument Calculation Sheets Instrument Loop Diagrams (ILD) Instrument Segment Diagrams (ISD) Instrument Interconnection Wiring Diagrams (ECD) – Junction Box Terminations & Marshalling Cabinet Terminations
• Cable & Conduit Schedule (CCS).
The file naming of these drawings shall comply with Section 5 of this standard.
The Data-Centric Instrumentation system shall contain all required data to generate the above drawings. Post modifications to these drawings are not allowed. These drawings shall be delivered to EK&RD in PDF format.
15.1
Instrument Installation Schedule (IIS)
Instrument Installation Schedule (IIS) format shall comply with Saudi Aramco Engineering Standards. These drawings shall be prepared in the Data-Centric Instrumentation system based on the EK&RD provided drawing templates.
15.2
Instrument Specification Sheets (ISS)
Instrument Specification sheets (ISS) format shall comply with Saudi Aramco Engineering Standards. ISS shall be prepared as per Section 7 of this appendix.
15.3
Instrument Loop Diagrams (ILD)
Instrument Loop Diagram shall be generated using the Data-Centric Instrumentation system. The generated ILD shall comply with this standard and SAES-J-003. Post-modification of the generated drawings after customization shall be stored in the Data-Centric Instrumentation system.
All used “C:\SAUDIARAMCO\INSTRUMENTATION\ILD\” folder.
templates, symbols, borders paths shall be
in
the
©Saudi Aramco 2020. All rights reserved.
Page 116 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings The path for the Field Instruments symbols in ILD shall be in the following folder: “C:\SAUDIARAMCO\INSTRUMENTATION\INSTRUMENTSYM\”
15.4
Instrument Segment Diagrams (ISD)
Instrument Segment Diagrams shall comply with this standard, SAES-J-904, and SAES-J-003. Post-modification of the generated drawing after customization shall be stored in the Data-Centric Instrumentation system.
All used “C:\SAUDIARAMCO\INSTRUMENTATION\ISD\” folder.
templates, symbols, borders paths shall be
in
the
15.5
Instrument Interconnection Wiring Diagrams (ECD)
The Junction Box and Marshalling Racks/cabinets Interconnection diagrams standard and SAES-J-003. Post-modification of the generated drawing after customization shall be stored in the Data-Centric Instrumentation system.
shall comply with
this
All used “C:\SAUDIARAMCO\INSTRUMENTATION\ECD\” folder.
templates, symbols, borders paths shall be
in
the
15.6 Cable & Conduit Schedule (CCS)
Cable & Conduit Schedule (CCS) format shall comply with Saudi Aramco Engineering Standards.
CCS shall be delivered to Saudi Aramco in PDF format according to the following:
CCS Fields
Remarks
LOAD
GLAND TYPE
RUN
CONDUITS
CONDUCTORS
CABLE/CONDUIT NUMBER SERVICE HP OR KVA VOLTS FROM END TO END FROM END TO
TYPE
SIZE LENGTH Ft/m BENDS TYPE NO. & SIZE INSULATION TYPE INSULATION
End_1 End_2 Connection to End_1 Connection to End_2 desc to be used for Conduits Type and Bends with a”-” separation. A browser need to be created for this.
insulation to be used for the Type and Volts with a “- ” separation.
©Saudi Aramco 2020. All rights reserved.
Page 117 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
CCS Fields
Remarks
VOLTS TOTAL QTY Ft/M REMARKS
- DATA HANDOVER
The Data-Centric Instrumentation database shall be handed over to Saudi Aramco at different project review milestones (30%, 60%, 90%, IFC and Final As-built).
16.1 All temporary instruments, panels, loops, cables, layouts, equipment’s, lines, test data, views and drawings not requested from iPlant shall be removed from the database before delivery.
16.2 Ensure all data is free of any database exceptions and orphan entries.
16.3 The database shall reflect the As-built stage of the plant.
16.4 All temporary project and subproject data shall be cleared prior to data
handover.
16.5 The following data shall be handed over to Saudi Aramco at each delivery:
16.5.1 The Data-Centric Instrumentation database in the approved
Saudi Aramco format.
16.5.2 Custom views, scripts and user preferences settings utilized by
Contractor to generate drawings.
16.5.3 All symbols, custom symbols, border templates, ISS illustrated
images and reports used to generate the required drawings.
16.5.4 Compliance document highlighting all approved deviations from
this Appendix;
16.5.5 All generated drawings with documentation showing the list of all drawings and procedure used to generate them from the provided items above.
16.5.6 Submittal form shall be delivered with every submittal containing complete information about the delivery and list of all generated drawings.
©Saudi Aramco 2020. All rights reserved.
Page 118 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Attachment 5 – Loop Typicals
The following list shows sample Loop Typicals.
- To be updated as required by the project.
LOOP TYPICAL
F-001
F-006
H-002
L-007
INTERNAL LOOP ORDER 1 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12
INSTRUMENT TYPE
INSTRUMENT TYPE DESCRIPTION
FE FIT FI FE FIT FC FXV FLSC FLSO FCV FLLC FLLO FALL FAL FAH FAHH HCV HLSC HLSO HC HLLC HLLO LIT LC LXV LLSC LLSO LCV LLLC LLLO LALL LAL LAH LAHH
ORIFICE PLATE FLOW INDICATING TRANSMITTER DCS FLOW INDICATOR ORIFICE PLATE FLOW INDICATING TRANSMITTER DCS FLOW CONTROLLER SOLENOID VALVE LIMIT SWITCH CLOSED LIMIT SWITCH OPEN FLOW CONTROL VALVE DCS VALVE CLOSED INDICATION DCS VALVE OPEN INDICATION DCS FLOW ALARM LOW LOW DCS FLOW ALARM LOW DCS FLOW ALARM HIGH DCS FLOW ALARM HIGH HIGH HAND CONTROL VALVE LIMIT SWITCH CLOSED LIMIT SWITCH OPEN DCS HAND CONTROLLER DCS VALVE CLOSED INDICATION DCS VALVE OPEN INDICATION LEVEL INDICATING TRANSMITTER DCS LEVEL CONTROLLER SOLENOID VALVE LIMIT SWITCH CLOSED LIMIT SWITCH OPEN LEVEL CONTROL VALVE DCS VALVE CLOSED INDICATION DCS VALVE OPEN INDICATION DCS LEVEL ALARM LOW LOW DCS LEVEL ALARM LOW DCS LEVEL ALARM HIGH DCS LEVEL ALARM HIGH HIGH
©Saudi Aramco 2020. All rights reserved.
Page 119 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Appendix G – Data-Centric Electrical Specification
INTRODUCTION
This document defines the requirements for preparing the Data-Centric Electrical Drawings and Reports for Saudi Aramco using the Data-Centric Electrical Design Software approved by Saudi Aramco. It is Contractor responsibility to request the approved Data-Centric Electrical Design software name and version, database name and version, and approved Electrical Template from EK&RD.
CONFLICTS AND DEVIATIONS
Any conflicts between this appendix and other applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs) shall be resolved in writing with EK&RD.
REFERENCES
Refer to applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs).
SCOPE
4.1
4.2
Contractor shall follow this appendix as the basis for the creation and delivery of the Data-Centric Electrical drawings.
This appendix defines the set-up, guidelines for drafting and the minimum data to be populated in the Data-Centrica Electrical database and list of deliverables. The Data-Centrica Electrical drawings for the project to Saudi Aramco EK&RD shall be delivered according to this appendix.
4.3 When requested, EK&RD will provide to the contractor, the Data-Centric Electrical Database template comprising of customized Data Dictionary and Reference files, which shall be used for the setup and drawings creation. However, contractor shall develop any additional forms, symbols, tools and/or templates as per the project requirements. Contractor shall obtain EK&RD approval prior to the creation of any form, symbol, border, and/or template.
4.4
The technical contents of the engineering drawings including engineering data properties, attachments and any other engineering information related to the electrical drawings shall be delivered per this specification.
©Saudi Aramco 2020. All rights reserved.
Page 120 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings Contractor shall create all required forms and drawings per this standard.
SAES-A-202
4.5
4.6
4.6
4.7
4.8
4.9
The Data-Centric Electrical system shall be used to generate Single Line Diagrams (E1L), Three Line diagram (E1L), Cable & Conduit Schedule (CCS) and Electrical Load Tabulation (SCH).
Note: A one-line diagram or single-line diagram (SLD) shows by means of
single lines and graphical symbols the course of an electrical circuit or system. Prior approval shall be obtained from EK&RD to waive creating Three-line diagram from the Data-Centric Electrical system.
All Drawings and Reports submitted to Saudi Aramco shall have customized border and title block information as per this standard.
All drawings associated with electrical data shall be generated automatically from the Data-Centric Electrical system without any post- modification. The generated documents shall comply with all applicable SAESs, SAEPs, and SASDs. Relocating any item on the drawing in a single line diagram generated from the Data-Centric Electrical system is not considered post modification.
All inconsistencies must be resolved. Any inconsistency that can’t be resolved shall be documented and submitted to EK&RD for approval.
All drawings and data shall reflect the plant As-built status before making the final delivery to Saudi Aramco.
4.10 Check List in Attachment 2 shall be used to ensure the quality, reliability
and integrity of the electrical data.
4.11 The delivered database must be free of any database exceptions and
orphan entries.
4.12 The delivered database shall be free from any test items, test data, test
drawings, and temporary reports.
4.13 Contractor shall upgrade the database to conform to the latest approved version of the Data-Centric Electrical system prior to final delivery.
DATA-CENTRIC ELECTRICAL SET-UP
5.1 General
Contractor shall use the latest version of the Data-Centric Electrical system approved by Saudi Aramco.
©Saudi Aramco 2020. All rights reserved.
Page 121 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
5.2
Database Setup
The database shall be set up and configured as shown below:
Database Storage Name: Temporary Database Storage Name: TEMP_XXX * Database User Name: Database Password:
XXXSITE* XXXSITE123*
TS_XXX_DATA_01*
Where XXX = Plant\Org abbreviation from iPlant, “e.g., HGP for Hawiyah Gas
5.3
Plant Setup
Plant”
The following plant’s data shall be defined for each Facility. Ex.: Gas Plant, GOSP, etc.
Template Path: Hierarchy: Plant Name: Format File location:
Template path Plant/Area/Unit Facility Name Reference Data path
Database Storage Name: Temp Database Storage Name: Database Username: Database Password:
TS_XXX_DATA_01* TEMP_XXX* XXXPLANT* XXXPLANT123*
Where XXX = Plant\Org abbreviation from iPlant, “e.g., HGP for Hawiyah Gas Plant”
Following table lists the required data for each plant (Facility Name)
Description
Data entry
Example
Name
Description
Location
Yes
Yes
Yes
HGP
Hawiyah Gas Plant
HAWIYAH
5.4
Electrical Application Association
The following configuration shall be followed:
Electrical Reference Data path:
Default Reference path
Template Path:
Template path
Database Storage Name: Temporary Storage Name: Database Username: Database Password:
TS_XXX_DATA_01 TEMP_XXX XXXPLANTEL* XXXPLANTEL123*
©Saudi Aramco 2020. All rights reserved.
Page 122 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Where XXX = Plant\Org abbreviation from iPlant, “e.g., HGP for Hawiyah Gas Plant”
5.5
Plant Hierarchy Structure
The project plant structure must comply with Hierarchy “Plant – Area – Unit”. All drawings shall be created at the Unit level only.
The following shall be applied to all project data:
A Plant shall be Facility Name
B Area shall be the Saudi Aramco plant number.
C Unit shall be the Saudi Aramco Unit
5.6 Options Setup
Plant group type shall be set to “Unit” and the item type uniqueness level shall be set to “Plant” for the equipment listed in Saudi Aramco Standard Drawing AE-036411-003.
5.7
Installation Options
Contractor shall request EK&RD for the required installation options for the approved Data-Centric Electrical system.
NAMING CONVENTION
The naming format of electrical equipment and cables shall comply with Section 10 of this standard.
Drawing Numbers naming format shall comply with Section 5 of the standard.
DATA-CENTRIC ELECTRICAL REFERENCE DATA
7.1
Data-Centric Electrical Reference Data
7.1.1
Saudi Aramco Reference Data contains:
• Symbols. • Saudi Aramco template, “i.e., E1L and Motor Control
Schematics Border Files”.
• Rules. • Formats. • References.
©Saudi Aramco 2020. All rights reserved.
Page 123 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
7.1.2
Saudi Aramco Engineering Drawings Saudi Aramco Electrical Reference Data shall be used for the creation of all electrical drawings. Any additional symbols, templates, formats, reports, rules, that do not exist in the Reference Data and are required by the project shall be created as per ANSI/ISA standard after obtaining EK&RD approval.
7.1.4
Arial Font shall be used for all textual elements of the drawing.
7.1.5
7.1.6
7.1.7
A prior approval from EK&RD is required for any modification to the provided Saudi Aramco Reference Data.
The latest Saudi Aramco border files shall be used for the Data- Centric electrical drawings.
The minimum attributes that shall be filled for the specified equipment are as shown below:
Equipment Type
Minimum Attributes
• Type • Connection type of transformers • Rated Power • Rated Voltage • Number of phases • Supply • Frequency • Phase arrangement • Secondary output
o Rated power o Nominal current o Rated voltage current ratios for potential transformers
•
• Rated Power impedance • • Rated Voltage • Brake power • Minimum Required power • Number of phases • Phase arrangement • Full Load current
• Rated Power • Rated Voltage • Demand factor • Supply • Number of phases • Frequency • Number of wires
Transformer
Motor
Capacitors Bank
©Saudi Aramco 2020. All rights reserved.
Page 124 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Equipment Type
Minimum Attributes
Offsite Supplies
Power
Battery Charger
Battery Bank
Generators
Power Distribution Boards (PDB’s)
• Phase arrangement • Operation Mode
• Rated voltage • Offsite Power rated power • Number of phase • Offsite power load • Full load current
• Rated Power • Rated Voltage • Number of phases • Supply • Frequency • Phase arrangement • Full load current • Secondary output
o Rated Voltage o Nominal current o Rated Voltage
• Rated Active power • Rated voltage • Full load current • Flooded seal • Number of cells • Float voltage
• Rated Apparent Power • Power Factor • Rated Active power • Supply • Number of phases • Frequency • Rated voltage • Efficiency • Neutral earthing • Number of poles • Full load current • Control mode
• Current rating • Frequency • Number of phases • Phase arrangement • Rated voltage • Short circuit current peak • Short circuit current rating
©Saudi Aramco 2020. All rights reserved.
Page 125 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Equipment Type
Minimum Attributes
Automatic transfer switches
Protective Devices: Fuse and circuit breaker
Current Limiting Reactor
• Short circuit duration short circuit
rating
• Current rating • Frequency • Number of phases • Phase arrangement • Rated voltage • Short circuit current peak • Short circuit current rating • Short circuit duration short circuit
rating
• Current rating • Control voltage • Rated Voltage • Short Circuit rating • Fuse size • Circuit breaker trip class • Full load current
Insulation level
• Rated Power • Rated Voltage • Frequency • number of phases • Full load current • • Resistance • Reactance • Short circuit current (RMS) • Short circuit Current [Peak] • Power factor • Basic impulse level
Control Panel:
• Tag number
Junction Box
• Tag number
Relay
• Relay function
Uninterruptible Power Supply
• Rated Power • Rated Voltage • Number of phase • Frequency • Phase arrangement • Full load current • Resistive losses • Reactive losses • Secondary output
©Saudi Aramco 2020. All rights reserved.
Page 126 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Equipment Type
Minimum Attributes
• Rated power • Nominal current • Rated voltage
• Bus current • Voltage rating • Rated power • Phase • Frequency
Electrical Bus
Note:
Contactor shall consult with EK&RD to obtain the latest additional attributes.
7.2
Saudi Aramco Electrical Dictionary
7.2.1
The Data Dictionary Contains:
• Data Attributes • Select Lists
Note:
System Select Lists shall not be altered.
7.2.2
7.2.3
Saudi Aramco Electrical Data Dictionary shall be used for the creation of the electrical deliverables.
Any additional attribute, select list and their entries that do not exist in the Data Dictionary and are required by the project shall be created after obtaining EK&RD approval.
Data-Centric ELECTRICAL DELIVERABLES
8.1
Data Clean-up
8.1.1
8.1.2
All temporary drawings, test drawings, test symbols, test assemblies, test units, temporary filters and test reports shall be removed from the Data-Centric Electrical database before final delivery.
All inconsistencies on the Electrical drawings and reports must be resolved before the final delivery. A list of all inconsistencies that cannot be resolved shall be submitted along with Saudi Aramco approvals.
8.1.3
The Data-Centric Electrical database must be free of any database exceptions and orphan entries.
©Saudi Aramco 2020. All rights reserved.
Page 127 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings All the Electrical drawings and reports must be As-built before the final delivery.
Contractor must upgrade the Data-Centric Electrical database to the latest approved version prior to final delivery.
8.1.4
8.1.5
8.2
Deliverables
8.2.1
8.2.2
8.2.3
8.2.4
A complete Data-Centric Electrical database and project backup, including the Electrical Reference Data (symbols, templates, assemblies, report templates, rules, and modified programs) used to generate the electrical deliverables.
Compliance document highlighting all approved deviations from this specification.
Document specifying customizations carried out in reference data, symbols, data dictionary, formats, rules, and reports along with their approvals.
Any modified source code for all programs that were created for the Data-Centric Electrical system and must highlight the modifications versus delivered code.
8.2.5
PDF files of the following electrical deliverables as generated from the Data-Centric Electrical system:
- One Line Diagrams
- Cable and Conduit Schedules
- Electrical Load Tabulation
©Saudi Aramco 2020. All rights reserved.
Page 128 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Attachment 6 – Border Title Block
Title Block Field Name
Display Name
PLANT NO
INDEX
DRAWING NUMBER
SHT. NO.
REV.NO.
Location
Drawing Title – Line 1
Drawing Title – Line 2
Drawing Title – Line 3
DRAWING TYPE
Plant No
Drawing Index
Drawing Number
Sheet No
Revision
Location
Title Line One
Title Line Two
Title Line Three
Drawing Type
JOB ORDER/EWO NO.
Job Order / EWO Number
Revision DATE
Revision Date
REVISION DESCRIPTION
Revision Description
Design Certification: ENGG.
Design Certification: DATE
Engineering By
Engineering Date
Design Certification: CERTIFIED BY
Certified By
Design Certification: CERTIFIED DATE Certified Date
Review: CONST. AGENCY
Construction Agency
Review: CONST. DATE
Review: OPERATIONS
Construction Agency Date
Operations
Review: OPERATIONS DATE
Operations Date
Other: BY
Other: DATE
DCC Number
Other
Other Date
DCC No
EMERGENCY DRAWING
Emergency Drawing
Drawing Sensitivity
Reference Drawing 1_Desc
Reference Drawing Desc 1
Reference Drawing 1_No
Reference Drawing No 1
Reference Drawing 2_Desc
Reference Drawing Desc 2
Reference Drawing 2_No
Reference Drawing No 2
Reference Drawing 3_Desc
Reference Drawing Desc 3
Reference Drawing 3_No
Reference Drawing No 3
Reference Drawing 4_Desc
Reference Drawing Desc 4
Reference Drawing 4_No
Reference Drawing No 4
Reference Drawing 5_Desc
Reference Drawing Desc 5
Reference Drawing 5_No
Reference Drawing No 5
NOTES
Description
©Saudi Aramco 2020. All rights reserved.
Page 129 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Attachment 7 - Check Lists
GENERAL CHECK LIST
1.1
1.2
1.3
1.4
All Equipment listed in Saudi Aramco Standard Drawing AE-036411 sheet 003, cables and raceways shall be tagged.
The Special character apostrophe ’ shall not be used to comment values of any attributes with unit of measure, in other words, unit attribute values shall not be commented.
All applicable data-attributes shall be filled to the fullest extent for all components such as equipment, cables, etc., in accordance with SAES.
Tags and associated data shall be entered in consistent manner as defined by this specification.
1.5
Saudi Aramco abbreviation conventions shall be followed as per SAES.
1.6
1.7
1.8
Drawing title block entries shall follow Section 6 of this standard and the corresponding user-defined attributes shall be as defined in this appendix.
Use of Item Note and Labels to place dumb text is to be minimized. Intelligent labels shall be the default option.
Electrical Equipment Class and Electrical Equipment Sub-class shall be defined for all the customized symbols.
1.9
Detail sketches shall be placed as intelligent items or Auxiliary Graphics.
1.10 Nothing shall be placed outside the drawing border.
1.11 There shall be no linked files, other than the Saudi Aramco approved templates,
to all drawings.
1.12
In case Contractor is forcing the re-creation of drawings from the data-centric database, all entities must be fetched from the database without any loss of information.
©Saudi Aramco 2020. All rights reserved.
Page 130 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
EQUIPMENT CHECK LIST
2.1
2.2
2.3
Electrical Equipment Class and Electrical Equipment Sub Class shall be the criteria for placing the equipment.
Equipment Tag Prefix, Tag Seq Number, and Tag Suffix are to be entered per this standard. Use of space or other characters to overcome the Duplicate Tag situation is not acceptable.
Equipment labels shall be standardized. If the Data-Centric Electrical system does not have the required properties, they shall be added with prior approval from EK&RD. If the labels do not have the proper units, the units shall be added with prior approval from EK&RD.
©Saudi Aramco 2020. All rights reserved.
Page 131 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Appendix H – Building Information Modeling (BIM) Specification
INTRODUCTION
This document defines the requirements for preparing the Building Information Model (BIM) and its related engineering drawings for Saudi Aramco whenever the use of BIM is mandated by the project.
CONFLICTS AND DEVIATIONS
Any conflicts between this appendix and other applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs) shall be resolved in writing with EK&RD.
It is the responsibilty of CONTRACTOR to acquire the latest Saudi Aramco engineering documents (SAESs, SAEPs, SAMSSs, and SASDs) that are necessary to comply with the BIM requirements.
SCOPE
3.1
3.2
3.3
3.4
3.5
3.6
3.7
Contractor shall follow this appendix as the basis for BIM modeling and generating the applicable drawings, as listed in Section 7 of this appendix.
This appendix defines the project set up, guidelines for modeling, the minimum data to be populated in the database and the types of drawings to be generated.
Contractor shall carry out the necessary customizations required for modeling and subsequent drawing generation.
The technical contents of the engineering drawings including engineering data properties, attachments and any other engineering information for all disciplines shall follow applicable SAESs, SAEPs, SAMSSs, and SASDs.
All Drawings & Reports submitted to Saudi Aramco shall have the title block as per Section 6 of this standard.
The drawings generated shall be submitted to Saudi Aramco as per this standard and SAEP-334.
The final Project backup delivered to Saudi Aramco shall have all the models and related drawings in ‘As-built’ state and shall have the minimum BIM Level of Development (LOD) of 500 and all model elements shall be field verified.
©Saudi Aramco 2020. All rights reserved.
Page 132 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings Contractor shall upgrade the project to the latest approved version of the software prior to final delivery.
Contractor shall prepare a BIM Execution Plan (BEP) for the complete project lifecycle and submit it to Saudi Aramco for approval.
3.8
3.9
3.10 The BIM level of development matrix shall be prepared by Contractor and approved by Saudi Aramco as part of the BEP at early stage of the project, which will be the basis of the design deliverables at all relevant stages.
3.11 Unless otherwise mandated by the owner scope requirements, contractor is highly recommended to provide level of development matrix to the level of LOD 500. The project development matrix shall be approved by Saudi Aramco as part of the BEP at early stage of the project, of which will be the base of the design deliverables at all relevant stages.
3.12 Contractor shall develop the BIM models for the project for the purpose of a virtual walkthrough ready to be shown using the Saudi Aramco’s virtual reality equipment.
3.13 Contractor shall provide detailed project Level 3 schedule extracted from BIM with list of specific deliverables for production of design information for the entire project.
3.14 Contractor shall develop the detailed list of Bill of Materials (BOM) for
the full project using the BIM model.
3.15 Contractor shall submit a full set of all required specifications without any
deviation from Saudi Aramco Standards.
3.16 Contractor shall submit Tender Documents covering the requirements for constructing the facility. The documents shall include construction design changes compiled Drawings, Technical Specifications, reports, Bill of Quantity (BOQ) for master plan, civil engineering and architectural design requirements, structural and, Mechanical, Equipment, and Piping (MEP) engineering requirements and whatever applicable in Scope Of Work for each design and construction phases.
3.17 Contractor shall produce all required shop drawings prior of construction
directly from the BIM models.
3.18 Contractor shall produce MEP/ HVAC, Shop – Fabrication and sleeve drawings, etc., after BIM coordination is completed for the area of construction requiring these drawings.
3.19 Contractor shall update Energy Optimization and Green Energy Report to
include the effects of the manufacturing building design.
©Saudi Aramco 2020. All rights reserved.
Page 133 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings 3.20 Contractor shall comply with GI-0710.002 and SAEP-334 for the level of the confidentiality and classification of the data, models, and drawings as restricted drawings, unless classified at higher level as confidential.
SAES-A-202
3.21 All models shall conform, by project phase, to the Level of Development (LOD) Matrix as listed in the below table “A” and confirmed at project kickoff and approved by Saudi Aramco:
Table A – LOD Requirements
Phase
DBSP
LOD
200
Project Proposal (IFB) 300
Dimension
• 3D
• 4D
• 5D (Budgetary Estimate)
• 3D
• 4D
• 5D (Bidding Stage)
Detail Design (IFC)
400
Construction
400
• 3D
• 4D
• 3D
• 4D
As-built
500
• 5D (Change Orders)
• 3D (Operation and Maintenance)
3.22 BEP shall contain at least the minimum following information:
Project Templates And Standards Project Folders Structures & Data Security and Exchange Procedures.
Project Information
• • BIM Scope • Roles, Responsibilities, and Contact Information • • • Modeling Strategy & Elements’ LOD • Project Phases And Milestones • Collaboration Plan • Coordination Process And Design Change MoC Process • • • Quality Control & Review Procedures • BIM Design And Construction Deliverables
4D Sequencing 5D Cost Estimation
The implementation of BIM on each project should be planned by the contractor at the beginning of a project life cycle and shall be kept updated throughout the project lifecycle.
©Saudi Aramco 2020. All rights reserved.
Page 134 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings 3.23 All drawings, schedules, simulations, and services required for assessment, review, bidding and construction shall be extractions from BIM models and shall be in compliance with Saudi Aramco design requirements outlined in this document.
3.24 All underground utilities shall be 3D objects located at topographic
elevations, illustrating nominal sizes and type.
3.25 Contractor shall utilize energy modeling and sustainable design software based on BIM data to perform energy simulation and life cycle cost calculations to validate their energy modeling. Energy Validation Analysis and software shall be approved by Saudi Aramco.
3.26 The delivered IFC at the detail design shall be clash free at the development level of 400. Contractor shall assure constructability by using a Federated Design BIM. Contractor shall conduct constructability review meetings with participation of Saudi Aramco at least once during Conceptual Design, Detail Design phases and throughout construction.
3.27 The contractor shall provide the clash-free review models supported by
acceptable resolution report to Saudi Aramco for review and concurrence.
3.28 Contractor shall link the BIM models to a scheduling application to create a virtual, visual schedule that depicts construction sequencing and activities to achieve 4D Scheduling and Sequencing. This 4D model will show the sequencing of activities in space and time and accounting for constraints such as procurement lead time/logistics, resources, spatial constraints, and weather among others to help improve accuracy and to better understand the schedule. 4D is mandatory at the Project Proposal and Detailed Design phases.
3.29 Contractor shall be responsible for obtaining, at their cost, the trained personnel, hardware, and software needed to successfully use BIM for the project. Contractor shall also be responsible for accuracy and reliability of all technical disciplines in the integrated BIM models.
©Saudi Aramco 2020. All rights reserved.
Page 135 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
PROJECT SET-UP FOR BIM MODELING
4.1 General
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.1.6
Contractor shall follow SAEP-301 for all units of measure. For annotative precision, the precision for length will have zero decimals places. Angular Dimensioning will have a precision of two decimal degrees (.00) precision.
For the BIM origin and coordinates, all models must be in the correct and agreed upon location and orientation in 3D Space (X, Y, and Z coordinates). Contractor shall ensure all BIM team utilize these coordinates. It is crucial Project Points remain static throughout the life of the project. Refer to Section 8 of this appendix for more detail.
The contractor shall provide the minimum level of details established in Table “A” above. ISO 19650 and based on British BIM standards PAS 1192-2 (latest) and the US standards American Institute of Architects (AIA) Document E202-2013 shall be used as reference guidelines to comply with by the design and construction teams in addition to the project requirements. The provided contractor’s project LOD matrix in BEP shall be approved by Saudi Aramco project manager.
Suitable versions of other pre-requisite software needed for the BIM model as per the compatibility matrix of the BIM vendor shall be used.
It is the responsibility of the design contractor to complete all implementation documents and prepare documents as required for stakeholder reviews and final construction documents. The documents shall include shop drawings for fabrication.
The construction contractor shall ensure integration of BIM construction schedule and the implementation of Quality Assurance/Quality Control (QA/QC) program to deliver a complete As-built models.
4.1.7
Contractor shall develop Model Progression Matrix (MPM) to indicate the LOD for various types of data and disciplines. MPM shall be a part of the project BIM execution plan (BEP).
4.1.8
The BEP must define Project North in relation to true North. All BIM data for the project must use these defined directions
©Saudi Aramco 2020. All rights reserved.
Page 136 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
consistently.
4.1.9
Abbreviations when used shall be clearly defined and contractor shall ensure compliance to international terms.
4.1.10 Contractor shall provide means of visualization to be used for design review. Those means may include, but not limited to, the following:
Images (Screen Shots, Renderings)
• • Live Animations (Fly‐through, Panoramic immersion) • Federated BIMs in a Read‐only format.
It is the Contractor’s responsibility to make a free viewer available to Saudi Aramco.
4.1.11 Contractor shall maintain the following Colors for Clash Detection:
• Architecture: White • Structural Steel: Maroon • Concrete: Gray • HVAC Duct: Blue • HVAC Pipe: Lime Green • Electrical: Cyan • Plumbing: Magenta • Fire Protection: Red • Pneumatic Tube: Dark Green • HVAC Equipment: Gold • Communication Conduit: Light Blue • Equipment (Medical): Light Green • Medical Gas: Light Green • Security Systems: Orange • Fire Alarm: Fuchsia
4.2
BIM Uses
At a minimum, the BIMs shall be used for design reviews, submittals, and construction documents. Contractor shall detail project BIM uses and what the models will be used to produce during the different design stages of this particular project (DBSP, Project Proposal-IFB, Detailed Design-IFC, and Shop Drawings). This is part of the guide that instructs the project team on modeling requirements and shall be clarified in the BIM Execution Plan.
The BIM uses section shall list all BIM uses for the project and the party, or parties, responsible for completing that use and any output defined for
©Saudi Aramco 2020. All rights reserved.
Page 137 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings that use as well as specifying the relevant platform and exchange format for each discipline. It includes the different standards to be adopted for creating, developing and delivering of the relevant BIM model(s), which are a direct implementation of the set BIM uses and the project scope of work.
It is the responsibilities of the contractor to detail the needed BIM uses to achieve and fulfill project scope and meet Saudi Aramco BIM requirements. Project Manager is to make sure and agree to the contractor’s inputs.
4.3
PROJECT INFORMATION
BIM authoring tools, data integration, and collaborative team workflow environments shall be used to develop and produce project information and BIM models and documentations as required for submittals.
When initializing the project, contractor shall use the following:
• Project Number: This number shall be the facility building number.
• Project Name: A description of the building example such as “Aramco Innovation Center”. Project naming shall be coordinated with Saudi Aramco BIM Project Management Team.
• Company Name: Saudi Aramco
• Job Number: Budget Item (BI)I Number
• Project Location: address where the building constructed
• Project and Model Description: brief information about the project and modeling and what is composed. The full description of the project, milestones / phases and all organizations involved roles and in responsibilities during the project, including team member names and contact information shall be addressed in BEM plan or a separate BEP project information documentation.
locations, documents,
the project, office
Table B – Discipline Code
Discipline
Architecture
Architectural Interiors
Environmental Graphic Design
Civil
Electrical – Low Current
Electrical – Power & Lighting
Code
AR
AI
AG
CL
LC
EL
©Saudi Aramco 2020. All rights reserved.
Page 138 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Code
ME
MH
MP
MF
MI
SS
SC
Discipline
Mechanical General
Mechanical - HVAC Mechanical - Plumbing
Mechanical - Fire
Mechanical - Process
Structural-Steel
Structural-Concrete
4.4
PROJECT HIERARCHY
4.4.1
Folder Structure and Naming Conventions
(WIP)’,
‘Shared’,
‘Published’ and
The defined structure shall follow the principles of ‘Work In Progress ‘Archived’ segregation of data within a designated set of folders. All project data (excluding a local user’s copy of Central file) shall be held within the standard project folder structure located on a central network server or appropriate Document Management technology. This includes all WIP components or assemblies.
4.4.2
Central Resource Library Folder Structure:
Standard templates, drawing borders, families and other non- project-specific data shall be held within the server based Central Resource Library, with restricted write access.
4.4.3
Local Project Folder Structure
Changes shall regularly be synchronized with the central file(s).
4.4.4
Project Folder Structure
The following folder structure is provided as an example arrangement. Numeric prefixes in the names of folders and files are used for proper sorting of files and folders.
©Saudi Aramco 2020. All rights reserved.
Page 139 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
4.4.5
The Models under each Discipline shall be created as per the following guidelines:
Design Area: This could represent a physical facility, e.g., Building code\name or logical breakdown which can act as design areas. The Design Area can be used to subdivide the project into meaningful subfolders.
Model: The models shall be created in respective to project and disciplines, under respective Design Areas. The model number & model descriptions shall be done in such a way that a user can locate a facility item from the correct model and the correct design area with ease.
Model Number: The Model number shall reflect the Project, Discipline, Design Area, and Floor No. and Sequence number. The submittal or project millstone can be added as part of the name for model submittal. For example: an architecture models of project called (Innovation Centre “01210”) in design area (Building Code\name “6154”) in Mezzanine Floor and has sequence of 01 and shall be 01210-B6154-A-M-101. To indicate the submittal phase the model name can be 01210- B6154-A-M-101-30 (for 30%) and 01210-B6154-A-M-101- IFC (for IFC).
©Saudi Aramco 2020. All rights reserved.
Page 140 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Model Description: Two ways can be adopted to give the Model Description. The Suitable one shall be consistently Description, Discipline & Model no. (e.g., Architecture model for Mezzanine floor of Building 6154).
NAMING CONVENTIONS
Refer to Section 10 of this standard for the Naming Convention of Mechanical, Electrical, Intstrumentations, Piping, and cables.
MODELING
Contractor is responsible for the accuracy of the model, data and the Level of Development (LOD) required for all elements(s) or systems(s) in the BIM models.
6.1 Modeling Main Principles
The following main principles shall be observed when creating and using the design components:
6.1.1 All components shall reside in the library of the specific project.
6.1.2 Components generated during the design development will be stored in the Work In Progress (WIP) area of the Common Data Environment.
6.1.3 The intended purpose of the components shall be considered
during content creation.
6.1.4 The BIM Manager/Coordinator shall assess and verify minimum quality compliance for all new objects to be approved by Saudi Aramco.
6.1.5 Components shall be developed with the LOD required at the
particular stage of design process. Refer to Table “A”.
6.1.6 Further purposes of the BIM will lead to additional specifications of the content, which should be built to suit the purposes of the deliverables. Information can be added to the existing components either by means of creation of shared parameters and their assignment to specific categories of elements within the design itself, or by separate addition of these parameters to each library component. Method that is to be used shall be defined in the BEP.
6.1.7
A corporate shared parameter file is encouraged in order to maintain consistency of variable naming during content creation. Where multiple LODs of the same component do exist, care should
©Saudi Aramco 2020. All rights reserved.
Page 141 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings be taken to ensure that the same Shared Parameters are incorporated into the objects, in order to maintain data integrity.
6.1.8 For drawing compilation and preparation for publication can be carried out by fully assembling compilation of views and sheets within the BIM environment.
6.1.9 Drawing sheet composition from within a BIM environment shall be established through the linking of views, callouts and elevations to drawing sheets fully within the BIM authoring software
6.2
Level of Development (LOD)
The Level of Development (LOD) required for elements or systems in the BIM models shall be detailed by the contractor in the BEP plan and agreed by Saudi Aramco.
The model elements shall contain the information and data required at each stage of the project and the BIM modelling process.
The Level of Development (LOD) for each architectural element shall be determined and described within the LOD Definitions/Requirements document or part of the BEP plan.
Contractor shall follow the LOD Definitions developed by the American Institute of Architects (AlA) and be grouped by the key disciplines used in Saudi Aramco construction projects- LOD 100 to LOD 500, as and where applicable.
The minimum level of development shall follow Table-A for the mentioned phase. The final Project backup delivered to Saudi Aramco- EK&RD shall have all the models & related drawings in ‘As-built’ stage and shall have minimum BIM Level of Development 500 and all model elements shall be field verified.
6.3
LOD Responsibility Matrix
LOD Responsibility Matrix shall be developed to reflect Saudi Aramco requirements for BIM elements presence in BIM models, and the required LOD. LOD Responsibility Matrix shall contain the following information:
©Saudi Aramco 2020. All rights reserved.
Page 142 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Element is required
(Y/N)
Quantity Take-off (QTO)
Category Code (CAT Code)
AUT
Project Phase
LOD
Site Model
Discipline Models
Typical data that can be extracted from the BIM Model for quantity measurement take off requirements in the BIM PXP Alphabetic code for each type of model element. Can be used for clash analysis, QA and model reviews. This code may be replaced by a Uniformat code Model Author
DSPB, Project Proposal, Detailed Design, Shop Drawings
Level of Development required
Site Model
Architecture/Structure/Mechanical/ Ventilation/Air-Conditioning/Electrical/ Communication/Building Systems Models. Any other Discipline model required by Saudi Aramco
6.4
Project Model Configuration
The combination of scale, density, and level of detail for building information models dictates certain models must be divided, in case of large scale BIMs. The BIM project can be divided into multiple models, in case essentially required and agreed by the assigned Saudi Aramco project manager, to accommodate scope of work, team structure, model performance and overall collaboration.
The objective is to break the project into as few models as possible while maintaining targeted open and synchronizations times for the minimum computing hardware. The models will be divided based on disciplines, model’s function and to accommodate the optimum size. When BIMs are divided, the continual and periodic linking of neighboring models is necessary as well as linking the corresponding models of other disciplines. Mutually developed and well managed work sets play an important role here in maintaining practical file open times for all teams.
6.5
BIM Procedure
BIM Procedures establish the processes that define the preparation of the BIM Model and govern the validity and the adequacy of the included technical data and other modelling information and references. BIM Procedures shall be established by Contractor and approved by Saudi Aramco.
The following items shall be applicable to any BIM project:
©Saudi Aramco 2020. All rights reserved.
Page 143 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
• BIM Origin Point & Orientation • Modeling Methodology and Model Division • File Naming Convention and Model Units • Layer Coding and Naming Convention • Annotations, Dimensions, Abbreviations and Symbols • IT Hardware & Software Solutions and Upgrades • Information Exchange Format • Data Security & Back-up
BIM models process shall be detailed by the contractor in the BEP plan and agreed by Saudi Aramco.
6.6
Collaboration Plan and Coordination Process
Contractor shall coordinate project collaboration environment for document management and file sharing, reviewing tools, project communication, and a built-in viewer for reviewing 3D BIM models.
The following requirements shall be met as minimum for collaboration between the design and the construction contractors:
• Contractor shall provide Collaboration Plan and have it approved by Saudi Aramco. The collaboration process shall allow other project’s team members for accessing up-to-date model and share required BIM models, drawings, and documents for completing work assigned.
• Contractor shall provide a communication plan detailing the required project meetings and workshops including phase of activity, frequency, and attendees. The types of meeting shall be for activities such as but not limited to, modeling status, project coordination, clash detection and other 3D models coordination’s and reviews. The workshops and meetings shall cover all project phases. The description collaboration process plan and communication plan shall be part of the contractor’s BEP plan.
• The Contractors BIM Manager shall develop a BIM folder structure in coordination with the Design Teams BIM Manager to be utilized in the designated project server or portal for access by the entire project team for uploading project data and the 3D models produced for work members from Design/Construction and Sub-contracting Teams. These BIMs will be accessible to an authorized team members for individual coordination purposes on a trade by trade basis.
©Saudi Aramco 2020. All rights reserved.
Page 144 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings • Contractor shall maintain accurate As-built Model and ensure clear and smooth data/file exchange coordination process between the design team and the construction trades. The Contractor is responsible to maintain project folder and project sharing environment that is in-line with all parties working in all phases of the projects. Such process shall be detailed in the BEP plan and approved by Saudi Aramco.
6.7
Discipline Modeling Requirements
It is the responsibility of the Contractor to meet and fulfill the project scope requirements set by Saudi Aramco and achieve a complete BIM models.
BIM Modelling at each stage of the project and level of development of the elements produced at each stage shall be carried-out as specified in the BIM Execution Plan (BEP). The resulting outcome of the BIM Modelling at each stage of the project shall be accessible to reviewers during project BIM reviews to all participants in the Project Review process from all involved Disciplines (Architectural, Structural, Mechanical, Electrical, Civil), as well as other potentially involved specialized disciplines. Reviewers shall be able to access via the review tools within the Saudi Aramco project review System for the review purposes and comments specific for that discipline.
The general Discipline Modelling Requirements could be amended from time-to-time by Saudi Aramco, depending on the required BIM modelling detail for a particular project.
Discipline Modelling Requirements for existing and/or additional element types may be added or omitted by Saudi Aramco for a specific discipline.
Discipline Modelling Requirements shall include detailed requirements for modelling the applicable types/groups of elements for that discipline.
Discipline Modelling Requirements for the disciplines conventionally involved in a Building Construction project and the BIM process shall include the following items to be modeled as a minimum:
6.7.1
Architecture
6.7.1.1 Architectural models must include the BIM Objects relative to floors, exterior and interior walls and partitions, roofs, vertical transportation, windows, doors, stairs, ramps, railings, ceilings, grilles & gates, interior specialties, etc.
©Saudi Aramco 2020. All rights reserved.
Page 145 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings 6.7.1.2 Required structural blocking (such as for TV, monitors) must be modeled for quantities, size, shape, and location, etc.
6.7.1.3 Major structural components from the Structural model (including but not limited to structural walls, floors, roof structure, columns, and foundations) shall be referenced. Interiors Model, Equipment Models, and appropriate building equipment and systems models (including mechanical for louvers), and others as needed to coordinate the work shall be referenced
6.7.1.4 Interior Finishes: Interior finish plans, ceiling plans, of intelligent elevations, objects/elements must be used to convey materials and finishes in a separate Interiors model, associated with the architectural model (and others as required)
scheduling
and
6.7.1.5
Interior Finishes must be included as a part of the room properties. All materials that are representative of a system greater than ¼ inch in thickness s be included in the model as 3D geometry (example: wall protection, interior cladding such as stone, masonry, glass, metal, or wood paneling)
6.7.1.6 Walls: Wall bases shall be modeled (based on dimension and type) where elevated. Wall finishes greater than ¼ inch thickness must be modeled for coordination and clearance. Non- geometric data (e.g., actual material specified) shall be included as part of the room finish tag on the architectural finish plans.
6.7.1.7 Modular Furniture: Manufactured modular furniture selected for the design-intent documents shall be modeled to correct dimensions (length/width, depth, and height) and linked to the basis-of-design cut sheet for the item
6.7.1.8 Ceilings: All ceiling materials, other than paint, shall be modeled and included as part of the overall room finish tag
6.7.1.9 Stairs: All stair finishes shall be scheduled in the
model
6.7.2
Structure
©Saudi Aramco 2020. All rights reserved.
Page 146 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings 6.7.2.1 Structural models must be the basis of evaluating and analyzing the building structure, and shall include all structural objects, elements, components and systems.
6.7.2.2 All material and material properties must be included
for each object.
6.7.2.3 Building structure and geometry must be accurately defined and foundations, subgrade for enclosures, slab-on-grade, superstructure, and exterior vertical enclosures and roofs.
labeled
6.7.3 Mechanical, Electrical, Plumbing, Fire Protection,
Technology Systems
6.7.3.1 Mechanical, Electrical, Plumbing, Fire Protection, and Technology systems must be in their own discipline models, referenced to the Architectural model and other discipline models as needed.
6.7.3.2 All system models must
include all equipment necessary for operations, including (but not limited to) boilers, chillers, geothermal and solar energy systems; pumps and piping distribution systems (including modeling for pipe slope and insulation), water- side terminal units; fans, air handlers, air distribution and evacuation systems (including modeling for duct and equipment insulation), air-side terminal units, variable air volume - VAV boxes; electrical feed and distribution systems transformers, electrical panels and switchgear, lighting, emergency circuitry, emergency generators; all public utility systems from tap, all control systems, data and phone wiring and terminal devices, data switches, data rooms, etc.
6.7.3.3 Mechanical: All components of the mechanical systems must be modeled accurately, and include the necessary space reservations for appropriate access during maintenance and replacement. Louvers should be modeled as a part of Mechanical.
6.7.3.4 Electrical: The Architectural, Mechanical, and Electrical models must reference each other and be a part of the Design Coordination to eliminate any mismatches between the models.
©Saudi Aramco 2020. All rights reserved.
Page 147 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings 6.7.3.5 Plumbing for Domestic (Potable) Water: All of the supply and return elements, components, and distribution systems of the Domestic Water System must be modeled regardless of size, with properties for the name of the system (e.g., Domestic Water), material (copper, PVC, etc.) diameter of pipe, direction of water flow, design temperature ranges, filter locations and type, color coded differently for supply and return, and other identification necessary to be able to view the Domestic Water System independently from other plumbing systems. The Domestic (Potable) Water system shall be identifiable and manageable for safety during facility management operations.
6.7.3.6 Fire protection models: must include fire ratings, sprinkler medium, pressure and flow volume
6.7.3.7 All riser diagrams shall be model-based
6.7.4
Site Civil
6.7.4.1 All features and information typically provided in site plans must be provided. This includes roadways, walks, physical (contours), features, location, and rim and invert
topography
6.7.4.2 Elevation levels of underground utilities, soil / geotechnical conditions, etc. AE modeling of subsurface utilities and conditions must be labeled as FOR INFORMATION ONLY
6.7.4.3 Buildings must be minimally modeled for site civil work but must reflect the accurate location of outside proposed building walls and any utility penetrations through floor slabs and walls below ground.
6.7.4.4 Site elements requiring maintenance must be labelled
separately.
6.7.4.5 Underground Site Utilities- Objects must be modeled in 3D for civil underground utilities and site work, both existing and proposed All properties of the utility shall be included.
identify
their
to
type.
6.7.4.6 Modeling of Underground Site Utilities shall extend to 1,500 mm (five feet) beyond the project construction
©Saudi Aramco 2020. All rights reserved.
Page 148 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings boundaries and will connect with the site and building utility services, if such are present.
6.8
4D Scheduling and Sequencing
The below table defines the minimum primary elements that are required in a 4D simulation but are not limited to:
Discipline
Minimum Required
Structural Systems
Exterior building envelope
All structural framing components including foundations, grade beams, columns, load bearing walls, floor and roof decks and support Stud walls, Exterior Panels and assemblies, curtain walls, openings, glazing
Interior partitions
Main plumbing walls and wall assemblies
Mechanical system
Main Ductwork and Equipment, (Separated by floors)
Electrical
Main runs and Equipment, Separated by floors
Roof systems
Roof Assemblies, Major Equipment, Openings
Site work and ground plane Excavation work, footings, foundations,
Plumbing
6.9
5D Estimation
on‐grade Slab Main Connection lines from site, main plumbing lines
The complete Project Cost Estimates/ Priced Bill Of Quantity shall include quantities derived from both the BIM data and conventional methods as appropriate and necessary. The cost estimation shall be prepared from the Project Team’s BIM Process.
The design team shall extract square meter and system information using BIM Authoring software and other BIM integrated tools to support comparative cost analysis. The output result shall be able to be converted to spreadsheets. The Schematic Design (SD) phase given the low level of development of the BIMs and used as a validator for Probable Cost Estimates.
As the BIMs LOD progress through the design phases, the design team shall use the quantities in the BIMs as a validator for their Estimates. It will be the responsibility of the design team to specify when they are writing the BEP plan what method and software they will use to perform this task. Below table indicates minimum requirements:
Stage
Minimum Required
©Saudi Aramco 2020. All rights reserved.
Page 149 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Planning
Probable Cost
Schematic Design Concept Design Detail Design
Probable Cost & quantity Takeoff based on Square Footage
Probable Cost & quantity Takeoff based on available BIMs at LOD 200 Probable Cost & quantity Takeoff based on available BIMs at LOD 300
6.10 As-built and Advanced Modeling Requirement
6.10.1 The provided information for the BIM models dimensions in this documents defines a minimum of “As-built” Saudi Aramco requirement (LOD 500).
6.10.2 Project requirements may request more to advanced level such as LOD 600 and acquire 6D, sustainability assessment, or even 7D for facility management. The requirements for advanced modeling shall be detailed in the owner scope requirements.
6.10.3 Contractor shall continue development of the models created in the Design Development Phase. Maintain parametric links within the respective models to enable automatic generation of all plans, sections, elevations, custom details, schedules, and 3D views. All information needed to describe the execution documents shall be graphically or alphanumerically included in and derived from these models only.
Table below provides the deliverable formats required according to project phases and LOD:
©Saudi Aramco 2020. All rights reserved.
Page 150 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Project Phase
Concept Design
Design Development
Tender Design
LOD Level
100
200
300
Construction/Fabrication
400
As-built / Record Documents
500
Deliverable Formats
Native, Industry Foundation Class, Review Format, PDF Native, Industry Foundation Class, Review Format, PDF Native, Industry Foundation Class, Review Format, PDF Native, Industry Foundation Class, Review Format, PDF, COBie data set deliverables Native, Industry Foundation Class, Review Format, PDF, COBie data set deliverables.
6.10.4 BIM models shall be submitted at 30%, 60%, 90%, Issued For Construction (IFC) and 100% As-built with all drawings matching with LOD as per this appendix and BEP.
6.11 Quality Control and Clash Detection
The design and construction teams shall take full responsibility to utilize an efficient processes for reviewing project works and provide BIM quality end results. All conflicts and interferences shall be identified within the BIM and/or BIMs, which would adversely affect the work described within the Construction Documents, shall be rectified prior to the final submission of the 100% BIM models and related drawings to Saudi Aramco project manager for review and acceptance.
6.11.1 At a minimum, the Design Team shall use automated conflict checking software to identify coordination issues within and between the BIMs that would adversely affect the execution of the work required by the Contract Drawings during and at the conclusion of 100% Construction Drawings.
6.11.2 The design team shall, at a minimum, use the Interference Check Tool on a routine basis during and at the conclusion of each Design Phase and or Sub-Phase, and as per their approved “Quality Control Program”.
6.11.3 It is the design and construction Team’s responsibility to conduct and manage an adequate and thorough clash detection process so that all major interferences between building components are detected and resolved before construction begins. It shall be the goal of the Design and construction teams to reduce the number of changes during construction due to major building interferences to zero.
©Saudi Aramco 2020. All rights reserved.
Page 151 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings 6.11.4 The design and construction Team’s BIM Managers shall assemble a composite BIM from all of the BIMs from each design discipline for the purpose of performing a visual check of the building design for spatial and system coordination. Vertical shafts should also be reviewed to ensure that adequate space has been allocated for all of the vertical mechanical systems and that all of the shafts line up floor to floor. Prior to each scheduled coordination meeting, an updated clash report will be issued by the Construction Team BIM Manager to the technical discipline consultants.
6.11.5 Coordination software shall be used for assembling the various design BIMs to electronically identify, collectively coordinate resolutions, and track and publish interference reports between all disciplines. The technical disciplines shall be responsible for updating their BIMs to reflect the coordinated resolution.
6.11.6 The Project Team shall review the model and the clash reports in coordination meetings on a regular, as-needed, basis throughout the design phases until all spatial and system coordination issues have been resolved.
6.11.7 During the construction phase, the accuracy of fabrication BIMs shall be verified. Prior to each fabrication submittal for approval, fabrication contractors shall submit their BIMs to the Construction Team BIM Manager for integration and clash detection / coordination and resolution.
6.11.8 Internal clash resolution, design consultants and subcontractors who are responsible for multiple scopes of work are expected to coordinate the clashes between those scopes prior to providing those BIMs to the appropriate Design/Construction BIM Manager for spatial and system coordination.
6.11.9 Contractor shall define D4M reviews (Design for Maintenance) in the BEP plan and incorporate them into constructability reviews. Reviews should address accessing at a minimum: all asset types requiring COBie data set deliverables.
©Saudi Aramco 2020. All rights reserved.
Page 152 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
DRAWINGS TO BE GENERATED
The drawing types that can be generated from the approved software are, but not limited, as the types mentioned in the below table. Any drawing type required by the proponent from the below table shall be generated using the approved software.
INDEX
DRAWING TYPE
DESCRIPTION
A
EQA
EQUIPMENT ARRANGEMENT / LAYOUT / LOCATION / LEGEND
L
M
J
P
ISO PDT PPL
PPL
SDT SDT SDT SDT
ARC ARC
ISOMETRIC PIPING DETAIL/ISOM PIPING SECTION/DETAIL/ELEVATION PIPING PLAN/LAYOUT/ARRANGEMENT PIPELINE ROUTING (ABOVE/UNDER-GROUND/SUB- MARINE) HVAC LAYOUT/PLAN/ARRANGEMENT HVAC DETAILS
PLAN/SECTION/ELEVATION/DETAIL STRUCTURAL ELEVATION/LAYOUT/PLAN WALKWAY PLAN/SECTION/ ELEVATION ALL DRAWINGS RELATED TO STRUCTURAL DETAILS
WALLS\FLOORS DETAILS ARCHITECTED LAYOUT/PLAN/ARRANGEMENT
RAK
INSTRUMENT LAYOUT (if applicable)
CBL CBL CBL CBL
CABLE TRAY/RACEWAY PLAN/LAYOUT CONDUIT LAYOUT CONDUIT RACEWAY PLAN/LAYOUT CONDUIT & JUNCTION BOX ARRANGEMENT
GEO-REFERENCE
8.1
The design team is required to geo-reference building information models, site plans and associated construction drawings to provide projection and coordinate system information necessary to ensure interoperability and display in real world geographic coordinates within existing Geographic Information Systems (GIS).
©Saudi Aramco 2020. All rights reserved.
Page 153 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
SAES-A-202
Saudi Aramco Engineering Drawings Final models, site plans and associated construction drawings shall be delivered based on Universal Transverse Mercator (UTM) coordinate system and Zones (36-40).
8.2
8.3
8.4
Projects located in Saudi Arabia; shall utilize the International 1924 Ellipsoid Saudi Aramco Ain Al Abd (1970) Horizontal Datum and on the SAVD (1978) Vertical datum, and; shall employ measurement units appropriate to the project’s scale and design in Meters per Saudi Aramco Engineering Standard SAES-A-100 “Survey Coordinates, Datum, and Data Formats”.
Further clarification related to the Geo-References, refer to Engineering Support Department/Geomatics Services Division (GSD), as it is responsible for coordinate systems, horizontal and vertical datum, datum transformations and data formats that will be used in engineering, design, construction, surveying, mapping, charting, and drawings of all Saudi Aramco facilities.
LASER SCANNING
Where laser scanning is planned in BIM project, scanning tolerances, file compatibility formats, and transfer methods shall be documented and coordinated with Geomatics Services Division (GSD). Laser scanning, in case required in BIM project, shall be detailed in the BIM Execution Plan by the contractor and approved by GSD and Saudi Aramco BIM project manager.
PROJECT DELIVERABLES
Contractor shall update their respective models with recorded changes (record drawings) before any submittals. Any 2D drawings effected shall be reproduced in their requested formats. It is mandated by Saudi Aramco that the BIM final models shall be cleaned of extraneous objects or/and other content that not needed and were used during development of the As-built models. All models and files shall be submitted in native software files, Industry Foundation Class and PDFs.
All BIM submissions to be provided in three formats: native format, which depends on the tool selected by the author and approved by EK&RD, PDFs, and the Industry Foundation Class format. BIM submissions shall comply with Saudi Aramco handover project review milestones (30%, 60%, 90%, Issued For Construction (IFC) and As-built Final). The contract has to submit in both the native and Industry Foundation Class formats at all stages of the facility lifecycle
- from planning through design, construction and operation (including As-built or record BIMs), and into operations.
©Saudi Aramco 2020. All rights reserved.
Page 154 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings All BIM record and facilities models, drawings, tender packages, and documentations shall be provided by the contractor project team in As-built state as per the tables below:
SAES-A-202
Milestones
Deliverable
Contract Award
BEP Plans (approved by Saudi Aramco)
Conceptual Schematic Phase Architectural Massing Model
Advanced Schematic Design Phase
Design Development
Construction Documents
Bidding
Construction Phase
Project Close‐out
Preliminary Energy/ Solar Orientation Analysis Architectural Model Schematic Energy Model Program and Space Validation Massing Model Civil Model COBie Data and Asset Worksheets Architectural Model Civil Model(s) MEP Model(s) Structural Model Program Validation Report Discipline Interference Reports Sustainable Design and LEED Credit Documentation COBie Data and Asset Worksheets Architectural Model Civil Model MEP Model(s) Structural Model Pre‐bid Collision Report Phasing Models (if applicable) COBie Data and Asset Worksheets Federated Model (Single integrated database) Design BIMPxP Coordination Models Collision Reports Architectural MEP/ FP Models Structural Models Fabrication Models (if applicable) Phasing Models COBie Data and Asset Worksheets Record Model ‐ Architect As-built Model ‐ clashes detected and verified, and model take-off Record Documents Project Drawings (Native and PDF format) O&M Manuals As-built Drawings COBie Data and Asset Worksheets
©Saudi Aramco 2020. All rights reserved.
Page 155 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use
Document Responsibility: Engineering Data and Drawing Systems Stds. Committee Issue Date: 11 August 2021 Next Revision: 29 October 2024
Saudi Aramco Engineering Drawings
SAES-A-202
Revision History
11 August 2021 26 March 2020 29 October 2019 25 May 2014
Editorial revision to fix incorrect referencing in standard’s appendix. Editorial revision. Addition of Appendix-H for Building Information Modeling (BIM) specification. Revised the Next Planned Update, reaffirmed the content of the document, and reissued as major revision.
©Saudi Aramco 2020. All rights reserved.
Page 156 of 156
Saudi Aramco: Company General Use Saudi Aramco: Company General Use