Unnamed: 0 | REQUIREMENTS | VENDOR CONFIRMED/NOT APPLICABLE/NOT CONFIRMED | VENDOR DETAILS (When applicable) | VENDOR COMMENTS | CONTRACTOR AGREED/NOT AGREED | CONTRACTOR COMMENTS | STATUS |
---|---|---|---|---|---|---|---|
1 | 5.3.3.7 VENDOR shall identify in the Quotation the country of origin of materials being quoted. SUBVENDORS List | CONFIRMED | Separate document provided with this TQ response | NaN | NaN | NaN | NaN |
2 | SAFETY SHOWERS | NaN | NaN | NaN | NaN | NaN | NaN |
3 | Including emergency eyewashes. | CONFIRMED | Please refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer) | Already included in our Offer | NaN | NaN | NaN |
4 | Connector size type: 1.5”, rating 150#, FF. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
5 | 1-1/4” NPS SS 316/316L pipe for safety shower. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
6 | ½” NPS SS 316/316L pipe for eyewash. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
7 | 1-1/4” to 1-1/2” reducers | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
8 | SS eyewash receptor basin (bowl). | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
9 | Chrome plated brass eye wash heads. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
10 | ABS plastic float-off covers. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
11 | 1-1/4“ NPS for inlet/drain connections. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
12 | Pedestal or floor mounted | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
13 | Selfdraining valve | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
14 | Antiscald protection valve | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
15 | eyewashes noozles with covers easily to remove | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
16 | Pressure controllers or selft regulating valves | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
17 | Pressure gauge: wettered part SS316 as minimun, range 30-70%, connection1/2”MNPT,dials 4 1/2” diameter, black numerals. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
18 | Strainer | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
19 | Activation: Step press and handle activator | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
20 | Flow switch: \n1)Piston or shuttle type 2 signal, One routed to junction box to the DCS , Other local to activate de beacon and horn.\n2) and double-pole, double-throw (DPDT) RATED AT 0.5A AT125VDC. Electrical entry (M20). The enclosures (in severe corrosive environments service) shall be NEMA Type 4X or IEC 60529 Type IP 66. As a minimum, the instrument enclosures shall be made of 316 SS or cast copper-free aluminium (0.6% max. copper), Adequate for use in Class I, Z2, IIB, T3, Explosion Proof (Ex ‘d’) per IEC. | CONFIRMED (with Clarification) | 1) Flow Switch model offered is the same type as supplied previously to TR on the Saudi Aramco ‘Marjan’ project (TR PO # 106510911). The flow switch is a Diaphragm type (not vane or paddle). \n2) 2 x SPDT Switch-Linked rated at 5A at 250VAC & 3A at 30VDC.\n- Please refer to Instrument Datasheets provided with original Offer. | Already included in our Offer & previously Approved for use on Saudi Aramco ‘Marjan’ project. | NaN | NaN | NaN |
21 | Alarm devices: \nHorn (90dB) and beacon(red flashing):\nmounted on shower body | CONFIRMED | 110dB(A) @ 1m +/- 3dB. \nPlease refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer) | Already included in our Offer | NaN | NaN | NaN |
22 | VENDOR shall provide 24VDC power converter in local panel for operation of beacon and horn | CONFIRMED | Please refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer) | Already included in our Offer | NaN | NaN | NaN |
23 | Suitable for Class I, Zone 2, IIB, T3, explosion proof. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
24 | Electrical power distibution | NaN | NaN | NaN | NaN | NaN | NaN |
25 | Power supply for beacon and siren shall be terminated in local panel. Contractor will provide only 1 power supply 230 VAC, 60 Hz, 1Ph+N+G. Vendor shall distribute power from local panel to beacon, siren and lighting. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
26 | Power cable shall comply with SAES-P-104. Incoming cable (by Contractor) shall be armored 2x4+4(G) mm² and to be connected to Junction Box. Cable gland for incoming cable shall be NPT and supplied by Vendor. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
27 | From that power and, within the SSEW/EW battery limit, vendor shall distribute it to all elements (lightning, alarm horn, beacon) as required, by properly wiring. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
28 | Connections to Field Junction Box. See point 10.2 within SAES-J-902 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
29 | All power converters from 230VAC to lower voltage, if required, shall be provided by vendor/manufacturer. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
30 | Supply and routing of cables for distribution among JB (junction box) and rest of devices must be under vendor scope as well. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
31 | Local panel shall be: | NaN | NaN | NaN | NaN | NaN | NaN |
32 | As per SAES-P-104 clause 7. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
33 | Suitable for Highly corrosive environment. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
34 | NEMA 4X, preferably made of fiberglass. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
35 | Suitable for hazardous area CLASS1, ZONE 2, GROUP IIB, T3/ CLASS1, ZONE 1,GROUP IIC, T1 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
36 | Suitable for 55 °C Ambient Temperature . | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
37 | Minimum input and output cable cross section 4 mm² | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
38 | For input cables, minimum 6 terminal blocks (2ph+ 2N + 2GND) | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
39 | Light Bulb (LED,Luminaire) | NaN | NaN | NaN | NaN | NaN | NaN |
40 | Preferably located at the top of the structure, a | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
41 | LED luminaire to illuminate the area with 100 Lux at grade level on safety shower area, complying with following characteristics: | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
42 | LED Lighting fixture CRI 80 or greater, | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
43 | CCT 5000K | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
44 | 230V, 60 Hz, 1Ph+N+G | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
45 | For outdoor areas such as oil refineries, chemical and industries facilities, Class1,Zone 2, IIB, T3 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
46 | Ex nA or nR. Factory Sealed. IP66 (NEMA 4X) | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
47 | 55 °C Ambient temperature. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
48 | Luminaire shall comply with SAES-P-123 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
49 | Power supply (230 VAC – 1ph+N+G) shall be taken by Vendor from Vendor local panel. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
50 | Photocell. | NaN | NaN | NaN | NaN | NaN | NaN |
51 | Vendor shall provide a photocell (at each shower) with the suitable control to automatically turn the light off during daylight. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
52 | IEC Ex suitable to be installed in Zone 2, gas group IIB, T3. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
53 | Enclosure (Junction box) | NaN | NaN | NaN | NaN | NaN | NaN |
54 | Requirements shall comply with points 7.1 to 7.6 of specification SAES-J-902. Junction Box shall be suitable for severe corrosive environment. Material shall be either SS 316 or UV protected GRP with three side sunshades. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
55 | Connections to Field Junction Box shall comply with statements as shown in point 10.2 within SAES-J-902 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
56 | Material Test Reports and Certificates shall be supplied in accordance with Saudi Aramco Inspection Requirements (Non Material Requirements). | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
57 | All Safety Showers shall be hydrostatic tested. Any other test instead of hydrostatic is not allowed, unless otherwise indicated. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
58 | VENDOR shall perform a functional and electrical inspection and test certificates will be submitted to CONTRACTOR for its review and approval. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
59 | Coating selection, surface preparation, inspection and testing for safety showers shall follow the ARAMCO standards stated in clause 5.3.7.3 of this document. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
60 | Colour\nSafety showers and eyewash shall be properly painted comply according to with SAESB-069 (Paragraph. 7.4) and SAES-B-067 “Safety Identification and Safety Colours | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
61 | The finish colour shall be according Spec 10651-00-PRE-SP-0001 Colour Coding For Equipment and Piping (Green / White RAL 6016/9010 ) | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
62 | Signage | NaN | NaN | NaN | NaN | NaN | NaN |
63 | If the location so permits, permanently installed safety shower and eyewash units shall have a vertical background area nominally 1 m wide by 2 m high painted with either alternating green and white stripes approximately 152 mm wide or a solid green colour (refer to SAES-B-067). | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
64 | The appropriate sign with words in Arabic and English shall be mounted in a clearly visible location near each permanently installed emergency shower and eyewash (refer to ANSI Z535.2,ANSI Z535.3, and SAES-B-067). | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
65 | Dedicated text in Arabic and English as per above standard to be included with the following information: | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
66 | Get into shower immediately. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
67 | Remove contaminated clothing while showering. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
68 | Shower for at least 15 minutes. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
69 | Summon medical assistance. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
70 | Sign board made of green plastic. White text on green background. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
71 | Each safety shower shall be identified by using a stainless-steel label with TAG number (available on each Data Sheet) firmly joined to it. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
72 | Instrumentation elements contained within the scope of the SSEW or EW, shall have as well individual tagging in addition.(Name/TAG complete list of all instruments to be provided later by CONTRACTOR.) | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
73 | Substitution\nFor any materials substitution, sufficient data shall be provided by the VENDOR to justify the substitution. This data shall include but shall not be limited to physical, mechanical and corrosion resistance properties. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
74 | preventative maintenance, overhaul procedures and schedules for the SUPPLY. VENDORshall provide | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
75 | Marking of safety showers and Washers shall be according to 12-SAMSS-005 and SAES-B-069. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
76 | No color coding for material segregation purposes is required at Warehouse since they are clearly identified. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
77 | Packing and transportation procedure shall be submitted for approval. Packing shall protect Safety Showers and Eyewashes against mechanical damage during Shipping and transportation | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
78 | Coating selection, surface preparation, inspection and testing for safety showers shall follow the ARAMCO standards stated in clause 5.3.7 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
79 | Replicability for safety showers shall follow the ARAMCO standards stated in clause 5.3.9 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
80 | Calibration certificates All measurement instruments and pressure safety valves within VENDOR´s scope of supply shall be calibrated prior to shipment to site. A calibration certificate (traceable to laboratories certified according to ISO/IEC 17025:2017) must be issued per each instrument. and 5.8.6 clause. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
81 | Data sheets, according to 5.8.8 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
82 | HSE documents VENDOR shall submit (if available) a copy of his HSE policy and/or HSE Management System (ISO 14001, OHSAS 18001/ISO 45001). | CONFIRMED | Copy of H&S Policy and H&S Handbook provided. | NaN | NaN | NaN | NaN |
83 | EYEWASHES | NaN | NaN | NaN | NaN | NaN | NaN |
84 | Connector size type: 1.5”, rating 150#, FF. | CONFIRMED | Please refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer) | Already included in our Offer | NaN | NaN | NaN |
85 | ½” NPS SS 316/316L pipe for eyewash. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
86 | 1-1/4” to 1-1/2” reducers | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
87 | receptor basin (bowl). | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
88 | Chrome plated brass eye wash heads. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
89 | ABS plastic float-off covers. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
90 | ½” NPS for inlet and 1-1/4“ NPS for inlet/drain connections. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
91 | Selfdraining valve | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
92 | Antiscald protection valve | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
93 | eyewashes noozles with covers easily to remove | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
94 | Pressure controllers or selft regulating valves | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
95 | pressure gauge: wettered part SS316 as minimun, range 30-70%, connection1/2”MNPT,dials 4 1/2” diameter, black numerals. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
96 | Strainer | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
97 | Activation: Step press and handle activator | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
98 | Flow switch: \n1)Piston or shuttle type 2 signal, One routed to junction box to the DCS , Other local to activate de beacon and horn.\n2) and double-pole, double-throw (DPDT) RATED AT 0.5A AT125VDC. Electrical entry (M20). The enclosures (in severe corrosive environments service) shall be NEMA Type 4X or IEC 60529 Type IP 66. As a minimum, the instrument enclosures shall be made of 316 SS or cast copper-free aluminium (0.6% max. copper), Adequate for use in Class I, Z2, IIB, T3, Explosion Proof (Ex ‘d’) per IEC. | CONFIRMED (with Clarification) | 1) Flow Switch model offered is the same type as supplied previously to TR on the Saudi Aramco ‘Marjan’ project (TR PO # 106510911). The flow switch is a Diaphragm type (not vane or paddle). \n2) 2 x SPDT Switch-Linked rated at 5A at 250VAC & 3A at 30VDC.\n- Please refer to Instrument Datasheets provided with original Offer. | Already included in our Offer & previously Approved for use on Saudi Aramco ‘Marjan’ project. | NaN | NaN | NaN |
99 | Alarm devices: \nHorn (90dB) and beacon(red flashing):\n installed together with self-stand support. | CONFIRMED | 110dB(A) @ 1m +/- 3dB. \nPlease refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer) | Already included in our Offer | NaN | NaN | NaN |
100 | VENDOR shall provide 24VDC power converter in local panel for operation of beacon and horn | CONFIRMED | Please refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer) | Already included in our Offer | NaN | NaN | NaN |
101 | Suitable for Class I, Zone 2, IIB , T3, explosion proof or/and Class I, Zone 1, IIC , T1, explosion proof | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
102 | Electrical power distibution | NaN | NaN | NaN | NaN | NaN | NaN |
103 | Power supply for beacon and siren shall be terminated in local panel. Contractor will provide only 1 power supply 230 VAC, 60 Hz, 1Ph+N+G. Vendor shall distribute power from local panel to beacon, siren and lighting. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
104 | Power cable shall comply with SAES-P-104. Incoming cable (by Contractor) shall be armored 2x4+4(G) mm² and to be connected to Junction Box. Cable gland for incoming cable shall be NPT and supplied by Vendor. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
105 | From that power and, within the SSEW/EW battery limit, vendor shall distribute it to all elements (lightning, alarm horn, beacon) as required, by properly wiring. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
106 | Connections to Field Junction Box. See point 10.2 within SAES-J-902 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
107 | All power converters from 230VAC to lower voltage, if required, shall be provided by vendor/manufacturer. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
108 | Supply and routing of cables for distribution among JB (junction box) and rest of devices must be under vendor scope as well. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
109 | Local panel shall be: | NaN | NaN | NaN | NaN | NaN | NaN |
110 | As per SAES-P-104 clause 7. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
111 | Suitable for Highly corrosive environment. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
112 | NEMA 4X, preferably made of fiberglass. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
113 | Suitable for hazardous area CLASS1, ZONE 2, GROUP IIB, T3/ CLASS1, ZONE 1,GROUP IIC, T1 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
114 | Suitable for 55 °C Ambient Temperature . | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
115 | Minimum input and output cable cross section 4 mm² | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
116 | For input cables, minimum 6 terminal blocks (2ph+ 2N + 2GND) | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
117 | Light Bulb (LED,Luminaire) | NaN | NaN | NaN | NaN | NaN | NaN |
118 | Preferably located at the top of the structure, a | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
119 | LED luminaire to illuminate the area with 100 Lux at grade level on safety shower area, complying with following characteristics: | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
120 | LED Lighting fixture CRI 80 or greater, | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
121 | CCT 5000K | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
122 | 230V, 60 Hz, 1Ph+N+G | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
123 | For outdoor areas such as oil refineries, chemical and industries facilities, Class1,Zone 2, IIB, T3 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
124 | Ex nA or nR. Factory Sealed. IP66 (NEMA 4X) | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
125 | 55 °C Ambient temperature. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
126 | Luminaire shall comply with SAES-P-123 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
127 | Power supply (230 VAC – 1ph+N+G) shall be taken by Vendor from Vendor local panel. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
128 | Photocell. | NaN | NaN | NaN | NaN | NaN | NaN |
129 | Vendor shall provide a photocell (at each shower) with the suitable control to automatically turn the light off during daylight. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
130 | IEC Ex suitable to be installed in Zone 2, gas group IIB, T3. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
131 | Enclosure (Junction box) | NaN | NaN | NaN | NaN | NaN | NaN |
132 | Requirements shall comply with points 7.1 to 7.6 of specification SAES-J-902. Junction Box shall be suitable for severe corrosive environment. Material shall be either SS 316 or UV protected GRP with three side sunshades. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
133 | Connections to Field Junction Box shall comply with statements as shown in point 10.2 within SAES-J-902 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
134 | Material Test Reports and Certificates shall be supplied in accordance with Saudi Aramco Inspection Requirements (Non Material Requirements). | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
135 | All Safety Showers shall be hydrostatic tested. Any other test instead of hydrostatic is not allowed, unless otherwise indicated. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
136 | VENDOR shall perform a functional and electrical inspection and test certificates will be submitted to CONTRACTOR for its review and approval. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
137 | Colour\nSafety showers and eyewash shall be properly painted comply according to with SAESB-069 (Paragraph. 7.4) and SAES-B-067 “Safety Identification and Safety Colours | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
138 | The finish colour shall be according Spec 10651-00-PRE-SP-0001 Colour Coding For Equipment and Piping (Green / White RAL 6016/9010 ) | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
139 | Signage | NaN | NaN | NaN | NaN | NaN | NaN |
140 | If the location so permits, permanently installed safety shower and eyewash units shall have a vertical background area nominally 1 m wide by 2 m high painted with either alternating green and white stripes approximately 152 mm wide or a solid green colour (refer to SAES-B-067). | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
141 | The appropriate sign with words in Arabic and English shall be mounted in a clearly visible location near each permanently installed emergency shower and eyewash (refer to ANSI Z535.2,ANSI Z535.3, and SAES-B-067). | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
142 | Dedicated text in Arabic and English as per above standard to be included with the following information: | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
143 | Flush eyes immediately. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
144 | Hold eyes open rolling them back and forth during flushing. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
145 | Flush for at least 15 minutes. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
146 | Summon medical assistance. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
147 | Sign board made of green plastic. White text on green background. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
148 | Each eyewash shall be identified by using a stainless-steel label with TAG number (available on each Data Sheet) firmly joined to it. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
149 | Instrumentation elements contained within the scope of the SSEW or EW, shall have as well individual tagging in addition.(Name/TAG complete list of all instruments to be provided later by CONTRACTOR.) | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
150 | Substitution\nFor any materials substitution, sufficient data shall be provided by the VENDOR to justify the substitution. This data shall include but shall not be limited to physical, mechanical and corrosion resistance properties. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
151 | preventative maintenance, overhaul procedures and schedules for the SUPPLY. VENDORshall provide | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
152 | Marking of safety showers and Washers shall be according to 12-SAMSS-005 and SAES-B-069. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
153 | No color coding for material segregation purposes is required at Warehouse since they are clearly identified. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
154 | Packing and transportation procedure shall be submitted for approval. Packing shall protect Safety Showers and Eyewashes against mechanical damage during Shipping and transportation | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
155 | Coating selection, surface preparation, inspection and testing for safety showers shall follow the ARAMCO standards stated in clause 5.3.7 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
156 | Replicability for safety showers shall follow the ARAMCO standards stated in clause 5.3.9 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
157 | Calibration certificates All measurement instruments and pressure safety valves within VENDOR´s scope of supply shall be calibrated prior to shipment to site. A calibration certificate (traceable to laboratories certified according to ISO/IEC 17025:2017) must be issued per each instrument. and 5.8.6 clause. | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
158 | Data sheets, according to 5.8.8 | CONFIRMED | Same comment as above | Already included in our Offer | NaN | NaN | NaN |
159 | HSE documents VENDOR shall submit (if available) a copy of his HSE policy and/or HSE Management System (ISO 14001, OHSAS 18001/ISO 45001). | CONFIRMED | Copy of H&S Policy and H&S Handbook provided. | NaN | NaN | NaN | NaN |