Unnamed: 0REQUIREMENTSVENDOR CONFIRMED/NOT APPLICABLE/NOT CONFIRMEDVENDOR DETAILS (When applicable)VENDOR COMMENTSCONTRACTOR AGREED/NOT AGREEDCONTRACTOR COMMENTSSTATUS
15.3.3.7 VENDOR shall identify in the Quotation the country of origin of materials being quoted. SUBVENDORS ListCONFIRMEDSeparate document provided with this TQ responseNaNNaNNaNNaN
2SAFETY SHOWERSNaNNaNNaNNaNNaNNaN
3Including emergency eyewashes.CONFIRMEDPlease refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer)Already included in our OfferNaNNaNNaN
4Connector size type: 1.5”, rating 150#, FF.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
51-1/4” NPS SS 316/316L pipe for safety shower.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
6½” NPS SS 316/316L pipe for eyewash.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
71-1/4” to 1-1/2” reducersCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
8SS eyewash receptor basin (bowl).CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
9Chrome plated brass eye wash heads.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
10ABS plastic float-off covers.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
111-1/4“ NPS for inlet/drain connections.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
12Pedestal or floor mountedCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
13Selfdraining valveCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
14Antiscald protection valveCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
15eyewashes noozles with covers easily to removeCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
16Pressure controllers or selft regulating valvesCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
17Pressure gauge: wettered part SS316 as minimun, range 30-70%, connection1/2”MNPT,dials 4 1/2” diameter, black numerals.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
18StrainerCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
19Activation: Step press and handle activatorCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
20Flow switch: \n1)Piston or shuttle type 2 signal, One routed to junction box to the DCS , Other local to activate de beacon and horn.\n2) and double-pole, double-throw (DPDT) RATED AT 0.5A AT125VDC. Electrical entry (M20). The enclosures (in severe corrosive environments service) shall be NEMA Type 4X or IEC 60529 Type IP 66. As a minimum, the instrument enclosures shall be made of 316 SS or cast copper-free aluminium (0.6% max. copper), Adequate for use in Class I, Z2, IIB, T3, Explosion Proof (Ex ‘d’) per IEC.CONFIRMED (with Clarification)1) Flow Switch model offered is the same type as supplied previously to TR on the Saudi Aramco ‘Marjan’ project (TR PO # 106510911). The flow switch is a Diaphragm type (not vane or paddle). \n2) 2 x SPDT Switch-Linked rated at 5A at 250VAC & 3A at 30VDC.\n- Please refer to Instrument Datasheets provided with original Offer.Already included in our Offer & previously Approved for use on Saudi Aramco ‘Marjan’ project.NaNNaNNaN
21Alarm devices: \nHorn (90dB) and beacon(red flashing):\nmounted on shower bodyCONFIRMED110dB(A) @ 1m +/- 3dB. \nPlease refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer)Already included in our OfferNaNNaNNaN
22VENDOR shall provide 24VDC power converter in local panel for operation of beacon and hornCONFIRMEDPlease refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer)Already included in our OfferNaNNaNNaN
23Suitable for Class I, Zone 2, IIB, T3, explosion proof.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
24Electrical power distibutionNaNNaNNaNNaNNaNNaN
25Power supply for beacon and siren shall be terminated in local panel. Contractor will provide only 1 power supply 230 VAC, 60 Hz, 1Ph+N+G. Vendor shall distribute power from local panel to beacon, siren and lighting.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
26Power cable shall comply with SAES-P-104. Incoming cable (by Contractor) shall be armored 2x4+4(G) mm² and to be connected to Junction Box. Cable gland for incoming cable shall be NPT and supplied by Vendor.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
27From that power and, within the SSEW/EW battery limit, vendor shall distribute it to all elements (lightning, alarm horn, beacon) as required, by properly wiring.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
28Connections to Field Junction Box. See point 10.2 within SAES-J-902CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
29All power converters from 230VAC to lower voltage, if required, shall be provided by vendor/manufacturer.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
30Supply and routing of cables for distribution among JB (junction box) and rest of devices must be under vendor scope as well.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
31Local panel shall be:NaNNaNNaNNaNNaNNaN
32As per SAES-P-104 clause 7.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
33Suitable for Highly corrosive environment.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
34NEMA 4X, preferably made of fiberglass.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
35Suitable for hazardous area CLASS1, ZONE 2, GROUP IIB, T3/ CLASS1, ZONE 1,GROUP IIC, T1CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
36Suitable for 55 °C Ambient Temperature .CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
37Minimum input and output cable cross section 4 mm²CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
38For input cables, minimum 6 terminal blocks (2ph+ 2N + 2GND)CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
39Light Bulb (LED,Luminaire)NaNNaNNaNNaNNaNNaN
40Preferably located at the top of the structure, aCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
41LED luminaire to illuminate the area with 100 Lux at grade level on safety shower area, complying with following characteristics:CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
42LED Lighting fixture CRI 80 or greater,CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
43CCT 5000KCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
44230V, 60 Hz, 1Ph+N+GCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
45For outdoor areas such as oil refineries, chemical and industries facilities, Class1,Zone 2, IIB, T3CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
46Ex nA or nR. Factory Sealed. IP66 (NEMA 4X)CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
4755 °C Ambient temperature.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
48Luminaire shall comply with SAES-P-123CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
49Power supply (230 VAC – 1ph+N+G) shall be taken by Vendor from Vendor local panel.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
50Photocell.NaNNaNNaNNaNNaNNaN
51Vendor shall provide a photocell (at each shower) with the suitable control to automatically turn the light off during daylight.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
52IEC Ex suitable to be installed in Zone 2, gas group IIB, T3.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
53Enclosure (Junction box)NaNNaNNaNNaNNaNNaN
54Requirements shall comply with points 7.1 to 7.6 of specification SAES-J-902. Junction Box shall be suitable for severe corrosive environment. Material shall be either SS 316 or UV protected GRP with three side sunshades.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
55Connections to Field Junction Box shall comply with statements as shown in point 10.2 within SAES-J-902CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
56Material Test Reports and Certificates shall be supplied in accordance with Saudi Aramco Inspection Requirements (Non Material Requirements).CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
57All Safety Showers shall be hydrostatic tested. Any other test instead of hydrostatic is not allowed, unless otherwise indicated.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
58VENDOR shall perform a functional and electrical inspection and test certificates will be submitted to CONTRACTOR for its review and approval.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
59Coating selection, surface preparation, inspection and testing for safety showers shall follow the ARAMCO standards stated in clause 5.3.7.3 of this document.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
60Colour\nSafety showers and eyewash shall be properly painted comply according to with SAESB-069 (Paragraph. 7.4) and SAES-B-067 “Safety Identification and Safety ColoursCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
61The finish colour shall be according Spec 10651-00-PRE-SP-0001 Colour Coding For Equipment and Piping (Green / White RAL 6016/9010 )CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
62SignageNaNNaNNaNNaNNaNNaN
63If the location so permits, permanently installed safety shower and eyewash units shall have a vertical background area nominally 1 m wide by 2 m high painted with either alternating green and white stripes approximately 152 mm wide or a solid green colour (refer to SAES-B-067).CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
64The appropriate sign with words in Arabic and English shall be mounted in a clearly visible location near each permanently installed emergency shower and eyewash (refer to ANSI Z535.2,ANSI Z535.3, and SAES-B-067).CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
65Dedicated text in Arabic and English as per above standard to be included with the following information:CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
66Get into shower immediately.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
67Remove contaminated clothing while showering.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
68Shower for at least 15 minutes.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
69Summon medical assistance.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
70Sign board made of green plastic. White text on green background.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
71Each safety shower shall be identified by using a stainless-steel label with TAG number (available on each Data Sheet) firmly joined to it.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
72Instrumentation elements contained within the scope of the SSEW or EW, shall have as well individual tagging in addition.(Name/TAG complete list of all instruments to be provided later by CONTRACTOR.)CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
73Substitution\nFor any materials substitution, sufficient data shall be provided by the VENDOR to justify the substitution. This data shall include but shall not be limited to physical, mechanical and corrosion resistance properties.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
74preventative maintenance, overhaul procedures and schedules for the SUPPLY. VENDORshall provideCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
75Marking of safety showers and Washers shall be according to 12-SAMSS-005 and SAES-B-069.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
76No color coding for material segregation purposes is required at Warehouse since they are clearly identified.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
77Packing and transportation procedure shall be submitted for approval. Packing shall protect Safety Showers and Eyewashes against mechanical damage during Shipping and transportationCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
78Coating selection, surface preparation, inspection and testing for safety showers shall follow the ARAMCO standards stated in clause 5.3.7CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
79Replicability for safety showers shall follow the ARAMCO standards stated in clause 5.3.9CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
80Calibration certificates All measurement instruments and pressure safety valves within VENDOR´s scope of supply shall be calibrated prior to shipment to site. A calibration certificate (traceable to laboratories certified according to ISO/IEC 17025:2017) must be issued per each instrument. and 5.8.6 clause.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
81Data sheets, according to 5.8.8CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
82HSE documents VENDOR shall submit (if available) a copy of his HSE policy and/or HSE Management System (ISO 14001, OHSAS 18001/ISO 45001).CONFIRMEDCopy of H&S Policy and H&S Handbook provided.NaNNaNNaNNaN
83EYEWASHESNaNNaNNaNNaNNaNNaN
84Connector size type: 1.5”, rating 150#, FF.CONFIRMEDPlease refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer)Already included in our OfferNaNNaNNaN
85½” NPS SS 316/316L pipe for eyewash.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
861-1/4” to 1-1/2” reducersCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
87receptor basin (bowl).CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
88Chrome plated brass eye wash heads.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
89ABS plastic float-off covers.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
90½” NPS for inlet and 1-1/4“ NPS for inlet/drain connections.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
91Selfdraining valveCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
92Antiscald protection valveCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
93eyewashes noozles with covers easily to removeCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
94Pressure controllers or selft regulating valvesCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
95pressure gauge: wettered part SS316 as minimun, range 30-70%, connection1/2”MNPT,dials 4 1/2” diameter, black numerals.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
96StrainerCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
97Activation: Step press and handle activatorCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
98Flow switch: \n1)Piston or shuttle type 2 signal, One routed to junction box to the DCS , Other local to activate de beacon and horn.\n2) and double-pole, double-throw (DPDT) RATED AT 0.5A AT125VDC. Electrical entry (M20). The enclosures (in severe corrosive environments service) shall be NEMA Type 4X or IEC 60529 Type IP 66. As a minimum, the instrument enclosures shall be made of 316 SS or cast copper-free aluminium (0.6% max. copper), Adequate for use in Class I, Z2, IIB, T3, Explosion Proof (Ex ‘d’) per IEC.CONFIRMED (with Clarification)1) Flow Switch model offered is the same type as supplied previously to TR on the Saudi Aramco ‘Marjan’ project (TR PO # 106510911). The flow switch is a Diaphragm type (not vane or paddle). \n2) 2 x SPDT Switch-Linked rated at 5A at 250VAC & 3A at 30VDC.\n- Please refer to Instrument Datasheets provided with original Offer.Already included in our Offer & previously Approved for use on Saudi Aramco ‘Marjan’ project.NaNNaNNaN
99Alarm devices: \nHorn (90dB) and beacon(red flashing):\n installed together with self-stand support.CONFIRMED110dB(A) @ 1m +/- 3dB. \nPlease refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer)Already included in our OfferNaNNaNNaN
100VENDOR shall provide 24VDC power converter in local panel for operation of beacon and hornCONFIRMEDPlease refer to Technical Documents (GAD, Wiring Diagram & Instrument Datasheets all provided with our Offer)Already included in our OfferNaNNaNNaN
101Suitable for Class I, Zone 2, IIB , T3, explosion proof or/and Class I, Zone 1, IIC , T1, explosion proofCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
102Electrical power distibutionNaNNaNNaNNaNNaNNaN
103Power supply for beacon and siren shall be terminated in local panel. Contractor will provide only 1 power supply 230 VAC, 60 Hz, 1Ph+N+G. Vendor shall distribute power from local panel to beacon, siren and lighting.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
104Power cable shall comply with SAES-P-104. Incoming cable (by Contractor) shall be armored 2x4+4(G) mm² and to be connected to Junction Box. Cable gland for incoming cable shall be NPT and supplied by Vendor.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
105From that power and, within the SSEW/EW battery limit, vendor shall distribute it to all elements (lightning, alarm horn, beacon) as required, by properly wiring.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
106Connections to Field Junction Box. See point 10.2 within SAES-J-902CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
107All power converters from 230VAC to lower voltage, if required, shall be provided by vendor/manufacturer.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
108Supply and routing of cables for distribution among JB (junction box) and rest of devices must be under vendor scope as well.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
109Local panel shall be:NaNNaNNaNNaNNaNNaN
110As per SAES-P-104 clause 7.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
111Suitable for Highly corrosive environment.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
112NEMA 4X, preferably made of fiberglass.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
113Suitable for hazardous area CLASS1, ZONE 2, GROUP IIB, T3/ CLASS1, ZONE 1,GROUP IIC, T1CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
114Suitable for 55 °C Ambient Temperature .CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
115Minimum input and output cable cross section 4 mm²CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
116For input cables, minimum 6 terminal blocks (2ph+ 2N + 2GND)CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
117Light Bulb (LED,Luminaire)NaNNaNNaNNaNNaNNaN
118Preferably located at the top of the structure, aCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
119LED luminaire to illuminate the area with 100 Lux at grade level on safety shower area, complying with following characteristics:CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
120LED Lighting fixture CRI 80 or greater,CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
121CCT 5000KCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
122230V, 60 Hz, 1Ph+N+GCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
123For outdoor areas such as oil refineries, chemical and industries facilities, Class1,Zone 2, IIB, T3CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
124Ex nA or nR. Factory Sealed. IP66 (NEMA 4X)CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
12555 °C Ambient temperature.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
126Luminaire shall comply with SAES-P-123CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
127Power supply (230 VAC – 1ph+N+G) shall be taken by Vendor from Vendor local panel.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
128Photocell.NaNNaNNaNNaNNaNNaN
129Vendor shall provide a photocell (at each shower) with the suitable control to automatically turn the light off during daylight.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
130IEC Ex suitable to be installed in Zone 2, gas group IIB, T3.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
131Enclosure (Junction box)NaNNaNNaNNaNNaNNaN
132Requirements shall comply with points 7.1 to 7.6 of specification SAES-J-902. Junction Box shall be suitable for severe corrosive environment. Material shall be either SS 316 or UV protected GRP with three side sunshades.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
133Connections to Field Junction Box shall comply with statements as shown in point 10.2 within SAES-J-902CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
134Material Test Reports and Certificates shall be supplied in accordance with Saudi Aramco Inspection Requirements (Non Material Requirements).CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
135All Safety Showers shall be hydrostatic tested. Any other test instead of hydrostatic is not allowed, unless otherwise indicated.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
136VENDOR shall perform a functional and electrical inspection and test certificates will be submitted to CONTRACTOR for its review and approval.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
137Colour\nSafety showers and eyewash shall be properly painted comply according to with SAESB-069 (Paragraph. 7.4) and SAES-B-067 “Safety Identification and Safety ColoursCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
138The finish colour shall be according Spec 10651-00-PRE-SP-0001 Colour Coding For Equipment and Piping (Green / White RAL 6016/9010 )CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
139SignageNaNNaNNaNNaNNaNNaN
140If the location so permits, permanently installed safety shower and eyewash units shall have a vertical background area nominally 1 m wide by 2 m high painted with either alternating green and white stripes approximately 152 mm wide or a solid green colour (refer to SAES-B-067).CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
141The appropriate sign with words in Arabic and English shall be mounted in a clearly visible location near each permanently installed emergency shower and eyewash (refer to ANSI Z535.2,ANSI Z535.3, and SAES-B-067).CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
142Dedicated text in Arabic and English as per above standard to be included with the following information:CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
143Flush eyes immediately.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
144Hold eyes open rolling them back and forth during flushing.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
145Flush for at least 15 minutes.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
146Summon medical assistance.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
147Sign board made of green plastic. White text on green background.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
148Each eyewash shall be identified by using a stainless-steel label with TAG number (available on each Data Sheet) firmly joined to it.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
149Instrumentation elements contained within the scope of the SSEW or EW, shall have as well individual tagging in addition.(Name/TAG complete list of all instruments to be provided later by CONTRACTOR.)CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
150Substitution\nFor any materials substitution, sufficient data shall be provided by the VENDOR to justify the substitution. This data shall include but shall not be limited to physical, mechanical and corrosion resistance properties.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
151preventative maintenance, overhaul procedures and schedules for the SUPPLY. VENDORshall provideCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
152Marking of safety showers and Washers shall be according to 12-SAMSS-005 and SAES-B-069.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
153No color coding for material segregation purposes is required at Warehouse since they are clearly identified.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
154Packing and transportation procedure shall be submitted for approval. Packing shall protect Safety Showers and Eyewashes against mechanical damage during Shipping and transportationCONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
155Coating selection, surface preparation, inspection and testing for safety showers shall follow the ARAMCO standards stated in clause 5.3.7CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
156Replicability for safety showers shall follow the ARAMCO standards stated in clause 5.3.9CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
157Calibration certificates All measurement instruments and pressure safety valves within VENDOR´s scope of supply shall be calibrated prior to shipment to site. A calibration certificate (traceable to laboratories certified according to ISO/IEC 17025:2017) must be issued per each instrument. and 5.8.6 clause.CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
158Data sheets, according to 5.8.8CONFIRMEDSame comment as aboveAlready included in our OfferNaNNaNNaN
159HSE documents VENDOR shall submit (if available) a copy of his HSE policy and/or HSE Management System (ISO 14001, OHSAS 18001/ISO 45001).CONFIRMEDCopy of H&S Policy and H&S Handbook provided.NaNNaNNaNNaN