NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

COMPANY Contract No.: LTC/C/NFP/5129/20 CONTRACTOR Project No.: 033764

ASSET

: NFPS

Document Title

:

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

COMPANY Document No.

:

200-51-IN-SPC-00060

CONTRACTOR Document No.

:

033764-E-D00-18-SPM-AS-S-00018

Discipline

:

INSTRUMENTATION

Document Type

: SPECIFICATION

Document Category/Class

:

1

Document Classification

:

Internal

00

03-MAR- 2025

Approved for Construction

B

29-JAN-2025

Issued for Approval

Hanumanthappa Kanekallara Hanumanthappa Kanekallara Engineer

Saravanan Selvam Saravanan Selvam GF Lead

Venkateswara Rao Moturi Venkateswara Rao Moturi Overall PSL

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

REVIEWED BY

APPROVED BY

Saipem S.p.A

www.saipem.com

THIS DOCUMENT IS PROPERTY OF QatarEnergy LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QatarEnergy LNG.

200-51-IN-SPC-00060_00

Page 1 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

REVISION HISTORY

Revision

Date

Revision Description

A1

12-DEC-2024

Issued for Inter-Discipline Check

A

B

17-DEC-2024

Issued for Review

29-JAN-2025

Issued for Approval

00

03-MAR-2025

Approved for Construction

HOLDS LIST

Hold No

Hold Description

200-51-IN-SPC-00060_00

Page 2 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

TABLE OF CONTENTS

1

1.1

1.2

2

2.1

2.2

3

3.1

3.2

3.3

4

5

5.1

5.2

5.3

5.4

5.5

6

7

7.1

7.2

7.3

7.4

8

INTRODUCTION … 5

Project Objective … 5

Project Scope … 5

DEFINITIONS AND ABBREVIATIONS … 8

Definitions … 8

Abbreviations … 9

REGULATIONS, CODES AND STANDARDS … 10

Company References … 11

Project Documents … 11

Design Codes, Standards And Specifications … 12

PURPOSE OF DOCUMENT … 13

PROJECT OVERVIEW … 13

Facility Description … 13

Design Life … 13

Environmental Conditions … 13

Hazardous Area Protection … 13

Ingress Protection … 13

SCOPE OF SUPPLY … 14

DESIGN REQUIREMENTS … 14

General … 14

Instrument Junction Boxes Segregation … 14

Requirements for Instrument Junction Boxes … 15

Requirements for Terminals in Junction Boxes … 16

QUALITY CONTROL … 17

8.1

Quality Control Procedures … 17

9

10

DOCUMENTATION … 17

TESTING AND INSPECTION … 18

10.1 General … 18

10.2

Inspection level … 18

10.3

Inspection and Test Plan (ITP) … 18

200-51-IN-SPC-00060_00

Page 3 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

11

APPENDIX … 19

Appendix 1: Details for Instrument Junction Boxes Name Plate … 19

200-51-IN-SPC-00060_00

Page 4 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all the State of Qatar’s gas production. The principal objective of the NFPS projects is to sustain plateau from existing QatarEnergy LNG Operation – S1, S2, S3, N1 and N2 , production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression.

NFPS projects comprise 3 main investment programs:

  1. Investment #1: Drilling and Associated Facilities [WHP12S/ WHP13S/ WHP14S/

WHP12N/ WHP13N]

  1. Investment #2: Trunk line Looping and Intra-field pipeline looping [32” PL1LN, 32”

PL1LS, 38”PL610LS]

  1. Investment #3: Compression Complexes and associated facilities [Phase 1 CP6S & CP7S; Phase 2: CP8S & CP4N; Phase 3: CP4S & CP6N Phase 4: CP1S & CP1N]

Drilling and Looping, Investments #1 and #2, projects are in execution phase and are being executed as I1P1, EPCOL Projects except for WHP13N, which will be part of NFPS Compression Projects execution which compromises total up to 9 COMPs.

1.1 Project Objective

The objective of this Project includes:

• Achieve standards of global excellence in Safety, Health, Environment, Security and

Quality performance.

• Sustain the Qatarenergy LNG North Field Production Plateau by installing new RPs and one WHPs to support new Compression Complex facilities CP6S & CP7S and pre-installed facilities for future Compression Complex facilities including but not limited to CP4N & CP8S tie-in with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible,

operable, and efficient throughout their required life.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, brownfield modifications, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start-up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit‐for‐ purpose in all respects.

Facilities – 1A

• RP5S RP with 2 x 28” CRA clad pipelines to RP7S and 2 subsea composite Cables

and associated J tubes from RP7S to RP5S & from CP7S to WHP13S.

• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP7S

200-51-IN-SPC-00060_00

Page 5 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

• Hook-up and brownfield modification at WHP5S/RP5S bridge connection & WHP13S/CP7S Composite cable tie-in and E&I integration including RGA Control modification

• Pipeline decommissioning of 28” CS PL5S including associated demolition work at

WHP5S

Facilities – 2A

• RP6N RP with 1x28” CRA clad pipeline to WHP13N, 2 Subsea composite cables and

associated J tubes from WHP12N to RP4N and RP6N to WHP13N. • New fuel gas spur-line and flanged riser from subsea skid to RP6N • WHP13N Topside • Hook-up and brownfield modification at WHP6N/RP6N, RP4N- HPU-Umbilical and tie- in, WHP12N-new J tube installation, E&I migration, WHP6N/RP4N/WHP4N-E&I migration (Pre-CP4N), WHP13N and RP6N interconnection to NFB.

Facilities – 3A

• RP9S RP with 1x28” CRA clad pipeline to RP4S, • Hook-up and brownfield modification at RP4S/WHP9S, Modifications to integrate

RP9S to the RGA control network.

• Pipeline decommissioning of 28” CS PL9 to WYE on existing 38” trunkline PL48

including associated demolition work at WHP9S.

Facilities – 1B

• New fuel gas spur-line and flanged riser from subsea skid to RP4N • Fiber Optic Cable from RP6N to onshore LFP East, RP6N to RP4N and RP6N to LQ6S. • Hook-up and brownfield modification at RP6N Composite and FO Tie-ins NFB-PU (East)- FO Tie-in

(East)/BVS

Power & Control modifications, LQ6S/LFP Controls/Telecoms Integration

Facilities – 2B

• RP5N RP with 2 x 28” CRA clad pipelines to RP4N, 1 x 28” CRA clad pipeline to RP6N and 2 subsea composite Cables and associated J tubes from WHP12N to RP5N & from RP6N to RP5N.

• Hook-up and brownfield modification at WHP5N- RP5N Bridge connection, WHP12N Composite cable tie-in, RP4N Intrafield pipeline Hook up PL54 N/LN and E&I integration including NFB-PU Power & Control modifications

• Pipeline decommissioning of 2 x 16” PL56/PL54 Subsea Spur line from WHP5N to

reducing barred tee in subsea tie-in skid on PL6 / PL4.

Facilities – 3B

• 2 subsea composite Cables from RP4S to RP9S & from RP4S to WHP12S (with J-

tube)

• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP4S • Hook-up and brownfield modification at WHP12S/ RP9S/ RP4S Composite cable tie-

in, Spurline riser installation at RP4S RGA Power & Control modifications.

Facilities – 4B

• 1 subsea composite Cable from CP8S to RP11S (& from RP8S to RP11S as option). • New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RP8S.

200-51-IN-SPC-00060_00

Page 6 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

• Hook-up and brownfield modification at WHP8S/ WHP11S for Test separator Internal Upgrade and MEG system modification, Spur lines, Power & Control Tie-ins on RP8S, RP11S/WHP11S-Tie-in (Power and Control), RGA Power & Control modifications.

Facilities – 5B

• 2 subsea composite Cables from RT2 to WHP3S & from RT2 to WHP2S (with J-tube)

and FO cable from RT2 to Barzan WHP1.

• New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RT2. • Hook-up and brownfield modification at BRZ-WHP1 – FO cable tie-in, WHP2S/ WHP3S/ RT&RT2 Composite cable tie-in and associated modification, RGA Power & Control modifications.

Facilities – 6B

• RP3S RP with 1x24” CRA clad pipeline to RT2 with Stalk on risers, • Hook-up and brownfield modification at RT2 for 24” Intrafield pipeline and Composite/FO cable Hook-up, WHP3S for Production diversion and Utilities, Power and ICSS Hook-up, WHP2S for Composite Cable Tie-ins and Power & Control Integration RGA Power & Control modifications. topside existing and

In-situ abandonment of existing Topside/subsea Composite Cables RT-WHP2S, RT-WHP3S, Topside/Subsea FO cable RT-BRXWHP1.

• Decommissioning at

Figure 1.2.1: NFPS Compression Project COMP3 Scope

200-51-IN-SPC-00060_00

Page 7 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

QatarEnergy LNG.

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

MILESTONE

PROJECT

SITE

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract.

All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

A reference event splitting a PROJECT activity for progress measurement purpose.

COMP3 - NFPS Offshore Riser/Wellhead Platform & Intrafield Pipelines Project

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Refer to article 2 of CONTRACT AGREEMENT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

VENDOR

The person, group, or organization responsible for the design, manufacture, the Equipment/Material.

load-out/shipping

testing,

and

of

200-51-IN-SPC-00060_00

Page 8 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

2.2 Abbreviations

Code

API

Definition

American Petroleum Institute

ASME

American Society of Mechanical Engineers

ASTM

American Society for Testing and Materials

CENELEC (CEN)

European Committee for Electrotechnical Standards (Comité Européen de Normalisation Électrotechnique)

EPC

EPCI

Engineering, Procurement and Construction

Engineering, Procurement, Construction and Installation

EU/EC

European Union/Commission

FAT

F&G

GRP

HPU

IEC

Factory Acceptance Test

Fire & Gas

Glass Reinforced Plastic

Hydraulic Power Unit

International Electrotechnical Commission

IEEE

Institute of Electrical and Electronic Engineers

IP

ISA

ISO

ITP

LP

MP

N2

Ingress Protection

International Society of Automation

International Organization for Standardization

Inspection Test Plan

Low Pressure

Medium Pressure

Nitrogen

NEMA

National Electrical Manufacturers Association

NFB

North Field Bravo

200-51-IN-SPC-00060_00

Page 9 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

Code

Definition

NFPA

National Fire Protection Association

NFPS

North Field Production Sustainability

QA/QC

Quality Assurance / Quality Control

QG

RLIC

SAT

SPI

SS

UPS

WHP

Qatar gas Operating Company Limited

Ras Laffan Industrial City

Site Acceptance Test

Smart Plant Instrumentation (Intools)

Stainless Steel

Uninterruptible Power Supply

Wellhead Platform

3 REGULATIONS, CODES AND STANDARDS

In general, the order of precedence shall be followed:

a) Qatari Governmental and Regularity Requirements

b) COMPANY Policies and Procedures

c) Project specifications

d) Industry Codes & Standards

e) COMPANY and CONTRACTOR’S lesson learned

If CONTRACTOR / VENDOR deems any deviation from the specification will result in significant project cost and schedule saving, proposal to such deviations shall be submitted to COMPANY for review and approval. CONTRACTOR / VENDOR shall not proceed with any deviation to the Philosophy with prior COMPANY APPROVAL.

The following is a list of relevant regulations, codes, standards, specification, Company documents that shall be considered for the Project in the order of precedence listed above.

200-51-IN-SPC-00060_00

Page 10 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

3.1 Company References

S. No

Document Number

Title

EXHIBIT 5

Project Instructions

PRJ-PJL-PRC-005_21

Facilities, System and Unit Number Codes and Descriptions Procedure

PRJ-PJL-PRC-006_01

Project Information Handover Procedure

PRJ-PJL-PRC-007_01

QG SmartPlant Eng Applications & Drafting (CAD) Standard

PRJ-PJL-PRC-008_16

Equipment Numbering Philosophy Procedure

PRJ-PJL-PRC-048_11

Facilities Documentation Metadata Requirements Procedure

PRJ-PJL-PRC-049_01

Project Information Handover, Verification and Acceptance Procedure

PRJ-PJL-PRC-080

AIMS Tag Management System

3.2 Project Documents

S. No

Document Number

200-51-IN-DEC-00011

200-51-IN-DEC-00012

200-50-IN-SPC-00004

200-51-IN-SPC-00054

200-51-IN-SPC-00059

200-51-IN-SPC-00057

200-51-IN-SPC-00061

Instrument and Control Systems Design Basis COMP3 Project

for

Integrated Control and Safety Systems (ICSS) philosophy for COMP3 project

Specification for Panels and Control Consoles for COMP3 project

Specification for field instrumentation (incl. flow, level, pressure and instrumentation & F&G temperature Detectors) for COMP3 project

Specification for Instrument Installation for COMP3 project

Specification for Instrument Cables & Cable Glands for COMP3 project

Instrumentation Requirements for Packaged Equipment for COMP3 Project

200-91-EL-DEC-00008

Electrical Design Basis for COMP3 Project

200-20-PE-DEC-00004

Project Basis of Design for COMP3 Project

200-20-CE-SPC-00027

Specification for Fixed Facilities Protective Coating for COMP3 project

200-51-IN-SPC-00060_00

Page 11 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

S. No

Document Number

COMP3-SPM-QM-PLN-

Project Quality Plan for COMP3 Project

00001

200-20-ST-SPC-00037

Specification For Offshore Weight Management for COMP3 Project

3.3 Design Codes, Standards And Specifications

Listed below are some of the important codes and standards to be applied for instrumentation and control design. However, the Instrument specification documents shall list out all applicable standards for a specific instrument item. In general, all latest revision of Codes and Standards shall be applied.

Document Number

Title

API RP 14F

API RP 500

API RP 505

Design and Installation of electrical system for offshore production platform

Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2

Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zones 0, 1 and 2

API RP 540

Electrical Installations in Petroleum Processing Plants

API RP 551

Process Measurement Instrumentation

API RP 554

Process Instrumentation and Control

IEC 60079-0

IEC 60079 Series Explosive Atmosphere Standards - All Parts

IEC 60529

IEC 61000

ISA 5.1

ISA 51.1

ISO 1000

NFPA 70

Degrees of protection provided by enclosures (IP Code)

Electromagnetic Compatibility

Instrumentation Symbols and Identification

Process Instrumentation Terminology

The International System of Units (SI) and its Application

National Electrical Code

200-51-IN-SPC-00060_00

Page 12 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

4 PURPOSE OF DOCUMENT

This document provides the specification for the Instrument junction boxes for the NFPS COMP3 Project described. This Specification shall be read in conjunction with the drawings and other specifications referred herein. This specification is intended to define the minimum requirements for selection, engineering, design, manufacture, inspection, testing and installation of the instrument junction boxes for COMP3 project.

5 PROJECT OVERVIEW

5.1 Facility Description

Refer to Project Basis of Design for COMP3 project (Doc.no: 200-20-PE-DEC-00004) for facility description.

5.2 Design Life

Minimum design life for all new and upgraded facilities shall be 30 years.

5.3 Environmental Conditions

Refer to Project Basis of Design for COMP3 project (Doc.no: 200-20-PE-DEC-00004) for environmental conditions. All equipment selected for outdoor installation exposed to the field ambient conditions shall be suitable for installation and operation in a saliferous corrosive marine conditions as encountered on an offshore facility. All equipment shall be suitable for use in an environment where the humidity may vary from 37% to 100%.

5.4 Hazardous Area Protection

All areas shall be classified in accordance with API RP 505 / NEC Article 505 for Zone type classifications. All instruments installed in outdoors (hazardous or non-hazardous) shall be certified for installation in a Zone 1, Group IIB, and Temperature class T3 minimum.

Increased safety ‘Exe’ type protection shall be considered for instrument junction boxes with terminal blocks.

5.5

Ingress Protection

All indoor/outdoor instrument junction/ terminal boxes shall be rated minimum IP 66 per IEC 60529.

200-51-IN-SPC-00060_00

Page 13 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

6 SCOPE OF SUPPLY

VENDOR scope of supply of instrument junction boxes, parts and assemblies shall include but not limited to the following:

•

Instrument junction boxes, terminals, parts and assemblies meeting the requirements of this specification.

Inspection and Testing Plan dedicated for instrument junction boxes Inspection, QA/QC and testing requirements.

• Manufacturing and delivery schedule. • • • Vendor shall provide material certificates for the instrument junction boxes. • Preservation and preparation for transportation. • Transportation from the fabrication / assembly location to the point of delivery. • Supply of engineering documents and drawing.

7 DESIGN REQUIREMENTS

7.1 General

VENDOR shall use this document as the basis for detailed design. VENDOR shall ensure that engineering practices are followed throughout design and fabrication and may propose alternatives.

VENDOR shall provide design, engineering, procurement, manufacturing, installation, and testing services as required to acquire all materials, to fabricate and test the Junction Boxes. VENDOR shall be responsible for directing any comments, conflicts, suggestions or alternatives to CONTRACTOR in writing and shall receive written approval prior to implementation.

VENDOR shall be responsible for the correct design and fabrication of Junction Boxes, according to specifications and any referenced documents.

7.2

Instrument Junction Boxes Segregation

For Instrument junction boxes segregation related to the signals connected to green field ICSS systems (including package type P1 & P2) refer to “Integrated Control and Safety Systems (ICSS) Philosophy for COMP3 Project (200-51-IN-DEC-00012)”.

For Instrument junction boxes segregation related to the signals connected to package systems/UCPs refer to “Instrumentation Requirements for Packaged Equipment for COMP3 Project (200-51-IN-SPC-00061)”.

Junction boxes segregation for brown field facilities under COMP3 project shall follow the existing philosophy.

200-51-IN-SPC-00060_00

Page 14 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

7.3 Requirements for Instrument Junction Boxes

a) Junction boxes for green field facilities under COMP3 project shall be of SS316 material including hinges, latches, screws etc. and shall be provided with removable gland plates.

b) Junction boxes shall be weather-proof and water-tight to minimum IP 66 / NEMA 4X and certified ‘Exe’ for Zone-1 classification provided with a door pocket for Holding wiring documentation. Junction boxes shall have bottom cable entries, however for secondary (one pair/triad or 2-cores, etc.) cables provision shall be made to allow cable entries on the lateral (side) walls of the junction box, as an alternative to the bottom, to facilitate flexible installation while maintaining ingress protection requirements. Entries for multicore/pair cables shall be bottom type only.

c) Junction boxes for brown field modifications scope under COMP3 project shall be installation

(GRP/SS316 material as applicable) consistent with existing platforms philosophy.

d) Junction boxes shall have a permanent Stainless steel certificate label attached to the front of the box, using corrosion-resistant metal screws or riveted, the certificate label shall have following minimum details:

  1. Manufacturer’s Name & Logo
  2. Model No and Serial No
  3. IP Rating (Ingress Protection)
  4. Certification Marks
  5. Voltage and Current Ratings
  6. Temperature Range
  7. Material of Construction

e) Junction boxes shall also be supplied with an additional tag plate of traffolyte or equivalent material as per Appendix-1, attached to the front of the box, using corrosion-resistant metal screws, adhesive is not acceptable.

f) Usage of screws or rivets to fix labels shall not compromise the electrical execution and

ingress protection rating of the entire junction box assembly.

g) Junction Boxes shall have warning or cautionary notes, indicate any special precautions,

such as “DO not open when energized” etc.

h) Each shall have an earth bolt at the outside for bonding to the structure. This bolt shall terminate at the inside to provide an earthing means inside the junction box to the dirty earth bar.

i) GRP Junction box shall be provided with gland bonding / continuity plate of SS316/Copper.

j) Junction boxes shall have one earth bar for earthing the armoring of cables or shall be equipped with earth continuity plates SS316/Copper. The earth bar shall be internally wired to the earth terminal of the box.

k) Junction Boxes shall be equipped with internal mounting plate in SS316, and label holder for

terminal strip and terminal markers.

200-51-IN-SPC-00060_00

Page 15 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

l)

Instrument junction boxes shall be provided with a 316 Stainless Steel breather and drain fittings, or a combination breather and drain fitting.

m) Junction Boxes construction shall also meet the following requirements:

  1. IEC or Ex labeled equipment meeting requirement of IEC 60079.
  2. External mounting brackets.
  3. All enclosures shall be mounted vertically.
  4. Instrument junction boxes shall be properly sized to allow for safe and easy access for

maintenance.

  1. Junction box shall be equipped with cable ducts or other approved cable management systems to prevent loose or unsupported cables and ensure organized and safe wiring.
  2. All Junction boxes shall be single door (hinged type) according to IEC 60529 Type IP 66 and door earthing connection shall be bonded to the metal case of the box or earth bar.
  3. Top entries are not allowed. However, if space constraint in the layout prevents the use

of hinged door, a bolted type may be considered as an alternative.

  1. Junction boxes shall have sufficient room to loop the incoming/outgoing cable cores

between the gland plate and terminals.

  1. Junction boxes shall have sufficient terminals for terminating all the spare cores of the

multiconductor cables.

  1. The junction boxes shall also be provided with individual terminals for termination of each

shield (individual and overall) of the cables.

  1. Sufficient spare space shall be provided on the din rail for easy routing/dressing of cables

inside the JBs.

  1. Cable entries shall be equipped with temporary blanking plugs to maintain ingress

protection rating during transportation and storage.

  1. Junction box painting shall be in-line with “Specification for Fixed Facilities Protective

Coating for COMP3 project” (200-20-CE-SPC-00027).

  1. If any components in the junction box assembly require welding, low-carbon grade

stainless steel SS316L shall be used instead of SS316 for those components.

7.4 Requirements for Terminals in Junction Boxes

a) Junction boxes and associated terminals shall be certified in accordance with the type of

circuit and hazardous area.

b) All terminal blocks shall be corrosion resistant, non-hygroscopic and fire-retardant. c) The terminal blocks shall be of “Modular” (or “stacked”) fitted with screw type terminals. d) The thickness of the terminals shall be 5 mm or higher. e) Terminal block shall be constructed of suitable high strength material, suitable for DIN rail mounting and shall be suitable for a minimum flexible stranded conductor core section of 2.5 sq.mm.

f) All terminals shall be marked as per the final vendor GA drawings. g) Terminal strips shall have block identification markers, on both sides, to indicate polarity,

ground connections, and any other pertinent information.

h) Terminals shall be provided for shield and drain wire connections for each pair where

applicable.

i) Terminal blocks shall be arranged in vertical rows with adequate separation to permit clear

wiring identification.

200-51-IN-SPC-00060_00

Page 16 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

8 QUALITY CONTROL

8.1 Quality Control Procedures

The VENDOR shall recognize their inherent responsibility for the high quality and reliability required in the industry. A total “Quality Assurance” (QA) program covering the span from design conception through user satisfaction shall be active.

VENDOR’s QA program shall be based upon ISO 9001-Certfifed Quality System for Quality Assurance in Design/Development, Production, Installation and Servicing (or equivalent) and be documented in a complete QA manual. Published and accepted industry standards shall be used where applicable.

9 DOCUMENTATION

The VENDOR shall provide all required documentation and drawings for the instrument junction boxes. The VENDOR shall supply the complete documentation for design, fabrication, inspection/ testing, commissioning, startup, operation and maintenance of the instrument junction boxes.

a) Complete Bill of Material listing items, quantity, description, Manufacturer, part number,

and material of construction

b) Dimensional drawings

c) Data sheets / Catalogues.

d) Construction detail drawing

e) Inspection and Test Plan (including check and test procedure).

f) All required test reports, material and electrical certificates and quality documents

g) Installation and operating and maintenance manual

h) Handling, transportation and packing procedure

i) Packing list

200-51-IN-SPC-00060_00

Page 17 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

10 TESTING AND INSPECTION

10.1 General

All Junction Boxes inspection activities shall be included in VENDOR Inspection and Test Plan, to be submitted to CONTRACTOR / COMPANY for approval.

All inspection and tests shall be carried out at VENDOR factory. All tests shall be performed under the responsibility of VENDOR.

All tests shall be documented with the results obtained and such results shall be submitted to CONTRACTOR for review.

10.2 Inspection level

The inspection level for the Junction box is Level 4. According to the above inspection level, VENDOR shall follow the requirements listed here below:

• VENDOR shall prepare a detailed “Inspection and Test Plan” (ITP) for each assigned equipment and material, for CONTRACTOR/COMPANY review and approval.

• VENDOR shall review the QA/QC requirements in all applicable standards and procedures listed in the material requisition package and to be included in the ITP’S (Inspection and Test Plan)

• Each ITP shall identify the inspection level and detail all witness, hold and

certification review points.

10.3 Inspection and Test Plan (ITP)

As a minimum, ITP shall include the following information:

• Quality control requirements. • Notification requirements for VENDOR inspection witness and hold points. • Responsibilities for inspection/test. • Applicable procedures. • Acceptance criteria (COMPANY and International Industry Standards). • Verifying documents. • • Reference to sub-vendor ITP (as applicable).

Inspection points (Hold, Witness & Review) by CONTRACTOR.

200-51-IN-SPC-00060_00

Page 18 of 19

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SPECIFICATION FOR INSTRUMENT JUNCTION BOXES FOR COMP3 PROJECT

11 APPENDIX

Appendix 1: Details for Instrument Junction Boxes Name Plate

200-51-IN-SPC-00060_00

Page 19 of 19

Project: Q-32705 - Saipem COMP3 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further