NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

COMPANY Contract No.: LTC/C/NFP/5129/20 CONTRACTOR Project No.: 033764

ASSET

: NFPS

Document Title

:

DATA SHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

COMPANY Document No.

:

200-83-SH-DTS-00007

CONTRACTOR Document No.

:

033764-E-D-18-SPM-LP-B-00005

Discipline

: HSE&Q

Document Type

: DATA SHEET

Document Category/Class

:

2

Document Classification

:

Internal

A

12-FEB-2025

Issued for Review

Mohammed Tanveer Alam LOSPE Engineer

Jerine Baby/ Gabriella Dy. LOSPE Lead

Balasubramani Perumal

LOSPE Lead

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

REVIEWED BY

APPROVED BY

Saipem S.p.A

www.saipem.com

THIS DOCUMENT IS PROPERTY OF QatarEnergy LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QatarEnergy LNG.

200-83-SH-DTS-00007_A

Page 1 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

REVISION HISTORY

Revision

Date

Revision Description

A1

20-JAN-2025

Issued for Inter Discipline Check

A

12-FEB-2025

Issued for Review

HOLDS LIST

Hold No

Hold Description

1

2

Qty. of Safety, Lifesaving & firefighting equipment

Tag Number

200-83-SH-DTS-00007_A

Page 2 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

TABLE OF CONTENTS

INTRODUCTION … 5

Project Objective … 5

Project Scope … 5

DEFINITIONS AND ABBREVIATIONS … 8

Definitions … 8

Abbreviations … 9

REGULATIONS, CODES AND STANDARDS … 12

Company References … 12

Project Documents … 12

Standards … 18

Order of Precedence … 20

TAG INDEX … 21

PURPOSE OF THE DOCUMENT … 22

DEVIATION CONTROL … 23

LIST OF SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT … 24

DATASHEET FOR SAFETY EQUIPMENT … 27

Combined Safety Shower and Eyewash Station … 27

Portable Eyewash Unit … 30

Lighted Windsock … 32

Fireman Equipment Cabinet … 34

Chemical Handling Safety Kit … 36

Electrical Safety Kit … 38

DATASHEET FOR LIFESAVING EQUIPMENT … 41

Life raft … 41

Scramble Net … 46

Lifebuoy … 48

Life Jackets and Cabinet … 52

Helicopter Crash and Rescue Equipment (HCRE) Cabinet … 55

First aid kit … 58

1

1.1

1.2

2

2.1

2.2

3

3.1

3.2

3.3

3.4

4

5

6

7

8

8.1

8.2

8.3

8.4

8.5

8.6

9

9.1

9.2

9.3

9.4

9.5

9.6

200-83-SH-DTS-00007_A

Page 3 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.7

9.8

Stretcher … 61

Self-Contained Breathing Apparatus (SCBA) and Cabinet … 63

9.9 Work Vest and Cabinet … 66

9.10 Oil Spill Kit … 68

9.11 Breathing Apparatus Escape Sets and Cabinet … 70

9.12 Medical Oxygen Cylinder with Face Mask … 74

10

DATASHEET FOR FIREFIGHTING EQUIPMENT … 76

10.1 Dry Chemical Powder Handheld Extinguisher (BC Type) 9 kg … 76

10.2 Carbon Dioxide Handheld Extinguisher 4.5 kg … 79

10.3 Carbon Dioxide Wheeled Extinguisher 45.4 kg … 82

10.4 Dry Chemical Powder Wheeled Extinguisher 56.7 kg … 85

10.5 Dry Chemical Powder Wheeled Extinguisher 136.4 kg … 88

10.6 AFFF Wheeled Extinguisher 135L … 91

10.7 Dry Chemical Powder (BC) Hand Extinguisher 4.1 kg … 94

10.8 Fire Blanket … 96

10.9

International Ship/Shore Connection … 98

10.10 High Velocity Spray Nozzle … 100

200-83-SH-DTS-00007_A

Page 4 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all the State of Qatar’s gas production. The principal objective of the NFPS projects is to sustain plateau from existing QatarEnergy LNG Operation – S1, S2, S3, N1 and N2, production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression.

NFPS projects comprise 3 main investment programs:

  1. Investment #1: Drilling and Associated Facilities [WHP12S/ WHP13S/ WHP14S/

WHP12N/ WHP13N]

  1. Investment #2: Trunk line Looping and Intra-field pipeline looping [32” PL1LN, 32”

PL1LS, 38”PL610LS]

  1. Investment #3: Compression Complexes and associated facilities [Phase 1 CP6S & CP7S; Phase 2: CP8S & CP4N; Phase 3: CP4S & CP6N Phase 4: CP1S & CP1N]

Drilling and Looping, Investments #1 and #2, projects are in execution phase and are being executed as I1P1, EPCOL Projects except for WHP13N, which will be part of NFPS Compression Projects execution which compromises total up to 9 COMPs.

1.1 Project Objective

The objective of this Project includes:

• Achieve standards of global excellence in Safety, Health, Environment, Security and

Quality performance.

• Sustain the Qatarenergy LNG North Field Production Plateau by installing new RPs and one WHPs to support new Compression Complex facilities CP6S & CP7S and pre-installed facilities for future Compression Complex facilities including but not limited to CP4N & CP8S tie-in with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible,

operable, and efficient throughout their required life.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, brownfield modifications, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start-up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit‐for‐ purpose in all respects.

Facilities - 1A

• RP5S RP with 2 x 28” CRA clad pipelines to RP7S and 2 subsea composite Cables

and associated J tubes from RP7S to RP5S & from CP7S to WHP13S.

• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP7S

200-83-SH-DTS-00007_A

Page 5 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

• Hook-up and brownfield modification at WHP5S/RP5S bridge connection & WHP13S/CP7S Composite cable tie-in and E&I integration including RGA Control modification

• Pipeline decommissioning of 28” CS PL5 including associated demolition work at

WHP5S

Facilities - 2A

• RP6N RP with 1x28” CRA clad pipeline to WHP13N, 2 Subsea composite cables and

associated J tubes from WHP12N to RP4N and RP6N to WHP13N. • New fuel gas spur-line and flanged riser from subsea skid to RP6N • WHP13N Topside • Hook-up and brownfield modification at WHP6N/RP6N, RP4N- HPU-Umbilical and tie- in, WHP12N-new J tube installation, E&I migration, WHP6N/RP4N/WHP4N-E&I migration (Pre-CP4N), WHP13N and RP6N interconnection to NFB.

Facilities - 3A

• RP9S RP with 1x28” CRA clad pipeline to RP4S, • Hook-up and brownfield modification at RP4S/WHP9S, Modifications to integrate

RP9S to the RGA control network.

• Pipeline decommissioning of 28” PL9 to WYE on existing 38” trunkline PL49including

associated demolition work at WHP9S.

Facilities - 1B

• New fuel gas spur-line and flanged riser from subsea skid to RP4N • Fiber Optic Cable from RP6N to onshore LFP East, RP6N to RP4N and RP6N to LQ6S. • Hook-up and brownfield modification at RP6N Composite and FO Tie-ins NFB-PU (East)- FO Tie-in

(East)/BVS

Power & Control modifications, LQ6S/LFP Controls/Telecoms Integration

Facilities - 2B

• RP5N RP with 2 x 28” CRA clad pipelines to RP4N, 1 x 28” CRA clad pipeline to RP6N and 2 subsea composite Cables and associated J tubes from WHP12N to RP5N & from RP6N to RP5N.

• Hook-up and brownfield modification at WHP5N- RP5N Bridge connection, WHP12N Composite cable tie-in, RP4N Intrafield pipeline Hook up PL54 N/LN and E&I integration including NFB-PU Power & Control modifications

• Pipeline decommissioning of 2 x 16” PL56/PL54 Subsea Spur line from WHP5N to

reducing barred tee in subsea tie-in skid on PL6 / PL4.

Facilities - 3B

• 2 subsea composite Cables from RP4S to RP9S & from RP4S to WHP12S (with J-

tube)

• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP4S • Hook-up and brownfield modification at WHP12S/ RP9S/ RP4S Composite cable tie-

in, Spurline riser installation at RP4S RGA Power & Control modifications.

Facilities - 4B

• 1 subsea composite Cable from CP8S to RP11S (or from RP8S to RP11S as Option).

200-83-SH-DTS-00007_A

Page 6 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

• New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RP8S. • Hook-up and brownfield modification at WHP8S/ WHP11S for Test separator Internal Upgrade and MEG system modification, Spur lines, Power & Control Tie-ins on RP8S, RP11S/WHP11S-Tie-in (Power and Control), RGA Power & Control modifications.

Facilities - 5B

• 2 subsea composite Cables from RT2 to WHP3S & from RT2 to WHP2S (with J-tube)

and FO Cable from RT2 to Barzan WHP1.

• New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RT2 • Hook-up and brownfield modification at BRZ-WHP1 - FO cable tie-in, WHP2S/ WHP3S/ RT&RT2 Composite cable tie-in and associated modification, RGA Power & Control modifications.

Facilities - 6B

• RP3S RP with 1x24” CRA clad pipeline to RT2 with Stalk on risers, • Hook-up and brownfield modification at RT2 for 24” Intrafield pipeline and Composite/FO cable Hook-up, WHP3S for Production diversion and Utilities, Power and ICSS Hook-up, WHP2S for Composite Cable Tie-ins and Power & Control Integration RGA Power & Control modifications. topside existing and

In-situ abandonment of existing Topside/subsea Composite Cables RT-WHP2S, RT-WHP3S, Topside/Subsea FO cable RT-BRXWHP1.

• Decommissioning at

Figure 1.2.1: NFPS Compression Project COMP3 Scope

200-83-SH-DTS-00007_A

Page 7 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

QatarEnergy LNG.

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

MILESTONE

PROJECT

SITE

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

A reference event splitting a PROJECT activity for progress measurement purpose.

COMP3 - NFPS Offshore Riser/Wellhead Platform & Intrafield Pipelines Project

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Refer to article 2 of CONTRACT AGREEMENT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

VENDOR (SUPPLIER)

A party who is responsible to manufacture and supply equipment and/or services.

SUB-VENDOR (SUB-SUPPLIER)

A party who is responsible to manufacture and supply equipment and/or services under responsibility of main VENDOR.

200-83-SH-DTS-00007_A

Page 8 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

2.2 Abbreviations

Code

AFFF

AIS

ANSI

API

ASME

ASTM

BA

CAP

CFC

CFR

COC

CO2

DCS

EPIRB

EOSTI

FAT

FGS

FM

Definition

Aqueous Film Forming Foam

Automatic Identification System

American National Standards Institute

American Petroleum Institute

American Society of Mechanical Engineers

American Society for Testing and Materials

Breathing Apparatus

Civil Aviation Publication

Chlorofluorocarbons

Code of Federal Regulations

Certificate of Conformity

Carbon Dioxide

Distributed Control System

Emergency Position Indicating Radio Beacon

End of Service Time Indicator

Factory Acceptance Test

Fire and Gas System

Factory Mutual

GMDSS

Global Maritime Distress and Safety System

GRP

Glass Reinforced Plastic

HCRE

Helicopter Crash and Rescue Equipment

HFE

H2S

Human Factors Engineering

Hydrogen Sulfide

200-83-SH-DTS-00007_A

Page 9 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

Code

IMO

Definition

International Maritime organization

ISEA

International Safety Equipment Association

ITP

LAT

LED

LER

LNG

LSA

MED

MH

Inspection and Test Plan

Lowest Astronomical Tide

Light-Emitting Diode

Local Electrical Room

Liquefied Natural Gas

Life Saving Appliance

Marine Equipment Directive

Material Handling

NFPA

National Fire Protection Association

NFPS

North Field Production Sustainability

NIOSH

National Institute for Occupational Safety and Health

NPT

N2

National Pipe Thread

Nitrogen

OSHA

Occupational Safety and Health Administration

POB

PVC

Oz

RP

RT

Persons On Board

Polyvinyl Chloride

Ounce

Riser Platform

Riser Tower

SART

Search and Rescue Transponder

SCBA

Self-contained Breathing Apparatus

SDR

Specification Deviation Request

200-83-SH-DTS-00007_A

Page 10 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

Code

Definition

SOLAS

Safety of Life at Sea

SS

TWA

UL

UV

Stainless Steel

Time-Weighted Average

Underwriters Laboratories

Ultraviolet

USCG

United States Coast Guard

WHP

Wellhead Platform

200-83-SH-DTS-00007_A

Page 11 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

3 REGULATIONS, CODES AND STANDARDS

3.1 Company References

S. No

Document Number

Title

  1. PRT-ERP-POL-001

Qatargas Fire Protection Policy

  1. PRT-PRS-PRC-014

Offshore Loss Prevention Philosophy

  1. PRT-PSF-PRC-003

Breathing Apparatus Usage, Maintenance

Filling

and

  1. PRT-PSF-PRC-012

Personal Protective Equipment (PPE)

  1. PRT-PSF-PRC-024

Hydrogen Sulfide Safety

  1. MED-00-PRC-011

First Aid Kits

  1. PRJ-PJL-PRC-004

  2. PRJ-PJL-PRC-005

Facilities Engineering and Vendor Document Numbering Procedure

Facility System and Unit Number Codes and Descriptions Procedure

  1. PRJ-PJL-PRC-006

Project Information Handover Procedure

  1. PRJ-PJL-PRC-008

  2. PRJ-PJL-PRC-048

  3. PRJ-PJL-PRC-049

Qatargas Equipment Numbering Philosophy Procedure

Facilities Documentation Metadata Requirements Procedure

Project Information Handover, Verification and Acceptance Procedure

  1. PRJ-PJL-PRC-080

AIMS: Tag Management System (TMS)

  1. PRJ-PJL-PRC-007

Smart Plant Engineering Applications & Drafting (CAD) Standard Procedure

3.2 Project Documents

S. No

Document Number

Title

  1. 200-20-SH-DEC-00013

  2. 200-20-SH-SPC-00020

Technical Safety Basis of Design (Offshore) for COMP3 Project

Specification for Safety, Lifesaving and Firefighting items for COMP3 Project

200-83-SH-DTS-00007_A

Page 12 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S. No

Document Number

Title

  1. 200-20-PE-DEC-00004

Project Basis of Design for COMP3 Project

  1. 200-20-PI-SPC-00044

Piping Material Specification for COMP3 Project

  1. 200-51-IN-SPC-00061

  2. 200-22-ST-DEC-00004

  3. 200-20-CE-SPC-00027

  4. 200-20-PI-DEC-00012

  5. 200-20-SH-SPC-00018

  6. 200-20-ME-SPC-00038

COMP3-SPM-PE-PLN- 00002

Instrumentation Requirements Equipment for COMP3 Project

for Packaged

Topside Structural Design Basis (Greenfield) for COMP3 Project

Specification for Fixed Facilities Protective Coating for COMP3 Project

Mechanical Handling Philosophy Project

for COMP3

Human Factor Engineering (HFE) Workplace Design Specification for COMP3 Project

Technical specification of Breathing Air Cascade System for COMP3 Project

Spare Parts Management Plan

  1. 200-20-SH-DEC-00014

Environmental Basis of Design for COMP3 Project

  1. 200-20-CE-DEC-00006

Material selection philosophy for COMP3 Project

  1. 200-91-EL-DEC-00008

Electrical Design Basis for COMP3 Project

  1. 200-91-EL-SPC-00031

  2. 200-91-EL-SPC-00032

  3. 200-91-EL-SPC-00033

Technical Specification for Electrical Packaged Equipment for COMP3 Project

Technical Specification for electrical conduits, cable ladder and trays for COMP3 Project

Technical Specification for electrical power cables, control and earthing cables for COMP3 Project

  1. 200-91-EL-DEC-00009

Lighting Design Philosophy for COMP3 Project

  1. 200-91-EL-DWG-00032

  2. 200-51-IN-SPC-00057

  3. 200-20-ST-SPC-00029

Electrical Installation Details for Power, Lighting and Earthing for COMP3 Project

Specification for Instrument Cables & Cable Glands for COMP3 Project

Specification for Structural Material for COMP3 Project

200-83-SH-DTS-00007_A

Page 13 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S. No

Document Number

Title

  1. 200-20-PI-SPC-00045

Specification for GRE pipes, fittings and flanges for COMP3 Project

  1. 200-20-PI-SPC-00050

Specification for pipes for COMP3 Project

  1. 200-20-PI-SPC-00046

Specification for pipe fasteners for COMP3 Project

  1. 200-20-ST-SPC-00033

Specification structural requirements for COMP3 project

for skid mounted assemblies –

  1. 200-20-PI-SPC-00047

Specification for Pipe Fittings for COMP3 Project

  1. 200-51-IN-SPC-00054

  2. 200-20-PI-SPC-00042

  3. 200-91-EL-SPC-00034

COMP3-SPM-QM-PRC- 00002

COMP3-SPM-QM-PRC- 00003

COMP3-SPM-QM-SPC- 00001

Specification for field instrumentation (incl. Flow, level, pressure and temperature instrumentation & F&G detectors) for COMP3 Project

Piping support standard specification for COMP3 Project

Technical Specification for Equipment Grounding and Bonding for COMP3 Project

Source Inspection Procedure

Project quality requirements for suppliers

Project quality requirements for subcontractors

COMP3-SPM-PO-PRC- 00005

Handling, Storage, Packing & Preservation Procedure

  1. 212-83-SH-PLN-00001

  2. 212-83-SH-PLN-00002

  3. 212-83-SH-PLN-00003

  4. 212-83-SH-PLN-00004

  5. 212-83-SH-PLN-00005

  6. 212-83-SH-PLN-00006

  7. 240-83-SH-PLN-00001

Fire, safety equipment and escape route layout - cellar deck - for RP3S

Fire, safety equipment and escape route layout - helideck - for RP3S

Fire, safety equipment and escape route layout - local equipment room - for RP3S

Fire, safety equipment and escape route layout - main deck - for RP3S

Fire, safety equipment and escape route layout - top deck - for RP3S

Fire, safety equipment and escape route layout - top of jacket - for RP3S

Fire, safety equipment and escape route layout - cellar deck - for RP5S

200-83-SH-DTS-00007_A

Page 14 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S. No

Document Number

Title

  1. 240-83-SH-PLN-00002

  2. 240-83-SH-PLN-00003

  3. 240-83-SH-PLN-00004

  4. 240-83-SH-PLN-00005

  5. 240-83-SH-PLN-00006

  6. 235-83-SH-PLN-00001

  7. 235-83-SH-PLN-00002

  8. 235-83-SH-PLN-00003

  9. 235-83-SH-PLN-00004

  10. 235-83-SH-PLN-00005

  11. 218-83-SH-PLN-00001

  12. 278-83-SH-PLN-00001

  13. 278-83-SH-PLN-00002

  14. 278-83-SH-PLN-00003

  15. 278-83-SH-PLN-00004

  16. 278-83-SH-PLN-00005

  17. 278-83-SH-PLN-00006

  18. 268-83-SH-PLN-00001

  19. 268-83-SH-PLN-00002

Fire, safety equipment and escape route layout - helideck - for RP5S

Fire, safety equipment and escape route layout - local equipment room - for RP5S

Fire, safety equipment and escape route layout - main deck - for RP5S

Fire, safety equipment and escape route layout - top deck - for RP5S

Fire, safety equipment and escape route layout - top of jacket - for RP5S

Fire, safety equipment and escape route layout - cellar deck - for RP9S

Fire, safety equipment and escape route layout - local equipment room - for RP9S

Fire, safety equipment and escape route layout - main deck - for RP9S

Fire, safety equipment and escape route layout - top deck - for RP9S

Fire, safety equipment and escape route layout - top of jacket - for RP9S

Fire, safety equipment and escape route layout - for BSP3S-1

Fire, safety equipment and escape route layout - cellar deck - for RP5N

Fire, safety equipment and escape route layout - helideck - for RP5N

Fire, safety equipment and escape route layout - local equipment room - for RP5N

Fire, safety equipment and escape route layout - main deck - for RP5N

Fire, safety equipment and escape route layout - top deck - for RP5N

Fire, safety equipment and escape route layout - top of jacket for RP5N

Fire, safety equipment and escape route layout - cellar deck - for RP6N

Fire, safety equipment and escape route layout - helideck - for RP6N

200-83-SH-DTS-00007_A

Page 15 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S. No

Document Number

Title

  1. 268-83-SH-PLN-00003

  2. 268-83-SH-PLN-00004

  3. 268-83-SH-PLN-00005

  4. 268-83-SH-PLN-00006

  5. 265-83-SH-PLN-00001

  6. 265-83-SH-PLN-00002

  7. 265-83-SH-PLN-00003

  8. 265-83-SH-PLN-00004

  9. 265-83-SH-PLN-00005

  10. 265-83-SH-PLN-00006

  11. 265-83-SH-PLN-00007

  12. 239-83-SH-PLN-00001

  13. 263-20-SH-PLN-00001

  14. 263-20-SH-PLN-00002

  15. 263-20-SH-PLN-00004

  16. 263-20-SH-PLN-00005

  17. 223-20-SH-PLN-00008

  18. 228-20-SH-PLN-00003

  19. 270-20-SH-PLN-00004

Fire, safety equipment and escape route layout - local equipment room - for RP6N

Fire, safety equipment and escape route layout - main deck - for RP6N

Fire, safety equipment and escape route layout - top deck - for RP6N

Fire, safety equipment and escape route layout - top of jacket - for RP6N

Fire, safety equipment and escape route layout - cellar deck - for WHP13N

Fire, safety equipment and escape route layout - drill deck - for WHP13N

Fire, safety equipment and escape route layout - helideck - for WHP13N

Fire, safety equipment and escape route layout - local equipment room - for WHP13N

Fire, safety equipment and escape route layout - mezzanine deck - for WHP13N

Fire, safety equipment and escape route layout - production deck - for WHP13N

Fire, safety equipment and escape route layout - top of jacket - for WHP13N

Fire, safety equipment and escape route layout - for BSP5S-1

Fire, safety equipment and escape route layout - RP4N - Drain Deck

Fire, safety equipment and escape route layout - RP4N - Jacket level

Fire, safety equipment and escape route layout - RP4N - Main Deck

Fire, safety equipment and escape route layout - RP4N - Top Deck

Fire, safety equipment and escape route layout - RP4S - Main Deck

Fire, safety equipment and escape route layout - RP7S - Main Deck

Fire, safety equipment and escape route layout - RP8S - Main Deck

200-83-SH-DTS-00007_A

Page 16 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S. No

Document Number

Title

  1. 270-20-SH-PLN-00005

  2. 210-20-SH-PLN-00003

  3. 210-20-SH-PLN-00004

  4. WT11-D-PN-4332

Fire, safety equipment and escape route layout - RP8S - Upper Deck

Fire, safety equipment and escape route layout - RT-2 - Main Deck

Fire, safety equipment and escape route layout - RT-2 - Top Deck

Wellhead platform WH11S topside escape route, fire protection and safety device location plan - Drill deck

210-32-23-SA-DR-PL- 022

Wellhead platform WH5 - firefighting & safety equipment layout drill deck

210-32-23-SA-DR-PL- 023

Wellhead platform WH5 - firefighting & safety equipment layout mezzanine deck

210-32-23-SA-DR-PL- 024

Wellhead platform WH5 - firefighting & safety equipment layout production deck

49450-WT3-EE-6120

49450-WT3-EE-6117

49450-WT3-EE-6119

49450-WT3-EE-6121

49450-WT3-EE-6118

49450-WT3-CS-7251

49450-WT3-CS-7252

49450-WT3-CS-7253

WT5-D-EE-6014

WT9-D-CS-7252

240-93-PR-PID-00001

WT3, fire protection, fire & gas safety system plan drain mezzanine wellhead platform no. 3

WT3, fire protection, fire & gas safety system plan drill deck- west wellhead platform no. 3

WT3, fire protection, fire & gas safety system plan production deck wellhead platform no.3

WT3, fire protection, fire & gas safety system plan top of jacket and boat landing wellhead platform no.3

WT3, fire protection, fire & gas safety system plan wellhead mezzanine wellhead platform no. 3

WT3, fire protection, fire protection and safety device location plan drill/ wellhead decks

WT3, fire protection, fire protection and safety device location plan production/ drain decks

WT3, fire protection, fire protection and safety device location plan top of jacket and boat landing

WT5, fire protection, fire protection and safety device production/mezzanine location walkway levels WT5 platform

plan

WT9, fire protection, fire protection and safety device location plan production deck

Piping and Instrumentation Diagram Riser Platform RP5S Diesel and Washdown System

200-83-SH-DTS-00007_A

Page 17 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S. No

Document Number

Title

268-93-PR-PID-00001

235-93-PR-PID-00001

278-93-PR-PID-00001

212-93-PR-PID-00001

265-94-PR-PID-00001

240-95-PR-PID-00001

268-95-PR-PID-00001

235-95-PR-PID-00001

278-95-PR-PID-00001

212-95-PR-PID-00001

265-95-PR-PID-00001

265-20-PR-PID-00002

COMP3-SPM-SH-TQY- 00019

Piping and Instrumentation Diagram Riser Platform RP6N Diesel and Washdown System

Piping and Instrumentation Diagram Riser Platform RP9S Diesel and Washdown System

Piping and Instrumentation Diagram Riser Platform RP5N Diesel and Washdown System

Piping and Instrumentation Diagram Riser Platform RP3S Diesel and Washdown System

Piping and Instrumentation Diagram Wellhead Platform WHP13N Washdown System

Piping and Instrumentation Diagram Riser Platform RP5S Plant and Breathing Air System

Piping and Instrumentation Diagram Riser Platform RP6N Plant and Breathing Air System

Piping and Instrumentation Diagram Riser Platform RP9S Plant and Breathing Air System

Piping and Instrumentation Diagram Riser Platform RP5N Plant and Breathing Air System

Piping and Instrumentation Diagram Riser Platform RP3S Plant and Breathing Air System

Piping and Instrumentation Diagram Wellhead Platform WHP13N Plant and Breathing Air System

Piping and Instrumentation Diagram Firewater Distribution System - WHP13N

Technical query for combined safety shower and eyewash (with chiller) for COMP3 Project

for Zone Classification

3.3 Standards

S. No

Document Number

Title

ANSI/ISEA Z308.1

ANSI/ISEA Z358.1

API RP 2A

API RP 2EQ

American National Standard - Workplace First Aid Kits and Eyewash Package

American National Standard Eyewash and Shower Equipment

for Emergency

Planning, Designing, and Constructing Fixed Offshore Platforms - Working Stress Design

Seismic Design Procedures and Criteria Offshore Structures

for

200-83-SH-DTS-00007_A

Page 18 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S. No

Document Number

Title

API RP 14C

API RP 14G

API RP 14J

for Analysis, Design, Recommended Practice Installation and Testing of Basic Surface Systems for Offshore Production Platform

Recommendation Practice for Fire Prevention and Control on Open Type Offshore Production Platforms

Recommendation Practice for Design and Hazard Analysis for Offshore Production Facilities

ASTM D4151

Standard Test Method for Flammability of Blankets

ASTM 1692- 74

CAP 437

IMO-SOLAS

Standard Method of Test for Rate of Burning of Cellular Plastics Using a Horizontally Supported Specimen

Offshore Helicopter Landing Areas: A Guide to Criteria, Recommended Minimum Standards and Best Practice

International Convention for the Safety of Life at Sea (SOLAS) 1974 and Amendments in force

IMO ID 982E

Life-Saving Appliances Code (LSA Code)

IMO IE110E

International Convention for the Safety of Life at Sea (SOLAS)

IMO MSC.207 (81)

IMO MSC.272 (85)

IMO MSC.274 (85)

Adoption of Amendments to the International Life- Saving Appliance (LSA) Code

Adoption of Amendments to the International Life- Saving Appliance (LSA) Code

the Revised Adoption of Amendments Recommendation on Testing of Life-Saving Appliances (Resolution MSC.81(70))

to

ISO 9001

Quality Management System

ISO 14001

Environmental Management System - Requirements with guidance for use

NFPA 10

Standard for Portable Fire Extinguishers

NFPA 11

Standard for Low-, Medium-, and High-Expansion Foam

NFPA 17

Standard for Dry Chemical Extinguishing Systems

200-83-SH-DTS-00007_A

Page 19 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S. No

Document Number

Title

NFPA 70E

Standard for Electrical Safety in Workplace

NFPA 1981

Standard on Open-Circuit Self- Contained Breathing Apparatus for Emergency Services

(SCBA)

OSHA 1910.266

Occupational Safety and Health Standard – Special Industries - First-aid Kits

UL 154

Carbon-Dioxide Fire Extinguishers

UL 299

Dry Chemical Fire Extinguishers

USCG 46 CFR Part 164 Subpart 164.018

USCG 46 CFR Part 161 Subpart 161.012

Retroreflective Material for Lifesaving Equipment

Personal Flotation Device Lights

33 CFR Part 145

Fire Fighting Equipment

29 CFR Part 1910

Occupational Safety and Health Standards

3.4 Order of Precedence

The COMP3 facilities shall be designed, and operated in accordance with the applicable laws, regulations of the State of Qatar, COMPANY Procedures & Standards, PROJECT related documentation, internationally recognized codes and standards listed at Section 3 in the order of precedence describe as below:

• Qatari Governmental and Regulatory Requirements • COMPANY Procedures, Policies and Standards • PROJECT Specifications. • • COMPANY and CONTRACTOR’s Lessons Learned

Industry Codes and Standards

When a conflict exists among codes, standards, and project specifications, the most stringent provision shall govern unless otherwise formally clarified and agreed with COMPANY. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented.

200-83-SH-DTS-00007_A

Page 20 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

4 TAG INDEX

Rev. No.

Item Tag No.

Item Description

A

HOLD-2

SAFETY, LIFESAVING & FIREFIGHTING ITEMS

200-83-SH-DTS-00007_A

Page 21 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

5 PURPOSE OF THE DOCUMENT

The purpose of this document is to covers the technical requirements for the Safety, Lifesaving and Firefighting Equipment for the NFPS COMP3 Project.

This Datasheet shall be read in conjunction with the Specification for Safety, Lifesaving and Firefighting items for COMP3 Project [Ref.16].

VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this data sheet and referred specification.

200-83-SH-DTS-00007_A

Page 22 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

6 DEVIATION CONTROL

VENDOR shall supply equipment that complies fully with this Datasheet, COMPANY standards & the international codes and standards listed herein. VENDOR shall notify CONTRACTOR/COMPANY immediately in writing in case of any deviations.

Engineering clarification shall not be regarded as deviation from any project requirement. VENDOR shall use deviation form provided by CONTRACTOR as part of the MR and such deviations (if any) shall follow the Specification Deviation Request (SDR) procedure for facilitating approval from CONTRACTOR/COMPANY.

VENDOR shall not proceed to change/deviate without CONTRACTOR/ COMPANY approval. VENDOR shall list and submit any identified deviation while submitting their proposal for CONTRACTOR/ COMPANY approval.

200-83-SH-DTS-00007_A

Page 23 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

7 LIST OF SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT

Table 7.1: List of safety, lifesaving & firefighting equipment

S.N.

ITEMS

PLATFORMS

A SAFETY EQUIPMENT

TOTAL QTY

(HOLD-1)

REMARKS

Combined safety shower & eyewash station

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

  1. Portable Eyewash

  2. Lighted Windsock

  3. Fireman Equipment Cabinet

  4. Chemical Handling Safety Kit

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

6 (Note 1)

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

6

6

6

6

  1. Electrical Safety Kit

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

12

B

LIFESAVING EQUIPMENT Life raft (15 Men Capacity) Life raft (12 Men Capacity) Life raft (10 Men Capacity)

  1. Scramble Net

  2. Life buoys

WHP13N RP3S, RP5S, RP9S RP5N, RP6N

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

2 6 4

12

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

100

Life Jacket & Cabinet (15 Life Jackets Capacity)

WHP13N

Life Jacket & Cabinet (12 Life Jackets Capacity)

RP3S, RP5S, RP9S

2

6

1 no. at each RPs & WHP (near MEG storage Tank) 1 no. at each LER building in RPs & WHP (inside battery room) 1 no. on each RPs & WHP (on Crane) 1 no. on each RPs & WHP (outside TR) 1 no. at each RPs & WHP (near MEG storage Tank) 2 nos. at each LER building in RPs & WHP (1 no. Inside & Electrical Instrument room, 1 no. at UPS, INST. & Telecom room)

2 nos. at WHP 2 nos. at each RPs 2 nos. at each RPs 2 nos. at each RPs & WHP (near life raft) 16 nos. at each RPs & 20 nos. at WHP 2 nos. cabinet on (for 100% WHP POB, near life raft/ TEMPSC) 2 nos. cabinet on (for each RPs 100% POB, near life raft)

200-83-SH-DTS-00007_A

Page 24 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S.N.

ITEMS

PLATFORMS

TOTAL QTY

REMARKS

Life Jacket & Cabinet (10 Life Jackets Capacity)

RP5N, RP6N

Life Jacket & Cabinet (5 Life Jackets Capacity)

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

Life Jacket (1 Life Jacket no. without cabinet)

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

4

7

6

Helicopter Crash & Rescue Equipment

RP6N, RP5S, RP5N, RP3S, WHP13N

10

  1. First Aid kit

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

24

  1. Stretcher

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

12

Self-Contained Breathing Apparatus Set and Cabinet (SCBA)

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

Work Vest and Cabinet (30 work vest capacity)

WHP13N

Work Vest and Cabinet (24 work vest capacity)

RP3S, RP5S, RP9S

Work Vest and Cabinet (20 work vest capacity)

RP5N, RP6N

  1. Oil Spill Kit and Cabinet

RP6N, RP5S, RP5N, RP3S, WHP13N

Breathing Apparatus (BA) Escape Sets and Cabinet (30 BA Escape sets capacity)

WHP13N

6

1

3

2

5

1

2 nos. cabinet on each RPs (for 100% POB, near life raft) 2 nos. cabinet on WHP & 1 no. cabinet on each RPs 1 no. each RPs & WHP crane cabin 2 nos. at each RPs & WHP (near Helideck) 4 nos. at each RPs & WHP (1 no. Inside Electrical & Instrument room, 1 no. at UPS, INST. & Telecom room, 1 no. at TR and 1 no. at crane cabin) 2 nos. at each RPs & WHP (inside TR) 1 no. cabinet on each RPs & WHP (4 nos. SCBA set in cabinet, outside of TR) 1 no. cabinet on WHP (for 100% POB) (outside of TR) 1 no. cabinet on each RPs (for 100% POB) (outside of TR) 1 no. cabinet on each RPs (for 100% POB) (outside of TR) 1 no. at each RPs & WHP (near Helideck) 1 no. cabinet on (for 100% WHP POB) (Inside TR)

200-83-SH-DTS-00007_A

Page 25 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

S.N.

ITEMS

PLATFORMS

TOTAL QTY

REMARKS

Breathing Apparatus (BA) Escape Sets and Cabinet (24 BA Escape sets capacity)

RP3S, RP5S, RP9S

Breathing Apparatus (BA) Escape Sets and Cabinet (20 BA Escape sets capacity)

RP5N, RP6N

Breathing Apparatus (BA) Escape Set (1 no. without cabinet) Medical Oxygen Cylinder with face mask FIREFIGHTING EQUIPMENT

C

Dry Chemical Powder Handheld Extinguisher 9 kg

Carbon Dioxide Handheld Extinguisher 4.5 kg

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N, WHP5N, WHP6N, WHP4N, RP4N RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

Carbon Dioxide Wheeled Extinguisher 45.4 kg

RP6N, RP5S, RP5N, RP3S, WHP13N

Dry Chemical Powder Wheeled Extinguisher 56.7 kg Dry Chemical Powder Wheeled Extinguisher 136.4 kg AFFF Wheeled Extinguishers 135 L

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

WHP13N

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

Dry Chemical Handheld Extinguisher 4.1 kg (BC type)

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

3

2

6

6

115

70

5

28

2

17

6

  1. Fire Blanket

RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N

12

International Ship/Shore Connection

WHP13N

  1. High Velocity Spray Nozzle

WHP13N

2 sets

21

Note: 1. Lighted Windsock will be supplied by pedestal crane vendor.

1 no. cabinet on each RPs (for 100% POB) (Inside TR) 1 no. cabinet on each RPs (for 100% POB) (Inside TR)

1 no. each RPs & WHP crane cabin

1 no. at each RPs & WHP (inside TR)

1 no. at each RPs (near & WHP Helideck stair landing)

1 no. on each RPs (Inside & WHP crane cabin)

2 nos. on each in LER building RPs & WHP (1 no. Inside Electrical & Instrument room and 1 no. at UPS, INST. & Telecom room) 1 set at boat landing & 1 set at drill deck

200-83-SH-DTS-00007_A

Page 26 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

8 DATASHEET FOR SAFETY EQUIPMENT

8.1 Combined Safety Shower and Eyewash Station

COMBINED SAFETY SHOWER AND EYEWASH STATION

ADMINISTRATIVE IDENTIFICATIONS

A 1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B

EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA

C

1

2

3

ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE

4

ATMOSPHERE

RP 6N

RP 5N

SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

RP 5S

RP 3S

RP 9S

WHP 13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

COMBINED SAFETY SHOWER & EYEWASH CONFORMING TO ANSI Z358.1-2014 (SELF-SUPPORTING UNIT AND USE LARGE DIAMETER STANDPIPE) WITH STORAGE TANK (48 IN) 1,200 MM IN DIAMETER

1 TYPE

2

AREA (MINIMUM UNOBSTRUCTED)

11

SHOWER SPRAY ANGLE (OVERHEAD)

60o

12

INLET CONNECTION TO POTABLE WATER

2” (VENDOR TO CONFIRM)

3 SAFETY SHOWER FLOW 75.7 LPM

13 MARKING

4

EYE WASH STATION FLOW

1.5 LPM

14 DRAIN OUTLET CONNECTION

5 DURATION

15 MIN (MINIMUM)

15

6 OPERATING METHOD

NOTE 10

16

TIE-IN FLANGE MATERIAL FOR WATER SUPPLY AND DRAIN WATER PRESSURE (SAFETY SHOWER OUTLET)

7 FLUID HANDLED

FRESH WATER OR POTABLE WATER QUALITY

17 WATER TEMPERATURE

200-83-SH-DTS-00007_A

AS PER BS EN5499

2” (VENDOR TO CONFIRM)

VENDOR TO ADVISE

2-3 BARG

15 – 35 oC BASED ON 15 MINUTES CONTINUOUS OPERATION OF THE SHOWER

Page 27 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

COMBINED SAFETY SHOWER AND EYEWASH STATION

8 TANK CAPACITY

1200 LITRES

18

LIGHTING WITH INTEGRATED BATTERY

REQUIRED (NOTE-10)

9

TANK MATERIAL/ COLOUR

GRP/ GREEN

19 SIGN AND BRACKET

YES. STAINLESS STEEL TAG

REQUIRED

REQUIRED (NOTE-5)

REQUIRED

REQUIRED

10 MATERIAL

GALVANIZED PIPE STRUCTURE SUITABLE FOR OUTDOOR INSTALLATION & MARINE ENVIRONMENT

E

EQUIPMENT ACCESSORIES

1

ANTI-SURGE HEADS WITH INTEGRAL FLOW CONTROL FOR SHOWER AND EYEWASH

REQUIRED

9

PROXIMITY SWITCH REQUIRED FOR TRANSFER SIGNAL TO DCS WHEN SAFETY SHOWER WILL BE WORKING

2 OVERFLOW

REQUIRED

10 DRAIN SUMP

11

12

PRESSURE REDUCING AND ISOLATION VALVE LOW LEVEL SWITCH (REMOTE)

3 PANIC BAR OPERATION REQUIRED

4

5

6

SELF DRAINING VALVE FOR EYEWASH WATER TREATMENT ADDITIVE CHILLER AND HEATER UNIT

REQUIRED

REQUIRED

13 DUST COVER FOR EYEWASH REQUIRED

REQUIRED

14 HIGH LEVEL SWITCH/ALARM REQUIRED

7 TEMPERATURE GAUGE REQUIRED

15 OTHER ACCESSORIES

8 PRESSURE GAUGE

REQUIRED

F PHYSICAL DATA

1

WEIGHT (DRY/ WITH WATER)

VENDOR TO ADVISE

2 DIMENSION

G EQUIPMENT IDENTIFICATIONS

1 EQUIPMENT TYPE

COMBINED SAFETY SHOWER & EYEWASH

3 MANUFACTURER NAME

2 MODEL NUMBER

VENDOR TO ADVISE

4 MANUFACTURER COUNTRY

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

H SPECIAL REQUIREMENTS

1

2

3

COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT HAZARDOUS AREA CLASSIFICATION REQUIREMENT

ANSI STANDARD AND REGULATIONS REQUIREMENTS (ANSI/ISEA Z358.1)

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION.

ALL ELECTRICAL EQUIPMENT INCLUDING CHILLER SHALL BE SUITABLE FOR ZONE 2 (ZONE 1 FOR INSTRUMENTATION), GAS GROUP IIB & TEMPERATURE CLASS T3.

I NOTES 1 STRAINERS FOR EYEWASH SHOWER SHALL BE PROVIDED.

200-83-SH-DTS-00007_A

Page 28 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

COMBINED SAFETY SHOWER AND EYEWASH STATION

2

3

INSULATION SHALL BE FITTED TO ENSURE THE WATER IS MAINTAINED AT A TEPID TEMPERATURE REGARDLESS OF THE ENVIRONMENT. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 5 LIQUID SEAL AND STRAINER SHALL BE PROVIDED ALONG WITH DRAIN SUMP.

6

7

8

9

10

11

GRP SIDE PANELS SHALL BE PROVIDED TO PROTECT THE SPLASHING OF WATER OUTSIDE THE SAFETY SHOWER. SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-0000200020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC- 0000200013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR. ILLUMINATION LEVEL INSIDE THE SAFETY SHOWER ENCLOSURE SHALL BE INLINE WITH LIGHTING DESIGN PHILOSOPHY FOR COMP3 PROJECT (DOC. NO. 200-91-EL-DEC-00009). ACTIVATION OF THE SHOWER SHALL BE BY PANIC BAR AND THE EYE-WASH UNIT SHALL BE BY PUSH FLAG OR FOOT TREADLE. THE VALVES, ONCE OPERATED, SHALL REMAIN OPEN UNTIL SUCH TIME AS THEY ARE SHUT-OFF MANUALLY.

200-83-SH-DTS-00007_A

Page 29 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

8.2 Portable Eyewash Unit

PORTABLE EYEWASH UNIT

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & PIPELINES PROJECT REFER TABLE 7.1

INTRAFIELD

1

TAG NUMBER (HOLD- 2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 EYEWASH UNIT CRITERIA:

1.1

WALL MOUNTED, SUPPLIED WITH FIXATION KIT

1.2

THE UNIT SHALL BE HIGHLY VISIBLE, GREEN HIGH-DENSITY POLYETHYLENE TYPE.

E GENERAL 1 LOCKABLE THREADED

CAP

REQUIRED

1.3

EYE WASH BOTTLE SHALL BE CLEARLY STAMPED WITH EXPIRY DATE.

REQUIRED

REQUIRED

REQUIRED

2

MINIMUM NUMBER OF BOTTLES FOR EACH UNIT

2

3 CAPACITY OF EACH

BOTTLE

APPROX.1000 ML

4 MARKING

PICTORIAL SAFETY SIGN & OPERATING INSTRUCTION IN ENGLISH.

5 GRP CABINET

REQUIRED

F EQUIPMENT ACCESSORIES 1 REQUIRED

ACCESSORIES G PHYSICAL DATA

WALL MOUNTING FIXING SCREWS / NUTS & BOLTS

200-83-SH-DTS-00007_A

Page 30 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

PORTABLE EYEWASH UNIT

1

WEIGHT (DRY/ WITH WATER)

VENDOR TO ADVISE

2

DIMENSION

VENDOR TO ADVISE

H SPECIAL REQUIREMENTS

1

2

COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT

ANSI STANDARD AND REGULATIONS REQUIREMENTS (ANSI/ISEA Z358.1)

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

I EQUIPMENT IDENTIFICATIONS

1 EQUIPMENT TYPE

PORTABLE EYEWASH UNIT

2

MODEL NUMBER

VENDOR TO ADVISE

J NOTES

3

4

MANUFACTURER NAME MANUFACTURER COUNTRY

VENDOR TO ADVISE

VENDOR TO ADVISE

1

2

3

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-0000200020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC- 0000200013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

5

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 31 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

8.3 Lighted Windsock

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

LIGHTED WINDSOCK

2 PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & PIPELINES PROJECT

INTRAFIELD

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

RP 9S

WHP13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

37.0

85

45 (NOTE-1)

100.0

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION

EQUIPMENT DESIGN CRITERIA

1 MATERIAL

2 COLOR (NOTE 4)

3

SUPPORT FRAME, POLE, BASE MATERIAL

4 WIND SPEED

LONG-LIFE NYLON MATERIAL CONTRAST AND REFLECTIVE COLOUR

5 LENGTH

VENDOR TO ADVISE

6 DESIGN LIFE (MIN)

VENDOR TO ADVISE

(NOTE 5 & 6)

7 ROTATION ANGLE

360 DEGREES

UP TO 38.6 M/S (3 SECOND GUST)

E EQUIPMENT ACCESSORIES

1 REQUIRED

ACCESSORIES

F PHYSICAL DATA

1 WEIGHT

2

WINDSOCK DIMENSION (APPROXIMATE)

5000 lm LED TYPE TOP MOUNTED LIGHT FOR LIGHTING WINDSOCK

REQUIRED

GALVANIZED FRAME

REQUIRED

VENDOR TO ADVISE

VENDOR TO ADVISE

G SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD 2 ENVIRONMENTAL REQUIREMENT

CAP 437

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

200-83-SH-DTS-00007_A

Page 32 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

3

HAZARDOUS AREA CLASSIFICATION REQUIREMENT

LIGHTED WINDSOCK

ZONE 1, GAS GROUP IIB, TEMPERATURE CLASS T3

H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

LIGHTED WINDSOCK

2 MANUFACTURER NAME VENDOR TO ADVISE

I NOTES

3 MODEL NUMBER MANUFACTURER COUNTRY

4

VENDOR TO ADVISE

VENDOR TO ADVISE

1

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

3

WINDSOCKS SHALL BE CONSTRUCTED OF LONG-LIFE NYLON MATERIAL TREATED TO RESIST THE EFFECTS OF WIND AND WEATHER.

4 WINDSOCKS SHALL PREFERABLY BE HIGH-VISIBILITY ORANGE IN COLOR. 5 WINDSOCK FRAME SHALL BE GALVANIZED MATERIAL.

6 WINDSOCK POLE, BASE SHALL BE GALVANIZED MATERIAL WITH XYLON COATED BOLTS.

7

THE WINDSOCK ASSEMBLY SHALL BE LOCATED AT HIGHEST POINT OF THE CRANE INCLUDING A LED LIGHT TO ILLUMINATE THE WINDSOCK IN ANY DIRECTION.

8 LIGHTING FIXTURE SHALL BE SUITABLE FOR POWER SUPPLY 240V, 50Hz, SINGLE PHASE, UNGROUNDED.

10

11

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

12 WINDSOCK IS SUPPLIED PART OF CRANE VENDOR PACKAGE.

200-83-SH-DTS-00007_A

Page 33 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

8.4 Fireman Equipment Cabinet

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

FIREMAN EQUIPMENT CABINET

2 PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & PIPELINES PROJECT

INTRAFIELD

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

RP 5S

RP 3S

RP 9S

WHP 13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-1)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 FIREMAN’S EQUIPMENT SHALL CONSIST OF THE FOLLOWING:

PROTECTIVE OUTFIT (INCLUDING FIRE FIGHTING SUIT, FIRE FIGHTING HELMET, FIRE FIGHTING GLOVES, FACE MASK OR HOOD, HEAT RESISTANT JACKET AND HEAT-RESISTANT TROUSERS) SELF-CONTAINED BREATHING APPARATUS PORTABLE BATTERY- OPERATED SAFETY LAMP (EXPLOSION PROOF)

1.1

1.2

1.3

REQUIRED (2 SETS)

1.4 FIREMAN’S AXE

REQUIRED (2 SETS)

REQUIRED (2 SETS)

1.5

SAFETY HARNESS AND LIFELINE

REQUIRED (2 SETS)

REQUIRED (2 SETS)

E CABINET DESIGN CRITERIA

1 SIZED FOR

TO ACCOMMODATE ALL THE EQUIPMENT SPECIFIED IN SECTION ‘D’

7

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

2 CABINET MATERIAL

RIGID FIBERGLASS

8

DONNING INSTUCTIONS

200-83-SH-DTS-00007_A

STAINLESS STEEL, SS316

IN ENGLISH, CONTAINED IN A WEATHER-PROOF COVER AND PERMANENTLY

Page 34 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

FIREMAN EQUIPMENT CABINET

ATTACHED TO THE INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT

3

MOUNTING / INSTALLATION

BOTTOM AND BACK FRAMES SHALL BE PROVIDED TO PERMIT DECK OR BULKHEAD MOUNTING

9 LABELLING (NOTE 3)

“FIREMAN’ EQUIPMENT” IN ENGLISH

4

IP RATING

VENDOR TO ADVISE

10

VENTILATION / DRAINAGE

5 CABINET PAINT FINISH VENDOR TO ADVISE

11 WEAR INSTRUCTION

PROVIDED TO AVOID INGRESS OF SEA / RAINWATER IN ENGLISH, PERMANENTLY ATTACHED TO THE INSIDE OF DOOR OF CONTAINER

6 COUNTRY OF ORIGIN

VENDOR TO ADVISE

F SPECIAL REQUIREMENTS

1

ENVIRONMENTAL REQUIREMENT

G PHYSICAL DATA

1

2

WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

FIREMAN EQUIPMENT

3 MANUFACTURER NAME VENDOR TO ADVISE

2 MODEL NUMBER

VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

I NOTES

1

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 3 THE DESIGNATED CABINET SHALL BE LABELLED IN WHITE BOLD LETTERS.

4

5

6

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 35 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

8.5 Chemical Handling Safety Kit

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

CHEMICAL HANDLING SAFETY KIT

2 PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & PIPELINES PROJECT

INTRAFIELD

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

C

1

2

3 BLACK BODY

TEMPERATURE

4 ATMOSPHERE

RP 6N

RP 5N

SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

RP 5S

RP 3S

RP 9S

WHP 13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-1)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION CHEMICAL HANDLING SAFETY KIT CONTENT

1 FACE MASK (3 NOS.)

REQUIRED

2

3

CHEMICAL SPLASH PROTECTION APRON (3 NOS.) CHEMICAL HANDLING GLOVES (3 NOS.)

REQUIRED

REQUIRED

4 CHEMICAL RESISTANT COVERALL (3 NOS.)

REQUIRED

5

CHEMICAL RESISTANT GOGGLES (3 NOS.)

REQUIRED

E CABINET DESIGN CRITERIA

6

7

8

9

CHEMICAL SPLASH SHIELD (3 NOS.)

REQUIRED

CHEMICAL PROTECTIVE BOOTS (3 NOS.)

REQUIRED

FILTER RESPIRATORS (3 NOS.) PORTABLE EYE WASH BOTTLES/EAR PLUGS (1 BOX OF 100 PIECES)

REQUIRED

REQUIRED

1 CAPACITY

2 CABINET MATERIAL

3 COLOUR

4 LABELLING (NOTE 3)

5 MOUNTING

6

IP RATING

ABLE TO FIT ALL THE ITEMS IN ‘SECTION D’ UV RESISTANT FIRE- RETARDANT GRP VENDOR TO ADVISE “CHEMICAL HANDLING SAFETY KIT” IN ENGLISH VENDOR TO ADVISE

7 CABINET PAINT FINISH VENDOR TO ADVISE

8

VENTILATION / DRAINAGE

REQUIRED

9 COUNTRY OF ORIGIN

VENDOR TO ADVISE

10

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

STAINLESS STEEL SS316

11 MANUFACTURER NAME VENDOR TO ADVISE

VENDOR TO ADVISE

12 MODEL

VENDOR TO ADVISE

F SPECIAL REQUIREMENTS

200-83-SH-DTS-00007_A

Page 36 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

1 COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT

2

G PHYSICAL DATA

1

2

WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET

CHEMICAL HANDLING SAFETY KIT

OSHA/NIOSH/SOLAS (VENDOR TO CONFIRM)

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

H EQUIPMENT IDENTIFICATIONS

1 EQUIPMENT TYPE

CHEMICAL HANDLING SAFETY KIT

3 MANUFACTURER NAME VENDOR TO ADVISE

2 MODEL NUMBER

VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

I NOTES

1

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

3

4

5

6

CHEMICAL HANDLING SAFETY KIT SHALL BE PROVIDED NEARBY HAZARDOUS CHEMICALS HANDLING AREA. SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200- 20-SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 37 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

8.6 Electrical Safety Kit

ELECTRICAL SAFETY KIT

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

C

1

2

3 BLACK BODY

TEMPERATURE

4 ATMOSPHERE

RP 6N

RP 5N

SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 2 & 3)

RP 5S

RP 3S

RP 9S

WHP 13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-2)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

1

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA RUBBER INSULATING GLOVES, LEATHER PROTECTORS AND SLEEVES

REQUIRED (2 SETS)

9

PORTABLE WARNING NOTICE

REQUIRED (1 SET)

2

DIELECTRIC FOOTWEAR

REQUIRED (1 PAIR)

10

3

4

5

6

INSULATING BLANKETS AND ACCESSORIES

INSULATING SHIELDING / ROLL BLANKETS SWITCHBOARD MATTING HOT STICKS, STATIC DISCHARGE STICKS, RESCUE HOOKS

REQUIRED (1 SET)

11

REQUIRED (1 SET)

12

REQUIRED (4 SETS)

13

VOLTAGE DETECTOR WITH FLEXIBLE ANTENNA CONTACT WALL MOUNTED SUPPORTS FOR STICKS AND VOLTAGES DETECTORS INSULATION PLATFORM (OUTDOOR MODELS) CABLE CUTTER WITH INSULATED HANDLES

REQUIRED (1 SET)

REQUIRED (1 SET)

REQUIRED (1 SET)

REQUIRED (2 SETS)

REQUIRED (1 SET)

14

TALCUM POWDER CAN

REQUIRED (1 SET)

7

FACE SHIELD WITH GOGGLES

REQUIRED (2 SETS)

15

EQUIPMENT (CATEGORY 2)

  • ARC-RATED COVERALL,

REQUIRED (2 SETS)

200-83-SH-DTS-00007_A

Page 38 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

ELECTRICAL SAFETY KIT

  • ARC-RATED FLASH SUIT HOOD,
  • ARC-RATED JACKET, PARKA, RAINWEAR,
  • HARD HAT,
  • SAFETY GOGGLES,
  • HEARING PROTECTION (EAR CANAL INSERTS)
  • HEAVY-DUTY LEATHER GLOVES
  • LEATHER FOOTWEAR

8

LOCKOUT / TAGOUT BOX (FOR HV AND LV)

REQUIRED (1 SET)

16

DESIGN LIFE FOR RESCUE KIT

VENDOR TO ADVISE

E CABINET DESIGN CRITERIA

1 CAPACITY

ABLE TO FIT ALL ITEMS IN ‘SECTION D’ ABOVE.

6 MOUNTING

FIXING ACCESSORIES FOR MOUNTING CABINET INSIDE THE BUILDING SHALL BE PROVIDED

2 CABINET DOOR TYPE

FRONT OPEN ( SINGLE DOOR)

7

IP RATING

IP56

3 CABINET MATERIAL

UV RESISTANT FIRE- RETARDANT GRP

8

VENTILATION / DRAINAGE

4 CABINET COLOUR

GREEN RAL 6029

9

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

5 LABELLING (NOTE 5)

“ELECTRICAL SAFETY KIT”

10

INSTRUCTION (IN ENGLISH)

PROVISIONS FOR BOTH DRAINAGE AND VENTILATION AND AFFORD FULL WEATHER PROOFING TO THE STORED CONTENTS

STAINLESS STEEL, SS316

CONTENT LIST WILL BE PERMANENTLY ATTACHED TO THE INSIDE DOOR OF CONTAINER THAT ENABLES THEM AT A HEIGHT TO BE EASILY READ BY A PERSON STANDING IN FRONT OF THE CONTAINER

F PHYSICAL DATA

1

2

WEIGHT OF FILLED CABINET

WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

2

DIMENSION OF CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

G EQUIPMENT IDENTIFICATIONS

1 EQUIPMENT TYPE

ELECTRICAL SAFETY KIT

4

MANUFACTURER NAME

VENDOR TO ADVISE

200-83-SH-DTS-00007_A

Page 39 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

ELECTRICAL SAFETY KIT

2 MODEL NUMBER

VENDOR TO ADVISE

5

MANUFACTURER COUNTRY

VENDOR TO ADVISE

H NOTES

1

2

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

3 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

4

5

6

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THE DESIGNATED CABINET SHALL BE LABELLED IN CAPITAL LETTER WITH CLEARLY PAINTED WITH WHITE BLOCK LETTERS ON THE OUTSIDE OF THE CABINET. COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 40 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9 DATASHEET FOR LIFESAVING EQUIPMENT

9.1 Life raft

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

LIFE RAFT

2 PROJECT

COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & PIPELINES PROJECT

INTRAFIELD

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1

TAG NUMBER (HOLD- 2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 LIFERAFT CRITERIA:

1.1 CAPACITY

15 MEN (WHP13N); 12 MEN (RP3S/ RP5S/RP9S); 10 MEN (RP5N/RP6N)

1.8

1.2 MATERIAL

DURABLE POLYURETHANE COATED FABRIC

1.9

1.3

LIFERAFTS SHALL BE HOUSED IN A RIGID CONTAINER AND SHALL AUTOMATICALLY INFLATE WHEN

200-83-SH-DTS-00007_A

REQUIRED

1.10

LIFERAFTS SHALL HAVE A CANOPY FOR WEATHER PROTECTION OF THE OCCUPANTS. SELF INFLATING AND ENCAPSULATED JETTISON TYPE/ THROW OVERBOARD TYPE COMPLETE WITH A SPLIT FIBRE GLASS UV PROTECTED CAPSULE, STORAGE CRADLE, TILTABLE PAINTER LINE (NOT LESS THAN 30m) FOR INFLATING. THE PLATFORM IDENTIFICATION NAME SHALL BE MARKED ON LIFERAFT AND PADDLES IN BLACK LETTERING.

REQUIRED

REQUIRED

REQUIRED

Page 41 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

LIFE RAFT

LAUNCHED / PAINTER LINE IS PULLED.

BUOYANCY CHAMBERS (COMPRISING SUPERIMPOSED AND INDEPENDENT AIRTIGHT MATERIAL COMPARTMENTS) SHALL BE MANUFACTURED FROM MATERIAL(S) THAT IS HIGHLY ABRASIVE RESISTANT AND IMPERVIOUS TO CORROSION IN A HUMID MARINE ENVIRONMENT.

LIFERAFTS SHALL HAVE RIGHTENING STRAP ACROSS THE UNDERSIDE OF THE FLOOR TO ASSIST A SINGLE SURVIVOR IN RIGHTENING THE LIFE RAFT SHALL IT BE INVERTED. STORAGE CRADLE SHALL BE MADE OF STAINLESS STEEL. THE CRADLE SHALL ALLOW EASY DEPLOYMENT OF THE RAFT INTO THE SEA BY ONE PERSON. LIFERAFTS SHALL BE EASILY CLIMBED INTO BY SURVIVOR FULLY CLOTHED AND WEARING A LIFEJACKET.

1.4

1.5

1.6

1.7

2 CANOPY CRITERIA: THE LIFERAFT CANOPY SHALL BE INTERNATIONAL ORANGE. ALSO, A LARGE CROSS (X) TO BE MARKED ON THE CANOPY WITH REFLECTIVE TAPES.

2.1

TYPE AND SIZE AND PRINTING ON THE LIFERAFT SHALL FULFILL THE REQUIREMENTS OF SOLAS/LSA. ALL LIFE RAFTS TOGETHER WITH PADDLES SHALL BE CONSPICUOUSLY MARKED WITH NAME OF THE PLATFORM. THE NUMBER OF PERSONS ALLOWED ON EACH RAFT SHALL BE MARKED WITH LETTERS AND NUMBERS AT LEAST 100 MM HIGH OF A COLOR CONTRASTING WITH THAT OF THE LIFE RAFT.

THE LIFE RAFT ASSEMBLY SHALL BE CONSTRUCTED TO WITHSTAND IMPACT WITH THE WATER (WITHOUT DAMAGE) FROM THE INSTALLED HEIGHT.

REQUIRED

REQUIRED

REQUIRED

1.11

REQUIRED

1.12

REQUIRED

1.13 LIFT RAFT SYSTEM

INCLINED LAUNCHING RACKS

REQUIRED

1.14

LIFERAFT SHALL BE ABLE BE TOWED AT A SPEED OF 3 KNOTS IN CALM WATER WHEN LOADED

REQUIRED

REQUIRED

2.6

IT SHALL BE PROVIDED WITH AT LEAST ONE VIEWING PORT.

REQUIRED

200-83-SH-DTS-00007_A

Page 42 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

LIFE RAFT

2.2

IT SHALL PROVIDE INSULATION AGAINST HEAT AND COLD BY MEANS OF EITHER TWO LAYERS OF MATERIAL SEPARATED BY AN AIR GAP OR OTHER EQUALLY EFFICIENT MEANS. MEANS SHALL BE PROVIDED TO PREVENT ACCUMULATION OF WATER IN THE AIR GAP.

2.3

ITS INTERIOR SHALL BE OF A COLOUR THAT DOES NOT CAUSE DISCOMFORT TO THE OCCUPANTS.

EACH ENTRANCE SHALL BE CLEARLY INDICATED AND BE PROVIDED WITH EFFICIENT ADJUSTABLE CLOSING ARRANGEMENTS WHICH CAN BE EASILY AND QUICKLY OPENED BY PERSONS CLOTHED IN IMMERSION SUITS FROM INSIDE AND OUTSIDE, AND CLOSED FROM INSIDE. THE LIFERAFT SO AS TO PERMIT VENTILATION BUT EXCLUDE SEAWATER, WIND AND COLD. LIFERAFTS SHALL HAVE AT LEAST TWO DIAMETRICALLY OPPOSITE ENTRANCES. IT SHALL ADMIT SUFFICIENT AIR FOR THE OCCUPANTS AT ALL TIMES, EVEN WITH THE ENTRANCES CLOSED.

2.4

2.5

REQUIRED

2.7

IT SHALL BE PROVIDED WITH MEANS FOR COLLECTING RAINWATER.

REQUIRED

REQUIRED

2.8

IT SHALL BE PROVIDED WITH MEANS TO MOUNT A SURVIVAL CRAFT RADAR TRANSPONDER AT A HEIGHT OF AT LEAST 1 M ABOVE THE SEA.

REQUIRED

REQUIRED

2.9

IT SHALL HAVE SUFFICIENT HEADROOM FOR SITTING OCCUPANTS UNDER ALL PARTS OF THE CANOPY.

REQUIRED

REQUIRED

E MARKINGS 1 MARKING ON THE LIFERAFT CONTAINER:

1.1

MAKER’S NAME AND TRADEMARK

VENDOR TO ADVISE

1.6

DATE WHEN LAST SERVICED

REQUIRED

200-83-SH-DTS-00007_A

Page 43 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

LIFE RAFT

1.2 SERIAL NUMBER

VENDOR TO ADVISE

1.7 LENGTH OF PAINTER VENDOR TO ADVISE

1.3

NAME OF APPROVING AUTHORITY AND THE NUMBER OF PERSONS IT IS PERMITTED TO CARRY

VENDOR TO ADVISE

1.8

1.4 SOLAS

VENDOR TO ADVISE

1.9

1.5

TYPE OF EMERGENCY PACK ENCLOSED

VENDOR TO ADVISE

2 MARKING ON THE LIFERAFT:

2.1

MAKER’S NAME OR TRADEMARK;

VENDOR TO ADVISE

2.4

2.2 SERIAL NUMBER;

VENDOR TO ADVISE

2.5

2.3

DATE OF MANUFACTURE (MONTH AND YEAR)

VENDOR TO ADVISE

2.6

MAXIMUM PERMITTED HEIGHT OF STOWAGE ABOVE WATERLINE (DEPENDING ON DROP-TEST HEIGHT AND LENGTH OF PAINTER) LAUNCHING INSTRUCTIONS IN ENGLISH

NAME OF APPROVING AUTHORITY; NAME AND PLACE OF SERVICING STATION WHERE IT WAS LAST SERVICED; NUMBER OF PERSONS IT IS PERMITTED TO ACCOMMODATE OVER EACH ENTRANCE IN CHARACTERS NOT LESS THAN 100 MM IN HEIGHT OF A COLOUR CONTRASTING WITH THAT OF THE LIFERAFT.

VENDOR TO ADVISE

REQUIRED

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

F EQUIPMENT ACCESSORIES

1

TWO (2) UNITS OF EMERGENCY POSITIONING INDICATING RADIO BEACON (EPIRB), ONE (1) UNIT OF SEARCH AND RESCUE TRANSPONDER (SART) (AIS) & ONE (1) UNIT OF SEARCH AND RESCUE TRANSPONDER (RADAR) STORED INSIDE EACH LIFE RAFT (BY OTHERS). TWO (2) UNITS OF VHF MARINE HANDHELD RADIOS SHALL BE STORED OUTSIDE IN AN UV RESISTANT, Ex ‘e’ ENCLOSURE LOCATED OUTSIDE TO EACH LIFE RAFT (BY VENDOR).

NO ITEM QUANTITY

NO ITEM

1 TOPPING-UP PUMP

2 SEA ANCHOR

3 BAILER

2

4 REPAIR KIT

5 KNIFE

6 SIGNAL MIRROR

7 SET OF LEAK STOPPERS

8 WHISTLE

9 SPONGES

1

2

2

1

2

1

1

1

2

QUANTITY

1

SEE 2

18 RADAR REFLECTOR

19 ANTI-SEA SICK PILLS (6/PERSON)

20 RESCUE QUOIT AND LINE OF NOT LESS THAN 30m

21 LIFE RAFT MANUAL (WATERPROOF)

22 THERMAL PROTECTIVE AIDS (TPA’S)

23 CAN OPENER

24 DRINKING CUP

25 WATER (1.5 LITER/PERSON)

26 EMERGENCY RATIONS (0.5kg = 10,000 kJ/PERSON)

1

1

2

3

1 LITER3

kg4

200-83-SH-DTS-00007_A

Page 44 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

LIFE RAFT

10 PADDLES

1 PAIR

27 FISHING KIT

11 PRESSURE RELIEVE PLUGS 1 SET

28 FLASH LIGHT

12 SEA SICKNESS BAG (1/PERSON) 1

13 LIFE SAVING SIGNALS

14 FIRST AID KIT 15 PARACHUTE ROCKET 16 HAND FLARES 17 SMOKE FLOATS

1

1 4 6 2

CONTENTS IN LIFERAFT AS PER SOLAS “A” PACK : 1 (15 nos. for 15 POB, 12 nos. for 12 POB, 10 nos. for 10 POB). 2 (90 nos. for 15 POB, 72 nos. for 12 POB, 60 nos. for 10 POB). 3 (22.5 liter for 15 POB, 18 liter for 12 POB, 15 liter for 10 POB). 4 (7.5 kg for 15 POB, 6 kg for 12 POB, 5 kg for 10 POB).

G SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD 2 CERTIFICATION

SOLAS, LSA

USCG / SOLAS

1

1

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

4

3

ENVIRONMENTAL REQUIREMENT HAZARDOUS AREA CLASSIFICATION H PHYSICAL DATA WEIGHT OF EQUIPMENT

1

ZONE 1, IIB, T3

VENDOR TO ADVISE

2 WEIGHT OF CRADLE VENDOR TO ADVISE

3

PAINT Q LINE LENGTH (MIN)

VENDOR TO ADVISE

I EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE MANUFACTURER NAME

2

LIFE RAFT

VENDOR TO ADVISE

4

5

DIMENSION OF EQUIPMENT DIMENSION OF CONTAINER

VENDOR TO ADVISE

VENDOR TO ADVISE

3 MODEL NUMBER MANUFACTURER COUNTRY

4

VENDOR TO ADVISE

VENDOR TO ADVISE

J NOTES 1

2

3

ITEM TO BE PROVIDED IN SEALED WATERPROOF CONTAINER. SURVIVAL KNIVES AND FLARES SHALL BE PACKED INSIDE THE LIFERAFT CONTAINER & CANNOT BE SHIPPED SEPARATELY AS THIS FORMS THE PART OF SOLAS “A” PACK REQUIREMENT. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

5

MAIN KNIFE SHALL BE OF THE NON-FOLDING TYPE. THE SECOND KNIFE CAN BE OF THE FOLDABLE TYPE.

6 LIFE RAFT SHALL BE CARTON PACKING AS PER MANUFACTURER STANDARD.

7

8

9

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 45 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.2 Scramble Net

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

SCRAMBLE NET

2 PROJECT

COMP3 PIPELINES PROJECT

  • NFPS OFFSHORE RISER/WELLHEAD PLATFORM &

INTRAFIELD

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1

TAG NUMBER (HOLD- 2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1

EQUIPMENT MATERIAL

FLAME RETARDANT POLYESTER WEBBING/DURABLE POLYPROPYLENE (OR EQUIVALENT) & FIBERGLASS RODS

8 TEST LOAD

VENDOR TO ADVISE

2 FITTINGS MATERIAL

STAINLESS STEEL (SS 316)

9

INSTRUCTION (NOTE 2)

ENGLISH, WITH ILLUSTRATION / PICTOGRAM IN ENGLISH

3 MESH SIZE 4 DIAMETER 5 WIDTH

6

SPREADER BAR MATERIAL

250 MM X 250 MM VENDOR TO ADVISE MIN. 1.8 M

10 LABELLING 11 MANUFACTURE NAME VENDOR TO ADVISE 12 MODEL VENDOR TO ADVISE

HARDWOOD

13 COUNTRY OF ORIGIN VENDOR TO ADVISE

7 STORED DIMENSION VENDOR TO ADVISE

14

SCRAMBLE NET LENGTH (METER)

VENDOR TO ADVISE

E STOWAGE COVER

1 MATERIAL

2 MARKING

F SUPPORT FRAME

FIRE RETARDANT AND UV RESISTANT PLASTICIZED LINEN (OR EQUAL) IN ENGLISH, CAPITAL LETTERS

3 DIMENSION

VENDOR TO ADVISE

1 CONNECTION TYPE

PROVISION FOR CONNECTION POINTS

3 MAXIMUM LOAD

3000 KG

200-83-SH-DTS-00007_A

Page 46 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

SCRAMBLE NET

FOR THE STAINLESS- STEEL WIRE SUSPENSION ROPES OF THE NET WELDED TO THE OUTSIDE OF THE PLATFORM DECK

2

SUPPORT FRAME INSTALLATION

G SPECIAL REQUIREMENT

4 TEST LOAD

4450 KG

SOLAS

2 CERTIFICATION

MANUFACTURER COC

1

COMPLIANCE STANDARD

LIFE SAVING APPLIANCES (LSA) CODE H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

SCRAMBLE NET

2 MODEL NUMBER

VENDOR TO ADVISE

I NOTES

3

ENVIRONMENTAL REQUIREMENT

NOTE 4

3 MANUFACTURER NAME VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

1

SACRIFICIAL SLINGS REFERS TO ROPES USED TO HANG THE STOWAGE BAG FROM THE DECK VIA THE DECK PAD EYES. SLINGS SHALL BE INSPECTED AND REPLACED ON A REGULAR BASIS.

2 OPERATING INSTRUCTIONS SHALL BE CLEARLY FIXED IN ENGLISH.

3

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

5

EACH UNIT SHALL BE TESTED TO COMPLY WITH STANDARDS AND MANUFACTURER TEST. CERTIFICATE SHALL BE PROVIDED.

6 ALL FIXATION ACCESSORIES SHALL BE PROVIDED BY VENDOR.

7

8

9

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 47 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.3 Lifebuoy

LIFEBUOY

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

033764 COMP3 PIPELINES PROJECT REFER TABLE 7.1

  • NFPS OFFSHORE RISER/WELLHEAD PLATFORM &

INTRAFIELD

1 TAG NUMBER (HOLD-2)

2 SERVICE C OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

1

2

3

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

BRIDGES

LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 6 & 7)

WHP 13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-6)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 LIFE BUOY CRITERIA:

1.1 TYPE

PERRYBUOY LIFE BUOYS, ADULT SIZE

1.7

ALL LIFEBUOY SHALL BE FITTED WITH SMOKE SIGNAL AND SELF-IGNITING LIGHTS

REQUIRED

1.2 COLOUR

SHALL BE FITTED WITH RETRO-REFLECTIVE MATERIAL TO ASSIST IN DETECTION. SHALL BE COMPLETE WITH GALVANIZED INVERTED “Y” MOUNTING BRACKET(S) FOR MOUNTING ON HANDRAILS, MATERIALS OF BRACKET(S) SHALL BE CORROSION RESISTANT AND SUITABLE FOR THE SALIFEROUS ENVIRONMENT. SHALL HAVE INNER CORE MADE OF A

1.3

1.4

1.5

INTERNATIONAL ORANGE

1.8

SHALL BE PROVIDED WITH LIFELINE

REQUIRED

REQUIRED

1.9

SHALL BE FITTED WITH A GRABLINE

REQUIRED

REQUIRED

1.10

ALL ACCESSORIES SHALL BE MADE UV AND MARINE RESISTANT MATERIAL.

REQUIRED

REQUIRED

1.11

SHALL BE PROVIDED WITH APPROVED

REQUIRED

200-83-SH-DTS-00007_A

Page 48 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

LIFEBUOY

AUTOMATIC ELECTRIC WATER LIGHT

RIGID CFC FREE POLYURETHANE FOAM.

SHALL HAVE COVER MADE OF ROTATIONALLY MOULDED HIGH DENSITY POLYETHYLENE SKIN, CONTAINING FIRE RETARDANT AND UV STABILIZING ADDITIVES.

1.6

REQUIRED

1.1

E EQUIPMENT ACCESSORIES 1 LIFELINE CRITERIA: POLYETHYLENE LIFELINE WITH ORANGE COLOR. ONE END OF LIFELINE SHALL BE ATTACHED TO THE LIFEBUOY AND OTHER END WILL BE MOUNTED ON THE BRACKET.

1.2

REQUIRED

REQUIRED

1.3 LENGTH.

MIN. 40 METERS

2 WHISTLE CRITERIA:

2.1 MADE OF PLASTIC.

REQUIRED

2.2

WHISTLE COILED WITH 1ft LENGTH OF LANYARD (NOT EASILY TANGLED) AND ATTACHED TO THE LIFE BUOY.

REQUIRED

3 SMOKE SIGNAL CRITERIA:

1.4

MADE OF SYNTHETIC ROPE WITH INHERENT UV RESISTANCE.

REQUIRED

1.5

ENCAPSULATED IN A PLASTIC HOLDER.

REQUIRED

2.3

THE LANYARD SHALL BE FREE OF HOOKS, SNAPS OR CLIPS.

REQUIRED

3.1

3.2

EMIT SMOKE OF A HIGHLY VISIBLE COLOUR (ORANGE) AT UNIFORM RATE FOR A PERIOD OF AT LEAST 15 MIN WHEN FLOATING IN WATER.

PROVIDED WITH A QUICK RELEASE ARRANGEMENT THAT WILL AUTOMATICALLY RELEASE AND ACTIVATE THE SIGNAL.

REQUIRED

3.3

REQUIRED

3.4

4 WATER ACTIVATED LIGHT CRITERIA:

4.1

SHALL BE SOLAS APPROVED.

REQUIRED

4.7

SMOKE SIGNAL SHALL BE PROVIDED WITH MOUNTING BRACKET & ALL FIXING ACCESSORIES AND ATTACHED TO THE LIFEBUOY WITH LANYARD. DO NOT IGNITE EXPLOSIVELY OR EMIT ANY FLAME DURING THE ENTIRE SMOKE EMISSION TIME OF THE SIGNAL.

LIGHT SHALL BE PROVIDED WITH MOUNTING BRACKET & ALL FIXING ACCESSORIES AND ATTACHED TO THE

REQUIRED

REQUIRED

REQUIRED

200-83-SH-DTS-00007_A

Page 49 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

LIFEBUOY

LIFEBUOY WITH LANYARD.

REQUIRED

4.8

SHALL EMIT WHITE COLOUR LIGHT FOR AT LEAST TWO (2) HOURS.

REQUIRED

4.2

SHALL BE TAMPER, IMPACT AND CORROSION RESISTANT.

4.3

SHALL BE SEALED TO PROTECT AND PROVIDE ITS BATTERY COMPARTMENT LONG TERM STORAGE PROPERTIES.

REQUIRED

4.9

SHALL BE CAPABLE TO EITHER BURN CONTINUOUSLY WITH INTENSITY NOT LESS THAN 2.0 Cd OR FLASHING WITH RATE NOT LESS THAN 50 FLASHES/MIN SHALL BE ATTACHED TO THE BUOY BY A TWELVE THREAD LANYARD BETWEEN 3 TO 6 FT.

REQUIRED

REQUIRED

4.4

SHALL OPERATE ON LITHIUM BATTERY.

REQUIRED

4.10

4.5

4.6

SHALL BE WATER- ACTIVATED AND INEXTINGUISHABLE BY WATER. HAZARDOUS AREA CLASSIFICATION REQUIREMENT: ZONE 1, GAS GROUP IIB, TEMPERATURE CLASS T3.

REQUIRED

REQUIRED

F SPECIAL REQUIREMENT

4.11

BATTERIES FOR EACH LIGHT SHALL BE PROVIDED.

REQUIRED

1

COMPLIANCE STANDARD

2 CERTIFICATION

SOLAS & LSA INTERNATIONAL LIFE SAVING APPLIANCES CODE USCG / SOLAS / EC

3

ENVIRONMENTAL REQUIREMENT G PHYSICAL DATA WEIGHT OF EQUIPMENT INNER DIAMETER

1

2 H EQUIPMENT IDENTIFICATIONS

VENDOR TO ADVISE

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

VENDOR TO ADVISE

3 OUTER DIAMETER

VENDOR TO ADVISE

1 EQUIPMENT TYPE

LIFEBUOY

2 MODEL NUMBER

VENDOR TO ADVISE

I LIFE BUOY MATERIAL LIFE BUOY OUTER MATERIAL

1

VENDOR TO ADVISE

2 LIFE BUOY COATING

VENDOR TO ADVISE

J NOTES

3

4

3

4

MANUFACTURER NAME MANUFACTURER COUNTRY

LIFE BUOY INNER MATERIAL LIFE BUOY COVER MATERIAL

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

1

2

WEIGHT OF EACH LIFE BUOY COMPLETE WITH ITS ACCESSORIES AS WELL AS WEIGHT OF THE MOUNTING BRACKET TO BE PROVIDED SEPARATELY. RING LIFE BUOY HOUSING WITH ROTATIONALLY MOLDED POLYETHYLENE COVER SHALL BE PROVIDED TO EXTEND LIFE SPAN OF THE LIFE BUOY.

200-83-SH-DTS-00007_A

Page 50 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

LIFEBUOY

3

4

5

6

LIFE BUOY HOLDER SHALL BE PROVIDED AT EACH LOCATION. THE HOLDER SHALL BE PERMANENTLY ATTACHED TO THE INSIDE OF HANDRAILS ALONG THE PLATFORM OUTER PERIMETER. VENDOR SHALL PROVIDE ALL FIXING ACCESSORIES SUITABLE FOR HANDRAIL INSTALLATION.

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

7 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

8

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 51 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.4 Life Jackets and Cabinet

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

LIFE JACKETS AND CABINET

2 PROJECT

COMP3 PIPELINES PROJECT

  • NFPS OFFSHORE RISER/WELLHEAD PLATFORM &

INTRAFIELD

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 4 & 5)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-4)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 LIFEJACKET CRITERIA:

1.1

SOLAS/MED LIFE JACKETS.

REQUIRED

1.7 COLOUR

1.2

TYPE-I LIFE JACKET (ADULT SIZE).

REQUIRED

1.8

INTERNATIONAL ORANGE

REQUIRED

HIGH BUOYANCY (190N BUOYANCY), INHERENTLY BUOYANT AND SELF- RIGHTING TYPE. SHALL NOT SUSTAIN BURNING AFTER BEING ENVELOPED IN A FIRE FOR A PERIOD OF 2 SECONDS.

1.3

1.4

1.5

SHALL BE UNICELLULAR, WITH PLASTIC PANEL AND SYNTHETIC FOAM FILLED. SHALL BE SEWN WITH MILDEW RESISTANT, ROT RESISTANT THREAD.

LIFE JACKET SHALL HAVE AT LEAST 0.02 M2 OF RETRO- REFLECTIVE MATERIAL ATTACHED TO EACH FRONT SIDE, BACK SIDE, AND REVERSIBLE SIDES.

REQUIRED

1.9

REQUIRED

REQUIRED

1.10

SHALL HAVE A SPLASH GUARD

REQUIRED

REQUIRED

1.11

LIFE JACKETS SHALL BE DESIGNED TO TURN AN UNCONSCIOUS PERSON FROM FACE DOWN IN THE WATER TO A VERTICAL OR SLIGHTLY BACKWARD (FACE-UP) POSITION

REQUIRED

200-83-SH-DTS-00007_A

Page 52 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

LIFE JACKETS AND CABINET

1.6

THE MATERIAL ATTACHED ON EACH SIDE OF THE JACKET MUST BE DIVIDED EQUALLY BETWEEN THE UPPER QUADRANTS OF THE SIDE, AND THE MATERIAL IN EACH QUADRANT MUST BE ATTACHED AS CLOSELY AS POSSIBLE TO THE SHOULDER AREA OF THE JACKET.

REQUIRED

E EQUIPMENT ACCESSORIES 1 EACH LIFE JACKET SHALL HAVE THE FOLLOWING ACCESSORIES:

1.1

WHISTLE AND LANYARD

REQUIRED

1.5 BATTERY FOR LIGHTS REQUIRED

1.2

SEAWATER ACTIVATED ILLUMINATING LIGHT

REQUIRED

1.3

1.4

BODY STRAP (SHALL BE FULLY ADJUSTABLE WITH BUCKLE) REFLECTIVE STRIPS (RETRO REFLECTIVE TAPE)

REQUIRED

REQUIRED

2 LIFEJACKET LIGHT CRITERIA:

1.6

1.7

1.8

LIFTING STRAPS AND ORAL INFLATION SYSTEM SUITABLE FOR FASTENING WITH BA SETS STAINLESS STEEL/PLASTIC SS-40 BUCKLE SNAP HOOK

REQUIRED

REQUIRED

REQUIRED

2.1

2.2

2.3

SHALL HAVE A LUMINOUS INTENSITY OF NOT LESS THAN 0.75 CD IN ALL DIRECTIONS OF THE UPPER HEMISPHERE. SHALL HAVE A SOURCE OF ENERGY CAPABLE OF PROVIDING A LUMINOUS INTENSITY OF 0.75 CD FOR A PERIOD OF AT LEAST 8 HOURS BE VISIBLE OVER AS GREAT A SEGMENT OF THE UPPER HEMISPHERE AS IS PRACTICABLE WHEN ATTACHED TO A LIFEJACKET.

REQUIRED

2.4

SHALL BE OF WHITE COLOUR.

REQUIRED

REQUIRED

2.5

HAZARDOUS AREA CLASSIFICATION REQUIREMENT: ZONE 1, GAS GROUP IIB, TEMPERATURE CLASS T3.

REQUIRED

REQUIRED

F CABINET DESIGN CRITERIA

1 SIZED FOR

FOR 50% POB UNITS OF LIFE JACKET, EXCLUDE CABINET LOCATED ON JACKET LEVEL (SHALL BE OF 5 POB)

8

VENTILATION / DRAINAGE

REQUIRED

200-83-SH-DTS-00007_A

Page 53 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

2 CABINET TYPE

LIFE JACKETS AND CABINET

DOUBLE DOOR, 180 DEGREE FRONT OPENING

9

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

3

MOUNTING / INSTALLATION

PROVISION OF ADEQUATE BOTTOM AND BACK FRAMES TO PERMIT DECK OR BULKHEAD MOUNTING

10

DONNING INSTRUCTIONS

4 CABINET MATERIAL

UV RESISTANT GRP

11 LABELLING (NOTE 1)

VENDOR TO ADVISE

IN ENGLISH, CONTAINED IN A WEATHER-PROOF COVER AND PERMANENTLY ATTACHED TO THE INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT “LIFE JACKETS” IN ENGLISH

5

IP RATING

IP56

12 MANUFACTURE NAME VENDOR TO ADVISE

6 CABINET PAINT FINISH

INTERNATIONAL ORANGE

7 COUNTRY OF ORIGIN VENDOR TO ADVISE

G SPECIAL REQUIREMENTS

13 MODEL

VENDOR TO ADVISE

1

COMPLIANCE STANDARD

2 CERTIFICATION

3

ENVIRONMENTAL REQUIREMENT

H PHYSICAL DATA

1

2

WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET

SOLAS OR EQUIVALENT INTERNATIONAL LIFE SAVING APPLIANCES CODE MED / SOLAS

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

I EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

LIFE JACKETS

2 MANUFACTURER NAME VENDOR TO ADVISE

J NOTES

3 MODEL NUMBER MANUFACTURER COUNTRY

4

VENDOR TO ADVISE

VENDOR TO ADVISE

1

2

3

4

THE DESIGNATED CABINET SHALL BE LABELLED “LIFE JACKETS” IN ENGLISH AND PLATFORM NAME IN BOLD BLACK LETTERS. TYPE AND SIZE AND PRINTING ON THE LIFEJACKET CABINET SHALL FULFIL THE REQUIREMENT OF LSA/SOLAS. SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-0000200020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC- 0000200013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

5 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

6

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 54 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.5 Helicopter Crash and Rescue Equipment (HCRE) Cabinet

HELICOPTER CRASH AND RESCUE EQUIPMENT (HCRE) CABINET

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

2 PROJECT

033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA

C

ENVIRONMENTAL / SITE CONDITIONS

1 AMBIENT TEMPERATURE

2

3

RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE

4 ATMOSPHERE

RP 6N

RP 5N

LIFESAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 5 & 6)

RP 5S

RP 3S

RP 9S

WHP 13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-5)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT ACCESSORIES

1

HELICOPTER CRASH AND RESCUE EQUIPMENT SHALL INCLUDE THE FOLLOWING ITEMS:

NO.

ITEM

QTY.

MODEL

MANUFACTURER, COUNTRY

1

FIBERGLASS STORAGE CABINET TO STORE ALL EQUIPMENT

2

ADJUSTABLE WRENCH

3

BOLT CUTTER

4 HACKSAW HEAVY DUTY C/W 6 SPARE BLADES

5

PLIERS, SIDE CUTTING (TIN SNIPS)

6

SET OF ASSORTED SCREWDRIVERS

7 HARNESS KNIFE C/W SHEATH OR HARNESS CUTTER

8 GLOVES, FIRE RESISTANT

9

LADDER (2 PIECE)

1

1

1

1

1

1

2

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

2 PAIR

VENDOR TO ADVISE

VENDOR TO ADVISE

1

VENDOR TO ADVISE

VENDOR TO ADVISE

200-83-SH-DTS-00007_A

Page 55 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

HELICOPTER CRASH AND RESCUE EQUIPMENT (HCRE) CABINET

10

LIFE-LINE (5CM CIRCUMFERENCE X 15M LENGTH) PLUS RESCUE HARNESS

11 CROWBAR, LARGE

12

RESCUE AXE, LARGE (NON-WEDGE OR AIRCRAFT TYPE)

13 BLANKET, FIRE RESISTANT

14 SELF-CONTAINED BREATHING APPARATUS

1

1

1

1

2

15 FIREMEN’S BUNKER JACKET/TUNIC AND TROUSERS

2 SETS

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

16 FIREMEN’S BOOTS

17 FIREMEN’S HELMET W/ VISOR

18 MAN-MADE MINERAL FIBRE (MMMF) FILTER MASKS

19 RESCUE GRAB HOOK

20 POWER CUTTING TOOL

21 FIREMEN’S FLASH HOOD

E CABINET DESIGN CRITERIA

2 SETS

VENDOR TO ADVISE

VENDOR TO ADVISE

2

2

2

1

2

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

VENDOR TO ADVISE

1 CAPACITY

SIZED FOR HELICOPTER CRASH EQUIPMENT

7

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

2 CABINET MATERIAL

UV RESISTANT GRP (FIBERGLASS)

8

OPERATING INSTRUCTIONS

3

MOUNTING / INSTALLATION

PROVISION OF ADEQUATE BOTTOM AND BACK FRAMES TO PERMIT DECK OR BULKHEAD MOUNTING

9 LABELLING (NOTE 1)

4

IP RATING

IP56

10 LOCATION

5 CABINET PAINT FINISH

INTERNATIONAL ORANGE

11

CERTIFICATION (INSPECTION)

STAINLESS STEEL, SS316

IN ENGLISH, CONTAINED IN A WEATHER-PROOF COVER AND PERMANENTLY ATTACHED TO THE INSIDE OF CABINET LID/DOOR

“HELICOPTER CRASH KIT” 50 MM WHITE LETTER IN ENGLISH

LOCATION AND ELEVATION SHALL BE SUCH THAT NO POSSIBLE WATER INGRESS INTO/COLLECTED INSIDE THE CABINET

LIOYDS REGISTER

200-83-SH-DTS-00007_A

Page 56 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

HELICOPTER CRASH AND RESCUE EQUIPMENT (HCRE) CABINET

6 CABINET TYPE

FRONT OPEN DOUBLE DOOR FOR EASY REACHING TYPE CABINET

F SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD 2 CERTIFICATION

3

ENVIRONMENTAL REQUIREMENT

G PHYSICAL DATA

1

2

DIMENSION OF CABINET WEIGHT OF FILLED CABINET

CAP 437

COC ISSUED FROM SOLAS

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

VENDOR TO ADVISE

3

WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

H EQUIPMENT IDENTIFICATIONS

1 EQUIPMENT TYPE

HELICOPTER CRASH AND RESCUE EQUIPMENT (HCRE) CABINET

3 MANUFACTURER NAME VENDOR TO ADVISE

2 MODEL NUMBER

VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

I NOTES 1 THE DESIGNATED CABINET SHALL BE LABELLED IN WHITE BOLD LETTERS.

2

3

4

5

EACH CRASH AND RESCUE EQUIPMENT BOX SHALL BE LOCATED AT STAIRWAY LANDING OF HELIDECK AND SHALL BE EASILY ACCESSIBLE. SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

6 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

7

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 57 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.6 First aid kit

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

FIRST AID KIT

2 PROJECT

3 QUANTITY

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

REFER TABLE 7.1

B EQUIPMENT IDENTIFICATION

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 5 & 6)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-5)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 FIRST AID KIT CRITERIA:

1.1

FIRST AID CABINET SHALL BE PROVIDED WITH HANDLE AND BRACKET & INCLUDING SUITABLE NUTS AND BOLTS FOR WALL MOUNTING.

1.2 MATERIAL

1.3

1.4

FIRST AID CABINET SHALL BE INDUSTRIAL GRADE, WATERTIGHT, WEATHERPROOF PLASTIC CONTAINER. FIRST AID CABINET SHALL BE EQUIPPED WITH A COVER THAT IS HELD CLOSED WITH SNAP TYPE FASTENERS.

REQUIRED

1.5

COLOUR OF FIRST AID BOX SHALL BE ORANGE. ALSO, SHALL INCLUDE O2 RESUSCITATION KIT

REQUIRED

INDUSTRIAL GRADE, CORROSION- RESISTANT MATERIAL

1.6 LABELLING

“FIRST AID KIT” IN ENGLISH WITH WHITE BOLD LETTER

REQUIRED

1.7

USAGE INSTRUCTIONS AND SHELF LIFE / EXPIRY DATE OF EACH ITEMS SHALL BE PROVIDED

REQUIRED

REQUIRED

E EQUIPMENT ACCESSORIES 1 CONTENTS IN FIRST AID KIT AS A MINIMUM:

NO. ITEM

QTY.

NO.

ITEM

1

STERILE ADHESIVE PLASTER DRESSING STRIPS

200-83-SH-DTS-00007_A

100

14

SURGICAL FACE MASKS

QTY.

10

Page 58 of 101

4

4

4

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

FIRST AID KIT

2 2.5CM X 5M ADHESIVE DRESSING TAPE

1

15

SAFETY GLASSES OR GOGGLES

2 PAIRS

3

4

5

PRE-PACKED, NON-ALCOHOL ANTISEPTIC SWABS

20

16

PACKET OF SAFETY PINS, ASSORTED SIZE

1

CREPE BANDAGES: SIZES MEDIUM AND LARGE

ELASTIC BANDAGES: SIZES MEDIUM AND LARGE

17

18

SHORT NOSED, BLUNT SCISSORS (12.5 CM MINIMUM LENGTH)

1 PAIR

STERILE EYEWASH SOLUTION (10ML & 30ML AMPOULE)

2 EACH

6 TRIANGULAR BANDAGES

19

SPLINTER FORCEPS (125MM LONG)

7 BODY FLUID “SPILL KIT” COMPRISING:

1 KIT

20

SINGLE USE STERILE SPLINTER PROBE

  • DISPOSABLE SCOOP AND SCRAPER

21

VOMIT BAGS

1

5

6

  • INFECTIOUS WASTE ABSORBENT

  • DISPOSABLE CLINICAL WASTE BAG (2 IN NUMBER)

22

23

STERILE, NON-MEDICATED WOUND DRESSING: SIZES MEDIUM AND LARGE

5 EACH

ANTISEPTIC CREAM / LOTION AND ANTI-ITCH CREAM

1 EACH

  • HYGIENIC WIPES (2 IN NUMBER)

24 O2 RESUSCITATION KIT

1 EACH

8

DISPOSABLE GLOVES: SIZES SMALL, MEDIUM AND LARGE

10 EACH

25

BURN DRESSING

9 STERILE EYE PADS

4

26

COMPRESS WOUND DRESSINGS (5 X 9 INCH)

10

(4 X 4 INCH) STERILE GAUZE SWABS (3 PER PACK)

5 PACKS

27 FOIL BLANKET

11 CHEMICAL ICEPACK

12 POCKET MASK

13

NON-FLAMMABLE, SILVER, SPACE RESCUE BLANKET

1

1

2

28

FIRST AID /CPR INSTRUCTION BOOKLET

29

LOG BOOK

30 CONTENTS LIST

2

2

3

1

1

1

F SPECIAL REQUIREMENTS 1 COMPLIANCE STANDARD 2 CERTIFICATION

ISEA Z308.1 COC ISSUED FROM SOLAS

3

ENVIRONMENTAL REQUIREMENT

G PHYSICAL DATA

1

2

WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

FIRST AID KIT

3 MANUFACTURER NAME VENDOR TO ADVISE

2 MODEL NUMBER

VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

I NOTES 1 THE DESIGNATED CABINET SHALL BE LABELLED “FIRST AID KIT” IN ENGLISH IN WHITE BOLD LETTERS.

2

VENDOR SHALL PROVIDE THE FIXING ACCESSORIES FOR MOUNTING FIXING CABINET FOR INDOOR INSTALLATION.

200-83-SH-DTS-00007_A

Page 59 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

FIRST AID KIT

3

4

5

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

6 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

7

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 60 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.7 Stretcher

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

STRETCHER

2 PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA

ENVIRONMENTAL / SITE CONDITIONS

AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 4 & 5)

RP 5S

RP 3S

RP 9S

WHP 13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-4)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 STRETCHER CRITERIA:

1.1

FOUR (4) POLE STRETCHERS OF AN APPROVED TYPE SHALL BE LOCATED ON THE PLATFORM.

1.2

SHALL BE THE TYPE THAT CAN BE USED IN HELICOPTER, CRANE, OR BOAT MEDICAL EVACUATION.

REQUIRED

1.8

REQUIRED

1.9

1.3

FOLDED AND STORED INSIDE VALISE

REQUIRED

1.10

1.4

THEY SHALL BE SUITABLE FOR TWO OR FOUR MAN CARRYING.

REQUIRED

1.11

STRETCHER SHALL BE DESIGNED WITH SUITABLE BRACKETS FOR WALL MOUNTING INCLUDING FIXING SCREWS / NUTS & BOLTS. ALL NECESSARY ACCESSORIES FOR THE STRETCHER E.G. CARRYING HANDLES, LIFTING STRAPS, PILLOW, AND STORAGE VALISE SHALL BE PROVIDED. SHALL HAVE PADS, BACK PLATE AND PULLOUT STRAPS TO SECURE THE HEAD, CHEST, ARMS, THIGHS, LOWER LEGS AND FEET. SHALL BE LIGHTWEIGHT AND EASILY MANEUVERABLE.

REQUIRED

REQUIRED

REQUIRED

REQUIRED

200-83-SH-DTS-00007_A

Page 61 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

STRETCHER

1.5

MINIMUM 100 KG PERSON WEIGHT SHALL BE CONSIDERED FOR THE STRETCHER DESIGN.

REQUIRED

1.12

1.6

COLLAPSIBLE TO MINIMUM SPACE

REQUIRED

1.13

1.7

STRETCHER VALISE SHALL BE MARKED AS “STRETCHER” IN ENGLISH.

REQUIRED

1.14

SHALL BE MADE OF HEAVY-DUTY MATERIAL WHICH IS SUITABLE FOR OFFSHORE USE AND RESISTANT TO ROT AND CORROSION. A PICK-UP BRIDLE AND STRAPS SHALL BE PROVIDED WITH EACH STRETCHER. STRETCHER SHALL BE PARAGUARGD (FERNO) OR EQUIVALENT

REQUIRED

REQUIRED

REQUIRED

E SPECIAL REQUIREMENTS 1 COMPLIANCE STANDARD 2 CERTIFICATION

EC DIRECTIVE 93/42/EEC

DECLARATION OF CONFORMITY WILL BE PROVIDED FROM MANUFACTURER – EC DIRECTIVE 93/42/EEC

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

3

ENVIRONMENTAL REQUIREMENT

F PHYSICAL DATA WEIGHT OF STRETCHER

1

VENDOR TO ADVISE

2 WEIGHT OF VALISE

VENDOR TO ADVISE

3 DIMENSION OF VALISE VENDOR TO ADVISE

G EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

STRETCHER

2 MANUFACTURER NAME VENDOR TO ADVISE

H

NOTES

4

5

DIMENSION OF STRETCHER FILLED WEIGHT WITH VALISE

VENDOR TO ADVISE

VENDOR TO ADVISE

3 MODEL NUMBER MANUFACTURER COUNTRY

4

VENDOR TO ADVISE

VENDOR TO ADVISE

1 DECLARATION OF CONFORMITY WILL BE PROVIDED FROM MANUFACTURER - EC DIRECTIVE 93/42/EEC.

2

3

4

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

5 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

6

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 62 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.8 Self-Contained Breathing Apparatus (SCBA) and Cabinet

SELF-CONTAINED BREATHING APPARATUS (SCBA) AND CABINET

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

2 PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA

ENVIRONMENTAL / SITE CONDITIONS

AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

LIFESAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

RP 5S

RP 3S

RP 9S

WHP 13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-1)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 SELF CONTAINED BREATHING APPARATUS CRITERIA:

1.1

SUPPLY DURATION (MINIMUM)

45 MINUTES OF BREATHING AIR AT WORKING PRESSURE (200 BAR, 9 LITERS CAPACITY)

1.8

1.2

SHALL BE MADE OF LIGHTWEIGHT COMPOSITE MATERIAL.

REQUIRED

1.9

1.3

THE REDUCER SHALL INCORPORATE A PRESSURE RELIEF VALVE.

REQUIRED

1.10

1.4

CYLINDER TEST CERTIFICATES SHALL BE SUBMITTED.

REQUIRED

1.11

SHALL CONTAIN FULLY LUMINESCENT SHOCK RESISTANT PRESSURE GAUGE AND A WARNING WHISTLE. WARNING WHISTLE IS ACTIVATED WHEN THE CYLINDER PRESSURE REDUCES TO 55BAR OR BELOW. THE MASK SHALL INCORPORATE A DOUBLE SEAL FOR INSTANT POSITIVE FIT AND A SPEECH DIAPHRAGM FOR GOOD COMMUNICATION. SHALL INCORPORATE A POSITIVE PRESSURE, FIRST BREATH ACTIVATED LDV, PROVIDING STABLE AIR SUPPLY WITH LOW BREATHING RESISTANCE.

REQUIRED

REQUIRED

REQUIRED

REQUIRED

200-83-SH-DTS-00007_A

Page 63 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

SELF-CONTAINED BREATHING APPARATUS (SCBA) AND CABINET

THE CARRYING SYSTEM SHALL CONSIST OF AN ORTHOPAEDICALLY DESIGNED BACK PLATE WITH HARNESS TO WHICH THE REDUCER, LUNG DEMAND VALVE (LDV) AND PRESSURE GAUGE ARE MOUNTED. THE BACK PLATE SHALL INCORPORATE A WAIST BELT TO CONCENTRATE WEIGHT ON HIPS OF THE BEARER. THE CYLINDER STRAPS SHALL BE ADJUSTABLE TO ACCOMMODATE THE CYLINDERS.

1.5

1.6

1.7

REQUIRED

1.12

OUTDOOR SCBA UNITS SHALL BE SUPPLIED WITH UV RESISTANT WEATHERPROOF FIBERGLASS ENCLOSURE.

REQUIRED

REQUIRED

1.13

SHALL CONSIST OF A FULLY CHARGED SINGLE CYLINDER TYPE.

REQUIRED

REQUIRED

E EQUIPMENT ACCESSORIES / FEATURES

1

2

PRESSURE GAUGE FITTED

WARNING WHISTLE FITTED

REQUIRED

9 CYLINDER MATERIAL

REQUIRED

10 CYLINDER CAPACITY

3 BACK PLATE MATERIAL VENDOR TO ADVISE

VENDOR TO ADVISE

11

12

CYLINDER VALVE FITTED CYLINDER WORKING PRESSURE

STEEL/ CARBON COMPOSITE FIBER 45 MINUTES OF BREATHING AIR AT WORKING PRESSURE (200 BAR, 9 LITERS CAPACITY)

REQUIRED

VENDOR TO ADVISE

4

5

6

7

ADJUSTABLE HARNESS MATERIAL FITTING AND ADJUSTERS MATERIAL FLAME RESISTANT MASK DEMAND VALVE WITH QUICK COUPLING FITTED

VENDOR TO ADVISE

13 CYLINDER FEATURES VENDOR TO ADVISE

REQUIRED

14 SPARE CYLINDER

REQUIRED

REQUIRED

15

FACE MASK WITH VISOR, NOSECUP

WIDE VISION NON- FOGGING

8

MATERIAL OF DEMAND VALVE

VENDOR TO ADVISE

16

1/4” MALE FOSTER OR EQUIVALENT ADAPTER FOR CONNECTION TO HOSE AND BREATHING AIR MANIFOLD

STAINLESS STEEL SS316

F CABINET DESIGN CRITERIA

1 CAPACITY

SIZED FOR THE 4 NOS. OF SCBA UNIT AND ITS SPARE CYLINDER WITH ASSEMBLY

6

MANUFACTURER NAME

VENDOR TO ADVISE

2

CABINET COLOR

GREEN

7 LABELLING

3 HANDLE

STAINLESS STEEL

8

DONNING INSTRUCTION

“SELF CONTAINED BREATHING APPARATUS” IN ENGLISH IN ENGLISH, CONTAINED IN A WEATHER-PROOF COVER AND PERMANENTLY ATTACHED TO THE

200-83-SH-DTS-00007_A

Page 64 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

SELF-CONTAINED BREATHING APPARATUS (SCBA) AND CABINET

INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT

4 CABINET MATERIAL

WEATHERPROOF UV RESISTANT, FIBREGLASS

9

IP RATING

IP56

5 COUNTRY OF ORIGIN

VENDOR TO ADVISE

10 MODEL

VENDOR TO ADVISE

G SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD

EN 137

3

ENVIRONMENTAL REQUIREMENT

2 CERTIFICATION

SOLAS MED

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

H PHYSICAL DATA

1

2

WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

I EQUIPMENT IDENTIFICATIONS

1 EQUIPMENT TYPE

SELF-CONTAINED BREATHING APPARATUS (SCBA)

3 MANUFACTURER NAME VENDOR TO ADVISE

2 MODEL NUMBER

VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

J NOTES

1

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 3 ONE SPARE CYLINDER WITH ASSEMBLY (EXCEPT HOSE) SHALL BE PROVIDED. 4 A SOFT COVER OR BAG SHALL BE PROVIDED TO PROTECT THE VISOR WHILST STORED.

5

6

7

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

THE DESIGNATED CABINET SHALL BE LABELLED “SELF CONTAINED BREATHING APPARATUS” IN ENGLISH IN WHITE BOLD LETTERS.

8 VENDOR SHALL PROVIDE THE FIXING ACCESSORIES FOR MOUNTING CABINET OUTSIDE THE BUILDING.

9

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

10

THE SCBA SHALL HAVE THE FLEXIBILITY TO RECEIVE BREATHING AIR FROM OTHER EQUIPMENT AND MUST BE PROVIDED AT LEAST ONE HOSE FOR THE TRANSFER OF AIR FROM ONE CYLINDER TO ANOTHER CYLINDER VIA A RIC-UAC OR EQUIVALENT CONNECTOR (I.E. BUDDY BREATHER, ETC.).

200-83-SH-DTS-00007_A

Page 65 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.9 Work Vest and Cabinet

WORK VEST AND CABINET

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & PIPELINES PROJECT REFER TABLE 7.1

INTRAFIELD

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-1)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 TYPE

V PFD USCG

2 SIZE

FIT FOR ADULT

3 MATERIAL

COATED WITH VINYL, WHICH IS TOUGH, FIRE RETARDANT, SELF- EXTINGUISHING, HIGHLY ABRASIVE RESISTANT, EASILY CLEANED AND SHALL RETAIN BUOYANCY EVEN WHEN PUNCTURED

9

10

MINIMUM BUOYANCY OF 70 NEWTONS SUITABLE FOR WEARING OVER COVERALLS

REQUIRED

REQUIRED

11

INSTRUCTION

IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION

4 WEIGHT

VENDOR TO ADVISE

12

5 COLOUR

INTERNATIONAL ORANGE

6 LABELLING

SCREEN PRINTED IN WATER RESISTANT VINYL INK

13

14

RETRO-REFLECTIVE TAPES BREAST POCKET COMPLETE WITH WHISTLE EQUIPPED WITH STAINLESS STEEL SNAP HOOKS AND D- RINGS, WITH TWO ENCIRCLING BELTS WITH SNAG RESISTANT BUCKLES

REQUIRED

REQUIRED

REQUIRED

200-83-SH-DTS-00007_A

Page 66 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

7

8

RESISTANT TO SUNLIGHT DETERIORATION OPEN ON THE BACK TO ACCOMMODATE MOST BRANDS OF FALL PROTECTION HARNESSES

WORK VEST AND CABINET

REQUIRED

15 MARKING

“WORK VEST” IN BLOCK LETTERS

REQUIRED

16

SELF-EXTINGUISHING UNDER ASTM1692-74

REQUIRED

E CABINET DESIGN CRITERIA 1 CAPACITY

VENDOR TO ADVISE

7 CABINET PAINT FINISH VENDOR TO ADVISE

2 COLOUR

INTERNATIONAL ORANGE

8

VENTILATION / DRAINAGE

INCORPORATE PROVISIONS FOR BOTH DRAINAGE AND VENTILATION AND AFFORD FULL WEATHER PROOFING TO THE STORED CONTENTS

3 LABELLING (NOTE 3)

4 CABINET MATERIAL

5 MOUNTING IP RATING

6 F SPECIAL REQUIREMENTS

“WORK VEST” 50MM WHITE LETTER HEAVY-DUTY GLASS REINFORCED PLASTIC (GRP) VENDOR TO ADVISE IP56

9 COUNTRY OF ORIGIN VENDOR TO ADVISE

10

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

STAINLESS STEEL, SS316

11 MANUFACTURE NAME VENDOR TO ADVISE VENDOR TO ADVISE 12 MODEL

1

2

COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT

G PHYSICAL DATA

1

2

WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET

USCG

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

WORK VEST

2 MODEL NUMBER

VENDOR TO ADVISE

I NOTES

3 MANUFACTURER NAME VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

1

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

3

THE DESIGNATED CABINET SHALL BE LABELLED IN CAPITAL LETTER OF ROMAN ALPHABET WITH WHITE COLOUR.

4 CE MARKING SHALL BE STAMPED ON ALL MATERIALS.

5

6

7

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 67 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.10 Oil Spill Kit

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

OIL SPILL KIT

2 PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

C

1

2

3 BLACK BODY

TEMPERATURE

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-1)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION SPILL KIT CONTENT

1 ABSORBENT PILLOW

REQUIRED

2 ABSORBENT BOOMS

REQUIRED

3 OIL ABSORBENT PADS REQUIRED

4

5

OIL AND SLUDGE CLEANER OIL RESISTANT GLOVES

REQUIRED

REQUIRED

E CABINET DESIGN CRITERIA

6

7

OIL SPILL CLEAN-UP GUIDE NATURAL HAND CLEANER

9

8 ABSORBENT ROLL CONTAMINATED WASTE BAGS DISPOSABLE COVERALL (SIZE XL)

10

REQUIRED

REQUIRED

REQUIRED

REQUIRED

REQUIRED

1 CAPACITY

2 CABINET MATERIAL

ABLE TO FIT ALL THE ITEMS IN ‘SECTION D’ UV RESISTANT FIRE- RETARDANT GRP

7

VENTILATION / DRAINAGE

VENTILATION LOUVERS AND DRAINAGE HOLES

8 COUNTRY OF ORIGIN VENDOR TO ADVISE

3 COLOUR

VENDOR TO ADVISE

9

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

STAINLESS STEEL SS316

10 MANUFACTURER NAME VENDOR TO ADVISE

11 MODEL

VENDOR TO ADVISE

4 LABELLING (NOTE 3)

“OIL SPILL KIT” IN ENGLISH 5 MOUNTING VENDOR TO ADVISE 6 CABINET PAINT FINISH VENDOR TO ADVISE F SPECIAL REQUIREMENTS 1 COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT

2

IMO / SOLAS (VENDOR TO CONFIRM)

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

200-83-SH-DTS-00007_A

Page 68 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

OIL SPILL KIT

G PHYSICAL DATA

1

2

WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

3

DIMENSION OF CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

OIL SPILL KIT

2 MODEL NUMBER

VENDOR TO ADVISE

I NOTES

3 MANUFACTURER NAME VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

1

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

3

4

5

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 69 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.11 Breathing Apparatus Escape Sets and Cabinet

BREATHING APPARATUS ESCAPE SETS AND CABINET

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

033764

2 PROJECT

COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1

TAG NUMBER (HOLD- 2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

3 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-1)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1

2

15 MINUTE AIR SUPPLY BASED ON HEAVY BREATHING ASSOCIATED WITH AEROBIC LEVELS OF ESCAPE

BA SET STEEL AIR CYLINDER SHALL BE USER SERVICEABLE AND SHALL BE CAPABLE OF BEING REFILLED.

REQUIRED

7

REQUIRED

8

CHANGING THE CYLINDER OF THE BA WHILE IN USE, WHICH IS NOT POSSIBLE IN BA SETS. HOWEVER PLEASE NOTE THAT THE SETS COMES WITH AIRLINE CONNECTION WHICH CAN BE CONNECTED TO THE CASCADE SYSTEM. THERE SHALL BE WARNING ALARM FITTED WITH THE BA SET UNIT WHICH WILL INITIATE ALARM WHEN THE CYLINDER AIR IS LESS THAN FOR 5 MINUTES/EOSTI (PRESSURE GAUGE)

REQUIRED

REQUIRED

200-83-SH-DTS-00007_A

Page 70 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

BREATHING APPARATUS ESCAPE SETS AND CABINET

3

BA SET UNIT SHALL BE ABLE TO PREVENT TOXIC GAS FROM ENTERING THE FACEMASK WHILE CONNECTING TO CASCADE BREATHING AIR SYSTEM (BA MANIFOLD).

REQUIRED

9

A FIRST STAGE REDUCER SHALL BE INCLUDED TO PROVIDE A HIGH PERFORMANCE FOR 200 OR 300 BAR WITHOUT ADJUSTMENT (1000 I/MIN. AVAILABLE NOMINAL FLOW, 500 I/MIN AVAILABLE FLOW AT CYLINDER PRESSURE AS LOW AS 20 BAR). THE BALANCED PISTON DESIGN FOR THE LUNG DEMAND VALVE ELIMINATES MEDIUM PRESSURE SENSITIVITY AND IT HAS THE OPTIMUM RELATIONSHIP BETWEEN SIZE, SERVICEABILITY AND RELIABILITY (4-10 MILLIBAR FIRST ACTIVATION PRESSURE; NO BY- PASS REQUIRED; SUPPLEMENTARY SUPPLY INCLUDED, POSITIVE PRESSURE MAINTAINED, EVEN AT 10 BAR AND 300 I/MIN.

REQUIRED

4

CYLINDER CAPACITY OF 3 LITRES AT 200 BAR

REQUIRED

10 REFILLABLE

YES

5 CYLINDER MATERIAL STEEL

11 MANUFACTURER NAME VENDOR TO ADVISE

6 MODEL

VENDOR TO ADVISE

12 COUNTRY OF ORIGIN

VENDOR TO ADVISE

E EQUIPMENT ACCESSORIES / FEATURES

FACEMASK WITH FIVE ADJUSTABLE HEAD STRAPS, HARD- COATED POLYCARBONATE LENS, BUILT-IN NOSECUP AND SPRING- LOADED DUAL EXHAUST VALVES, ALSO INCLUDE THREADED INLET AT CENTRE FRONT FOR CONNECTION WITH PRESSURE DEMAND VALVE COMPACT CARRYING POUCH TO CARRY FACEMASK

1

2

REQUIRED

3

INCLUDE DUST CAPS FOR ENDS OF HOSES FOR AIR LINES

VENTILATION LOUVERS AND DRAINAGE HOLES

REQUIRED

4

1/4” MALE FOSTER OR EQUIVALENT ADAPTER FOR CONNECTION TO

STAINLESS STEEL SS316

200-83-SH-DTS-00007_A

Page 71 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

BREATHING APPARATUS ESCAPE SETS AND CABINET

HOSE AND BREATHING AIR MANIFOLD.

F CABINET DESIGN CRITERIA

1 CAPACITY

CABINET SIZE SHALL BE SUITABLE TO STORE REQUIRED NUMBER OF ESCAPE SETS.

2

CABINET SHALL HAVE TWO DOORS ON FRONT TO ACCESS EQUIPMENT

REQUIRED

7

VENTILATION / DRAINAGE

VENTILATION LOUVERS AND DRAINAGE HOLES

8

FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)

STAINLESS STEEL SS316

3 COLOUR

GREEN

9 MANUFACTURER NAME VENDOR TO ADVISE

4 CABINET MATERIAL

UV RESISTANT FIRE RETARDANT GRP

10 COUNTRY OF ORIGIN

VENDOR TO ADVISE

5 MOUNTING

FIXING ACCESSORIES FOR MOUNTING CABINET INSIDE THE BUILDING WILL BE PROVIDED

11 INSTRUCTIONS

DONNING INSTRUCTIONS IN ENGLISH, CONTAINED IN A WEATHER- PROOF COVER AND PERMANENTLY ATTACHED INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT

6 LABELLING

“BREATHING APPARATUS” 50 MM WHITE LETTER IN ENGLISH

12 MODEL

VENDOR TO ADVISE

G SPECIAL REQUIREMENTS 1 COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT

2

IMO / SOLAS (VENDOR TO CONFIRM)

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

H PHYSICAL DATA

1

2

WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET

VENDOR TO ADVISE

3 DIMENSION OF CABINET

VENDOR TO ADVISE

VENDOR TO ADVISE

I EQUIPMENT IDENTIFICATIONS

1 EQUIPMENT TYPE

BREATHING APPARATUS ESCAPE SETS

3 MANUFACTURER NAME VENDOR TO ADVISE

2 MODEL NUMBER

VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

J NOTES

1

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

3

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200- 20-SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

200-83-SH-DTS-00007_A

Page 72 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

BREATHING APPARATUS ESCAPE SETS AND CABINET

4

5

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

6 EN 402 APPROVAL CERTIFICATE WILL BE PROVIDED.

200-83-SH-DTS-00007_A

Page 73 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

9.12 Medical Oxygen Cylinder with Face Mask

MEDICAL OXYGEN CYLINDER WITH FACE MASK

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

C

1

2

3 BLACK BODY

TEMPERATURE

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

LIFESAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 2 & 3)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-2)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 MATERIAL

CYLINDER BODY & OUTLETS: ALUMINIUM/ NICKEL PLATED BRASS

INTERNAL PARTS: BRASS/ STAINLESS STEEL

CART: CHROME PLATED STEEL

6 RELIEF VALVE

YES

2 SUPPLY PRESSURE

200-2600 PSI

7 CART

3 OUTLET PRESSURE

45-55 PSI

8 DEMAND VALVE

SUITABLE FOR D-SIZE CYLINDER, HEIGHT ADJUSTMENT FROM 36 TO 43”, STABLE, LIGHTWEIGHT, C/W CARRY HANDLE AND FOAM TIRES

YES, C/W WITH ADULT SIZE MASK, AND 6 FT HOSE

4 FLOW CAPACITY

CONSTANT FLOW OUTLET SELECTIONS 0-25 LPM: 0, ¼, ½, 1, 2, 3, 4, 6, 8, 10, 15, 25 HIGH FLOW OUTLET 100 LPM MIN

9 DESIGN LIFE

VENDOR TO ADVISE

200-83-SH-DTS-00007_A

Page 74 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

5 FILTER

E ACCESSORIES

1

MEDICAL OXYGEN D- SIZE CYLINDER (415 LITERS) WITH TOGGLE VALVE

2 VALVE REGULATOR F PHYSICAL DATA 1 WEIGHT (KG)

MEDICAL OXYGEN CYLINDER WITH FACE MASK

25 MICRON SINTERED BRONZE

10

WARRANTY & GUARANTEE

VENDOR TO CONFIRM

REQUIRED

REQUIRED

3

ADJUSTABLE CART FOR D-SIZE CYLINDER

REQUIRED

4 OXYGEN POWERED DEMAND VALVE

REQUIRED

VENDOR TO ADVISE

2 DIMENSION

VENDOR TO ADVISE

G EQUIPMENT IDENTIFICATIONS

1 EQUIPMENT TYPE

MEDICAL OXYGEN CYLINDER

2 MODEL NUMBER

VENDOR TO ADVISE

H NOTES

4

5

MANUFACTURER NAME MANUFACTURER COUNTRY

VENDOR TO ADVISE

VENDOR TO ADVISE

1

2

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

3 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

4 MEDICAL OXYGEN CYLINDER SHALL BE KEPT INSIDE TR.

5

6

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 75 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10 DATASHEET FOR FIREFIGHTING EQUIPMENT

10.1 Dry Chemical Powder Handheld Extinguisher (BC Type) 9 kg

DRY CHEMICAL POWDER HANDHELD EXTINGUISHER (BC TYPE) 9 KG

ADMINISTRATIVE IDENTIFICATIONS

A 1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B

EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

WHP4N

RP 5S

RP 3S

RP4N

RP 9S

WHP6N

WHP 13N

WHP5N

FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION

EQUIPMENT DESIGN CRITERIA

1 EXTINGUISHANT AGENT

POTASSIUM BICARBONATE (BC TYPE),

15

HOSE COUPLING, SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL

2 PROPELLANT TYPE

NITROGEN (N2) CARTRIDGE

16

ALL CARRYING AND OPERATING HANDLES

STAINLESS STEEL 316L

PISTOL-GRIP DESIGN, MADE OF STEEL WITH ELECTRO-CHEMICAL CORROSION RESISTANCE

3

4

5

EXTINGUISHANT CAPACITY

9 kg

CARTRIDGE OPERATING PRESSURE CARTRIDGE TEST PRESSURE

VENDOR TO ADVISE

17

18

DISCHARGE LEVER FITTED WITH SAFETY RING PIN AND CHAIN UNIT DISCHARGE INDICATOR

REQUIRED

REQUIRED

VENDOR TO ADVISE

19 PAINT FINISH

NFPA-10 / LISTED

6 DESIGN TEMPERATURE VENDOR TO ADVISE

20

MINIMUM EXTINGUISHING RATING TESTING

120 B:C (120 SQ FT)

7 UL CLASSIFICATION

120-B:C

21 TESTING

UL/ULC

8

MINIMUM DISCHARGE TIME

20-25 SECONDS

22

PROVIDED WITH 35 MM WIDE MOUNTING POINT

REQUIRED

200-83-SH-DTS-00007_A

Page 76 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

DRY CHEMICAL POWDER HANDHELD EXTINGUISHER (BC TYPE) 9 KG

9

EFFECTIVE RANGE (MIN)

9 METERS

23

ON THE SHOULDER OF THE BODY SHELL, SUITABLE FOR USE WITH A BRACKET PROVISION OF MAINTENANCE RECORD PLATE

10 CONTAINER MATERIAL

CARBON STEEL WITH CORROSION RESISTANCE COATING MARINE CONDITION

24

OPERATING INSTRUCTION

11 MOUNTING BRACKETS

REQUIRED (FOR INDOOR LOCATIONS)

25 REFILL INSTRUCTION

REQUIRED

IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION

IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION

12 LABEL

WHITE LETTERINGS “POWDER” ON BLUE BACKGROUND

26 HOSE LENGTH (MIN)

VENDOR TO ADVISE

13 APPROVALS

UL/FM/USCG APPROVED 27 HOSE MATERIAL

NON-ELECTRICAL CONDUCTING FLEXIBLE NEOPRENE

14 STANDARD

NFPA 10

28

CONTAINER PAINT FINISH

RED (RAL 3000)

E

NAMEPLATE

1 MATERIAL

2

OPERATION INSTRUCTIONS

AS PER MANUFACTURER STANDARD

5 FIRE RATING

REQUIRED

REQUIRED

6 APPROVAL STANDARD UL LISTED/FM APPROVED

3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED F

CABINET DESIGN

7 LANGUAGE

ENGLISH

1 MATERIAL

2

DIMENSION (APPROXIMATE)

3 PAINTING

4 THICKNESS (MIN) 5 WEIGHT G PHYSICAL DATA FULLY CHARGED WEIGHT

1

FIRE RETARDANT AND UV RESISTANT HEAVY DUTY GRP

6 MARKING

VENDOR TO ADVISE

7 DOOR

CORROSION RESISTANCE PAINTING VENDOR TO ADVISE VENDOR TO ADVISE

8 FITTINGS

IP RATING

9 10 COLOUR

“FIRE EXTINGUISHER” WITH WHITE BLOCK LETTERS SHALL BE HINGED AND SHALL NOT BE LOCKABLE

MADE FROM STAINLESS STEEL 316L IP56 RED (RAL 3000)

VENDOR TO ADVISE

2

EXTINGUISHER DIMENSION

VENDOR TO ADVISE

H SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD

NFPA 10, UL 299

2

ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

I EQUIPMENT IDENTIFICATIONS

1 MODEL NUMBER

VENDOR TO ADVISE

2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES

3

MANUFACTURER COUNTRY

VENDOR TO ADVISE

200-83-SH-DTS-00007_A

Page 77 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

DRY CHEMICAL POWDER HANDHELD EXTINGUISHER (BC TYPE) 9 KG

1

2

3

EXTINGUISHER SHALL BE SPECIFIED WITH FIRE EXTINGUISHER CABINET FOR OUTDOOR LOCATIONS WITH DECKS MOUNTED, AND WALL BRACKET FOR INDOOR LOCATIONS. EXTINGUISHERS SHALL BE US COAST GUARD APPROVED AND SHALL BE IN ACCORDANCE WITH UL REQUIREMENTS. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANCE PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FIRE EXTINGUISHER CABINET SHALL ALSO BE SUITABLE FOR CORROSIVE ENVIRONMENT.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

5

6

7

200-83-SH-DTS-00007_A

Page 78 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10.2 Carbon Dioxide Handheld Extinguisher 4.5 kg

A

ADMINISTRATIVE IDENTIFICATIONS

CARBON DIOXIDE HANDHELD EXTINGUISHER 4.5 KG

1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B

EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION

EQUIPMENT DESIGN CRITERIA

1 EXTINGUISHANT AGENT CARBON DIOXIDE

15

HOSE COUPLING, SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL

2 PROPELLANT TYPE

SELF EXPELLANT

16

ALL CARRYING AND OPERATING HANDLES

STAINLESS STEEL 316L

PISTOL-GRIP DESIGN, MADE OF STEEL WITH ELECTRO-CHEMICAL CORROSION RESISTANCE

3

4

5

EXTINGUISHANT CAPACITY

4.5 kg

17

DISCHARGE LEVER FITTED WITH SAFETY RING PIN AND CHAIN

REQUIRED

CARTRIDGE OPERATING PRESSURE

CARTRIDGE TEST PRESSURE

VENDOR TO ADVISE

18 LABEL

WHITE LETTERINGS “CO2” ON BLACK BACKGROUND

VENDOR TO ADVISE

19

MINIMUM EXTINGUISHING RATING TESTING

10-B:C

6 DESIGN TEMPERATURE VENDOR TO ADVISE

20 TESTING

UL/ULC

7 UL CLASSIFICATION

10-B:C

21

8

MINIMUM DISCHARGE TIME

8-30 SECONDS

22

PROVIDED WITH 35 MM WIDE MOUNTING POINT ON THE SHOULDER OF THE BODY SHELL, SUITABLE FOR USE WITH A BRACKET PROVISION OF MAINTENANCE RECORD PLATE

REQUIRED

REQUIRED

200-83-SH-DTS-00007_A

Page 79 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

CARBON DIOXIDE HANDHELD EXTINGUISHER 4.5 KG

9

EFFECTIVE RANGE (MIN)

1-2.5 METERS

23

OPERATING INSTRUCTION

IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION

IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION

10 CONTAINER MATERIAL

11 MOUNTING BRACKETS

ALUMINIUM WITH CORROSION RESISTANCE COATING MARINE CONDITION REQUIRED (FOR INDOOR LOCATIONS)

24 REFILL INSTRUCTION

25 HOSE LENGTH (MIN)

VENDOR TO ADVISE

12 PAINT FINISH

NFPA-10 / LISTED

26 HOSE MATERIAL

NON-ELECTRICAL CONDUCTING FLEXIBLE NEOPRENE

13 APPROVALS

UL/FM/USCG APPROVED 27

CONTAINER PAINT FINISH

RED (RAL 3000)

14 STANDARD E

NAMEPLATE

1 MATERIAL

2

OPERATION INSTRUCTIONS

NFPA 10

AS PER MANUFACTURER STANDARD

5 FIRE RATING

REQUIRED

REQUIRED

6 APPROVAL STANDARD UL LISTED/FM APPROVED

3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED F

CABINET DESIGN

7 LANGUAGE

ENGLISH

1 MATERIAL

2

DIMENSION (APPROXIMATE)

3 PAINTING

4 THICKNESS (MIN) 5 WEIGHT G PHYSICAL DATA FULLY CHARGED WEIGHT

1

FIRE RETARDANT AND UV RESISTANT HEAVY DUTY GRP

6 MARKING

VENDOR TO ADVISE

7 DOOR

CORROSION RESISTANCE PAINTING VENDOR TO ADVISE VENDOR TO ADVISE

8 FITTINGS

IP RATING

9 10 COLOUR

“FIRE EXTINGUISHER” WITH WHITE BLOCK LETTERS SHALL BE HINGED AND SHALL NOT BE LOCKABLE MADE FROM STAINLESS STEEL 316L IP56 RED (RAL 3000)

VENDOR TO ADVISE

2

EXTINGUISHER DIMENSION

VENDOR TO ADVISE

H SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD

NFPA 10, UL 154

2

ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

I EQUIPMENT IDENTIFICATIONS

1 MODEL NUMBER

VENDOR TO ADVISE

2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES

3

MANUFACTURER COUNTRY

VENDOR TO ADVISE

1

2

3

EXTINGUISHER SHALL BE SPECIFIED WITH FIRE EXTINGUISHER CABINET FOR OUTDOOR LOCATIONS WITH DECKS MOUNTED, AND WALL BRACKET FOR INDOOR LOCATIONS. EXTINGUISHERS SHALL BE US COAST GUARD APPROVED AND SHALL BE IN ACCORDANCE WITH UL REQUIREMENTS. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

200-83-SH-DTS-00007_A

Page 80 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

CARBON DIOXIDE HANDHELD EXTINGUISHER 4.5 KG

EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANCE PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FIRE EXTINGUISHER CABINET SHALL ALSO BE SUITABLE FOR CORROSIVE ENVIRONMENT. CO2 EXTINGUISHERS (STORED PRESSURE TYPE) SHALL BE DESIGNED FOR A MINIMUM PRESSURE OF 1800 PSIG AND IT SHALL BE PROVIDED WITH PRESSURE RELIEF DEVICE AS PER UL 154 STANDARD.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

5

6

7

8

200-83-SH-DTS-00007_A

Page 81 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10.3 Carbon Dioxide Wheeled Extinguisher 45.4 kg

A ADMINISTRATIVE IDENTIFICATIONS

CARBON DIOXIDE WHEELED EXTINGUISHER 45.4 KG

1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

4 ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 EXTINGUISHANT AGENT CARBON DIOXIDE

2 PROPELLANT TYPE

SELF EXPELLANT

EXTINGUISHANT CAPACITY

45.4 kg

16

HEAD CAP ASSEMBLY MATERIAL

CORROSION RESISTANCE MATERIAL

17

HOSE COUPLINGMATERIAL

18

SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL

STAINLESS STEEL 316L OR CHROME PLATED BRASS

STAINLESS STEEL 316L OR BRASS

CYLINDER OPERATING PRESSURE

50 BAR, AT 20 OC

19 APPROVALS

UL LISTED

CYLINDER TEST PRESSURE

200 BAR (VENDOR TO ADVISE)

20 REFILL INSTRUCTION

6 DESIGN TEMPERATURE VENDOR TO ADVISE

7

HORN SHAPED DIRECTIONAL DISCHARGE NOZZLE

REQUIRED

8 DISCHARGE TIME (MIN) 30-35 SECONDS

21

22

23

OPERATING INSTRUCTION PROVISION OF MAINTENANCE RECORD PLATE MINIMUM EXTINGUISHING RATING TESTING

ENGLISH, WITH PICTOGRAM / ILLUSTRATION ENGLISH, UNIVERSAL PICTORIAL LABELS

REQUIRED

20 B:C (20 SQ FT)

9

EFFECTIVE RANGE (MIN)

3-4 METERS

24 SPARE PARTS

VENDOR TO ADVISE

200-83-SH-DTS-00007_A

Page 82 of 101

C

1

2

3

3

4

5

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

CARBON DIOXIDE WHEELED EXTINGUISHER 45.4 KG

10 CONTAINER MATERIAL

11

CONTAINER PAINT FINISH

12

DISCHARGE HOSE MATERIAL

13

UNIT DISCHARGE INDICATOR AND DISCHARGE LEVER

CARBON STEEL WITH CORROSION RESISTANCE COATING MARINE CONDITION RED (RAL 3000), WITH CORROSION RESISTANT PAINT NON-ELECTRICAL CONDUCTIVE FLEXIBLE NEOPRENE

25

2.5 METER EXTENSION APPLICATOR (WITH INSULATION)

REQUIRED

26

DISCHARGE HORN NOZZLE

REQUIRED

27 WHEEL TYPE

TWO WHEELS (ANTI STATIC AND NON- SPARKING)

REQUIRED

28 WHEEL MATERIAL

RUBBER

14 HOSE LENGTH (MAX)

12.2M

29 UL/FM CLASSIFICATION 20-B:C

15 OPERATING VALVE

BRASS CYLINDER VALVE 30 LABEL

WHITE LETTERINGS “CO2” ON BLACK BACKGROUND

E NAMEPLATE

1 MATERIAL

2

OPERATION INSTRUCTIONS

AS PER MANUFACTURER STANDARD

5 FIRE RATING

REQUIRED

REQUIRED

6 APPROVAL STANDARD UL LISTED/FM APPROVED

3 AGENT CAPACITY IN KG REQUIRED

7 LANGUAGE

ENGLISH

4 CLASS OF FIRE F WEATHER PROOF COVER

REQUIRED

1 MATERIAL

G PHYSICAL DATA FULLY CHARGED WEIGHT

1

UV-RESISTANT RED- VINYL

2 MARKING

“FIRE EXTINGUISHER”

VENDOR TO ADVISE

2 DIMENSION

VENDOR TO ADVISE

H SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD

2

ENVIRONMENTAL REQUIREMENT

NFPA 10, UL 154

3 MOVEMENT

EXTINGUISHER WHEELS SHALL BE ABLE TO MOVE ON GRATED DECK

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

I EQUIPMENT IDENTIFICATIONS

1 MODEL NUMBER

VENDOR TO ADVISE

3

MANUFACTURER COUNTRY

VENDOR TO ADVISE

2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES 1 CYLINDER SHALL BE HYDRAULICALLY TESTED. VENDOR SHALL PROVIDE TEST RECORDS.

2

3

ALL WHEELED EXTINGUISHER SHALL BE PROVIDED WITH WEATHER PROOF COVER OF UV RESISTANT RED VINYL AND STAINLESS STEEL IDENTIFICATION TAG. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 5 WEATHER PROOF COVER TO BE MARKED “FIRE EXTINGUISHER” WITH WHITE LETTERING IN ENGLISH.

6

ALL WHEELED EXTINGUISHERS SHALL BE CAPABLE TO MOVE FREELY ON GRATED FLOOR. ANTI-STATIC, RUBBER WHEEL SHALL BE USED.

200-83-SH-DTS-00007_A

Page 83 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

CARBON DIOXIDE WHEELED EXTINGUISHER 45.4 KG

7 ALL WHEELED EXTINGUISHERS SHALL BE EQUIPPED WITH LIFTING LUG. 8 EXTINGUISHERS SHALL BE IN ACCORDANCE WITH UL REQUIREMENTS.

9

10

11

12

EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANT PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. CO2 EXTINGUISHERS (STORED PRESSURE TYPE) SHALL BE DESIGNED FOR A MINIMUM PRESSURE OF 1800 PSIG AND IT SHALL BE PROVIDED WITH PRESSURE RELIEF DEVICE AS PER UL 154 STANDARD. FACILITY SHALL BE PROVIDED FOR TROLLEY MOUNTED EXTINGUISHER TO IDENTIFY THE WEIGHT OR EMPTY OF THE CYLINDER. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

200-83-SH-DTS-00007_A

Page 84 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10.4 Dry Chemical Powder Wheeled Extinguisher 56.7 kg

DRY CHEMICAL POWDER WHEELED EXTINGUISHER 56.7 KG

A ADMINISTRATIVE IDENTIFICATIONS

1 PROJECT NUMBER

033764

2 PROJECT

COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

C

1

2

3

3

4

5

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

4 ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 EXTINGUISHANT AGENT

POTASSIUM BICARBONATE

17

HOSE COUPLINGMATERIAL

2 PROPELLANT TYPE

EXTERNAL NITROGEN CYLINDER

18

SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL

EXTINGUISHANT CAPACITY

56.7 kg

19 APPROVALS

STAINLESS STEEL 316L OR CHROME PLATED BRASS

STAINLESS STEEL 316L OR BRASS

UL LISTED; FM/USCG APPROVED

CYLINDER OPERATING PRESSURE

VENDOR TO ADVISE

20

DISCHARGE LEVER FITTED WITH SAFETY RING PIN AND CHAIN

REQUIRED

CYLINDER TEST PRESSURE

VENDOR TO ADVISE

21 REFILL INSTRUCTION

6 DESIGN TEMPERATURE VENDOR TO ADVISE

22

OPERATING INSTRUCTION

ENGLISH, WITH PICTOGRAM / ILLUSTRATION ENGLISH, UNIVERSAL PICTORIAL LABELS

7

UNIT DISCHARGE INDICATOR

REQUIRED

23 PAINT FINISH

NFPA-10 / LISTING

8 DISCHARGE TIME (MIN) 30 SECONDS

24

MINIMUM EXTINGUISHING RATING TESTING

320-B:C (320 SQ FT)

9

EFFECTIVE RANGE (MIN)

7-14 METERS

25 SPARE PARTS

VENDOR TO ADVISE

200-83-SH-DTS-00007_A

Page 85 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

DRY CHEMICAL POWDER WHEELED EXTINGUISHER 56.7 KG

10 CONTAINER MATERIAL

11

CONTAINER PAINT FINISH

12

DISCHARGE HOSE MATERIAL

13 HOSE LENGTH (MIN) 14 HOSE LENGTH (MAX)

CARBON STEEL WITH CORROSION RESISTANCE COATING MARINE CONDITION

26

PRESSURE GAUGE ON EXTERNAL N2 CYLINDER

REQUIRED

RED (RAL 3000)

27 OPERATING VALVE

BRASS CYLINDER VALVE

NON-ELECTRICAL CONDUCTIVE FLEXIBLE NEOPRENE 15 METERS 30 METERS

28 WHEEL TYPE

29 WHEEL MATERIAL 30 UL/FM CLASSIFICATION 320-B:C

TWO WHEELS (ANTI STATIC AND NON- SPARKING) RUBBER

15 NOZZLE

LONG RANGE NOZZLE

31 LABEL

16

E

HEAD CAP ASSEMBLY MATERIAL NAMEPLATE

CORROSION RESISTANCE MATERIAL

WHITE LETTERINGS “POWDER” ON BLUE BACKGROUND

1 MATERIAL

2

OPERATION INSTRUCTIONS

AS PER MANUFACTURER STANDARD

5 FIRE RATING

REQUIRED

REQUIRED

6 APPROVAL STANDARD UL LISTED/FM APPROVED

3 AGENT CAPACITY IN KG REQUIRED REQUIRED 4 CLASS OF FIRE F WEATHER PROOF COVER

7 LANGUAGE

ENGLISH

1 MATERIAL

G PHYSICAL DATA FULLY CHARGED WEIGHT

1

UV-RESISTANT RED- VINYL

2 MARKING

“FIRE EXTINGUISHER”

VENDOR TO ADVISE

2 DIMENSION

VENDOR TO ADVISE

H SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD

2

ENVIRONMENTAL REQUIREMENT

NFPA 10

3 MOVEMENT

EXTINGUISHER WHEELS SHALL BE ABLE TO MOVE ON GRATED DECK

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

I EQUIPMENT IDENTIFICATIONS

1 MODEL NUMBER

VENDOR TO ADVISE

2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES

3

MANUFACTURER COUNTRY

VENDOR TO ADVISE

1 CYLINDER SHALL BE HYDRAULICALLY TESTED. VENDOR SHALL PROVIDE TEST RECORDS.

2

3

ALL WHEELED EXTINGUISHER SHALL BE PROVIDED WITH WEATHER PROOF COVER OF UV RESISTANT RED VINYL AND STAINLESS STEEL IDENTIFICATION TAG. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

5 WEATHER PROOF COVER TO BE MARKED “FIRE EXTINGUISHER” WITH WHITE LETTERING IN ENGLISH.

200-83-SH-DTS-00007_A

Page 86 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

DRY CHEMICAL POWDER WHEELED EXTINGUISHER 56.7 KG

6

ALL WHEELED EXTINGUISHERS SHALL BE CAPABLE TO MOVE FREELY ON GRATED FLOOR. ANTI-STATIC, RUBBER WHEEL SHALL BE USED.

7 ALL WHEELED EXTINGUISHERS SHALL BE EQUIPPED WITH LIFTING LUG.

8 HAND APPLICATOR HOSE COMPLETE WITH NOZZLE.

9

EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANT PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT.

10 THE HOSE LENGTH FOR DCP WHEELED EXTINGUISHER AT HELIDECK SHALL BE 15 M.

11

12

FACILITY SHALL BE PROVIDED FOR TROLLEY MOUNTED EXTINGUISHER TO IDENTIFY THE WEIGHT OR EMPTY OF THE CYLINDER. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

200-83-SH-DTS-00007_A

Page 87 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10.5 Dry Chemical Powder Wheeled Extinguisher 136.4 kg

DRY CHEMICAL POWDER WHEELED EXTINGUISHER 136.4 KG

A ADMINISTRATIVE IDENTIFICATIONS

1 PROJECT NUMBER

033764

2 PROJECT

COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

WHP 13N

FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

C

1

2

3

4 ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 EXTINGUISHANT AGENT

POTASSIUM BICARBONATE

17

HOSE COUPLING MATERIAL

2 PROPELLANT TYPE

EXTERNAL NITROGEN CYLINDER

18

19

SPRINGS, AND MOVING PARTS MATERIAL SPRAY NOZZLE MATERIAL

136.4 kg

3

4

5

EXTINGUISHANT CAPACITY CYLINDER OPERATING PRESSURE

CYLINDER TEST PRESSURE

VENDOR TO ADVISE

20 APPROVALS

VENDOR TO ADVISE

21

DISCHARGE LEVER FITTED WITH SAFETY RING PIN AND CHAIN

REQUIRED

STAINLESS STEEL 316L OR CADMIUM PLATED BRASS STAINLESS STEEL 316L OR BRASS

ANODIZED ALUMINUM

UL LISTED; FM/USCG APPROVED

6 DESIGN TEMPERATURE VENDOR TO ADVISE

22 REFILL INSTRUCTION

7

UNIT DISCHARGE INDICATOR

REQUIRED

23

OPERATING INSTRUCTION

ENGLISH, WITH PICTOGRAM / ILLUSTRATION ENGLISH, UNIVERSAL PICTORIAL LABELS

8 DISCHARGE TIME (MIN) 30 SECONDS

24 PAINT FINISH

NFPA-10 / LISTED

9

EFFECTIVE RANGE (MIN)

7-14 METERS

10 CONTAINER MATERIAL

STEEL WITH CORROSION RESISTANCE COATING MARINE CONDITION

11

CONTAINER PAINT FINISH

RED (RAL 3000)

25

MINIMUM EXTINGUISHING RATING TESTING

640-B:C (640 SQ FT)

26 SPARE PARTS

VENDOR TO ADVISE

27

PRESSURE GAUGE ON EXTERNAL N2 CYLINDER

REQUIRED

200-83-SH-DTS-00007_A

Page 88 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

DRY CHEMICAL POWDER WHEELED EXTINGUISHER 136.4 KG

12

DISCHARGE HOSE MATERIAL

NON-ELECTRICAL CONDUCTIVE FLEXIBLE NEOPRENE

28 OPERATING VALVE

BRASS CYLINDER VALVE

13 HOSE LENGTH (MIN)

15 METERS

29 WHEEL TYPE

14 HOSE LENGTH (MAX)

30 METERS

30 WHEEL MATERIAL

TWO WHEELS (ANTI STATIC AND NON- SPARKING) RUBBER

15 NOZZLE

LONG RANGE NOZZLE

31 UL/FM CLASSIFICATION 640-B:C

16

HEAD CAP ASSEMBLY MATERIAL

CORROSION RESISTANCE MATERIAL

32 LABEL

WHITE LETTERINGS “POWDER” ON BLUE BACKGROUND

E

NAMEPLATE

1 MATERIAL

2

OPERATION INSTRUCTIONS

AS PER MANUFACTURER STANDARD

5 FIRE RATING

REQUIRED

REQUIRED

6 APPROVAL STANDARD UL LISTED/FM APPROVED

3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED F WEATHER PROOF COVER

7 LANGUAGE

ENGLISH

1 MATERIAL

G PHYSICAL DATA FULLY CHARGED WEIGHT

1

UV-RESISTANT RED- VINYL

2 MARKING

“FIRE EXTINGUISHER”

VENDOR TO ADVISE

2 DIMENSION

VENDOR TO ADVISE

I SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD

2

ENVIRONMENTAL REQUIREMENT

NFPA 10

3 MOVEMENT

EXTINGUISHER WHEELS SHALL BE ABLE TO MOVE ON GRATED DECK

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

H EQUIPMENT IDENTIFICATIONS

1 MODEL NUMBER

VENDOR TO ADVISE

2 MANUFACTURER NAME VENDOR TO ADVISE I NOTES

3

MANUFACTURER COUNTRY

VENDOR TO ADVISE

1 CYLINDER SHALL BE HYDRAULICALLY TESTED. VENDOR SHALL PROVIDE TEST RECORDS.

2

3

ALL WHEELED EXTINGUISHER SHALL BE PROVIDED WITH WEATHER PROOF COVER OF UV RESISTANT RED VINYL AND STAINLESS STEEL IDENTIFICATION TAG ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

5 WEATHER PROOF COVER TO BE MARKED “FIRE EXTINGUISHER” WITH WHITE LETTERING IN ENGLISH.

6

ALL WHEELED EXTINGUISHERS SHALL BE CAPABLE TO MOVE FREELY ON GRATED FLOOR. ANTI-STATIC, RUBBER WHEEL SHALL BE USED.

7 ALL WHEELED EXTINGUISHERS SHALL BE EQUIPPED WITH LIFTING LUG.

8 HAND APPLICATOR HOSE COMPLETE WITH NOZZLE.

200-83-SH-DTS-00007_A

Page 89 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

DRY CHEMICAL POWDER WHEELED EXTINGUISHER 136.4 KG

9

10

11

12

EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANT PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FACILITY SHALL BE PROVIDED FOR TROLLEY MOUNTED EXTINGUISHER TO IDENTIFY THE WEIGHT OR EMPTY OF THE CYLINDER. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

200-83-SH-DTS-00007_A

Page 90 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10.6 AFFF Wheeled Extinguisher 135L

A ADMINISTRATIVE IDENTIFICATIONS

AFFF WHEELED EXTINGUISHER 135L

1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

C

1

2

3

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

4 ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 EXTINGUISHANT AGENT

2 PROPELLANT TYPE

AQUEOUS FILM FORMING FOAM

EXTERNAL CO2 CYLINDER

16 REFILL INSTRUCTION ENGLISH

17 PAINT FINISH

NFPA 10 / LISTED

3

4

5

EXTINGUISHANT CAPACITY

135 L

18 HOSE LENGTH (MIN)

6 M

CYLINDER OPERATING PRESSURE

VENDOR TO ADVISE

19

MINIMUM EXTINGUISHING RATING TESTING

VENDOR TO ADVISE

CYLINDER TEST PRESSURE

VENDOR TO ADVISE

20 SPARE PARTS

VENDOR TO ADVISE

6 DESIGN TEMPERATURE VENDOR TO ADVISE

7 UL CLASSIFICATION

IVB

21

OPERATING INSTRUCTION

22 LABEL

8 DISCHARGE TIME (MIN)

60 SEC (VENDOR TO ADVISE)

23 WHEEL

9

EFFECTIVE RANGE (MIN)

VENDOR TO ADVISE

24 WHEEL TYPE

ENGLISH

ENGLISH HARD RUBBER COATED STEEL WHEELS (NON PNEUMATIC) ANTI STATIC AND NON SPARKING

10 CONTAINER MATERIAL STEEL

25 WHEEL MATERIAL

RUBBER

11 NOZZLE

LONG RANGE NOZZLE

26

THE EXTINGUISHER TANK SHALL BE OF WELDED STEEL

REQUIRED

200-83-SH-DTS-00007_A

Page 91 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

AFFF WHEELED EXTINGUISHER 135L

CONSTRUCTION DESIGNED FOR A MINIMUM WORKING PRESSURE OF 1.52 MPA-G (220 PSIG). THE TANK NORMALLY SHALL BE AT ATMOSPHERIC PRESSURE AND SHALL BE PRESSURIZED PRIOR TO USE BY A NITROGEN CYLINDER WITH A QUICK- OPENING VALVE THE NITROGEN CYLINDER SHALL BE OF STEEL CONSTRUCTION

REQUIRED

28

29

MINIMUM EXTINGUISHING RATING TESTING

IVB

12

CONTAINER PAINT FINISH

RED (RAL 3000)

27

REQUIRED

13

UNIT DISCHARGE INDICATOR

REQUIRED

UL LISTED / FM APPROVED OR EQUIVALENT (E.G. KITEMARK)

REQUIRED

14 APPROVALS

15

DISCHARGE LEVER FITTED WITH SAFETY PIN

E NAME PLATE

1 MATERIAL

2

OPERATION INSTRUCTIONS

AS PER MANUFACTURER STANDARD

5 FIRE RATING

REQUIRED

REQUIRED

6 APPROVAL STANDARD

UL LISTED/FM OR EQUIVALENT APPROVED

3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED E WEATHER PROOF COVER

7 LANGUAGE

ENGLISH

1 MATERIAL

F PHYSICAL DATA FULLY CHARGED WEIGHT

1

UV-RESISTANT RED- VINYL

2 MARKING

“WHEELED AFFF 135 L FIRE EXTINGUISHER”

VENDOR TO ADVISE

2

DIMENSION (APPROXIMATE)

VENDOR TO ADVISE

G SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD

2

ENVIRONMENTAL REQUIREMENT

NFPA 10

3 MOVEMENT

EXTINGUISHER WHEELS SHALL BE ABLE TO MOVE ON GRATED DECK

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

H EQUIPMENT IDENTIFICATIONS 1 MODEL NUMBER VENDOR TO ADVISE 2 MANUFACTURER NAME VENDOR TO ADVISE I NOTES

4 MANUFACTURER DATE VENDOR TO ADVISE

1 CYLINDER SHALL BE HYDRAULICALLY TESTED. VENDOR SHALL PROVIDE TEST RECORDS.

2

ALL WHEELED EXTINGUISHER SHALL BE PROVIDED WITH WEATHERPROOF COVER OF UV RESISTANT RED VINYL AND STAINLESS STEEL IDENTIFICATION TAG.

200-83-SH-DTS-00007_A

Page 92 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

AFFF WHEELED EXTINGUISHER 135L

3

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

5 WEATHER PROOF COVER TO BE MARKED “FOAM FIRE EXTINGUISHER” WITH WHITE LETTERING IN ENGLISH.

6

ALL WHEELED EXTINGUISHERS SHALL BE CAPABLE TO MOVE FREELY ON GRATED FLOOR. ANTI-STATIC, RUBBER WHEEL SHALL BE USED.

7 ALL WHEELED EXTINGUISHERS SHALL BE EQUIPPED WITH LIFTING LUG.

8

9

10

EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANT PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FIRE EXTINGUISHER CABINET ALSO SHALL BE SUITABLE FOR CORROSIVE ENVIRONMENT. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

200-83-SH-DTS-00007_A

Page 93 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10.7 Dry Chemical Powder (BC) Hand Extinguisher 4.1 kg

A ADMINISTRATIVE IDENTIFICATIONS

DRY CHEMICAL POWDER (BC) HAND EXTINGUISHER 4.1 KG

1 PROJECT NUMBER

2 PROJECT

3 QUANTITY B EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

RP 6N

RP 5N

RP 5S

RP 3S

RP 9S

WHP 13N

FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-3)

72

VENDOR TO ADVISE

°C

%

°C

4 ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 EXTINGUISHANT AGENT

2 PROPELLANT TYPE

3

4

5

EXTINGUISHANT CAPACITY CARTRIDGE OPERATING PRESSURE

CARTRIDGE TEST PRESSURE

POTASSIUM BICARBONATE

NITROGEN (N2 CARTRIDGE)

13 HOSE COUPLING

STAINLESS STEEL 316L

14

SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL

ETCHED ALUMINUM

4.1 KG

15 REFILL INSTRUCTION ENGLISH

VENDOR TO ADVISE

16 PAINT FINISH

NFPA 10 / LISTED

VENDOR TO ADVISE

17 APPROVALS

6 DESIGN TEMPERATURE VENDOR TO ADVISE

18

DISCHARGE LEVER FITTED WITH SAFETY PIN

UL LISTED / FM APPROVED OR EQUIVALENT

REQUIRED

6 UL CLASSIFICATION

60-B:C

19 HOSE LENGTH (MIN)

VENDOR TO ADVISE

7 DISCHARGE TIME (MIN) 15 SEC

8

EFFECTIVE RANGE (MIN)

5 M

9 CONTAINER MATERIAL CARBON STEEL

20

MINIMUM EXTINGUISHING RATING TESTING

60-B:C

21 SPARE PARTS

VENDOR TO ADVISE

22

OPERATING INSTRUCTION

ENGLISH

200-83-SH-DTS-00007_A

Page 94 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

DRY CHEMICAL POWDER (BC) HAND EXTINGUISHER 4.1 KG

10

11

CONTAINER PAINT FINISH UNIT DISCHARGE INDICATOR HEAD CAP ASSEMBLY MATERIAL E NAME PLATE

12

RED (RAL 3000)

23 LABEL

ENGLISH

REQUIRED

24 BOTTOM SKIRT

NOT LESS THAN 6 MM

CORROSION RESISTANCE MATERIAL

1 MATERIAL

AS PER MANUFACTURER STANDARD

5 FIRE RATING

REQUIRED

INSTRUCTIONS

2 OPERATION REQUIRED 3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED F MOUNTING DESIGN 1 MATERIAL G SPECIAL REQUIREMENTS

NOTE 1

6 APPROVAL STANDARD UL LISTED/FM APPROVED 7 LANGUAGE

ENGLISH

1

COMPLIANCE STANDARD

H PHYSICAL DATA

1

FULLY CHARGED WEIGHT

NFPA 10, UL 154

2

ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

VENDOR TO ADVISE

2

DIMENSION (APPROXIMATE)

VENDOR TO ADVISE

I EQUIPMENT IDENTIFICATIONS

1 MODEL NUMBER

VENDOR TO ADVISE

2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES

3

MANUFACTURER COUNTRY

VENDOR TO ADVISE

1 THE EXTINGUISHER LOCATED INDOOR SHALL BE PROVIDED WITH WALL MOUNTING HANGER / BRACKET

2

3

EXTINGUISHERS SHALL BE US COAST GUARD APPROVED AND SHALL BE IN ACCORDANCE WITH UL REQUIREMENTS. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANCE PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FIRE EXTINGUISHER CABINET SHALL ALSO BE SUITABLE FOR CORROSIVE ENVIRONMENT. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

5

6

7

200-83-SH-DTS-00007_A

Page 95 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10.8 Fire Blanket

FIRE BLANKET

A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER

2 PROJECT

033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & PIPELINES PROJECT

INTRAFIELD

3 QUANTITY B EQUIPMENT IDENTIFICATION

REFER TABLE 7.1

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

4 ATMOSPHERE

RP 6N

RP 5N

FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

RP 5S

RP 3S

RP 9S

WHP 13N

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-1)

72

VENDOR TO ADVISE

°C

%

°C

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 DIMENSION

APPROXIMATELY 1800 MM x 1800 MM

6

2 WEIGHT

VENDOR TO ADVISE

7

3 MATERIAL

FIRE RESISTANT TREATED 100% WOOL OR FIBERGLASS

8

4 COLOUR

VENDOR TO ADVISE

9

LIGHT WEIGHT, SOFTNESS AND SMOOTHNESS, WELL HANDLE HEAT INSULATION, HIGH TEMPERATURE RESISTANCE, FIRE RESISTANCE, SELF- EXTINGUISHABLE ACID-RESISTANCE, ALKALINE-RESISTANCE AND REPEAT USING FIRE BLANKET SHALL BE ATTACHED TO A ROLLER FOR RAPID DEPLOYMENT AND STORED ON ROLLER INSIDE A DEDICATED CASE

REQUIRED

REQUIRED

REQUIRED

REQUIRED

5

INSTRUCTION

IN ENGLISH LANGUAGE, WITH PICTOGRAM / ILLUSTRATION

10

FIRE BLANKET SHALL BE MADE OF GEL TYPE

REQUIRED

E CABINET DESIGN CRITERIA

1 PAINT

RED

2 LABELLING (NOTE 3)

“FIRE BLANKET” IN ENGLISH

6

VENTILATION / DRAINAGE

REQUIRED

7 COUNTRY OF ORIGIN VENDOR TO ADVISE

200-83-SH-DTS-00007_A

Page 96 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

FIRE BLANKET

3 CABINETMATERIAL

PVC OR EQUIVALENT

8 MANUFACTURE NAME VENDOR TO ADVISE

4

EQUIPPED WITH QUICK OPENING SNAP FASTENERS AND DESIGN FOR WALL MOUNTING IP RATING

5 F SPECIAL REQUIREMENTS

VENDOR TO ADVISE

REQUIRED

9 MODEL

VENDOR TO ADVISE

1

2

COMPLIANCE STANDARD

ENVIRONMENTAL REQUIREMENT

1

G PHYSICAL DATA WEIGHT OFFIRE BLANKET 2 BULK DENSITY

ANSI / ASTM D5141

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

VENDOR TO ADVISE

3

VENDOR TO ADVISE

DIMENSION OF FIRE BLANKET (MIN.)

1.8 M X 1.8 M

H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

FIRE BLANKET

2 MODEL NUMBER

VENDOR TO ADVISE

I NOTES

3 MANUFACTURER NAME VENDOR TO ADVISE

4

MANUFACTURER COUNTRY

VENDOR TO ADVISE

1

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 3 THE DESIGNATED CABINET SHALL BE LABELLED “FIRE BLANKET” IN ENGLISH IN WHITE BOLD LETTERS.

4

5

6

SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.

200-83-SH-DTS-00007_A

Page 97 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10.9

International Ship/Shore Connection

A ADMINISTRATIVE IDENTIFICATIONS

INTERNATIONAL SHIP/SHORE CONNECTION

1 PROJECT NUMBER

2 PROJECT

3 QUANTITY 4 P&ID REFERENCE B EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1 265-20-PR-PID-00002

1 TAG NUMBER (HOLD-2)

2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS

AMBIENT TEMPERATURE

RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

WHP 13N

FIRE FIGHTING SYSTEM ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-1)

72

VENDOR TO ADVISE

°C

%

°C

4 ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA

1 TYPE

4 WAY BREECHING INLET 7

INLET

2 DESIGN STANDARD

BS5041:PART 3

8 OUTLET

4 X 2.5” MALE BS 336 INSTANTANEOUS COUPLING 6” NB ANSI B16.24 CLASS 150 FF

3 MATERIAL

DUCTILE IRON BODY WITH LG2 GUNMETAL INLETS

9 FINISH

RED (RAL 3000)

4 DESIGN PRESSURE

15 BARG

10 WEIGHT

VENDOR TO ADVISE

5

MAX. WORKING PRESSURE

10 BARG (VENDOR TO ADVISE)

11 APPROVALS

UL, FM OR EQUIVALENT (KITEMARK ETC.)

6 DESIGN TEMPERATURE -29 TO 85 oC

E PROCESS CONDITION

1 FLUID HANDLED

SEA WATER

3 PIPING CLASS

A35A1

2

MAX. OPERATING TEMPERATURE

35°C

4 PIPING MATERIAL

Cu / Ni 90-10

F EQUIPMENT ACCESSORIES GUNMETAL CAPS WILL BE PROVIDED FOR EACH INLET

1

REQUIRED

3

SS CHAIN WILL BE PROVIDED ALONG WITH BLANK CAPS

REQUIRED

200-83-SH-DTS-00007_A

Page 98 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

INTERNATIONAL SHIP/SHORE CONNECTION

2

EACH INLET CONNECTION SHALL BE FITTED WITH NON- RETURN VALVE AND OF SPRING- LOADED MUSHROOM TYPE.

REQUIRED

G SPECIAL REQUIREMENTS

1

COMPLIANCE STANDARD

BS5041:PART3

2

ENVIRONMENTAL REQUIREMENT

ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION

H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE

BREECHING INLET

3 MANUFACTURER

VENDOR TO ADVISE

2 MODEL NUMBER

VENDOR TO ADVISE

4

NAME MANUFACTURER COUNTRY

VENDOR TO ADVISE

I NOTES

1

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.

THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

3

4

200-83-SH-DTS-00007_A

Page 99 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

10.10 High Velocity Spray Nozzle

A ADMINISTRATIVE IDENTIFICATIONS

HIGH VELOCITY SPRAY NOZZLE

1 PROJECT NUMBER

2 PROJECT

3 QUANTITY 4 P&ID REFERENCE B EQUIPMENT IDENTIFICATION

033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1 265-20-PR-PID-00002

1 TAG NUMBER 2 SERVICE

OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE

BLACK BODY TEMPERATURE

C

1

2

3

N/A FIRE FIGHTING SYSTEM ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)

MINIMUM

NORMAL

MAXIMUM

UNITS

6

51

85

45 (NOTE-1)

72

VENDOR TO ADVISE

°C

%

°C

4 ATMOSPHERE

HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE

D

TECHNICAL SPECIFICATION NOZZLEDESIGN CRITERIA

1 MANUFACTURER

VENDOR TO ADVISE

10 TYPE

HIGH VELOCITY, NON- CLOGGING TYPE AND CONSISTS OF ONE PIECE BODY 166.5 (VENDOR TO ADVISE)

89 (VENDOR TO ADVISE)

2 VENDOR MODEL

VENDOR TO ADVISE

3

INSTALLATION

VENDOR TO ADVISE

11

12

MIN FLOW EACH NOZZLE (LPM) K FACTOR (LPM/√BARG) (NOTE 3)

4 SYSTEM

DRY PIPE

13 NOZZLE MATERIAL

NICKEL ALUMINIUM BRONZE

5 WEIGHT(KG)

VENDOR TO ADVISE

14 SPRAY PATTERN

FULL CONE

6

STAMPED WITH MODEL NUMBER AND ANGLE (OR EQUIVALENT MARKING)

7 APPROVAL

8

ORIFICE SIZE (MINIMUM)

REQUIRED

UL LISTED / FM APPROVED

15

NOZZLE END CONNECTION

1” NPTM

16 SPRAY ANGLE

85O (VENDOR TO ADVISE)

6MM

17 PAINTING

VENDOR TO ADVISE

9 AREA PER NOZZLE (M2)

3 ~ 4 (VENDOR TO ADVISE)

18 DESIGN TEMPERATURE -29 TO 85°C

E PROCESS CONDITION 1 FLUID

2

3

MINIMUM OPERATING PRESSURE MAXIMUM OPERATING PRESSURE

SEAWATER

3.5 BARG

5.0 BARG

6 PIPING MATERIAL

7

8

DESIGN PRESSURE (NOZZLE) FLUID SPECIFIC GRAVITY

Cu / Ni 90-10 12 BARG (VENDOR TO ADVISE)

1.026

200-83-SH-DTS-00007_A

Page 100 of 101

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT

HIGH VELOCITY SPRAY NOZZLE

4

MAX. OPERATING TEMPERATURE

35°C

5 PIPING CLASS

A35A1

F SPECIAL REQUIREMENT

9 VISCOSITY

0.828 CP

10

PIPING END CONNECTION

1” NPTF

1

CODES AND STANDARDS

F NOTES

NFPA 15

2 TOOLS

SPRAY NOZZLE WRENCH SHALL BE SUPPLIED BY VENDOR

ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).

VENDOR TO INDICATE ACTUAL K-FACTOR FOR OFFERED NOZZLES. VENDOR TO FURNISH ACTUAL CHARACTERISTIC CURVES FOR THE OFFERED NOZZLES TO MEET THE DESIRED WATER SPRAY DENSITY

1

3

4 NOZZLES SHALL BE DESIGNED FOR A LIFE DURATION OF 30 YEARS, AS A MINIMUM.

5

6

7

SPARE PARTS FOR START-UP, PRE-COMMISSIONING AND OPERATION SPARES SHALL MEET THE REQUIREMENT OF SPARE PARTS MANAGEMENT PLAN (COMP3-SPM-PE-PLN-00002). THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.

200-83-SH-DTS-00007_A

Page 101 of 101