Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
COMPANY Contract No.: LTC/C/NFP/5129/20 CONTRACTOR Project No.: 033764
ASSET
: NFPS
Document Title
:
DATA SHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
COMPANY Document No.
:
200-83-SH-DTS-00007
CONTRACTOR Document No.
:
033764-E-D-18-SPM-LP-B-00005
Discipline
: HSE&Q
Document Type
: DATA SHEET
Document Category/Class
:
2
Document Classification
:
Internal
A
12-FEB-2025
Issued for Review
Mohammed Tanveer Alam LOSPE Engineer
Jerine Baby/ Gabriella Dy. LOSPE Lead
Balasubramani Perumal
LOSPE Lead
REV.
DATE
DESCRIPTION OF REVISION
PREPARED BY
REVIEWED BY
APPROVED BY
Saipem S.p.A
THIS DOCUMENT IS PROPERTY OF QatarEnergy LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QatarEnergy LNG.
200-83-SH-DTS-00007_A
Page 1 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
REVISION HISTORY
Revision
Date
Revision Description
A1
20-JAN-2025
Issued for Inter Discipline Check
A
12-FEB-2025
Issued for Review
HOLDS LIST
Hold No
Hold Description
1
2
Qty. of Safety, Lifesaving & firefighting equipment
Tag Number
200-83-SH-DTS-00007_A
Page 2 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
TABLE OF CONTENTS
INTRODUCTION … 5
Project Objective … 5
Project Scope … 5
DEFINITIONS AND ABBREVIATIONS … 8
Definitions … 8
Abbreviations … 9
REGULATIONS, CODES AND STANDARDS … 12
Company References … 12
Project Documents … 12
Standards … 18
Order of Precedence … 20
TAG INDEX … 21
PURPOSE OF THE DOCUMENT … 22
DEVIATION CONTROL … 23
LIST OF SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT … 24
DATASHEET FOR SAFETY EQUIPMENT … 27
Combined Safety Shower and Eyewash Station … 27
Portable Eyewash Unit … 30
Lighted Windsock … 32
Fireman Equipment Cabinet … 34
Chemical Handling Safety Kit … 36
Electrical Safety Kit … 38
DATASHEET FOR LIFESAVING EQUIPMENT … 41
Life raft … 41
Scramble Net … 46
Lifebuoy … 48
Life Jackets and Cabinet … 52
Helicopter Crash and Rescue Equipment (HCRE) Cabinet … 55
First aid kit … 58
1
1.1
1.2
2
2.1
2.2
3
3.1
3.2
3.3
3.4
4
5
6
7
8
8.1
8.2
8.3
8.4
8.5
8.6
9
9.1
9.2
9.3
9.4
9.5
9.6
200-83-SH-DTS-00007_A
Page 3 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.7
9.8
Stretcher … 61
Self-Contained Breathing Apparatus (SCBA) and Cabinet … 63
9.9 Work Vest and Cabinet … 66
9.10 Oil Spill Kit … 68
9.11 Breathing Apparatus Escape Sets and Cabinet … 70
9.12 Medical Oxygen Cylinder with Face Mask … 74
10
DATASHEET FOR FIREFIGHTING EQUIPMENT … 76
10.1 Dry Chemical Powder Handheld Extinguisher (BC Type) 9 kg … 76
10.2 Carbon Dioxide Handheld Extinguisher 4.5 kg … 79
10.3 Carbon Dioxide Wheeled Extinguisher 45.4 kg … 82
10.4 Dry Chemical Powder Wheeled Extinguisher 56.7 kg … 85
10.5 Dry Chemical Powder Wheeled Extinguisher 136.4 kg … 88
10.6 AFFF Wheeled Extinguisher 135L … 91
10.7 Dry Chemical Powder (BC) Hand Extinguisher 4.1 kg … 94
10.8 Fire Blanket … 96
10.9
International Ship/Shore Connection … 98
10.10 High Velocity Spray Nozzle … 100
200-83-SH-DTS-00007_A
Page 4 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
1
INTRODUCTION
The North Field is the world’s largest natural gas field and accounts for nearly all the State of Qatar’s gas production. The principal objective of the NFPS projects is to sustain plateau from existing QatarEnergy LNG Operation – S1, S2, S3, N1 and N2, production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression.
NFPS projects comprise 3 main investment programs:
- Investment #1: Drilling and Associated Facilities [WHP12S/ WHP13S/ WHP14S/
WHP12N/ WHP13N]
- Investment #2: Trunk line Looping and Intra-field pipeline looping [32” PL1LN, 32”
PL1LS, 38”PL610LS]
- Investment #3: Compression Complexes and associated facilities [Phase 1 CP6S & CP7S; Phase 2: CP8S & CP4N; Phase 3: CP4S & CP6N Phase 4: CP1S & CP1N]
Drilling and Looping, Investments #1 and #2, projects are in execution phase and are being executed as I1P1, EPCOL Projects except for WHP13N, which will be part of NFPS Compression Projects execution which compromises total up to 9 COMPs.
1.1 Project Objective
The objective of this Project includes:
• Achieve standards of global excellence in Safety, Health, Environment, Security and
Quality performance.
• Sustain the Qatarenergy LNG North Field Production Plateau by installing new RPs and one WHPs to support new Compression Complex facilities CP6S & CP7S and pre-installed facilities for future Compression Complex facilities including but not limited to CP4N & CP8S tie-in with integration to the existing facilities under Investment #3 program.
• Facility development shall be safe, high quality, reliable, maintainable, accessible,
operable, and efficient throughout their required life.
1.2 Project Scope
The Project Scope includes detailed engineering, procurement, construction, brownfield modifications, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start-up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit‐for‐ purpose in all respects.
Facilities - 1A
• RP5S RP with 2 x 28” CRA clad pipelines to RP7S and 2 subsea composite Cables
and associated J tubes from RP7S to RP5S & from CP7S to WHP13S.
• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP7S
200-83-SH-DTS-00007_A
Page 5 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
• Hook-up and brownfield modification at WHP5S/RP5S bridge connection & WHP13S/CP7S Composite cable tie-in and E&I integration including RGA Control modification
• Pipeline decommissioning of 28” CS PL5 including associated demolition work at
WHP5S
Facilities - 2A
• RP6N RP with 1x28” CRA clad pipeline to WHP13N, 2 Subsea composite cables and
associated J tubes from WHP12N to RP4N and RP6N to WHP13N. • New fuel gas spur-line and flanged riser from subsea skid to RP6N • WHP13N Topside • Hook-up and brownfield modification at WHP6N/RP6N, RP4N- HPU-Umbilical and tie- in, WHP12N-new J tube installation, E&I migration, WHP6N/RP4N/WHP4N-E&I migration (Pre-CP4N), WHP13N and RP6N interconnection to NFB.
Facilities - 3A
• RP9S RP with 1x28” CRA clad pipeline to RP4S, • Hook-up and brownfield modification at RP4S/WHP9S, Modifications to integrate
RP9S to the RGA control network.
• Pipeline decommissioning of 28” PL9 to WYE on existing 38” trunkline PL49including
associated demolition work at WHP9S.
Facilities - 1B
• New fuel gas spur-line and flanged riser from subsea skid to RP4N • Fiber Optic Cable from RP6N to onshore LFP East, RP6N to RP4N and RP6N to LQ6S. • Hook-up and brownfield modification at RP6N Composite and FO Tie-ins NFB-PU (East)- FO Tie-in
(East)/BVS
Power & Control modifications, LQ6S/LFP Controls/Telecoms Integration
Facilities - 2B
• RP5N RP with 2 x 28” CRA clad pipelines to RP4N, 1 x 28” CRA clad pipeline to RP6N and 2 subsea composite Cables and associated J tubes from WHP12N to RP5N & from RP6N to RP5N.
• Hook-up and brownfield modification at WHP5N- RP5N Bridge connection, WHP12N Composite cable tie-in, RP4N Intrafield pipeline Hook up PL54 N/LN and E&I integration including NFB-PU Power & Control modifications
• Pipeline decommissioning of 2 x 16” PL56/PL54 Subsea Spur line from WHP5N to
reducing barred tee in subsea tie-in skid on PL6 / PL4.
Facilities - 3B
• 2 subsea composite Cables from RP4S to RP9S & from RP4S to WHP12S (with J-
tube)
• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP4S • Hook-up and brownfield modification at WHP12S/ RP9S/ RP4S Composite cable tie-
in, Spurline riser installation at RP4S RGA Power & Control modifications.
Facilities - 4B
• 1 subsea composite Cable from CP8S to RP11S (or from RP8S to RP11S as Option).
200-83-SH-DTS-00007_A
Page 6 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
• New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RP8S. • Hook-up and brownfield modification at WHP8S/ WHP11S for Test separator Internal Upgrade and MEG system modification, Spur lines, Power & Control Tie-ins on RP8S, RP11S/WHP11S-Tie-in (Power and Control), RGA Power & Control modifications.
Facilities - 5B
• 2 subsea composite Cables from RT2 to WHP3S & from RT2 to WHP2S (with J-tube)
and FO Cable from RT2 to Barzan WHP1.
• New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RT2 • Hook-up and brownfield modification at BRZ-WHP1 - FO cable tie-in, WHP2S/ WHP3S/ RT&RT2 Composite cable tie-in and associated modification, RGA Power & Control modifications.
Facilities - 6B
• RP3S RP with 1x24” CRA clad pipeline to RT2 with Stalk on risers, • Hook-up and brownfield modification at RT2 for 24” Intrafield pipeline and Composite/FO cable Hook-up, WHP3S for Production diversion and Utilities, Power and ICSS Hook-up, WHP2S for Composite Cable Tie-ins and Power & Control Integration RGA Power & Control modifications. topside existing and
In-situ abandonment of existing Topside/subsea Composite Cables RT-WHP2S, RT-WHP3S, Topside/Subsea FO cable RT-BRXWHP1.
• Decommissioning at
Figure 1.2.1: NFPS Compression Project COMP3 Scope
200-83-SH-DTS-00007_A
Page 7 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
2 DEFINITIONS AND ABBREVIATIONS
2.1 Definitions
Definition
Description
COMPANY
QatarEnergy LNG.
CONTRACTOR
Saipem S.p.A.
DELIVERABLES
FACILITIES
MILESTONE
PROJECT
SITE
All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.
fabricated,
A reference event splitting a PROJECT activity for progress measurement purpose.
COMP3 - NFPS Offshore Riser/Wellhead Platform & Intrafield Pipelines Project
(i) any area where Engineering, Procurement, Fabrication of the FACILITIES are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar
SUBCONTRACT
Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.
SUBCONTRACTOR
Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.
WORK
Refer to article 2 of CONTRACT AGREEMENT.
WORK PACKAGE
The lowest manageable and convenient level in each WBS subdivision.
VENDOR (SUPPLIER)
A party who is responsible to manufacture and supply equipment and/or services.
SUB-VENDOR (SUB-SUPPLIER)
A party who is responsible to manufacture and supply equipment and/or services under responsibility of main VENDOR.
200-83-SH-DTS-00007_A
Page 8 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
2.2 Abbreviations
Code
AFFF
AIS
ANSI
API
ASME
ASTM
BA
CAP
CFC
CFR
COC
CO2
DCS
EPIRB
EOSTI
FAT
FGS
FM
Definition
Aqueous Film Forming Foam
Automatic Identification System
American National Standards Institute
American Petroleum Institute
American Society of Mechanical Engineers
American Society for Testing and Materials
Breathing Apparatus
Civil Aviation Publication
Chlorofluorocarbons
Code of Federal Regulations
Certificate of Conformity
Carbon Dioxide
Distributed Control System
Emergency Position Indicating Radio Beacon
End of Service Time Indicator
Factory Acceptance Test
Fire and Gas System
Factory Mutual
GMDSS
Global Maritime Distress and Safety System
GRP
Glass Reinforced Plastic
HCRE
Helicopter Crash and Rescue Equipment
HFE
H2S
Human Factors Engineering
Hydrogen Sulfide
200-83-SH-DTS-00007_A
Page 9 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
Code
IMO
Definition
International Maritime organization
ISEA
International Safety Equipment Association
ITP
LAT
LED
LER
LNG
LSA
MED
MH
Inspection and Test Plan
Lowest Astronomical Tide
Light-Emitting Diode
Local Electrical Room
Liquefied Natural Gas
Life Saving Appliance
Marine Equipment Directive
Material Handling
NFPA
National Fire Protection Association
NFPS
North Field Production Sustainability
NIOSH
National Institute for Occupational Safety and Health
NPT
N2
National Pipe Thread
Nitrogen
OSHA
Occupational Safety and Health Administration
POB
PVC
Oz
RP
RT
Persons On Board
Polyvinyl Chloride
Ounce
Riser Platform
Riser Tower
SART
Search and Rescue Transponder
SCBA
Self-contained Breathing Apparatus
SDR
Specification Deviation Request
200-83-SH-DTS-00007_A
Page 10 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
Code
Definition
SOLAS
Safety of Life at Sea
SS
TWA
UL
UV
Stainless Steel
Time-Weighted Average
Underwriters Laboratories
Ultraviolet
USCG
United States Coast Guard
WHP
Wellhead Platform
200-83-SH-DTS-00007_A
Page 11 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
3 REGULATIONS, CODES AND STANDARDS
3.1 Company References
S. No
Document Number
Title
- PRT-ERP-POL-001
Qatargas Fire Protection Policy
- PRT-PRS-PRC-014
Offshore Loss Prevention Philosophy
- PRT-PSF-PRC-003
Breathing Apparatus Usage, Maintenance
Filling
and
- PRT-PSF-PRC-012
Personal Protective Equipment (PPE)
- PRT-PSF-PRC-024
Hydrogen Sulfide Safety
- MED-00-PRC-011
First Aid Kits
-
PRJ-PJL-PRC-004
-
PRJ-PJL-PRC-005
Facilities Engineering and Vendor Document Numbering Procedure
Facility System and Unit Number Codes and Descriptions Procedure
- PRJ-PJL-PRC-006
Project Information Handover Procedure
-
PRJ-PJL-PRC-008
-
PRJ-PJL-PRC-048
-
PRJ-PJL-PRC-049
Qatargas Equipment Numbering Philosophy Procedure
Facilities Documentation Metadata Requirements Procedure
Project Information Handover, Verification and Acceptance Procedure
- PRJ-PJL-PRC-080
AIMS: Tag Management System (TMS)
- PRJ-PJL-PRC-007
Smart Plant Engineering Applications & Drafting (CAD) Standard Procedure
3.2 Project Documents
S. No
Document Number
Title
-
200-20-SH-DEC-00013
-
200-20-SH-SPC-00020
Technical Safety Basis of Design (Offshore) for COMP3 Project
Specification for Safety, Lifesaving and Firefighting items for COMP3 Project
200-83-SH-DTS-00007_A
Page 12 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S. No
Document Number
Title
- 200-20-PE-DEC-00004
Project Basis of Design for COMP3 Project
- 200-20-PI-SPC-00044
Piping Material Specification for COMP3 Project
-
200-51-IN-SPC-00061
-
200-22-ST-DEC-00004
-
200-20-CE-SPC-00027
-
200-20-PI-DEC-00012
-
200-20-SH-SPC-00018
-
200-20-ME-SPC-00038
COMP3-SPM-PE-PLN- 00002
Instrumentation Requirements Equipment for COMP3 Project
for Packaged
Topside Structural Design Basis (Greenfield) for COMP3 Project
Specification for Fixed Facilities Protective Coating for COMP3 Project
Mechanical Handling Philosophy Project
for COMP3
Human Factor Engineering (HFE) Workplace Design Specification for COMP3 Project
Technical specification of Breathing Air Cascade System for COMP3 Project
Spare Parts Management Plan
- 200-20-SH-DEC-00014
Environmental Basis of Design for COMP3 Project
- 200-20-CE-DEC-00006
Material selection philosophy for COMP3 Project
- 200-91-EL-DEC-00008
Electrical Design Basis for COMP3 Project
-
200-91-EL-SPC-00031
-
200-91-EL-SPC-00032
-
200-91-EL-SPC-00033
Technical Specification for Electrical Packaged Equipment for COMP3 Project
Technical Specification for electrical conduits, cable ladder and trays for COMP3 Project
Technical Specification for electrical power cables, control and earthing cables for COMP3 Project
- 200-91-EL-DEC-00009
Lighting Design Philosophy for COMP3 Project
-
200-91-EL-DWG-00032
-
200-51-IN-SPC-00057
-
200-20-ST-SPC-00029
Electrical Installation Details for Power, Lighting and Earthing for COMP3 Project
Specification for Instrument Cables & Cable Glands for COMP3 Project
Specification for Structural Material for COMP3 Project
200-83-SH-DTS-00007_A
Page 13 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S. No
Document Number
Title
- 200-20-PI-SPC-00045
Specification for GRE pipes, fittings and flanges for COMP3 Project
- 200-20-PI-SPC-00050
Specification for pipes for COMP3 Project
- 200-20-PI-SPC-00046
Specification for pipe fasteners for COMP3 Project
- 200-20-ST-SPC-00033
Specification structural requirements for COMP3 project
for skid mounted assemblies –
- 200-20-PI-SPC-00047
Specification for Pipe Fittings for COMP3 Project
-
200-51-IN-SPC-00054
-
200-20-PI-SPC-00042
-
200-91-EL-SPC-00034
COMP3-SPM-QM-PRC- 00002
COMP3-SPM-QM-PRC- 00003
COMP3-SPM-QM-SPC- 00001
Specification for field instrumentation (incl. Flow, level, pressure and temperature instrumentation & F&G detectors) for COMP3 Project
Piping support standard specification for COMP3 Project
Technical Specification for Equipment Grounding and Bonding for COMP3 Project
Source Inspection Procedure
Project quality requirements for suppliers
Project quality requirements for subcontractors
COMP3-SPM-PO-PRC- 00005
Handling, Storage, Packing & Preservation Procedure
-
212-83-SH-PLN-00001
-
212-83-SH-PLN-00002
-
212-83-SH-PLN-00003
-
212-83-SH-PLN-00004
-
212-83-SH-PLN-00005
-
212-83-SH-PLN-00006
-
240-83-SH-PLN-00001
Fire, safety equipment and escape route layout - cellar deck - for RP3S
Fire, safety equipment and escape route layout - helideck - for RP3S
Fire, safety equipment and escape route layout - local equipment room - for RP3S
Fire, safety equipment and escape route layout - main deck - for RP3S
Fire, safety equipment and escape route layout - top deck - for RP3S
Fire, safety equipment and escape route layout - top of jacket - for RP3S
Fire, safety equipment and escape route layout - cellar deck - for RP5S
200-83-SH-DTS-00007_A
Page 14 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S. No
Document Number
Title
-
240-83-SH-PLN-00002
-
240-83-SH-PLN-00003
-
240-83-SH-PLN-00004
-
240-83-SH-PLN-00005
-
240-83-SH-PLN-00006
-
235-83-SH-PLN-00001
-
235-83-SH-PLN-00002
-
235-83-SH-PLN-00003
-
235-83-SH-PLN-00004
-
235-83-SH-PLN-00005
-
218-83-SH-PLN-00001
-
278-83-SH-PLN-00001
-
278-83-SH-PLN-00002
-
278-83-SH-PLN-00003
-
278-83-SH-PLN-00004
-
278-83-SH-PLN-00005
-
278-83-SH-PLN-00006
-
268-83-SH-PLN-00001
-
268-83-SH-PLN-00002
Fire, safety equipment and escape route layout - helideck - for RP5S
Fire, safety equipment and escape route layout - local equipment room - for RP5S
Fire, safety equipment and escape route layout - main deck - for RP5S
Fire, safety equipment and escape route layout - top deck - for RP5S
Fire, safety equipment and escape route layout - top of jacket - for RP5S
Fire, safety equipment and escape route layout - cellar deck - for RP9S
Fire, safety equipment and escape route layout - local equipment room - for RP9S
Fire, safety equipment and escape route layout - main deck - for RP9S
Fire, safety equipment and escape route layout - top deck - for RP9S
Fire, safety equipment and escape route layout - top of jacket - for RP9S
Fire, safety equipment and escape route layout - for BSP3S-1
Fire, safety equipment and escape route layout - cellar deck - for RP5N
Fire, safety equipment and escape route layout - helideck - for RP5N
Fire, safety equipment and escape route layout - local equipment room - for RP5N
Fire, safety equipment and escape route layout - main deck - for RP5N
Fire, safety equipment and escape route layout - top deck - for RP5N
Fire, safety equipment and escape route layout - top of jacket for RP5N
Fire, safety equipment and escape route layout - cellar deck - for RP6N
Fire, safety equipment and escape route layout - helideck - for RP6N
200-83-SH-DTS-00007_A
Page 15 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S. No
Document Number
Title
-
268-83-SH-PLN-00003
-
268-83-SH-PLN-00004
-
268-83-SH-PLN-00005
-
268-83-SH-PLN-00006
-
265-83-SH-PLN-00001
-
265-83-SH-PLN-00002
-
265-83-SH-PLN-00003
-
265-83-SH-PLN-00004
-
265-83-SH-PLN-00005
-
265-83-SH-PLN-00006
-
265-83-SH-PLN-00007
-
239-83-SH-PLN-00001
-
263-20-SH-PLN-00001
-
263-20-SH-PLN-00002
-
263-20-SH-PLN-00004
-
263-20-SH-PLN-00005
-
223-20-SH-PLN-00008
-
228-20-SH-PLN-00003
-
270-20-SH-PLN-00004
Fire, safety equipment and escape route layout - local equipment room - for RP6N
Fire, safety equipment and escape route layout - main deck - for RP6N
Fire, safety equipment and escape route layout - top deck - for RP6N
Fire, safety equipment and escape route layout - top of jacket - for RP6N
Fire, safety equipment and escape route layout - cellar deck - for WHP13N
Fire, safety equipment and escape route layout - drill deck - for WHP13N
Fire, safety equipment and escape route layout - helideck - for WHP13N
Fire, safety equipment and escape route layout - local equipment room - for WHP13N
Fire, safety equipment and escape route layout - mezzanine deck - for WHP13N
Fire, safety equipment and escape route layout - production deck - for WHP13N
Fire, safety equipment and escape route layout - top of jacket - for WHP13N
Fire, safety equipment and escape route layout - for BSP5S-1
Fire, safety equipment and escape route layout - RP4N - Drain Deck
Fire, safety equipment and escape route layout - RP4N - Jacket level
Fire, safety equipment and escape route layout - RP4N - Main Deck
Fire, safety equipment and escape route layout - RP4N - Top Deck
Fire, safety equipment and escape route layout - RP4S - Main Deck
Fire, safety equipment and escape route layout - RP7S - Main Deck
Fire, safety equipment and escape route layout - RP8S - Main Deck
200-83-SH-DTS-00007_A
Page 16 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S. No
Document Number
Title
-
270-20-SH-PLN-00005
-
210-20-SH-PLN-00003
-
210-20-SH-PLN-00004
-
WT11-D-PN-4332
Fire, safety equipment and escape route layout - RP8S - Upper Deck
Fire, safety equipment and escape route layout - RT-2 - Main Deck
Fire, safety equipment and escape route layout - RT-2 - Top Deck
Wellhead platform WH11S topside escape route, fire protection and safety device location plan - Drill deck
210-32-23-SA-DR-PL- 022
Wellhead platform WH5 - firefighting & safety equipment layout drill deck
210-32-23-SA-DR-PL- 023
Wellhead platform WH5 - firefighting & safety equipment layout mezzanine deck
210-32-23-SA-DR-PL- 024
Wellhead platform WH5 - firefighting & safety equipment layout production deck
49450-WT3-EE-6120
49450-WT3-EE-6117
49450-WT3-EE-6119
49450-WT3-EE-6121
49450-WT3-EE-6118
49450-WT3-CS-7251
49450-WT3-CS-7252
49450-WT3-CS-7253
WT5-D-EE-6014
WT9-D-CS-7252
240-93-PR-PID-00001
WT3, fire protection, fire & gas safety system plan drain mezzanine wellhead platform no. 3
WT3, fire protection, fire & gas safety system plan drill deck- west wellhead platform no. 3
WT3, fire protection, fire & gas safety system plan production deck wellhead platform no.3
WT3, fire protection, fire & gas safety system plan top of jacket and boat landing wellhead platform no.3
WT3, fire protection, fire & gas safety system plan wellhead mezzanine wellhead platform no. 3
WT3, fire protection, fire protection and safety device location plan drill/ wellhead decks
WT3, fire protection, fire protection and safety device location plan production/ drain decks
WT3, fire protection, fire protection and safety device location plan top of jacket and boat landing
WT5, fire protection, fire protection and safety device production/mezzanine location walkway levels WT5 platform
plan
WT9, fire protection, fire protection and safety device location plan production deck
Piping and Instrumentation Diagram Riser Platform RP5S Diesel and Washdown System
200-83-SH-DTS-00007_A
Page 17 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S. No
Document Number
Title
268-93-PR-PID-00001
235-93-PR-PID-00001
278-93-PR-PID-00001
212-93-PR-PID-00001
265-94-PR-PID-00001
240-95-PR-PID-00001
268-95-PR-PID-00001
235-95-PR-PID-00001
278-95-PR-PID-00001
212-95-PR-PID-00001
265-95-PR-PID-00001
265-20-PR-PID-00002
COMP3-SPM-SH-TQY- 00019
Piping and Instrumentation Diagram Riser Platform RP6N Diesel and Washdown System
Piping and Instrumentation Diagram Riser Platform RP9S Diesel and Washdown System
Piping and Instrumentation Diagram Riser Platform RP5N Diesel and Washdown System
Piping and Instrumentation Diagram Riser Platform RP3S Diesel and Washdown System
Piping and Instrumentation Diagram Wellhead Platform WHP13N Washdown System
Piping and Instrumentation Diagram Riser Platform RP5S Plant and Breathing Air System
Piping and Instrumentation Diagram Riser Platform RP6N Plant and Breathing Air System
Piping and Instrumentation Diagram Riser Platform RP9S Plant and Breathing Air System
Piping and Instrumentation Diagram Riser Platform RP5N Plant and Breathing Air System
Piping and Instrumentation Diagram Riser Platform RP3S Plant and Breathing Air System
Piping and Instrumentation Diagram Wellhead Platform WHP13N Plant and Breathing Air System
Piping and Instrumentation Diagram Firewater Distribution System - WHP13N
Technical query for combined safety shower and eyewash (with chiller) for COMP3 Project
for Zone Classification
3.3 Standards
S. No
Document Number
Title
ANSI/ISEA Z308.1
ANSI/ISEA Z358.1
API RP 2A
API RP 2EQ
American National Standard - Workplace First Aid Kits and Eyewash Package
American National Standard Eyewash and Shower Equipment
for Emergency
Planning, Designing, and Constructing Fixed Offshore Platforms - Working Stress Design
Seismic Design Procedures and Criteria Offshore Structures
for
200-83-SH-DTS-00007_A
Page 18 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S. No
Document Number
Title
API RP 14C
API RP 14G
API RP 14J
for Analysis, Design, Recommended Practice Installation and Testing of Basic Surface Systems for Offshore Production Platform
Recommendation Practice for Fire Prevention and Control on Open Type Offshore Production Platforms
Recommendation Practice for Design and Hazard Analysis for Offshore Production Facilities
ASTM D4151
Standard Test Method for Flammability of Blankets
ASTM 1692- 74
CAP 437
IMO-SOLAS
Standard Method of Test for Rate of Burning of Cellular Plastics Using a Horizontally Supported Specimen
Offshore Helicopter Landing Areas: A Guide to Criteria, Recommended Minimum Standards and Best Practice
International Convention for the Safety of Life at Sea (SOLAS) 1974 and Amendments in force
IMO ID 982E
Life-Saving Appliances Code (LSA Code)
IMO IE110E
International Convention for the Safety of Life at Sea (SOLAS)
IMO MSC.207 (81)
IMO MSC.272 (85)
IMO MSC.274 (85)
Adoption of Amendments to the International Life- Saving Appliance (LSA) Code
Adoption of Amendments to the International Life- Saving Appliance (LSA) Code
the Revised Adoption of Amendments Recommendation on Testing of Life-Saving Appliances (Resolution MSC.81(70))
to
ISO 9001
Quality Management System
ISO 14001
Environmental Management System - Requirements with guidance for use
NFPA 10
Standard for Portable Fire Extinguishers
NFPA 11
Standard for Low-, Medium-, and High-Expansion Foam
NFPA 17
Standard for Dry Chemical Extinguishing Systems
200-83-SH-DTS-00007_A
Page 19 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S. No
Document Number
Title
NFPA 70E
Standard for Electrical Safety in Workplace
NFPA 1981
Standard on Open-Circuit Self- Contained Breathing Apparatus for Emergency Services
(SCBA)
OSHA 1910.266
Occupational Safety and Health Standard – Special Industries - First-aid Kits
UL 154
Carbon-Dioxide Fire Extinguishers
UL 299
Dry Chemical Fire Extinguishers
USCG 46 CFR Part 164 Subpart 164.018
USCG 46 CFR Part 161 Subpart 161.012
Retroreflective Material for Lifesaving Equipment
Personal Flotation Device Lights
33 CFR Part 145
Fire Fighting Equipment
29 CFR Part 1910
Occupational Safety and Health Standards
3.4 Order of Precedence
The COMP3 facilities shall be designed, and operated in accordance with the applicable laws, regulations of the State of Qatar, COMPANY Procedures & Standards, PROJECT related documentation, internationally recognized codes and standards listed at Section 3 in the order of precedence describe as below:
• Qatari Governmental and Regulatory Requirements • COMPANY Procedures, Policies and Standards • PROJECT Specifications. • • COMPANY and CONTRACTOR’s Lessons Learned
Industry Codes and Standards
When a conflict exists among codes, standards, and project specifications, the most stringent provision shall govern unless otherwise formally clarified and agreed with COMPANY. Conflict among applicable specification and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented.
200-83-SH-DTS-00007_A
Page 20 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
4 TAG INDEX
Rev. No.
Item Tag No.
Item Description
A
HOLD-2
SAFETY, LIFESAVING & FIREFIGHTING ITEMS
200-83-SH-DTS-00007_A
Page 21 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
5 PURPOSE OF THE DOCUMENT
The purpose of this document is to covers the technical requirements for the Safety, Lifesaving and Firefighting Equipment for the NFPS COMP3 Project.
This Datasheet shall be read in conjunction with the Specification for Safety, Lifesaving and Firefighting items for COMP3 Project [Ref.16].
VENDOR’s scope of supply shall include, but not be limited to, the requirements listed in this data sheet and referred specification.
200-83-SH-DTS-00007_A
Page 22 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
6 DEVIATION CONTROL
VENDOR shall supply equipment that complies fully with this Datasheet, COMPANY standards & the international codes and standards listed herein. VENDOR shall notify CONTRACTOR/COMPANY immediately in writing in case of any deviations.
Engineering clarification shall not be regarded as deviation from any project requirement. VENDOR shall use deviation form provided by CONTRACTOR as part of the MR and such deviations (if any) shall follow the Specification Deviation Request (SDR) procedure for facilitating approval from CONTRACTOR/COMPANY.
VENDOR shall not proceed to change/deviate without CONTRACTOR/ COMPANY approval. VENDOR shall list and submit any identified deviation while submitting their proposal for CONTRACTOR/ COMPANY approval.
200-83-SH-DTS-00007_A
Page 23 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
7 LIST OF SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT
Table 7.1: List of safety, lifesaving & firefighting equipment
S.N.
ITEMS
PLATFORMS
A SAFETY EQUIPMENT
TOTAL QTY
(HOLD-1)
REMARKS
Combined safety shower & eyewash station
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
-
Portable Eyewash
-
Lighted Windsock
-
Fireman Equipment Cabinet
-
Chemical Handling Safety Kit
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
6 (Note 1)
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
6
6
6
6
- Electrical Safety Kit
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
12
B
LIFESAVING EQUIPMENT Life raft (15 Men Capacity) Life raft (12 Men Capacity) Life raft (10 Men Capacity)
-
Scramble Net
-
Life buoys
WHP13N RP3S, RP5S, RP9S RP5N, RP6N
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
2 6 4
12
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
100
Life Jacket & Cabinet (15 Life Jackets Capacity)
WHP13N
Life Jacket & Cabinet (12 Life Jackets Capacity)
RP3S, RP5S, RP9S
2
6
1 no. at each RPs & WHP (near MEG storage Tank) 1 no. at each LER building in RPs & WHP (inside battery room) 1 no. on each RPs & WHP (on Crane) 1 no. on each RPs & WHP (outside TR) 1 no. at each RPs & WHP (near MEG storage Tank) 2 nos. at each LER building in RPs & WHP (1 no. Inside & Electrical Instrument room, 1 no. at UPS, INST. & Telecom room)
2 nos. at WHP 2 nos. at each RPs 2 nos. at each RPs 2 nos. at each RPs & WHP (near life raft) 16 nos. at each RPs & 20 nos. at WHP 2 nos. cabinet on (for 100% WHP POB, near life raft/ TEMPSC) 2 nos. cabinet on (for each RPs 100% POB, near life raft)
200-83-SH-DTS-00007_A
Page 24 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S.N.
ITEMS
PLATFORMS
TOTAL QTY
REMARKS
Life Jacket & Cabinet (10 Life Jackets Capacity)
RP5N, RP6N
Life Jacket & Cabinet (5 Life Jackets Capacity)
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
Life Jacket (1 Life Jacket no. without cabinet)
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
4
7
6
Helicopter Crash & Rescue Equipment
RP6N, RP5S, RP5N, RP3S, WHP13N
10
- First Aid kit
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
24
- Stretcher
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
12
Self-Contained Breathing Apparatus Set and Cabinet (SCBA)
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
Work Vest and Cabinet (30 work vest capacity)
WHP13N
Work Vest and Cabinet (24 work vest capacity)
RP3S, RP5S, RP9S
Work Vest and Cabinet (20 work vest capacity)
RP5N, RP6N
- Oil Spill Kit and Cabinet
RP6N, RP5S, RP5N, RP3S, WHP13N
Breathing Apparatus (BA) Escape Sets and Cabinet (30 BA Escape sets capacity)
WHP13N
6
1
3
2
5
1
2 nos. cabinet on each RPs (for 100% POB, near life raft) 2 nos. cabinet on WHP & 1 no. cabinet on each RPs 1 no. each RPs & WHP crane cabin 2 nos. at each RPs & WHP (near Helideck) 4 nos. at each RPs & WHP (1 no. Inside Electrical & Instrument room, 1 no. at UPS, INST. & Telecom room, 1 no. at TR and 1 no. at crane cabin) 2 nos. at each RPs & WHP (inside TR) 1 no. cabinet on each RPs & WHP (4 nos. SCBA set in cabinet, outside of TR) 1 no. cabinet on WHP (for 100% POB) (outside of TR) 1 no. cabinet on each RPs (for 100% POB) (outside of TR) 1 no. cabinet on each RPs (for 100% POB) (outside of TR) 1 no. at each RPs & WHP (near Helideck) 1 no. cabinet on (for 100% WHP POB) (Inside TR)
200-83-SH-DTS-00007_A
Page 25 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
S.N.
ITEMS
PLATFORMS
TOTAL QTY
REMARKS
Breathing Apparatus (BA) Escape Sets and Cabinet (24 BA Escape sets capacity)
RP3S, RP5S, RP9S
Breathing Apparatus (BA) Escape Sets and Cabinet (20 BA Escape sets capacity)
RP5N, RP6N
Breathing Apparatus (BA) Escape Set (1 no. without cabinet) Medical Oxygen Cylinder with face mask FIREFIGHTING EQUIPMENT
C
Dry Chemical Powder Handheld Extinguisher 9 kg
Carbon Dioxide Handheld Extinguisher 4.5 kg
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N, WHP5N, WHP6N, WHP4N, RP4N RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
Carbon Dioxide Wheeled Extinguisher 45.4 kg
RP6N, RP5S, RP5N, RP3S, WHP13N
Dry Chemical Powder Wheeled Extinguisher 56.7 kg Dry Chemical Powder Wheeled Extinguisher 136.4 kg AFFF Wheeled Extinguishers 135 L
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
WHP13N
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
Dry Chemical Handheld Extinguisher 4.1 kg (BC type)
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
3
2
6
6
115
70
5
28
2
17
6
- Fire Blanket
RP6N, RP5S, RP9S, RP5N, RP3S, WHP13N
12
International Ship/Shore Connection
WHP13N
- High Velocity Spray Nozzle
WHP13N
2 sets
21
Note: 1. Lighted Windsock will be supplied by pedestal crane vendor.
1 no. cabinet on each RPs (for 100% POB) (Inside TR) 1 no. cabinet on each RPs (for 100% POB) (Inside TR)
1 no. each RPs & WHP crane cabin
1 no. at each RPs & WHP (inside TR)
1 no. at each RPs (near & WHP Helideck stair landing)
1 no. on each RPs (Inside & WHP crane cabin)
2 nos. on each in LER building RPs & WHP (1 no. Inside Electrical & Instrument room and 1 no. at UPS, INST. & Telecom room) 1 set at boat landing & 1 set at drill deck
200-83-SH-DTS-00007_A
Page 26 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
8 DATASHEET FOR SAFETY EQUIPMENT
8.1 Combined Safety Shower and Eyewash Station
COMBINED SAFETY SHOWER AND EYEWASH STATION
ADMINISTRATIVE IDENTIFICATIONS
A 1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B
EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA
C
1
2
3
ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE
4
ATMOSPHERE
RP 6N
RP 5N
SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
RP 5S
RP 3S
RP 9S
WHP 13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
COMBINED SAFETY SHOWER & EYEWASH CONFORMING TO ANSI Z358.1-2014 (SELF-SUPPORTING UNIT AND USE LARGE DIAMETER STANDPIPE) WITH STORAGE TANK (48 IN) 1,200 MM IN DIAMETER
1 TYPE
2
AREA (MINIMUM UNOBSTRUCTED)
11
SHOWER SPRAY ANGLE (OVERHEAD)
60o
12
INLET CONNECTION TO POTABLE WATER
2” (VENDOR TO CONFIRM)
3 SAFETY SHOWER FLOW 75.7 LPM
13 MARKING
4
EYE WASH STATION FLOW
1.5 LPM
14 DRAIN OUTLET CONNECTION
5 DURATION
15 MIN (MINIMUM)
15
6 OPERATING METHOD
NOTE 10
16
TIE-IN FLANGE MATERIAL FOR WATER SUPPLY AND DRAIN WATER PRESSURE (SAFETY SHOWER OUTLET)
7 FLUID HANDLED
FRESH WATER OR POTABLE WATER QUALITY
17 WATER TEMPERATURE
200-83-SH-DTS-00007_A
AS PER BS EN5499
2” (VENDOR TO CONFIRM)
VENDOR TO ADVISE
2-3 BARG
15 – 35 oC BASED ON 15 MINUTES CONTINUOUS OPERATION OF THE SHOWER
Page 27 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
COMBINED SAFETY SHOWER AND EYEWASH STATION
8 TANK CAPACITY
1200 LITRES
18
LIGHTING WITH INTEGRATED BATTERY
REQUIRED (NOTE-10)
9
TANK MATERIAL/ COLOUR
GRP/ GREEN
19 SIGN AND BRACKET
YES. STAINLESS STEEL TAG
REQUIRED
REQUIRED (NOTE-5)
REQUIRED
REQUIRED
10 MATERIAL
GALVANIZED PIPE STRUCTURE SUITABLE FOR OUTDOOR INSTALLATION & MARINE ENVIRONMENT
E
EQUIPMENT ACCESSORIES
1
ANTI-SURGE HEADS WITH INTEGRAL FLOW CONTROL FOR SHOWER AND EYEWASH
REQUIRED
9
PROXIMITY SWITCH REQUIRED FOR TRANSFER SIGNAL TO DCS WHEN SAFETY SHOWER WILL BE WORKING
2 OVERFLOW
REQUIRED
10 DRAIN SUMP
11
12
PRESSURE REDUCING AND ISOLATION VALVE LOW LEVEL SWITCH (REMOTE)
3 PANIC BAR OPERATION REQUIRED
4
5
6
SELF DRAINING VALVE FOR EYEWASH WATER TREATMENT ADDITIVE CHILLER AND HEATER UNIT
REQUIRED
REQUIRED
13 DUST COVER FOR EYEWASH REQUIRED
REQUIRED
14 HIGH LEVEL SWITCH/ALARM REQUIRED
7 TEMPERATURE GAUGE REQUIRED
15 OTHER ACCESSORIES
8 PRESSURE GAUGE
REQUIRED
F PHYSICAL DATA
1
WEIGHT (DRY/ WITH WATER)
VENDOR TO ADVISE
2 DIMENSION
G EQUIPMENT IDENTIFICATIONS
1 EQUIPMENT TYPE
COMBINED SAFETY SHOWER & EYEWASH
3 MANUFACTURER NAME
2 MODEL NUMBER
VENDOR TO ADVISE
4 MANUFACTURER COUNTRY
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
H SPECIAL REQUIREMENTS
1
2
3
COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT HAZARDOUS AREA CLASSIFICATION REQUIREMENT
ANSI STANDARD AND REGULATIONS REQUIREMENTS (ANSI/ISEA Z358.1)
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION.
ALL ELECTRICAL EQUIPMENT INCLUDING CHILLER SHALL BE SUITABLE FOR ZONE 2 (ZONE 1 FOR INSTRUMENTATION), GAS GROUP IIB & TEMPERATURE CLASS T3.
I NOTES 1 STRAINERS FOR EYEWASH SHOWER SHALL BE PROVIDED.
200-83-SH-DTS-00007_A
Page 28 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
COMBINED SAFETY SHOWER AND EYEWASH STATION
2
3
INSULATION SHALL BE FITTED TO ENSURE THE WATER IS MAINTAINED AT A TEPID TEMPERATURE REGARDLESS OF THE ENVIRONMENT. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 5 LIQUID SEAL AND STRAINER SHALL BE PROVIDED ALONG WITH DRAIN SUMP.
6
7
8
9
10
11
GRP SIDE PANELS SHALL BE PROVIDED TO PROTECT THE SPLASHING OF WATER OUTSIDE THE SAFETY SHOWER. SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-0000200020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC- 0000200013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR. ILLUMINATION LEVEL INSIDE THE SAFETY SHOWER ENCLOSURE SHALL BE INLINE WITH LIGHTING DESIGN PHILOSOPHY FOR COMP3 PROJECT (DOC. NO. 200-91-EL-DEC-00009). ACTIVATION OF THE SHOWER SHALL BE BY PANIC BAR AND THE EYE-WASH UNIT SHALL BE BY PUSH FLAG OR FOOT TREADLE. THE VALVES, ONCE OPERATED, SHALL REMAIN OPEN UNTIL SUCH TIME AS THEY ARE SHUT-OFF MANUALLY.
200-83-SH-DTS-00007_A
Page 29 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
8.2 Portable Eyewash Unit
PORTABLE EYEWASH UNIT
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & PIPELINES PROJECT REFER TABLE 7.1
INTRAFIELD
1
TAG NUMBER (HOLD- 2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 EYEWASH UNIT CRITERIA:
1.1
WALL MOUNTED, SUPPLIED WITH FIXATION KIT
1.2
THE UNIT SHALL BE HIGHLY VISIBLE, GREEN HIGH-DENSITY POLYETHYLENE TYPE.
E GENERAL 1 LOCKABLE THREADED
CAP
REQUIRED
1.3
EYE WASH BOTTLE SHALL BE CLEARLY STAMPED WITH EXPIRY DATE.
REQUIRED
REQUIRED
REQUIRED
2
MINIMUM NUMBER OF BOTTLES FOR EACH UNIT
2
3 CAPACITY OF EACH
BOTTLE
APPROX.1000 ML
4 MARKING
PICTORIAL SAFETY SIGN & OPERATING INSTRUCTION IN ENGLISH.
5 GRP CABINET
REQUIRED
F EQUIPMENT ACCESSORIES 1 REQUIRED
ACCESSORIES G PHYSICAL DATA
WALL MOUNTING FIXING SCREWS / NUTS & BOLTS
200-83-SH-DTS-00007_A
Page 30 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
PORTABLE EYEWASH UNIT
1
WEIGHT (DRY/ WITH WATER)
VENDOR TO ADVISE
2
DIMENSION
VENDOR TO ADVISE
H SPECIAL REQUIREMENTS
1
2
COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT
ANSI STANDARD AND REGULATIONS REQUIREMENTS (ANSI/ISEA Z358.1)
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
I EQUIPMENT IDENTIFICATIONS
1 EQUIPMENT TYPE
PORTABLE EYEWASH UNIT
2
MODEL NUMBER
VENDOR TO ADVISE
J NOTES
3
4
MANUFACTURER NAME MANUFACTURER COUNTRY
VENDOR TO ADVISE
VENDOR TO ADVISE
1
2
3
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-0000200020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC- 0000200013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
5
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 31 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
8.3 Lighted Windsock
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
LIGHTED WINDSOCK
2 PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & PIPELINES PROJECT
INTRAFIELD
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
RP 9S
WHP13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
37.0
85
45 (NOTE-1)
100.0
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION
EQUIPMENT DESIGN CRITERIA
1 MATERIAL
2 COLOR (NOTE 4)
3
SUPPORT FRAME, POLE, BASE MATERIAL
4 WIND SPEED
LONG-LIFE NYLON MATERIAL CONTRAST AND REFLECTIVE COLOUR
5 LENGTH
VENDOR TO ADVISE
6 DESIGN LIFE (MIN)
VENDOR TO ADVISE
(NOTE 5 & 6)
7 ROTATION ANGLE
360 DEGREES
UP TO 38.6 M/S (3 SECOND GUST)
E EQUIPMENT ACCESSORIES
1 REQUIRED
ACCESSORIES
F PHYSICAL DATA
1 WEIGHT
2
WINDSOCK DIMENSION (APPROXIMATE)
5000 lm LED TYPE TOP MOUNTED LIGHT FOR LIGHTING WINDSOCK
REQUIRED
GALVANIZED FRAME
REQUIRED
VENDOR TO ADVISE
VENDOR TO ADVISE
G SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD 2 ENVIRONMENTAL REQUIREMENT
CAP 437
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
200-83-SH-DTS-00007_A
Page 32 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
3
HAZARDOUS AREA CLASSIFICATION REQUIREMENT
LIGHTED WINDSOCK
ZONE 1, GAS GROUP IIB, TEMPERATURE CLASS T3
H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
LIGHTED WINDSOCK
2 MANUFACTURER NAME VENDOR TO ADVISE
I NOTES
3 MODEL NUMBER MANUFACTURER COUNTRY
4
VENDOR TO ADVISE
VENDOR TO ADVISE
1
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
3
WINDSOCKS SHALL BE CONSTRUCTED OF LONG-LIFE NYLON MATERIAL TREATED TO RESIST THE EFFECTS OF WIND AND WEATHER.
4 WINDSOCKS SHALL PREFERABLY BE HIGH-VISIBILITY ORANGE IN COLOR. 5 WINDSOCK FRAME SHALL BE GALVANIZED MATERIAL.
6 WINDSOCK POLE, BASE SHALL BE GALVANIZED MATERIAL WITH XYLON COATED BOLTS.
7
THE WINDSOCK ASSEMBLY SHALL BE LOCATED AT HIGHEST POINT OF THE CRANE INCLUDING A LED LIGHT TO ILLUMINATE THE WINDSOCK IN ANY DIRECTION.
8 LIGHTING FIXTURE SHALL BE SUITABLE FOR POWER SUPPLY 240V, 50Hz, SINGLE PHASE, UNGROUNDED.
10
11
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
12 WINDSOCK IS SUPPLIED PART OF CRANE VENDOR PACKAGE.
200-83-SH-DTS-00007_A
Page 33 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
8.4 Fireman Equipment Cabinet
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
FIREMAN EQUIPMENT CABINET
2 PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & PIPELINES PROJECT
INTRAFIELD
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
RP 5S
RP 3S
RP 9S
WHP 13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-1)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 FIREMAN’S EQUIPMENT SHALL CONSIST OF THE FOLLOWING:
PROTECTIVE OUTFIT (INCLUDING FIRE FIGHTING SUIT, FIRE FIGHTING HELMET, FIRE FIGHTING GLOVES, FACE MASK OR HOOD, HEAT RESISTANT JACKET AND HEAT-RESISTANT TROUSERS) SELF-CONTAINED BREATHING APPARATUS PORTABLE BATTERY- OPERATED SAFETY LAMP (EXPLOSION PROOF)
1.1
1.2
1.3
REQUIRED (2 SETS)
1.4 FIREMAN’S AXE
REQUIRED (2 SETS)
REQUIRED (2 SETS)
1.5
SAFETY HARNESS AND LIFELINE
REQUIRED (2 SETS)
REQUIRED (2 SETS)
E CABINET DESIGN CRITERIA
1 SIZED FOR
TO ACCOMMODATE ALL THE EQUIPMENT SPECIFIED IN SECTION ‘D’
7
FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)
2 CABINET MATERIAL
RIGID FIBERGLASS
8
DONNING INSTUCTIONS
200-83-SH-DTS-00007_A
STAINLESS STEEL, SS316
IN ENGLISH, CONTAINED IN A WEATHER-PROOF COVER AND PERMANENTLY
Page 34 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
FIREMAN EQUIPMENT CABINET
ATTACHED TO THE INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT
3
MOUNTING / INSTALLATION
BOTTOM AND BACK FRAMES SHALL BE PROVIDED TO PERMIT DECK OR BULKHEAD MOUNTING
9 LABELLING (NOTE 3)
“FIREMAN’ EQUIPMENT” IN ENGLISH
4
IP RATING
VENDOR TO ADVISE
10
VENTILATION / DRAINAGE
5 CABINET PAINT FINISH VENDOR TO ADVISE
11 WEAR INSTRUCTION
PROVIDED TO AVOID INGRESS OF SEA / RAINWATER IN ENGLISH, PERMANENTLY ATTACHED TO THE INSIDE OF DOOR OF CONTAINER
6 COUNTRY OF ORIGIN
VENDOR TO ADVISE
F SPECIAL REQUIREMENTS
1
ENVIRONMENTAL REQUIREMENT
G PHYSICAL DATA
1
2
WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
VENDOR TO ADVISE
3
DIMENSION OF CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
FIREMAN EQUIPMENT
3 MANUFACTURER NAME VENDOR TO ADVISE
2 MODEL NUMBER
VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
I NOTES
1
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 3 THE DESIGNATED CABINET SHALL BE LABELLED IN WHITE BOLD LETTERS.
4
5
6
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 35 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
8.5 Chemical Handling Safety Kit
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
CHEMICAL HANDLING SAFETY KIT
2 PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & PIPELINES PROJECT
INTRAFIELD
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
C
1
2
3 BLACK BODY
TEMPERATURE
4 ATMOSPHERE
RP 6N
RP 5N
SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
RP 5S
RP 3S
RP 9S
WHP 13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-1)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION CHEMICAL HANDLING SAFETY KIT CONTENT
1 FACE MASK (3 NOS.)
REQUIRED
2
3
CHEMICAL SPLASH PROTECTION APRON (3 NOS.) CHEMICAL HANDLING GLOVES (3 NOS.)
REQUIRED
REQUIRED
4 CHEMICAL RESISTANT COVERALL (3 NOS.)
REQUIRED
5
CHEMICAL RESISTANT GOGGLES (3 NOS.)
REQUIRED
E CABINET DESIGN CRITERIA
6
7
8
9
CHEMICAL SPLASH SHIELD (3 NOS.)
REQUIRED
CHEMICAL PROTECTIVE BOOTS (3 NOS.)
REQUIRED
FILTER RESPIRATORS (3 NOS.) PORTABLE EYE WASH BOTTLES/EAR PLUGS (1 BOX OF 100 PIECES)
REQUIRED
REQUIRED
1 CAPACITY
2 CABINET MATERIAL
3 COLOUR
4 LABELLING (NOTE 3)
5 MOUNTING
6
IP RATING
ABLE TO FIT ALL THE ITEMS IN ‘SECTION D’ UV RESISTANT FIRE- RETARDANT GRP VENDOR TO ADVISE “CHEMICAL HANDLING SAFETY KIT” IN ENGLISH VENDOR TO ADVISE
7 CABINET PAINT FINISH VENDOR TO ADVISE
8
VENTILATION / DRAINAGE
REQUIRED
9 COUNTRY OF ORIGIN
VENDOR TO ADVISE
10
FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)
STAINLESS STEEL SS316
11 MANUFACTURER NAME VENDOR TO ADVISE
VENDOR TO ADVISE
12 MODEL
VENDOR TO ADVISE
F SPECIAL REQUIREMENTS
200-83-SH-DTS-00007_A
Page 36 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
1 COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT
2
G PHYSICAL DATA
1
2
WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET
CHEMICAL HANDLING SAFETY KIT
OSHA/NIOSH/SOLAS (VENDOR TO CONFIRM)
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
VENDOR TO ADVISE
3
DIMENSION OF CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
H EQUIPMENT IDENTIFICATIONS
1 EQUIPMENT TYPE
CHEMICAL HANDLING SAFETY KIT
3 MANUFACTURER NAME VENDOR TO ADVISE
2 MODEL NUMBER
VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
I NOTES
1
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
3
4
5
6
CHEMICAL HANDLING SAFETY KIT SHALL BE PROVIDED NEARBY HAZARDOUS CHEMICALS HANDLING AREA. SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200- 20-SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 37 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
8.6 Electrical Safety Kit
ELECTRICAL SAFETY KIT
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
C
1
2
3 BLACK BODY
TEMPERATURE
4 ATMOSPHERE
RP 6N
RP 5N
SAFETY ENVIRONMENTAL / SITE CONDITIONS (NOTE 2 & 3)
RP 5S
RP 3S
RP 9S
WHP 13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-2)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
1
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA RUBBER INSULATING GLOVES, LEATHER PROTECTORS AND SLEEVES
REQUIRED (2 SETS)
9
PORTABLE WARNING NOTICE
REQUIRED (1 SET)
2
DIELECTRIC FOOTWEAR
REQUIRED (1 PAIR)
10
3
4
5
6
INSULATING BLANKETS AND ACCESSORIES
INSULATING SHIELDING / ROLL BLANKETS SWITCHBOARD MATTING HOT STICKS, STATIC DISCHARGE STICKS, RESCUE HOOKS
REQUIRED (1 SET)
11
REQUIRED (1 SET)
12
REQUIRED (4 SETS)
13
VOLTAGE DETECTOR WITH FLEXIBLE ANTENNA CONTACT WALL MOUNTED SUPPORTS FOR STICKS AND VOLTAGES DETECTORS INSULATION PLATFORM (OUTDOOR MODELS) CABLE CUTTER WITH INSULATED HANDLES
REQUIRED (1 SET)
REQUIRED (1 SET)
REQUIRED (1 SET)
REQUIRED (2 SETS)
REQUIRED (1 SET)
14
TALCUM POWDER CAN
REQUIRED (1 SET)
7
FACE SHIELD WITH GOGGLES
REQUIRED (2 SETS)
15
EQUIPMENT (CATEGORY 2)
- ARC-RATED COVERALL,
REQUIRED (2 SETS)
200-83-SH-DTS-00007_A
Page 38 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
ELECTRICAL SAFETY KIT
- ARC-RATED FLASH SUIT HOOD,
- ARC-RATED JACKET, PARKA, RAINWEAR,
- HARD HAT,
- SAFETY GOGGLES,
- HEARING PROTECTION (EAR CANAL INSERTS)
- HEAVY-DUTY LEATHER GLOVES
- LEATHER FOOTWEAR
8
LOCKOUT / TAGOUT BOX (FOR HV AND LV)
REQUIRED (1 SET)
16
DESIGN LIFE FOR RESCUE KIT
VENDOR TO ADVISE
E CABINET DESIGN CRITERIA
1 CAPACITY
ABLE TO FIT ALL ITEMS IN ‘SECTION D’ ABOVE.
6 MOUNTING
FIXING ACCESSORIES FOR MOUNTING CABINET INSIDE THE BUILDING SHALL BE PROVIDED
2 CABINET DOOR TYPE
FRONT OPEN ( SINGLE DOOR)
7
IP RATING
IP56
3 CABINET MATERIAL
UV RESISTANT FIRE- RETARDANT GRP
8
VENTILATION / DRAINAGE
4 CABINET COLOUR
GREEN RAL 6029
9
FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)
5 LABELLING (NOTE 5)
“ELECTRICAL SAFETY KIT”
10
INSTRUCTION (IN ENGLISH)
PROVISIONS FOR BOTH DRAINAGE AND VENTILATION AND AFFORD FULL WEATHER PROOFING TO THE STORED CONTENTS
STAINLESS STEEL, SS316
CONTENT LIST WILL BE PERMANENTLY ATTACHED TO THE INSIDE DOOR OF CONTAINER THAT ENABLES THEM AT A HEIGHT TO BE EASILY READ BY A PERSON STANDING IN FRONT OF THE CONTAINER
F PHYSICAL DATA
1
2
WEIGHT OF FILLED CABINET
WEIGHT OF EMPTY CABINET
VENDOR TO ADVISE
2
DIMENSION OF CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
G EQUIPMENT IDENTIFICATIONS
1 EQUIPMENT TYPE
ELECTRICAL SAFETY KIT
4
MANUFACTURER NAME
VENDOR TO ADVISE
200-83-SH-DTS-00007_A
Page 39 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
ELECTRICAL SAFETY KIT
2 MODEL NUMBER
VENDOR TO ADVISE
5
MANUFACTURER COUNTRY
VENDOR TO ADVISE
H NOTES
1
2
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
3 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
4
5
6
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THE DESIGNATED CABINET SHALL BE LABELLED IN CAPITAL LETTER WITH CLEARLY PAINTED WITH WHITE BLOCK LETTERS ON THE OUTSIDE OF THE CABINET. COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 40 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9 DATASHEET FOR LIFESAVING EQUIPMENT
9.1 Life raft
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
LIFE RAFT
2 PROJECT
COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & PIPELINES PROJECT
INTRAFIELD
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1
TAG NUMBER (HOLD- 2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 LIFERAFT CRITERIA:
1.1 CAPACITY
15 MEN (WHP13N); 12 MEN (RP3S/ RP5S/RP9S); 10 MEN (RP5N/RP6N)
1.8
1.2 MATERIAL
DURABLE POLYURETHANE COATED FABRIC
1.9
1.3
LIFERAFTS SHALL BE HOUSED IN A RIGID CONTAINER AND SHALL AUTOMATICALLY INFLATE WHEN
200-83-SH-DTS-00007_A
REQUIRED
1.10
LIFERAFTS SHALL HAVE A CANOPY FOR WEATHER PROTECTION OF THE OCCUPANTS. SELF INFLATING AND ENCAPSULATED JETTISON TYPE/ THROW OVERBOARD TYPE COMPLETE WITH A SPLIT FIBRE GLASS UV PROTECTED CAPSULE, STORAGE CRADLE, TILTABLE PAINTER LINE (NOT LESS THAN 30m) FOR INFLATING. THE PLATFORM IDENTIFICATION NAME SHALL BE MARKED ON LIFERAFT AND PADDLES IN BLACK LETTERING.
REQUIRED
REQUIRED
REQUIRED
Page 41 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
LIFE RAFT
LAUNCHED / PAINTER LINE IS PULLED.
BUOYANCY CHAMBERS (COMPRISING SUPERIMPOSED AND INDEPENDENT AIRTIGHT MATERIAL COMPARTMENTS) SHALL BE MANUFACTURED FROM MATERIAL(S) THAT IS HIGHLY ABRASIVE RESISTANT AND IMPERVIOUS TO CORROSION IN A HUMID MARINE ENVIRONMENT.
LIFERAFTS SHALL HAVE RIGHTENING STRAP ACROSS THE UNDERSIDE OF THE FLOOR TO ASSIST A SINGLE SURVIVOR IN RIGHTENING THE LIFE RAFT SHALL IT BE INVERTED. STORAGE CRADLE SHALL BE MADE OF STAINLESS STEEL. THE CRADLE SHALL ALLOW EASY DEPLOYMENT OF THE RAFT INTO THE SEA BY ONE PERSON. LIFERAFTS SHALL BE EASILY CLIMBED INTO BY SURVIVOR FULLY CLOTHED AND WEARING A LIFEJACKET.
1.4
1.5
1.6
1.7
2 CANOPY CRITERIA: THE LIFERAFT CANOPY SHALL BE INTERNATIONAL ORANGE. ALSO, A LARGE CROSS (X) TO BE MARKED ON THE CANOPY WITH REFLECTIVE TAPES.
2.1
TYPE AND SIZE AND PRINTING ON THE LIFERAFT SHALL FULFILL THE REQUIREMENTS OF SOLAS/LSA. ALL LIFE RAFTS TOGETHER WITH PADDLES SHALL BE CONSPICUOUSLY MARKED WITH NAME OF THE PLATFORM. THE NUMBER OF PERSONS ALLOWED ON EACH RAFT SHALL BE MARKED WITH LETTERS AND NUMBERS AT LEAST 100 MM HIGH OF A COLOR CONTRASTING WITH THAT OF THE LIFE RAFT.
THE LIFE RAFT ASSEMBLY SHALL BE CONSTRUCTED TO WITHSTAND IMPACT WITH THE WATER (WITHOUT DAMAGE) FROM THE INSTALLED HEIGHT.
REQUIRED
REQUIRED
REQUIRED
1.11
REQUIRED
1.12
REQUIRED
1.13 LIFT RAFT SYSTEM
INCLINED LAUNCHING RACKS
REQUIRED
1.14
LIFERAFT SHALL BE ABLE BE TOWED AT A SPEED OF 3 KNOTS IN CALM WATER WHEN LOADED
REQUIRED
REQUIRED
2.6
IT SHALL BE PROVIDED WITH AT LEAST ONE VIEWING PORT.
REQUIRED
200-83-SH-DTS-00007_A
Page 42 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
LIFE RAFT
2.2
IT SHALL PROVIDE INSULATION AGAINST HEAT AND COLD BY MEANS OF EITHER TWO LAYERS OF MATERIAL SEPARATED BY AN AIR GAP OR OTHER EQUALLY EFFICIENT MEANS. MEANS SHALL BE PROVIDED TO PREVENT ACCUMULATION OF WATER IN THE AIR GAP.
2.3
ITS INTERIOR SHALL BE OF A COLOUR THAT DOES NOT CAUSE DISCOMFORT TO THE OCCUPANTS.
EACH ENTRANCE SHALL BE CLEARLY INDICATED AND BE PROVIDED WITH EFFICIENT ADJUSTABLE CLOSING ARRANGEMENTS WHICH CAN BE EASILY AND QUICKLY OPENED BY PERSONS CLOTHED IN IMMERSION SUITS FROM INSIDE AND OUTSIDE, AND CLOSED FROM INSIDE. THE LIFERAFT SO AS TO PERMIT VENTILATION BUT EXCLUDE SEAWATER, WIND AND COLD. LIFERAFTS SHALL HAVE AT LEAST TWO DIAMETRICALLY OPPOSITE ENTRANCES. IT SHALL ADMIT SUFFICIENT AIR FOR THE OCCUPANTS AT ALL TIMES, EVEN WITH THE ENTRANCES CLOSED.
2.4
2.5
REQUIRED
2.7
IT SHALL BE PROVIDED WITH MEANS FOR COLLECTING RAINWATER.
REQUIRED
REQUIRED
2.8
IT SHALL BE PROVIDED WITH MEANS TO MOUNT A SURVIVAL CRAFT RADAR TRANSPONDER AT A HEIGHT OF AT LEAST 1 M ABOVE THE SEA.
REQUIRED
REQUIRED
2.9
IT SHALL HAVE SUFFICIENT HEADROOM FOR SITTING OCCUPANTS UNDER ALL PARTS OF THE CANOPY.
REQUIRED
REQUIRED
E MARKINGS 1 MARKING ON THE LIFERAFT CONTAINER:
1.1
MAKER’S NAME AND TRADEMARK
VENDOR TO ADVISE
1.6
DATE WHEN LAST SERVICED
REQUIRED
200-83-SH-DTS-00007_A
Page 43 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
LIFE RAFT
1.2 SERIAL NUMBER
VENDOR TO ADVISE
1.7 LENGTH OF PAINTER VENDOR TO ADVISE
1.3
NAME OF APPROVING AUTHORITY AND THE NUMBER OF PERSONS IT IS PERMITTED TO CARRY
VENDOR TO ADVISE
1.8
1.4 SOLAS
VENDOR TO ADVISE
1.9
1.5
TYPE OF EMERGENCY PACK ENCLOSED
VENDOR TO ADVISE
2 MARKING ON THE LIFERAFT:
2.1
MAKER’S NAME OR TRADEMARK;
VENDOR TO ADVISE
2.4
2.2 SERIAL NUMBER;
VENDOR TO ADVISE
2.5
2.3
DATE OF MANUFACTURE (MONTH AND YEAR)
VENDOR TO ADVISE
2.6
MAXIMUM PERMITTED HEIGHT OF STOWAGE ABOVE WATERLINE (DEPENDING ON DROP-TEST HEIGHT AND LENGTH OF PAINTER) LAUNCHING INSTRUCTIONS IN ENGLISH
NAME OF APPROVING AUTHORITY; NAME AND PLACE OF SERVICING STATION WHERE IT WAS LAST SERVICED; NUMBER OF PERSONS IT IS PERMITTED TO ACCOMMODATE OVER EACH ENTRANCE IN CHARACTERS NOT LESS THAN 100 MM IN HEIGHT OF A COLOUR CONTRASTING WITH THAT OF THE LIFERAFT.
VENDOR TO ADVISE
REQUIRED
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
F EQUIPMENT ACCESSORIES
1
TWO (2) UNITS OF EMERGENCY POSITIONING INDICATING RADIO BEACON (EPIRB), ONE (1) UNIT OF SEARCH AND RESCUE TRANSPONDER (SART) (AIS) & ONE (1) UNIT OF SEARCH AND RESCUE TRANSPONDER (RADAR) STORED INSIDE EACH LIFE RAFT (BY OTHERS). TWO (2) UNITS OF VHF MARINE HANDHELD RADIOS SHALL BE STORED OUTSIDE IN AN UV RESISTANT, Ex ‘e’ ENCLOSURE LOCATED OUTSIDE TO EACH LIFE RAFT (BY VENDOR).
NO ITEM QUANTITY
NO ITEM
1 TOPPING-UP PUMP
2 SEA ANCHOR
3 BAILER
2
4 REPAIR KIT
5 KNIFE
6 SIGNAL MIRROR
7 SET OF LEAK STOPPERS
8 WHISTLE
9 SPONGES
1
2
2
1
2
1
1
1
2
QUANTITY
1
SEE 2
18 RADAR REFLECTOR
19 ANTI-SEA SICK PILLS (6/PERSON)
20 RESCUE QUOIT AND LINE OF NOT LESS THAN 30m
21 LIFE RAFT MANUAL (WATERPROOF)
22 THERMAL PROTECTIVE AIDS (TPA’S)
23 CAN OPENER
24 DRINKING CUP
25 WATER (1.5 LITER/PERSON)
26 EMERGENCY RATIONS (0.5kg = 10,000 kJ/PERSON)
1
1
2
3
1 LITER3
kg4
200-83-SH-DTS-00007_A
Page 44 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
LIFE RAFT
10 PADDLES
1 PAIR
27 FISHING KIT
11 PRESSURE RELIEVE PLUGS 1 SET
28 FLASH LIGHT
12 SEA SICKNESS BAG (1/PERSON) 1
13 LIFE SAVING SIGNALS
14 FIRST AID KIT 15 PARACHUTE ROCKET 16 HAND FLARES 17 SMOKE FLOATS
1
1 4 6 2
CONTENTS IN LIFERAFT AS PER SOLAS “A” PACK : 1 (15 nos. for 15 POB, 12 nos. for 12 POB, 10 nos. for 10 POB). 2 (90 nos. for 15 POB, 72 nos. for 12 POB, 60 nos. for 10 POB). 3 (22.5 liter for 15 POB, 18 liter for 12 POB, 15 liter for 10 POB). 4 (7.5 kg for 15 POB, 6 kg for 12 POB, 5 kg for 10 POB).
G SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD 2 CERTIFICATION
SOLAS, LSA
USCG / SOLAS
1
1
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
4
3
ENVIRONMENTAL REQUIREMENT HAZARDOUS AREA CLASSIFICATION H PHYSICAL DATA WEIGHT OF EQUIPMENT
1
ZONE 1, IIB, T3
VENDOR TO ADVISE
2 WEIGHT OF CRADLE VENDOR TO ADVISE
3
PAINT Q LINE LENGTH (MIN)
VENDOR TO ADVISE
I EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE MANUFACTURER NAME
2
LIFE RAFT
VENDOR TO ADVISE
4
5
DIMENSION OF EQUIPMENT DIMENSION OF CONTAINER
VENDOR TO ADVISE
VENDOR TO ADVISE
3 MODEL NUMBER MANUFACTURER COUNTRY
4
VENDOR TO ADVISE
VENDOR TO ADVISE
J NOTES 1
2
3
ITEM TO BE PROVIDED IN SEALED WATERPROOF CONTAINER. SURVIVAL KNIVES AND FLARES SHALL BE PACKED INSIDE THE LIFERAFT CONTAINER & CANNOT BE SHIPPED SEPARATELY AS THIS FORMS THE PART OF SOLAS “A” PACK REQUIREMENT. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
5
MAIN KNIFE SHALL BE OF THE NON-FOLDING TYPE. THE SECOND KNIFE CAN BE OF THE FOLDABLE TYPE.
6 LIFE RAFT SHALL BE CARTON PACKING AS PER MANUFACTURER STANDARD.
7
8
9
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 45 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.2 Scramble Net
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
SCRAMBLE NET
2 PROJECT
COMP3 PIPELINES PROJECT
- NFPS OFFSHORE RISER/WELLHEAD PLATFORM &
INTRAFIELD
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1
TAG NUMBER (HOLD- 2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1
EQUIPMENT MATERIAL
FLAME RETARDANT POLYESTER WEBBING/DURABLE POLYPROPYLENE (OR EQUIVALENT) & FIBERGLASS RODS
8 TEST LOAD
VENDOR TO ADVISE
2 FITTINGS MATERIAL
STAINLESS STEEL (SS 316)
9
INSTRUCTION (NOTE 2)
ENGLISH, WITH ILLUSTRATION / PICTOGRAM IN ENGLISH
3 MESH SIZE 4 DIAMETER 5 WIDTH
6
SPREADER BAR MATERIAL
250 MM X 250 MM VENDOR TO ADVISE MIN. 1.8 M
10 LABELLING 11 MANUFACTURE NAME VENDOR TO ADVISE 12 MODEL VENDOR TO ADVISE
HARDWOOD
13 COUNTRY OF ORIGIN VENDOR TO ADVISE
7 STORED DIMENSION VENDOR TO ADVISE
14
SCRAMBLE NET LENGTH (METER)
VENDOR TO ADVISE
E STOWAGE COVER
1 MATERIAL
2 MARKING
F SUPPORT FRAME
FIRE RETARDANT AND UV RESISTANT PLASTICIZED LINEN (OR EQUAL) IN ENGLISH, CAPITAL LETTERS
3 DIMENSION
VENDOR TO ADVISE
1 CONNECTION TYPE
PROVISION FOR CONNECTION POINTS
3 MAXIMUM LOAD
3000 KG
200-83-SH-DTS-00007_A
Page 46 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
SCRAMBLE NET
FOR THE STAINLESS- STEEL WIRE SUSPENSION ROPES OF THE NET WELDED TO THE OUTSIDE OF THE PLATFORM DECK
2
SUPPORT FRAME INSTALLATION
G SPECIAL REQUIREMENT
4 TEST LOAD
4450 KG
SOLAS
2 CERTIFICATION
MANUFACTURER COC
1
COMPLIANCE STANDARD
LIFE SAVING APPLIANCES (LSA) CODE H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
SCRAMBLE NET
2 MODEL NUMBER
VENDOR TO ADVISE
I NOTES
3
ENVIRONMENTAL REQUIREMENT
NOTE 4
3 MANUFACTURER NAME VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
1
SACRIFICIAL SLINGS REFERS TO ROPES USED TO HANG THE STOWAGE BAG FROM THE DECK VIA THE DECK PAD EYES. SLINGS SHALL BE INSPECTED AND REPLACED ON A REGULAR BASIS.
2 OPERATING INSTRUCTIONS SHALL BE CLEARLY FIXED IN ENGLISH.
3
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
5
EACH UNIT SHALL BE TESTED TO COMPLY WITH STANDARDS AND MANUFACTURER TEST. CERTIFICATE SHALL BE PROVIDED.
6 ALL FIXATION ACCESSORIES SHALL BE PROVIDED BY VENDOR.
7
8
9
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 47 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.3 Lifebuoy
LIFEBUOY
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
033764 COMP3 PIPELINES PROJECT REFER TABLE 7.1
- NFPS OFFSHORE RISER/WELLHEAD PLATFORM &
INTRAFIELD
1 TAG NUMBER (HOLD-2)
2 SERVICE C OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
1
2
3
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
BRIDGES
LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 6 & 7)
WHP 13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-6)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 LIFE BUOY CRITERIA:
1.1 TYPE
PERRYBUOY LIFE BUOYS, ADULT SIZE
1.7
ALL LIFEBUOY SHALL BE FITTED WITH SMOKE SIGNAL AND SELF-IGNITING LIGHTS
REQUIRED
1.2 COLOUR
SHALL BE FITTED WITH RETRO-REFLECTIVE MATERIAL TO ASSIST IN DETECTION. SHALL BE COMPLETE WITH GALVANIZED INVERTED “Y” MOUNTING BRACKET(S) FOR MOUNTING ON HANDRAILS, MATERIALS OF BRACKET(S) SHALL BE CORROSION RESISTANT AND SUITABLE FOR THE SALIFEROUS ENVIRONMENT. SHALL HAVE INNER CORE MADE OF A
1.3
1.4
1.5
INTERNATIONAL ORANGE
1.8
SHALL BE PROVIDED WITH LIFELINE
REQUIRED
REQUIRED
1.9
SHALL BE FITTED WITH A GRABLINE
REQUIRED
REQUIRED
1.10
ALL ACCESSORIES SHALL BE MADE UV AND MARINE RESISTANT MATERIAL.
REQUIRED
REQUIRED
1.11
SHALL BE PROVIDED WITH APPROVED
REQUIRED
200-83-SH-DTS-00007_A
Page 48 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
LIFEBUOY
AUTOMATIC ELECTRIC WATER LIGHT
RIGID CFC FREE POLYURETHANE FOAM.
SHALL HAVE COVER MADE OF ROTATIONALLY MOULDED HIGH DENSITY POLYETHYLENE SKIN, CONTAINING FIRE RETARDANT AND UV STABILIZING ADDITIVES.
1.6
REQUIRED
1.1
E EQUIPMENT ACCESSORIES 1 LIFELINE CRITERIA: POLYETHYLENE LIFELINE WITH ORANGE COLOR. ONE END OF LIFELINE SHALL BE ATTACHED TO THE LIFEBUOY AND OTHER END WILL BE MOUNTED ON THE BRACKET.
1.2
REQUIRED
REQUIRED
1.3 LENGTH.
MIN. 40 METERS
2 WHISTLE CRITERIA:
2.1 MADE OF PLASTIC.
REQUIRED
2.2
WHISTLE COILED WITH 1ft LENGTH OF LANYARD (NOT EASILY TANGLED) AND ATTACHED TO THE LIFE BUOY.
REQUIRED
3 SMOKE SIGNAL CRITERIA:
1.4
MADE OF SYNTHETIC ROPE WITH INHERENT UV RESISTANCE.
REQUIRED
1.5
ENCAPSULATED IN A PLASTIC HOLDER.
REQUIRED
2.3
THE LANYARD SHALL BE FREE OF HOOKS, SNAPS OR CLIPS.
REQUIRED
3.1
3.2
EMIT SMOKE OF A HIGHLY VISIBLE COLOUR (ORANGE) AT UNIFORM RATE FOR A PERIOD OF AT LEAST 15 MIN WHEN FLOATING IN WATER.
PROVIDED WITH A QUICK RELEASE ARRANGEMENT THAT WILL AUTOMATICALLY RELEASE AND ACTIVATE THE SIGNAL.
REQUIRED
3.3
REQUIRED
3.4
4 WATER ACTIVATED LIGHT CRITERIA:
4.1
SHALL BE SOLAS APPROVED.
REQUIRED
4.7
SMOKE SIGNAL SHALL BE PROVIDED WITH MOUNTING BRACKET & ALL FIXING ACCESSORIES AND ATTACHED TO THE LIFEBUOY WITH LANYARD. DO NOT IGNITE EXPLOSIVELY OR EMIT ANY FLAME DURING THE ENTIRE SMOKE EMISSION TIME OF THE SIGNAL.
LIGHT SHALL BE PROVIDED WITH MOUNTING BRACKET & ALL FIXING ACCESSORIES AND ATTACHED TO THE
REQUIRED
REQUIRED
REQUIRED
200-83-SH-DTS-00007_A
Page 49 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
LIFEBUOY
LIFEBUOY WITH LANYARD.
REQUIRED
4.8
SHALL EMIT WHITE COLOUR LIGHT FOR AT LEAST TWO (2) HOURS.
REQUIRED
4.2
SHALL BE TAMPER, IMPACT AND CORROSION RESISTANT.
4.3
SHALL BE SEALED TO PROTECT AND PROVIDE ITS BATTERY COMPARTMENT LONG TERM STORAGE PROPERTIES.
REQUIRED
4.9
SHALL BE CAPABLE TO EITHER BURN CONTINUOUSLY WITH INTENSITY NOT LESS THAN 2.0 Cd OR FLASHING WITH RATE NOT LESS THAN 50 FLASHES/MIN SHALL BE ATTACHED TO THE BUOY BY A TWELVE THREAD LANYARD BETWEEN 3 TO 6 FT.
REQUIRED
REQUIRED
4.4
SHALL OPERATE ON LITHIUM BATTERY.
REQUIRED
4.10
4.5
4.6
SHALL BE WATER- ACTIVATED AND INEXTINGUISHABLE BY WATER. HAZARDOUS AREA CLASSIFICATION REQUIREMENT: ZONE 1, GAS GROUP IIB, TEMPERATURE CLASS T3.
REQUIRED
REQUIRED
F SPECIAL REQUIREMENT
4.11
BATTERIES FOR EACH LIGHT SHALL BE PROVIDED.
REQUIRED
1
COMPLIANCE STANDARD
2 CERTIFICATION
SOLAS & LSA INTERNATIONAL LIFE SAVING APPLIANCES CODE USCG / SOLAS / EC
3
ENVIRONMENTAL REQUIREMENT G PHYSICAL DATA WEIGHT OF EQUIPMENT INNER DIAMETER
1
2 H EQUIPMENT IDENTIFICATIONS
VENDOR TO ADVISE
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
VENDOR TO ADVISE
3 OUTER DIAMETER
VENDOR TO ADVISE
1 EQUIPMENT TYPE
LIFEBUOY
2 MODEL NUMBER
VENDOR TO ADVISE
I LIFE BUOY MATERIAL LIFE BUOY OUTER MATERIAL
1
VENDOR TO ADVISE
2 LIFE BUOY COATING
VENDOR TO ADVISE
J NOTES
3
4
3
4
MANUFACTURER NAME MANUFACTURER COUNTRY
LIFE BUOY INNER MATERIAL LIFE BUOY COVER MATERIAL
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
1
2
WEIGHT OF EACH LIFE BUOY COMPLETE WITH ITS ACCESSORIES AS WELL AS WEIGHT OF THE MOUNTING BRACKET TO BE PROVIDED SEPARATELY. RING LIFE BUOY HOUSING WITH ROTATIONALLY MOLDED POLYETHYLENE COVER SHALL BE PROVIDED TO EXTEND LIFE SPAN OF THE LIFE BUOY.
200-83-SH-DTS-00007_A
Page 50 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
LIFEBUOY
3
4
5
6
LIFE BUOY HOLDER SHALL BE PROVIDED AT EACH LOCATION. THE HOLDER SHALL BE PERMANENTLY ATTACHED TO THE INSIDE OF HANDRAILS ALONG THE PLATFORM OUTER PERIMETER. VENDOR SHALL PROVIDE ALL FIXING ACCESSORIES SUITABLE FOR HANDRAIL INSTALLATION.
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
7 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
8
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 51 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.4 Life Jackets and Cabinet
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
LIFE JACKETS AND CABINET
2 PROJECT
COMP3 PIPELINES PROJECT
- NFPS OFFSHORE RISER/WELLHEAD PLATFORM &
INTRAFIELD
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 4 & 5)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-4)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 LIFEJACKET CRITERIA:
1.1
SOLAS/MED LIFE JACKETS.
REQUIRED
1.7 COLOUR
1.2
TYPE-I LIFE JACKET (ADULT SIZE).
REQUIRED
1.8
INTERNATIONAL ORANGE
REQUIRED
HIGH BUOYANCY (190N BUOYANCY), INHERENTLY BUOYANT AND SELF- RIGHTING TYPE. SHALL NOT SUSTAIN BURNING AFTER BEING ENVELOPED IN A FIRE FOR A PERIOD OF 2 SECONDS.
1.3
1.4
1.5
SHALL BE UNICELLULAR, WITH PLASTIC PANEL AND SYNTHETIC FOAM FILLED. SHALL BE SEWN WITH MILDEW RESISTANT, ROT RESISTANT THREAD.
LIFE JACKET SHALL HAVE AT LEAST 0.02 M2 OF RETRO- REFLECTIVE MATERIAL ATTACHED TO EACH FRONT SIDE, BACK SIDE, AND REVERSIBLE SIDES.
REQUIRED
1.9
REQUIRED
REQUIRED
1.10
SHALL HAVE A SPLASH GUARD
REQUIRED
REQUIRED
1.11
LIFE JACKETS SHALL BE DESIGNED TO TURN AN UNCONSCIOUS PERSON FROM FACE DOWN IN THE WATER TO A VERTICAL OR SLIGHTLY BACKWARD (FACE-UP) POSITION
REQUIRED
200-83-SH-DTS-00007_A
Page 52 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
LIFE JACKETS AND CABINET
1.6
THE MATERIAL ATTACHED ON EACH SIDE OF THE JACKET MUST BE DIVIDED EQUALLY BETWEEN THE UPPER QUADRANTS OF THE SIDE, AND THE MATERIAL IN EACH QUADRANT MUST BE ATTACHED AS CLOSELY AS POSSIBLE TO THE SHOULDER AREA OF THE JACKET.
REQUIRED
E EQUIPMENT ACCESSORIES 1 EACH LIFE JACKET SHALL HAVE THE FOLLOWING ACCESSORIES:
1.1
WHISTLE AND LANYARD
REQUIRED
1.5 BATTERY FOR LIGHTS REQUIRED
1.2
SEAWATER ACTIVATED ILLUMINATING LIGHT
REQUIRED
1.3
1.4
BODY STRAP (SHALL BE FULLY ADJUSTABLE WITH BUCKLE) REFLECTIVE STRIPS (RETRO REFLECTIVE TAPE)
REQUIRED
REQUIRED
2 LIFEJACKET LIGHT CRITERIA:
1.6
1.7
1.8
LIFTING STRAPS AND ORAL INFLATION SYSTEM SUITABLE FOR FASTENING WITH BA SETS STAINLESS STEEL/PLASTIC SS-40 BUCKLE SNAP HOOK
REQUIRED
REQUIRED
REQUIRED
2.1
2.2
2.3
SHALL HAVE A LUMINOUS INTENSITY OF NOT LESS THAN 0.75 CD IN ALL DIRECTIONS OF THE UPPER HEMISPHERE. SHALL HAVE A SOURCE OF ENERGY CAPABLE OF PROVIDING A LUMINOUS INTENSITY OF 0.75 CD FOR A PERIOD OF AT LEAST 8 HOURS BE VISIBLE OVER AS GREAT A SEGMENT OF THE UPPER HEMISPHERE AS IS PRACTICABLE WHEN ATTACHED TO A LIFEJACKET.
REQUIRED
2.4
SHALL BE OF WHITE COLOUR.
REQUIRED
REQUIRED
2.5
HAZARDOUS AREA CLASSIFICATION REQUIREMENT: ZONE 1, GAS GROUP IIB, TEMPERATURE CLASS T3.
REQUIRED
REQUIRED
F CABINET DESIGN CRITERIA
1 SIZED FOR
FOR 50% POB UNITS OF LIFE JACKET, EXCLUDE CABINET LOCATED ON JACKET LEVEL (SHALL BE OF 5 POB)
8
VENTILATION / DRAINAGE
REQUIRED
200-83-SH-DTS-00007_A
Page 53 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
2 CABINET TYPE
LIFE JACKETS AND CABINET
DOUBLE DOOR, 180 DEGREE FRONT OPENING
9
FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)
3
MOUNTING / INSTALLATION
PROVISION OF ADEQUATE BOTTOM AND BACK FRAMES TO PERMIT DECK OR BULKHEAD MOUNTING
10
DONNING INSTRUCTIONS
4 CABINET MATERIAL
UV RESISTANT GRP
11 LABELLING (NOTE 1)
VENDOR TO ADVISE
IN ENGLISH, CONTAINED IN A WEATHER-PROOF COVER AND PERMANENTLY ATTACHED TO THE INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT “LIFE JACKETS” IN ENGLISH
5
IP RATING
IP56
12 MANUFACTURE NAME VENDOR TO ADVISE
6 CABINET PAINT FINISH
INTERNATIONAL ORANGE
7 COUNTRY OF ORIGIN VENDOR TO ADVISE
G SPECIAL REQUIREMENTS
13 MODEL
VENDOR TO ADVISE
1
COMPLIANCE STANDARD
2 CERTIFICATION
3
ENVIRONMENTAL REQUIREMENT
H PHYSICAL DATA
1
2
WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET
SOLAS OR EQUIVALENT INTERNATIONAL LIFE SAVING APPLIANCES CODE MED / SOLAS
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
VENDOR TO ADVISE
3
DIMENSION OF CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
I EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
LIFE JACKETS
2 MANUFACTURER NAME VENDOR TO ADVISE
J NOTES
3 MODEL NUMBER MANUFACTURER COUNTRY
4
VENDOR TO ADVISE
VENDOR TO ADVISE
1
2
3
4
THE DESIGNATED CABINET SHALL BE LABELLED “LIFE JACKETS” IN ENGLISH AND PLATFORM NAME IN BOLD BLACK LETTERS. TYPE AND SIZE AND PRINTING ON THE LIFEJACKET CABINET SHALL FULFIL THE REQUIREMENT OF LSA/SOLAS. SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING EQUIPMENT ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-0000200020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC- 0000200013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
5 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
6
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 54 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.5 Helicopter Crash and Rescue Equipment (HCRE) Cabinet
HELICOPTER CRASH AND RESCUE EQUIPMENT (HCRE) CABINET
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
2 PROJECT
033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA
C
ENVIRONMENTAL / SITE CONDITIONS
1 AMBIENT TEMPERATURE
2
3
RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE
4 ATMOSPHERE
RP 6N
RP 5N
LIFESAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 5 & 6)
RP 5S
RP 3S
RP 9S
WHP 13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-5)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT ACCESSORIES
1
HELICOPTER CRASH AND RESCUE EQUIPMENT SHALL INCLUDE THE FOLLOWING ITEMS:
NO.
ITEM
QTY.
MODEL
MANUFACTURER, COUNTRY
1
FIBERGLASS STORAGE CABINET TO STORE ALL EQUIPMENT
2
ADJUSTABLE WRENCH
3
BOLT CUTTER
4 HACKSAW HEAVY DUTY C/W 6 SPARE BLADES
5
PLIERS, SIDE CUTTING (TIN SNIPS)
6
SET OF ASSORTED SCREWDRIVERS
7 HARNESS KNIFE C/W SHEATH OR HARNESS CUTTER
8 GLOVES, FIRE RESISTANT
9
LADDER (2 PIECE)
1
1
1
1
1
1
2
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
2 PAIR
VENDOR TO ADVISE
VENDOR TO ADVISE
1
VENDOR TO ADVISE
VENDOR TO ADVISE
200-83-SH-DTS-00007_A
Page 55 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
HELICOPTER CRASH AND RESCUE EQUIPMENT (HCRE) CABINET
10
LIFE-LINE (5CM CIRCUMFERENCE X 15M LENGTH) PLUS RESCUE HARNESS
11 CROWBAR, LARGE
12
RESCUE AXE, LARGE (NON-WEDGE OR AIRCRAFT TYPE)
13 BLANKET, FIRE RESISTANT
14 SELF-CONTAINED BREATHING APPARATUS
1
1
1
1
2
15 FIREMEN’S BUNKER JACKET/TUNIC AND TROUSERS
2 SETS
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
16 FIREMEN’S BOOTS
17 FIREMEN’S HELMET W/ VISOR
18 MAN-MADE MINERAL FIBRE (MMMF) FILTER MASKS
19 RESCUE GRAB HOOK
20 POWER CUTTING TOOL
21 FIREMEN’S FLASH HOOD
E CABINET DESIGN CRITERIA
2 SETS
VENDOR TO ADVISE
VENDOR TO ADVISE
2
2
2
1
2
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
VENDOR TO ADVISE
1 CAPACITY
SIZED FOR HELICOPTER CRASH EQUIPMENT
7
FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)
2 CABINET MATERIAL
UV RESISTANT GRP (FIBERGLASS)
8
OPERATING INSTRUCTIONS
3
MOUNTING / INSTALLATION
PROVISION OF ADEQUATE BOTTOM AND BACK FRAMES TO PERMIT DECK OR BULKHEAD MOUNTING
9 LABELLING (NOTE 1)
4
IP RATING
IP56
10 LOCATION
5 CABINET PAINT FINISH
INTERNATIONAL ORANGE
11
CERTIFICATION (INSPECTION)
STAINLESS STEEL, SS316
IN ENGLISH, CONTAINED IN A WEATHER-PROOF COVER AND PERMANENTLY ATTACHED TO THE INSIDE OF CABINET LID/DOOR
“HELICOPTER CRASH KIT” 50 MM WHITE LETTER IN ENGLISH
LOCATION AND ELEVATION SHALL BE SUCH THAT NO POSSIBLE WATER INGRESS INTO/COLLECTED INSIDE THE CABINET
LIOYDS REGISTER
200-83-SH-DTS-00007_A
Page 56 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
HELICOPTER CRASH AND RESCUE EQUIPMENT (HCRE) CABINET
6 CABINET TYPE
FRONT OPEN DOUBLE DOOR FOR EASY REACHING TYPE CABINET
F SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD 2 CERTIFICATION
3
ENVIRONMENTAL REQUIREMENT
G PHYSICAL DATA
1
2
DIMENSION OF CABINET WEIGHT OF FILLED CABINET
CAP 437
COC ISSUED FROM SOLAS
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
VENDOR TO ADVISE
3
WEIGHT OF EMPTY CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
H EQUIPMENT IDENTIFICATIONS
1 EQUIPMENT TYPE
HELICOPTER CRASH AND RESCUE EQUIPMENT (HCRE) CABINET
3 MANUFACTURER NAME VENDOR TO ADVISE
2 MODEL NUMBER
VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
I NOTES 1 THE DESIGNATED CABINET SHALL BE LABELLED IN WHITE BOLD LETTERS.
2
3
4
5
EACH CRASH AND RESCUE EQUIPMENT BOX SHALL BE LOCATED AT STAIRWAY LANDING OF HELIDECK AND SHALL BE EASILY ACCESSIBLE. SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
6 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
7
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 57 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.6 First aid kit
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
FIRST AID KIT
2 PROJECT
3 QUANTITY
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
REFER TABLE 7.1
B EQUIPMENT IDENTIFICATION
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 5 & 6)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-5)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 FIRST AID KIT CRITERIA:
1.1
FIRST AID CABINET SHALL BE PROVIDED WITH HANDLE AND BRACKET & INCLUDING SUITABLE NUTS AND BOLTS FOR WALL MOUNTING.
1.2 MATERIAL
1.3
1.4
FIRST AID CABINET SHALL BE INDUSTRIAL GRADE, WATERTIGHT, WEATHERPROOF PLASTIC CONTAINER. FIRST AID CABINET SHALL BE EQUIPPED WITH A COVER THAT IS HELD CLOSED WITH SNAP TYPE FASTENERS.
REQUIRED
1.5
COLOUR OF FIRST AID BOX SHALL BE ORANGE. ALSO, SHALL INCLUDE O2 RESUSCITATION KIT
REQUIRED
INDUSTRIAL GRADE, CORROSION- RESISTANT MATERIAL
1.6 LABELLING
“FIRST AID KIT” IN ENGLISH WITH WHITE BOLD LETTER
REQUIRED
1.7
USAGE INSTRUCTIONS AND SHELF LIFE / EXPIRY DATE OF EACH ITEMS SHALL BE PROVIDED
REQUIRED
REQUIRED
E EQUIPMENT ACCESSORIES 1 CONTENTS IN FIRST AID KIT AS A MINIMUM:
NO. ITEM
QTY.
NO.
ITEM
1
STERILE ADHESIVE PLASTER DRESSING STRIPS
200-83-SH-DTS-00007_A
100
14
SURGICAL FACE MASKS
QTY.
10
Page 58 of 101
4
4
4
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
FIRST AID KIT
2 2.5CM X 5M ADHESIVE DRESSING TAPE
1
15
SAFETY GLASSES OR GOGGLES
2 PAIRS
3
4
5
PRE-PACKED, NON-ALCOHOL ANTISEPTIC SWABS
20
16
PACKET OF SAFETY PINS, ASSORTED SIZE
1
CREPE BANDAGES: SIZES MEDIUM AND LARGE
ELASTIC BANDAGES: SIZES MEDIUM AND LARGE
17
18
SHORT NOSED, BLUNT SCISSORS (12.5 CM MINIMUM LENGTH)
1 PAIR
STERILE EYEWASH SOLUTION (10ML & 30ML AMPOULE)
2 EACH
6 TRIANGULAR BANDAGES
19
SPLINTER FORCEPS (125MM LONG)
7 BODY FLUID “SPILL KIT” COMPRISING:
1 KIT
20
SINGLE USE STERILE SPLINTER PROBE
- DISPOSABLE SCOOP AND SCRAPER
21
VOMIT BAGS
1
5
6
-
INFECTIOUS WASTE ABSORBENT
-
DISPOSABLE CLINICAL WASTE BAG (2 IN NUMBER)
22
23
STERILE, NON-MEDICATED WOUND DRESSING: SIZES MEDIUM AND LARGE
5 EACH
ANTISEPTIC CREAM / LOTION AND ANTI-ITCH CREAM
1 EACH
- HYGIENIC WIPES (2 IN NUMBER)
24 O2 RESUSCITATION KIT
1 EACH
8
DISPOSABLE GLOVES: SIZES SMALL, MEDIUM AND LARGE
10 EACH
25
BURN DRESSING
9 STERILE EYE PADS
4
26
COMPRESS WOUND DRESSINGS (5 X 9 INCH)
10
(4 X 4 INCH) STERILE GAUZE SWABS (3 PER PACK)
5 PACKS
27 FOIL BLANKET
11 CHEMICAL ICEPACK
12 POCKET MASK
13
NON-FLAMMABLE, SILVER, SPACE RESCUE BLANKET
1
1
2
28
FIRST AID /CPR INSTRUCTION BOOKLET
29
LOG BOOK
30 CONTENTS LIST
2
2
3
1
1
1
F SPECIAL REQUIREMENTS 1 COMPLIANCE STANDARD 2 CERTIFICATION
ISEA Z308.1 COC ISSUED FROM SOLAS
3
ENVIRONMENTAL REQUIREMENT
G PHYSICAL DATA
1
2
WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
VENDOR TO ADVISE
3
DIMENSION OF CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
FIRST AID KIT
3 MANUFACTURER NAME VENDOR TO ADVISE
2 MODEL NUMBER
VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
I NOTES 1 THE DESIGNATED CABINET SHALL BE LABELLED “FIRST AID KIT” IN ENGLISH IN WHITE BOLD LETTERS.
2
VENDOR SHALL PROVIDE THE FIXING ACCESSORIES FOR MOUNTING FIXING CABINET FOR INDOOR INSTALLATION.
200-83-SH-DTS-00007_A
Page 59 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
FIRST AID KIT
3
4
5
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
6 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
7
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 60 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.7 Stretcher
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
STRETCHER
2 PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA
ENVIRONMENTAL / SITE CONDITIONS
AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 4 & 5)
RP 5S
RP 3S
RP 9S
WHP 13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-4)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 STRETCHER CRITERIA:
1.1
FOUR (4) POLE STRETCHERS OF AN APPROVED TYPE SHALL BE LOCATED ON THE PLATFORM.
1.2
SHALL BE THE TYPE THAT CAN BE USED IN HELICOPTER, CRANE, OR BOAT MEDICAL EVACUATION.
REQUIRED
1.8
REQUIRED
1.9
1.3
FOLDED AND STORED INSIDE VALISE
REQUIRED
1.10
1.4
THEY SHALL BE SUITABLE FOR TWO OR FOUR MAN CARRYING.
REQUIRED
1.11
STRETCHER SHALL BE DESIGNED WITH SUITABLE BRACKETS FOR WALL MOUNTING INCLUDING FIXING SCREWS / NUTS & BOLTS. ALL NECESSARY ACCESSORIES FOR THE STRETCHER E.G. CARRYING HANDLES, LIFTING STRAPS, PILLOW, AND STORAGE VALISE SHALL BE PROVIDED. SHALL HAVE PADS, BACK PLATE AND PULLOUT STRAPS TO SECURE THE HEAD, CHEST, ARMS, THIGHS, LOWER LEGS AND FEET. SHALL BE LIGHTWEIGHT AND EASILY MANEUVERABLE.
REQUIRED
REQUIRED
REQUIRED
REQUIRED
200-83-SH-DTS-00007_A
Page 61 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
STRETCHER
1.5
MINIMUM 100 KG PERSON WEIGHT SHALL BE CONSIDERED FOR THE STRETCHER DESIGN.
REQUIRED
1.12
1.6
COLLAPSIBLE TO MINIMUM SPACE
REQUIRED
1.13
1.7
STRETCHER VALISE SHALL BE MARKED AS “STRETCHER” IN ENGLISH.
REQUIRED
1.14
SHALL BE MADE OF HEAVY-DUTY MATERIAL WHICH IS SUITABLE FOR OFFSHORE USE AND RESISTANT TO ROT AND CORROSION. A PICK-UP BRIDLE AND STRAPS SHALL BE PROVIDED WITH EACH STRETCHER. STRETCHER SHALL BE PARAGUARGD (FERNO) OR EQUIVALENT
REQUIRED
REQUIRED
REQUIRED
E SPECIAL REQUIREMENTS 1 COMPLIANCE STANDARD 2 CERTIFICATION
EC DIRECTIVE 93/42/EEC
DECLARATION OF CONFORMITY WILL BE PROVIDED FROM MANUFACTURER – EC DIRECTIVE 93/42/EEC
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
3
ENVIRONMENTAL REQUIREMENT
F PHYSICAL DATA WEIGHT OF STRETCHER
1
VENDOR TO ADVISE
2 WEIGHT OF VALISE
VENDOR TO ADVISE
3 DIMENSION OF VALISE VENDOR TO ADVISE
G EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
STRETCHER
2 MANUFACTURER NAME VENDOR TO ADVISE
H
NOTES
4
5
DIMENSION OF STRETCHER FILLED WEIGHT WITH VALISE
VENDOR TO ADVISE
VENDOR TO ADVISE
3 MODEL NUMBER MANUFACTURER COUNTRY
4
VENDOR TO ADVISE
VENDOR TO ADVISE
1 DECLARATION OF CONFORMITY WILL BE PROVIDED FROM MANUFACTURER - EC DIRECTIVE 93/42/EEC.
2
3
4
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
5 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
6
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 62 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.8 Self-Contained Breathing Apparatus (SCBA) and Cabinet
SELF-CONTAINED BREATHING APPARATUS (SCBA) AND CABINET
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
2 PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA
ENVIRONMENTAL / SITE CONDITIONS
AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
LIFESAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
RP 5S
RP 3S
RP 9S
WHP 13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-1)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 SELF CONTAINED BREATHING APPARATUS CRITERIA:
1.1
SUPPLY DURATION (MINIMUM)
45 MINUTES OF BREATHING AIR AT WORKING PRESSURE (200 BAR, 9 LITERS CAPACITY)
1.8
1.2
SHALL BE MADE OF LIGHTWEIGHT COMPOSITE MATERIAL.
REQUIRED
1.9
1.3
THE REDUCER SHALL INCORPORATE A PRESSURE RELIEF VALVE.
REQUIRED
1.10
1.4
CYLINDER TEST CERTIFICATES SHALL BE SUBMITTED.
REQUIRED
1.11
SHALL CONTAIN FULLY LUMINESCENT SHOCK RESISTANT PRESSURE GAUGE AND A WARNING WHISTLE. WARNING WHISTLE IS ACTIVATED WHEN THE CYLINDER PRESSURE REDUCES TO 55BAR OR BELOW. THE MASK SHALL INCORPORATE A DOUBLE SEAL FOR INSTANT POSITIVE FIT AND A SPEECH DIAPHRAGM FOR GOOD COMMUNICATION. SHALL INCORPORATE A POSITIVE PRESSURE, FIRST BREATH ACTIVATED LDV, PROVIDING STABLE AIR SUPPLY WITH LOW BREATHING RESISTANCE.
REQUIRED
REQUIRED
REQUIRED
REQUIRED
200-83-SH-DTS-00007_A
Page 63 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
SELF-CONTAINED BREATHING APPARATUS (SCBA) AND CABINET
THE CARRYING SYSTEM SHALL CONSIST OF AN ORTHOPAEDICALLY DESIGNED BACK PLATE WITH HARNESS TO WHICH THE REDUCER, LUNG DEMAND VALVE (LDV) AND PRESSURE GAUGE ARE MOUNTED. THE BACK PLATE SHALL INCORPORATE A WAIST BELT TO CONCENTRATE WEIGHT ON HIPS OF THE BEARER. THE CYLINDER STRAPS SHALL BE ADJUSTABLE TO ACCOMMODATE THE CYLINDERS.
1.5
1.6
1.7
REQUIRED
1.12
OUTDOOR SCBA UNITS SHALL BE SUPPLIED WITH UV RESISTANT WEATHERPROOF FIBERGLASS ENCLOSURE.
REQUIRED
REQUIRED
1.13
SHALL CONSIST OF A FULLY CHARGED SINGLE CYLINDER TYPE.
REQUIRED
REQUIRED
E EQUIPMENT ACCESSORIES / FEATURES
1
2
PRESSURE GAUGE FITTED
WARNING WHISTLE FITTED
REQUIRED
9 CYLINDER MATERIAL
REQUIRED
10 CYLINDER CAPACITY
3 BACK PLATE MATERIAL VENDOR TO ADVISE
VENDOR TO ADVISE
11
12
CYLINDER VALVE FITTED CYLINDER WORKING PRESSURE
STEEL/ CARBON COMPOSITE FIBER 45 MINUTES OF BREATHING AIR AT WORKING PRESSURE (200 BAR, 9 LITERS CAPACITY)
REQUIRED
VENDOR TO ADVISE
4
5
6
7
ADJUSTABLE HARNESS MATERIAL FITTING AND ADJUSTERS MATERIAL FLAME RESISTANT MASK DEMAND VALVE WITH QUICK COUPLING FITTED
VENDOR TO ADVISE
13 CYLINDER FEATURES VENDOR TO ADVISE
REQUIRED
14 SPARE CYLINDER
REQUIRED
REQUIRED
15
FACE MASK WITH VISOR, NOSECUP
WIDE VISION NON- FOGGING
8
MATERIAL OF DEMAND VALVE
VENDOR TO ADVISE
16
1/4” MALE FOSTER OR EQUIVALENT ADAPTER FOR CONNECTION TO HOSE AND BREATHING AIR MANIFOLD
STAINLESS STEEL SS316
F CABINET DESIGN CRITERIA
1 CAPACITY
SIZED FOR THE 4 NOS. OF SCBA UNIT AND ITS SPARE CYLINDER WITH ASSEMBLY
6
MANUFACTURER NAME
VENDOR TO ADVISE
2
CABINET COLOR
GREEN
7 LABELLING
3 HANDLE
STAINLESS STEEL
8
DONNING INSTRUCTION
“SELF CONTAINED BREATHING APPARATUS” IN ENGLISH IN ENGLISH, CONTAINED IN A WEATHER-PROOF COVER AND PERMANENTLY ATTACHED TO THE
200-83-SH-DTS-00007_A
Page 64 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
SELF-CONTAINED BREATHING APPARATUS (SCBA) AND CABINET
INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT
4 CABINET MATERIAL
WEATHERPROOF UV RESISTANT, FIBREGLASS
9
IP RATING
IP56
5 COUNTRY OF ORIGIN
VENDOR TO ADVISE
10 MODEL
VENDOR TO ADVISE
G SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD
EN 137
3
ENVIRONMENTAL REQUIREMENT
2 CERTIFICATION
SOLAS MED
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
H PHYSICAL DATA
1
2
WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET
VENDOR TO ADVISE
3
DIMENSION OF CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
I EQUIPMENT IDENTIFICATIONS
1 EQUIPMENT TYPE
SELF-CONTAINED BREATHING APPARATUS (SCBA)
3 MANUFACTURER NAME VENDOR TO ADVISE
2 MODEL NUMBER
VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
J NOTES
1
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 3 ONE SPARE CYLINDER WITH ASSEMBLY (EXCEPT HOSE) SHALL BE PROVIDED. 4 A SOFT COVER OR BAG SHALL BE PROVIDED TO PROTECT THE VISOR WHILST STORED.
5
6
7
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
THE DESIGNATED CABINET SHALL BE LABELLED “SELF CONTAINED BREATHING APPARATUS” IN ENGLISH IN WHITE BOLD LETTERS.
8 VENDOR SHALL PROVIDE THE FIXING ACCESSORIES FOR MOUNTING CABINET OUTSIDE THE BUILDING.
9
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
10
THE SCBA SHALL HAVE THE FLEXIBILITY TO RECEIVE BREATHING AIR FROM OTHER EQUIPMENT AND MUST BE PROVIDED AT LEAST ONE HOSE FOR THE TRANSFER OF AIR FROM ONE CYLINDER TO ANOTHER CYLINDER VIA A RIC-UAC OR EQUIVALENT CONNECTOR (I.E. BUDDY BREATHER, ETC.).
200-83-SH-DTS-00007_A
Page 65 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.9 Work Vest and Cabinet
WORK VEST AND CABINET
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & PIPELINES PROJECT REFER TABLE 7.1
INTRAFIELD
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-1)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 TYPE
V PFD USCG
2 SIZE
FIT FOR ADULT
3 MATERIAL
COATED WITH VINYL, WHICH IS TOUGH, FIRE RETARDANT, SELF- EXTINGUISHING, HIGHLY ABRASIVE RESISTANT, EASILY CLEANED AND SHALL RETAIN BUOYANCY EVEN WHEN PUNCTURED
9
10
MINIMUM BUOYANCY OF 70 NEWTONS SUITABLE FOR WEARING OVER COVERALLS
REQUIRED
REQUIRED
11
INSTRUCTION
IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION
4 WEIGHT
VENDOR TO ADVISE
12
5 COLOUR
INTERNATIONAL ORANGE
6 LABELLING
SCREEN PRINTED IN WATER RESISTANT VINYL INK
13
14
RETRO-REFLECTIVE TAPES BREAST POCKET COMPLETE WITH WHISTLE EQUIPPED WITH STAINLESS STEEL SNAP HOOKS AND D- RINGS, WITH TWO ENCIRCLING BELTS WITH SNAG RESISTANT BUCKLES
REQUIRED
REQUIRED
REQUIRED
200-83-SH-DTS-00007_A
Page 66 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
7
8
RESISTANT TO SUNLIGHT DETERIORATION OPEN ON THE BACK TO ACCOMMODATE MOST BRANDS OF FALL PROTECTION HARNESSES
WORK VEST AND CABINET
REQUIRED
15 MARKING
“WORK VEST” IN BLOCK LETTERS
REQUIRED
16
SELF-EXTINGUISHING UNDER ASTM1692-74
REQUIRED
E CABINET DESIGN CRITERIA 1 CAPACITY
VENDOR TO ADVISE
7 CABINET PAINT FINISH VENDOR TO ADVISE
2 COLOUR
INTERNATIONAL ORANGE
8
VENTILATION / DRAINAGE
INCORPORATE PROVISIONS FOR BOTH DRAINAGE AND VENTILATION AND AFFORD FULL WEATHER PROOFING TO THE STORED CONTENTS
3 LABELLING (NOTE 3)
4 CABINET MATERIAL
5 MOUNTING IP RATING
6 F SPECIAL REQUIREMENTS
“WORK VEST” 50MM WHITE LETTER HEAVY-DUTY GLASS REINFORCED PLASTIC (GRP) VENDOR TO ADVISE IP56
9 COUNTRY OF ORIGIN VENDOR TO ADVISE
10
FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)
STAINLESS STEEL, SS316
11 MANUFACTURE NAME VENDOR TO ADVISE VENDOR TO ADVISE 12 MODEL
1
2
COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT
G PHYSICAL DATA
1
2
WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET
USCG
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
VENDOR TO ADVISE
3
DIMENSION OF CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
WORK VEST
2 MODEL NUMBER
VENDOR TO ADVISE
I NOTES
3 MANUFACTURER NAME VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
1
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
3
THE DESIGNATED CABINET SHALL BE LABELLED IN CAPITAL LETTER OF ROMAN ALPHABET WITH WHITE COLOUR.
4 CE MARKING SHALL BE STAMPED ON ALL MATERIALS.
5
6
7
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 67 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.10 Oil Spill Kit
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
OIL SPILL KIT
2 PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
C
1
2
3 BLACK BODY
TEMPERATURE
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-1)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION SPILL KIT CONTENT
1 ABSORBENT PILLOW
REQUIRED
2 ABSORBENT BOOMS
REQUIRED
3 OIL ABSORBENT PADS REQUIRED
4
5
OIL AND SLUDGE CLEANER OIL RESISTANT GLOVES
REQUIRED
REQUIRED
E CABINET DESIGN CRITERIA
6
7
OIL SPILL CLEAN-UP GUIDE NATURAL HAND CLEANER
9
8 ABSORBENT ROLL CONTAMINATED WASTE BAGS DISPOSABLE COVERALL (SIZE XL)
10
REQUIRED
REQUIRED
REQUIRED
REQUIRED
REQUIRED
1 CAPACITY
2 CABINET MATERIAL
ABLE TO FIT ALL THE ITEMS IN ‘SECTION D’ UV RESISTANT FIRE- RETARDANT GRP
7
VENTILATION / DRAINAGE
VENTILATION LOUVERS AND DRAINAGE HOLES
8 COUNTRY OF ORIGIN VENDOR TO ADVISE
3 COLOUR
VENDOR TO ADVISE
9
FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)
STAINLESS STEEL SS316
10 MANUFACTURER NAME VENDOR TO ADVISE
11 MODEL
VENDOR TO ADVISE
4 LABELLING (NOTE 3)
“OIL SPILL KIT” IN ENGLISH 5 MOUNTING VENDOR TO ADVISE 6 CABINET PAINT FINISH VENDOR TO ADVISE F SPECIAL REQUIREMENTS 1 COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT
2
IMO / SOLAS (VENDOR TO CONFIRM)
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
200-83-SH-DTS-00007_A
Page 68 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
OIL SPILL KIT
G PHYSICAL DATA
1
2
WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET
VENDOR TO ADVISE
3
DIMENSION OF CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
OIL SPILL KIT
2 MODEL NUMBER
VENDOR TO ADVISE
I NOTES
3 MANUFACTURER NAME VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
1
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
3
4
5
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 69 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.11 Breathing Apparatus Escape Sets and Cabinet
BREATHING APPARATUS ESCAPE SETS AND CABINET
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
033764
2 PROJECT
COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1
TAG NUMBER (HOLD- 2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
3 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
LIFE SAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-1)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1
2
15 MINUTE AIR SUPPLY BASED ON HEAVY BREATHING ASSOCIATED WITH AEROBIC LEVELS OF ESCAPE
BA SET STEEL AIR CYLINDER SHALL BE USER SERVICEABLE AND SHALL BE CAPABLE OF BEING REFILLED.
REQUIRED
7
REQUIRED
8
CHANGING THE CYLINDER OF THE BA WHILE IN USE, WHICH IS NOT POSSIBLE IN BA SETS. HOWEVER PLEASE NOTE THAT THE SETS COMES WITH AIRLINE CONNECTION WHICH CAN BE CONNECTED TO THE CASCADE SYSTEM. THERE SHALL BE WARNING ALARM FITTED WITH THE BA SET UNIT WHICH WILL INITIATE ALARM WHEN THE CYLINDER AIR IS LESS THAN FOR 5 MINUTES/EOSTI (PRESSURE GAUGE)
REQUIRED
REQUIRED
200-83-SH-DTS-00007_A
Page 70 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
BREATHING APPARATUS ESCAPE SETS AND CABINET
3
BA SET UNIT SHALL BE ABLE TO PREVENT TOXIC GAS FROM ENTERING THE FACEMASK WHILE CONNECTING TO CASCADE BREATHING AIR SYSTEM (BA MANIFOLD).
REQUIRED
9
A FIRST STAGE REDUCER SHALL BE INCLUDED TO PROVIDE A HIGH PERFORMANCE FOR 200 OR 300 BAR WITHOUT ADJUSTMENT (1000 I/MIN. AVAILABLE NOMINAL FLOW, 500 I/MIN AVAILABLE FLOW AT CYLINDER PRESSURE AS LOW AS 20 BAR). THE BALANCED PISTON DESIGN FOR THE LUNG DEMAND VALVE ELIMINATES MEDIUM PRESSURE SENSITIVITY AND IT HAS THE OPTIMUM RELATIONSHIP BETWEEN SIZE, SERVICEABILITY AND RELIABILITY (4-10 MILLIBAR FIRST ACTIVATION PRESSURE; NO BY- PASS REQUIRED; SUPPLEMENTARY SUPPLY INCLUDED, POSITIVE PRESSURE MAINTAINED, EVEN AT 10 BAR AND 300 I/MIN.
REQUIRED
4
CYLINDER CAPACITY OF 3 LITRES AT 200 BAR
REQUIRED
10 REFILLABLE
YES
5 CYLINDER MATERIAL STEEL
11 MANUFACTURER NAME VENDOR TO ADVISE
6 MODEL
VENDOR TO ADVISE
12 COUNTRY OF ORIGIN
VENDOR TO ADVISE
E EQUIPMENT ACCESSORIES / FEATURES
FACEMASK WITH FIVE ADJUSTABLE HEAD STRAPS, HARD- COATED POLYCARBONATE LENS, BUILT-IN NOSECUP AND SPRING- LOADED DUAL EXHAUST VALVES, ALSO INCLUDE THREADED INLET AT CENTRE FRONT FOR CONNECTION WITH PRESSURE DEMAND VALVE COMPACT CARRYING POUCH TO CARRY FACEMASK
1
2
REQUIRED
3
INCLUDE DUST CAPS FOR ENDS OF HOSES FOR AIR LINES
VENTILATION LOUVERS AND DRAINAGE HOLES
REQUIRED
4
1/4” MALE FOSTER OR EQUIVALENT ADAPTER FOR CONNECTION TO
STAINLESS STEEL SS316
200-83-SH-DTS-00007_A
Page 71 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
BREATHING APPARATUS ESCAPE SETS AND CABINET
HOSE AND BREATHING AIR MANIFOLD.
F CABINET DESIGN CRITERIA
1 CAPACITY
CABINET SIZE SHALL BE SUITABLE TO STORE REQUIRED NUMBER OF ESCAPE SETS.
2
CABINET SHALL HAVE TWO DOORS ON FRONT TO ACCESS EQUIPMENT
REQUIRED
7
VENTILATION / DRAINAGE
VENTILATION LOUVERS AND DRAINAGE HOLES
8
FITTINGS MATERIAL (HINGES, HANDLES, LATCHES, BOLTS, ETC.)
STAINLESS STEEL SS316
3 COLOUR
GREEN
9 MANUFACTURER NAME VENDOR TO ADVISE
4 CABINET MATERIAL
UV RESISTANT FIRE RETARDANT GRP
10 COUNTRY OF ORIGIN
VENDOR TO ADVISE
5 MOUNTING
FIXING ACCESSORIES FOR MOUNTING CABINET INSIDE THE BUILDING WILL BE PROVIDED
11 INSTRUCTIONS
DONNING INSTRUCTIONS IN ENGLISH, CONTAINED IN A WEATHER- PROOF COVER AND PERMANENTLY ATTACHED INSIDE OF CABINET LID/DOOR AT HEIGHT WHERE READABLE BY PERSON STANDING IN FRONT
6 LABELLING
“BREATHING APPARATUS” 50 MM WHITE LETTER IN ENGLISH
12 MODEL
VENDOR TO ADVISE
G SPECIAL REQUIREMENTS 1 COMPLIANCE STANDARD ENVIRONMENTAL REQUIREMENT
2
IMO / SOLAS (VENDOR TO CONFIRM)
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
H PHYSICAL DATA
1
2
WEIGHT OF FILLED CABINET WEIGHT OF EMPTY CABINET
VENDOR TO ADVISE
3 DIMENSION OF CABINET
VENDOR TO ADVISE
VENDOR TO ADVISE
I EQUIPMENT IDENTIFICATIONS
1 EQUIPMENT TYPE
BREATHING APPARATUS ESCAPE SETS
3 MANUFACTURER NAME VENDOR TO ADVISE
2 MODEL NUMBER
VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
J NOTES
1
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
3
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200- 20-SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
200-83-SH-DTS-00007_A
Page 72 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
BREATHING APPARATUS ESCAPE SETS AND CABINET
4
5
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
6 EN 402 APPROVAL CERTIFICATE WILL BE PROVIDED.
200-83-SH-DTS-00007_A
Page 73 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
9.12 Medical Oxygen Cylinder with Face Mask
MEDICAL OXYGEN CYLINDER WITH FACE MASK
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
C
1
2
3 BLACK BODY
TEMPERATURE
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
LIFESAVING ENVIRONMENTAL / SITE CONDITIONS (NOTE 2 & 3)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-2)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 MATERIAL
CYLINDER BODY & OUTLETS: ALUMINIUM/ NICKEL PLATED BRASS
INTERNAL PARTS: BRASS/ STAINLESS STEEL
CART: CHROME PLATED STEEL
6 RELIEF VALVE
YES
2 SUPPLY PRESSURE
200-2600 PSI
7 CART
3 OUTLET PRESSURE
45-55 PSI
8 DEMAND VALVE
SUITABLE FOR D-SIZE CYLINDER, HEIGHT ADJUSTMENT FROM 36 TO 43”, STABLE, LIGHTWEIGHT, C/W CARRY HANDLE AND FOAM TIRES
YES, C/W WITH ADULT SIZE MASK, AND 6 FT HOSE
4 FLOW CAPACITY
CONSTANT FLOW OUTLET SELECTIONS 0-25 LPM: 0, ¼, ½, 1, 2, 3, 4, 6, 8, 10, 15, 25 HIGH FLOW OUTLET 100 LPM MIN
9 DESIGN LIFE
VENDOR TO ADVISE
200-83-SH-DTS-00007_A
Page 74 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
5 FILTER
E ACCESSORIES
1
MEDICAL OXYGEN D- SIZE CYLINDER (415 LITERS) WITH TOGGLE VALVE
2 VALVE REGULATOR F PHYSICAL DATA 1 WEIGHT (KG)
MEDICAL OXYGEN CYLINDER WITH FACE MASK
25 MICRON SINTERED BRONZE
10
WARRANTY & GUARANTEE
VENDOR TO CONFIRM
REQUIRED
REQUIRED
3
ADJUSTABLE CART FOR D-SIZE CYLINDER
REQUIRED
4 OXYGEN POWERED DEMAND VALVE
REQUIRED
VENDOR TO ADVISE
2 DIMENSION
VENDOR TO ADVISE
G EQUIPMENT IDENTIFICATIONS
1 EQUIPMENT TYPE
MEDICAL OXYGEN CYLINDER
2 MODEL NUMBER
VENDOR TO ADVISE
H NOTES
4
5
MANUFACTURER NAME MANUFACTURER COUNTRY
VENDOR TO ADVISE
VENDOR TO ADVISE
1
2
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
3 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
4 MEDICAL OXYGEN CYLINDER SHALL BE KEPT INSIDE TR.
5
6
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET. COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 75 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10 DATASHEET FOR FIREFIGHTING EQUIPMENT
10.1 Dry Chemical Powder Handheld Extinguisher (BC Type) 9 kg
DRY CHEMICAL POWDER HANDHELD EXTINGUISHER (BC TYPE) 9 KG
ADMINISTRATIVE IDENTIFICATIONS
A 1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B
EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
WHP4N
RP 5S
RP 3S
RP4N
RP 9S
WHP6N
WHP 13N
WHP5N
FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION
EQUIPMENT DESIGN CRITERIA
1 EXTINGUISHANT AGENT
POTASSIUM BICARBONATE (BC TYPE),
15
HOSE COUPLING, SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL
2 PROPELLANT TYPE
NITROGEN (N2) CARTRIDGE
16
ALL CARRYING AND OPERATING HANDLES
STAINLESS STEEL 316L
PISTOL-GRIP DESIGN, MADE OF STEEL WITH ELECTRO-CHEMICAL CORROSION RESISTANCE
3
4
5
EXTINGUISHANT CAPACITY
9 kg
CARTRIDGE OPERATING PRESSURE CARTRIDGE TEST PRESSURE
VENDOR TO ADVISE
17
18
DISCHARGE LEVER FITTED WITH SAFETY RING PIN AND CHAIN UNIT DISCHARGE INDICATOR
REQUIRED
REQUIRED
VENDOR TO ADVISE
19 PAINT FINISH
NFPA-10 / LISTED
6 DESIGN TEMPERATURE VENDOR TO ADVISE
20
MINIMUM EXTINGUISHING RATING TESTING
120 B:C (120 SQ FT)
7 UL CLASSIFICATION
120-B:C
21 TESTING
UL/ULC
8
MINIMUM DISCHARGE TIME
20-25 SECONDS
22
PROVIDED WITH 35 MM WIDE MOUNTING POINT
REQUIRED
200-83-SH-DTS-00007_A
Page 76 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
DRY CHEMICAL POWDER HANDHELD EXTINGUISHER (BC TYPE) 9 KG
9
EFFECTIVE RANGE (MIN)
9 METERS
23
ON THE SHOULDER OF THE BODY SHELL, SUITABLE FOR USE WITH A BRACKET PROVISION OF MAINTENANCE RECORD PLATE
10 CONTAINER MATERIAL
CARBON STEEL WITH CORROSION RESISTANCE COATING MARINE CONDITION
24
OPERATING INSTRUCTION
11 MOUNTING BRACKETS
REQUIRED (FOR INDOOR LOCATIONS)
25 REFILL INSTRUCTION
REQUIRED
IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION
IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION
12 LABEL
WHITE LETTERINGS “POWDER” ON BLUE BACKGROUND
26 HOSE LENGTH (MIN)
VENDOR TO ADVISE
13 APPROVALS
UL/FM/USCG APPROVED 27 HOSE MATERIAL
NON-ELECTRICAL CONDUCTING FLEXIBLE NEOPRENE
14 STANDARD
NFPA 10
28
CONTAINER PAINT FINISH
RED (RAL 3000)
E
NAMEPLATE
1 MATERIAL
2
OPERATION INSTRUCTIONS
AS PER MANUFACTURER STANDARD
5 FIRE RATING
REQUIRED
REQUIRED
6 APPROVAL STANDARD UL LISTED/FM APPROVED
3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED F
CABINET DESIGN
7 LANGUAGE
ENGLISH
1 MATERIAL
2
DIMENSION (APPROXIMATE)
3 PAINTING
4 THICKNESS (MIN) 5 WEIGHT G PHYSICAL DATA FULLY CHARGED WEIGHT
1
FIRE RETARDANT AND UV RESISTANT HEAVY DUTY GRP
6 MARKING
VENDOR TO ADVISE
7 DOOR
CORROSION RESISTANCE PAINTING VENDOR TO ADVISE VENDOR TO ADVISE
8 FITTINGS
IP RATING
9 10 COLOUR
“FIRE EXTINGUISHER” WITH WHITE BLOCK LETTERS SHALL BE HINGED AND SHALL NOT BE LOCKABLE
MADE FROM STAINLESS STEEL 316L IP56 RED (RAL 3000)
VENDOR TO ADVISE
2
EXTINGUISHER DIMENSION
VENDOR TO ADVISE
H SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD
NFPA 10, UL 299
2
ENVIRONMENTAL REQUIREMENT
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
I EQUIPMENT IDENTIFICATIONS
1 MODEL NUMBER
VENDOR TO ADVISE
2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES
3
MANUFACTURER COUNTRY
VENDOR TO ADVISE
200-83-SH-DTS-00007_A
Page 77 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
DRY CHEMICAL POWDER HANDHELD EXTINGUISHER (BC TYPE) 9 KG
1
2
3
EXTINGUISHER SHALL BE SPECIFIED WITH FIRE EXTINGUISHER CABINET FOR OUTDOOR LOCATIONS WITH DECKS MOUNTED, AND WALL BRACKET FOR INDOOR LOCATIONS. EXTINGUISHERS SHALL BE US COAST GUARD APPROVED AND SHALL BE IN ACCORDANCE WITH UL REQUIREMENTS. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANCE PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FIRE EXTINGUISHER CABINET SHALL ALSO BE SUITABLE FOR CORROSIVE ENVIRONMENT.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
5
6
7
200-83-SH-DTS-00007_A
Page 78 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10.2 Carbon Dioxide Handheld Extinguisher 4.5 kg
A
ADMINISTRATIVE IDENTIFICATIONS
CARBON DIOXIDE HANDHELD EXTINGUISHER 4.5 KG
1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B
EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION
EQUIPMENT DESIGN CRITERIA
1 EXTINGUISHANT AGENT CARBON DIOXIDE
15
HOSE COUPLING, SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL
2 PROPELLANT TYPE
SELF EXPELLANT
16
ALL CARRYING AND OPERATING HANDLES
STAINLESS STEEL 316L
PISTOL-GRIP DESIGN, MADE OF STEEL WITH ELECTRO-CHEMICAL CORROSION RESISTANCE
3
4
5
EXTINGUISHANT CAPACITY
4.5 kg
17
DISCHARGE LEVER FITTED WITH SAFETY RING PIN AND CHAIN
REQUIRED
CARTRIDGE OPERATING PRESSURE
CARTRIDGE TEST PRESSURE
VENDOR TO ADVISE
18 LABEL
WHITE LETTERINGS “CO2” ON BLACK BACKGROUND
VENDOR TO ADVISE
19
MINIMUM EXTINGUISHING RATING TESTING
10-B:C
6 DESIGN TEMPERATURE VENDOR TO ADVISE
20 TESTING
UL/ULC
7 UL CLASSIFICATION
10-B:C
21
8
MINIMUM DISCHARGE TIME
8-30 SECONDS
22
PROVIDED WITH 35 MM WIDE MOUNTING POINT ON THE SHOULDER OF THE BODY SHELL, SUITABLE FOR USE WITH A BRACKET PROVISION OF MAINTENANCE RECORD PLATE
REQUIRED
REQUIRED
200-83-SH-DTS-00007_A
Page 79 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
CARBON DIOXIDE HANDHELD EXTINGUISHER 4.5 KG
9
EFFECTIVE RANGE (MIN)
1-2.5 METERS
23
OPERATING INSTRUCTION
IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION
IN ENGLISH, WITH PICTOGRAM / ILLUSTRATION
10 CONTAINER MATERIAL
11 MOUNTING BRACKETS
ALUMINIUM WITH CORROSION RESISTANCE COATING MARINE CONDITION REQUIRED (FOR INDOOR LOCATIONS)
24 REFILL INSTRUCTION
25 HOSE LENGTH (MIN)
VENDOR TO ADVISE
12 PAINT FINISH
NFPA-10 / LISTED
26 HOSE MATERIAL
NON-ELECTRICAL CONDUCTING FLEXIBLE NEOPRENE
13 APPROVALS
UL/FM/USCG APPROVED 27
CONTAINER PAINT FINISH
RED (RAL 3000)
14 STANDARD E
NAMEPLATE
1 MATERIAL
2
OPERATION INSTRUCTIONS
NFPA 10
AS PER MANUFACTURER STANDARD
5 FIRE RATING
REQUIRED
REQUIRED
6 APPROVAL STANDARD UL LISTED/FM APPROVED
3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED F
CABINET DESIGN
7 LANGUAGE
ENGLISH
1 MATERIAL
2
DIMENSION (APPROXIMATE)
3 PAINTING
4 THICKNESS (MIN) 5 WEIGHT G PHYSICAL DATA FULLY CHARGED WEIGHT
1
FIRE RETARDANT AND UV RESISTANT HEAVY DUTY GRP
6 MARKING
VENDOR TO ADVISE
7 DOOR
CORROSION RESISTANCE PAINTING VENDOR TO ADVISE VENDOR TO ADVISE
8 FITTINGS
IP RATING
9 10 COLOUR
“FIRE EXTINGUISHER” WITH WHITE BLOCK LETTERS SHALL BE HINGED AND SHALL NOT BE LOCKABLE MADE FROM STAINLESS STEEL 316L IP56 RED (RAL 3000)
VENDOR TO ADVISE
2
EXTINGUISHER DIMENSION
VENDOR TO ADVISE
H SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD
NFPA 10, UL 154
2
ENVIRONMENTAL REQUIREMENT
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
I EQUIPMENT IDENTIFICATIONS
1 MODEL NUMBER
VENDOR TO ADVISE
2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES
3
MANUFACTURER COUNTRY
VENDOR TO ADVISE
1
2
3
EXTINGUISHER SHALL BE SPECIFIED WITH FIRE EXTINGUISHER CABINET FOR OUTDOOR LOCATIONS WITH DECKS MOUNTED, AND WALL BRACKET FOR INDOOR LOCATIONS. EXTINGUISHERS SHALL BE US COAST GUARD APPROVED AND SHALL BE IN ACCORDANCE WITH UL REQUIREMENTS. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
200-83-SH-DTS-00007_A
Page 80 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
CARBON DIOXIDE HANDHELD EXTINGUISHER 4.5 KG
EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANCE PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FIRE EXTINGUISHER CABINET SHALL ALSO BE SUITABLE FOR CORROSIVE ENVIRONMENT. CO2 EXTINGUISHERS (STORED PRESSURE TYPE) SHALL BE DESIGNED FOR A MINIMUM PRESSURE OF 1800 PSIG AND IT SHALL BE PROVIDED WITH PRESSURE RELIEF DEVICE AS PER UL 154 STANDARD.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
5
6
7
8
200-83-SH-DTS-00007_A
Page 81 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10.3 Carbon Dioxide Wheeled Extinguisher 45.4 kg
A ADMINISTRATIVE IDENTIFICATIONS
CARBON DIOXIDE WHEELED EXTINGUISHER 45.4 KG
1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
4 ATMOSPHERE
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 EXTINGUISHANT AGENT CARBON DIOXIDE
2 PROPELLANT TYPE
SELF EXPELLANT
EXTINGUISHANT CAPACITY
45.4 kg
16
HEAD CAP ASSEMBLY MATERIAL
CORROSION RESISTANCE MATERIAL
17
HOSE COUPLINGMATERIAL
18
SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL
STAINLESS STEEL 316L OR CHROME PLATED BRASS
STAINLESS STEEL 316L OR BRASS
CYLINDER OPERATING PRESSURE
50 BAR, AT 20 OC
19 APPROVALS
UL LISTED
CYLINDER TEST PRESSURE
200 BAR (VENDOR TO ADVISE)
20 REFILL INSTRUCTION
6 DESIGN TEMPERATURE VENDOR TO ADVISE
7
HORN SHAPED DIRECTIONAL DISCHARGE NOZZLE
REQUIRED
8 DISCHARGE TIME (MIN) 30-35 SECONDS
21
22
23
OPERATING INSTRUCTION PROVISION OF MAINTENANCE RECORD PLATE MINIMUM EXTINGUISHING RATING TESTING
ENGLISH, WITH PICTOGRAM / ILLUSTRATION ENGLISH, UNIVERSAL PICTORIAL LABELS
REQUIRED
20 B:C (20 SQ FT)
9
EFFECTIVE RANGE (MIN)
3-4 METERS
24 SPARE PARTS
VENDOR TO ADVISE
200-83-SH-DTS-00007_A
Page 82 of 101
C
1
2
3
3
4
5
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
CARBON DIOXIDE WHEELED EXTINGUISHER 45.4 KG
10 CONTAINER MATERIAL
11
CONTAINER PAINT FINISH
12
DISCHARGE HOSE MATERIAL
13
UNIT DISCHARGE INDICATOR AND DISCHARGE LEVER
CARBON STEEL WITH CORROSION RESISTANCE COATING MARINE CONDITION RED (RAL 3000), WITH CORROSION RESISTANT PAINT NON-ELECTRICAL CONDUCTIVE FLEXIBLE NEOPRENE
25
2.5 METER EXTENSION APPLICATOR (WITH INSULATION)
REQUIRED
26
DISCHARGE HORN NOZZLE
REQUIRED
27 WHEEL TYPE
TWO WHEELS (ANTI STATIC AND NON- SPARKING)
REQUIRED
28 WHEEL MATERIAL
RUBBER
14 HOSE LENGTH (MAX)
12.2M
29 UL/FM CLASSIFICATION 20-B:C
15 OPERATING VALVE
BRASS CYLINDER VALVE 30 LABEL
WHITE LETTERINGS “CO2” ON BLACK BACKGROUND
E NAMEPLATE
1 MATERIAL
2
OPERATION INSTRUCTIONS
AS PER MANUFACTURER STANDARD
5 FIRE RATING
REQUIRED
REQUIRED
6 APPROVAL STANDARD UL LISTED/FM APPROVED
3 AGENT CAPACITY IN KG REQUIRED
7 LANGUAGE
ENGLISH
4 CLASS OF FIRE F WEATHER PROOF COVER
REQUIRED
1 MATERIAL
G PHYSICAL DATA FULLY CHARGED WEIGHT
1
UV-RESISTANT RED- VINYL
2 MARKING
“FIRE EXTINGUISHER”
VENDOR TO ADVISE
2 DIMENSION
VENDOR TO ADVISE
H SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD
2
ENVIRONMENTAL REQUIREMENT
NFPA 10, UL 154
3 MOVEMENT
EXTINGUISHER WHEELS SHALL BE ABLE TO MOVE ON GRATED DECK
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
I EQUIPMENT IDENTIFICATIONS
1 MODEL NUMBER
VENDOR TO ADVISE
3
MANUFACTURER COUNTRY
VENDOR TO ADVISE
2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES 1 CYLINDER SHALL BE HYDRAULICALLY TESTED. VENDOR SHALL PROVIDE TEST RECORDS.
2
3
ALL WHEELED EXTINGUISHER SHALL BE PROVIDED WITH WEATHER PROOF COVER OF UV RESISTANT RED VINYL AND STAINLESS STEEL IDENTIFICATION TAG. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 5 WEATHER PROOF COVER TO BE MARKED “FIRE EXTINGUISHER” WITH WHITE LETTERING IN ENGLISH.
6
ALL WHEELED EXTINGUISHERS SHALL BE CAPABLE TO MOVE FREELY ON GRATED FLOOR. ANTI-STATIC, RUBBER WHEEL SHALL BE USED.
200-83-SH-DTS-00007_A
Page 83 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
CARBON DIOXIDE WHEELED EXTINGUISHER 45.4 KG
7 ALL WHEELED EXTINGUISHERS SHALL BE EQUIPPED WITH LIFTING LUG. 8 EXTINGUISHERS SHALL BE IN ACCORDANCE WITH UL REQUIREMENTS.
9
10
11
12
EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANT PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. CO2 EXTINGUISHERS (STORED PRESSURE TYPE) SHALL BE DESIGNED FOR A MINIMUM PRESSURE OF 1800 PSIG AND IT SHALL BE PROVIDED WITH PRESSURE RELIEF DEVICE AS PER UL 154 STANDARD. FACILITY SHALL BE PROVIDED FOR TROLLEY MOUNTED EXTINGUISHER TO IDENTIFY THE WEIGHT OR EMPTY OF THE CYLINDER. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
200-83-SH-DTS-00007_A
Page 84 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10.4 Dry Chemical Powder Wheeled Extinguisher 56.7 kg
DRY CHEMICAL POWDER WHEELED EXTINGUISHER 56.7 KG
A ADMINISTRATIVE IDENTIFICATIONS
1 PROJECT NUMBER
033764
2 PROJECT
COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
C
1
2
3
3
4
5
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
4 ATMOSPHERE
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 EXTINGUISHANT AGENT
POTASSIUM BICARBONATE
17
HOSE COUPLINGMATERIAL
2 PROPELLANT TYPE
EXTERNAL NITROGEN CYLINDER
18
SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL
EXTINGUISHANT CAPACITY
56.7 kg
19 APPROVALS
STAINLESS STEEL 316L OR CHROME PLATED BRASS
STAINLESS STEEL 316L OR BRASS
UL LISTED; FM/USCG APPROVED
CYLINDER OPERATING PRESSURE
VENDOR TO ADVISE
20
DISCHARGE LEVER FITTED WITH SAFETY RING PIN AND CHAIN
REQUIRED
CYLINDER TEST PRESSURE
VENDOR TO ADVISE
21 REFILL INSTRUCTION
6 DESIGN TEMPERATURE VENDOR TO ADVISE
22
OPERATING INSTRUCTION
ENGLISH, WITH PICTOGRAM / ILLUSTRATION ENGLISH, UNIVERSAL PICTORIAL LABELS
7
UNIT DISCHARGE INDICATOR
REQUIRED
23 PAINT FINISH
NFPA-10 / LISTING
8 DISCHARGE TIME (MIN) 30 SECONDS
24
MINIMUM EXTINGUISHING RATING TESTING
320-B:C (320 SQ FT)
9
EFFECTIVE RANGE (MIN)
7-14 METERS
25 SPARE PARTS
VENDOR TO ADVISE
200-83-SH-DTS-00007_A
Page 85 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
DRY CHEMICAL POWDER WHEELED EXTINGUISHER 56.7 KG
10 CONTAINER MATERIAL
11
CONTAINER PAINT FINISH
12
DISCHARGE HOSE MATERIAL
13 HOSE LENGTH (MIN) 14 HOSE LENGTH (MAX)
CARBON STEEL WITH CORROSION RESISTANCE COATING MARINE CONDITION
26
PRESSURE GAUGE ON EXTERNAL N2 CYLINDER
REQUIRED
RED (RAL 3000)
27 OPERATING VALVE
BRASS CYLINDER VALVE
NON-ELECTRICAL CONDUCTIVE FLEXIBLE NEOPRENE 15 METERS 30 METERS
28 WHEEL TYPE
29 WHEEL MATERIAL 30 UL/FM CLASSIFICATION 320-B:C
TWO WHEELS (ANTI STATIC AND NON- SPARKING) RUBBER
15 NOZZLE
LONG RANGE NOZZLE
31 LABEL
16
E
HEAD CAP ASSEMBLY MATERIAL NAMEPLATE
CORROSION RESISTANCE MATERIAL
WHITE LETTERINGS “POWDER” ON BLUE BACKGROUND
1 MATERIAL
2
OPERATION INSTRUCTIONS
AS PER MANUFACTURER STANDARD
5 FIRE RATING
REQUIRED
REQUIRED
6 APPROVAL STANDARD UL LISTED/FM APPROVED
3 AGENT CAPACITY IN KG REQUIRED REQUIRED 4 CLASS OF FIRE F WEATHER PROOF COVER
7 LANGUAGE
ENGLISH
1 MATERIAL
G PHYSICAL DATA FULLY CHARGED WEIGHT
1
UV-RESISTANT RED- VINYL
2 MARKING
“FIRE EXTINGUISHER”
VENDOR TO ADVISE
2 DIMENSION
VENDOR TO ADVISE
H SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD
2
ENVIRONMENTAL REQUIREMENT
NFPA 10
3 MOVEMENT
EXTINGUISHER WHEELS SHALL BE ABLE TO MOVE ON GRATED DECK
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
I EQUIPMENT IDENTIFICATIONS
1 MODEL NUMBER
VENDOR TO ADVISE
2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES
3
MANUFACTURER COUNTRY
VENDOR TO ADVISE
1 CYLINDER SHALL BE HYDRAULICALLY TESTED. VENDOR SHALL PROVIDE TEST RECORDS.
2
3
ALL WHEELED EXTINGUISHER SHALL BE PROVIDED WITH WEATHER PROOF COVER OF UV RESISTANT RED VINYL AND STAINLESS STEEL IDENTIFICATION TAG. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
5 WEATHER PROOF COVER TO BE MARKED “FIRE EXTINGUISHER” WITH WHITE LETTERING IN ENGLISH.
200-83-SH-DTS-00007_A
Page 86 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
DRY CHEMICAL POWDER WHEELED EXTINGUISHER 56.7 KG
6
ALL WHEELED EXTINGUISHERS SHALL BE CAPABLE TO MOVE FREELY ON GRATED FLOOR. ANTI-STATIC, RUBBER WHEEL SHALL BE USED.
7 ALL WHEELED EXTINGUISHERS SHALL BE EQUIPPED WITH LIFTING LUG.
8 HAND APPLICATOR HOSE COMPLETE WITH NOZZLE.
9
EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANT PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT.
10 THE HOSE LENGTH FOR DCP WHEELED EXTINGUISHER AT HELIDECK SHALL BE 15 M.
11
12
FACILITY SHALL BE PROVIDED FOR TROLLEY MOUNTED EXTINGUISHER TO IDENTIFY THE WEIGHT OR EMPTY OF THE CYLINDER. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
200-83-SH-DTS-00007_A
Page 87 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10.5 Dry Chemical Powder Wheeled Extinguisher 136.4 kg
DRY CHEMICAL POWDER WHEELED EXTINGUISHER 136.4 KG
A ADMINISTRATIVE IDENTIFICATIONS
1 PROJECT NUMBER
033764
2 PROJECT
COMP3 - NFPS OFFSHORE RISER/ WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
WHP 13N
FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
C
1
2
3
4 ATMOSPHERE
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 EXTINGUISHANT AGENT
POTASSIUM BICARBONATE
17
HOSE COUPLING MATERIAL
2 PROPELLANT TYPE
EXTERNAL NITROGEN CYLINDER
18
19
SPRINGS, AND MOVING PARTS MATERIAL SPRAY NOZZLE MATERIAL
136.4 kg
3
4
5
EXTINGUISHANT CAPACITY CYLINDER OPERATING PRESSURE
CYLINDER TEST PRESSURE
VENDOR TO ADVISE
20 APPROVALS
VENDOR TO ADVISE
21
DISCHARGE LEVER FITTED WITH SAFETY RING PIN AND CHAIN
REQUIRED
STAINLESS STEEL 316L OR CADMIUM PLATED BRASS STAINLESS STEEL 316L OR BRASS
ANODIZED ALUMINUM
UL LISTED; FM/USCG APPROVED
6 DESIGN TEMPERATURE VENDOR TO ADVISE
22 REFILL INSTRUCTION
7
UNIT DISCHARGE INDICATOR
REQUIRED
23
OPERATING INSTRUCTION
ENGLISH, WITH PICTOGRAM / ILLUSTRATION ENGLISH, UNIVERSAL PICTORIAL LABELS
8 DISCHARGE TIME (MIN) 30 SECONDS
24 PAINT FINISH
NFPA-10 / LISTED
9
EFFECTIVE RANGE (MIN)
7-14 METERS
10 CONTAINER MATERIAL
STEEL WITH CORROSION RESISTANCE COATING MARINE CONDITION
11
CONTAINER PAINT FINISH
RED (RAL 3000)
25
MINIMUM EXTINGUISHING RATING TESTING
640-B:C (640 SQ FT)
26 SPARE PARTS
VENDOR TO ADVISE
27
PRESSURE GAUGE ON EXTERNAL N2 CYLINDER
REQUIRED
200-83-SH-DTS-00007_A
Page 88 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
DRY CHEMICAL POWDER WHEELED EXTINGUISHER 136.4 KG
12
DISCHARGE HOSE MATERIAL
NON-ELECTRICAL CONDUCTIVE FLEXIBLE NEOPRENE
28 OPERATING VALVE
BRASS CYLINDER VALVE
13 HOSE LENGTH (MIN)
15 METERS
29 WHEEL TYPE
14 HOSE LENGTH (MAX)
30 METERS
30 WHEEL MATERIAL
TWO WHEELS (ANTI STATIC AND NON- SPARKING) RUBBER
15 NOZZLE
LONG RANGE NOZZLE
31 UL/FM CLASSIFICATION 640-B:C
16
HEAD CAP ASSEMBLY MATERIAL
CORROSION RESISTANCE MATERIAL
32 LABEL
WHITE LETTERINGS “POWDER” ON BLUE BACKGROUND
E
NAMEPLATE
1 MATERIAL
2
OPERATION INSTRUCTIONS
AS PER MANUFACTURER STANDARD
5 FIRE RATING
REQUIRED
REQUIRED
6 APPROVAL STANDARD UL LISTED/FM APPROVED
3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED F WEATHER PROOF COVER
7 LANGUAGE
ENGLISH
1 MATERIAL
G PHYSICAL DATA FULLY CHARGED WEIGHT
1
UV-RESISTANT RED- VINYL
2 MARKING
“FIRE EXTINGUISHER”
VENDOR TO ADVISE
2 DIMENSION
VENDOR TO ADVISE
I SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD
2
ENVIRONMENTAL REQUIREMENT
NFPA 10
3 MOVEMENT
EXTINGUISHER WHEELS SHALL BE ABLE TO MOVE ON GRATED DECK
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
H EQUIPMENT IDENTIFICATIONS
1 MODEL NUMBER
VENDOR TO ADVISE
2 MANUFACTURER NAME VENDOR TO ADVISE I NOTES
3
MANUFACTURER COUNTRY
VENDOR TO ADVISE
1 CYLINDER SHALL BE HYDRAULICALLY TESTED. VENDOR SHALL PROVIDE TEST RECORDS.
2
3
ALL WHEELED EXTINGUISHER SHALL BE PROVIDED WITH WEATHER PROOF COVER OF UV RESISTANT RED VINYL AND STAINLESS STEEL IDENTIFICATION TAG ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
5 WEATHER PROOF COVER TO BE MARKED “FIRE EXTINGUISHER” WITH WHITE LETTERING IN ENGLISH.
6
ALL WHEELED EXTINGUISHERS SHALL BE CAPABLE TO MOVE FREELY ON GRATED FLOOR. ANTI-STATIC, RUBBER WHEEL SHALL BE USED.
7 ALL WHEELED EXTINGUISHERS SHALL BE EQUIPPED WITH LIFTING LUG.
8 HAND APPLICATOR HOSE COMPLETE WITH NOZZLE.
200-83-SH-DTS-00007_A
Page 89 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
DRY CHEMICAL POWDER WHEELED EXTINGUISHER 136.4 KG
9
10
11
12
EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANT PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FACILITY SHALL BE PROVIDED FOR TROLLEY MOUNTED EXTINGUISHER TO IDENTIFY THE WEIGHT OR EMPTY OF THE CYLINDER. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
200-83-SH-DTS-00007_A
Page 90 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10.6 AFFF Wheeled Extinguisher 135L
A ADMINISTRATIVE IDENTIFICATIONS
AFFF WHEELED EXTINGUISHER 135L
1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
C
1
2
3
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
4 ATMOSPHERE
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 EXTINGUISHANT AGENT
2 PROPELLANT TYPE
AQUEOUS FILM FORMING FOAM
EXTERNAL CO2 CYLINDER
16 REFILL INSTRUCTION ENGLISH
17 PAINT FINISH
NFPA 10 / LISTED
3
4
5
EXTINGUISHANT CAPACITY
135 L
18 HOSE LENGTH (MIN)
6 M
CYLINDER OPERATING PRESSURE
VENDOR TO ADVISE
19
MINIMUM EXTINGUISHING RATING TESTING
VENDOR TO ADVISE
CYLINDER TEST PRESSURE
VENDOR TO ADVISE
20 SPARE PARTS
VENDOR TO ADVISE
6 DESIGN TEMPERATURE VENDOR TO ADVISE
7 UL CLASSIFICATION
IVB
21
OPERATING INSTRUCTION
22 LABEL
8 DISCHARGE TIME (MIN)
60 SEC (VENDOR TO ADVISE)
23 WHEEL
9
EFFECTIVE RANGE (MIN)
VENDOR TO ADVISE
24 WHEEL TYPE
ENGLISH
ENGLISH HARD RUBBER COATED STEEL WHEELS (NON PNEUMATIC) ANTI STATIC AND NON SPARKING
10 CONTAINER MATERIAL STEEL
25 WHEEL MATERIAL
RUBBER
11 NOZZLE
LONG RANGE NOZZLE
26
THE EXTINGUISHER TANK SHALL BE OF WELDED STEEL
REQUIRED
200-83-SH-DTS-00007_A
Page 91 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
AFFF WHEELED EXTINGUISHER 135L
CONSTRUCTION DESIGNED FOR A MINIMUM WORKING PRESSURE OF 1.52 MPA-G (220 PSIG). THE TANK NORMALLY SHALL BE AT ATMOSPHERIC PRESSURE AND SHALL BE PRESSURIZED PRIOR TO USE BY A NITROGEN CYLINDER WITH A QUICK- OPENING VALVE THE NITROGEN CYLINDER SHALL BE OF STEEL CONSTRUCTION
REQUIRED
28
29
MINIMUM EXTINGUISHING RATING TESTING
IVB
12
CONTAINER PAINT FINISH
RED (RAL 3000)
27
REQUIRED
13
UNIT DISCHARGE INDICATOR
REQUIRED
UL LISTED / FM APPROVED OR EQUIVALENT (E.G. KITEMARK)
REQUIRED
14 APPROVALS
15
DISCHARGE LEVER FITTED WITH SAFETY PIN
E NAME PLATE
1 MATERIAL
2
OPERATION INSTRUCTIONS
AS PER MANUFACTURER STANDARD
5 FIRE RATING
REQUIRED
REQUIRED
6 APPROVAL STANDARD
UL LISTED/FM OR EQUIVALENT APPROVED
3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED E WEATHER PROOF COVER
7 LANGUAGE
ENGLISH
1 MATERIAL
F PHYSICAL DATA FULLY CHARGED WEIGHT
1
UV-RESISTANT RED- VINYL
2 MARKING
“WHEELED AFFF 135 L FIRE EXTINGUISHER”
VENDOR TO ADVISE
2
DIMENSION (APPROXIMATE)
VENDOR TO ADVISE
G SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD
2
ENVIRONMENTAL REQUIREMENT
NFPA 10
3 MOVEMENT
EXTINGUISHER WHEELS SHALL BE ABLE TO MOVE ON GRATED DECK
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
H EQUIPMENT IDENTIFICATIONS 1 MODEL NUMBER VENDOR TO ADVISE 2 MANUFACTURER NAME VENDOR TO ADVISE I NOTES
4 MANUFACTURER DATE VENDOR TO ADVISE
1 CYLINDER SHALL BE HYDRAULICALLY TESTED. VENDOR SHALL PROVIDE TEST RECORDS.
2
ALL WHEELED EXTINGUISHER SHALL BE PROVIDED WITH WEATHERPROOF COVER OF UV RESISTANT RED VINYL AND STAINLESS STEEL IDENTIFICATION TAG.
200-83-SH-DTS-00007_A
Page 92 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
AFFF WHEELED EXTINGUISHER 135L
3
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
5 WEATHER PROOF COVER TO BE MARKED “FOAM FIRE EXTINGUISHER” WITH WHITE LETTERING IN ENGLISH.
6
ALL WHEELED EXTINGUISHERS SHALL BE CAPABLE TO MOVE FREELY ON GRATED FLOOR. ANTI-STATIC, RUBBER WHEEL SHALL BE USED.
7 ALL WHEELED EXTINGUISHERS SHALL BE EQUIPPED WITH LIFTING LUG.
8
9
10
EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANT PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FIRE EXTINGUISHER CABINET ALSO SHALL BE SUITABLE FOR CORROSIVE ENVIRONMENT. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
200-83-SH-DTS-00007_A
Page 93 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10.7 Dry Chemical Powder (BC) Hand Extinguisher 4.1 kg
A ADMINISTRATIVE IDENTIFICATIONS
DRY CHEMICAL POWDER (BC) HAND EXTINGUISHER 4.1 KG
1 PROJECT NUMBER
2 PROJECT
3 QUANTITY B EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
RP 6N
RP 5N
RP 5S
RP 3S
RP 9S
WHP 13N
FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 3 & 4)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-3)
72
VENDOR TO ADVISE
°C
%
°C
4 ATMOSPHERE
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 EXTINGUISHANT AGENT
2 PROPELLANT TYPE
3
4
5
EXTINGUISHANT CAPACITY CARTRIDGE OPERATING PRESSURE
CARTRIDGE TEST PRESSURE
POTASSIUM BICARBONATE
NITROGEN (N2 CARTRIDGE)
13 HOSE COUPLING
STAINLESS STEEL 316L
14
SPRAY NOZZLE, SPRINGS, AND MOVING PARTS MATERIAL
ETCHED ALUMINUM
4.1 KG
15 REFILL INSTRUCTION ENGLISH
VENDOR TO ADVISE
16 PAINT FINISH
NFPA 10 / LISTED
VENDOR TO ADVISE
17 APPROVALS
6 DESIGN TEMPERATURE VENDOR TO ADVISE
18
DISCHARGE LEVER FITTED WITH SAFETY PIN
UL LISTED / FM APPROVED OR EQUIVALENT
REQUIRED
6 UL CLASSIFICATION
60-B:C
19 HOSE LENGTH (MIN)
VENDOR TO ADVISE
7 DISCHARGE TIME (MIN) 15 SEC
8
EFFECTIVE RANGE (MIN)
5 M
9 CONTAINER MATERIAL CARBON STEEL
20
MINIMUM EXTINGUISHING RATING TESTING
60-B:C
21 SPARE PARTS
VENDOR TO ADVISE
22
OPERATING INSTRUCTION
ENGLISH
200-83-SH-DTS-00007_A
Page 94 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
DRY CHEMICAL POWDER (BC) HAND EXTINGUISHER 4.1 KG
10
11
CONTAINER PAINT FINISH UNIT DISCHARGE INDICATOR HEAD CAP ASSEMBLY MATERIAL E NAME PLATE
12
RED (RAL 3000)
23 LABEL
ENGLISH
REQUIRED
24 BOTTOM SKIRT
NOT LESS THAN 6 MM
CORROSION RESISTANCE MATERIAL
1 MATERIAL
AS PER MANUFACTURER STANDARD
5 FIRE RATING
REQUIRED
INSTRUCTIONS
2 OPERATION REQUIRED 3 AGENT CAPACITY IN KG REQUIRED 4 CLASS OF FIRE REQUIRED F MOUNTING DESIGN 1 MATERIAL G SPECIAL REQUIREMENTS
NOTE 1
6 APPROVAL STANDARD UL LISTED/FM APPROVED 7 LANGUAGE
ENGLISH
1
COMPLIANCE STANDARD
H PHYSICAL DATA
1
FULLY CHARGED WEIGHT
NFPA 10, UL 154
2
ENVIRONMENTAL REQUIREMENT
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
VENDOR TO ADVISE
2
DIMENSION (APPROXIMATE)
VENDOR TO ADVISE
I EQUIPMENT IDENTIFICATIONS
1 MODEL NUMBER
VENDOR TO ADVISE
2 MANUFACTURER NAME VENDOR TO ADVISE J NOTES
3
MANUFACTURER COUNTRY
VENDOR TO ADVISE
1 THE EXTINGUISHER LOCATED INDOOR SHALL BE PROVIDED WITH WALL MOUNTING HANGER / BRACKET
2
3
EXTINGUISHERS SHALL BE US COAST GUARD APPROVED AND SHALL BE IN ACCORDANCE WITH UL REQUIREMENTS. ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
4 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
EXTINGUISHERS SHALL BE PROVIDED WITH CORROSION RESISTANCE PAINTING IN ACCORDANCE WITH UL LISTING REQUIREMENTS SUITABLE FOR CORROSIVE MARINE ENVIRONMENT. FIRE EXTINGUISHER CABINET SHALL ALSO BE SUITABLE FOR CORROSIVE ENVIRONMENT. THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
5
6
7
200-83-SH-DTS-00007_A
Page 95 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10.8 Fire Blanket
FIRE BLANKET
A ADMINISTRATIVE IDENTIFICATIONS 1 PROJECT NUMBER
2 PROJECT
033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & PIPELINES PROJECT
INTRAFIELD
3 QUANTITY B EQUIPMENT IDENTIFICATION
REFER TABLE 7.1
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
4 ATMOSPHERE
RP 6N
RP 5N
FIRE FIGHTING ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
RP 5S
RP 3S
RP 9S
WHP 13N
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-1)
72
VENDOR TO ADVISE
°C
%
°C
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 DIMENSION
APPROXIMATELY 1800 MM x 1800 MM
6
2 WEIGHT
VENDOR TO ADVISE
7
3 MATERIAL
FIRE RESISTANT TREATED 100% WOOL OR FIBERGLASS
8
4 COLOUR
VENDOR TO ADVISE
9
LIGHT WEIGHT, SOFTNESS AND SMOOTHNESS, WELL HANDLE HEAT INSULATION, HIGH TEMPERATURE RESISTANCE, FIRE RESISTANCE, SELF- EXTINGUISHABLE ACID-RESISTANCE, ALKALINE-RESISTANCE AND REPEAT USING FIRE BLANKET SHALL BE ATTACHED TO A ROLLER FOR RAPID DEPLOYMENT AND STORED ON ROLLER INSIDE A DEDICATED CASE
REQUIRED
REQUIRED
REQUIRED
REQUIRED
5
INSTRUCTION
IN ENGLISH LANGUAGE, WITH PICTOGRAM / ILLUSTRATION
10
FIRE BLANKET SHALL BE MADE OF GEL TYPE
REQUIRED
E CABINET DESIGN CRITERIA
1 PAINT
RED
2 LABELLING (NOTE 3)
“FIRE BLANKET” IN ENGLISH
6
VENTILATION / DRAINAGE
REQUIRED
7 COUNTRY OF ORIGIN VENDOR TO ADVISE
200-83-SH-DTS-00007_A
Page 96 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
FIRE BLANKET
3 CABINETMATERIAL
PVC OR EQUIVALENT
8 MANUFACTURE NAME VENDOR TO ADVISE
4
EQUIPPED WITH QUICK OPENING SNAP FASTENERS AND DESIGN FOR WALL MOUNTING IP RATING
5 F SPECIAL REQUIREMENTS
VENDOR TO ADVISE
REQUIRED
9 MODEL
VENDOR TO ADVISE
1
2
COMPLIANCE STANDARD
ENVIRONMENTAL REQUIREMENT
1
G PHYSICAL DATA WEIGHT OFFIRE BLANKET 2 BULK DENSITY
ANSI / ASTM D5141
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
VENDOR TO ADVISE
3
VENDOR TO ADVISE
DIMENSION OF FIRE BLANKET (MIN.)
1.8 M X 1.8 M
H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
FIRE BLANKET
2 MODEL NUMBER
VENDOR TO ADVISE
I NOTES
3 MANUFACTURER NAME VENDOR TO ADVISE
4
MANUFACTURER COUNTRY
VENDOR TO ADVISE
1
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS. 3 THE DESIGNATED CABINET SHALL BE LABELLED “FIRE BLANKET” IN ENGLISH IN WHITE BOLD LETTERS.
4
5
6
SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20- SH-SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
COMPLIANCE CERTIFICATES, 3RD PARTY VERIFICATION CERTIFICATES AND TEST CERTIFICATES SHALL BE PROVIDED BY THE VENDOR.
200-83-SH-DTS-00007_A
Page 97 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10.9
International Ship/Shore Connection
A ADMINISTRATIVE IDENTIFICATIONS
INTERNATIONAL SHIP/SHORE CONNECTION
1 PROJECT NUMBER
2 PROJECT
3 QUANTITY 4 P&ID REFERENCE B EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1 265-20-PR-PID-00002
1 TAG NUMBER (HOLD-2)
2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS
AMBIENT TEMPERATURE
RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
WHP 13N
FIRE FIGHTING SYSTEM ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-1)
72
VENDOR TO ADVISE
°C
%
°C
4 ATMOSPHERE
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION EQUIPMENT DESIGN CRITERIA
1 TYPE
4 WAY BREECHING INLET 7
INLET
2 DESIGN STANDARD
BS5041:PART 3
8 OUTLET
4 X 2.5” MALE BS 336 INSTANTANEOUS COUPLING 6” NB ANSI B16.24 CLASS 150 FF
3 MATERIAL
DUCTILE IRON BODY WITH LG2 GUNMETAL INLETS
9 FINISH
RED (RAL 3000)
4 DESIGN PRESSURE
15 BARG
10 WEIGHT
VENDOR TO ADVISE
5
MAX. WORKING PRESSURE
10 BARG (VENDOR TO ADVISE)
11 APPROVALS
UL, FM OR EQUIVALENT (KITEMARK ETC.)
6 DESIGN TEMPERATURE -29 TO 85 oC
E PROCESS CONDITION
1 FLUID HANDLED
SEA WATER
3 PIPING CLASS
A35A1
2
MAX. OPERATING TEMPERATURE
35°C
4 PIPING MATERIAL
Cu / Ni 90-10
F EQUIPMENT ACCESSORIES GUNMETAL CAPS WILL BE PROVIDED FOR EACH INLET
1
REQUIRED
3
SS CHAIN WILL BE PROVIDED ALONG WITH BLANK CAPS
REQUIRED
200-83-SH-DTS-00007_A
Page 98 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
INTERNATIONAL SHIP/SHORE CONNECTION
2
EACH INLET CONNECTION SHALL BE FITTED WITH NON- RETURN VALVE AND OF SPRING- LOADED MUSHROOM TYPE.
REQUIRED
G SPECIAL REQUIREMENTS
1
COMPLIANCE STANDARD
BS5041:PART3
2
ENVIRONMENTAL REQUIREMENT
ALL MATERIALS SHALL BE SUITABLE FOR OFFSHORE SALINE CONDITION
H EQUIPMENT IDENTIFICATIONS 1 EQUIPMENT TYPE
BREECHING INLET
3 MANUFACTURER
VENDOR TO ADVISE
2 MODEL NUMBER
VENDOR TO ADVISE
4
NAME MANUFACTURER COUNTRY
VENDOR TO ADVISE
I NOTES
1
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
2 ALL MATERIALS SHALL BE SUITABLE FOR OUTDOOR OFFSHORE CONDITIONS.
THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
3
4
200-83-SH-DTS-00007_A
Page 99 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
10.10 High Velocity Spray Nozzle
A ADMINISTRATIVE IDENTIFICATIONS
HIGH VELOCITY SPRAY NOZZLE
1 PROJECT NUMBER
2 PROJECT
3 QUANTITY 4 P&ID REFERENCE B EQUIPMENT IDENTIFICATION
033764 COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT REFER TABLE 7.1 265-20-PR-PID-00002
1 TAG NUMBER 2 SERVICE
OPERATION DATA ENVIRONMENTAL / SITE CONDITIONS AMBIENT TEMPERATURE RELATIVE HUMIDITY DAILY AVERAGE
BLACK BODY TEMPERATURE
C
1
2
3
N/A FIRE FIGHTING SYSTEM ENVIRONMENTAL / SITE CONDITIONS (NOTE 1 & 2)
MINIMUM
NORMAL
MAXIMUM
UNITS
6
51
85
45 (NOTE-1)
72
VENDOR TO ADVISE
°C
%
°C
4 ATMOSPHERE
HUMID, SALIFEROUS, SALT LADEN, AND MARINE ATMOSPHERE, POSSIBLE H2S PRESENCE
D
TECHNICAL SPECIFICATION NOZZLEDESIGN CRITERIA
1 MANUFACTURER
VENDOR TO ADVISE
10 TYPE
HIGH VELOCITY, NON- CLOGGING TYPE AND CONSISTS OF ONE PIECE BODY 166.5 (VENDOR TO ADVISE)
89 (VENDOR TO ADVISE)
2 VENDOR MODEL
VENDOR TO ADVISE
3
INSTALLATION
VENDOR TO ADVISE
11
12
MIN FLOW EACH NOZZLE (LPM) K FACTOR (LPM/√BARG) (NOTE 3)
4 SYSTEM
DRY PIPE
13 NOZZLE MATERIAL
NICKEL ALUMINIUM BRONZE
5 WEIGHT(KG)
VENDOR TO ADVISE
14 SPRAY PATTERN
FULL CONE
6
STAMPED WITH MODEL NUMBER AND ANGLE (OR EQUIVALENT MARKING)
7 APPROVAL
8
ORIFICE SIZE (MINIMUM)
REQUIRED
UL LISTED / FM APPROVED
15
NOZZLE END CONNECTION
1” NPTM
16 SPRAY ANGLE
85O (VENDOR TO ADVISE)
6MM
17 PAINTING
VENDOR TO ADVISE
9 AREA PER NOZZLE (M2)
3 ~ 4 (VENDOR TO ADVISE)
18 DESIGN TEMPERATURE -29 TO 85°C
E PROCESS CONDITION 1 FLUID
2
3
MINIMUM OPERATING PRESSURE MAXIMUM OPERATING PRESSURE
SEAWATER
3.5 BARG
5.0 BARG
6 PIPING MATERIAL
7
8
DESIGN PRESSURE (NOZZLE) FLUID SPECIFIC GRAVITY
Cu / Ni 90-10 12 BARG (VENDOR TO ADVISE)
1.026
200-83-SH-DTS-00007_A
Page 100 of 101
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
DATASHEET FOR SAFETY, LIFESAVING AND FIRE FIGHTING ITEMS FOR COMP3 PROJECT
HIGH VELOCITY SPRAY NOZZLE
4
MAX. OPERATING TEMPERATURE
35°C
5 PIPING CLASS
A35A1
F SPECIAL REQUIREMENT
9 VISCOSITY
0.828 CP
10
PIPING END CONNECTION
1” NPTF
1
CODES AND STANDARDS
F NOTES
NFPA 15
2 TOOLS
SPRAY NOZZLE WRENCH SHALL BE SUPPLIED BY VENDOR
ENVIRONMENTAL CONDITIONS SHALL BE AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004). DESIGN TEMPERATURE FOR EQUIPMENT OPERATING UNDER ATMOSPHERIC CONDITIONS SHALL BE 49°C AS PER PROJECT BASIS OF DESIGN FOR COMP3 PROJECT (DOC.NO. 200-20-PE-DEC-00004).
VENDOR TO INDICATE ACTUAL K-FACTOR FOR OFFERED NOZZLES. VENDOR TO FURNISH ACTUAL CHARACTERISTIC CURVES FOR THE OFFERED NOZZLES TO MEET THE DESIRED WATER SPRAY DENSITY
1
3
4 NOZZLES SHALL BE DESIGNED FOR A LIFE DURATION OF 30 YEARS, AS A MINIMUM.
5
6
7
SPARE PARTS FOR START-UP, PRE-COMMISSIONING AND OPERATION SPARES SHALL MEET THE REQUIREMENT OF SPARE PARTS MANAGEMENT PLAN (COMP3-SPM-PE-PLN-00002). THIS DATASHEET SHALL BE READ IN CONJUNCTION WITH SPECIFICATION FOR SAFETY, LIFESAVING & FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH-SPC-00020) AND TECHNICAL SAFETY DESIGN OF BASIS (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013). SPECIFICATION FOR SAFETY, LIFE SAVING AND FIREFIGHTING ITEMS FOR COMP3 PROJECT (200-20-SH- SPC-00020) SHALL BE THE GOVERNING GUIDELINE IN CASE OF DISCREPANCY WITH DATASHEET.
200-83-SH-DTS-00007_A
Page 101 of 101
Project: Q-32705 - Saipem COMP3 Folder: RFQ Files