Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 32705 Saipem COMP3

❯

RFQ Files

❯

240 83 SH PLN 00001_A

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

WHP5S & RP5S KEY PLAN

TRUE NORTH

NOTES:

Classification: Internal

1

PLATFORM NORTH

45°

45°

A

B

C

D

E

F

G

H

I

J

K

L

N

TRUE NORTH

TRUE NORTH

PREVAILING WIND

N. 114000

2

12”- FUEL GAS PIPELINE

FUTURE

28” PL5S TO RP7S

28” PL5LS TO RP7S

N. 100000

1

0 0 0 4 1

0 0 0 0 1

EQUIPMENT NO. 240T-8701 240P-8703 240P-8704 240P-8702 240V-8701 240XB-2004

1

EQUIPMENT LIST

DESCRIPTION

OPEN DRAIN TANK OPEN DRAIN WATER PUMP OPEN DRAIN OIL PUMP CLOSED DRAIN TRANSFER PUMP CLOSED DRAIN DRUM MONORAIL 1 T

2

SIZE (MM)

3500(L) X 2200(W) X 1400 (H) 2650(L) X 1650(W) X 2261 (H)

1250 (L) X 500(W) X 500(H) 3070 (L) X 1550(W) X 2260(H) 1500 (L) X 2700(T/T) UB254 X 146 X 43

3

A

0 0 0 0 0 1

.

E

240-XZ8309

240-XZ8310

C

0 0 0 5 1 1

.

E

15000

I

E L B A C E T S O P M O C R O F E B U T

J

” 2 1

S 5 P R O T S 7 P R M O R F

T.O.G EL. +13632

TO JACKET DECK

DN

T.O.G EL. +10832

B

0 0 0 0 3 1

.

E

15000

TO MAIN DECK

UP

UP

T.O.G EL. +13632

(HOLD-1)

BAM 6

XXX-FEXXXX (HOLD-1)

9 Kg

240-P8702

240-P8703

240-V8701

EL. +12682

240-T8701

T.O.G. EL.+10032

240-P8704

U P

240-XB2004

EL +13500 (B.O.S)

240-US-05

LAYDOWN “C” 1500(L) X 2000(W)

TO JACKET DECK

T.O.G EL. +9032

D N

T.O.G EL. +12746

T.O.G EL. +10832

TO MAIN DECK

UP

UP

XXX-FEXXXX (HOLD-1)

9 Kg

240-XZ8311

240-XZ8312

CELLAR DECK ELEVATION (T.O.S.EL. +10000)

RP5S

BSPS

CHEVRON MARKING

CHEVRON MARKING

N

BRDIGE NOMINAL POSITION

WHP5S (EXISTING)

  1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS

UNLESS STATED OTHERWISE.

  1. PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,

SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)

A

  1. THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN ALL

AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.

  1. THIS LAYOUT SHALL BE USED ONLY FOR QUANTITY AND

LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS AND ESCAPE ROUTES.

  1. AS PER TECHNICAL SAFETY BASIS OF DESIGN

(200-20-SH-DEC-00013) – FOR OUTDOOR AREAS, THE DEAD END SHALL NOT EXCEED 6 M OF TRAVEL DISTANCE.

  1. THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL BE

PROVIDED WITH WEATHER-PROOF CABINET.

  1. WHEELED EXTINGUISHERS LOCATED OUTDOOR SHALL BE

PROVIDED WITH A UV-RESISTANT RED-VINYL COVER.

  1. ARROWS SHOWN ON THE ESCAPE ROUTE DRAWING INDICATE

THE PREFERRED DIRECTION OF EGRESS TOWARDS THE MUSTER AREA. IN CASE OF EMERGENCY AT RP, PERSONNEL SHALL USE BRIDGE TO REACH PRIMARY MUSTER AREA LOCATED AT WELLHEAD PLATFORM 5S LER BUILDING TR. IN CASE ESCAPE THROUGH BRIDGE TOWARDS WELLHEAD IS NOT FEASIBLE, PERSONNEL TO PROCEED TO SECONDARY MUSTER AREA LOCATED AT RP LER BUILDING TR FOR MUSTERING.

  1. LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING

EQUIPMENTS AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.

  1. STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN

INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.

  1. ALL FIRE & SAFETY EQUIPMENTS SHALL BE LOCATED IN SUCH

A WAY THAT THEY ARE EASILY ACCESSIBLE.

B

C

12.BREATHING AIR MANIFOLD FOR 6 PERSON, AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

D

  1. ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER THAT IS VISIBLE, DURABLE AND ANTI-SLIP.

LEGEND:

LEGEND

DESCRIPTIONS

PRIMARY ESCAPE ROUTE 1.12m(WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m(WIDTH) X 2.286m (HEAD CLEARANCE) 135L AFFF FOAM WHEELED FIRE EXTINGUISHER

9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER

LIFEBUOY WITH LIFELINE

AFFF 135 L

9 Kg

BAM 6

BREATHING AIR MANIFOLD CABINET WITH 6 NUMBERS OF HOSE UNIT (NOTE-12)

QTY

E

1

2

4

1

AFFF 135 L

XXX-FEXXXX (HOLD-1)

HOLDS:

  1. TAG NOS.

200-20-SH-DEC-00013

TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT

240-23-PI-PLP-00002

EQUIPMENT ARRANGEMENT PLAN CELLAR DECK FOR RP5S

REFERENCE NO.

TITLE

REFERENCES

A

A1

No.

ISSUED FOR REVIEW

ISSUED FOR IDC

DESCRIPTION

MTA

MTA

JB

JB

BPB

20/03/25

BPB

10/03/25

BY

CHKD

APVD

DATE

REVISIONS

PROJECT TITLE :

COMP3 - NFPS OFFSHORE RISER / WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

Qatar Energy LNG

Qatar Energy LNG

THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.

CONSULTANT / CONTRACTOR :

Saipem S.p.A.

100

0 0 2

100

0 0 2

400

400

TYPICAL DETAIL-1

TYPICAL DETAIL-2

TITLE :

N.T.S

N.T.S

CONTRACTOR DRAWING No. :

033764-G-D00-11-SPM-LP-D-00044-0001

FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - CELLAR DECK - RP5S

1M

0

1M

2M

3M

4M

5M

PROJECT

DRAWING No.

SHT

SIZE REVISION

033764

240-83-SH-PLN-00001

0001

A1

A

SCALE :

1:100

PROJECT No. :

LTC/C/NFP/5129/20

F

G

H

I

J

K

L

4

5

6

7

10

11

12

13

14

15

16

Project: Q-32705 - Saipem COMP3 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further