Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 32705 Saipem COMP3

❯

RFQ Files

❯

240 83 SH PLN 00003_A

Classification: Internal

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

LEGENDS:

EQUIPMENT LIST FOR ELECTRICAL & ISNTRUMENT ROOM (LER 1ST FLOOR)

LEGEND

DESCRIPTIONS

QTY

SI.NO.

TAG NUMBER

DESCRIPTION

DIMENSIONS (MM)

LENGTH

WIDTH

HEIGHT

WEIGHT (KG)

TYPE OF MOUNTING

PLATFORM NORTH

45°

45°

N

TRUE NORTH

TRUE NORTH

PREVAILING WIND

240-XZ8347 240-XZ8348

(HOLD-1) 240-XZXXXX

BAM 12

240-XZ8350

(HOLD-1) 240-FEXXXX

(HOLD-1) 240-XZXXXX

240-XZ8351

240-XZ8338

240-XZ8305

(HOLD-1) 240-FEXXXX

CO2 4.5 kg

BAM 12

FB

BA

CO2 4.5 kg

240-XZ8357 OXYGEN


FULL CYLINDER

A

CO2 4.5 kg

BAM 12

BA

4.5kg CO2 PORTABLE FIRE EXTINGUISHER

BREATHING AIR MANIFOLD CABINET WITH 12 NUMBERS OF HOSE UNIT (NOTE-2)

BREATHING APPARATUS ESCAPE SET CABINET (15 MINUTES AND 3L CYLINDER)

STRETCHER

FB

FIRE BLANKET

FIRST AID KIT

ESK

ELECTRICAL SAFETY KIT

OXYGEN


FULL CYLINDER

OXYGEN CYLINDER WITH THE MASK

C

L O O T F O E G A R O T S

R O F E C A P S D E T A C O L L A

15

60

61

14

0 5 8 2 1

2

79

80

72

77

93A 94

93B

57

92

I

T X E

I

T X E

UP

167

209

TEMPORARY REFUGE AREA (0.6 SQM x 24 POB )

71

168

75

90

AIR LOCK ROOM

HVAC DUCTING (400x300) TO FLOOR VOID

165

TEL. CABLE TRAY

EXIT

81 100

211

92

FB

94

95

INST. CABLE TRAY

151

152

153

154

155

156

157

158

159

160

161

162

103

164

DROP ZONE (2000x1500)

P U

62

1

17

166

163

ELECTRICAL & INSTRUMENT ROOM

132

131

130

112

56

7

6

5

I

T X E

2

101

82

92

102

UP

UP

ALLOCATED SPACE FOR ELECTRICAL CABLE TRAY

FIRE/BLAST WALL

15000

ESK

240-XZ8343

FLOOR PLAN VIEW EL.+16800 T.O.F (FIRST FLOOR)

MAIN DECK EL. +15500 T.O.S

CO2 4.5 kg

240-FEXXXX (HOLD-1)

A

B

C

D

E

F

G

H

I

J

K

L

NOTES: 1.

ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

BREATHING AIR MANIFOLD FOR 12 PERSON, AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

THIS LAYOUT SHALL BE USED ONLY FOR ESCAPE ROUTE, QUANTITY AND LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS.

PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT, SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)

NOVEC 1230 (FK-5-1-12) CLEAN AGENT PROTECTION SHALL BE PROVIDED FOR ELECTRICAL & INSTRUMENT ROOM AND UPS, INSTRUMENT & TELECOM ROOM IN THE LER.

LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.

ALL FIRE & SAFETY EQUIPMENTS SHALL BE LOCATED IN SUCH A WAY THAT THEY ARE EASILY ACCESSIBLE.

A

B

OXYGEN CYLINDER WITH FACE MASK SHALL BE PROVIDED INSIDE BUILDING (IN TEMPORARY REFUGE).

FOR TEMPORARY REFUGE, AN OVERALL FREE FLOOR SPACE OF 14.4 M² BETWEEN EQUIPMENTS SHALL BE MAINTAINED IN THE TR.

C

  1. AIR LOCK ROOM SHOULD ALLOW SAFE MANEUVERING OF AN

INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.

3

2

1

2

1

2

1

1

ELECTRICAL EQUIPMENT LIST

SB-240301

415V LV SWITCHGEAR

LTR-240301

LIGHTING TRANSFORMER

LP-2402301

LIGHTING AND SMALL POWER DISTRIBUTION PANEL

PDB-2402301

AC POWER DISTRIBUTION BOARD

PDB-2402302

AC POWER DISTRIBUTION BOARD

CP-240301

IMCS PANEL

KEY ONLINE DIAGRAM FRAME

LIFTING TRUCK FOR ACB

PADLOCK KEY BOX

7000

1133

1000

800

800

800

1000

1000

250

HVAC EQUIPMENT LIST

240-YH4201ACP04

ELECTRIC DUCT HEATER POWER PANEL

240-YH4201ACP01

HVAC CONTROL PANEL

240-YH4201ACP05

HVAC PURGE PANEL FOR ELECTRICAL & ISNTRUMENT ROOM - LER 1ST FLOOR

800

1200

600

INSTRUMENT EQUIPMENT LIST

240-PDB5101

ICSS PDB-1

240-DCM5001

DCS MARSHALLING CABINET-1

240-DCS5001

DCS SYSTEM CABINET-1

240-DCM5002

DCS MARSHALLING CABINET-2

240-DCS5002

DCS SYSTEM CABINET-2

240-DCM5003

DCS MARSHALLING CABINET-3

240-ESM4901

ESD MARSHALLING CABINET-1

240-ESD4901

ESD SYSTEM CABINET-1

240-ESM4902

ESD MARSHALLING CABINET-2

240-COM5001

ICSS NETWORK CABINET

240-COM5002

ICSS SERVER CABINET

FUTURE CABINET-1

240-IRP5101

IRP PANEL

240-CON5001

DCS CONSOLE (OWS/EWS/AUX)

HOLD

HOLD

HSSD PANEL-1

HSSD PANEL-2

800

800

800

800

800

800

800

800

800

800

800

800

800

2200

600

600

1600

1110

500

500

500

800

50

750

100

500

800

500

800

800

800

800

800

800

800

800

800

1000

1000

800

800

800

300

300

2300

1239

1200

1400

1400

2200

700

1158

350

2100

2100

1000

2100

2100

2100

2100

2100

2100

2100

2100

2100

2100

2100

2100

2100

770

600

600

1

2

5

6

7

14

15

17

56

60

61

62

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

211

240-ACJB-L1-01

ACS ENCLOSURE -1

616

300

616

TELECOM EQUIPMENT LIST

12080

FLOOR MOUNTED

400

300

125

125

300

10

90

10

FLOOR MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

FLOOR MOUNTED

WALL MOUNTED

PORTABLE

WALL MOUNTED

FLOOR MOUNTED

1000

FLOOR MOUNTED

200

WALL MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

450

450

450

450

450

450

450

450

450

450

450

450

300

150

150

80

15

15

23

15

10

40

40

40

HOLDS: 1.

TAG NUMBERS.

WALL MOUNTED

KEY PLAN

LOSPE EQUIPMENT LIST

240-XXXXX

NOVEC LOCAL STATUS PANEL 1

240-XXXXX

NOVEC LOCAL STATUS PANEL 2

300

300

240-XXXXX

4.5 KG CO2 EXTINGUISHER 2 NO’S

178 DIA

240-XZ8351

FIRST AID KIT

240-XZ8338

FIRE BLANKET

240-XXXXX

240-XXXXX

240-XXXXX

NOVEC (FK-5-1-12) INDOOR PUSH BUTTON & LAMP PANEL

NOVEC (FK-5-1-12) INDOOR PUSH BUTTON & LAMP PANEL

NOVEC (FK-5-1-12) OUTDOOR PUSH BUTTON & LAMP PANEL

240-XZ8343

ELECTRICAL SAFETY KIT

448

300

450

450

450

1000

ARCHITECTURAL EQUIPMENT LIST

FILE CABINET-1

FILE CABINET-2

FILE CABINET-3

600

600

800

150

150

213

500

300

300

300

400

450

450

500

81

82

92

94

95

100

101

102

112

130

131

132

300

300

1225

425

1200

450

450

450

PLATFORM NORTH

45°

45°

N

TRUE NORTH

TRUE NORTH

240NL-502 240NL-506

PREVAILING WIND

14613.2870

A

0 0 0 , 0 0 1

.

E

2 0 3 8 Z X

0 4 2

THIS DRAWING

C

0 0 0 , 5 1 1

.

E

B

0 0 0 , 0 3 1

.

E

15000.0000

15000.0000

240-XB2003 2 TON ELECTRIC EL+20200 (B.O.S.)

DROP ZONE (2000x1500)

7500.0000

6319.9500

TEMPORARY REFUGE ROOM

AIR LOCK ROOM

E&I ROOM

LER BUILDING

SPLITTER BOX WORKING AREA

T.O.G. EL. +15532

800.2044

FIRE/BLAST WALL

240-XB2006 10 TON MANUAL EL+21800 (B.O.S.)

1008.7755

240-XB2009 10 TON MANUAL EL+21800 (B.O.S.)

MONORAIL

240MOV 230 073

240SDV 230 020

240MOV 230074

1675.0000

240FCV 230 023B

240MOV 230 078

240MOV 230 071

240MOV 230 077

240MOV 230 072

240FCV 230 023A

240SDV 230 001

240-XZ8304

240-XZ8303

DROP ZONE FROM SECOND FLOOR 1300x1300)

LAYDOWN AREA D (2500x2500)

240-XZ8328

240-XZ8329

240-XZ9501B

T.O.S. EL. +18315

UP

DN

240-XZ9501A

240-XB2002

20 TON ELECTRIC EL+19990 (B.O.S.)

240-XB2001

20 TON ELECTRIC EL+19990 (B.O.S.)

240-US-04

1900.4190

6400.0770

240NL-503 240NL-507

9554.5383

3110.4620

200-X2001

LAYDOWN A 13700(L) x 5300(W) CAP. 20MT

14000.0000

200-X2001

5530

7000

2250.1170

3200

3100

3200.0000

2250.0051

N. 100,000

1

240-XB2008 10 TON MANUAL EL+21800 (B.O.S.)

499.8290

240-US-03

6599.8695

9999.9949

240NL-505 240NL-501

240-XB2007 10 TON MANUAL EL+21800 (B.O.S.)

HATCH TO LAYDOWN “C” AT CELLAR DECK

4000.0005

SPACE PROVISION FOR FUTURE TEST SEPARATOR

BRIDGE TO EXISTING WHP5S PLATFORM

240-XB2005 15 TON MANUAL EL+21800 (B.O.S.)

240-V9501

3800.0613

4500

UP

UP

T.O.S. EL. +12750

4600.0800

7449.5990

240-T8702

5580.2540

3750

240-P9701

SPACE RESERVED FOR FUTURE BRIDGE LANDING/PIPING

240NL-508 240NL-504

WALL MOUNTED

N. 114,000

2

WALL MOUNTED

1800

145

FLOOR MOUNTED

1880

1880

1200

100

100

100

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

EQUIPMENT LIST FOR TEMPORARY REFUGE (LER 1ST FLOOR)

SI.NO.

TAG NUMBER

DESCRIPTION

DIMENSIONS (MM)

LENGTH

WIDTH

HEIGHT

WEIGHT (KG)

TYPE OF MOUNTING

INSTRUMENT EQUIPMENT LIST

167

168

240-CON5003

DCS WORKSTATION

HOLD

MULTI -GAS DETECTOR

1000

455

800

450

770

640

200

50

FLOOR MOUNTED

FLOOR MOUNTED

TELECOM EQUIPMENT LIST

209

240-CON-L1-01

TELECOM CONSOLE - 1

800

600

1690

150

FLOOR MOUNTED

71

72

75

77

79

80

90

92

93A

93B

94

103

57

LOSPE EQUIPMENT LIST

240-XXXXXA

BREATHING AIR MANIFOLD A

240-XXXXXB

BREATHING AIR MANIFOLD B

240-XZ8305

ESCAPE BREATHING APPARATUS CABINET

SPARE

240-XXXX

240-XXXX

NOVEC (FK-5-1-12) MAIN JB

NOVEC (FK-5-1-12) CONTROL PANEL

240-XZ8357

OXYGEN CYLINDER WITH MASK

1500

1500

750

800

600

300

240-XXXXX

4.5 KG CO2 EXTINGUISHER

178 DIA

240-XZ8347

STRETCHER 1

240-XZ8348

STRETCHER 2

240-XZ8350

FIRST AID KIT

240-XXXXX

NOVEC (FK-5-1-12) OUTDOOR PUSH BUTTON & LAMP PANEL

300

300

448

450

610

610

600

450

450

300

200

200

213

300

960

960

857

1500

1200

1000

1225

1200

1200

425

450

150

150

224

120

120

20

23

25

25

15

40

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

PORTABLE

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

200-20-SH-DEC-00013

240-23-PI-PLP-00003

240-91-EL-PLN-00001-0004

TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT EQUIPMENT ARRANGEMENT PLAN MAIN DECK FOR RP5S ELECTRICAL EQUIPMENT LAYOUT LOCAL EQUIPMENT ROOM (LER) FOR RP5S

REFERENCE NO.

TITLE

REFERENCES

A

A1

NO.

ISSUED FOR REVIEW

ISSUED FOR IDC

DESCRIPTION

MTA

MTA

JB

JB

BPB

20/03/25

BPB

10/03/25

BY

CHKD

APVD

DATE

PORTABLE HANDLAMP

300

200

350

3

WALL MOUNTED

PROJECT TITLE :

ELECTRICAL EQUIPMENT LIST

REVISIONS

NFPS Offshore Riser Platforms & Intrafield Pipelines Project - COMP3

Qatar Energy LNG

Qatar Energy LNG

THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.

CONSULTANT / CONTRACTOR :

Saipem S.p.A.

CONTRACTOR DRAWING NO:

033764-G-D00-18-SPM-LP-D-00046-0001

TITLE :

FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - LOCAL EQUIPMENT ROOM- RP5S

SCALE :

1:50

PROJECT NO. :

LTC/C/NFP/5129/20

PROJECT

033764

DRAWING NO.

SHT

SIZE REVISION

240-83-SH-PLN-00003

0001

A1

A

D

E

F

G

H

I

J

K

L

1

2

3

4

5

6

7

10

11

12

13

14

15

16

Classification: Internal

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

LEGENDS:

EQUIPMENT LIST FOR UPS, INSTRUMENT & TELECOM ROOM (LER 2ND FLOOR)

LEGEND

DESCRIPTIONS

QTY

SI.NO.

TAG NUMBER

DESCRIPTION

DIMENSIONS (MM)

LENGTH

WIDTH

HEIGHT

WEIGHT (KG)

PLATFORM NORTH

45°

45°

N

TRUE NORTH

TRUE NORTH

PREVAILING WIND

A

(HOLD-1) 240-FEXXXX

CO2 4.5 kg

240-XZ8344

ESK

(HOLD-1) 240-FEXXXX

CO2 4.5 kg

CO2 4.5 kg

FB

4.5kg CO2 PORTABLE FIRE EXTINGUISHER

FIRE BLANKET

FIRST AID KIT

EYE WASH

PORTABLE EYE WASH

ESK

ELECTRICAL SAFETY KIT

4

1

1

1

1

(HOLD-1) 240-FEXXXX

CO2 4.5 kg

C

A

B

C

D

E

F

G

H

I

J

K

L

HVAC DUCTING (350x250) TO FLOOR LEVEL

64

EXIT

92

213

41

65

25

23

39

40

92

109

107

31

33

34

32

24

26

BATTERY ROOM

EXIT

92

105

84

113

22

30

208

185

186

212

FB

95

94

104

83

I

T X E

184

183

182

181

180

206

205

204

203

201

202

AIR LOCK

92

210

18

19

20

21

UPS, INSTRUMENT & TELECOM ROOM

I

T X E

I

T X E

106

43

42

35

36

37

29

28

27

44

EYE WASH 240-EW8301

FB 240-XZ8339

240-XZ8352

(HOLD-1) 240-FEXXXX

CO2 4.5 kg

UP

UP

0 4 8 2 1

2

ALLOCATED SPACE FOR ELECTRICAL CABLE TRAY

HVAC DUCTING (300x200) TO FLOOR VOID

15000

FLOOR PLAN VIEW EL.+21610 T.O.F (SECOND FLOOR)

18

19

20

21

22

27

28

29

30

35

36

37

38

42

43

44

83

84

92

94

95

104

105

106

107

113

ELECTRICAL EQUIPMENT LIST

UPS-240401A

AC UPS SYSTEM A

UPS-240401B

AC UPS SYSTEM B

UPSDP-240401A

AC UPS DISTRIBUTION BOARD A

UPSDP-240401B

AC UPS DISTRIBUTION BOARD B

BM-240401

AC UPS SYSTEM BATTERY MONITORING PANEL

BC-240501A & B

DC UPS BATTERY CHARGER A & B

DCP-240501A

DC UPS DISTRIBUTION BOARD A

DCP-240501B

DC UPS DISTRIBUTION BOARD B

BM-240501

DC UPS SYSTEM BATTERY MONITORING PANEL

UPS-240403A

NAVIGATIONAL AIDS AC UPS A

UPS-240403B

NAVIGATIONAL AIDS AC UPS B

NCP-240501

MAIN DISTRIBUTION BOARD NAVIGATIONAL AIDS UPS

NAV AID BATTERY MONITORING SYSTEM

3000

3000

1600

1600

800

2940

1200

1200

800

1600

1200

800

600

LP-2403301

LIGHTING AND SMALL POWER DISTRIBUTION PANEL

1000

PDB-2403301

AC POWER DISTRIBUTION BOARD

AWL-240301

HELIDECK LIGHTING MAIN CONTROL PANEL

800

800

LOSPE EQUIPMENT LIST

240-XXXXX

240-XXXXX

NOVEC (FK-5-1-12) LOCAL STATUS PANEL 3

NOVEC (FK-5-1-12) LOCAL STATUS PANEL 4

240-XXXXX

4.5KG CO2 EXTINGUISHER 2 NO’S

240-XZ8352

FIRST AID KIT

240-XZ8339

FIRE BLANKET

240-XXXXX

240-XXXXX

240-XXXXX

240-XXXXX

NOVEC (FK-5-1-12)INDOOR PUSH BUTTON & LAMP PANEL

NOVEC (FK-5-1-12) INDOOR PUSH BUTTON & LAMP PANEL

NOVEC (FK-5-1-12) OUTDOOR PUSH BUTTON & LAMP PANEL

NOVEC (FK-5-1-12) OUTDOOR PUSH BUTTON & LAMP PANEL

240-XZ8344

ELECTRICAL SAFETY KIT

300

300

178 DIA

448

300

450

450

450

450

1000

HVAC EQUIPMENT LIST

1000

1000

800

800

400

1000

800

800

400

800

800

800

400

500

500

800

150

150

213

500

300

300

300

300

400

2200

2200

2000

2000

1000

2200

2000

2000

1000

2200

2200

2450

1000

1200

1400

1000

300

300

1225

425

1200

450

450

450

450

4500

4500

500

500

100

2500

500

500

100

550

550

100

100

300

125

160

15

15

23

15

10

40

40

40

40

1800

145

65

240-YH4201ACP07

HVAC PURGE PANEL FOR UPS, INSTRUMENT AND TELECOM ROOM - LER 2ND FLOOR

600

500

1000

200

INSTRUMENT EQUIPMENT LIST

180

181

182

183

184

185

186

201

202

203

204

205

206

208

210

212

240-FGS8301

F&G SYSTEM CABINET-1

240-FGM8301

F&G MARSHALLING CABINET-1

240-FGS8302

F&G SYSTEM CABINET-2

240-FGM8302

F&G MARSHALLING CABINET-2

HOLD

HOLD

FUTURE CABINET-2

HSSD PANEL -3

HSSD PANEL -4

240-TCB-L2-01

TELECOM CABINET -1

240-TCB-L2-02

TELECOM CABINET -2

240-TCB-L2-03

TELECOM CABINET -3

240-TCB-L2-04

TELECOM CABINET -4

240-TCB-L2-05

TELECOM CABINET -5

240-TCB-L2-06

TELECOM CABINET -6

240-PDB-L2-01

TELECOM PDB

240-CON-L2-01

TELECOM CONSOLE - 1

240-ACJB-L2-01

ACS ENCLOSURE -1

800

800

800

800

800

600

600

TELECOM EQUIPMENT LIST

800

800

800

800

800

800

1400

1900

600

800

800

800

800

800

250

250

800

1000

800

800

800

800

400

600

300

2100

2100

2100

2100

2100

800

800

2100

2100

2100

2100

2100

2100

1500

1690

600

450

450

450

450

200

200

350

400

350

350

350

350

200

300

150

SI.NO.

TAG NUMBER

DESCRIPTION

DIMENSIONS (MM)

LENGTH

WIDTH

HEIGHT

WEIGHT (KG)

EQUIPMENT LIST FOR BATTERY ROOM (LER 2ND FLOOR)

ELECTRICAL EQUIPMENT LIST

23

24

25

26

31

32

33

34

39

40

41

CB-240401A

BATTERY CIRCUIT BREAKER A

CB-240401B

BATTERY CIRCUIT BREAKER B

BB-240401A

AC UPS SYSTEM BATTERY BANK A

BB-240401B

AC UPS SYSTEM BATTERY BANK B

CB-240501A

BATTERY CIRCUIT BREAKER A

CB-240501B

BATTERY CIRCUIT BREAKER B

BB-240501A

DC UPS SYSTEM BATTERY BANK A

BB-240501B

DC UPS SYSTEM BATTERY BANK B

CB-240503

NAVIGATIONAL AIDS UPS ISOLATION SWITCH

BB-240503

NAVIGATIONAL UPS BATTERY BANK

BATTERY LIFTING TROLLEY

500

500

3920

3920

500

500

1700

1700

500

1500

1050

300

300

800

800

300

300

800

800

300

900

650

600

600

1540

1540

600

600

1400

1400

600

1130

1600

TELECOM EQUIPMENT LIST

213

240-ACJB-L2-02

ACS ENCLOSURE -2

616

300

616

LOSPE EQUIPMENT LIST

92

109

240-XXXXX

4.5 KG CO2 EXTINGUISHER 2 NO’S

240-EW8301

PORTABLE EYE WASH

178 DIA

300

250

1225

300

100

100

6250

6250

100

100

2000

2000

125

1500

100

80

23

10

NOTES: 1.

ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.

BREATHING AIR MANIFOLD FOR 12 PERSON, AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

THIS LAYOUT SHALL BE USED ONLY FOR ESCAPE ROUTE, QUANTITY AND LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS.

PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT, SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)

NOVEC 1230 (FK-5-1-12) CLEAN AGENT PROTECTION SHALL BE PROVIDED FOR ELECTRICAL & INSTRUMENT ROOM AND UPS, INSTRUMENT & TELECOM ROOM IN THE LER.

LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.

ALL FIRE & SAFETY EQUIPMENTS SHALL BE LOCATED IN SUCH A WAY THAT THEY ARE EASILY ACCESSIBLE.

AIR LOCK ROOM SHOULD ALLOW SAFE MANEUVERING OF AN INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.

HOLDS: 1.

TAG NUMBERS.

A

0 0 0 , 0 0 1

.

E

2 0 3 8 Z X

0 4 2

PLATFORM NORTH

45°

45°

N

TRUE NORTH

TRUE NORTH

240NL-502 240NL-506

PREVAILING WIND

14613.2870

N. 114,000

2

5530

7000

2250.1170

3200

3100

3200.0000

2250.0051

THIS DRAWING

C

0 0 0 , 5 1 1

.

E

B

0 0 0 , 0 3 1

.

E

15000.0000

15000.0000

240-XB2003 2 TON ELECTRIC EL+20200 (B.O.S.)

DROP ZONE (2000x1500)

7500.0000

6319.9500

TEMPORARY REFUGE ROOM

AIR LOCK ROOM

E&I ROOM

LER BUILDING

SPLITTER BOX WORKING AREA

T.O.G. EL. +15532

800.2044

FIRE/BLAST WALL

240-XB2006 10 TON MANUAL EL+21800 (B.O.S.)

1008.7755

240-XB2009 10 TON MANUAL EL+21800 (B.O.S.)

MONORAIL

240MOV 230 073

240SDV 230 020

240MOV 230074

1675.0000

240FCV 230 023B

240MOV 230 078

240MOV 230 071

240MOV 230 077

240MOV 230 072

240FCV 230 023A

240SDV 230 001

240-XZ8304

240-XZ8303

DROP ZONE FROM SECOND FLOOR 1300x1300)

LAYDOWN AREA D (2500x2500)

240-XZ8328

240-XZ8329

240-XZ9501B

T.O.S. EL. +18315

UP

DN

240-XZ9501A

240-XB2002

20 TON ELECTRIC EL+19990 (B.O.S.)

240-XB2001

20 TON ELECTRIC EL+19990 (B.O.S.)

240-US-04

1900.4190

6400.0770

240NL-503 240NL-507

9554.5383

3110.4620

200-X2001

LAYDOWN A 13700(L) x 5300(W) CAP. 20MT

14000.0000

200-X2001

N. 100,000

1

240-XB2008 10 TON MANUAL EL+21800 (B.O.S.)

499.8290

240-US-03

6599.8695

9999.9949

240NL-505 240NL-501

240-XB2007 10 TON MANUAL EL+21800 (B.O.S.)

HATCH TO LAYDOWN “C” AT CELLAR DECK

4000.0005

SPACE PROVISION FOR FUTURE TEST SEPARATOR

BRIDGE TO EXISTING WHP5S PLATFORM

240-XB2005 15 TON MANUAL EL+21800 (B.O.S.)

240-V9501

3800.0613

4500

UP

UP

T.O.S. EL. +12750

4600.0800

7449.5990

240-T8702

5580.2540

3750

240-P9701

SPACE RESERVED FOR FUTURE BRIDGE LANDING/PIPING

240NL-508 240NL-504

200-20-SH-DEC-00013

240-23-PI-PLP-00003

240-91-EL-PLN-00001-0005

TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT EQUIPMENT ARRANGEMENT PLAN MAIN DECK FOR RP5S ELECTRICAL EQUIPMENT LAYOUT LOCAL EQUIPMENT ROOM (LER) FOR RP5S

REFERENCE NO.

TITLE

REFERENCES

A

A1

NO.

ISSUED FOR REVIEW

ISSUED FOR IDC

DESCRIPTION

MTA

MTA

JB

JB

BPB

20/03/25

BPB

10/03/25

BY

CHKD

APVD

DATE

REVISIONS

HVAC EQUIPMENT LIST

PROJECT TITLE :

64

240-YH4201ACP06

HVAC PURGE PANEL FOR BATTERY ROOM - LER 2ND FLOOR

600

500

1000

200

NFPS Offshore Riser Platforms & Intrafield Pipelines Project - COMP3

Qatar Energy LNG

Qatar Energy LNG

THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.

CONSULTANT / CONTRACTOR :

Saipem S.p.A.

CONTRACTOR DRAWING NO:

033764-G-D00-18-SPM-LP-D-00046-0001

TITLE :

FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - LOCAL EQUIPMENT ROOM- RP5S

SCALE :

1:50

PROJECT NO. :

LTC/C/NFP/5129/20

PROJECT

033764

DRAWING NO.

SHT

SIZE REVISION

240-83-SH-PLN-00003

0002

A1

A

A

B

C

D

E

F

G

H

I

J

K

L

1

2

3

4

5

6

7

10

11

12

13

14

15

16

Project: Q-32705 - Saipem COMP3 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further