Classification: Internal
1
2
3
PLATFORM NORTH
45°
45°
N
TRUE NORTH
TRUE NORTH
PREVAILING WIND
240NL-502 240NL-506
3 1 6 4 1
4
A
0 0 0 , 0 0 1
.
E
240-XZ8302 NOVEC
2 0 3 8 Z X
0 4 2
TEMPORARY REFUGE ROOM
AIR LOCK ROOM
NOTE 14
E&I ROOM
LER BUILDING
SPLITTER BOX WORKING AREA
T.O.G. EL. +15532
FIRE/BLAST WALL
240-XB2006 10 TON MANUAL EL+21800 (B.O.S.)
240-XB2009 10 TON MANUAL EL+21800 (B.O.S.)
240MOV 230074
MONORAIL
240MOV 230 073
240SDV 230 020
240FCV 230 023B
240MOV 230 078
240MOV 230 071
240MOV 230 077
240MOV 230 072
240FCV 230 023A
240SDV 230 001
240NL-505 240NL-501
240-XB2008 10 TON MANUAL EL+21800 (B.O.S.)
240-US-03
240-XB2007 10 TON MANUAL EL+21800 (B.O.S.)
HATCH TO LAYDOWN “C” AT CELLAR DECK
SPACE PROVISION FOR FUTURE TEST SEPARATOR
BRIDGE TO EXISTING WHP5S PLATFORM
MAIN DECK(T.O.S. EL. +15500)
240-XB2005 15 TON MANUAL EL+21800 (B.O.S.)
240-V9501
UP
UP
T.O.S. EL. +12750
N. 114,000
2
XXX-FEXXXX (HOLD-1)
9 Kg
240-XZ8316
XXX-FEXXXX (HOLD-1)
BC 56.7 kg
N. 100,000
1
XXX-FEXXXX (HOLD-1)
9 Kg
0 5 2 2
0 0 2 3
0 0 1 3
0 0 2 3
0 5 2 2
0 0 0 0 1
0 0 0 4
A
B
C
D
E
F
G
H
I
J
K
L
5
6
240-XZ8313
15000
(HOLD-1) NOTE 15 XXX-FEXXXX XXX-FEXXXX XXX-FEXXXX
X3
CO2 4.5 kg
7
C
0 0 0 , 5 1 1
.
E
8
9
10
11
12
240-XZ8356 FE
240-XZ8332 WV
240-XZ8308
240-XZ8304
240-XZ8303
240-XZ8328
240-XZ8329
SC
240-XZ8334
B
HOLDS:
- TAG NO.
n=4
15000
0 0 0 , 0 3 1
.
E
n=12
n=12
7500
6320
13
14
WHP5S & RP5S KEY PLAN
TRUE NORTH
NOTES:
15
16
240-XB2003 2 TON ELECTRIC EL+20200 (B.O.S.)
DROP ZONE (2000x1500)
DROP ZONE FROM SECOND FLOOR 1300x1300)
240-XZ8328
240-XZ8329
LAYDOWN AREA D (2500x2500)
T.O.S. EL. +18315
240-XZ9501B
UP
DN
240-XZ9501A
RP5S
BSPS
CHEVRON MARKING
CHEVRON MARKING
N
BRDIGE NOMINAL POSITION
WHP5S (EXISTING)
- ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS
UNLESS STATED OTHERWISE.
- PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,
SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)
- BREATHING AIR MANIFOLD FOR 6 PERSON, AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
A
- AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE)
FOR COMP3 PROJECT (200-20-SH-DEC-00013) - DEDICATED 45 MINUTES 4 SCBA SETS WITH CABINETS SHOULD BE PROVIDED FOR INVESTIGATION TEAM USE ONLY.
-
THIS LAYOUT SHALL BE USED ONLY FOR ESCAPE ROUTE, QUANTITY AND LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS.
-
THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN ALL
AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.
- THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL BE
PROVIDED WITH WEATHER-PROOF CABINET.
- WHEELED EXTINGUISHERS LOCATED OUTDOOR SHALL BE
PROVIDED WITH A UV-RESISTANT RED-VINYL COVER.
- ARROWS SHOWN ON THE ESCAPE ROUTE DRAWING INDICATE
THE PREFERRED DIRECTION OF EGRESS TOWARDS THE MUSTER AREA. IN CASE OF EMERGENCY AT RP, PERSONNEL SHALL USE BRIDGE TO REACH PRIMARY MUSTER AREA LOCATED AT WELLHEAD PLATFORM 5S LER BUILDING TR. IN CASE ESCAPE THROUGH BRIDGE TOWARDS WELLHEAD IS NOT FEASIBLE, PERSONNEL TO PROCEED TO SECONDARY MUSTER AREA LOCATED AT RP LER BUILDING TR FOR MUSTERING.
B
C
10.LOCATION OF FIREFIGHTING, SAFETY, LIFE SAVING
EQUIPMENTS AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.
11.STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN
INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.
- ALL FIRE & SAFETY EQUIPMENTS SHALL BE LOCATED IN SUCH
A WAY THAT THEY ARE EASILY ACCESSIBLE.
13.NOVEC 1230 (FK-5-1-12) CLEAN AGENT PROTECTION SHALL BE PROVIDED FOR ELECTRICAL & INSTRUMENT ROOM AND UPS, INSTRUMENT & TELECOM ROOM IN THE LER.
D
14.REFER TO FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE
LAYOUT - LOCAL EQUIPMENT ROOM-RP5S (240-83-SH-PLN-00003) FOR THE DETAIL ARRANGEMENT OF FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT INSIDE THE LER.
-
THREE (3) NOS. CO2 PORTABLE FIRE EXTINGUISHERS SHALL BE LOCATED AT THE MAIN ENTRANCE TO THE ELECTRICAL & INSTRUMENT ROOM FOR FIRE BRIGADE USE.
-
ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER THAT IS VISIBLE, DURABLE AND ANTI-SLIP. LEGENDS:
240NL-503 240NL-507
5 5 5 9
0 1 1 3
XXX-FEXXXX (HOLD-1)
9 Kg
200-X2001
LEGEND
240-US-04
240-XB2002
20 TON ELECTRIC EL+19990 (B.O.S.)
240-XB2001
20 TON ELECTRIC EL+19990 (B.O.S.)
LAYDOWN A 13700(L) x 5300(W) CAP. 20MT
0 0 0 4 1
BAM 6
XXX-XZXXXX (HOLD-1)
BC 56.7 kg
XXX-FEXXXX (HOLD-1)
XXX-FEXXXX (HOLD-1)
9 Kg
200-X2001
CO2 4.5 kg
9 Kg
BC 56.7 kg
n=4
FE
SC
BAM 6
n=12
WV
DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m(WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m(WIDTH) X 2.286m (HEAD CLEARANCE) 4.5kg CO2 PORTABLE FIRE EXTINGUISHER
9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER
56.7kg DRY CHEMICAL POWDER (BC) WHEELED FIRE EXTINGUISHER
LIFEBUOY WITH LIFELINE
LIFE RAFT n=(NUMBERS OF PERSON CAPACITY)
SELF CONTAINED BREATHING APPARATUS (45 MINUTES) (NOTE 4) CABINET FOR 4 UNITS OF SCBA
FIREMAN EQUIPMENT
SCRAMBLE NET
BREATHING AIR MANIFOLD CABINET WITH 6 NUMBERS OF HOSE UNIT (NOTE 3)
LIFE JACKET
CABINET FOR 12 UNITS OF LIFE JACKET
WORK VEST CABINET WITH 24 UNITS OF WORK VEST
NOVEC
NOVEC 1230 (FK-5-1-12) FIRE SUPPRESSION SYSTEM PACKAGE (NOTE-13)
QTY
3
5
2
4
2
4
1
1
1
2
24
2
1
1
240-T8702
SPACE RESERVED FOR FUTURE BRIDGE LANDING/PIPING
240-P9701
240-XZ8314
240NL-508 240NL-504
A
0 0 0 0 0 1
.
E
C
0 0 0 5 1 1
.
E
AIR LOCK ROOM
BATTERY ROOM
T.O.G EL. +21610
NOTE 14 UPS ROOM LER LEVEL 2
T.O.G EL. +20600
BAM 6
XXX-XZXXXX (HOLD-1)
240-XZ8315
9 Kg XXX-FEXXXX (HOLD-1)
100
0 0 2
100
0 0 2
400
400
TYPICAL DETAIL-1
TYPICAL DETAIL-2
N.T.S
N.T.S
LER LEVEL 2 (SCALE:NTS)
N. 114000
2
MONORAIL B.O.S. EL. +25200 240-XB 2004
Qatar Energy LNG
THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.
CONSULTANT / CONTRACTOR :
Saipem S.p.A.
UP
DN
UP
T.O.G EL. +22810
T.O.G EL. +21610
TITLE :
CONTRACTOR DRAWING No. :
033764-G-D00-12-SPM-LP-D-00043-0001
FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - MAIN DECK - RP5S
1M
0
1M
2M
3M
4M
5M
SCALE :
1:100
PROJECT No. :
LTC/C/NFP/5129/20
PROJECT
033764
DRAWING No.
SHT
SIZE REVISION
240-83-SH-PLN-00004
0001
A1
A
200-20-SH-DEC-00013
240-83-SH-PLN-00003
TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - LOCAL EQUIPMENT ROOM - RP5S
240-23-PI-PLP-00006
EQUIPEMENT ARRANGEMENT PLAN LER LEVEL 2 FOR RP5S
240-23-PI-PLP-00003
EQUIPMENT ARRANGEMENT PLAN MAIN DECK FOR RP5S
REFERENCE No.
TITLE
REFERENCES
A
A1
No.
ISSUED FOR REVIEW
ISSUED FOR IDC
DESCRIPTION
MTA
MTA
JB
JB
BPB
20/03/25
BPB
10/03/25
BY
CHKD
APVD
DATE
REVISIONS
PROJECT TITLE :
COMP3 - NFPS OFFSHORE RISER / WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
Qatar Energy LNG
E
F
G
H
I
J
K
L
EQUIPMENT NO. 240-T8702 200-X2001 240-XZ8302 240-XZ8303 240-XZ8304 240-P9701 240-NL501 240-NL502 240-NL503 240-NL504
1
EQUIPMENT LIST
DESCRIPTION
SIZE (MM)
CP SEPARATOR PIPELINE PIG LAUNCHER TEMPORARY CLEAN AGENT FIRE SUPPRESSION SYSTEM PACKAGE LIFE RAFT LIFE RAFT MEG TRANSFER PUMP NAVAID LANTERN 1 (WHITE) NAVAID LANTERN 2 (WHITE) NAVAID LANTERN 3 (WHITE) NAVAID LANTERN 4 (WHITE)
3400(L) X 2200(W) X 1800 (H) 28” X 32”(OD) X 8400(L) 3000 (L) X 1500(W) X 3200(H) 1300 (L) X 713(W) X 685(H) 1300 (L) X 713(W) X 685(H) 1910(L) X 900(W) X 910(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H)
2
3
EQUIPMENT NO. 240-NL505 240-NL506 240-NL07 240-NL508 240-V9501 240-XZ9501A/B 240-US-03 240-US-04 240-XB2001 240-XB2002 4
EQUIPMENT LIST
DESCRIPTION
SIZE (MM)
NAVAID OBSTRUCTION LANTERN 1 (RED) NAVAID OBSTRUCTION LANTERN 2 (RED) NAVAID OBSTRUCTION LANTERN 3 (RED) NAVAID OBSTRUCTION LANTERN 4 (RED) INSTRUMENT AIR RECEIVER CASCADE BREATHING AIR PACKAGE UTILITY STATION UTILITY STATION MONORAIL 20 MT ELECTRIC MONORAIL 20 MT ELECTRIC
400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 1400 (ID) X 4000 (T/T) 1380(L)X1355(W)2500(H)
EQUIPMENT NO. 240-XB2003 240-XB2005 240-XB2006 240-XB2007 240-XB2008 240-XB2009 240-XZ8328 240-XZ8329
EQUIPMENT LIST
DESCRIPTION
SIZE (MM)
MONORAIL 2 TON ELECTRIC MONORAIL 15 TON MANUAL MONORAIL 10 TON MANUAL MONORAIL 10 TON MANUAL MONORAIL 10 TON MANUAL MONORAIL 10 TON MANUAL LIFE JACKET CABINET LIFE JACKET CABINET
5
6
7
10
11
12
13
14
15
16
Project: Q-32705 - Saipem COMP3 Folder: RFQ Files