PLATFORM NORTH

45°

45°

N

TRUE NORTH

TRUE NORTH

PREVAILING WIND

240NL-502 240NL-506

3 1 6 4 1

4

A

0 0 0 , 0 0 1

.

E

240-XZ8302 NOVEC

2 0 3 8 Z X

0 4 2

TEMPORARY REFUGE ROOM

AIR LOCK ROOM

NOTE 14

E&I ROOM

LER BUILDING

SPLITTER BOX WORKING AREA

T.O.G. EL. +15532

FIRE/BLAST WALL

240-XB2006 10 TON MANUAL EL+21800 (B.O.S.)

240-XB2009 10 TON MANUAL EL+21800 (B.O.S.)

240MOV 230074

MONORAIL

240MOV 230 073

240SDV 230 020

240FCV 230 023B

240MOV 230 078

240MOV 230 071

240MOV 230 077

240MOV 230 072

240FCV 230 023A

240SDV 230 001

240NL-505 240NL-501

240-XB2008 10 TON MANUAL EL+21800 (B.O.S.)

240-US-03

240-XB2007 10 TON MANUAL EL+21800 (B.O.S.)

HATCH TO LAYDOWN “C” AT CELLAR DECK

SPACE PROVISION FOR FUTURE TEST SEPARATOR

BRIDGE TO EXISTING WHP5S PLATFORM

MAIN DECK(T.O.S. EL. +15500)

240-XB2005 15 TON MANUAL EL+21800 (B.O.S.)

240-V9501

UP

UP

T.O.S. EL. +12750

N. 114,000

2

XXX-FEXXXX (HOLD-1)

9 Kg

240-XZ8316

XXX-FEXXXX (HOLD-1)

BC 56.7 kg

N. 100,000

1

XXX-FEXXXX (HOLD-1)

9 Kg

0 5 2 2

0 0 2 3

0 0 1 3

0 0 2 3

0 5 2 2

0 0 0 0 1

0 0 0 4

A

B

C

D

E

F

G

H

I

J

K

L

5

6

240-XZ8313

15000

(HOLD-1) NOTE 15 XXX-FEXXXX XXX-FEXXXX XXX-FEXXXX

X3

CO2 4.5 kg

7

C

0 0 0 , 5 1 1

.

E

8

9

10

11

12

240-XZ8356 FE

240-XZ8332 WV

240-XZ8308

240-XZ8304

240-XZ8303

240-XZ8328

240-XZ8329

SC

240-XZ8334

B

HOLDS:

  1. TAG NO.

n=4

15000

0 0 0 , 0 3 1

.

E

n=12

n=12

7500

6320

13

14

WHP5S & RP5S KEY PLAN

TRUE NORTH

NOTES:

15

16

240-XB2003 2 TON ELECTRIC EL+20200 (B.O.S.)

DROP ZONE (2000x1500)

DROP ZONE FROM SECOND FLOOR 1300x1300)

240-XZ8328

240-XZ8329

LAYDOWN AREA D (2500x2500)

T.O.S. EL. +18315

240-XZ9501B

UP

DN

240-XZ9501A

RP5S

BSPS

CHEVRON MARKING

CHEVRON MARKING

N

BRDIGE NOMINAL POSITION

WHP5S (EXISTING)

  1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS

UNLESS STATED OTHERWISE.

  1. PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,

SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)

  1. BREATHING AIR MANIFOLD FOR 6 PERSON, AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

A

  1. AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE)

FOR COMP3 PROJECT (200-20-SH-DEC-00013) - DEDICATED 45 MINUTES 4 SCBA SETS WITH CABINETS SHOULD BE PROVIDED FOR INVESTIGATION TEAM USE ONLY.

  1. THIS LAYOUT SHALL BE USED ONLY FOR ESCAPE ROUTE, QUANTITY AND LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS.

  2. THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN ALL

AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.

  1. THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL BE

PROVIDED WITH WEATHER-PROOF CABINET.

  1. WHEELED EXTINGUISHERS LOCATED OUTDOOR SHALL BE

PROVIDED WITH A UV-RESISTANT RED-VINYL COVER.

  1. ARROWS SHOWN ON THE ESCAPE ROUTE DRAWING INDICATE

THE PREFERRED DIRECTION OF EGRESS TOWARDS THE MUSTER AREA. IN CASE OF EMERGENCY AT RP, PERSONNEL SHALL USE BRIDGE TO REACH PRIMARY MUSTER AREA LOCATED AT WELLHEAD PLATFORM 5S LER BUILDING TR. IN CASE ESCAPE THROUGH BRIDGE TOWARDS WELLHEAD IS NOT FEASIBLE, PERSONNEL TO PROCEED TO SECONDARY MUSTER AREA LOCATED AT RP LER BUILDING TR FOR MUSTERING.

B

C

10.LOCATION OF FIREFIGHTING, SAFETY, LIFE SAVING

EQUIPMENTS AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.

11.STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN

INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.

  1. ALL FIRE & SAFETY EQUIPMENTS SHALL BE LOCATED IN SUCH

A WAY THAT THEY ARE EASILY ACCESSIBLE.

13.NOVEC 1230 (FK-5-1-12) CLEAN AGENT PROTECTION SHALL BE PROVIDED FOR ELECTRICAL & INSTRUMENT ROOM AND UPS, INSTRUMENT & TELECOM ROOM IN THE LER.

D

14.REFER TO FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE

LAYOUT - LOCAL EQUIPMENT ROOM-RP5S (240-83-SH-PLN-00003) FOR THE DETAIL ARRANGEMENT OF FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT INSIDE THE LER.

  1. THREE (3) NOS. CO2 PORTABLE FIRE EXTINGUISHERS SHALL BE LOCATED AT THE MAIN ENTRANCE TO THE ELECTRICAL & INSTRUMENT ROOM FOR FIRE BRIGADE USE.

  2. ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER THAT IS VISIBLE, DURABLE AND ANTI-SLIP. LEGENDS:

240NL-503 240NL-507

5 5 5 9

0 1 1 3

XXX-FEXXXX (HOLD-1)

9 Kg

200-X2001

LEGEND

240-US-04

240-XB2002

20 TON ELECTRIC EL+19990 (B.O.S.)

240-XB2001

20 TON ELECTRIC EL+19990 (B.O.S.)

LAYDOWN A 13700(L) x 5300(W) CAP. 20MT

0 0 0 4 1

BAM 6

XXX-XZXXXX (HOLD-1)

BC 56.7 kg

XXX-FEXXXX (HOLD-1)

XXX-FEXXXX (HOLD-1)

9 Kg

200-X2001

CO2 4.5 kg

9 Kg

BC 56.7 kg

n=4

FE

SC

BAM 6

n=12

WV

DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m(WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m(WIDTH) X 2.286m (HEAD CLEARANCE) 4.5kg CO2 PORTABLE FIRE EXTINGUISHER

9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER

56.7kg DRY CHEMICAL POWDER (BC) WHEELED FIRE EXTINGUISHER

LIFEBUOY WITH LIFELINE

LIFE RAFT n=(NUMBERS OF PERSON CAPACITY)

SELF CONTAINED BREATHING APPARATUS (45 MINUTES) (NOTE 4) CABINET FOR 4 UNITS OF SCBA

FIREMAN EQUIPMENT

SCRAMBLE NET

BREATHING AIR MANIFOLD CABINET WITH 6 NUMBERS OF HOSE UNIT (NOTE 3)

LIFE JACKET

CABINET FOR 12 UNITS OF LIFE JACKET

WORK VEST CABINET WITH 24 UNITS OF WORK VEST

NOVEC

NOVEC 1230 (FK-5-1-12) FIRE SUPPRESSION SYSTEM PACKAGE (NOTE-13)

QTY

3

5

2

4

2

4

1

1

1

2

24

2

1

1

240-T8702

SPACE RESERVED FOR FUTURE BRIDGE LANDING/PIPING

240-P9701

240-XZ8314

240NL-508 240NL-504

A

0 0 0 0 0 1

.

E

C

0 0 0 5 1 1

.

E

AIR LOCK ROOM

BATTERY ROOM

T.O.G EL. +21610

NOTE 14 UPS ROOM LER LEVEL 2

T.O.G EL. +20600

BAM 6

XXX-XZXXXX (HOLD-1)

240-XZ8315

9 Kg XXX-FEXXXX (HOLD-1)

100

0 0 2

100

0 0 2

400

400

TYPICAL DETAIL-1

TYPICAL DETAIL-2

N.T.S

N.T.S

LER LEVEL 2 (SCALE:NTS)

N. 114000

2

MONORAIL B.O.S. EL. +25200 240-XB 2004

Qatar Energy LNG

THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.

CONSULTANT / CONTRACTOR :

Saipem S.p.A.

UP

DN

UP

T.O.G EL. +22810

T.O.G EL. +21610

TITLE :

CONTRACTOR DRAWING No. :

033764-G-D00-12-SPM-LP-D-00043-0001

FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - MAIN DECK - RP5S

1M

0

1M

2M

3M

4M

5M

SCALE :

1:100

PROJECT No. :

LTC/C/NFP/5129/20

PROJECT

033764

DRAWING No.

SHT

SIZE REVISION

240-83-SH-PLN-00004

0001

A1

A

200-20-SH-DEC-00013

240-83-SH-PLN-00003

TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - LOCAL EQUIPMENT ROOM - RP5S

240-23-PI-PLP-00006

EQUIPEMENT ARRANGEMENT PLAN LER LEVEL 2 FOR RP5S

240-23-PI-PLP-00003

EQUIPMENT ARRANGEMENT PLAN MAIN DECK FOR RP5S

REFERENCE No.

TITLE

REFERENCES

A

A1

No.

ISSUED FOR REVIEW

ISSUED FOR IDC

DESCRIPTION

MTA

MTA

JB

JB

BPB

20/03/25

BPB

10/03/25

BY

CHKD

APVD

DATE

REVISIONS

PROJECT TITLE :

COMP3 - NFPS OFFSHORE RISER / WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

Qatar Energy LNG

E

F

G

H

I

J

K

L

EQUIPMENT NO. 240-T8702 200-X2001 240-XZ8302 240-XZ8303 240-XZ8304 240-P9701 240-NL501 240-NL502 240-NL503 240-NL504

1

EQUIPMENT LIST

DESCRIPTION

SIZE (MM)

CP SEPARATOR PIPELINE PIG LAUNCHER TEMPORARY CLEAN AGENT FIRE SUPPRESSION SYSTEM PACKAGE LIFE RAFT LIFE RAFT MEG TRANSFER PUMP NAVAID LANTERN 1 (WHITE) NAVAID LANTERN 2 (WHITE) NAVAID LANTERN 3 (WHITE) NAVAID LANTERN 4 (WHITE)

3400(L) X 2200(W) X 1800 (H) 28” X 32”(OD) X 8400(L) 3000 (L) X 1500(W) X 3200(H) 1300 (L) X 713(W) X 685(H) 1300 (L) X 713(W) X 685(H) 1910(L) X 900(W) X 910(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H)

2

3

EQUIPMENT NO. 240-NL505 240-NL506 240-NL07 240-NL508 240-V9501 240-XZ9501A/B 240-US-03 240-US-04 240-XB2001 240-XB2002 4

EQUIPMENT LIST

DESCRIPTION

SIZE (MM)

NAVAID OBSTRUCTION LANTERN 1 (RED) NAVAID OBSTRUCTION LANTERN 2 (RED) NAVAID OBSTRUCTION LANTERN 3 (RED) NAVAID OBSTRUCTION LANTERN 4 (RED) INSTRUMENT AIR RECEIVER CASCADE BREATHING AIR PACKAGE UTILITY STATION UTILITY STATION MONORAIL 20 MT ELECTRIC MONORAIL 20 MT ELECTRIC

400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 400(L) X 400(W) X 1834(H) 1400 (ID) X 4000 (T/T) 1380(L)X1355(W)2500(H)

EQUIPMENT NO. 240-XB2003 240-XB2005 240-XB2006 240-XB2007 240-XB2008 240-XB2009 240-XZ8328 240-XZ8329

EQUIPMENT LIST

DESCRIPTION

SIZE (MM)

MONORAIL 2 TON ELECTRIC MONORAIL 15 TON MANUAL MONORAIL 10 TON MANUAL MONORAIL 10 TON MANUAL MONORAIL 10 TON MANUAL MONORAIL 10 TON MANUAL LIFE JACKET CABINET LIFE JACKET CABINET

5

6

7

10

11

12

13

14

15

16

Project: Q-32705 - Saipem COMP3 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further