NORTH
45°
45°
N
TRUE NORTH
TRUE NORTH
PREVAILING WIND
2 8 6 2 1
0 1 0 4
0 9 4 5
0 0 5 4
5 9 5 4
I
E M A R F N O T C E T O R P R E S R
I
XXX-FEXXXX (HOLD-1)
9 Kg
N. 114,000
2
240-XZ8336
CHSK
240-SEW8301
XXX-FEXXXX (HOLD-1)
BC 56.7 kg
N. 100,000
1 XXX-FEXXXX (HOLD-1)
9 Kg
XXX-XZXXXX (HOLD-1)
BAM 6
240-XZ8319
BRIDGE BR5S TO WHP5S PLATFORM
112°
0 0 0 , 0 0 1 .
E
A
A
B
C
D
E
F
G
H
I
J
K
L
Classification: Internal
1
2
3
4
5
6
7
8
9
10
11
12
13
14
WHP5S & RP5S KEY PLAN
TRUE NORTH
NOTES:
15
16
240-XZ8317
15000
NOTE 14
240-XZ8301
DIFFS
6825
UP
TO HELIDECK
8175
TOS. EL. +29.055
DROPZONE FOR LAYDOWN “D”
HVAC AREA
DN
TO MAIN DECK
240-XZ8301
EMERGENCY LADDER FROM HELIDECK
18828
RP5S
BSPS
CHEVRON MARKING
CHEVRON MARKING
N
BRDIGE NOMINAL POSITION
WHP5S (EXISTING)
- ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS
UNLESS STATED OTHERWISE.
- PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,
SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)
-
BREATHING AIR MANIFOLD FOR 6 PERSON, AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
-
THIS LAYOUT SHALL BE USED ONLY FOR ESCAPE ROUTE, QUANTITY AND LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS.
-
THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN ALL
AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.
- THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL
BE PROVIDED WITH WEATHER-PROOF CABINET.
- WHEELED EXTINGUISHERS LOCATED OUTDOOR SHALL BE
PROVIDED WITH A UV-RESISTANT RED-VINYL COVER.
- ARROWS SHOWN ON THE ESCAPE ROUTE DRAWING INDICATE
THE PREFERRED DIRECTION OF EGRESS TOWARDS THE MUSTER AREA. IN CASE OF EMERGENCY AT RP, PERSONNEL SHALL USE BRIDGE TO REACH PRIMARY MUSTER AREA LOCATED AT WELLHEAD PLATFORM 5S LER BUILDING TR. IN CASE ESCAPE THROUGH BRIDGE TOWARDS WELLHEAD IS NOT FEASIBLE, PERSONNEL TO PROCEED TO SECONDARY MUSTER AREA LOCATED AT RP LER BUILDING TR FOR MUSTERING.
- LOCATION OF FIREFIGHTING, SAFETY, LIFE SAVING
EQUIPMENTS AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.
10.STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN
INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.
- ALL FIRE & SAFETY EQUIPMENTS SHALL BE LOCATED IN SUCH
A WAY THAT THEY ARE EASILY ACCESSIBLE.
A
B
C
12.COMBINED SAFETY SHOWER & EYEWASH WITH CHILLER UNIT SHALL BE LOCATED WITHIN 10 SECOND REACH OR 15 M FROM MEG STORAGE TANK.
D
- ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER THAT IS VISIBLE, DURABLE AND ANTI-SLIP. 14.ESCAPE ROUTE HAS BEEN UPDATED BASED ON 30% 3D
MODEL REVIEW WORKSHOP.
240XP-9601A 240XP-9601B 240XP-9601C
XXX-FEXXXX (HOLD-1)
9 Kg
LEGEND:
NOTE 14
240T-9701B
TOS. EL. +32.400
240T-9701A
TO HELIDECK
UP
SPACE FOR MEG INJECTION PIPING
(8.5M X 5.0M)
PIPING AREA
TOS. EL. +30.000
2 0
S U
0 4 2
240-SEW8301
FUTURE PIG TRAP
R O F E N O Z P O R D
REFER DETAIL-2
REFER DETAIL-1
I
R E H C N U A L G P Y R A R O P M E T
SUPPLY VESSEL APPROACH
BOOM TIP MAINT. PLTF.
240-US-01
TOG. EL. +35500
240 SDV 490004
HATCH TO LAYDOWN C
CRANE BOOM REST
FUTURE
PIPING AREA
DN
TO MAIN DECK
XXX-FEXXXX (HOLD-1)
9 Kg
240-XZ8318
LAYDOWN AREA B 3400(L)x2400(W)
240-XZ2001
240XC-9301
O B S T A
CLE F 150° R E E S E C T O R
MIN. CRANE RADIUS 6.7M
LEGEND
9 Kg
BC 56.7 kg
DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m(WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m(WIDTH) X 2.286m (HEAD CLEARANCE) 9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER
56.7kg DRY CHEMICAL POWDER (BC) WHEELED FIRE EXTINGUISHER
LIFEBUOY WITH LIFELINE
COMBINED SAFETY SHOWER AND EYEWASH STATION WITH CHILLER (NOTE-12)
CHSK
CHEMICAL HANDLING SAFETY KIT
DIFFS
BAM 6
DECK INTEGRATED FIRE FIGHTING SYSTEM
BREATHING AIR MANIFOLD CABINET WITH 6 NUMBERS OF HOSE UNIT (NOTE 3)
QTY
5
1
4
1
1
1
1
HOLDS:
- TAG NO.
200-20-SH-DEC-00013
TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT
240-23-PI-PLP-00004
EQUIPMENT ARRANGEMENT PLAN TOP DECK FOR RP5S
REFERENCE No.
TITLE
REFERENCES
A
A1
No.
ISSUED FOR REVIEW
ISSUED FOR IDC
DESCRIPTION
MTA
MTA
JB
JB
BPB
20/03/25
BPB
10/03/25
BY
CHKD
APVD
DATE
REVISIONS
PROJECT TITLE :
COMP3 - NFPS OFFSHORE RISER / WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
Qatar Energy LNG
Qatar Energy LNG
THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.
CONSULTANT / CONTRACTOR :
E
F
G
H
I
J
K
L
NO GO ZONE
(22.5MT)
MAX. CRANE RADIUS 35M
PRIMARY BOAT LANDING
APPROACH
0 0 0 , 5 1 1 .
E
C
240-XZ8320
0 0 0 , 0 3 1 .
E
B
XXX-FEXXXX (HOLD-1)
9 Kg
CRANE RADIUS 20M @ (22.5MT) (DYNAMIC LIFT (SUPPLY VESSEL APPROACHSIDE)
TOP DECK (T.O.S. EL. +26.500)
100
0 0 2
100
0 0 2
400
400
TYPICAL DETAIL-1
TYPICAL DETAIL-2
N.T.S
N.T.S
EQUIPMENT NO. 240XC-9301C 240XP-9601A/B/C 240T-7901A 240T-7901B 200Y-2008 240-XZ8301 240-SEW8301
1M
0
1M
2M
3M
4M
5M
Saipem S.p.A.
EQUIPMENT LIST
DESCRIPTION
SIZE (MM)
TITLE :
PEDESTAL CRANE
NITROGEN CYLINDER RACK 7000(L) X 5800(W) X 2300(H) 6000(TT) X 4400(ID) MEG STORAGE TANK 6000(TT) X 4400(ID) MEG STORAGE TANK 16” X 12”(OD) X 9000 (L) TEMPORARY PIG RECEIVER FUTURE 9000(L) X 2875(W) X 2699(H) DECK INTEGRATED FIRE FIGHTING SYSTEM COMBINED SAFETY SHOWER AND EYE WASH STATION 1257(L) X 2394(W) X 3804(H)
CONTRACTOR DRAWING No. :
033764-G-D00-15-SPM-LP-D-00042-0001
FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - TOP DECK - RP5S
SCALE :
1:100
PROJECT No. :
LTC/C/NFP/5129/20
PROJECT
033764
DRAWING No.
SHT
SIZE REVISION
240-83-SH-PLN-00005
0001
A1
A
1
2
3
4
5
6
7
10
11
12
13
14
15
16
Project: Q-32705 - Saipem COMP3 Folder: RFQ Files