Classification: Internal
1
NORTH
30°
30°
N
E H U T R R T O N
E H U T R R T O N
PREVAILING WIND
0 5 7 3
0 5 2 8
0 0 0 4 1
0 0 4 3
N. 122250
3
(HOLD-1) XXX-FEXXXX
BC 136.4 kg
XXX-FEXXXX (HOLD-1)
9 Kg
265-XZ8318
N. 114000
2
RIG APPROACH
265-XZ8319
XXX-FEXXXX (HOLD-1)
9 Kg
N. 100000
1
MAX. CRANE RADIUS 35M
A
B
C
D
E
F
G
H
I
J
K
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
A
0 0 0 0 0 1
.
E
B
0 0 0 5 1 1
.
E
15000
DN
DN
DN
FROM DRILL DECK
TO PROD. DECK
(HOLD-1) XXX-FEXXXX
9 Kg
15000
L A T S E D E P E N A R C
1 0 3 9 T
5 6 2
C
0 0 0 0 3 1
.
E
MIN. CRANE RADIUS 6.7M
13014
DROP ZONE TO LAYDOWN ‘B’ PRODUCTION DECK
11000(L) x 2500(W) 20T
LADDER TO/FROM PRODUCTION DECK
.
D O R P O T
K C E D
N D
EDGE OF DECK
265-T9302
DN
265-T9401A
(SPARE)
WELLSLOT#04
WELLSLOT#05 (SPARE)
WELLSLOT#06 (SPARE)
WELLSLOT#07 WELLSLOT#08 WELLSLOT#09
NOTE 14
(SPARE)
WELLSLOT#10 WELLSLOT#11 WELLSLOT#12
(SPARE)
A E R A L E N A P E C A F R E T N
I
E N I L E R W
I
T.O.S. EL.+21050
NOTE 11
REFER DETAIL-2
3 0
U
5 6 2
FLOWLINE PIPING AREA
265-V2301
LER BUILDING NOTE 11
REFER DETAIL-1
HOLDS:
- TAG NOS.
265-T9401B
T.O.G. EL.+21804
DN
TO PROD. DECK
T.O.S. EL.+19350
FLOWLINE PIPING AREA
DROP ZONE TO LAYDOWN ‘D’ ATCELLAR DECK 3000(L) x 2000(W) 2T
LAYDOWN ‘F’ 3000(L) x 2000(W) 5T
I
G N D N A L T A O B
H C A O R P P A
Y R A M R P
I
T.O.S. EL.+21050
T.O.P. EL.+21060
T.O.G. EL.+21600
DROP ZONE TO LAYDOWN ‘A’
AT PRODUCTION DECK 3000(L) x 3500(W) 5T
DN
T.O.S. EL.+19550
T.O.S. EL.+21050
TO PROD. DECK
DN
CONT. TO FLARE
XXX-FEXXXX (HOLD-1)
9 Kg
265-XZ8321
DN
DN
TO PROD. DECK
EL +22160 T.O.G
LAYDOWN AREA FOR LER LEVEL-2 1500(L) x 1500(W)
265-XZ8320
100
0 0 2
100
0 0 2
200-20-SH-DEC-00013
265-83-SH-PLN-00004
265-23-PI-PLP-00004
REFERENCE No.
TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - LOCAL EQUIPMENT ROOM - WHP13N EQUIPMENT ARRANGEMENT PLAN MEZZANINE DECK FOR WHP13N
TITLE
REFERENCES
A
A1
No.
ISSUED FOR REVIEW
ISSUED FOR IDC
DESCRIPTION
DP
MTA
JB
JB
BPB
09/04/25
BPB
25/03/25
BY
CHKD
APVD
DATE
REVISIONS
PROJECT TITLE :
COMP3 - NFPS OFFSHORE RISER / WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
Qatar Energy LNG
Qatar Energy LNG
THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.
CONSULTANT / CONTRACTOR :
Saipem S.p.A.
CONTRACTOR DRAWING No. :
033764-M-D00-14-SPM-LP-D-00043-0001
400
400
TITLE :
TYPICAL DETAIL-1
TYPICAL DETAIL-2
N.T.S
N.T.S
1M
0
1M
2M
3M
4M
5M
FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - MEZZANINE DECK - WHP13N
SCALE :
1:100
PROJECT No. :
LTC/C/NFP/5129/20
PROJECT
033764
DRAWING No.
SHT
SIZE REVISION
265-83-SH-PLN-00005
0001
A1
A
EQUIPMENT LIST
L
EQUIPMENT NO.
DESCRIPTION
265-V2301 265-US-03
TEST SEPARATOR UTILITY STATION
SIZE (MM)
1900(ID) X 5500(T/T)
MEZZANINE DECK (T.O.S. EL.+19350)
1
2
3
4
5
6
7
10
11
12
13
14
15
16
NOTES:
- ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS
UNLESS STATED OTHERWISE.
- PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,
SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)
- THIS LAYOUT SHALL BE USED ONLY FOR QUANTITY AND
A
LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENT AND DIRECTION OF ESCAPE ROUTES.
- THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN
ALL AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.
- THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL
BE PROVIDED WITH WEATHER-PROOF CABINET.
- WHEELED EXTINGUISHERS LOCATED OUTDOOR SHALL BE
PROVIDED WITH A UV-RESISTANT RED-VINYL COVER. 7. ARROWS SHOWN ON THE ESCAPE ROUTE INDICATE THE
PREFERRED DIRECTION OF EGRESS TOWARDS THE PRIMARY MUSTER AREA.
B
- LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING
EQUIPMENT AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.
- STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN
INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.
- ALL FIRE & SAFETY EQUIPMENT SHALL BE LOCATED IN SUCH
A WAY THAT THEY ARE EASILY ACCESSIBLE.
11.REFER TO FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE
LAYOUT - LOCAL EQUIPMENT LAYOUT-WHP13N (265-83-SH-PLN-00004) FOR THE DETAIL ARRANGEMENT OF FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT INSIDE THE LER.
-
ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER PAINTED ON THE FLOOR IN OIL RESISTANT PHOTOLUMINESCENT PAINT THAT IS VISIBLE, DURABLE AND ANTI-SLIP.
-
AS PER TECHNICAL SAFETY BASIS OF DESIGN
(200-20-SH-DEC-00013) – FOR OUTDOOR AREAS, THE DEAD END SHALL NOT EXCEED 6 M OF TRAVEL DISTANCE.
- WELLHEAD PLATFORM DOES NOT HAVE FIXED FIRE WATER SYSTEM, ONLY DRY DELUGE IS PROVIDED FOR WELL BAY AREA AND THE DELUGE SKID IS LOCATED ON THE JACK-UP RIG (JUR) OR SUPPLY BOAT.
LEGENDS:
LEGEND
9 Kg
BC 136.4 kg
DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m(WIDTH) X 2.286m(HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m(WIDTH) X 2.286m(HEAD CLEARANCE) 9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER
136.4kg DRY CHEMICAL POWDER (BC) WHEELED FIRE EXTINGUISHER
LIFEBUOY WITH LIFELINE
QTY
4
1
4
C
D
E
F
G
H
I
J
K
L
Project: Q-32705 - Saipem COMP3 Folder: RFQ Files