Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 32705 Saipem COMP3

❯

RFQ Files

❯

265 83 SH PLN 00005_A

Classification: Internal

1

NORTH

30°

30°

N

E H U T R R T O N

E H U T R R T O N

PREVAILING WIND

0 5 7 3

0 5 2 8

0 0 0 4 1

0 0 4 3

N. 122250

3

(HOLD-1) XXX-FEXXXX

BC 136.4 kg

XXX-FEXXXX (HOLD-1)

9 Kg

265-XZ8318

N. 114000

2

RIG APPROACH

265-XZ8319

XXX-FEXXXX (HOLD-1)

9 Kg

N. 100000

1

MAX. CRANE RADIUS 35M

A

B

C

D

E

F

G

H

I

J

K

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

A

0 0 0 0 0 1

.

E

B

0 0 0 5 1 1

.

E

15000

DN

DN

DN

FROM DRILL DECK

TO PROD. DECK

(HOLD-1) XXX-FEXXXX

9 Kg

15000

L A T S E D E P E N A R C

1 0 3 9 T

5 6 2

C

0 0 0 0 3 1

.

E

MIN. CRANE RADIUS 6.7M

13014

DROP ZONE TO LAYDOWN ‘B’ PRODUCTION DECK

11000(L) x 2500(W) 20T

LADDER TO/FROM PRODUCTION DECK

.

D O R P O T

K C E D

N D

EDGE OF DECK

265-T9302

DN

265-T9401A

(SPARE)

WELLSLOT#04

WELLSLOT#05 (SPARE)

WELLSLOT#06 (SPARE)

WELLSLOT#07 WELLSLOT#08 WELLSLOT#09

NOTE 14

(SPARE)

WELLSLOT#10 WELLSLOT#11 WELLSLOT#12

(SPARE)

A E R A L E N A P E C A F R E T N

I

E N I L E R W

I

T.O.S. EL.+21050

NOTE 11

REFER DETAIL-2

3 0

U

5 6 2

FLOWLINE PIPING AREA

265-V2301

LER BUILDING NOTE 11

REFER DETAIL-1

HOLDS:

  1. TAG NOS.

265-T9401B

T.O.G. EL.+21804

DN

TO PROD. DECK

T.O.S. EL.+19350

FLOWLINE PIPING AREA

DROP ZONE TO LAYDOWN ‘D’ ATCELLAR DECK 3000(L) x 2000(W) 2T

LAYDOWN ‘F’ 3000(L) x 2000(W) 5T

I

G N D N A L T A O B

H C A O R P P A

Y R A M R P

I

T.O.S. EL.+21050

T.O.P. EL.+21060

T.O.G. EL.+21600

DROP ZONE TO LAYDOWN ‘A’

AT PRODUCTION DECK 3000(L) x 3500(W) 5T

DN

T.O.S. EL.+19550

T.O.S. EL.+21050

TO PROD. DECK

DN

CONT. TO FLARE

XXX-FEXXXX (HOLD-1)

9 Kg

265-XZ8321

DN

DN

TO PROD. DECK

EL +22160 T.O.G

LAYDOWN AREA FOR LER LEVEL-2 1500(L) x 1500(W)

265-XZ8320

100

0 0 2

100

0 0 2

200-20-SH-DEC-00013

265-83-SH-PLN-00004

265-23-PI-PLP-00004

REFERENCE No.

TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - LOCAL EQUIPMENT ROOM - WHP13N EQUIPMENT ARRANGEMENT PLAN MEZZANINE DECK FOR WHP13N

TITLE

REFERENCES

A

A1

No.

ISSUED FOR REVIEW

ISSUED FOR IDC

DESCRIPTION

DP

MTA

JB

JB

BPB

09/04/25

BPB

25/03/25

BY

CHKD

APVD

DATE

REVISIONS

PROJECT TITLE :

COMP3 - NFPS OFFSHORE RISER / WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

Qatar Energy LNG

Qatar Energy LNG

THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.

CONSULTANT / CONTRACTOR :

Saipem S.p.A.

CONTRACTOR DRAWING No. :

033764-M-D00-14-SPM-LP-D-00043-0001

400

400

TITLE :

TYPICAL DETAIL-1

TYPICAL DETAIL-2

N.T.S

N.T.S

1M

0

1M

2M

3M

4M

5M

FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - MEZZANINE DECK - WHP13N

SCALE :

1:100

PROJECT No. :

LTC/C/NFP/5129/20

PROJECT

033764

DRAWING No.

SHT

SIZE REVISION

265-83-SH-PLN-00005

0001

A1

A

EQUIPMENT LIST

L

EQUIPMENT NO.

DESCRIPTION

265-V2301 265-US-03

TEST SEPARATOR UTILITY STATION

SIZE (MM)

1900(ID) X 5500(T/T)

MEZZANINE DECK (T.O.S. EL.+19350)

1

2

3

4

5

6

7

10

11

12

13

14

15

16

NOTES:

  1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS

UNLESS STATED OTHERWISE.

  1. PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,

SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)

  1. THIS LAYOUT SHALL BE USED ONLY FOR QUANTITY AND

A

LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENT AND DIRECTION OF ESCAPE ROUTES.

  1. THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN

ALL AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.

  1. THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL

BE PROVIDED WITH WEATHER-PROOF CABINET.

  1. WHEELED EXTINGUISHERS LOCATED OUTDOOR SHALL BE

PROVIDED WITH A UV-RESISTANT RED-VINYL COVER. 7. ARROWS SHOWN ON THE ESCAPE ROUTE INDICATE THE

PREFERRED DIRECTION OF EGRESS TOWARDS THE PRIMARY MUSTER AREA.

B

  1. LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING

EQUIPMENT AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.

  1. STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN

INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.

  1. ALL FIRE & SAFETY EQUIPMENT SHALL BE LOCATED IN SUCH

A WAY THAT THEY ARE EASILY ACCESSIBLE.

11.REFER TO FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE

LAYOUT - LOCAL EQUIPMENT LAYOUT-WHP13N (265-83-SH-PLN-00004) FOR THE DETAIL ARRANGEMENT OF FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT INSIDE THE LER.

  1. ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER PAINTED ON THE FLOOR IN OIL RESISTANT PHOTOLUMINESCENT PAINT THAT IS VISIBLE, DURABLE AND ANTI-SLIP.

  2. AS PER TECHNICAL SAFETY BASIS OF DESIGN

(200-20-SH-DEC-00013) – FOR OUTDOOR AREAS, THE DEAD END SHALL NOT EXCEED 6 M OF TRAVEL DISTANCE.

  1. WELLHEAD PLATFORM DOES NOT HAVE FIXED FIRE WATER SYSTEM, ONLY DRY DELUGE IS PROVIDED FOR WELL BAY AREA AND THE DELUGE SKID IS LOCATED ON THE JACK-UP RIG (JUR) OR SUPPLY BOAT.

LEGENDS:

LEGEND

9 Kg

BC 136.4 kg

DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m(WIDTH) X 2.286m(HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m(WIDTH) X 2.286m(HEAD CLEARANCE) 9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER

136.4kg DRY CHEMICAL POWDER (BC) WHEELED FIRE EXTINGUISHER

LIFEBUOY WITH LIFELINE

QTY

4

1

4

C

D

E

F

G

H

I

J

K

L

Project: Q-32705 - Saipem COMP3 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further