1
PLATFORM NORTH
A
B
C
D
E
F
G
H
I
J
K
L
EQUIPMENT NO. 268-T8701 268-P8703 268-P8704 268-V8701 268-P8701 268-Y9302A/B 1
N
TRUE NORTH
TRUE NORTH
PREVAILING WIND
45°
A
B
C
15000
15000
3000
7500
268-XZ8313
XXX-XZXXXX (HOLD-1)
BAM 6
XXX-FEXXXX (HOLD-1)
9 Kg
LAYDOWN AREA CAP.1MT
268-XZ8314
4000
3500
1500
O T
I
N A M
K C E D
BOAT POWER SUPPLY JB
0 0 3 2
0 0 3 2
0 0 3 2
0 0 3 2
0 0 3 2
2000
0 0 0 3
SPLICE
BOX
SPLITTER BOX
TOS.+12000
2 1 °
° 8 3
I
G N L L U P E L B A C
Y R A R O P M E T R O F E C A P S
R O F T N E M P U Q E
I
268-P8701
COAMED AREA
M O R F
T E K C A J
L E V E L
268-V8701
268-T8701
PIPING AREA
268-P8704
3 0 7 8 P
8 6 2
0 0 5 4
0 0 5 7
0 0 0 7
0 0 0 7
0 0 1 2
LADDER TO MAIN DECK
TOS.+10000
T E K C A J
L E V E L
M O R F
SPLICE
BOX
0 5 5
MONORAIL MR-MD-11 CAP 1MT
2000
0 0 0 3
268-Y9302B
1500
268-XZ8315
28” PIPILINE FROM WHP13N
(FUTURE)
28” PIPILINE FROM WHP13N
28” PIPILINE FROM RP5N
0 0 0 4 1
8” FUEL GAS PIPE LINE
FROM SUBSEA SKID
2
1
710
790
268-Y9302A
SPLICE
BOX
SPLITTER
BOX
2200
2250
3500
4000
7500
6400
4250
AFFF 135 L
XXX-FEXXXX (HOLD-1)
XXX-FEXXXX (HOLD-1)
9 Kg
O T
I
N A M
K C E D
CELLAR DECK (T.O.S EL. +10000)
TOS.+12200
200-20-SH-DEC-00013
TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT
268-23-PI-PLP-00002
EQUIPMENT ARRANGEMENT PLAN CELLAR DECK FOR RP6N
REFERENCE NO.
TITLE
REFERENCES
A
A1
No.
ISSUED FOR REVIEW
ISSUED FOR IDC
DESCRIPTION
REVISIONS
Digitally si gn ed b y Val en ti na Brusati DN: c n=V alentina B rusati , o= Saipem, ou, email =valentina. bru sati@saip em. com, c= IT Date: 2025. 04.15 14:11:47 +02’ 00’
Gabrie ll a Alma sio
Al ma sio, E = gabrie lla .al masi o@sa ipem .co m Re aso n: I ha ve re vie w ed this docu ment Loca tion :
VB
VB
BY
GA
GA
BPB
15/04/25
BPB
09/04/25
CHKD
APVD
DATE
PROJECT TITLE :
COMP3 - NFPS OFFSHORE RISER / WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
Qatar Energy LNG
Qatar Ene rgy LNG
THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.
CONSULTANT / CONTRACTOR :
Saipem S.p.A.
268-XZ8316
100
0 0 2
100
0 0 2
400
400
TYPICAL DETAIL-1
TYPICAL DETAIL-2
TITLE :
N.T.S
N.T.S
CONTRACTOR DRAWING No. :
033764-L-D00-11-SPM-LP-D-00044-0001
FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - CELLAR DECK - RP6N
SCALE :
1:100
PROJECT No. :
LTC/C/NFP/5129/20
PROJECT
033764
DRAWING No.
SHT
SIZE REVISION
268-83-SH-PLN-00001
0001
A1
A
EQUIPMENT LIST
DESCRIPTION
OPEN DRAIN TANK OPEN DRAIN WATER PUMP OPEN DRAIN OIL PUMP CLOSED DRAIN DRUM CLOSED DRAIN TRANSFER PUMP TOPSIDE UMBILICAL TERMINATION UNIT
SIZE (MM)
3000(L) x 2300(W) x 2000(H) 1800(L) x 1400(W) x800(H) 1800(L) x 1400(W) x800(H) 1400(ID) x 3500 (TL/TL) 2321(L) x 1550(W) x2260(H) 2500(L) x 700(W) x 1900(H)
2
3
4
5
6
7
10
11
12
13
14
15
16
NOTES:
- ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS
UNLESS STATED OTHERWISE.
- PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,
SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)
A
- THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN ALL
AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.
-
THIS LAYOUT SHALL BE USED ONLY FOR ESCAPE ROUTE QUANTITY AND LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS.
-
AS PER TECHNICAL SAFETY BASIS OF DESIGN
(200-20-SH-DEC-00013), FOR OUTDOOR AREAS, THE DEAD END SHALL NOT EXCEED 6 M OF TRAVEL DISTANCE.
- THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL BE
PROVIDED WITH WEATHER-PROOF CABINET.
- WHEELED EXTINGUISHERS LOCATED OUTDOOR SHALL BE
PROVIDED WITH A UV-RESISTANT RED-VINYL COVER.
- ARROWS SHOWN ON THE ESCAPE ROUTE DRAWING INDICATE
THE PREFERRED DIRECTION OF EGRESS TOWARDS THE MUSTER AREA. IN CASE OF EMERGENCY AT RP6N, PERSONNEL SHALL USE BRIDGE TO REACH PRIMARY MUSTER AREA LOCATED AT WELLHEAD PLATFORM LER BUILDING TR. IN CASE ESCAPE THROUGH BRIDGE TOWARDS WELLHEAD IS NOT FEASIBLE, PERSONNEL TO PROCEED TO SECONDARY MUSTER AREA LOCATED AT RP6N LER BUILDING TR FOR MUSTERING.
- LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING
EQUIPMENTS AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.
- STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN
INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.
- ALL FIRE & SAFETY EQUIPMENTS SHALL BE LOCATED IN SUCH
A WAY THAT THEY ARE EASILY ACCESSIBLE.
B
C
12.BREATHING AIR MANIFOLD FOR 6 PERSON, AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).
D
- ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER THAT IS VISIBLE, DURABLE AND ANTI-SLIP.
LEGEND:
LEGEND
DESCRIPTIONS
QTY
PRIMARY ESCAPE ROUTE 1.12m (WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m (WIDTH) X 2.286m (HEAD CLEARANCE) 135L AFFF FOAM WHEELED FIRE EXTINGUISHER
9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER
AFFF 135 L
9 Kg
LIFEBUOY WITH LIFELINE
BAM 6
BREATHING AIR MANIFOLD CABINET WITH 6 NUMBERS OF HOSE UNIT (NOTE 12)
1
2
4
1
HOLDS:
- TAG NOS.
KEY ELEVATION:
T.O.S.EL.33900
T.O.S.EL.26500
T.O.S.EL.15500
T.O.S.EL.10000 T.O.S. EL.6950
E
F
G
H
I
J
K
L
Project: Q-32705 - Saipem COMP3 Folder: RFQ Files