Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 32705 Saipem COMP3

❯

RFQ Files

❯

268 83 SH PLN 00003_A

Classification: Internal

1

45°

2

1

3

4

5

6

7

8

9

10

11

C

268-FEXXXX (HOLD-1)

kg

268-XZ8338 FB

268-XZ8350

D

268-XZXXXX (HOLD-1)

31900

268-XZ8343

268-FEXXXX (HOLD-1)

kg

12

LEGENDS:

LEGEND

kg

13

14

15

16

DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m (WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m (WIDTH) X 2.286m (HEAD CLEARANCE) 4.5kg CO2 PORTABLE FIRE EXTINGUISHER

BREATHING AIR MANIFOLD CABINET WITH 10 NUMBERS OF HOSE UNIT (NOTE 7)

NOTES:

QTY

  1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS UNLESS STATED

OTHERWISE.

  1. PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT, SECONDARY

ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.).

  1. THIS LAYOUT SHALL BE USED ONLY FOR ESCAPE ROUTE, QUANTITY AND

A

LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS.

  1. THE PORTABLE EXTINGUISHERS LOCATED INDOOR SHALL BE PROVIDED

WITH WALL MOUNTING HANGER/ BRACKET.

5 1 5 3

BREATHING APPARATUS ESCAPE SET CABINET (15 MINUTES AND 3L CYLINDER)

STRETCHER

FB

FIRE BLANKET

FIRST AID KIT

1

2

0 0 0 1

72

ELECTRICAL SAFETY KIT

OXYGEN


FULL CYLINDER

OXYGEN CYLINDER WITH THE MASK

0 1 9 3 1

0 0 4

211

210

150

83

62 82

213

FB

75

74

72

202

204

203

206

207

205

201

1205

14

13

8 0 2

ELECTRICAL ROOM TOF EL. +16800

151

152

154

155

158

159

170

171

166

161

162

165

3

1000

72

0 5 2 1

0 0 2

1200

1000

173

41

10

172

168

169

12

0 0 2

6

7

8

52

174

60

59

164

105

106

101

0 0 2

0 0 2

TEMPORARY REFUGE AREA (0.6 SQM X 20 PP)

209

175

57

55

51

212

7 5 6

73

73

4000

9500

7200

7700

11 61 81

92

163

AIR LOCK

42

80

5

72

FB

75

74

70

0 0 2

OXYGEN


FULL CYLINDER

268-XZ8357

FB 268-XZ8339

268-XZ8351

4

2

1

2

2

2

1

1

  1. LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS AND

DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.

  1. ALL FIRE & SAFETY EQUIPMENTS SHALL BE LOCATED IN SUCH A WAY

THAT THEY ARE EASILY ACCESSIBLE.

  1. BREATHING AIR MANIFOLD FOR 10 PERSON, AS PER TECHNICAL SAFETY

BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

  1. NOVEC 1230 (FK-5-1-12) CLEAN AGENT PROTECTION SHALL BE PROVIDED FOR ELECTRICAL & INSTRUMENT ROOM AND UPS ROOM IN THE LER.

  2. OXYGEN CYLINDER WITH FACE MASK SHALL BE PROVIDED INSIDE

BUILDING (TEMPORARY REFUGE).

  1. FOR TEMPORARY REFUGE, AN OVERALL FREE FLOOR SPACE OF 12 M²

BETWEEN EQUIPMENTS SHALL BE MAINTAINED IN THE TR.

  1. AIR LOCK ROOM SHOULD ALLOW SAFE MANEUVERING OF AN INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.

HOLDS:

  1. TAG NOS.

KEY PLAN

A A A A

B B B B

C C C C

D D D D

GE TO GE TO GE TO GE TO N N N N RID RID RID RID P6 P6 P6 P6 WH WH WH WH B B B B

AM PLEMANN GANGWAY AM PLEMANN GANGWAY AM PLEMANN GANGWAY AM PLEMANN GANGWAY LANDING (NOTE 5) LANDING (NOTE 5) LANDING (NOTE 5) LANDING (NOTE 5)

UP UP UP UP

UP UP UP UP

TO TO TO TO TOP DECK TOP DECK TOP DECK TOP DECK

I I I I

N N N N A A A A R R R R D D D D

K K K K C C C C E E E E D D D D

05 05 05 05

O O O O T T T T

N N N N D D D D

PIPING PIPING PIPING PIPING AR EA AR EA AR EA AR EA

DROP ZON E DROP ZON E DROP ZON E DROP ZON E DRAIN DEC K DRAIN DEC K DRAIN DEC K DRAIN DEC K

MAIN DE CK MAIN DE CK MAIN DE CK MAIN DE CK LAYDOWN LAYDOWN LAYDOWN LAYDOWN AR EA AR EA AR EA AR EA

MAIN DE CK MAIN DE CK MAIN DE CK MAIN DE CK LAYDOWN LAYDOWN LAYDOWN LAYDOWN AR EA AR EA AR EA AR EA

PIPING AREA PIPING AREA PIPING AREA PIPING AREA

268MOV-50015 268MOV-50015 268MOV-50015 268MOV-50015

268 SDV-49002 268 SDV-49002 268 SDV-49002 268 SDV-49002

MONORAIL MONORAIL MONORAIL MONORAIL

MONOR AIL MONOR AIL MONOR AIL MONOR AIL

PIPING AR EA PIPING AR EA PIPING AR EA PIPING AR EA

14 14 14 14

MONOR AIL MONOR AIL MONOR AIL MONOR AIL

PI G HANDLIN G PI G HANDLIN G PI G HANDLIN G PI G HANDLIN G AR EA AR EA AR EA AR EA

03B 03B 03B 03B

268 MOV-5 00016 268 MOV-5 00016 268 MOV-5 00016 268 MOV-5 00016

268 MOV-5 00017 268 MOV-5 00017 268 MOV-5 00017 268 MOV-5 00017

PIPING PIPING PIPING PIPING AREA AREA AREA AREA

268MOV-50 014 268MOV-50 014 268MOV-50 014 268MOV-50 014 268MOV-50 019 268MOV-50 019 268MOV-50 019 268MOV-50 019

03A 03A 03A 03A

PIPING AREA PIPING AREA PIPING AREA PIPING AREA

268MOV-50020 268MOV-50020 268MOV-50020 268MOV-50020

PIPING AR EA PIPING AR EA PIPING AR EA PIPING AR EA

268 SDV-49009

MON ORAIL

MONOR AIL MONOR AIL MONOR AIL MONOR AIL 28 28 28 28

MON OR AIL MON OR AIL MON OR AIL MON OR AIL

21 21 21 21

LADDER TO LADDER TO LADDER TO LADDER TO LER ROOF LER ROOF LER ROOF LER ROOF

A A A A E E E E R R R R A A A A G G G G N N N N P P P P P P P P

I I I I

I I I I

24 24 24 24

P P P P A A A A R R R R T T T T

G G G G P P P P

I I I I

N N N N W W W W O O O O D D D D Y Y Y Y A A A A L L L L

A A A A E E E E R R R R A A A A

PI G HANDLIN G PI G HANDLIN G PI G HANDLIN G PI G HANDLIN G AR EA AR EA AR EA AR EA

MONOR AIL MONOR AIL MONOR AIL MONOR AIL

3 3 3 3

2 2 2 2

1 1 1 1

268-XZ8347 268-XZ8348

kg

268-FEXXXX (HOLD-1)

268-XZ8305

kg

268-FEXXXX (HOLD-1)

ELECTRICAL ROOM LER LEVEL - 1 AT MAIN DECK TOS. EL +15500

268-XZXXXX (HOLD-1)

SI. NO.

TAG

DESCRIPTION

DIMENSIONS (MM)

LENGTH WIDTH

HEIGHT

WEIGHT (KG)

TYPE OF MOUNTING

TELECOM EQUIPMENT LIST

26 26 26 26

19 19 19 19

20 20 20 20

27A 27A 27A 27A

27B 27B 27B 27B

A A A A E E E E R R R R A A A A G G G G N N N N P P P P P P P P

I I I I

I I I I

04A 04A 04A 04A

04B 04B 04B 04B

TO DRA IN DECK TO DRA IN DECK TO DRA IN DECK TO DRA IN DECK

P P P P U U U U

N N N N D D D D

P P P P U U U U

Y Y Y Y R R R R A A A A R R R R O O O O P P P P M M M M E E E E T T T T

E E E E G G G G U U U U F F F F E E E E R R R R

TO TOP DECK TO TOP DECK TO TOP DECK TO TOP DECK

THIS DRAWING

SI.NO.

TAG

DESCRIPTION

DIMENSIONS (MM)

LENGTH WIDTH

HEIGHT

WEIGHT (KG)

TYPE OF MOUNTING

SI. NO.

TAG

DESCRIPTION

DIMENSIONS (MM)

LENGTH WIDTH

HEIGHT

WEIGHT (KG)

TYPE OF MOUNTING

150 HOLD-1

DCS CONSOLE (OWS / EWS / AUX)

3000

INSTRUMENT EQUIPMENT LIST

ELECTRICAL EQUIPMENT LIST

1

2

3

5

6

7

8

HOLD-1

HOLD-1

HOLD-1

HOLD-1

HOLD-1

HOLD-1

HOLD-1

11kV SWITCHBOARD

11/0.4kV TRANSFORMER

LV NORMAL SWITCHBOARD

MAIN LIGHTING & SMALL POWER DB

LIGHTING & SMALL POWER DB

POWER DISTRIBUTION BOARD

LIGHTING DISTRIBUTION BOARD

10

HOLD-1

SUBSEA CABLE MONITORING CABINET

11

HOLD-1

PARTIAL DISCHARGE ACQUISITION

12

13

14

KEY ONE LINE DIAGRAM FRAME

BREAKER TROLLEY (MV)

BREAKER TROLLEY (LV)

41 HOLD-1

IMCS CABINET

42

57

KEY BOX

HOLD-1

SAFETY LAMP & SELF-CONTEINED CHARGING UNIT

208 HOLD-1

TELECOM PDB

4100

1800

7400

1400

800

800

800

800

600

1000

1000

1000

800

300

500

1400

1750

1300

1600

600

400

400

400

800

210

50

800

800

800

150

600

400

2750

1900

2400

1400

1600

1600

1600

2000

600

700

900

900

6600

FLOOR MOUNTED

2500

FLOOR MOUNTED

8500

FLOOR MOUNTED

300

150

150

150

300

50

10

80

80

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

FLOOR MOUNTED

WALL MOUNTED

WALL MOUNTED

PORTABLE

PORTABLE

2100

450

FLOOR MOUNTED

350

500

30

WALL MOUNTED

WALL MOUNTED

2100

200

FLOOR MOUNTED

SI. NO.

TAG

DESCRIPTION

DIMENSIONS (MM)

LENGTH WIDTH

HEIGHT

WEIGHT (KG)

TYPE OF MOUNTING

151 HOLD-1

DCS MARSHALLING CABINET - 1

152 HOLD-1

DCS SYSTEM CABINET-1

153 HOLD-1

DCS MARSHALLING CABINET - 3

154 HOLD-1

DCS SYSTEM CABINET - 2

155 HOLD-1

DCS MARSHALLING CABINET - 2

156 HOLD-1

F&G MARSHALLING CABINET - 3

157 HOLD-1

F&G SYSTEM CABINET - 2

158 HOLD-1

ESD MARSHALLING CABINET - 1

159 HOLD-1

ESD SYSTEM CABINET

160 HOLD-1

ESD MARSHALLING CABINET - 2

161 HOLD-1

F&G MARSHALLING CABINET - 1

162 HOLD-1

F&G SYSTEM CABINET - 1

163 HOLD-1

HSSD PANEL - 1

164 HOLD-1

HSSD PANEL - 2

165 HOLD-1

F&G MARSHALLING CABINET - 2

166 HOLD-1

HIPPS CABINET

168 HOLD-1

NETWORK CABINET

169 HOLD-1

ICSS SERVER CABINET

HVAC / ARCHITECTURAL EQUIPMENT LIST

170 HOLD-1

ICSS PDP

101 HOLD-1

HVAC CONTROL PANEL

102 HOLD-1

HVAC PURGE PANEL FOR ELECTRICAL ROOM - LER 1ST FLOOR

105

FILING CABINET

106 HOLD-1

DUCT HEATER PANEL

1800

600

800

800

800

500

500

500

2100

1000

1200

2100

600

200

100

600

FLOOR MOUNTED

171 HOLD-1

IRP CABINET

WALL MOUNTED

172 HOLD-1

FUTURE CABINET

FLOOR MOUNTED

173 HOLD-1

FUTURE CABINET

FLOOR MOUNTED

174 HOLD-1

DCS CONSOLE (OWS)

175 HOLD-1

MULTI-GAS DETECTOR

800

800

800

800

800

800

800

800

800

800

800

800

800

300

300

800

800

1000

1000

800

800

800

800

800

482

770

2100

2100

2100

2100

2100

2100

2100

2100

2100

2100

2100

2100

600

600

2100

2100

2100

2100

2100

2100

2100

2100

770

640

800

800

800

800

800

800

800

800

800

800

800

800

600

600

800

800

800

800

800

800

800

800

1000

457

300

450

450

450

450

450

450

450

450

450

450

450

450

150

150

450

450

450

450

450

450

201 HOLD-1

TELECOM CABINET -1

202 HOLD-1

TELECOM CABINET -2

203 HOLD-1

TELECOM CABINET -3

204 HOLD-1

TELECOM CABINET -4

FLOOR MOUNTED

205 HOLD-1

PROCESS CCTV CABINET

FLOOR MOUNTED

206 HOLD-1

PA/GA SYSTEM CABINET A

FLOOR MOUNTED

207 HOLD-1

PA/GA SYSTEM CABINET B

FLOOR MOUNTED

209 HOLD-1

TELECOM CONSOLE-1

FLOOR MOUNTED

210 HOLD-1

TELECOM CONSOLE-2

FLOOR MOUNTED

211 HOLD-1

TELEPHONE WALL OUTLET

FLOOR MOUNTED

212 HOLD-1

ACS ENCLOSURE

FLOOR MOUNTED

213 HOLD-1

ACS ENCLOSURE

FLOOR MOUNTED

51 HOLD-1

BREATHING AIR MANIFOLD A

FLOOR MOUNTED

52 HOLD-1

BREATHING AIR MANIFOLD B

FLOOR MOUNTED

55 HOLD-1

ESCAPE BREATHING APPARATUS

FLOOR MOUNTED

59 HOLD-1

NOVEC MAIN JB

WALL MOUNTED

60 HOLD-1

NOVEC CONTROL PANEL

WALL MOUNTED

61 HOLD-1

NOVEC LOCAL STATUS PANEL 1

FLOOR MOUNTED

62 HOLD-1

NOVEC LOCAL STATUS PANEL 2

FLOOR MOUNTED

LOSPE EQUIPMENT LIST

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

200

FLOOR MOUNTED

8

FLOOR MOUNTED

70 HOLD-1

OXYGEN CYLINDER WITH MASK

72 HOLD-1

4.5 KG CO2 EXTINGUISHER (4 NO.)

178 DIA

73 HOLD-1

STRETCHER (2 NO.)

74 HOLD-1

FIRST AID KIT (2 NO.)

75 HOLD-1

FIRE BLANKET (2 NO.)

80 HOLD-1

NOVEC OUTDOOR PUSH BUTTON & LAMP PANEL

81 HOLD-1

NOVEC INDOOR PUSH BUTTON & LAMP PANEL

82 HOLD-1

NOVEC INDOOR PUSH BUTTON & LAMP PANEL

83 HOLD-1

NOVEC OUTDOOR PUSH BUTTON & LAMP PANEL

92 HOLD-1

ELECTRICAL SAFETY KIT

95 HOLD-1

LIFE JACKET CABINET

300

448

300

450

450

450

450

1000

1600

800

800

800

800

800

800

800

800

1900

100

616

616

1700

1700

750

800

600

300

300

300

800

1000

800

800

800

800

800

600

600

250

300

300

610

610

600

400

400

150

150

300

500

213

500

300

300

300

300

400

600

2100

2100

2100

2100

1500

2100

2100

1690

1690

200

616

616

960

960

857

1500

1200

300

300

1000

1225

1200

425

1200

450

450

450

450

1800

1750

13

400

400

400

400

250

250

250

450

450

80

80

150

150

224

120

120

15

15

20

23

10

15

10

40

40

40

40

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

WALL MOUNTED

WALL MOUNTED

PORTABLE

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

200-20-SH-DEC-00013

TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT

268-91-EL-PLN-00001-0004

ELECTRICAL EQUIPMENT LAYOUT LOCAL EQUIPMENT ROOM (LER) FOR RPN6

268-23-PI-PLP-00003

EQUIPMENT ARRANGEMENT PLAN MAIN DECK FOR RP6N

REFERENCE NO.

TITLE

REFERENCES

A

A1

NO.

ISSUED FOR REVIEW

ISSUED FOR IDC

DESCRIPTION

PROJECT TITLE :

REVISIONS

Digita lly signe d by Valentina Brusati DN: cn=Valentina Brusati, o=Saipem, ou, email=valentina. brusa ti@saipem. co m, c=IT Date: 2025. 04. 15 13 :4 1:48 +02’ 00’

Gabri ella Alma sio

al ma sio @ sai pem.c om Re ason: I have re vie wed

VB

VB

BY

GA

GA

BPB

BPB

15/04/25

09/04/25

CHKD

APVD

DATE

NFPS Offshore Riser Platforms & Intrafield Pipelines Project - COMP3

Qatar Energy LNG

Qatar Ene rgy LNG

THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.

CONSULTANT / CONTRACTOR :

Saipem S.p.A.

CONTRACTOR DRAWING NO:

033764-L-D00-18-SPM-LP-D-00046-0001

TITLE :

FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - LOCAL EQUIPMENT ROOM - RP6N

145

100

FLOOR MOUNTED

FLOOR MOUNTED

SCALE :

1:75

PROJECT NO. :

033764

PROJECT

033764

DRAWING NO.

SHT

SIZE REVISION

268-83-SH-PLN-00003

0001

A1

A

14

15

16

1

2

3

4

5

6

7

10

11

12

B

C

D

E

F

G

H

I

J

K

L

A

B

C

D

E

F

G

H

I

J

K

L

Classification: Internal

1

45°

A

B

C

D

E

F

G

H

I

J

K

L

2

3

4

5

6

7

8

9

10

11

12

13

14

NOTES:

15

16

268-EW8301

EYE WASH

C

268-FEXXXX (HOLD-1)

268-FEXXXX (HOLD-1)

kg

kg

268-XZ8344

D

268-XZ8340 FB

3600

3900

9500

2320

268-XZ8352

7200

0 1 9 3 1

103

72

87

1500

20

21

22

31

40

23

30

36

29

28

35

72

38

37

15

16

25

17

18

26

24

167

27

19

34

32

33

39

93

FB

FB

74

75

104

85

200

4 1 2

AIR LOCK

84

63 72

EQUIPMENT LIST FOR BATTERY ROOM (LER 2ND FLOOR)

EQUIPMENT LIST FOR UPS ROOM (LER 2ND FLOOR)

SI.NO.

TAG

DESCRIPTION

DIMENSIONS (MM)

LENGTH WIDTH

HEIGHT

WEIGHT (KG)

TYPE OF MOUNTING

SI.NO.

TAG

DESCRIPTION

DIMENSIONS (MM)

LENGTH WIDTH

HEIGHT

WEIGHT (KG)

TYPE OF MOUNTING

ELECTRICAL EQUIPMENT LIST

ELECTRICAL EQUIPMENT LIST

UPS ROOM / BATTERY ROOM LER LEVEL-2 TOS. EL +20900

kg

268-FEXXXX (HOLD-1)

20 HOLD-1

AC UPS A MCCB BOX

21 HOLD-1

AC UPS B MCCB BOX

22 HOLD-1

AC UPS A BATTERY BANK

23 HOLD-1

AC UPS B BATTERY BANK

28 HOLD-1

DC UPS A MCCB BOX

29 HOLD-1

DC UPS B MCCB BOX

30 HOLD-1

DC UPS A BATTERY BANK

31 HOLD-1

DC UPS B BATTERY BANK

35 HOLD-1

NAV - AID UPS ISOLATION SWITCH (Ex’de”)

36 HOLD-1

NAV - AID UPS BATTERY BANK

40 HOLD-1

BATTERY LIFTING TROLLEY

500

500

3920

3920

500

500

1700

1700

500

1500

1050

300

300

800

800

300

300

800

800

300

900

650

600

600

1540

1540

600

600

1400

1400

600

1130

1600

HVAC EQUIPMENT LIST

100

100

WALL MOUNTED

WALL MOUNTED

2500

FLOOR MOUNTED

2500

FLOOR MOUNTED

WALL MOUNTED

100

100

1220

FLOOR MOUNTED

100

PORTABLE

103 HOLD-1

HVAC PURGE PANEL FOR BATTERY ROOM - LER 2ND FLOOR

600

500

1000

200

WALL MOUNTED

72 HOLD-1

6.8KG CO2 EXTINGUISHER

87 HOLD-1

PORTABLE EYE WASH

178 DIA

300

250

1225

300

7

10

WALL MOUNTED

WALL MOUNTED

LOSPE EQUIPMENT LIST

15

16

17

18

19

HOLD-1

HOLD-1

HOLD-1

HOLD-1

HOLD-1

AC UPS SYSTEM A

AC UPS SYSTEM B

AC UPS DISTRIBUTION BOARD A

AC UPS DISTRIBUTION BOARD B

AC UPS BATTERY MONITORING SYSTEM

WALL MOUNTED

24 HOLD-1

DC UPS BATTERY CHARGER

1100

FLOOR MOUNTED

25

HOLD-1

DC UPS DISTRIBUTION BOARD A

1100

FLOOR MOUNTED

26 HOLD-1

DC UPS DISTRIBUTION BOARD B

100

WALL MOUNTED

27 HOLD-1

DC UPS BATTERY MONITORING SYSTEM

32

33

34

37

38

39

HOLD-1

HOLD-1

HOLD-1

HOLD-1

HOLD-1

HOLD-1

NAVIGATIONAL AIDS UPS A

NAVIGATIONAL AIDS UPS B

MAIN DISTRIBUTION BOARD NAV - AID UPS

LIGHTING & SMALL POWER DB

POWER DISTRIBUTION BOARD

HELIDECK LIGHTING MAIN CONTROL PANEL

3000

3000

1600

1600

600

2940

1200

1200

600

1200

1200

800

1000

1000

800

1000

1000

800

800

400

1000

800

800

400

800

800

800

400

400

800

2200

2200

2000

2000

1000

2200

2000

2000

1000

2200

2200

2450

1600

1600

1000

3500

FLOOR MOUNTED

3500

FLOOR MOUNTED

500

500

100

FLOOR MOUNTED

FLOOR MOUNTED

WALL MOUNTED

2000

FLOOR MOUNTED

500

500

100

500

500

100

200

200

160

FLOOR MOUNTED

FLOOR MOUNTED

WALL MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

FLOOR MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

HVAC EQUIPMENT LIST

104 HOLD-1

HVAC PURGE PANEL FOR UPS ROOM - LER 2ND FLOOR

600

500

1000

200

WALL MOUNTED

LOSPE EQUIPMENT LIST

63

72

74

HOLD-1

HOLD-1

HOLD-1

NOVEC LOCAL STATUS PANEL 3

6.8KG CO2 EXTINGUISHER (3 NO.)

FIRST AID KIT

75

HOLD-1

FIRE BLANKET

84

85

93

HOLD-1

HOLD-1

HOLD-1

NOVEC INDOOR PUSH BUTTON & LAMP PANEL

NOVEC OUTDOOR PUSH BUTTON & LAMP PANEL

ELECTRICAL SAFETY KIT

300

178 DIA

448

300

450

450

1000

150

213

500

300

300

400

300

1225

425

1200

450

450

15

7

15

10

40

40

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

WALL MOUNTED

1800

145

FLOOR MOUNTED

INSTRUMENT EQUIPMENT LIST

167 HOLD-1

HSSD PANEL - 3

600

300

600

150

WALL MOUNTED

214 HOLD-1

ACS ENCLOSURE

616

300

616

80

WALL MOUNTED

TELECOM EQUIPMENT LIST

  1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS UNLESS STATED

OTHERWISE.

  1. PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT, SECONDARY

ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.).

  1. THIS LAYOUT SHALL BE USED ONLY FOR ESCAPE ROUTE, QUANTITY AND

LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS.

  1. THE PORTABLE EXTINGUISHERS LOCATED INDOOR SHALL BE PROVIDED

A

WITH WALL MOUNTING HANGER/ BRACKET.

  1. LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENTS AND

DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.

  1. ALL FIRE & SAFETY EQUIPMENTS SHALL BE LOCATED IN SUCH A WAY

THAT THEY ARE EASILY ACCESSIBLE.

  1. BREATHING AIR MANIFOLD FOR 10 PERSON, AS PER TECHNICAL SAFETY

BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

  1. NOVEC 1230 (FK-5-1-12) CLEAN AGENT PROTECTION SHALL BE PROVIDED FOR ELECTRICAL & INSTRUMENT ROOM AND UPS ROOM IN THE LER.

B

  1. OXYGEN CYLINDER WITH FACE MASK SHALL BE PROVIDED INSIDE

BUILDING (TEMPORARY REFUGE).

  1. FOR TEMPORARY REFUGE, AN OVERALL FREE FLOOR SPACE OF 12 M²

BETWEEN EQUIPMENTS SHALL BE MAINTAINED IN THE TR.

  1. AIR LOCK ROOM SHOULD ALLOW SAFE MANEUVERING OF AN INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.

LEGENDS:

LEGEND

kg

FB

DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m (WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m (WIDTH) X 2.286m (HEAD CLEARANCE) 4.5kg CO2 PORTABLE FIRE EXTINGUISHER

FIRE BLANKET

FIRST AID KIT

EYE WASH

PORTABLE EYE WASH

ELECTRICAL SAFETY KIT

QTY

3

1

1

1

1

HOLDS:

  1. TAG NOS.

KEY PLAN

A A A A

B B B B

C C C C

D D D D

RIDGE TO RIDGE TO RIDGE TO RIDGE TO

P6N P6N P6N P6N WH WH WH WH

B B B B

AMPLEMA NN GANGWAY AMPLEMA NN GANGWAY AMPLEMA NN GANGWAY AMPLEMA NN GANGWAY LA NDING (NOTE 5) LA NDING (NOTE 5) LA NDING (NOTE 5) LA NDING (NOTE 5)

UP UP UP UP

UP UP UP UP

TO TO TO TO TO P DECK TO P DECK TO P DECK TO P DECK

I I I I

N N N N A A A A R R R R D D D D

K K K K C C C C E E E E D D D D

05 05 05 05

PIPING PIPING PIPING PIPING AR EA AR EA AR EA AR EA

O O O O T T T T

N N N N D D D D

DROP Z ONE DROP Z ONE DROP Z ONE DROP Z ONE DRAIN DECK DRAIN DECK DRAIN DECK DRAIN DECK

MAIN DECK MAIN DECK MAIN DECK MAIN DECK L AYDOWN L AYDOWN L AYDOWN L AYDOWN AR EA AR EA AR EA AR EA

MAIN DECK MAIN DECK MAIN DECK MAIN DECK L AYDOWN L AYDOWN L AYDOWN L AYDOWN AR EA AR EA AR EA AR EA

PIPING AREA PIPING AREA PIPING AREA PIPING AREA

3 3 3 3

2 2 2 2

1 1 1 1

2 68MOV-50015 2 68MOV-50015 2 68MOV-50015 2 68MOV-50015

268SDV-49 002 268SDV-49 002 268SDV-49 002 268SDV-49 002

MONORAIL MONORAIL MONORAIL MONORAIL

MONORAIL MONORAIL MONORAIL MONORAIL

PIPING AREA PIPING AREA PIPING AREA PIPING AREA

14 14 14 14

MONOR AIL MONOR AIL MONOR AIL MONOR AIL

PIG HAND LIN G PIG HAND LIN G PIG HAND LIN G PIG HAND LIN G AR EA AR EA AR EA AR EA

A A A A E E E E R R R R A A A A G G G G N N N N P P P P P P P P

I I I I

I I I I

24 24 24 24

P P P P A A A A R R R R T T T T G G G G P P P P

N N N N W W W W O O O O D D D D Y Y Y Y A A A A L L L L

I I I I

A A A A E E E E R R R R A A A A

PIG HAND LIN G PIG HAND LIN G PIG HAND LIN G PIG HAND LIN G AR EA AR EA AR EA AR EA

MON ORAIL MON ORAIL MON ORAIL MON ORAIL

03B 03B 03B 03B

268M OV -5 00016 268M OV -5 00016 268M OV -5 00016 268M OV -5 00016

268M OV -500017 268M OV -500017 268M OV -500017 268M OV -500017

PIPING PIPING PIPING PIPING AREA AREA AREA AREA

268M OV-50014 268M OV-50014 268M OV-50014 268M OV-50014 268M OV-50019 268M OV-50019 268M OV-50019 268M OV-50019

03A 03A 03A 03A

PIPING AREA PIPING AREA PIPING AREA PIPING AREA

2 68MOV-50020 2 68MOV-50020 2 68MOV-50020 2 68MOV-50020

PIPIN G AREA PIPIN G AREA PIPIN G AREA PIPIN G AREA

268SDV-49009

MONORAIL

MONORAIL MONORAIL MONORAIL MONORAIL 28 28 28 28

MON ORAIL MON ORAIL MON ORAIL MON ORAIL

21 21 21 21

LADDER TO LADDER TO LADDER TO LADDER TO LER ROOF LER ROOF LER ROOF LER ROOF

26 26 26 26

19 19 19 19

20 20 20 20

27A 27A 27A 27A

27B 27B 27B 27B

A A A A E E E E R R R R A A A A G G G G N N N N P P P P P P P P

I I I I

I I I I

04A 04A 04A 04A

04B 04B 04B 04B

T O DRAIN DEC K T O DRAIN DEC K T O DRAIN DEC K T O DRAIN DEC K

P P P P U U U U

N N N N D D D D

P P P P U U U U

Y Y Y Y R R R R A A A A R R R R O O O O P P P P M M M M E E E E T T T T

E E E E G G G G U U U U F F F F E E E E R R R R

T O TOP DECK T O TOP DECK T O TOP DECK T O TOP DECK

THIS DRAWING

200-20-SH-DEC-00013

TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT

268-91-EL-PLN-00001-0005

ELECTRICAL EQUIPMENT LAYOUT LOCAL EQUIPMENT ROOM (LER) FOR RPN6

268-23-PI-PLP-00003

EQUIPMENT ARRANGEMENT PLAN MAIN DECK FOR RP6N

REFERENCE NO.

TITLE

REFERENCES

ISSUED FOR REVIEW

Gabriell a Digit ally signed by Vale ntina Brusat i Alm asi DN: cn=Valent ina Brusa ti, o o=Saipe m, ou, e mail=valentin a.bru sati@saipem.c om, c=IT Date : 2025.04. 15 13:42:34 +02’00’

gab rie lla.alm asi o@ sai pem.com Re ason: I have re vie wed this docu ment

VB

GA

ISSUED FOR IDC

VB

GA

BPB

BPB

15/04/25

08/04/25

DESCRIPTION

BY

CHKD

APVD

DATE

REVISIONS

A

A1

NO.

PROJECT TITLE :

NFPS Offshore Riser Platforms & Intrafield Pipelines Project - COMP3

Qatar Energy LNG

Qatar Ene rgy LNG

THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.

CONSULTANT / CONTRACTOR :

Saipem S.p.A.

CONTRACTOR DRAWING NO:

033764-L-D00-18-SPM-LP-D-00046-0002

TITLE :

FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - LOCAL EQUIPMENT ROOM - RP6N

SCALE :

1:75

PROJECT NO. :

033764

PROJECT

033764

DRAWING NO.

SHT

SIZE REVISION

268-83-SH-PLN-00003

0002

A1

A

C

D

E

F

G

H

I

J

K

L

1

2

3

4

5

6

7

10

11

12

13

14

15

16

Project: Q-32705 - Saipem COMP3 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further