NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

COMPANY Contract No.: LTC/C/NFP/5129/20 CONTRACTOR Project No.: 033764

ASSET

: NFPS

Document Title

: TAG NUMBERING PROCEDURE

COMPANY Document No.

: COMP3-SPM-PE-PRC-00010

CONTRACTOR Document No.

:

033764-B-D-18-SPM-EM-P-10010

Discipline

:

ADMINISTRATIVE, ENGINEERING MANAGEMENT

Document Type

: PROCEDURE

Document Category/Class

:

1

Document Classification

:

Internal

A

05-FEB-2025

Issued for Review

Anirudh Nadiger

Jobi George

Reetesh Jha

Tech. Manager Tech. Manager Eng. Manager

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

REVIEWED BY

APPROVED BY

Saipem S.p.A

www.saipem.com

THIS DOCUMENT IS PROPERTY OF QatarEnergy LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QatarEnergy LNG.

COMP3-SPM-PE-PRC-00010_A

Page 1 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

REVISION HISTORY

Revision

Date

Revision Description

A1

A

23-JAN-2025

Issued for Inter Discipline Check

05-FEB-2025

Issued for Review

HOLDS LIST

Hold No

Hold Description

Nil

COMP3-SPM-PE-PRC-00010_A

Page 2 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

TABLE OF CONTENTS

1

INTRODUCTION … 6 Project Objective … 6 1.1 Project Scope … 6 1.2

2 DEFINITIONS AND ABBREVIATIONS … 9 Definitions … 9 Abbreviations … 10

2.1 2.2

3 REGULATIONS, CODES AND STANDARDS … 12 Company References … 12 Project Documents … 12 Standards… 13

3.1 3.2 3.3

4 SCOPE AND PURPOSE … 13

5 ROLES AND RESPONSIBILITIES … 13 CONTRACTOR’s responsibilities … 13 COMPANY’s responsibilities … 13 Validated TAG list by COMPANY … 13 TAG Number Request Process Flow … 13

5.1 5.2 5.3 5.4

6 DEFINITION OF TAG NUMBER … 15

7 TAG NUMBERING FOR EXISTING FACILITY (BROWNFIELD) … 15

8 TAG NUMBERING FOR NEW FACILITY … 17

9 MECHANICAL TAG NUMBERING SYSTEM … 17 9.1 Main Equipment Tag Numbering … 17 Auxiliary Equipment Numbering System … 17 9.2

10 INSTRUMENT NUMBERING SYSTEM … 18 10.1 Looped DCS Instrument Numbering System … 18 10.2 Looped non DCS Instrument Numbering System … 18 10.3 Non-Looped Instrument Numbering System … 18 10.4 PLC Functional Logic Numbering System … 18 10.5 DCS Functional Logic Numbering System … 18 10.6 Hardwired Relay Functional Logic Numbering System … 18 10.7 Hardwired Solid State Shutdown Logic Numbering System … 18 10.8 Restriction Orifice Numbering System … 18 10.9 Field Junction Box Numbering System … 18 10.10 Smart Junction Box Numbering … 18 10.11 Loop Tagging System … 19 10.12 Actuated ON/OFF Valve Control Box … 19

11 VALVES AND SPECIAL ITEMS NUMBERING SYSTEM … 19 11.1 Special Items and Vacuum Breakers … 19 11.2 Numbering Structure – Non-Manual Valves … 19

COMP3-SPM-PE-PRC-00010_A

Page 3 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

11.3 Numbering Structure –Manual Valves … 19

12 FIRE PROTECTION SYSTEM … 20 12.1 Fire/Gas detectors … 20 12.2 For other Instrument and Alarms … 20 12.3 Fire Protection System Valve … 20 12.4 Fire Protection System Valve Headers … 20 12.5 Line Fault Alarm of Fire/Gas Detectors and other instruments … 20 12.6 Line Fault Alarm of Fire Protection System Valves … 20

13 LINE NUMBERING SYSTEM … 20 13.1 Numbering Structure for Line … 20

14 HVAC NUMBERING SYSTEM … 21

15 ELECTRICAL NUMBERING SYSTEM … 21 15.1 Main Electric Equipment … 21 15.2 Building Electrical Equipment … 21 15.3 Motor Numbering for Main Equipment … 21 15.4 Motor Numbering for Auxiliary Equipment … 21 15.5 Electrical Heater Numbering … 21 15.6 Local Control Unit Numbering … 22 15.7 Light Fixture, Light Fixture Junction Box and Convenience Socket … 22

16 TELECOMMUNICATIONS EQUIPMENT NUMBERING SYSTEM … 22

17 FIRE FIGHTING AND SAFETY EQUIPMENT NUMBERING … 22 17.1 Fire Alarm Equipment… 22 17.2 Fire Fighting System Package … 22 17.3 Bypass Valve … 22

18 CABLE NUMBERING SYSTEM … 22 18.1 Feeder Cable … 22 18.2 Power Cable for Motor … 22 18.3 Power Cable for Electric Heater … 22 18.4 Control Cable for Motor … 23 18.5 Power and Control Cable for Panel … 23 18.6 Welding Socket Power Cable … 23 18.7 Fire Alarm Cable … 23 18.8 Telephone Cable … 23 18.9 Public Address Cable … 23 18.10 LAN Fiber Cable… 23 18.11 CCTV Cable Numbering … 23 18.12 DATA Cable Numbering … 23 18.13 Antenna Cable Numbering … 23 18.14 Fiber Optic & Composite Cable … 23 18.15 Umbilical Cable … 23 18.16 Instrument Cable - Direct … 24

COMP3-SPM-PE-PRC-00010_A

Page 4 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

18.17 Instrument Cable – Multiple Junction Box (JB) … 24 18.18 Instrument Cable – Multiple Control Room … 24 18.19 Instrument Cable – Individual … 24 18.20 Instrument Grounding Wire … 24

19 APPENDICES … 25 19.1 Appendix 1 Equipment Classes … 25 19.2 Appendix 2 Package Numbers … 25 19.3 Appendix 3 Voltage Levels … 25 19.4 Appendix 4 Telecommunications Location Codes … 25 19.5 Appendix 5 List of Project Specification for Reference … 25 19.6 Appendix 6 Portfolio Asset Names and Abbreviations … 25 19.7 Appendix 7 BZ Brownfield Tag Request Form Templates_Offshore … 26 19.8 Appendix 8 BZ Brownfield Tag Request Form Templates_Onshore … 26 19.9 Appendix 9 QN Brownfield Tag Request Form Templates … 26 19.10 Appendix 10 QN Brownfield Tag Request Form Templates_Cables and Telecoms … 27 19.11 Appendix 11 QS Brownfield Tag Request Form Templates … 27 19.12 Appendix 12 Green Field Tag Request Form Template… 27 19.13 Appendix 13 System Number for NFPS COMP3 … 28 19.14 Appendix 14 Unit Number for NFPS COMP3 … 32

COMP3-SPM-PE-PRC-00010_A

Page 5 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all the State of Qatar’s gas production. The principal objective of the NFPS projects is to sustain plateau from existing QatarEnergy LNG Operation – S1, S2, S3, N1 and N2, production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression.

NFPS projects comprise 3 main investment programs:

  1. Investment #1: Drilling and Associated Facilities [WHP12S/ WHP13S/ WHP14S/

WHP12N/ WHP13N]

  1. Investment #2: Trunk line Looping and Intra-field pipeline looping [32” PL1LN, 32”

PL1LS, 38”PL610LS]

  1. Investment #3: Compression Complexes and associated facilities [Phase 1 CP6S & CP7S; Phase 2: CP8S & CP4N; Phase 3: CP4S & CP6N Phase 4: CP1S & CP1N]

Drilling and Looping, Investments #1 and #2, projects are in execution phase and are being executed as I1P1, EPCOL Projects except for WHP13N, which will be part of NFPS Compression Projects execution which compromises total up to 9 COMPs.

1.1 Project Objective

The objective of this Project includes:

• Achieve standards of global excellence in Safety, Health, Environment, Security and

Quality performance.

• Sustain the Qatarenergy LNG North Field Production Plateau by installing new RPs and one WHPs to support new Compression Complex facilities CP6S & CP7S and pre-installed facilities for future Compression Complex facilities including but not limited to CP4N & CP8S tie-in with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible,

operable, and efficient throughout their required life.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, brownfield modifications, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start-up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit purpose in all respects.

for

‐

‐

Facilities - 1A

• RP5S RP with 2 x 28” CRA clad pipelines to RP7S and 2 subsea composite Cables

and associated J tubes from RP7S to RP5S & from CP7S to WHP13S.

• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP7S

COMP3-SPM-PE-PRC-00010_A

Page 6 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

• Hook-up and brownfield modification at WHP5S/RP5S bridge connection & WHP13S/CP7S Composite cable tie-in and E&I integration including RGA Control modification

• Pipeline decommissioning of 28” CS PL5 including associated demolition work at

WHP5S

Facilities - 2A

• RP6N RP with 1x28” CRA clad pipeline to WHP13N, 2 Subsea composite cables and

associated J tubes from WHP12N to RP4N and RP6N to WHP13N. • New fuel gas spur-line and flanged riser from subsea skid to RP6N • WHP13N Topside • Hook-up and brownfield modification at WHP6N/RP6N, RP4N- HPU-Umbilical and tie- in, WHP12N-new J tube installation, E&I migration, WHP6N/RP4N/WHP4N-E&I migration (Pre-CP4N), WHP13N and RP6N interconnection to NFB.

Facilities - 3A

• RP9S RP with 1x28” CRA clad pipeline to RP4S, • Hook-up and brownfield modification at RP4S/WHP9S, Modifications to integrate

RP9S to the RGA control network.

• Pipeline decommissioning of 28” PL9 to WYE on existing 38” trunkline PL49including

associated demolition work at WHP9S.

Facilities - 1B

• New fuel gas spur-line and flanged riser from subsea skid to RP4N • Fiber Optic Cable from RP6N to onshore LFP East, RP6N to RP4N and RP6N to LQ6S. • Hook-up and brownfield modification at RP6N Composite and FO Tie-ins NFB-PU (East)- FO Tie-in

(East)/BVS

Power & Control modifications, LQ6S/LFP Controls/Telecoms Integration

Facilities - 2B

• RP5N RP with 2 x 28” CRA clad pipelines to RP4N, 1 x 28” CRA clad pipeline to RP6N and 2 subsea composite Cables and associated J tubes from WHP12N to RP5N & from RP6N to RP5N.

• Hook-up and brownfield modification at WHP5N- RP5N Bridge connection, WHP12N Composite cable tie-in, RP4N Intrafield pipeline Hook up PL54 N/LN and E&I integration including NFB-PU Power & Control modifications

• Pipeline decommissioning of 2 x 16” PL56/PL54 Subsea Spur line from WHP5N to

reducing barred tee in subsea tie-in skid on PL6 / PL4.

Facilities - 3B

• 2 subsea composite Cables from RP4S to RP9S & from RP4S to WHP12S (with J-

tube)

• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP4S • Hook-up and brownfield modification at WHP12S/ RP9S/ RP4S Composite cable tie-

in, Spurline riser installation at RP4S RGA Power & Control modifications.

Facilities - 4B

• 1 subsea composite Cable from CP8S to RP11S (or from RP8S to RP11S as Option). • New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RP8S.

COMP3-SPM-PE-PRC-00010_A

Page 7 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

• Hook-up and brownfield modification at WHP8S/ WHP11S for Test separator Internal Upgrade and MEG system modification, Spur lines, Power & Control Tie-ins on RP8S, RP11S/WHP11S-Tie-in (Power and Control), RGA Power & Control modifications.

Facilities - 5B

• 2 subsea composite Cables from RT2 to WHP3S & from RT2 to WHP2S (with J-tube)

and FO Cable from RT2 to Barzan WHP1.

• New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RT2 • Hook-up and brownfield modification at BRZ-WHP1 - FO cable tie-in, WHP2S/ WHP3S/ RT&RT2 Composite cable tie-in and associated modification, RGA Power & Control modifications.

Facilities - 6B

• RP3S RP with 1x24” CRA clad pipeline to RT2 with Stalk on risers, • Hook-up and brownfield modification at RT2 for 24” Intrafield pipeline and Composite/FO cable Hook-up, WHP3S for Production diversion and Utilities, Power and ICSS Hook-up, WHP2S for Composite Cable Tie-ins and Power & Control Integration RGA Power & Control modifications. topside existing and

In-situ abandonment of existing Topside/subsea Composite Cables RT-WHP2S, RT-WHP3S, Topside/Subsea FO cable RT-BRXWHP1.

• Decommissioning at

Figure 1.2.1: NFPS Compression Project COMP3 Scope

COMP3-SPM-PE-PRC-00010_A

Page 8 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

QatarEnergy LNG.

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

MILESTONE

PROJECT

SITE

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, tested and manufactured, constructed, supplied, permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

A reference event splitting a PROJECT activity for progress measurement purpose.

COMP3 - NFPS Offshore Riser/Wellhead Platform & Intrafield Pipelines Project

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Refer to article 2 of CONTRACT AGREEMENT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

COMP3-SPM-PE-PRC-00010_A

Page 9 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

2.2 Abbreviations

Code

Definition

AFC

AIV

BSP

C&E

CA

DCL

DDE

DDM

DM

DPR

DSI

E&I

Approved for Construction

Acoustic Induced Vibration

Bridge Support Platform

Cause & Effect

Contract Award

Document Control Lead

Detailed Design Engineering

Document Distribution Matrix

Department Manager

Daily Progress Report

Digitalization System Integrator

Electrical and Instrumentation

EDMS

Electronic Document Management System

EG

EM

Ethylene Glycol

Engineering Manager

EPCI (or part of)

Engineering/Procurement/Construction/Installation

FAT

FG

GA

GDP

IDC

IFA

IFH

Factory Acceptance Test

Fuel Gas

General Arrangement

General Distribution Process

Inter-Discipline Check

Issued for Approval

Issued for HAZOP

COMP3-SPM-PE-PRC-00010_A

Page 10 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

Issued for Review

Integrated Main Instrument & Control Contractor

Invitation to Tender

Independent Verification Body

Long Lead Item

Main Contractor – Saipem SPA

Master Document Register

Mono Ethylene Glycol

Material Requisition

Project Control Manager

Planning Engineer

Project Manager

Project Management Team

Purchase Order

Project Quality Manager

Project Specialist Leader (Engineering Discipline Leader)

Preparation / Verification / Approval Workflow In EDMS

Record of Conversation

SubContractor

Transportation & Installation

Technical Bid Evaluation

Technical Integrity Verification

Technical Manager (equivalent to Engineering Manager)

Telecom System Integrator

Vendor Data Incorporation

IFR

IMICC

ITT

IVB

LLI

MC

MDR

MEG

MR

PCM

PLE

PM

PMT

PO

PQM

PSL

PVA

ROC

SC

T&I

TBE

TIV

TM

TSI

VDI

COMP3-SPM-PE-PRC-00010_A

Page 11 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

VDR

WBS

Vendor Data Review

Work Breakdown Structure

3 REGULATIONS, CODES AND STANDARDS

3.1 Company References

S. No

Document Number

Title

LTC/C/NFP/5129/20

Contract Agreement

EXHIBIT 5

Project Instructions

PRJ-PJL-PRC-004

PRJ-PJL-PRC-005

Facilities Engineering and Vendor Document Numbering Procedure

Facilities, System and Unit Number Codes and Descriptions Procedure

PRJ-PJL-PRC-006

Project Information Handover Procedure

PRJ-PJL-PRC-048

PRJ-PJL-PRC-049

Facilities Documentation Metadata Requirements Procedure

Project Acceptance Procedure

Information Handover, Verification and

PRJ-PJL-PRC-008_17

Qatargas Procedure

Equipment Numbering

Philosophy

PRJ-PJL-PRC-080_02

AIMS: Tag Management System (TMS) Procedure

3.2 Project Documents

S. No

Document Number

Title

COMP3-SPM-PE-PRC-00003 Document Numbering Procedure

COMP3-SPM-PE-PLN-00001 Engineering Management Plan

COMP3-SPM-PM-PLN-00004 Digital Project Delivery Plan

COMP3-SPM-PE-PRC-00005 Technical Query procedure

COMP3-SPM-PE-TQY-00003

Technical Query for System Numbers of BSP5S-1 and BR5S-2 (Note 1).

Note 1: System number updated per COMPANY RNDN Metadata.

COMP3-SPM-PE-PRC-00010_A

Page 12 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

3.3 Standards

S. No

Document Number

Title

N/A

4 SCOPE AND PURPOSE

The purpose of this document is to detail the Structure of Tag numbering for NFPS COMP3 Project. Tag number request/validation will be as per Qatargas Procedure PRJ-PJL-PRC-080_02 AIMS: Tag Management System (TMS).

This procedure is developed from Qatargas procedure PRJ-PJL-PRC-008_17. This procedure shall be implemented in conjunction with Qatargas procedure PRJ-PJL-PRC-008_17 – Qatargas Equipment Numbering Philosophy, PRJ-PJL-PRC-005_17 – Facilities System and Unit Number Codes and Descriptions, and with procedure PRJ-PTI-PRC-003 Equipment Numbering Workflow for Brownfield Modifications

5 ROLES AND RESPONSIBILITIES

5.1 CONTRACTOR’s responsibilities

CONTRACTOR is responsible for below:

• To fill the required data for Tag numbering in line with Appendix 6-11 • Request Tag Number in Qatargas Tag Management System as per PRJ-PJL-PRC-080_02

5.2 COMPANY’s responsibilities

COMPANY is responsible for below.

• Review requested Tag number input file and provide / Validate Tag Number as per PRJ-PJL-

PRC-080_02

• Provide Project Specific Tag Structure for existing facilities as per section 1.2 of PRJ-PJL-

PRC-008_17

5.3 Validated TAG list by COMPANY

These tags will be directly used in the project and does not require to follow Tag Number request process flow as mentioned in section 5.4.

5.4 TAG Number Request Process Flow

Below process flow will describe the overall process in general when requesting TAG numbers to effectively follow the tagging philosophy as per requirements:

5.4.1 Process Flow for Greenfield

The process flow as per below:

COMP3-SPM-PE-PRC-00010_A

Page 13 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

5.4.2 Process Flow for Brownfield

The process flow as per below:

COMP3-SPM-PE-PRC-00010_A

Page 14 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

5.4.3 Process Flow for Vendor

The process flow as per below:

6 DEFINITION OF TAG NUMBER

Tag number is a unique identification reference of an entity (equipment, instrument, or function) within the Qatargas operated facilities. Unique tag number is required in following (but not limited to) purposes,

• Required for unique reference in Piping and Instrumentation Diagrams (P&ID). • Required as unique Identification of Equipment’s (Mechanical, Electrical, Instruments, Fire & Gas, and Telecommunication) and monitoring & control functions.

7 TAG NUMBERING FOR EXISTING FACILITY (BROWNFIELD)

In general, the addition of tag numbers in existing facilities (both Onshore and Offshore) shall follow section 3 of the AIMS: Tag Management Procedure (TMS) Doc. Nr PRJ-PJL- PRC-080. Below Procedures to be followed for existing facilities:

S Nr. 1 2 3 4 5 6

7

8

Facility

Asset OFFSHORE WHP6S (WT6) OFFSHORE WHP10S (WT10) OFFSHORE WHP7S (WT7) OFFSHORE LQS (QT) OFFSHORE WHP5S (WT5) OFFSHORE RP6S

OFFSHORE RP10S

OFFSHORE RP7S

Procedure PRJ-PJL-PRC-080 PRJ-PJL-PRC-080 PRJ-PJL-PRC-080 PRJ-PJL-PRC-080 PRJ-PJL-PRC-080 a) PRJ-PJL-PRC-080 b) COMP2-SPM-PE-PRC-00008 a) PRJ-PJL-PRC-080 b) COMP2-SPM-PE-PRC-00008 a) PRJ-PJL-PRC-080 b) COMP2-SPM-PE-PRC-00008

COMP3-SPM-PE-PRC-00010_A

Page 15 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

S Nr. 1 2

Asset QG2 OFFSHORE WHP4S (WT4)

Facility WHP4N

3

4

5 6 7 8 9 10 11 12

13

14

15 16 17 18 19 20 21 22 23 24

25

OFFSHORE WHP6S (WT6)

OFFSHORE WHP10S (WT10)

OFFSHORE WHP7S (WT7) I1P1 QG1 QG1 QG1 QG1 QG1 QG1

RP1N PUN LQN PRN WHP1N WHP2N WHP3N

OFFSHORE WHP8S (WT8)

OFFSHORE WHP11S (WT11)

WHP6N

OFFSHORE PUS (PT) OFFSHORE LQS (QT) OFFSHORE RTS QG2 OFFSHORE WHP1S (WT1) OFFSHORE WHP2S (WT2) OFFSHORE WHP3S (WT3) OFFSHORE WHP5S (WT5) OFFSHORE WHP9S (WT9) QG2

WHP5N

RA1

QGS SC1

26

RA6

QGS BUILDINGS (SIH 85, SS02 & SS03)

27

RA3

QGS SC3S

28

RA3

QGS SC3S

29

RA4

QGS SC1

30

RA3

QGS SC3S

Procedure (Note-1,2,3, 4) 210-30-20-PE-PC-NA-024 GXP2-O-PE-0082

GXP2-O-PE-0082 GXP2-O-PE-0091

GXP2-O-PE-0091 GXP2-O-PE-0082

GXP2-O-PE-0082 200-51-IN-PRC-001

PRJ-PJL-PRC-008

003-00-51-IN-DP-00-002 01-00-51-IN-TS-00-205

GXP2-O-PE-0091 GXP2-O-PE-0082

GXP2-O-PE-0091 GXP2-O-PE-0082

GXP2-O-PE-0082 GXP2-O-PE-0082 GXP2-O-PE-0082 210-30-20-PE-PC-NA-024 GXP2-O-PE-0082 GXP2-O-PE-0082 GXP2-O-PE-0082 GXP2-O-PE-0082 GXP2-O-PE-0082 210-30-20-PE-PC-NA-024 S-00-1141-002 D-00-1378-001 RG6-S-00-1130-005 RG6-D-00-1378-001 RG6-S-00-1130-005 RG6-D-00-1378-001 RG6-S-00-1130-005 RG6-D-00-1378-001 D-00-1378-001 D-00-1378-001 RG6-S-00-1130-005 RG6-D-00-1378-001

COMP3-SPM-PE-PRC-00010_A

Page 16 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

S Nr.

Asset

Facility

31

QG1

QGN SC1, UPCB, SS01

32

QG1

QGN SC1, UPCB, SS01

33

QG1

34

RA5

QGN MCR, HQ DATA CENTER, NEW PLANT GATE HOUSE QGS SS 506, QGS MAIN GATE HOUSE (XK-07)

35

QGN

QGN-BVS/LER

36

GEN

QGS-BVS/LER

Notes:

Procedure (Note-1,2,3, 4) 003-00-51-IN-DP-00-002 010-00-51-IN-TS-00-205 003-00-51-IN-DP-00-002 010-00-51-IN-TS-00-205

199-00-00-PE-PC-NA-000203

RG6-S-00-1130-005 RG6-D-00-1378-001 PRJ-PJL-PRC-008

003-00-51-IN-DP-00-002

010-00-51-IN-TS-00-205

RG6-S-00-1130-005 RG6-D-00-1378-001

  1. General: Cases where, the Platform/Project Specific Existing Tagging Procedure is not covering tagging philosophy for items, Tags are reserved based on “FREE TEXT” (following existing drawings/documents) in Tag Management System (TMS) in alignment with COMPANY Engineering counterparts. Tag request is deemed closed once approved by COMPANY Tag focal point in TMS.

  2. Piping Manual Valves & SP Items: Existing Tagging procedures does not cover the philosophy for Piping items. Tags are reserved based on “FREE TEXT” (following existing drawings/documents) in Tag Management System (TMS).

  3. Electrical: PRJ-PJL-PRC-008 is followed for new UPS cable tagging and for Lighting Fixtures/Cable Tags are reserved based on “FREE TEXT” (following existing drawings/documents) in Tag Management System (TMS).

  4. PRJ-PJL-PRC-048 contains only document numbering procedure and not Tagging

philosophy, therefore GXP2-O-PE-0082 is used for Tagging as applicable.

8 TAG NUMBERING FOR NEW FACILITY

Below section from Section 9 to 17 will be followed for Tag numbering of new facilities under this project.

9 MECHANICAL TAG NUMBERING SYSTEM

9.1 Main Equipment Tag Numbering

As per Section 2.3.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

9.2 Auxiliary Equipment Numbering System

COMP3-SPM-PE-PRC-00010_A

Page 17 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

As per Section 2.3.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10 INSTRUMENT NUMBERING SYSTEM

10.1 Looped DCS Instrument Numbering System

As per Section 2.4.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10.2 Looped non DCS Instrument Numbering System

As per Section 2.4.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10.3 Non-Looped Instrument Numbering System

As per Section 2.4.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10.4 PLC Functional Logic Numbering System

As per Section 2.4.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10.5 DCS Functional Logic Numbering System

As per Section 2.4.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10.6 Hardwired Relay Functional Logic Numbering System

As per Section 2.4.6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10.7 Hardwired Solid State Shutdown Logic Numbering System

As per Section 2.4.7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10.8 Restriction Orifice Numbering System

As per Section 2.4.8 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”.

10.8.1 Line Service Code

As per Appendix 3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17” Secondary Identifier

10.9 Field Junction Box Numbering System

As per Section 2.4.9 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10.10 Smart Junction Box Numbering

COMP3-SPM-PE-PRC-00010_A

Page 18 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

As per Section 2.4.10 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

10.11 Loop Tagging System

Loop Tagging system is described as below.

  1. Loop Name shall use the first character of parent tag Functional Identification Symbol

(FIS), for example: 225P49100, with parent tag 225PT49100 225F49102, with parent tag 225FT49102

  1. Loop Name for ACTUATED VALVES, it will be divided into 2 categories: a) ACTUATED VALVES related with ESD function, it will use “V” for valve loop, for example:

230V49100, with parent tag 230BDV49100 230V49102, with parent tag 230SDV49102

b) ACTUATED/CONTROL VALVES related with DCS function, it will use first character of the

parent tag, for example: 230K50023, with parent tag 230KXV50023 230H50015, with parent tag 230HV50015 230F50013, with parent tag 230FCV50013

Hence, the Instrument Loop Naming convention shall be defined in SPI as per below.

260 Area/System (Length:3) P Loop Measured Var. (Max. Length:2) 49 Unit Number (Length:2) Free Segment (Length:1) 0 114 Component Number (Length:3) A

Component Suffix (Length:1) if required

Example Loop Name: 260P490114A

10.12 Actuated ON/OFF Valve Control Box

In line with the procedure PRJ-PJL-PRC-008, no separate tag names to be provided for the Valve Control Box and the Valve Tag number can be allocated for Control boxes also.

11 VALVES AND SPECIAL ITEMS NUMBERING SYSTEM

11.1 Special Items and Vacuum Breakers

As per Section 2.5.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

11.2 Numbering Structure – Non-Manual Valves

As per Section 2.5.2.1 – 2.5.2.7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL- PRC-008_17”

11.3 Numbering Structure –Manual Valves

COMP3-SPM-PE-PRC-00010_A

Page 19 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

As per Section 2.5.2.8 – 2.5.2.12 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ- PJL-PRC-008_17”

12 FIRE PROTECTION SYSTEM

12.1 Fire/Gas detectors

As per Section 2.6.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

12.2 For other Instrument and Alarms

As per Section 2.6.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

12.3 Fire Protection System Valve

As per Section 2.6.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

12.4 Fire Protection System Valve Headers

As per Section 2.6.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

12.5 Line Fault Alarm of Fire/Gas Detectors and other instruments

As per Section 2.6.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

12.6 Line Fault Alarm of Fire Protection System Valves

As per Section 2.6.6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

13 LINE NUMBERING SYSTEM

13.1 Numbering Structure for Line

As per Section 2.7.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

13.1.1 Line Service Code

Appendix 3 of PRJ-PJL-PRC-008_17 - Line Service Codes shall be applied

13.1.2 System Number

As per section 2.3.1.1 of PRJ-PJL-PRC-008_17

13.1.3 Unit Number

As per section 2.3.1.3 of PRJ-PJL-PRC-008_17

COMP3-SPM-PE-PRC-00010_A

Page 20 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

13.1.4 Line Number

As per Section 2.7.1.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”.

13.1.5 Line Size

Line Size shall be specified without any unit symbol like Inch (“).

13.1.6 Line Class

As per Section 2.7.1.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”.

13.1.7 Insulation Type

As per Section 2.7.1.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”.

13.1.8 Insulation Temperature

Normal Operating Temperature shall be mentioned.

14 HVAC NUMBERING SYSTEM

As per Section 2.8.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

15 ELECTRICAL NUMBERING SYSTEM

15.1 Main Electric Equipment

As per Section 2.9.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

15.2 Building Electrical Equipment

As per Section 2.9.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

15.3 Motor Numbering for Main Equipment

As per Section 2.9.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

15.4 Motor Numbering for Auxiliary Equipment

As per Section 2.9.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

15.5 Electrical Heater Numbering

COMP3-SPM-PE-PRC-00010_A

Page 21 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

As per Section 2.9.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

15.6 Local Control Unit Numbering

As per Section 2.9.6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

15.7 Light Fixture, Light Fixture Junction Box and Convenience Socket

As per Section 2.9.7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

16 TELECOMMUNICATIONS EQUIPMENT NUMBERING SYSTEM

As per Section 2.10 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

17 FIRE FIGHTING AND SAFETY EQUIPMENT NUMBERING

17.1 Fire Alarm Equipment

As per Section 2.11.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

17.2 Fire Fighting System Package

As per Section 2.11.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

17.3 Bypass Valve

As per Section 2.11.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18 CABLE NUMBERING SYSTEM

As per Section 2.12 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.1 Feeder Cable

As per Section 2.12.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.2 Power Cable for Motor

As per Section 2.12.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.3 Power Cable for Electric Heater

COMP3-SPM-PE-PRC-00010_A

Page 22 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

As per Section 2.12.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.4 Control Cable for Motor

As per Section 2.12.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.5 Power and Control Cable for Panel

As per Section 2.12.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.6 Welding Socket Power Cable

As per Section 2.12.6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.7 Fire Alarm Cable

As per Section 2.12.7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.8 Telephone Cable

As per Section 2.12.8 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.9 Public Address Cable

As per Section 2.12.9 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.10 LAN Fiber Cable

As per Section 2.12.10 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.11 CCTV Cable Numbering

As per Section 2.12.11 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.12 DATA Cable Numbering

As per Section 2.12.12 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.13 Antenna Cable Numbering

As per Section 2.12.13 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.14 Fiber Optic & Composite Cable

As per Section 2.12.14 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.15 Umbilical Cable

COMP3-SPM-PE-PRC-00010_A

Page 23 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

As per Section 2.12.15 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.16 Instrument Cable - Direct

As per Section 2.12.16 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.17 Instrument Cable – Multiple Junction Box (JB)

As per Section 2.12.17 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.18 Instrument Cable – Multiple Control Room

As per Section 2.12.18 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.19 Instrument Cable – Individual

As per Section 2.11.19 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

18.20 Instrument Grounding Wire

As per Section 2.11.12 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”

COMP3-SPM-PE-PRC-00010_A

Page 24 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

19 APPENDICES

Appendix 1 Equipment Classes

Appendix 2 Package Numbers

Appendix 3 Voltage Levels

Appendix 4 Telecommunications Location Codes

Appendix 5 List of Project Specification for Reference

Appendix 6 Portfolio Asset Names and Abbreviations

Appendix 7 BZ Brownfield Tag Request Form Templates_Offshore

Appendix 8 BZ Brownfield Tag Request Form Templates_Onshore

Appendix 9 QN Brownfield Tag Request Form Templates

Appendix 10 QN Brownfield Tag Request Form Templates_Cables and Telecoms

Appendix 11 QS Brownfield Tag Request Form Templates

Appendix 12 Green Field Tag Request Form Templates

Appendix 13 System Number for NFPS COMP3

Appendix 14 Unit Number for NFPS COMP3

19.1 Appendix 1

Equipment Classes

Refer Appendix 3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”

19.2 Appendix 2 Package Numbers

Refer Appendix 4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”

19.3 Appendix 3

Voltage Levels

Refer Appendix 5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”

19.4 Appendix 4

Telecommunications Location Codes

Refer Appendix 6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”

19.5 Appendix 5

List of Project Specification for Reference

Refer Appendix 7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”

19.6 Appendix 6

Portfolio Asset Names and Abbreviations

Refer Appendix 8 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”

COMP3-SPM-PE-PRC-00010_A

Page 25 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

19.7 Appendix 7 BZ Brownfield Tag Request Form Templates_Offshore

Refer to BZ_Facilities Asset Type

Column A Column G Column A

Refer to BZ_Taxonomy Column C

Refer to list

Mandatory if the requested tag number must have a suffix

Existing Tag Refernece Mandatory if auxiliary equipment, instrument tubing is requested

As defined within AIMS EPDMS

Refer to list link Mandatory if special requirment such as for safety equipment, civil/structural etc

Refer to list link Mandatory if Tag requested is for architectural/structural equipment reuquired info service location, architectural location etc

Refer to list link Mandatory if Tag requested is for a instrument with special instructionc such as loop code, area, installed location etc

Refer to list link Mandatory if Tag requested is Line, required info line class identification letter/number, pipe support, pipe equipment etc

Refer to list link Mandatory if Tag requested is Electrical Equipment, required info voltage, ciruit code, electrical cable etc.

Refer to list link Mandatory if Tag requested is Telecomm Equipment, required info system code etc

Refer to list link Mandatory if Tag requested is JunctionBox or , required info service location etc.

Refer to list link Mandatory if Tag requested is special item e.g. flange required info line service code, spool location, line service, isometric number etc.

Asset

Unit

Category

Code

Structure Identifier

Suffix

Main Tag Number

Project Number Contractor Tag Quantity User Comment

Building Info

Instrument Info

Line Information

Electrical Equipment Info

Telecomm Equipment Info

JunctionBox Item Info

Special Item Info

1

19.8 Appendix 8 BZ Brownfield Tag Request Form Templates_Onshore

Refer to BZ_Facilities Asset Type Column A Column C Column G Column A

Refer to BZ_Taxonomy

Column C Mandatory if the

requested tag number must have a suffix

Existing Tag Refernece Mandatory if auxiliary equipment is requested

As defined within AIMS EPDMS

Refer to list link Mandatory if special requirment such as for area for structure, workshop equipment , DCS Building Code, lifting equipment etc

Refer to list link Mandatory if Tag requested is for a building such as building tag number, HVAC code , ciruit code, auxiliary number analyser shelter etc

Refer to list link Mandatory if Tag requested is for a instrument with special instructionc such as control valve code, FE code, flange location, resisitance, loop code etc

Refer to list link Mandatory if Tag requested is Line, required info line size/ line class/ Insulation Type, branch no

Refer to list link Mandatory if Tag requested is Electrical Equipment, required info voltage, ciruit code, phase number, cathodic protection, cable aux code, heat traced equipment etc.

Refer to list link Mandatory if Tag requested is Telecomm Equipment, required info tag number, system code, location code, system identifier , telecom from/to building etc.

Refer to list link Mandatory if Tag requested is JunctionBox Item etc.

Asset

Area

Unit

Category

Code

Suffix

Main Tag Number

Project Number Contractor Tag Quantity User Comment

Building Info

Instrument Info

Line Information

Electrical Equipment Info

Telecomm Equipment Info

JunctionBox Item Info

1

19.9 Appendix 9 QN Brownfield Tag Request Form Templates

Refer to QN_Facilities Asset Type

Refer to QNTaxonomy

Column A Column C Column E Column G Column A

Column C Mandatory if the

requested tag number must have a suffix

LetterOrDigit One-to-Three in Length else “0” (zero) Mandatory if instrument As defined within

AIMS EPDMS

Existing Tag Refernece Mandatory if auxiliary equipment (including Motor Numbering/ Electrical Heater Numbering) is requested

Refer to list link Mandatory if special requirment such as restriction orifice tag will require line service code, instrument loop code etc

Refer to signal list link Mandatory if Tag requested is Junction Box. Signal Category & Control Room

Refer to list link Mandatory if Tag requested is other F&G instrument (other than GE code)

Refer to list link Mandatory if Tag requested is Line, required info line size/ line class/ Insulation Type/ Insulation Temperature (optional)

Refer to list link Mandatory if Tag requested is Electrical Equipment, required info Voltage level, Building Sequence (if applicable -optional)

Asset

Area

System Unit

Category

Code

Suffix

Main Tag Number

Package No/Area No Project Number Contractor Tag Quantity User Comment

JunctionBox Info

Detector Info

Line Information

Electrical Equipment Info

1

COMP3-SPM-PE-PRC-00010_A

Page 26 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

19.10 Appendix 10 QN Brownfield Tag Request Form Templates_Cables and

Telecoms

Refer to QN_Facilities Asset Type Column A Column C Column E Column A

Refer to QNTaxonomy

Refer to list link

Column C Mandatory if the

requested tag number must have a suffix

Existing Tag Refernece Mandatory if auxiliary equipment is requested

Refer to list link Mandatory if special requirment such as cables without sequence number, ITR control room number etc

Refer to list link Mandatory if Tag requested is Instrument Cable for JB

Refer to list link Mandatory if Tag requested is Telecommunication Equipment

Refer to list link Mandatory if Tag requested is feeder/motor power cable single core

Refer to list link Mandatory if splice is required for cany cables such as Antenna / Fire Alarm / Telephone / PA / FO / Composite Cable

Refer to list link Mandatory system identifier if cable is local panel or analyser house or control panel

Asset

Area

System Category

Code

Suffix / Spliced Main Tag Number

Project Number Contractor Tag Quantity User Comment

Instrument Cable

TeleComm Location

Feeder Cable

Composite Cable

Local Panel Cable

1

19.11 Appendix 11 QS Brownfield Tag Request Form Templates

Refer to QS_Facilities Asset Type Column A Column C Column G Column A

Refer to QS_Taxonomy

Column C Mandatory if the

requested tag number must have a suffix

Existing Tag Refernece Mandatory if tag requested is auxiliary equipment/HVAC

As defined within AIMS EPDMS

Mandatory for special cases such as instrument loop will require loop code etc

Refer to list link Mandatory if Tag requested is structure

Refer to list link Mandatory if Tag requested is Line, required info line size/ line class/ Insulation Type/ service code

Refer to list link Mandatory if Tag requested is Electrical Equipment, required info Voltage level, substations, power item

Asset

Area

Unit

Category

Code

Suffix

Main Tag Number

Project Number Contractor Tag Quantity User Comment

Structure Info

Line Information

Electrical Equipment Info

1

19.12 Appendix 12 Green Field Tag Request Form Template

Tag Number

Facility

System

Unit

Category Function code

Tag description

Main Tag Number

Project Number

Package ID

COMP3-SPM-PE-PRC-00010_A

Page 27 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

19.13 Appendix 13 System Number for NFPS COMP3

Extract from Appendix 3 – System numbers of “Facilities System and Unit Number Codes and Descriptions Doc Nr. PRJ-PJL-PRC-005_21”

QATARGAS SOUTH SYSTEM NUMBER 999

Qatargas South

SYSTEM DESCRIPTION

Note: System Number 999 shall only be applied for the assignment of new Document Numbers within the existing Qatargas South assets.

QG2 OFFSHORE SYSTEM NUMBER

SYSTEM DESCRIPTION

30 31 32 33

Common / General Offshore (QG2, QG3 and QG4) Wellhead Platform 4 Wellhead Platform 5 Wellhead Platform 6

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 200

201 202 210 211 212 213

214 215 217 218 220 221

222 223 224 225 226 227

228 229 230 231 232 233

SYSTEM DESCRIPTION

NFPS Common Offshore

NFPS Common Onshore NFPS Umbilical (Common Infrastructure) NFPS Riser Platform RT-2 NFPS Bridge BR2S-1 NFPS Riser Platform RP3S NFPS Bridge BR3S-1

NFPS Pipeline (Intrafield) PL3LS NFPS Pipeline (Export) PL1LS NFPS Bridge BR3S-2 NFPS Bridge Support Platform BSP3S-1 NFPS Wellhead Platform WHP12S NFPS Pipeline (Intrafield) PL12S

NFPS Subsea Cable SC12S NFPS Riser Platform RP4S NFPS Bridge BR4S-1 NFPS Wellhead Platform WHP13S NFPS Pipeline (Intrafield) PL13S NFPS Subsea Cable SC13S

NFPS Riser Platform RP7S NFPS Bridge BR7S-1 NFPS Wellhead Platform WHP14S NFPS Pipeline (Intrafield) PL14S NFPS Subsea Cable SC14S NFPS Riser Platform RP6S

COMP3-SPM-PE-PRC-00010_A

Page 28 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 234 235 236 237 238

SYSTEM DESCRIPTION

NFPS Bridge BR6S-1 NFPS Riser Platform RP9S NFPS Bridge BR9S-1 NFPS Pipeline (Intrafield) PL9S NFPS Pipeline (Intrafield) PL9LS

239 240 241 242 243 244

245 246 247 248 249 250

251 252 253 254 255 256

257 258 259 260 261 262

263 264 265 266 267 268

269 270 271 272 273 274

NFPS Bridge Support Platform BSP5S-1 (Ref.[14], Note-1) NFPS Riser Platform RP5S NFPS Bridge BR5S-1 NFPS Pipeline (Intrafield) PL5S NFPS Pipeline (Intrafield) PL5LS NFPS Bridge BR5S-2 (Ref.[14], Note-1)

NFPS Riser Platform RP10S NFPS Bridge BR10S-1 NFPS Pipeline (Intrafield) PL10S NFPS Pipeline (Intrafield) PL10LS NFPS Pipeline (Export) P610L NFPS Wellhead Platform WHP10N

NFPS Pipeline (Intrafield) PL10N NFPS Subsea Cable SC10N NFPS Wellhead Platform WHP11N NFPS Pipeline (Intrafield) PL11N NFPS Subsea Cable SC11N NFPS Riser Platform RP1N

NFPS Bridge BR1N-1 NFPS Bridge BR1N-2 NFPS Pipeline (Export) PL1N NFPS Wellhead Platform WHP12N NFPS Pipeline (Intrafield) PL12N NFPS Subsea Cable SC12N

NFPS Riser Platform RP4N NFPS Bridge BR4N-1 NFPS Wellhead Platform WHP13N NFPS Pipeline (Intrafield) PL13N NFPS Subsea Cable SC13N NFPS Riser Platform RP6N

NFPS Bridge BR6N-1 NFPS Riser Platform RP8S NFPS Bridge BR8S-1 NFPS Riser Platform RP11S NFPS Bridge BR11S-1 NFPS Pipeline (Intrafield) PL11S

COMP3-SPM-PE-PRC-00010_A

Page 29 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 275 276 278 279 280

281 282 286 510 511 512

513 514 515 516 517 518

519 521 522 523 524 525

540 541 542 543 544 545

546 547 548 560 561 562

563 564 565 566 567 568

SYSTEM DESCRIPTION

NFPS Pipeline (Intrafield) PL11LS NFPS Riser Platform RP3N NFPS Riser Platform RP5N NFPS Bridge BR5N-1 NFPS Pipeline (Intrafield) PL54N (Note-1)

NFPS Pipeline (Intrafield) PL56N (Note-1) NFPS Pipeline (Intrafield) PL54LN (Note-1) NFPS Pipeline (Intrafield) PL13LS NFPS Compression Platform CP1S NFPS Bridge BR1S-2 NFPS Living Quarters Platform LQ1S

NFPS Bridge BR1S-3 NFPS Flare Platform FL1S NFPS Bridge BR1S-4 NFPS Bridge BR1S-5 NFPS Bridge BR1S-6 NFPS Bridge BR1S-7

NFPS Bridge BR1S-8 NFPS Bridge Support Platform BSP1S-1 NFPS Bridge Support Platform BSP1S-2 NFPS Bridge Support Platform BSP1S-3 NFPS Bridge Support Platform BSP1S-4 NFPS Bridge Support Platform BSP1S-5

NFPS Compression Platform CP4S NFPS Bridge BR4S-2 NFPS Living Quarters Platform LQ4S NFPS Bridge BR4S-3 NFPS Flare Platform FL4S NFPS Bridge BR4S-4

NFPS Bridge BR4S-5 NFPS Bridge Support Platform BSP4S-1 NFPS Bridge Support Platform BSP4S-2 NFPS Compression Platform CP6S NFPS Bridge BR6S-2 NFPS Living Quarters Platform LQ6S

NFPS Bridge BR6S-3 NFPS Flare Platform FL6S NFPS Bridge BR6S-4 NFPS Bridge BR6S-5 NFPS Bridge Support Platform BSP6S-1 NFPS Bridge Support Platform BSP6S-2

COMP3-SPM-PE-PRC-00010_A

Page 30 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 569 570 571 572 573

574 575 576 577 578 580

581 582 583 584 585 586

587 606 610 613 614 615

616 617 621 622 623 640

641 642 643 644 645 646

647 651 652 653 660 661

SYSTEM DESCRIPTION

NFPS Bridge Support Platform BSP6S-3 NFPS Compression Platform CP7S NFPS Bridge BR7S-2 NFPS Living Quarters Platform LQ7S NFPS Bridge BR7S-3

NFPS Flare Platform FL7S NFPS Bridge BR7S-4 NFPS Bridge BR7S-5 NFPS Bridge Support Platform BSP7S-1 NFPS Bridge Support Platform BSP7S-2 NFPS Compression Platform CP8S

NFPS Bridge BR8S-2 NFPS Living Quarters Platform LQ8S NFPS Bridge BR8S-3 NFPS Flare Platform FL8S NFPS Bridge BR8S-4 NFPS Bridge BR8S-5

NFPS Bridge Support Platform BSP8S-1 NFPS Bridge BR6S-6 NFPS Compression Platform CP1N NFPS Bridge BR1N-3 NFPS Flare Platform FL1N NFPS Bridge BR1N-4

NFPS Bridge BR1N-5 NFPS Bridge BR1N-6 NFPS Bridge Support Platform BSP1N-1 NFPS Bridge Support Platform BSP1N-2 NFPS Bridge Support Platform BSP1N-3 NFPS Compression Platform CP4N

NFPS Bridge BR4N-2 NFPS Living Quarters Platform LQ4N NFPS Bridge BR4N-3 NFPS Flare Platform FL4N NFPS Bridge BR4N-4 NFPS Bridge BR4N-5

NFPS Bridge BR4N-6 NFPS Bridge Support Platform BSP4N-1 NFPS Bridge Support Platform BSP4N-2 NFPS Bridge Support Platform BSP4N-3 NFPS Compression Platform CP6N NFPS Bridge BR6N-2

COMP3-SPM-PE-PRC-00010_A

Page 31 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 662 663 664 665 666

SYSTEM DESCRIPTION

NFPS Living Quarters Platform LQ6N NFPS Bridge BR6N-3 NFPS Flare Platform FL6N NFPS Bridge BR6N-4 NFPS Bridge BR6N-5

667 671 672 673 701 702

711 712 713 714 715 720

NFPS Bridge BR6N-6 NFPS Bridge Support Platform BSP6N-1 NFPS Bridge Support Platform BSP6N-2 NFPS Bridge Support Platform BSP6N-3 NFPS Fuel Gas Network Onshore (Common Infrastructure) NFPS Fuel Gas Network Offshore (Common Infrastructure)

NFPS Fuel Gas Metering Station 1 (Offplot) NFPS Fuel Gas Metering Station 1 (Onplot) NFPS Fuel Gas Metering Station 2 (Offplot) NFPS Fuel Gas Metering Station 2 (Onplot) NFPS QG South Onshore Collaborative Building NFPS Onshore Logistics Base (Common Infrastructure)

Note-1: System number updated per COMPANY RNDN Metadata

19.14 Appendix 14 Unit Number for NFPS COMP3

Extract from Appendix 4 – Unit numbers of “Facilities System and Unit Number Codes and Descriptions Doc Nr. PRJ-PJL-PRC-005_21”

QG2 / QG3&4 / NFPS / NFE / NFS OFFSHORE UNIT NUMBER 20 21 22

23 24 25 26 30 42

48 49 50 51 52 53

79

UNIT DESCRIPTION

Common / General Upstream (Offshore) Fixed Platform Structure (Jacket / Piles) Topside Structure

Offshore Production System and Equipment Flow line / Risers Pipeline / Risers Subsea Cable Common / General Upstream (Onshore) HVAC

High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection

Chemicals and Catalyst Storage

COMP3-SPM-PE-PRC-00010_A

Page 32 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

QG2 / QG3&4 / NFPS / NFE / NFS OFFSHORE UNIT NUMBER 82 83 84 87 91

92 93 94 95 96 97

QATARGAS SOUTH OFFSHORE UNIT NUMBER BA

BB

BC

BD

BE

BF

BG

BJ

BJ1

BJ2

BJ3

BT1

BT2

BT3

UNIT DESCRIPTION

Sea Water Systems Fire Protection Systems Flare and Liquid Burners Effluent Treatment / Site Drainage Power Generation / Distribution

Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems Nitrogen Systems MEG Systems

UNIT DESCRIPTION

Bridge “A” from QT to PT

Bridge “B” from RT to WT1

Bridge “C” from PT to RT

Bridge “D” from RT to BT

Bridge “E” from BT to FT

Bridge “F” from PT to RT

Bridge “G” from PT to RT

Bridge “J” from RT to FT

Wellhead Platform 1 - Jacket

Wellhead Platform 2 - Jacket

Wellhead Platform 3 - Jacket

Wellhead Platform 1 - Topside

Wellhead Platform 2 - Topside

Wellhead Platform 3 - Topside

BZOF

Barzan Offshore General

FJ1

FJ2

FJ3

FT1

FT2

FT3

IC

IP

MP

OFGN

PJ

PT

FJ1 - Flare Tower 1 - Jacket

Flare Tower 2 - Jacket

Flare Tower 3 - Jacket

Flare Tower 1 - Topside

Flare Tower 2 - Topside

Flare Tower 3 - Topside

Intrafield Subsea Cable

Intrafield Pipeline

MEG Pipeline

Qatargas South Offshore General

Process Utility Platform - Jacket

Process Utility Platform - Topside

COMP3-SPM-PE-PRC-00010_A

Page 33 of 34

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

TAG NUMBERING PROCEDURE

QATARGAS SOUTH OFFSHORE UNIT NUMBER QJ

QT

RGA

RJ

RT

SC

WJ1

WJ10

WJ11

WJ2

WJ3

WJ4

WJ5

WJ6

WJ7

WJ8

WJ9

WT1

WT10

WT11

WT2

WT3

WT4

WT5

WT6

WT7

WT8

WT9

XP

UNIT DESCRIPTION

Quarters Platform - Jacket

Quarters Platform - Topside

RasGas Alpha

Riser Platform - Jacket

Riser Platform - Topside

Subsea Cable to Shore

Wellhead Platform 1 - Jacket

Wellhead Platform 10 - Jacket

Wellhead Platform 11 - Jacket

Wellhead Platform 2 - Jacket

Wellhead Platform 3 - Jacket

Wellhead Platform 4 - Jacket

Wellhead Platform 5 - Jacket

Wellhead Platform 6 - Jacket

Wellhead Platform 7 - Jacket

Wellhead Platform 8 - Jacket

Wellhead Platform 9 - Jacket

Wellhead Platform 1 - Topside

Wellhead Platform 10 - Topside

Wellhead Platform 11 - Topside

Wellhead Platform 2 - Topside

Wellhead Platform 3 - Topside

Wellhead Platform 4 - Topside

Wellhead Platform 5 - Topside

Wellhead Platform 6 - Topside

Wellhead Platform 7 - Topside

Wellhead Platform 8 - Topside

Wellhead Platform 9 - Topside

Export Pipeline

COMP3-SPM-PE-PRC-00010_A

Page 34 of 34

Project: Q-32705 - Saipem COMP3 Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further