Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
COMPANY Contract No.: LTC/C/NFP/5129/20 CONTRACTOR Project No.: 033764
ASSET
: NFPS
Document Title
: TAG NUMBERING PROCEDURE
COMPANY Document No.
: COMP3-SPM-PE-PRC-00010
CONTRACTOR Document No.
:
033764-B-D-18-SPM-EM-P-10010
Discipline
:
ADMINISTRATIVE, ENGINEERING MANAGEMENT
Document Type
: PROCEDURE
Document Category/Class
:
1
Document Classification
:
Internal
A
05-FEB-2025
Issued for Review
Anirudh Nadiger
Jobi George
Reetesh Jha
Tech. Manager Tech. Manager Eng. Manager
REV.
DATE
DESCRIPTION OF REVISION
PREPARED BY
REVIEWED BY
APPROVED BY
Saipem S.p.A
THIS DOCUMENT IS PROPERTY OF QatarEnergy LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QatarEnergy LNG.
COMP3-SPM-PE-PRC-00010_A
Page 1 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
REVISION HISTORY
Revision
Date
Revision Description
A1
A
23-JAN-2025
Issued for Inter Discipline Check
05-FEB-2025
Issued for Review
HOLDS LIST
Hold No
Hold Description
Nil
COMP3-SPM-PE-PRC-00010_A
Page 2 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
TABLE OF CONTENTS
1
INTRODUCTION … 6 Project Objective … 6 1.1 Project Scope … 6 1.2
2 DEFINITIONS AND ABBREVIATIONS … 9 Definitions … 9 Abbreviations … 10
2.1 2.2
3 REGULATIONS, CODES AND STANDARDS … 12 Company References … 12 Project Documents … 12 Standards… 13
3.1 3.2 3.3
4 SCOPE AND PURPOSE … 13
5 ROLES AND RESPONSIBILITIES … 13 CONTRACTOR’s responsibilities … 13 COMPANY’s responsibilities … 13 Validated TAG list by COMPANY … 13 TAG Number Request Process Flow … 13
5.1 5.2 5.3 5.4
6 DEFINITION OF TAG NUMBER … 15
7 TAG NUMBERING FOR EXISTING FACILITY (BROWNFIELD) … 15
8 TAG NUMBERING FOR NEW FACILITY … 17
9 MECHANICAL TAG NUMBERING SYSTEM … 17 9.1 Main Equipment Tag Numbering … 17 Auxiliary Equipment Numbering System … 17 9.2
10 INSTRUMENT NUMBERING SYSTEM … 18 10.1 Looped DCS Instrument Numbering System … 18 10.2 Looped non DCS Instrument Numbering System … 18 10.3 Non-Looped Instrument Numbering System … 18 10.4 PLC Functional Logic Numbering System … 18 10.5 DCS Functional Logic Numbering System … 18 10.6 Hardwired Relay Functional Logic Numbering System … 18 10.7 Hardwired Solid State Shutdown Logic Numbering System … 18 10.8 Restriction Orifice Numbering System … 18 10.9 Field Junction Box Numbering System … 18 10.10 Smart Junction Box Numbering … 18 10.11 Loop Tagging System … 19 10.12 Actuated ON/OFF Valve Control Box … 19
11 VALVES AND SPECIAL ITEMS NUMBERING SYSTEM … 19 11.1 Special Items and Vacuum Breakers … 19 11.2 Numbering Structure – Non-Manual Valves … 19
COMP3-SPM-PE-PRC-00010_A
Page 3 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
11.3 Numbering Structure –Manual Valves … 19
12 FIRE PROTECTION SYSTEM … 20 12.1 Fire/Gas detectors … 20 12.2 For other Instrument and Alarms … 20 12.3 Fire Protection System Valve … 20 12.4 Fire Protection System Valve Headers … 20 12.5 Line Fault Alarm of Fire/Gas Detectors and other instruments … 20 12.6 Line Fault Alarm of Fire Protection System Valves … 20
13 LINE NUMBERING SYSTEM … 20 13.1 Numbering Structure for Line … 20
14 HVAC NUMBERING SYSTEM … 21
15 ELECTRICAL NUMBERING SYSTEM … 21 15.1 Main Electric Equipment … 21 15.2 Building Electrical Equipment … 21 15.3 Motor Numbering for Main Equipment … 21 15.4 Motor Numbering for Auxiliary Equipment … 21 15.5 Electrical Heater Numbering … 21 15.6 Local Control Unit Numbering … 22 15.7 Light Fixture, Light Fixture Junction Box and Convenience Socket … 22
16 TELECOMMUNICATIONS EQUIPMENT NUMBERING SYSTEM … 22
17 FIRE FIGHTING AND SAFETY EQUIPMENT NUMBERING … 22 17.1 Fire Alarm Equipment… 22 17.2 Fire Fighting System Package … 22 17.3 Bypass Valve … 22
18 CABLE NUMBERING SYSTEM … 22 18.1 Feeder Cable … 22 18.2 Power Cable for Motor … 22 18.3 Power Cable for Electric Heater … 22 18.4 Control Cable for Motor … 23 18.5 Power and Control Cable for Panel … 23 18.6 Welding Socket Power Cable … 23 18.7 Fire Alarm Cable … 23 18.8 Telephone Cable … 23 18.9 Public Address Cable … 23 18.10 LAN Fiber Cable… 23 18.11 CCTV Cable Numbering … 23 18.12 DATA Cable Numbering … 23 18.13 Antenna Cable Numbering … 23 18.14 Fiber Optic & Composite Cable … 23 18.15 Umbilical Cable … 23 18.16 Instrument Cable - Direct … 24
COMP3-SPM-PE-PRC-00010_A
Page 4 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
18.17 Instrument Cable – Multiple Junction Box (JB) … 24 18.18 Instrument Cable – Multiple Control Room … 24 18.19 Instrument Cable – Individual … 24 18.20 Instrument Grounding Wire … 24
19 APPENDICES … 25 19.1 Appendix 1 Equipment Classes … 25 19.2 Appendix 2 Package Numbers … 25 19.3 Appendix 3 Voltage Levels … 25 19.4 Appendix 4 Telecommunications Location Codes … 25 19.5 Appendix 5 List of Project Specification for Reference … 25 19.6 Appendix 6 Portfolio Asset Names and Abbreviations … 25 19.7 Appendix 7 BZ Brownfield Tag Request Form Templates_Offshore … 26 19.8 Appendix 8 BZ Brownfield Tag Request Form Templates_Onshore … 26 19.9 Appendix 9 QN Brownfield Tag Request Form Templates … 26 19.10 Appendix 10 QN Brownfield Tag Request Form Templates_Cables and Telecoms … 27 19.11 Appendix 11 QS Brownfield Tag Request Form Templates … 27 19.12 Appendix 12 Green Field Tag Request Form Template… 27 19.13 Appendix 13 System Number for NFPS COMP3 … 28 19.14 Appendix 14 Unit Number for NFPS COMP3 … 32
COMP3-SPM-PE-PRC-00010_A
Page 5 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
1
INTRODUCTION
The North Field is the world’s largest natural gas field and accounts for nearly all the State of Qatar’s gas production. The principal objective of the NFPS projects is to sustain plateau from existing QatarEnergy LNG Operation – S1, S2, S3, N1 and N2, production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression.
NFPS projects comprise 3 main investment programs:
- Investment #1: Drilling and Associated Facilities [WHP12S/ WHP13S/ WHP14S/
WHP12N/ WHP13N]
- Investment #2: Trunk line Looping and Intra-field pipeline looping [32” PL1LN, 32”
PL1LS, 38”PL610LS]
- Investment #3: Compression Complexes and associated facilities [Phase 1 CP6S & CP7S; Phase 2: CP8S & CP4N; Phase 3: CP4S & CP6N Phase 4: CP1S & CP1N]
Drilling and Looping, Investments #1 and #2, projects are in execution phase and are being executed as I1P1, EPCOL Projects except for WHP13N, which will be part of NFPS Compression Projects execution which compromises total up to 9 COMPs.
1.1 Project Objective
The objective of this Project includes:
• Achieve standards of global excellence in Safety, Health, Environment, Security and
Quality performance.
• Sustain the Qatarenergy LNG North Field Production Plateau by installing new RPs and one WHPs to support new Compression Complex facilities CP6S & CP7S and pre-installed facilities for future Compression Complex facilities including but not limited to CP4N & CP8S tie-in with integration to the existing facilities under Investment #3 program.
• Facility development shall be safe, high quality, reliable, maintainable, accessible,
operable, and efficient throughout their required life.
1.2 Project Scope
The Project Scope includes detailed engineering, procurement, construction, brownfield modifications, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start-up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit purpose in all respects.
for
‐
‐
Facilities - 1A
• RP5S RP with 2 x 28” CRA clad pipelines to RP7S and 2 subsea composite Cables
and associated J tubes from RP7S to RP5S & from CP7S to WHP13S.
• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP7S
COMP3-SPM-PE-PRC-00010_A
Page 6 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
• Hook-up and brownfield modification at WHP5S/RP5S bridge connection & WHP13S/CP7S Composite cable tie-in and E&I integration including RGA Control modification
• Pipeline decommissioning of 28” CS PL5 including associated demolition work at
WHP5S
Facilities - 2A
• RP6N RP with 1x28” CRA clad pipeline to WHP13N, 2 Subsea composite cables and
associated J tubes from WHP12N to RP4N and RP6N to WHP13N. • New fuel gas spur-line and flanged riser from subsea skid to RP6N • WHP13N Topside • Hook-up and brownfield modification at WHP6N/RP6N, RP4N- HPU-Umbilical and tie- in, WHP12N-new J tube installation, E&I migration, WHP6N/RP4N/WHP4N-E&I migration (Pre-CP4N), WHP13N and RP6N interconnection to NFB.
Facilities - 3A
• RP9S RP with 1x28” CRA clad pipeline to RP4S, • Hook-up and brownfield modification at RP4S/WHP9S, Modifications to integrate
RP9S to the RGA control network.
• Pipeline decommissioning of 28” PL9 to WYE on existing 38” trunkline PL49including
associated demolition work at WHP9S.
Facilities - 1B
• New fuel gas spur-line and flanged riser from subsea skid to RP4N • Fiber Optic Cable from RP6N to onshore LFP East, RP6N to RP4N and RP6N to LQ6S. • Hook-up and brownfield modification at RP6N Composite and FO Tie-ins NFB-PU (East)- FO Tie-in
(East)/BVS
Power & Control modifications, LQ6S/LFP Controls/Telecoms Integration
Facilities - 2B
• RP5N RP with 2 x 28” CRA clad pipelines to RP4N, 1 x 28” CRA clad pipeline to RP6N and 2 subsea composite Cables and associated J tubes from WHP12N to RP5N & from RP6N to RP5N.
• Hook-up and brownfield modification at WHP5N- RP5N Bridge connection, WHP12N Composite cable tie-in, RP4N Intrafield pipeline Hook up PL54 N/LN and E&I integration including NFB-PU Power & Control modifications
• Pipeline decommissioning of 2 x 16” PL56/PL54 Subsea Spur line from WHP5N to
reducing barred tee in subsea tie-in skid on PL6 / PL4.
Facilities - 3B
• 2 subsea composite Cables from RP4S to RP9S & from RP4S to WHP12S (with J-
tube)
• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP4S • Hook-up and brownfield modification at WHP12S/ RP9S/ RP4S Composite cable tie-
in, Spurline riser installation at RP4S RGA Power & Control modifications.
Facilities - 4B
• 1 subsea composite Cable from CP8S to RP11S (or from RP8S to RP11S as Option). • New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RP8S.
COMP3-SPM-PE-PRC-00010_A
Page 7 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
• Hook-up and brownfield modification at WHP8S/ WHP11S for Test separator Internal Upgrade and MEG system modification, Spur lines, Power & Control Tie-ins on RP8S, RP11S/WHP11S-Tie-in (Power and Control), RGA Power & Control modifications.
Facilities - 5B
• 2 subsea composite Cables from RT2 to WHP3S & from RT2 to WHP2S (with J-tube)
and FO Cable from RT2 to Barzan WHP1.
• New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RT2 • Hook-up and brownfield modification at BRZ-WHP1 - FO cable tie-in, WHP2S/ WHP3S/ RT&RT2 Composite cable tie-in and associated modification, RGA Power & Control modifications.
Facilities - 6B
• RP3S RP with 1x24” CRA clad pipeline to RT2 with Stalk on risers, • Hook-up and brownfield modification at RT2 for 24” Intrafield pipeline and Composite/FO cable Hook-up, WHP3S for Production diversion and Utilities, Power and ICSS Hook-up, WHP2S for Composite Cable Tie-ins and Power & Control Integration RGA Power & Control modifications. topside existing and
In-situ abandonment of existing Topside/subsea Composite Cables RT-WHP2S, RT-WHP3S, Topside/Subsea FO cable RT-BRXWHP1.
• Decommissioning at
Figure 1.2.1: NFPS Compression Project COMP3 Scope
COMP3-SPM-PE-PRC-00010_A
Page 8 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
2 DEFINITIONS AND ABBREVIATIONS
2.1 Definitions
Definition
Description
COMPANY
QatarEnergy LNG.
CONTRACTOR
Saipem S.p.A.
DELIVERABLES
FACILITIES
MILESTONE
PROJECT
SITE
All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, tested and manufactured, constructed, supplied, permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.
fabricated,
A reference event splitting a PROJECT activity for progress measurement purpose.
COMP3 - NFPS Offshore Riser/Wellhead Platform & Intrafield Pipelines Project
(i) any area where Engineering, Procurement, Fabrication of the FACILITIES are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar
SUBCONTRACT
Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.
SUBCONTRACTOR
Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.
WORK
Refer to article 2 of CONTRACT AGREEMENT.
WORK PACKAGE
The lowest manageable and convenient level in each WBS subdivision.
COMP3-SPM-PE-PRC-00010_A
Page 9 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
2.2 Abbreviations
Code
Definition
AFC
AIV
BSP
C&E
CA
DCL
DDE
DDM
DM
DPR
DSI
E&I
Approved for Construction
Acoustic Induced Vibration
Bridge Support Platform
Cause & Effect
Contract Award
Document Control Lead
Detailed Design Engineering
Document Distribution Matrix
Department Manager
Daily Progress Report
Digitalization System Integrator
Electrical and Instrumentation
EDMS
Electronic Document Management System
EG
EM
Ethylene Glycol
Engineering Manager
EPCI (or part of)
Engineering/Procurement/Construction/Installation
FAT
FG
GA
GDP
IDC
IFA
IFH
Factory Acceptance Test
Fuel Gas
General Arrangement
General Distribution Process
Inter-Discipline Check
Issued for Approval
Issued for HAZOP
COMP3-SPM-PE-PRC-00010_A
Page 10 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
Issued for Review
Integrated Main Instrument & Control Contractor
Invitation to Tender
Independent Verification Body
Long Lead Item
Main Contractor – Saipem SPA
Master Document Register
Mono Ethylene Glycol
Material Requisition
Project Control Manager
Planning Engineer
Project Manager
Project Management Team
Purchase Order
Project Quality Manager
Project Specialist Leader (Engineering Discipline Leader)
Preparation / Verification / Approval Workflow In EDMS
Record of Conversation
SubContractor
Transportation & Installation
Technical Bid Evaluation
Technical Integrity Verification
Technical Manager (equivalent to Engineering Manager)
Telecom System Integrator
Vendor Data Incorporation
IFR
IMICC
ITT
IVB
LLI
MC
MDR
MEG
MR
PCM
PLE
PM
PMT
PO
PQM
PSL
PVA
ROC
SC
T&I
TBE
TIV
TM
TSI
VDI
COMP3-SPM-PE-PRC-00010_A
Page 11 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
VDR
WBS
Vendor Data Review
Work Breakdown Structure
3 REGULATIONS, CODES AND STANDARDS
3.1 Company References
S. No
Document Number
Title
LTC/C/NFP/5129/20
Contract Agreement
EXHIBIT 5
Project Instructions
PRJ-PJL-PRC-004
PRJ-PJL-PRC-005
Facilities Engineering and Vendor Document Numbering Procedure
Facilities, System and Unit Number Codes and Descriptions Procedure
PRJ-PJL-PRC-006
Project Information Handover Procedure
PRJ-PJL-PRC-048
PRJ-PJL-PRC-049
Facilities Documentation Metadata Requirements Procedure
Project Acceptance Procedure
Information Handover, Verification and
PRJ-PJL-PRC-008_17
Qatargas Procedure
Equipment Numbering
Philosophy
PRJ-PJL-PRC-080_02
AIMS: Tag Management System (TMS) Procedure
3.2 Project Documents
S. No
Document Number
Title
COMP3-SPM-PE-PRC-00003 Document Numbering Procedure
COMP3-SPM-PE-PLN-00001 Engineering Management Plan
COMP3-SPM-PM-PLN-00004 Digital Project Delivery Plan
COMP3-SPM-PE-PRC-00005 Technical Query procedure
COMP3-SPM-PE-TQY-00003
Technical Query for System Numbers of BSP5S-1 and BR5S-2 (Note 1).
Note 1: System number updated per COMPANY RNDN Metadata.
COMP3-SPM-PE-PRC-00010_A
Page 12 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
3.3 Standards
S. No
Document Number
Title
N/A
4 SCOPE AND PURPOSE
The purpose of this document is to detail the Structure of Tag numbering for NFPS COMP3 Project. Tag number request/validation will be as per Qatargas Procedure PRJ-PJL-PRC-080_02 AIMS: Tag Management System (TMS).
This procedure is developed from Qatargas procedure PRJ-PJL-PRC-008_17. This procedure shall be implemented in conjunction with Qatargas procedure PRJ-PJL-PRC-008_17 – Qatargas Equipment Numbering Philosophy, PRJ-PJL-PRC-005_17 – Facilities System and Unit Number Codes and Descriptions, and with procedure PRJ-PTI-PRC-003 Equipment Numbering Workflow for Brownfield Modifications
5 ROLES AND RESPONSIBILITIES
5.1 CONTRACTOR’s responsibilities
CONTRACTOR is responsible for below:
• To fill the required data for Tag numbering in line with Appendix 6-11 • Request Tag Number in Qatargas Tag Management System as per PRJ-PJL-PRC-080_02
5.2 COMPANY’s responsibilities
COMPANY is responsible for below.
• Review requested Tag number input file and provide / Validate Tag Number as per PRJ-PJL-
PRC-080_02
• Provide Project Specific Tag Structure for existing facilities as per section 1.2 of PRJ-PJL-
PRC-008_17
5.3 Validated TAG list by COMPANY
These tags will be directly used in the project and does not require to follow Tag Number request process flow as mentioned in section 5.4.
5.4 TAG Number Request Process Flow
Below process flow will describe the overall process in general when requesting TAG numbers to effectively follow the tagging philosophy as per requirements:
5.4.1 Process Flow for Greenfield
The process flow as per below:
COMP3-SPM-PE-PRC-00010_A
Page 13 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
5.4.2 Process Flow for Brownfield
The process flow as per below:
COMP3-SPM-PE-PRC-00010_A
Page 14 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
5.4.3 Process Flow for Vendor
The process flow as per below:
6 DEFINITION OF TAG NUMBER
Tag number is a unique identification reference of an entity (equipment, instrument, or function) within the Qatargas operated facilities. Unique tag number is required in following (but not limited to) purposes,
• Required for unique reference in Piping and Instrumentation Diagrams (P&ID). • Required as unique Identification of Equipment’s (Mechanical, Electrical, Instruments, Fire & Gas, and Telecommunication) and monitoring & control functions.
7 TAG NUMBERING FOR EXISTING FACILITY (BROWNFIELD)
In general, the addition of tag numbers in existing facilities (both Onshore and Offshore) shall follow section 3 of the AIMS: Tag Management Procedure (TMS) Doc. Nr PRJ-PJL- PRC-080. Below Procedures to be followed for existing facilities:
S Nr. 1 2 3 4 5 6
7
8
Facility
Asset OFFSHORE WHP6S (WT6) OFFSHORE WHP10S (WT10) OFFSHORE WHP7S (WT7) OFFSHORE LQS (QT) OFFSHORE WHP5S (WT5) OFFSHORE RP6S
OFFSHORE RP10S
OFFSHORE RP7S
Procedure PRJ-PJL-PRC-080 PRJ-PJL-PRC-080 PRJ-PJL-PRC-080 PRJ-PJL-PRC-080 PRJ-PJL-PRC-080 a) PRJ-PJL-PRC-080 b) COMP2-SPM-PE-PRC-00008 a) PRJ-PJL-PRC-080 b) COMP2-SPM-PE-PRC-00008 a) PRJ-PJL-PRC-080 b) COMP2-SPM-PE-PRC-00008
COMP3-SPM-PE-PRC-00010_A
Page 15 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
S Nr. 1 2
Asset QG2 OFFSHORE WHP4S (WT4)
Facility WHP4N
3
4
5 6 7 8 9 10 11 12
13
14
15 16 17 18 19 20 21 22 23 24
25
OFFSHORE WHP6S (WT6)
OFFSHORE WHP10S (WT10)
OFFSHORE WHP7S (WT7) I1P1 QG1 QG1 QG1 QG1 QG1 QG1
RP1N PUN LQN PRN WHP1N WHP2N WHP3N
OFFSHORE WHP8S (WT8)
OFFSHORE WHP11S (WT11)
WHP6N
OFFSHORE PUS (PT) OFFSHORE LQS (QT) OFFSHORE RTS QG2 OFFSHORE WHP1S (WT1) OFFSHORE WHP2S (WT2) OFFSHORE WHP3S (WT3) OFFSHORE WHP5S (WT5) OFFSHORE WHP9S (WT9) QG2
WHP5N
RA1
QGS SC1
26
RA6
QGS BUILDINGS (SIH 85, SS02 & SS03)
27
RA3
QGS SC3S
28
RA3
QGS SC3S
29
RA4
QGS SC1
30
RA3
QGS SC3S
Procedure (Note-1,2,3, 4) 210-30-20-PE-PC-NA-024 GXP2-O-PE-0082
GXP2-O-PE-0082 GXP2-O-PE-0091
GXP2-O-PE-0091 GXP2-O-PE-0082
GXP2-O-PE-0082 200-51-IN-PRC-001
PRJ-PJL-PRC-008
003-00-51-IN-DP-00-002 01-00-51-IN-TS-00-205
GXP2-O-PE-0091 GXP2-O-PE-0082
GXP2-O-PE-0091 GXP2-O-PE-0082
GXP2-O-PE-0082 GXP2-O-PE-0082 GXP2-O-PE-0082 210-30-20-PE-PC-NA-024 GXP2-O-PE-0082 GXP2-O-PE-0082 GXP2-O-PE-0082 GXP2-O-PE-0082 GXP2-O-PE-0082 210-30-20-PE-PC-NA-024 S-00-1141-002 D-00-1378-001 RG6-S-00-1130-005 RG6-D-00-1378-001 RG6-S-00-1130-005 RG6-D-00-1378-001 RG6-S-00-1130-005 RG6-D-00-1378-001 D-00-1378-001 D-00-1378-001 RG6-S-00-1130-005 RG6-D-00-1378-001
COMP3-SPM-PE-PRC-00010_A
Page 16 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
S Nr.
Asset
Facility
31
QG1
QGN SC1, UPCB, SS01
32
QG1
QGN SC1, UPCB, SS01
33
QG1
34
RA5
QGN MCR, HQ DATA CENTER, NEW PLANT GATE HOUSE QGS SS 506, QGS MAIN GATE HOUSE (XK-07)
35
QGN
QGN-BVS/LER
36
GEN
QGS-BVS/LER
Notes:
Procedure (Note-1,2,3, 4) 003-00-51-IN-DP-00-002 010-00-51-IN-TS-00-205 003-00-51-IN-DP-00-002 010-00-51-IN-TS-00-205
199-00-00-PE-PC-NA-000203
RG6-S-00-1130-005 RG6-D-00-1378-001 PRJ-PJL-PRC-008
003-00-51-IN-DP-00-002
010-00-51-IN-TS-00-205
RG6-S-00-1130-005 RG6-D-00-1378-001
-
General: Cases where, the Platform/Project Specific Existing Tagging Procedure is not covering tagging philosophy for items, Tags are reserved based on “FREE TEXT” (following existing drawings/documents) in Tag Management System (TMS) in alignment with COMPANY Engineering counterparts. Tag request is deemed closed once approved by COMPANY Tag focal point in TMS.
-
Piping Manual Valves & SP Items: Existing Tagging procedures does not cover the philosophy for Piping items. Tags are reserved based on “FREE TEXT” (following existing drawings/documents) in Tag Management System (TMS).
-
Electrical: PRJ-PJL-PRC-008 is followed for new UPS cable tagging and for Lighting Fixtures/Cable Tags are reserved based on “FREE TEXT” (following existing drawings/documents) in Tag Management System (TMS).
-
PRJ-PJL-PRC-048 contains only document numbering procedure and not Tagging
philosophy, therefore GXP2-O-PE-0082 is used for Tagging as applicable.
8 TAG NUMBERING FOR NEW FACILITY
Below section from Section 9 to 17 will be followed for Tag numbering of new facilities under this project.
9 MECHANICAL TAG NUMBERING SYSTEM
9.1 Main Equipment Tag Numbering
As per Section 2.3.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
9.2 Auxiliary Equipment Numbering System
COMP3-SPM-PE-PRC-00010_A
Page 17 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
As per Section 2.3.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10 INSTRUMENT NUMBERING SYSTEM
10.1 Looped DCS Instrument Numbering System
As per Section 2.4.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10.2 Looped non DCS Instrument Numbering System
As per Section 2.4.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10.3 Non-Looped Instrument Numbering System
As per Section 2.4.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10.4 PLC Functional Logic Numbering System
As per Section 2.4.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10.5 DCS Functional Logic Numbering System
As per Section 2.4.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10.6 Hardwired Relay Functional Logic Numbering System
As per Section 2.4.6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10.7 Hardwired Solid State Shutdown Logic Numbering System
As per Section 2.4.7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10.8 Restriction Orifice Numbering System
As per Section 2.4.8 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”.
10.8.1 Line Service Code
As per Appendix 3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17” Secondary Identifier
10.9 Field Junction Box Numbering System
As per Section 2.4.9 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10.10 Smart Junction Box Numbering
COMP3-SPM-PE-PRC-00010_A
Page 18 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
As per Section 2.4.10 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
10.11 Loop Tagging System
Loop Tagging system is described as below.
- Loop Name shall use the first character of parent tag Functional Identification Symbol
(FIS), for example: 225P49100, with parent tag 225PT49100 225F49102, with parent tag 225FT49102
- Loop Name for ACTUATED VALVES, it will be divided into 2 categories: a) ACTUATED VALVES related with ESD function, it will use “V” for valve loop, for example:
230V49100, with parent tag 230BDV49100 230V49102, with parent tag 230SDV49102
b) ACTUATED/CONTROL VALVES related with DCS function, it will use first character of the
parent tag, for example: 230K50023, with parent tag 230KXV50023 230H50015, with parent tag 230HV50015 230F50013, with parent tag 230FCV50013
Hence, the Instrument Loop Naming convention shall be defined in SPI as per below.
260 Area/System (Length:3) P Loop Measured Var. (Max. Length:2) 49 Unit Number (Length:2) Free Segment (Length:1) 0 114 Component Number (Length:3) A
Component Suffix (Length:1) if required
Example Loop Name: 260P490114A
10.12 Actuated ON/OFF Valve Control Box
In line with the procedure PRJ-PJL-PRC-008, no separate tag names to be provided for the Valve Control Box and the Valve Tag number can be allocated for Control boxes also.
11 VALVES AND SPECIAL ITEMS NUMBERING SYSTEM
11.1 Special Items and Vacuum Breakers
As per Section 2.5.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
11.2 Numbering Structure – Non-Manual Valves
As per Section 2.5.2.1 – 2.5.2.7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL- PRC-008_17”
11.3 Numbering Structure –Manual Valves
COMP3-SPM-PE-PRC-00010_A
Page 19 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
As per Section 2.5.2.8 – 2.5.2.12 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ- PJL-PRC-008_17”
12 FIRE PROTECTION SYSTEM
12.1 Fire/Gas detectors
As per Section 2.6.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
12.2 For other Instrument and Alarms
As per Section 2.6.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
12.3 Fire Protection System Valve
As per Section 2.6.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
12.4 Fire Protection System Valve Headers
As per Section 2.6.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
12.5 Line Fault Alarm of Fire/Gas Detectors and other instruments
As per Section 2.6.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
12.6 Line Fault Alarm of Fire Protection System Valves
As per Section 2.6.6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
13 LINE NUMBERING SYSTEM
13.1 Numbering Structure for Line
As per Section 2.7.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
13.1.1 Line Service Code
Appendix 3 of PRJ-PJL-PRC-008_17 - Line Service Codes shall be applied
13.1.2 System Number
As per section 2.3.1.1 of PRJ-PJL-PRC-008_17
13.1.3 Unit Number
As per section 2.3.1.3 of PRJ-PJL-PRC-008_17
COMP3-SPM-PE-PRC-00010_A
Page 20 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
13.1.4 Line Number
As per Section 2.7.1.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”.
13.1.5 Line Size
Line Size shall be specified without any unit symbol like Inch (“).
13.1.6 Line Class
As per Section 2.7.1.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”.
13.1.7 Insulation Type
As per Section 2.7.1.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”.
13.1.8 Insulation Temperature
Normal Operating Temperature shall be mentioned.
14 HVAC NUMBERING SYSTEM
As per Section 2.8.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
15 ELECTRICAL NUMBERING SYSTEM
15.1 Main Electric Equipment
As per Section 2.9.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
15.2 Building Electrical Equipment
As per Section 2.9.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
15.3 Motor Numbering for Main Equipment
As per Section 2.9.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
15.4 Motor Numbering for Auxiliary Equipment
As per Section 2.9.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
15.5 Electrical Heater Numbering
COMP3-SPM-PE-PRC-00010_A
Page 21 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
As per Section 2.9.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
15.6 Local Control Unit Numbering
As per Section 2.9.6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
15.7 Light Fixture, Light Fixture Junction Box and Convenience Socket
As per Section 2.9.7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
16 TELECOMMUNICATIONS EQUIPMENT NUMBERING SYSTEM
As per Section 2.10 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
17 FIRE FIGHTING AND SAFETY EQUIPMENT NUMBERING
17.1 Fire Alarm Equipment
As per Section 2.11.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
17.2 Fire Fighting System Package
As per Section 2.11.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
17.3 Bypass Valve
As per Section 2.11.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18 CABLE NUMBERING SYSTEM
As per Section 2.12 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.1 Feeder Cable
As per Section 2.12.1 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.2 Power Cable for Motor
As per Section 2.12.2 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.3 Power Cable for Electric Heater
COMP3-SPM-PE-PRC-00010_A
Page 22 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
As per Section 2.12.3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.4 Control Cable for Motor
As per Section 2.12.4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.5 Power and Control Cable for Panel
As per Section 2.12.5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.6 Welding Socket Power Cable
As per Section 2.12.6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.7 Fire Alarm Cable
As per Section 2.12.7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.8 Telephone Cable
As per Section 2.12.8 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.9 Public Address Cable
As per Section 2.12.9 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.10 LAN Fiber Cable
As per Section 2.12.10 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.11 CCTV Cable Numbering
As per Section 2.12.11 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.12 DATA Cable Numbering
As per Section 2.12.12 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.13 Antenna Cable Numbering
As per Section 2.12.13 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.14 Fiber Optic & Composite Cable
As per Section 2.12.14 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.15 Umbilical Cable
COMP3-SPM-PE-PRC-00010_A
Page 23 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
As per Section 2.12.15 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.16 Instrument Cable - Direct
As per Section 2.12.16 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.17 Instrument Cable – Multiple Junction Box (JB)
As per Section 2.12.17 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.18 Instrument Cable – Multiple Control Room
As per Section 2.12.18 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.19 Instrument Cable – Individual
As per Section 2.11.19 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
18.20 Instrument Grounding Wire
As per Section 2.11.12 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC- 008_17”
COMP3-SPM-PE-PRC-00010_A
Page 24 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
19 APPENDICES
Appendix 1 Equipment Classes
Appendix 2 Package Numbers
Appendix 3 Voltage Levels
Appendix 4 Telecommunications Location Codes
Appendix 5 List of Project Specification for Reference
Appendix 6 Portfolio Asset Names and Abbreviations
Appendix 7 BZ Brownfield Tag Request Form Templates_Offshore
Appendix 8 BZ Brownfield Tag Request Form Templates_Onshore
Appendix 9 QN Brownfield Tag Request Form Templates
Appendix 10 QN Brownfield Tag Request Form Templates_Cables and Telecoms
Appendix 11 QS Brownfield Tag Request Form Templates
Appendix 12 Green Field Tag Request Form Templates
Appendix 13 System Number for NFPS COMP3
Appendix 14 Unit Number for NFPS COMP3
19.1 Appendix 1
Equipment Classes
Refer Appendix 3 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”
19.2 Appendix 2 Package Numbers
Refer Appendix 4 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”
19.3 Appendix 3
Voltage Levels
Refer Appendix 5 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”
19.4 Appendix 4
Telecommunications Location Codes
Refer Appendix 6 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”
19.5 Appendix 5
List of Project Specification for Reference
Refer Appendix 7 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”
19.6 Appendix 6
Portfolio Asset Names and Abbreviations
Refer Appendix 8 of “Qatargas Equipment Numbering Philosophy Doc Nr. PRJ-PJL-PRC-008_17”
COMP3-SPM-PE-PRC-00010_A
Page 25 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
19.7 Appendix 7 BZ Brownfield Tag Request Form Templates_Offshore
Refer to BZ_Facilities Asset Type
Column A Column G Column A
Refer to BZ_Taxonomy Column C
Refer to list
Mandatory if the requested tag number must have a suffix
Existing Tag Refernece Mandatory if auxiliary equipment, instrument tubing is requested
As defined within AIMS EPDMS
Refer to list link Mandatory if special requirment such as for safety equipment, civil/structural etc
Refer to list link Mandatory if Tag requested is for architectural/structural equipment reuquired info service location, architectural location etc
Refer to list link Mandatory if Tag requested is for a instrument with special instructionc such as loop code, area, installed location etc
Refer to list link Mandatory if Tag requested is Line, required info line class identification letter/number, pipe support, pipe equipment etc
Refer to list link Mandatory if Tag requested is Electrical Equipment, required info voltage, ciruit code, electrical cable etc.
Refer to list link Mandatory if Tag requested is Telecomm Equipment, required info system code etc
Refer to list link Mandatory if Tag requested is JunctionBox or , required info service location etc.
Refer to list link Mandatory if Tag requested is special item e.g. flange required info line service code, spool location, line service, isometric number etc.
Asset
Unit
Category
Code
Structure Identifier
Suffix
Main Tag Number
Project Number Contractor Tag Quantity User Comment
Building Info
Instrument Info
Line Information
Electrical Equipment Info
Telecomm Equipment Info
JunctionBox Item Info
Special Item Info
1
19.8 Appendix 8 BZ Brownfield Tag Request Form Templates_Onshore
Refer to BZ_Facilities Asset Type Column A Column C Column G Column A
Refer to BZ_Taxonomy
Column C Mandatory if the
requested tag number must have a suffix
Existing Tag Refernece Mandatory if auxiliary equipment is requested
As defined within AIMS EPDMS
Refer to list link Mandatory if special requirment such as for area for structure, workshop equipment , DCS Building Code, lifting equipment etc
Refer to list link Mandatory if Tag requested is for a building such as building tag number, HVAC code , ciruit code, auxiliary number analyser shelter etc
Refer to list link Mandatory if Tag requested is for a instrument with special instructionc such as control valve code, FE code, flange location, resisitance, loop code etc
Refer to list link Mandatory if Tag requested is Line, required info line size/ line class/ Insulation Type, branch no
Refer to list link Mandatory if Tag requested is Electrical Equipment, required info voltage, ciruit code, phase number, cathodic protection, cable aux code, heat traced equipment etc.
Refer to list link Mandatory if Tag requested is Telecomm Equipment, required info tag number, system code, location code, system identifier , telecom from/to building etc.
Refer to list link Mandatory if Tag requested is JunctionBox Item etc.
Asset
Area
Unit
Category
Code
Suffix
Main Tag Number
Project Number Contractor Tag Quantity User Comment
Building Info
Instrument Info
Line Information
Electrical Equipment Info
Telecomm Equipment Info
JunctionBox Item Info
1
19.9 Appendix 9 QN Brownfield Tag Request Form Templates
Refer to QN_Facilities Asset Type
Refer to QNTaxonomy
Column A Column C Column E Column G Column A
Column C Mandatory if the
requested tag number must have a suffix
LetterOrDigit One-to-Three in Length else “0” (zero) Mandatory if instrument As defined within
AIMS EPDMS
Existing Tag Refernece Mandatory if auxiliary equipment (including Motor Numbering/ Electrical Heater Numbering) is requested
Refer to list link Mandatory if special requirment such as restriction orifice tag will require line service code, instrument loop code etc
Refer to signal list link Mandatory if Tag requested is Junction Box. Signal Category & Control Room
Refer to list link Mandatory if Tag requested is other F&G instrument (other than GE code)
Refer to list link Mandatory if Tag requested is Line, required info line size/ line class/ Insulation Type/ Insulation Temperature (optional)
Refer to list link Mandatory if Tag requested is Electrical Equipment, required info Voltage level, Building Sequence (if applicable -optional)
Asset
Area
System Unit
Category
Code
Suffix
Main Tag Number
Package No/Area No Project Number Contractor Tag Quantity User Comment
JunctionBox Info
Detector Info
Line Information
Electrical Equipment Info
1
COMP3-SPM-PE-PRC-00010_A
Page 26 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
19.10 Appendix 10 QN Brownfield Tag Request Form Templates_Cables and
Telecoms
Refer to QN_Facilities Asset Type Column A Column C Column E Column A
Refer to QNTaxonomy
Refer to list link
Column C Mandatory if the
requested tag number must have a suffix
Existing Tag Refernece Mandatory if auxiliary equipment is requested
Refer to list link Mandatory if special requirment such as cables without sequence number, ITR control room number etc
Refer to list link Mandatory if Tag requested is Instrument Cable for JB
Refer to list link Mandatory if Tag requested is Telecommunication Equipment
Refer to list link Mandatory if Tag requested is feeder/motor power cable single core
Refer to list link Mandatory if splice is required for cany cables such as Antenna / Fire Alarm / Telephone / PA / FO / Composite Cable
Refer to list link Mandatory system identifier if cable is local panel or analyser house or control panel
Asset
Area
System Category
Code
Suffix / Spliced Main Tag Number
Project Number Contractor Tag Quantity User Comment
Instrument Cable
TeleComm Location
Feeder Cable
Composite Cable
Local Panel Cable
1
19.11 Appendix 11 QS Brownfield Tag Request Form Templates
Refer to QS_Facilities Asset Type Column A Column C Column G Column A
Refer to QS_Taxonomy
Column C Mandatory if the
requested tag number must have a suffix
Existing Tag Refernece Mandatory if tag requested is auxiliary equipment/HVAC
As defined within AIMS EPDMS
Mandatory for special cases such as instrument loop will require loop code etc
Refer to list link Mandatory if Tag requested is structure
Refer to list link Mandatory if Tag requested is Line, required info line size/ line class/ Insulation Type/ service code
Refer to list link Mandatory if Tag requested is Electrical Equipment, required info Voltage level, substations, power item
Asset
Area
Unit
Category
Code
Suffix
Main Tag Number
Project Number Contractor Tag Quantity User Comment
Structure Info
Line Information
Electrical Equipment Info
1
19.12 Appendix 12 Green Field Tag Request Form Template
Tag Number
Facility
System
Unit
Category Function code
Tag description
Main Tag Number
Project Number
Package ID
COMP3-SPM-PE-PRC-00010_A
Page 27 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
19.13 Appendix 13 System Number for NFPS COMP3
Extract from Appendix 3 – System numbers of “Facilities System and Unit Number Codes and Descriptions Doc Nr. PRJ-PJL-PRC-005_21”
QATARGAS SOUTH SYSTEM NUMBER 999
Qatargas South
SYSTEM DESCRIPTION
Note: System Number 999 shall only be applied for the assignment of new Document Numbers within the existing Qatargas South assets.
QG2 OFFSHORE SYSTEM NUMBER
SYSTEM DESCRIPTION
30 31 32 33
Common / General Offshore (QG2, QG3 and QG4) Wellhead Platform 4 Wellhead Platform 5 Wellhead Platform 6
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 200
201 202 210 211 212 213
214 215 217 218 220 221
222 223 224 225 226 227
228 229 230 231 232 233
SYSTEM DESCRIPTION
NFPS Common Offshore
NFPS Common Onshore NFPS Umbilical (Common Infrastructure) NFPS Riser Platform RT-2 NFPS Bridge BR2S-1 NFPS Riser Platform RP3S NFPS Bridge BR3S-1
NFPS Pipeline (Intrafield) PL3LS NFPS Pipeline (Export) PL1LS NFPS Bridge BR3S-2 NFPS Bridge Support Platform BSP3S-1 NFPS Wellhead Platform WHP12S NFPS Pipeline (Intrafield) PL12S
NFPS Subsea Cable SC12S NFPS Riser Platform RP4S NFPS Bridge BR4S-1 NFPS Wellhead Platform WHP13S NFPS Pipeline (Intrafield) PL13S NFPS Subsea Cable SC13S
NFPS Riser Platform RP7S NFPS Bridge BR7S-1 NFPS Wellhead Platform WHP14S NFPS Pipeline (Intrafield) PL14S NFPS Subsea Cable SC14S NFPS Riser Platform RP6S
COMP3-SPM-PE-PRC-00010_A
Page 28 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 234 235 236 237 238
SYSTEM DESCRIPTION
NFPS Bridge BR6S-1 NFPS Riser Platform RP9S NFPS Bridge BR9S-1 NFPS Pipeline (Intrafield) PL9S NFPS Pipeline (Intrafield) PL9LS
239 240 241 242 243 244
245 246 247 248 249 250
251 252 253 254 255 256
257 258 259 260 261 262
263 264 265 266 267 268
269 270 271 272 273 274
NFPS Bridge Support Platform BSP5S-1 (Ref.[14], Note-1) NFPS Riser Platform RP5S NFPS Bridge BR5S-1 NFPS Pipeline (Intrafield) PL5S NFPS Pipeline (Intrafield) PL5LS NFPS Bridge BR5S-2 (Ref.[14], Note-1)
NFPS Riser Platform RP10S NFPS Bridge BR10S-1 NFPS Pipeline (Intrafield) PL10S NFPS Pipeline (Intrafield) PL10LS NFPS Pipeline (Export) P610L NFPS Wellhead Platform WHP10N
NFPS Pipeline (Intrafield) PL10N NFPS Subsea Cable SC10N NFPS Wellhead Platform WHP11N NFPS Pipeline (Intrafield) PL11N NFPS Subsea Cable SC11N NFPS Riser Platform RP1N
NFPS Bridge BR1N-1 NFPS Bridge BR1N-2 NFPS Pipeline (Export) PL1N NFPS Wellhead Platform WHP12N NFPS Pipeline (Intrafield) PL12N NFPS Subsea Cable SC12N
NFPS Riser Platform RP4N NFPS Bridge BR4N-1 NFPS Wellhead Platform WHP13N NFPS Pipeline (Intrafield) PL13N NFPS Subsea Cable SC13N NFPS Riser Platform RP6N
NFPS Bridge BR6N-1 NFPS Riser Platform RP8S NFPS Bridge BR8S-1 NFPS Riser Platform RP11S NFPS Bridge BR11S-1 NFPS Pipeline (Intrafield) PL11S
COMP3-SPM-PE-PRC-00010_A
Page 29 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 275 276 278 279 280
281 282 286 510 511 512
513 514 515 516 517 518
519 521 522 523 524 525
540 541 542 543 544 545
546 547 548 560 561 562
563 564 565 566 567 568
SYSTEM DESCRIPTION
NFPS Pipeline (Intrafield) PL11LS NFPS Riser Platform RP3N NFPS Riser Platform RP5N NFPS Bridge BR5N-1 NFPS Pipeline (Intrafield) PL54N (Note-1)
NFPS Pipeline (Intrafield) PL56N (Note-1) NFPS Pipeline (Intrafield) PL54LN (Note-1) NFPS Pipeline (Intrafield) PL13LS NFPS Compression Platform CP1S NFPS Bridge BR1S-2 NFPS Living Quarters Platform LQ1S
NFPS Bridge BR1S-3 NFPS Flare Platform FL1S NFPS Bridge BR1S-4 NFPS Bridge BR1S-5 NFPS Bridge BR1S-6 NFPS Bridge BR1S-7
NFPS Bridge BR1S-8 NFPS Bridge Support Platform BSP1S-1 NFPS Bridge Support Platform BSP1S-2 NFPS Bridge Support Platform BSP1S-3 NFPS Bridge Support Platform BSP1S-4 NFPS Bridge Support Platform BSP1S-5
NFPS Compression Platform CP4S NFPS Bridge BR4S-2 NFPS Living Quarters Platform LQ4S NFPS Bridge BR4S-3 NFPS Flare Platform FL4S NFPS Bridge BR4S-4
NFPS Bridge BR4S-5 NFPS Bridge Support Platform BSP4S-1 NFPS Bridge Support Platform BSP4S-2 NFPS Compression Platform CP6S NFPS Bridge BR6S-2 NFPS Living Quarters Platform LQ6S
NFPS Bridge BR6S-3 NFPS Flare Platform FL6S NFPS Bridge BR6S-4 NFPS Bridge BR6S-5 NFPS Bridge Support Platform BSP6S-1 NFPS Bridge Support Platform BSP6S-2
COMP3-SPM-PE-PRC-00010_A
Page 30 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 569 570 571 572 573
574 575 576 577 578 580
581 582 583 584 585 586
587 606 610 613 614 615
616 617 621 622 623 640
641 642 643 644 645 646
647 651 652 653 660 661
SYSTEM DESCRIPTION
NFPS Bridge Support Platform BSP6S-3 NFPS Compression Platform CP7S NFPS Bridge BR7S-2 NFPS Living Quarters Platform LQ7S NFPS Bridge BR7S-3
NFPS Flare Platform FL7S NFPS Bridge BR7S-4 NFPS Bridge BR7S-5 NFPS Bridge Support Platform BSP7S-1 NFPS Bridge Support Platform BSP7S-2 NFPS Compression Platform CP8S
NFPS Bridge BR8S-2 NFPS Living Quarters Platform LQ8S NFPS Bridge BR8S-3 NFPS Flare Platform FL8S NFPS Bridge BR8S-4 NFPS Bridge BR8S-5
NFPS Bridge Support Platform BSP8S-1 NFPS Bridge BR6S-6 NFPS Compression Platform CP1N NFPS Bridge BR1N-3 NFPS Flare Platform FL1N NFPS Bridge BR1N-4
NFPS Bridge BR1N-5 NFPS Bridge BR1N-6 NFPS Bridge Support Platform BSP1N-1 NFPS Bridge Support Platform BSP1N-2 NFPS Bridge Support Platform BSP1N-3 NFPS Compression Platform CP4N
NFPS Bridge BR4N-2 NFPS Living Quarters Platform LQ4N NFPS Bridge BR4N-3 NFPS Flare Platform FL4N NFPS Bridge BR4N-4 NFPS Bridge BR4N-5
NFPS Bridge BR4N-6 NFPS Bridge Support Platform BSP4N-1 NFPS Bridge Support Platform BSP4N-2 NFPS Bridge Support Platform BSP4N-3 NFPS Compression Platform CP6N NFPS Bridge BR6N-2
COMP3-SPM-PE-PRC-00010_A
Page 31 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) SYSTEM NUMBER 662 663 664 665 666
SYSTEM DESCRIPTION
NFPS Living Quarters Platform LQ6N NFPS Bridge BR6N-3 NFPS Flare Platform FL6N NFPS Bridge BR6N-4 NFPS Bridge BR6N-5
667 671 672 673 701 702
711 712 713 714 715 720
NFPS Bridge BR6N-6 NFPS Bridge Support Platform BSP6N-1 NFPS Bridge Support Platform BSP6N-2 NFPS Bridge Support Platform BSP6N-3 NFPS Fuel Gas Network Onshore (Common Infrastructure) NFPS Fuel Gas Network Offshore (Common Infrastructure)
NFPS Fuel Gas Metering Station 1 (Offplot) NFPS Fuel Gas Metering Station 1 (Onplot) NFPS Fuel Gas Metering Station 2 (Offplot) NFPS Fuel Gas Metering Station 2 (Onplot) NFPS QG South Onshore Collaborative Building NFPS Onshore Logistics Base (Common Infrastructure)
Note-1: System number updated per COMPANY RNDN Metadata
19.14 Appendix 14 Unit Number for NFPS COMP3
Extract from Appendix 4 – Unit numbers of “Facilities System and Unit Number Codes and Descriptions Doc Nr. PRJ-PJL-PRC-005_21”
QG2 / QG3&4 / NFPS / NFE / NFS OFFSHORE UNIT NUMBER 20 21 22
23 24 25 26 30 42
48 49 50 51 52 53
79
UNIT DESCRIPTION
Common / General Upstream (Offshore) Fixed Platform Structure (Jacket / Piles) Topside Structure
Offshore Production System and Equipment Flow line / Risers Pipeline / Risers Subsea Cable Common / General Upstream (Onshore) HVAC
High-integrity Pressure Protection Systems (HIPPS) Process Safety Systems (PSS) Process Control Systems (PCS) Instrumentation Telecommunication Cathodic Protection
Chemicals and Catalyst Storage
COMP3-SPM-PE-PRC-00010_A
Page 32 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
QG2 / QG3&4 / NFPS / NFE / NFS OFFSHORE UNIT NUMBER 82 83 84 87 91
92 93 94 95 96 97
QATARGAS SOUTH OFFSHORE UNIT NUMBER BA
BB
BC
BD
BE
BF
BG
BJ
BJ1
BJ2
BJ3
BT1
BT2
BT3
UNIT DESCRIPTION
Sea Water Systems Fire Protection Systems Flare and Liquid Burners Effluent Treatment / Site Drainage Power Generation / Distribution
Steam Systems Fuel Systems Fresh Water Systems Compressed Air Systems Nitrogen Systems MEG Systems
UNIT DESCRIPTION
Bridge “A” from QT to PT
Bridge “B” from RT to WT1
Bridge “C” from PT to RT
Bridge “D” from RT to BT
Bridge “E” from BT to FT
Bridge “F” from PT to RT
Bridge “G” from PT to RT
Bridge “J” from RT to FT
Wellhead Platform 1 - Jacket
Wellhead Platform 2 - Jacket
Wellhead Platform 3 - Jacket
Wellhead Platform 1 - Topside
Wellhead Platform 2 - Topside
Wellhead Platform 3 - Topside
BZOF
Barzan Offshore General
FJ1
FJ2
FJ3
FT1
FT2
FT3
IC
IP
MP
OFGN
PJ
PT
FJ1 - Flare Tower 1 - Jacket
Flare Tower 2 - Jacket
Flare Tower 3 - Jacket
Flare Tower 1 - Topside
Flare Tower 2 - Topside
Flare Tower 3 - Topside
Intrafield Subsea Cable
Intrafield Pipeline
MEG Pipeline
Qatargas South Offshore General
Process Utility Platform - Jacket
Process Utility Platform - Topside
COMP3-SPM-PE-PRC-00010_A
Page 33 of 34
Classification: Internal
NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT
COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT
TAG NUMBERING PROCEDURE
QATARGAS SOUTH OFFSHORE UNIT NUMBER QJ
QT
RGA
RJ
RT
SC
WJ1
WJ10
WJ11
WJ2
WJ3
WJ4
WJ5
WJ6
WJ7
WJ8
WJ9
WT1
WT10
WT11
WT2
WT3
WT4
WT5
WT6
WT7
WT8
WT9
XP
UNIT DESCRIPTION
Quarters Platform - Jacket
Quarters Platform - Topside
RasGas Alpha
Riser Platform - Jacket
Riser Platform - Topside
Subsea Cable to Shore
Wellhead Platform 1 - Jacket
Wellhead Platform 10 - Jacket
Wellhead Platform 11 - Jacket
Wellhead Platform 2 - Jacket
Wellhead Platform 3 - Jacket
Wellhead Platform 4 - Jacket
Wellhead Platform 5 - Jacket
Wellhead Platform 6 - Jacket
Wellhead Platform 7 - Jacket
Wellhead Platform 8 - Jacket
Wellhead Platform 9 - Jacket
Wellhead Platform 1 - Topside
Wellhead Platform 10 - Topside
Wellhead Platform 11 - Topside
Wellhead Platform 2 - Topside
Wellhead Platform 3 - Topside
Wellhead Platform 4 - Topside
Wellhead Platform 5 - Topside
Wellhead Platform 6 - Topside
Wellhead Platform 7 - Topside
Wellhead Platform 8 - Topside
Wellhead Platform 9 - Topside
Export Pipeline
COMP3-SPM-PE-PRC-00010_A