Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 32705 Saipem COMP3

❯

TQ's

❯

Latest Docs provided with TQ

❯

1. 26.06.25

❯

235 83 SH PLN 00003_A

A

B

C

D

E

F

G

H

I

J

Classification: Internal

1

2

3

4

5

6

7

8

9

10

PLATFORM NORTH

45°

45°

N

TRUE NORTH

TRUE NORTH

PREVAILING WIND

A

0 0 0

,

0 0 1

.

E

10160

4289

2011

1200

1469

1900

3025

I

C R T C E L E N O T 2

3 0 0 2 B X

5 3 2

T.O.G EL. +15532

235-XZ9501B

LAYDOWN AREA ‘D’ 2500(L)x 2500(W)

T.O.G EL. +15532

T.O.G EL. +18315

N D

UP

TO LER 2ND FLR

235-XZ9501A

UP

ML235503

FUTURE BRIDGE

) .

.

.

(

S O B 1105 0 0 2 0 2 + L E

C

0 0 0 5 1 1

,

.

E

15000

235-XZ8313

NOTE 15 235-FE830038 235-FE830039 235-FE830040

X3

CO2 4.5 kg

11

B

235-XZ8303

12

4152

235-XZ8304

235-XZ8334

235-XZ8329

235-XZ8330

SC T.O.G EL. +15532 235-XZ8334

235-XZ8304

n=12

n=12

0 0 0 0 3 1

,

.

E

235-XZ8303

ML235502

13 WHP9S & RP9S KEY PLAN

14

B

2

1

45°

PREVAILING WIND

E U R T

H T R O N

C

A

DROP ZONE FROM SECOND FLOOR 1300 (L)x1300(W)

235-XZ8329

235-XZ8330

LADDER TO LER 2ND FLOOR

HOLDS:

  1. TAG NOS.

NOTE 14

T.O.P. EL. +16800

2 0 3 8 Z X

5 3 2

235-FE830003

9 Kg

FIRE/BLAST WALL

T.O.P. EL. +16800

FIRE/BLAST WALL

235-XB2002 20 TON ELECTRIC EL+20000 (B.O.S.)

235-X2001

COAMED AREA

235SDV 49 001

235MOV 50 072

235FCV 23 022

235FE 50 022

235MOV 50 077

235MOV 50 071

235-US-04

235 FCV 23 021

235FE 50 001

235MOV 50 078

235MOV 50 074

XXX-XZXXXX (HOLD-1)

BAM 6

235-FE830026

235-FE830004

BC 56.7 kg

9 Kg

LAYDOWN AREA ‘A’ CAP. 20MT 13400(L) x 5300(W)

235-XB2001 20 TON ELECTRIC EL+20000 (B.O.S.)

235-X2001

235-XZ8316

COAMED AREA

235SDV 49 020

REMOVABLE HANDRAIL

REFER DETAIL-2

235-T8702

235-V9501

REFER DETAIL-1

235-P9701

UP

UP

TO TOP DECK

SPACE PROVISION FOR FUTURE TEST SEPARATOR 3250(L) x 3100(W)

100

0 0 2

100

0 0 2

MIN. CRANE RADIUS 6.7M

400

400

ML235504

T.O.G. EL. +18282

235-XZ8315

9 Kg

235-FE830005

BAM 6

XXX-XZXXXX (HOLD-1)

235MOV 50 073

235-US-03

° 7 1

) E L G N A E N O Z O G O N (

2

1

235-XZ8354 FE

235-XZ8302 NOVEC

235-XZ8332 WV

235-XZ8308

n=4

N. 114,000

2

235-FE830007

9 Kg

235-XZ8314

BC 56.7 kg

235-FE830027

N. 100,000

1

235-FE830006

9 Kg

2 8 8 2 1

0 7 7 1

0 0 0 4 1

0 3 5 8

ML235501

BRIDGE BR9S-1 TO EXISTING WHP9S PLATFORM (REFER 235-20-PI-PLN-0002 FOR OVERALL FIELD LAYOUT OF RP9S)

1M

0

1M

2M

3M

4M

5M

C

0 0 0 , 5 1 1 .

E

B

0 0 0 , 0 3 1 .

E

B

C

AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.

A

  1. THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL BE

15

16

NOTES:

  1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS

UNLESS STATED OTHERWISE.

  1. PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,

SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)

  1. BREATHING AIR MANIFOLD 6 PERSON IS PROVIDED, AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

  2. AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE)

FOR COMP3 PROJECT (200-20-SH-DEC-00013) - DEDICATED 45 MINUTES 4 SCBA SETS WITH CABINETS SHOULD BE PROVIDED FOR INVESTIGATION TEAM USE ONLY.

  1. THIS LAYOUT SHALL BE USED ONLY FOR QUANTITY AND

LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENT AND DIRECTION OF ESCAPE ROUTES.

  1. THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN ALL

PROVIDED WITH WEATHER-PROOF CABINET.

  1. WHEELED EXTINGUISHERS LOCATED OUTDOOR SHALL BE

PROVIDED WITH A UV-RESISTANT RED-VINYL COVER. 9. ARROWS SHOWN ON THE ESCAPE ROUTE INDICATE THE

PREFERRED DIRECTION OF EGRESS TOWARDS THE PRIMARY MUSTER AREA. IN CASE OF EMERGENCY AT RP, PERSONNEL SHALL USE BRIDGE TO REACH PRIMARY MUSTER AREA LOCATED AT WELLHEAD PLATFORM 9S LER BUILDING TR. IN CASE ESCAPE THROUGH BRIDGE TOWARDS WELLHEAD IS NOT FEASIBLE, PERSONNEL TO PROCEED TO SECONDARY MUSTER AREA LOCATED AT RP LER BUILDING TR FOR MUSTERING.

10.LOCATION OF FIREFIGHTING, SAFETY, LIFE SAVING

EQUIPMENT AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.

11.STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN

INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.

  1. ALL FIRE & SAFETY EQUIPMENT SHALL BE LOCATED IN SUCH A

WAY THAT THEY ARE EASILY ACCESSIBLE.

13.NOVEC 1230 (FK-5-1-12) CLEAN AGENT SYSTEM PROTECTION SHALL BE PROVIDED FOR ELECTRICAL & INSTRUMENT ROOM AND UPS, INSTRUMENT & TELECOM ROOM IN THE LER. 14.REFER TO FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE

LAYOUT - LOCAL EQUIPMENT ROOM-RP9S (235-83-SH-PLN-00002) FOR THE DETAIL ARRANGEMENT OF FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT INSIDE THE LER.

  1. THREE (3) NOS. CO2 PORTABLE FIRE EXTINGUISHERS SHALL BE LOCATED AT THE MAIN ENTRANCE TO THE ELECTRICAL & INSTRUMENT ROOM FOR FIRE BRIGADE USE.

  2. ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER PAINTED ON THE FLOOR IN OIL RESISTANT PHOTOLUMINESCENT PAINT THAT IS VISIBLE, DURABLE AND ANTI-SLIP.

  3. AS PER TECHNICAL SAFETY BASIS OF DESIGN

(200-20-SH-DEC-00013) – FOR OUTDOOR AREAS, THE DEAD END SHALL NOT EXCEED 6 M OF TRAVEL DISTANCE.

LEGENDS:

LEGEND

CO2 4.5 kg

9 Kg

BC 56.7 kg

n=4

FE

SC

BAM 6

n=12

WV

DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m(WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m(WIDTH) X 2.286m (HEAD CLEARANCE) 4.5kg CO2 PORTABLE FIRE EXTINGUISHER

9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER

56.7kg DRY CHEMICAL POWDER (BC) WHEELED FIRE EXTINGUISHER

LIFEBUOY WITH LIFELINE

LIFE RAFT n=(NUMBERS OF PERSON CAPACITY)

SELF CONTAINED BREATHING APPARATUS (45 MINUTES) (NOTE 4) CABINET FOR 4 UNITS OF SCBA

FIREMAN EQUIPMENT

SCRAMBLE NET

BREATHING AIR MANIFOLD CABINET WITH 6 NUMBERS OF HOSE UNIT (NOTE 3) LIFE JACKET

CABINET FOR 12 UNITS OF LIFE JACKET

WORK VEST

CABINET WITH 24 UNITS OF WORK VEST

NOVEC

NOVEC 1230 (FK-5-1-12) FIRE SUPPRESSION SYSTEM PACKAGE (NOTE-13)

QTY

3

5

2

4

2

4

1

1

1

2

24

2

24

1

1

200-20-SH-DEC-00013

TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT

235-23-PI-PLP-00005

EQUIPEMENT ARRANGEMENT PLAN LER LEVEL 2 FOR RP9S

235-23-PI-PLP-00003

EQUIPMENT ARRANGEMENT PLAN MAIN DECK FOR RP9S

REFERENCE No.

TITLE

REFERENCES

A

A1

No.

ISSUED FOR REVIEW

ISSUED FOR IDC

DESCRIPTION

MTA

MTA

JB

JB

BPB

13/05/25

BPB

28/04/25

BY

CHKD

APVD

DATE

REVISIONS

PROJECT TITLE :

COMP3 - NFPS OFFSHORE RISER / WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

A

B

C

D

E

F

G

H

I

J

K

L

K

TYPICAL DETAIL-1

TYPICAL DETAIL-2

N.T.S

N.T.S

L

EQUIPMENT NO. 235-X2001 235-XZ9501A/B 235-XB2001 235-XB2002 235-XB2003 235-XZ8302 ML235501 ML235502

1

EQUIPMENT LIST

DESCRIPTION

PIPELINE PIG LAUNCHER TEMPORARY CASCADE BREATHING AIR PACKAGE

MONORAIL 20 MT ELECTRIC MONORAIL 20 MT ELECTRIC MONORAIL 2 TON ELECTRIC NOVEC 1230 (FK-5-1-12) CLEAN AGENT SKID NAVAID LANTERN NAVAID LANTERN

2

SIZE (MM)

28” X 32”(OD) X 6022(L) 1360(L) X 1360(W) X 3000(H)

HEB600 HEB600 UB254X146X43

400 (L)X400(W)X1834(H) 400 (L)X400(W)X1834(H) 3

EQUIPMENT NO. ML235503 ML235504 235-P9701 235-T8702 235-US-03 235-US-04 235-V9501 235-XZ8303

4

EQUIPMENT LIST

DESCRIPTION

NAVAID LANTERN NAVAID LANTERN

MEG TRANSFER PUMP CP SEPARATOR UTILITY STATION UTILITY STATION INSTRUMENT AIR RECEIVER LIFE RAFT 5

SIZE (MM) 400 (L)X400(W)X1834(H) 400 (L)X400(W)X1834(H)

1910 (L) X 900 (W) X 1834 (H) 3400(L) X 2200(W) X 1800 (H)

EQUIPMENT NO. 235-XZ8304 235-XZ8334

1700 ID x 4000 (T/T) 1300 (L) X 713(W) X 685(H)

7

6

MAIN DECK (T.O.S. EL. +15500) FROM EL.+ 14000 TO 20400

MIN. NO GO ZONE (R=30.177M)

NO GO ZONE FOR BRIDGE

DROP ZONE 2600(L) x1300 (W)

MAX. CRANE RADIUS 35M MAIN HOIST SWL 22.5MT

EQUIPMENT LIST

DESCRIPTION

LIFE RAFT SCRAMBLE NET

SIZE (MM)

1300 (L) X 713(W) X 685(H)

T.O.G EL. +22810

UP TO TOP DECK

DN

TO MAIN DECK

UP

Qatar Energy LNG

T.O.G EL. +21610

T.O.P EL. +21588

Qatar Energy LNG

THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.

CONSULTANT / CONTRACTOR :

Saipem S.p.A.

AIR LOCK

NOTE 14

LADDER TO MAIN DECK

TITLE :

CONTRACTOR DRAWING No. :

033764-H-D00-12-SPM-LP-D-00042-0001

FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - MAIN DECK - RP9S

SCALE :

1:100

PROJECT No. :

LTC/C/NFP/5129/20

PROJECT

033764

DRAWING No.

SHT

SIZE REVISION

235-83-SH-PLN-00003

0001

A1

A

BLAST WALL

N. 114,000

2

BLAST WALL

LER LEVEL 2 (SCALE:NTS)

10

11

12

13

14

15

16

Project: Q-32705 - Saipem COMP3 Folder: 1. 26.06.25


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further