Classification: Internal

1

PLATFORM NORTH

45°

45°

N

TRUE NORTH

TRUE NORTH

PREVAILING WIND

2963

7675

A

B

C

6 7 6 4

9 Kg

2 7 5 4

0 0 0 4 1

FUTURE BRIDGE

0 5 2

SUPPLY VESSEL APPROACH

D

235-FE830008

E

F

G

)

(

W

0 0 3 5 X

REFER DETAIL-1 R E H C N U A L G P Y R A R O P M E T

R O F E N O Z P O R D

M 0 0 4 3 1

) L (

I

235-FE830009

9 Kg

235-XZ8352

235-XZ8307

BA

235-XZ8331

H

235-FE830051

235-XZ8320

235-XZ2001

BC 4.1 kg

5 7 1 0 1

LAYDOWN AREA B 3400(L)x2350(W)

REMOVABLE HANDRAIL

235-XC9301

235-FE830013

9 Kg

I

J

K

L

2

3

4

5

6

7

8

9

10

11

12

A

0 0 0

,

0 0 1

.

E

C

0 0 0 5 1 1

,

.

E

235-XZ8317

B

0 0 0 0 3 1

,

.

E

15000

15000

DROP ZONE/ TO MAIN DECK 2500(L) x2500 (W)

DROP ZONE 1300 (L) x1300 (W)

T.O.P. EL.+26510

TO MAIN DECK

DN

HVAC AREA

235-XP9601A 235-XP9601B

235-XP9601C

13 WHP9S & RP9S KEY PLAN

14

B

2

1

45°

PREVAILING WIND

E U R T

H T R O N

C

A

2

1

B

C

A

HOLDS:

  1. TAG NOS.

15

16

NOTES:

  1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS

UNLESS STATED OTHERWISE.

  1. PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,

SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)

  1. BREATHING AIR MANIFOLD 6 PERSON IS PROVIDED, AS PER TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT (200-20-SH-DEC-00013).

  2. THIS LAYOUT SHALL BE USED ONLY FOR QUANTITY AND

LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENT AND DIRECTION OF ESCAPE ROUTES.

A

  1. THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN ALL

AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.

  1. THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL

BE PROVIDED WITH WEATHER-PROOF CABINET.

  1. WHEELED EXTINGUISHERS LOCATED OUTDOOR SHALL BE

B

PROVIDED WITH A UV-RESISTANT RED-VINYL COVER. 8. ARROWS SHOWN ON THE ESCAPE ROUTE INDICATE THE

PREFERRED DIRECTION OF EGRESS TOWARDS THE PRIMARY MUSTER AREA. IN CASE OF EMERGENCY AT RP, PERSONNEL SHALL USE BRIDGE TO REACH PRIMARY MUSTER AREA LOCATED AT WELLHEAD PLATFORM 9S LER BUILDING TR. IN CASE ESCAPE THROUGH BRIDGE TOWARDS WELLHEAD IS NOT FEASIBLE, PERSONNEL TO PROCEED TO SECONDARY MUSTER AREA LOCATED AT RP LER BUILDING TR FOR MUSTERING.

  1. LOCATION OF FIREFIGHTING, SAFETY, LIFE SAVING

C

EQUIPMENT AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.

10.STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN

INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.

  1. ALL FIRE & SAFETY EQUIPMENT SHALL BE LOCATED IN SUCH A

WAY THAT THEY ARE EASILY ACCESSIBLE.

12.COMBINED SAFETY SHOWER & EYEWASH WITH CHILLER UNIT SHALL BE LOCATED WITHIN 10 SECOND REACH OR 15 M FROM MEG STORAGE TANK.

D

T.O.P. EL. +26510

REFER DETAIL-2

235-US-02

PIPING AREA 6700 (L) X 5400 (W)

SPACE FOR MEG INJECTION PIPING 8500 (L) X 5400 (W)

FUTURE PIG TRAP

24350 (L) X 2840 (W) (200-Y2008)

FUTURE PIPING AREA 10800 (L) X 3400 (W)

1 0 3 8 W E S

5 3 2

235-US-01

235-T9701B

PLTF. T.O.G EL. +32090

235-T9701A

235 SDV 49004

CRANE BOOM REST

T.O.G EL. +35500

235-FE830012

9 Kg

N. 114,000

2

CHSK

235-XZ8336

235-SEW8301

BC 56.7 kg

235-FE830028

N. 100,000

1

235-FE830011

9 Kg

BAM 6

XXX-XZXXXX

30” PRODUCTION HEADER FROM WHP9S

235-XZ8318

235-FE830010

9 Kg

FUTURE PIPING AREA 7000 (L) X 2250 (W)

MIN. CRANE RADIUS 6.7M

TO MAIN DECK

DN

SPACE PROVISION FOR FUTURE TEST SEPARATOR 3250(L) x 2100 (W)

° 7 1

) E L G N A E N O Z O G O N (

NO GO ZONE FOR BRIDGE

100

0 0 2

100

0 0 2

400

400

TYPICAL DETAIL-1

TYPICAL DETAIL-2

  1. ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER PAINTED ON THE FLOOR IN OIL RESISTANT PHOTOLUMINESCENT PAINT THAT IS VISIBLE, DURABLE AND ANTI-SLIP.

  2. AS PER TECHNICAL SAFETY BASIS OF DESIGN

(200-20-SH-DEC-00013) – FOR OUTDOOR AREAS, THE DEAD END SHALL NOT EXCEED 6 M OF TRAVEL DISTANCE. 15.LIGHTED WINDSOCK SHALL BE MOUNTED ABOVE CRANE

CABIN BY THE PEDESTAL CRANE VENDOR.

16.ONE NO. LIFE JACKET, ONE NO. FIRST AID KIT, ONE NO. 4.1 KG

BC PORTABLE FIRE EXTINGUISHER & ONE NO. EBA 15 MINUTES CAPACITY SHALL BE PROVIDED INSIDE THE CRANE CABIN. ONE NO. 9 KG POTASSIUM BICARBONATE DRY CHEMICAL POWDER EXTINGUISHER SHALL BE PROVIDED INSIDE THE CRANE MACHINERY ROOM.

LEGEND:

LEGEND

BC 4.1 kg

9 Kg

BC 56.7 kg

DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m(WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m(WIDTH) X 2.286m (HEAD CLEARANCE) 4.1kg DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER (NOTE-16) 9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER

56.7kg DRY CHEMICAL POWDER (BC) WHEELED FIRE EXTINGUISHER

LIFEBUOY WITH LIFELINE

COMBINED SAFETY SHOWER AND EYEWASH STATION WITH CHILLER (NOTE-12)

CHSK

CHEMICAL HANDLING SAFETY KIT

BAM 6

BREATHING AIR MANIFOLD CABINET WITH 6 NUMBERS OF HOSE UNIT (NOTE 3)

LIGHTED WINDSOCK (NOTE-15)

BA

BREATHING APPARATUS ESCAPE SET (15 MINUTES AND 3L CYLINDER) (NOTE-16)

LIFE JACKET (NOTE-16)

FIRST AID KIT (NOTE-16)

QTY

1

6

1

4

1

1

1

1

1

1

1

235-23-PI-PLP-00004

EQUIPMENT ARRANGEMENT PLAN TOP DECK OF RP9S

200-20-SH-DEC-00013

TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT

REFERENCE NO.

TITLE

REFERENCES

A

A1

No.

ISSUED FOR REVIEW

ISSUED FOR IDC

DESCRIPTION

MTA

MTA

JB

JB

BPB

13/05/25

BPB

28/04/25

BY

CHKD

APVD

DATE

REVISIONS

PROJECT TITLE :

COMP3 - NFPS OFFSHORE RISER / WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

Qatar Energy LNG

E

F

G

H

I

J

K

L

235-XZ8319

CRANE RADIUS 20M MAIN HOIST SWL 22.5MT (DYNAMIC LIFT SUPPLY VESSEL SIDE APPROACH)

TOP DECK (T.O.S. EL. +26500) FROM EL.+ 25000 AND ABOVE

MIN. NO GO ZONE (R=30.177M)

MAX. CRANE RADIUS 35M MAIN HOIST SWL 22.5MT

N.T.S

N.T.S

Qatar Energy LNG

THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.

1M

0

1M

2M

3M

4M

5M

CONSULTANT / CONTRACTOR :

Saipem S.p.A.

EQUIPMENT NO. 235-XP9601A/B/C 235-SEW8301 235-T9701A/B 235-XC9301 235-US-01 235-US-02 200-Y2008 11

EQUIPMENT LIST

DESCRIPTION

SIZE (MM)

NITROGEN CYLINDER RACK 7000(L) X 5800(W) X 2300(H) COMBINED SAFETY SHOWER AND EYE WASH STATION 1257(L) X 2394(W) X 3804(H) MEG STORAGE TANK PEDESTAL CRANE UTILITY STATION UTILITY STATION TEMPORARY PIG RECEIVER FUTURE

6000(T/T) X 4400(ID) 22.5 MT S.W.L. @ 35M

16” X 12”(OD) X 9200 (L) 14

12

13

CONTRACTOR DRAWING No. :

033764-H-D00-15-SPM-LP-D-00041-0001

TITLE :

FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - TOP DECK - RP9S

SCALE :

1:100

PROJECT No. :

LTC/C/NFP/5129/20

PROJECT

033764

DRAWING No.

SHT

SIZE REVISION

235-83-SH-PLN-00004

0001

A1

A

15

16

1

2

3

4

5

6