2
3
4
5
6
7
8
9
10
11
12
Classification: Internal
1
PLATFORM NORTH
45°
45°
A
B
C
D
E
F
G
H
I
J
K
L
N
TRUE NORTH
TRUE NORTH
PREVAILING WIND
A
0 0 0
,
0 0 1
.
E
C
0 0 0
,
5 1 1
.
E
7500
15000
15000
235-XZ8355
n=5
235-XZ8321
B
0 0 0
,
0 3 1
.
E
235-FE830014
235-XZ8322
9 Kg
UPPER BOAT LANDING
T.O.G. EL. +3700
SWING ROPE.
BOAT LANDING
BOAT APPROACH
SWING ROPE.
JACKET LEVEL WALKWAY
T.O.G. EL. +6875
REFER DETAIL-1
D N
N D
DN
T.O.G. EL. +4700
LOWER BOAT LANDING
T.O.G. EL. +2700
NOTE 10
T.O.G. EL. +9032
TO CELLAR DECK/ TO MAIN DECK
UP
T.O.G. EL. +6875
EMERGENCY LADDER
SPACE ALLOCATION
EMERGENCY LADDER
UP
2500
2000
MAX. CRANE RADIUS 35M MAIN HOIST SWL 22.5MT
MIN. CRANE RADIUS 6.7M
TOP OF JACKET (T.O.S.EL.+6830) FROM EL. +0.000 TO EL. +9200
9 Kg
235-XZ8324
235-FE830015
235-XZ8323
13 WHP9S & RP9S KEY PLAN
14
NOTES:
15
16
B
2
1
2
1
B
C
A
- ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS
UNLESS STATED OTHERWISE.
- PRIMARY ESCAPE ROUTE: 1.12M WIDTH & 2.286M HEIGHT,
SECONDARY ESCAPE ROUTE 0.76M WIDTH & 2.286M HEIGHT (TYP.)
- THE MINIMUM HEADROOM HEIGHT SHALL BE PROVIDED IN ALL
AREA, MEASURED VERTICALLY FROM DECK SURFACE OF LANDING OR PLATFORM.
- THIS LAYOUT SHALL BE USED ONLY FOR QUANTITY AND
LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING EQUIPMENT AND DIRECTION OF ESCAPE ROUTES.
- THE PORTABLE EXTINGUISHERS LOCATED OUTDOOR SHALL
BE PROVIDED WITH WEATHER-PROOF CABINET.
- ARROWS SHOWN ON THE ESCAPE ROUTE INDICATE THE
PREFERRED DIRECTION OF EGRESS TOWARDS THE PRIMARY MUSTER AREA. IN CASE OF EMERGENCY AT RP, PERSONNEL SHALL USE BRIDGE TO REACH PRIMARY MUSTER AREA LOCATED AT WELLHEAD PLATFORM 9S LER BUILDING TR. IN CASE ESCAPE THROUGH BRIDGE TOWARDS WELLHEAD IS NOT FEASIBLE, PERSONNEL TO PROCEED TO SECONDARY MUSTER AREA LOCATED AT RP LER BUILDING TR FOR MUSTERING.
- LOCATION OF FIREFIGHTING, SAFETY, LIFESAVING
EQUIPMENT AND DIRECTIONAL ARROWS INDICATIVE ONLY. THE EXACT LOCATION WILL BE BASED ON ACTUAL SITE CONDITION.
- STAIRCASES SHOULD ALLOW TRANSPORTATION OF AN
INJURED PERSON THROUGH STRETCHER, TO BE CARRIED BY TWO PERSONS.
- ALL FIRE & SAFETY EQUIPMENT SHALL BE LOCATED IN SUCH A
WAY THAT THEY ARE EASILY ACCESSIBLE.
- A FIXED LADDER IS PROVIDED ON THE BOAT LANDING SO
THAT A PERSON FALLS OVERBOARD WILL HAVE A WAY BACK ONTO THE PLATFORM.
-
ALL ESCAPE ROUTES SHALL BE MARKED WITH ESCAPE MARKER PAINTED ON THE FLOOR IN OIL RESISTANT PHOTOLUMINESCENT PAINT THAT IS VISIBLE, DURABLE AND ANTI-SLIP.
-
AS PER TECHNICAL SAFETY BASIS OF DESIGN
(200-20-SH-DEC-00013) – FOR OUTDOOR AREAS, THE DEAD END SHALL NOT EXCEED 6 M OF TRAVEL DISTANCE.
LEGEND:
LEGEND
9 Kg
DESCRIPTIONS PRIMARY ESCAPE ROUTE 1.12m(WIDTH) X 2.286m (HEAD CLEARANCE) SECONDARY ESCAPE ROUTE 0.76m(WIDTH) X 2.286m (HEAD CLEARANCE) 9 kg POTASSIUM BICARBONATE DRY CHEMICAL POWDER (BC) PORTABLE FIRE EXTINGUISHER
LIFEBUOY WITH LIFELINE
LIFE JACKET
n=5
CABINET FOR 5 UNITS OF LIFE JACKET
QTY
2
4
5
1
45°
PREVAILING WIND
E U R T
H T R O N
C
A
N. 114,000
2
12” - FUEL GAS PIPELINE FUTURE
12” J-TUBE FOR COMPOSITE CABLE FROM RP4S TO RP9S
28” PL9LS - PIPELINE TO
RP4S
(FUTURE)
28” PL9S - PIPELINE TO
RP4S
N. 100,000
1
200-20-SH-DEC-00013
TECHNICAL SAFETY BASIS OF DESIGN (OFFSHORE) FOR COMP3 PROJECT
235-23-PI-PLP-00001
EQUIPMENT ARRANGEMENT PLAN TOP OF JACKET LEVEL FOR RP9S
REFERENCE NO.
TITLE
REFERENCES
A
A1
NO.
ISSUED FOR REVIEW
ISSUED FOR IDC
DESCRIPTION
MTA
MTA
JB
JB
BPB
13/05/25
BPB
28/04/25
BY
CHKD
APVD
DATE
PROJECT TITLE :
REVISIONS
NFPS Offshore Riser Platforms & Intrafield Pipelines Project - COMP3
Qatar Energy LNG
Qatar Energy LNG
THIS DOCUMENT IS PROPERTY OF QATARENERGY LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QATARENERGY LNG.
CONSULTANT / CONTRACTOR :
Saipem S.p.A.
CONTRACTOR DRAWING NO:
033764-H-D00-08-SPM-LP-D-00044-0001
TITLE :
FIRE, SAFETY EQUIPMENT AND ESCAPE ROUTE LAYOUT - TOP OF JACKET LEVEL - RP9S
SCALE :
1:100
PROJECT NO. :
LTC/C/NFP/5129/20
PROJECT
033764
DRAWING NO.
SHT
SIZE REVISION
235-83-SH-PLN-00005
0001
A1
A
14
15
16
100
0 0 2
400
TYPICAL DETAIL-1
N.T.S
13
A
B
C
D
E
F
G
H
I
J
K
L
1
2
3
4
5
6
7
10
11
12
Project: Q-32705 - Saipem COMP3 Folder: 1. 26.06.25