Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 32705 Saipem COMP3

❯

TQ's

❯

Latest Docs provided with TQ

❯

1. 26.06.25

❯

268 20 SH LIS 00002_A

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

COMPANY Contract No.: LTC/C/NFP/5129/20 CONTRACTOR Project No.: 033764

ASSET

: NFPS

Document Title

: SAFETY EQUIPMENT LIST FOR RP6N

COMPANY Document No.

:

268-20-SH-LIS-00002

CONTRACTOR Document No.

:

033764-L-D00-18-SPM-LP-L-00001

Discipline

: HSE&Q

Document Type

: LIST

Document Category/Class

:

2

Document Classification

:

Internal

A 07-MAG-2025 Issued for Review Valentina Brusati Gabriella Almasio

A1 02-MAG-2025

Issued for IDC

Valentina Brusati Gabriella Almasio

LOSPE Engr.

Dy. LOSPE Lead

Balasubramani Perumal Balasubramani Perumal LOSPE Lead

REV.

DATE

DESCRIPTION OF REVISION

PREPARED BY

REVIEWED BY

APPROVED BY

Saipem S.p.A

www.saipem.com

THIS DOCUMENT IS PROPERTY OF QatarEnergy LNG. THIS DRAWING OR MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY QatarEnergy LNG.

268-20-SH-LIS-00002_A

Page 1 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

REVISION HISTORY

Revision

Date

Revision Description

A1

A

02-MAG-2025

Issued for Inter Discipline Check

07-MAG-2025

Issued for Review

HOLDS LIST

Hold No

Hold Description

1

2

Tag nos.

Equipment unit weight and dimensions based on vendor input.

268-20-SH-LIS-00002_A

Page 2 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

TABLE OF CONTENTS

1

1.1

1.2

2

2.1

2.2

3

3.1

3.2

3.3

4

5

5.1

5.2

5.3

5.4

INTRODUCTION … 4

Project Objective … 4

Project Scope … 4

DEFINITIONS AND ABBREVIATIONS … 7

Definitions … 7

Abbreviations … 8

REGULATIONS, CODES AND STANDARDS … 9

Company References … 9

Project Documents … 9

Order of Precedence … 10

PURPOSE OF DOCUMENT … 11

EQUIPMENT LIST … 12

Firefighting Equipment … 13

Lifesaving Equipment … 14

Safety Equipment … 16

Safety Signs … 17

5.4.1 Prohibition Signs – Photo Reflective Type … 17

5.4.2 Mandatory Signs – Photo Reflective Type … 17

5.4.3 Warning Signs – Photo Reflective Type … 18

5.4.4

Informative and Emergency Signs – Photo Luminescent Type … 18

5.4.5 Fire Fighting Equipment Signs – Photo Luminescent Type … 20

268-20-SH-LIS-00002_A

Page 3 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

1

INTRODUCTION

The North Field is the world’s largest natural gas field and accounts for nearly all the State of Qatar’s gas production. The principal objective of the NFPS projects is to sustain plateau from existing QatarEnergy LNG Operation – S1, S2, S3, N1 and N2, production areas by implementing an integrated and optimum investment program consisting of subsurface development, pressure drop reduction steps and compression.

NFPS projects comprise 3 main investment programs:

  1. Investment #1: Drilling and Associated Facilities [WHP12S/ WHP13S/ WHP14S/

WHP12N/ WHP13N]

  1. Investment #2: Trunk line Looping and Intra-field pipeline looping [32” PL1LN, 32” PL1LS,

38”PL610LS]

  1. Investment #3: Compression Complexes and associated facilities [Phase 1 CP6S & CP7S; Phase 2: CP8S & CP4N; Phase 3: CP4S & CP6N Phase 4: CP1S & CP1N]

Drilling and Looping, Investments #1 and #2, projects are in execution phase and are being executed as I1P1, EPCOL Projects except for WHP13N, which will be part of NFPS Compression Projects execution which compromises total up to 9 COMPs.

1.1 Project Objective

The objective of this Project includes:

• Achieve standards of global excellence in Safety, Health, Environment, Security and

Quality performance.

• Sustain the Qatarenergy LNG North Field Production Plateau by installing new RPs and one WHPs to support new Compression Complex facilities CP6S & CP7S and pre- installed facilities for future Compression Complex facilities including but not limited to CP4N & CP8S tie-in with integration to the existing facilities under Investment #3 program.

• Facility development shall be safe, high quality, reliable, maintainable, accessible,

operable, and efficient throughout their required life.

1.2 Project Scope

The Project Scope includes detailed engineering, procurement, construction, brownfield modifications, transportation & installation, hook-up and commissioning, tie-in to EXISTING PROPERTY and provide support for start-up activities of the following facilities and provisions for future development. The WORK shall be following the specified regulations, codes, specifications and standards, achieves the specified performance, and is safe and fit‐for‐purpose in all respects.

Facilities - 1A

• RP5S RP with 2 x 28” CRA clad pipelines to RP7S and 2 subsea composite Cables and

associated J tubes from RP7S to RP5S & from CP7S to WHP13S.

• New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP7S

268-20-SH-LIS-00002_A

Page 4 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

• Hook-up and brownfield modification at WHP5S/RP5S bridge connection & WHP13S/CP7S Composite cable tie-in and E&I integration including RGA Control modification

• Pipeline decommissioning of 28” CS PL5 including associated demolition work at

WHP5S

Facilities - 2A

• RP6N RP with 1x28” CRA clad pipeline to WHP13N, 2 Subsea composite cables and

associated J tubes from WHP12N to RP4N and RP6N to WHP13N. • New fuel gas spur-line and flanged riser from subsea skid to RP6N • WHP13N Topside • Hook-up and brownfield modification at WHP6N/RP6N, RP4N- HPU-Umbilical and tie-in, WHP12N-new J tube installation, E&I migration, WHP6N/RP4N/WHP4N-E&I migration (Pre-CP4N), WHP13N and RP6N interconnection to NFB.

Facilities - 3A

• RP9S RP with 1x28” CRA clad pipeline to RP4S, • Hook-up and brownfield modification at RP4S/WHP9S, Modifications to integrate RP9S

to the RGA control network.

• Pipeline decommissioning of 28” PL9 to WYE on existing 38” trunkline PL49including

associated demolition work at WHP9S.

Facilities - 1B

• New fuel gas spur-line and flanged riser from subsea skid to RP4N • Fiber Optic Cable from RP6N to onshore LFP East, RP6N to RP4N and RP6N to LQ6S. • Hook-up and brownfield modification at RP6N Composite and FO Tie-ins NFB-PU Power & Control modifications, LQ6S/LFP (East)/BVS (East)- FO Tie-in Controls/Telecoms Integration

Facilities - 2B

• RP5N RP with 2 x 28” CRA clad pipelines to RP4N, 1 x 28” CRA clad pipeline to RP6N and 2 subsea composite Cables and associated J tubes from WHP12N to RP5N & from RP6N to RP5N.

• Hook-up and brownfield modification at WHP5N- RP5N Bridge connection, WHP12N Composite cable tie-in, RP4N Intrafield pipeline Hook up PL54 N/LN and E&I integration including NFB-PU Power & Control modifications

• Pipeline decommissioning of 2 x 16” PL56/PL54 Subsea Spur line from WHP5N to

reducing barred tee in subsea tie-in skid on PL6 / PL4.

Facilities - 3B

• 2 subsea composite Cables from RP4S to RP9S & from RP4S to WHP12S (with J-tube) • New Fuel Gas 8” CRA Spur-lines and flanged risers from Subsea skid to RP4S • Hook-up and brownfield modification at WHP12S/ RP9S/ RP4S Composite cable tie-in,

Spurline riser installation at RP4S RGA Power & Control modifications.

Facilities - 4B

• 1 subsea composite Cable from CP8S to RP11S (or from RP8S to RP11S as Option). • New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RP8S.

268-20-SH-LIS-00002_A

Page 5 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

• Hook-up and brownfield modification at WHP8S/ WHP11S for Test separator Internal Upgrade and MEG system modification, Spur lines, Power & Control Tie-ins on RP8S, RP11S/WHP11S-Tie-in (Power and Control), RGA Power & Control modifications.

Facilities - 5B

• 2 subsea composite Cables from RT2 to WHP3S & from RT2 to WHP2S (with J-tube)

and FO Cable from RT2 to Barzan WHP1.

• New Fuel Gas 8” CRA Spur-line and flanged riser from Subsea skid to RT2 • Hook-up and brownfield modification at BRZ-WHP1 - FO cable tie-in, WHP2S/ WHP3S/ RT&RT2 Composite cable tie-in and associated modification, RGA Power & Control modifications.

Facilities - 6B

• RP3S RP with 1x24” CRA clad pipeline to RT2 with Stalk on risers, • Hook-up and brownfield modification at RT2 for 24” Intrafield pipeline and Composite/FO cable Hook-up, WHP3S for Production diversion and Utilities, Power and ICSS Hook-up, WHP2S for Composite Cable Tie-ins and Power & Control Integration RGA Power & Control modifications. • Decommissioning at

In-situ abandonment of existing Topside/subsea Composite Cables RT-WHP2S, RT-WHP3S, Topside/Subsea FO cable RT-BRXWHP1.

topside existing and

Figure 1.2.1: NFPS Compression Project COMP3 Scope

268-20-SH-LIS-00002_A

Page 6 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

2 DEFINITIONS AND ABBREVIATIONS

2.1 Definitions

Definition

Description

COMPANY

QatarEnergy LNG.

CONTRACTOR

Saipem S.p.A.

DELIVERABLES

FACILITIES

MILESTONE

PROJECT

SITE

All products (drawings, equipment, services) which must be submitted by CONTRACTOR to COMPANY at times specified in the contract. All machinery, apparatus, materials, articles, components, systems and items of all kinds to be designed, engineered, procured, manufactured, constructed, supplied, tested and permanently installed by CONTRACTOR at SITE in connection with the NFPS Project as further described in Exhibit 6.

fabricated,

A reference event splitting a PROJECT activity for progress measurement purpose.

COMP3 - NFPS Offshore Riser/Wellhead Platform & Intrafield Pipelines Project

(i) any area where Engineering, Procurement, Fabrication of the FACILITIES are being carried out and (ii) the area offshore required for installation of the FACILITIES in the State of Qatar

SUBCONTRACT

Contract signed by SUBCONTRACTOR and CONTRACTOR for the performance of a certain portion of the WORK within the Project.

SUBCONTRACTOR

Any organization selected and awarded by CONTRACTOR to supply a certain Project materials or equipment or whom a part of the WORK has been Subcontracted.

WORK

Refer to article 2 of CONTRACT AGREEMENT.

WORK PACKAGE

The lowest manageable and convenient level in each WBS subdivision.

268-20-SH-LIS-00002_A

Page 7 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

2.2 Abbreviations

Code

Definition

AFFF

Aqueous film forming foam

BA

BAM

CO2

Breathing Apparatus

Breathing Air Manifold

Carbon Dioxide

DIFFS

Deck Integrated Fire Fighting System

EPC

Engineering, Procurement, Construction

HCRE

Helicopter Crash and Rescue Equipment

LER

NFPA

NFPS

PL

RP

Local Equipment Room

National Fire Protection Association

North Field Production Sustainability

Pipeline

Riser Platform

SCBA

Self-contained breathing apparatus

UPS

WHP

Uninterruptible Power Supply

Well Head Platform

268-20-SH-LIS-00002_A

Page 8 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

3 REGULATIONS, CODES AND STANDARDS

3.1 Company References

S. No

Document Number

Title

LTC/C/NFP/5129/20

Contract Agreement

EXHIBIT 5

Project Instructions

PRJ-PJL-PRC-005

Facilities, System and Unit Number Codes and Descriptions Procedure

PRT-PRS-PRC-014

Offshore Loss Prevention Philosophy

3.2 Project Documents

S. No

Document Number

Title

200-20-SH-DEC-00013

200-83-SH-DTS-00007

200-20-SH-SPC-00020

Technical Safety Basis of Design (Offshore) for COMP3 Project

Data Sheet for Safety, Lifesaving and Fire Fighting Items for COMP3 Project

Specification for Safety, Lifesaving and Fire Fighting Items for COMP3 Project

200-20-SH-DTS-00004

Data Sheet for Safety Signs for COMP3 Project

200-20-SH-SPC-00022

Specification for Safety Signs for COMP3 Project

200-83-SH-DTS-00006

200-20-SH-SPC-00019

200-83-SH-DTS-00005

200-20-SH-SPC-00021

268-83-SH-PLN-00001

268-83-SH-PLN-00002

268-83-SH-PLN-00003

268-83-SH-PLN-00004

268-83-SH-PLN-00005

Data Sheet for DIFFS (Deck Integrated Firefighting System) for COMP3 Project

Specification for DIFFS (Deck Integrated Firefighting System) for COMP3 Project

Data Sheet for NOVEC 1230 (FK-5-1-12) Clean Agent for COMP3 Project

Specification for NOVEC 1230 (FK-5-1-12) Clean Agent for COMP3 Project

Fire, Safety Equipment and Escape Route Layout - Cellar Deck - for RP6N

Fire, Safety Equipment and Escape Route Layout - Helideck - for RP6N

Fire, Safety Equipment and Escape Route Layout – Local Equipment Room - for RP6N

Fire, Safety Equipment and Escape Route Layout - Main Deck - for RP6N

Fire, Safety Equipment and Escape Route Layout – Top Deck - for RP6N

268-20-SH-LIS-00002_A

Page 9 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

S. No

Document Number

Title

268-83-SH-PLN-00006

Fire, Safety Equipment and Escape Route Layout – Top of Jacket - for RP6N

268-20-SH-PLN-00019

Safety Signs Layout- Cellar Deck - for RP6N

268-20-SH-PLN-00020

Safety Signs Layout- Helideck - for RP6N

268-20-SH-PLN-00021

Safety Signs Layout– Local Equipment Room - for RP6N

268-20-SH-PLN-00022

Safety Signs Layout- Main Deck - for RP6N

268-20-SH-PLN-00023

Safety Signs Layout– Top Deck - for RP6N

268-20-SH-PLN-00024

Safety Signs Layout– Top of Jacket - for RP6N

3.3 Order of Precedence

The COMP3 facilities shall be designed, and operated in accordance with the applicable laws, regulations of the State of Qatar, COMPANY Procedures & Standards, PROJECT related documentation, internationally recognized codes and standards listed at Section 3 in the order of precedence describe as below:

• Qatari Governmental and Regulatory Requirements • COMPANY Procedures, Policies and Standards • PROJECT Specifications. • • COMPANY and CONTRACTOR’s Lessons Learned

Industry Codes and Standards

When a conflict exists among codes, standards, and project specifications, the most stringent provision shall govern unless otherwise formally clarified and agreed with COMPANY. Conflict among applicable specifications and / or codes shall be brought to the attention of the COMPANY for resolution COMPANY decision shall be final and shall be implemented.

268-20-SH-LIS-00002_A

Page 10 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

4 PURPOSE OF DOCUMENT

The purpose of this document is to list Fire Fighting, Life Saving & Safety equipment and Safety signs to be provided for the new riser platform RP6N.

268-20-SH-LIS-00002_A

Page 11 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

5 EQUIPMENT LIST

The sections below present the list of Fire Fighting, Life Saving & Safety equipment and Safety signs to be provided for the new riser platform RP6N.

The location of the above mentioned equipment shall be as per Fire, Safety Equipment and Escape Route Layouts and Safety Sign Layouts [Ref 14 to Ref 25] whereas technical details shall be as per Datasheet and Specification for Safety, Lifesaving and Fire Fighting Items and Safety Signs [Ref 6 to Ref 13] .

268-20-SH-LIS-00002_A

Page 12 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

5.1 Firefighting Equipment

The following Firefighting equipment shall be provided as part of the project.

Table 5-1: List of Fire Fighting Equipment

Qty (Nos.)

S.No.

Tag No.

Item Description

Outdoor

Top of Jacket Level

Cellar Deck

Main Deck

Top Deck

Helideck Crane

Indoor

LER (First Floor)

LER (Second Floor)

Total

Spares (Note1)

Grand Total

Dimension

Unit weight (kg)

Remarks

Dry Chemical Powder Handheld Extinguisher (BC Type) 9 kg

Carbon Dioxide Handheld Extinguisher 4.5 kg

Carbon Dioxide Wheeled Extinguisher 22.5 kg

Dry Chemical Powder Wheeled Extinguisher 56.7 kg

AFFF Wheeled Extinguisher 135L

Dry Chemical Powder (BC) Hand Extinguisher 4.1 kg

2

2

5

3

5

1

4

3

2

2

2

1

1

1

2

1

268-XZ8338 268-XZ8339 268-XZ8340

268-XZ8302

Fire Blanket

NOVEC 1230 (FK-5-1-12) Clean Agent System

268-XZ8301

Deck Integrated Fire Fighting System (DIFFS)

1

1

1

HOLD-1

HOLD-1

HOLD-1

HOLD-1

HOLD-1

HOLD-1

2

3

4

5

6

7

8

9

Notes:-

15

10

2

5

1

1

3

1

1

2

1

0

1

0

0

17

HOLD-2

HOLD-2

Note 2

11

HOLD-2

HOLD-2

Note 2

2

6

1

1

3

1

1

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

Note 3,4

HOLD-2

HOLD-2

  1. 10 % spare fire extinguishers shall be provided for all types and capacities of the extinguishers [Ref 7].

  2. All portable Fire Extinguishers located outdoor shall be provided with weatherproof cabinet.

  3. NOVEC 1230 (FK-5-1-12) Clean Agent System protection shall be provided for Electrical & Instrument Room and UPS Room in the LER.

  4. Main and Reserve cylinders for NOVEC 1230 (FK-5-1-12) Clean Agent system is located outside the LER (First floor).

268-20-SH-LIS-00002_A

Page 13 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

5.2 Lifesaving Equipment

The following Life Saving equipment shall be provided as part of the project.

Table 5-2: List of Life Saving Equipment

Qty (Nos.)

S.No .

Tag No.

Item Description

Outdoor

Top of Jacket Level

Cellar Deck

Main Deck

Top Deck

Helideck Crane

Indoor

LER (First Floor)

LER (Second Floor)

Total Spares

Grand Total

Dimension

Unit weight (kg)

Remarks

4

4

5

1

1

2

3

4

5

6

7

8

9

10

268-XZ8303 268-XZ8304

Life Raft

268-XZ8334

Scramble Net

268-XZ-8309 to 268-XZ-8324

Lifebuoy

HOLD-1

Life Jacket (inside cabinet)

Cabinet for 5 units of Life Jacket

268-XZ8329 268-XZ8330

Cabinet for 10 units of Life Jacket

268-XZ8331

268-XZ8354 268-XZ8355 268-XZ8349 268-XZ8350 268-XZ8351 268-XZ8352

268-XZ8347 268-XZ8348

Life Jacket (without cabinet)

Helicopter Crash and Rescue Equipment (HCRE) Cabinet

First Aid Kit

Stretcher

11

Self-Contained Breathing Apparatus (45 mins)

12

268-XZ8308

Cabinet for 4 units of SCBA

13

Work vest

14

268-XZ8332

Cabinet with 20 units of work vest

15

268-XZ8358

Oil Spill Kit and Cabinet

4

2

1

4

20

2

4

1

20

1

2

1

1

1

1

2

2

2

1

16

25

1

2

1

2

4

2

4

1

20

1

1

2

1

16

25

1

2

1

2

4

2

4

1

HOLD-2

HOLD-2

Note 1

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

Note 2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

20

HOLD-2

HOLD-2

1

1

HOLD-2

HOLD-2

HOLD-2

HOLD-2

268-20-SH-LIS-00002_A

Page 14 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

Tag No.

Item Description

Outdoor

Qty (Nos.)

Indoor

Top of Jacket Level

Cellar Deck

Main Deck

Top Deck

Helideck Crane

LER (First Floor)

LER (Second Floor)

Total

Spares

Grand Total

Dimension

Unit weight (kg)

Remarks

S.No .

16

17

268-XZ8305

18

268-XZ8307

Breathing Apparatus Escape sets (inside cabinet)

Cabinet for 20 units of Breathing Apparatus Escape sets

Breathing Apparatus Escape set (without cabinet)

19

268-XZ8357

Medical Oxygen Cylinder with face mask

20 HOLD-1

21 HOLD-1

Notes :-

Breathing Air Manifold Cabinet with 6 Units of Hoses (BAM 6)

Breathing Air Manifold Cabinet with 10 Units of Hoses (BAM 10)

1

2

1

  1. Each life raft shall be suitable for 10 men (50 % POB) capacity.

  2. Helicopter Crash Rescue Equipment cabinet shall include all equipment required per CAP 437.

1

20

1

1

2

20

1

1

1

4

2

20

HOLD-2

HOLD-2

1

1

1

4

2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

268-20-SH-LIS-00002_A

Page 15 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

5.3 Safety Equipment

The following Safety equipment shall be provided as part of the project.

Table 5-3: List of Safety Equipment

Qty (Nos.)

S.No.

Tag No.

Item Description

Outdoor

Top of Jacket Level

Cellar Deck

Main Deck

Top Deck

Helideck Crane

Indoor

LER (First Floor)

LER (Second Floor)

Total

Spares

Grand Total

Dimension

Unit weight (kg)

Remarks

268-SEW8301

Combined Safety Shower and Eyewash Station

268-EW8301

Portable Eyewash Unit

268-XZ2001

Lighted Windsock

268-XZ8356

Fireman Equipment Cabinet

1

268-XZ8336

Chemical Handling Safety Kit

268-XZ8343 268-XZ8344

Electrical Safety Kit

1

2

3

4

5

6

Notes :-

  1. Lighted windsock shall be mounted above crane cabin by pedestal crane vendor.

1

1

1

1

1

1

1

1

1

1

1

2

1

1

1

1

1

2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

Note 1

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

268-20-SH-LIS-00002_A

Page 16 of 20

Classification: Internal

5.4 Safety Signs

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

The following Safety Signs of all types (Prohibition, Mandatory, Warning, Informative & Emergency and Fire Fighting Equipment) shall be provided as part of the project. The exit signs illuminated with battery back-up inside the LER (by Electrical vendor) and safety signs for Clean Agent and DIFFS system including push buttons (by respective system vendor) are not listed in the below tables.

5.4.1 Prohibition Signs – Photo Reflective Type

S. No.

Item Description

1

No Mobile Phone

Top of Jacket Level

1

5.4.2 Mandatory Signs – Photo Reflective Type

S. No.

Item Description

1

2

Combined safety sign which includes:

  • Personal Gas Detector must

be worn.

  • H2S Emergency Escape Hood must be carried.

Combined safety sign which includes:

  • Ear protection must be worn.
  • Foot protection must be worn.
  • Head protection must be worn.
  • Eye protection must be worn.

Top of Jacket Level

1

1

Table 5-4: List of Prohibition Signs

Qty (Nos.)

Outdoor

Cellar Deck

Main Deck

Top Deck

Helideck

Crane

Indoor LER (First Floor)

LER (Second Floor)

Total

Spares

Grand Total

Dimension

Unit weight (kg)

Remarks

1

1

HOLD-2

HOLD-2

Table 5-5: List of Mandatory Signs

Qty (Nos.)

Outdoor

Cellar Deck

Main Deck

Top Deck

Helideck

Crane

Indoor

LER (First Floor)

LER (Second Floor)

Total

Spares

Grand Total

Dimension

Unit weight (kg)

Remarks

2

1

3

1

HOLD-2

HOLD-2

3

HOLD-2

HOLD-2

268-20-SH-LIS-00002_A

Page 17 of 20

Classification: Internal

5.4.3 Warning Signs – Photo Reflective Type

S. No.

Item Description

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

Table 5-6: List of Warning Signs

Qty (Nos.)

Outdoor

Top of Jacket Level

Cellar Deck

Main Deck

Top Deck

Helideck

Crane

Indoor

LER (First Floor)

LER (Second Floor)

2

5

Beware Electricity

Cold Surface

Dropped Object Warning sign

1

Helideck Warning sign

Radiation Hazard

4

5

3

2

2

1

1

2

3

4

5

Note:

Total

Spares

Grand Total

Dimension

Unit weight (kg)

Remarks

7

4

9

2

3

7

4

9

2

3

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

Note 1

  1. Radiation Hazard Safety sign shall be for the antenna (located outdoor) mounted above the crane cabin.

5.4.4

Informative and Emergency Signs – Photo Luminescent Type

S. No.

Item Description

Table 5-7: List of Informative and Emergency Signs

Outdoor

Qty (Nos.)

Top of Jacket Level

Cellar Deck

Main Deck

Top Deck

Helideck

Crane

Indoor

LER (First Floor)

LER (Second Floor)

1

2

3

4

5

6

7

Combined Safety Shower and Eye Wash Station

Portable Eyewash Unit

First Aid Kit

Exit Direction Towards Right Down

Exit Direction Towards Right Up

Exit Direction Towards Right

Exit Direction Towards Left

1

3

1

1

4

4

1

5

12

2

1

1

1

2

1

1

Total

Spares

Grand Total

Dimension

Unit weight (kg)

Remarks

1

1

4

2

2

11

20

1

1

4

2

2

11

20

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

268-20-SH-LIS-00002_A

Page 18 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

Qty (Nos.)

S. No.

Item Description

Outdoor

Top of Jacket Level

Cellar Deck

Main Deck

Top Deck

Helideck

Crane

Indoor

LER (First Floor)

LER (Second Floor)

Total

Spares

Grand Total

Dimension

Unit weight (kg)

Remarks

Exit Direction Towards Left Down Exit Direction Towards Left Up

Breathing Air Escape Set

Self-Contained Breathing Apparatus (SCBA)

Muster Station

Lifebuoy With Lifeline, Smoke Signal and Light

Life Jacket

Life Raft

Scramble Net

Stretcher

Work Vest

Electrical Safety Kit

Helicopter Crash & Rescue Equipment

1

4

1

4

1

4

2

2

1

1

Breathing Air Manifold

1

2

Emergency Oil Spill Kit

Chemical Handling Safety Kit

Lighted Windsock

Oxygen Cylinder with Face Mask

VHF Radio

Embarkation Area

1

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

Note:

1

1

4

1

1

2

1

1

1

1

1

1

2

1

2

1

1

1

1

1

2

1

1

16

4

2

1

2

1

2

2

6

1

1

1

1

1

1

1

1

2

1

1

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

16

HOLD-2

HOLD-2

4

2

1

2

1

2

2

6

1

1

1

1

1

1

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

Note 1

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

  1. The Illuminated Windsock safety sign shall be for the windsock (located outdoor) mounted above the crane cabin.

268-20-SH-LIS-00002_A

Page 19 of 20

Classification: Internal

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

COMP3 - NFPS OFFSHORE RISER/WELLHEAD PLATFORM & INTRAFIELD PIPELINES PROJECT

SAFETY EQUIPMENT LIST FOR RP6N

5.4.5 Fire Fighting Equipment Signs – Photo Luminescent Type

S. No.

Item Description

1

2

3

4

5

6

7

8

9

10

Portable Dry Chemical Fire Extinguisher

Portable CO2 Fire Extinguisher

Wheeled Foam Fire Extinguisher

Wheeled DCP Fire Extinguisher

Wheeled CO2 Fire Extinguisher

Fire Blanket

Manual Alarm Call Point

Firemen Equipment Cabinet

Emergency Shutdown Push Button – 1 Emergency Shutdown Push Button – 2

Top of Jacket Level

2

2

1

Table 5-8: List of Fire Fighting Equipment Signs

Outdoor

Qty (Nos.)

Cellar Deck

Main Deck

Top Deck

Helideck

Crane

Indoor

LER (First Floor)

LER (Second Floor)

2

4

3

2

4

1

5

2

1

4

5

1

5

5

3

2

7

1

1

2

2

3

2

Total

Spares

Grand Total

Dimension

Unit weight (kg)

Remarks

16

10

1

5

2

3

30

1

3

1

16

10

1

5

2

3

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

30

HOLD-2

HOLD-2

1

3

1

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

HOLD-2

268-20-SH-LIS-00002_A

Page 20 of 20

Project: Q-32705 - Saipem COMP3 Folder: 1. 26.06.25


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further