ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

COMPANY DOC No: 1-CF0000-40-MOR-0042-00

Rev. 01

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

CONTRACTOR Document Number: CF0000-1085354

01

00

10/04/2024

20/12/2024

IFP

IFP

Issued for Purchase C. Zuliani V. Cavaliere A. Massoni C. Copelli

Issued for Purchase C. Zuliani V. Cavaliere A. Massoni C. Copelli

A1

12/10/2024

IFR

Issued for COMPANY Review

C. Zuliani V. Cavaliere A. Massoni C. Copelli

Rev

Date (DD/MM/YYYY)

Status

Status Description

PREPARED

CHECKED

APPROVED 1

APPROVED 2

This Document is intended for use by ADNOC and its nominated Consultants, Contractors, Manufacturers and Suppliers.

DOCUMENT CLASS – 2A Page 1 of 47

       Uncontrolled When Printed

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

COMPANY DOC No: 1-CF0000-40-MOR-0042-00

Rev. 01

HOLD

Section

Description

HOLD LIST

HOLD2

2

The need for scramble net still to be decided or alternative measure (foldable ladder) to be considered

DOCUMENT CLASS – 2A Page 2 of 47

       Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

TABLE OF CONTENTS

PROJECT OVERVIEW … 6

1.1

EPC for HAIL & GHASHA Development Project … 6

PURPOSE … 7

DEFINITIONS AND ABBREVIATIONS … 8

3.1

3.2

Definitions … 8

Abbreviations … 8

REFERENCE DOCUMENTS … 9

ORDER OF PRECEDENCE … 11

COMPLETENESS OF SUPPLY … 11

6.1

6.2

Statement of Compliance (SOC) … 12

Concession and Deviation after Order placement … 12

GENERAL REQUIREMENTS … 12

7.1

7.2

7.3

7.4

7.5

7.6

Site Condition … 12

Noise Level … 12

Units of Measurement and Standard Conditions … 12

Design Life … 12

Language … 13

Blast Condition … 13

SCOPE OF SUPPLY AND SERVICES … 13

8.1

8.2

8.3

8.4

8.5

Battery Limits … 18

Exclusions … 18

Surface preparation, Painting and Coating. Requirements for fireproofing … 18

Transport and Installation Requirement … 18

Level of packaging … 19

8.6 Weight, Dimension and Foundation Loads Monitoring … 19

8.7

8.8

8.9

Transportation Limitation … 19

Interface Data for Modularizations Engineering … 20

Nameplate … 20

8.10 E-Tagging… 20

8.11 Packing and Marking … 20

8.12 Special Tools, Jigs and Template … 20

8.13 Lubricants… 21

DOCUMENT CLASS 2A

Page 3 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

8.14 Consumables … 21

8.15 Spare Parts … 21

REQUIREMENTS FOR VENDOR DOCUMENTATION … 24

9.1

9.2

9.3

9.4

Supplier Documents Requirements List … 25

Review and comments by PURCHASER … 25

3D Model … 26

As-built drawings … 26

9.5 Manuals: Mechanical Catalogue, Operating & Maintenance Manual,

Manufacturing Record Book, Dispatch Dossier … 26

9.6 Maintenance and inspection Information Requirements … 31

9.6.1 VENDOR’s Maintenance Deliverables … 31

9.6.2 Maintenance Information Available from VENDOR’s Manual … 31

9.6.3 Maintenance Plan Matrix … 31

9.6.4 Maintenance Task List … 31

9.6.5

Inspection Information … 32

9.7

Software and Licenses; deliverables format … 32

PROJECT ADMINISTRATION … 32

10.1 Participation to meetings … 32

10.2 SUB-VENDORS … 33

10.3 Sub-Vendor Management and Control: … 34

QUALITY REQUIREMENTS… 35

11.1 VENDOR’s Quality System … 35

11.2

INSPECTION & TESTING REQUIREMENTS … 35

11.3 Dual use requirements … 39

  1. MATERIAL TAKE OFF, PURCHASE ORDES AND DELIVERY … 39

VENDOR ASSISTANCE AND SITE SERVICES … 40

13.1 Site assistance … 40

13.2 Training Requirements for COMPANY Personnel … 41

SAFETY INFORMATION … 41

14.1 Safety Information … 42

GUARANTEES … 42

15.1 VENDOR Responsibility … 42

15.2 Mechanical Guarantees … 43

15.3 Performance Guarantees … 43

15.4 Site Acceptance Test … 43

15.5 Make-good … 43

DOCUMENT CLASS 2A

Page 4 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

INFORMATION REQUIRED ALONG WITH THE BID … 44

16.1 Price Breakdown … 45

ATTACHMENTS … 46

17.1 Attachment 1 – Deviation / Clarification List … 46

17.2 Attachment 2 – Supplier Documents Requirements List … 47

DOCUMENT CLASS 2A

Page 5 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

PROJECT OVERVIEW

1.1

EPC for HAIL & GHASHA Development Project The Hail & Ghasha Development (HGD) Project is of strategic importance to the Emirate of Abu Dhabi. The Project will develop the untapped oil and gas reserves from the highly sour Hail and Ghasha fields. Production is targeted to start by Q4 2027 with sustainable production of 1 BSCFD of Raw Gas, and max production of 82.5 MSBPD of Oil, 76.3 MSBPD of Condensate, 9000 TPD of Sulphur and 5030 TPD of NGL. In addition, Project will capture 1.52 million tonnes of CO2 per year taking ADNOC’s committed investment for carbon capture capacity. The Hail and Ghasha fields are situated offshore ABU DHABI about 140 km away from ABU DHABI mainland in water depths varying from 0 to 15 meters.

The HGD Project comprises the following:

• Artificial Islands Construction;

• Offshore package – EPC 01: Offshore Drilling Centres (DCs), Subsea Pipelines, Umbilicals, Power Cable Connections, Seawater Intake Structure, Bridges, Risers, Flare Structure, facilities at Ghasha Offshore Processing Plant (“GOP”);

• Onshore package – EPC 02: Manayif Onshore Processing Plant (“OPP”), Manayif

Utilities, Offsite Pipelines & Tie-ins, Main Control and Other Buildings.

The HGD Project will be executed in a single phase approach. It will start production from three Drilling Centres (Reeah, Jzool & Seebah) in Ghasha Field to GOP and from Gaff Island in Hail Field to OPP. Remaining Drilling Centres, gas injection, and other associated facilities will be developed in ‘future’ to sustain production from Hail & Ghasha fields.

Figure 1 - Hail & Ghasha Fields

DOCUMENT CLASS 2A

Page 6 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

PURPOSE

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

The purpose of this document is to request a quotation for the following equipment:

Items No.

Safety and life Saving Equipment description

Safety Shower Containing Integral Eye Wash

Standalone Safety Shower Containing Integral Eye Wash (at DC)

Portable Safety Shower Containing Integral Eye Wash (at DC)

Windsocks With Lights

Lifebuoys (in the Plant and Ready for operational phase)

Life Raft

Life Jacket (in the Plant and Ready for operational phase)

Helicopter Crash Equipment Cabinet

Chemical Kit

First Aid Kit (FAK)

Electrical Safety Kit (Ready for operational phase)

Heat Stress Monitor (Ready for operational phase)

Noise Monitor Dose Meter (Ready for operational phase)

Safety Gloves (Ready for operational phase)

Hand held megaphone (Ready for operational phase)

Rechargeable torches (Ready for operational phase)

Windsock tissue / ring (Ready for operational phase)

Rescue basket (Ready for operational phase)

DOCUMENT CLASS 2A

Page 7 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Safety harnesses (Ready for operational phase)

Complete Firemen’s Equipment Set (Ready operational phase)

for

Scramble Net (HOLD 2)

Chemical Kit Battery Room

Multiple gas detectors (Ready for operational phase)

Portable Multiple gas detector with alarm

The quotation shall be in accordance with this Material Requisition and its attachments.

This Material Requisition defines the minimum technical requirements for the SUPPLY of materials, manufacture, inspection, testing, packing, transportation, training, site assistance and supervision.

DEFINITIONS AND ABBREVIATIONS

3.1

Definitions

COMPANY

PROJECT

Abu Dhabi National Oil Company (ADNOC)

Hail and Ghasha Development Project

PURCHASER

Unincorporated Joint Venture NPCC - SAIPEM

VENDOR/SUPPLIER

A supplier of Materials in connection with the Works including related documentation and services, where necessary.

SUPPLY

Equipment, materials and/or services included in the scope of this document

3.2

Abbreviations

ADNOC

AGES

BEDD

BSCFD

DC

EPC

Abu Dhabi National Oil Company

ADNOC Group Engineering Standards and Specifications

Basic Engineering Design Data

Billion Standard Cubic Feet per Day

Drilling Centre

Engineering, Procurement, Construction

DOCUMENT CLASS 2A

Page 8 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

GOP

HGD

IVB

Ghasha Offshore Processing

Hail & Ghasha Development

Independent Verification Body

MSBPD

Thousand Standard Barrels per Day

OPP

PO

SDRL

SOW

UAE

VRU

Onshore Processing Plant

Purchase Order

Supplier Document Requirement List

Scope of Work

United Arab Emirates

Vapour Recovery Unit

REFERENCE DOCUMENTS

Sl. No.

Document No.

Document Title

  1. 1-CF0000-07-BOD-1000-00

Basis of Structural Design (Offshore Islands)

  1. 1-CF0000-25-SPE-9073-00

Criticality Rating and Inspection Class For Material And Equipment

  1. 1-CF0000-40-PHL-0002-00

HSE Design Philosophy

  1. 1-CF0000-40-PHL-0003-00

H2S (Hydrogen Sulphide) Philosophy

  1. 1-CF0000-40-PLN-0061-00

HFE philosophy and activities plan

  1. 1-CF0000-51-PRO-9697-00

Preservation Management Procedure

  1. 1-CF0000-52-PRO-5806-00

Project HSE Requirements for Subcontractors and Vendors

  1. 1-CF0000-53-PLN-9114-00

Project Information Management Plan

  1. 1-CF0000-54-SPE-9604-00

Quality Assurance Requirement for Vendors

  1. 1-CF0000-54-PRO-3005-00

QC Requirements for Suppliers of Materials, Equipment and Services

  1. 1-CF0000-58-PRO-0008-00

Packing, Marking & Shipping Instruction

  1. 1-CF0000-59-PHL-0001-00

Basic Engineering Design Data (BEDD)

  1. 1-CF0000-59-PRO-0002-00

Project Procedure for Document and Drawing Numbering

  1. 1-CF0000-59-PRO-0003-00

Project Procedure for Tag Numbering

  1. 1-CF0000-59-PRO-0004-00

Documents Title Blocks

  1. 1-CF0000-59-PRO-0006-00

Project Documentation – Reviews, Comments and Approvals

DOCUMENT CLASS 2A

Page 9 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

  1. 1-CF0000-59-PRO-91139-00

  2. 1-CF0000-59-PRO-9121-00

  3. 1-CF0000-71-PLN-9502-00

  4. 1-CF0000-40-SPE-0032-00

  5. HSE-OS-ST20

AGES-SP-03-001

ADNOC Doc. No. PK1- 03.B.04

PK1-10.10C.2 Subcontractor and vendor list and vendor approval process

PK1-10.10C.2 Subcontractor and vendor list and vendor approval process

PK1-10.10C.2 Subcontractor and vendor list and vendor approval process

  1. 1-GH5161-04-PID-1005-00

Procedure For Final Handover Documentation

Vendor Guidelines for the spare parts management

Pre-Commissioning and Commissioning Execution Plan

Safety And Life Saving Equipment Specification

Personal Protective Equipment

Escape, Evacuation, Rescue & Life Saving Appliances (EER & LSA) Specification

Attachment 2 to Scope of Work Narratives

Attachment 5 - Approach 2.1 HGD RVL

Attachment 6 - Approach 2.3 (AVL)

Attachment 13 - Approach 1.2 HGD SVL (onshore & offshore)

Piping & Instrument Diagram - OFFSHORE UNIT 61 - (GOP) Chananiz Isl. Potable Water Distribution

  1. 1-CF0000-25-SPE-0702-00

Painting, Coating and Lining Specification

DOCUMENT CLASS 2A

Page 10 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

ORDER OF PRECEDENCE

Design and engineering for the Facilities shall be undertaken in accordance with regulations, codes, standards and specifications in the order of precedence stated below:

• United Arab Emirates (UAE) Local Codes, Laws and Regulations.

• COMPANY HSE Standards.

• Project Specifications / Datasheets.

• COMPANY Group Engineering Standards and Specifications (AGES)

• ADNOC Offshore and ADNOC Onshore Specifications and Standards

•

International Codes & Standards.

• VENDOR Procedures and Standards

In cases of conflicts, discrepancies, inconsistencies or ambiguity between this document and any associated document, and between documents in the same level of hierarchy as listed above, the most stringent and safest requirement shall prevail. In such cases, VENDOR shall provide its interpretation for most stringent and safest requirement in writing for PURCHASER/COMPANY’s written clarifications and approval, and PURCHASER / COMPANY’s decision shall be final.

inadequate

information

Conflicting or the Material Requisition, or review by PURCHASER/COMPANY of VENDOR drawings or other documents, or release of equipment for shipment by PURCHASER/COMPANY’s inspectors shall not relieve VENDOR from responsibility to supply equipment of required design, materials and workmanship for the intended service under the specified conditions.

in

VENDOR is responsible to obtain latest applicable standards at the date of the Purchase Order award.

COMPLETENESS OF SUPPLY

Without prejudice to the Order of Precedence of the Purchase Order Documents as set forth herein, if the VENDOR discovers any errors, omissions, or discrepancies in the Purchase Order, it shall immediately notify the PURCHASER in writing, who will promptly clarify such matters as necessary. Any SUPPLY, or part thereof, affected by such discoveries which is performed by the VENDOR without such notification or subsequent to discovery and notification but prior to clarification by the PURCHASER, shall be at the VENDOR’s risk. Moreover, the PURCHASER shall not entertain any claim arising from such matter.

Should any materials or services not be denoted in the VENDOR’s design, specifications and drawings, but which are necessary for the proper carrying out of the SUPPLY in accordance with the Purchase Order, the VENDOR shall nevertheless supply such material or services as if so denoted, the cost of which shall be deemed to be included in the Purchase Order amount and price.

DOCUMENT CLASS 2A

Page 11 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

6.1

Statement of Compliance (SOC)

As indicated at section 16 “Information Required Along with the Bid”, VENDOR shall fully comply and submit with his offer a statement of compliance (SOC) to declare the full acceptance of the scope of work and full compliance with all the requirements as stated in this Material Requisition.

Any and all deviations shall be subject to COMPANY/PURCHASER review during bidding phase.

VENDOR shall provide with his offer the deviation/clarification list (reference shall be made to para 0 Attachment 1 – Deviation / Clarification List) properly filled out for review.

COMPANY/PURCHASER’s review of the subject list shall be final.

6.2

Concession and Deviation after Order placement

Following the Purchase Order placement, no requests for concessions or deviations from VENDOR shall be accepted.

GENERAL REQUIREMENTS

7.1

Site Condition

All equipment offered under this Material Requisition shall be suitable for operating under the design conditions and utilities available given in Basic Engineering Design Data (BEDD)

  • Doc No: 1-CF0000-59-PHL-0001-00.

7.2

Noise Level

Outdoor Noise level shall not exceed 85 dBA at 1 m distance from the equipment surface in all direction. Maximum noise limits and safeguards shall conform to HSE-OH-ST08 Physical Health Standard as per Section 9.1 AGES-SP-03-004 Human Factors.

For Indoor Noise level shall conform to HSE-OH-ST08 Physical Health Standard as per table 7.2.3: Noise for Indoor Environments.

7.3

Units of Measurement and Standard Conditions

For Unit of Measurement and standard conditions reference shall be made to Basic Engineering Design Data (BEDD) - Doc No: 1-CF0000-59-PHL-0001-00.

7.4

Design Life

30 years of design life shall be considered for all equipment/system.

DOCUMENT CLASS 2A

Page 12 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

7.5

Language

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

All correspondence, drawings, instructions, data sheets, design calculations and any other written information shall be in the English language.

7.6

Blast Condition

Not applicable

SCOPE OF SUPPLY AND SERVICES

The VENDOR shall supply the listed equipment items complete with all auxiliary equipment necessary to meet the conditions and to perform all the duties as specified in the Equipment Data Sheets and Specification (see ref. 20).

The scope of work shall include the design, sizing, supply of engineering documents and certificates, supply of materials, fabrication, assembly, testing in accordance with the scope, drawings, specifications, datasheets, etc. enclosed herewith.

The scope shall include the following but not limited to:

Description

Qty

Price Extension

Safety Shower Containing Integral Eye Wash

7 16 Nos.

Pos

Standalone Safety Shower Containing Integral Eye Wash (at DC)

4 Nos.

Portable Safety Shower Containing Integral Eye Wash (at DC)

4 Nos

Windsocks With Lights

35 Nos

Lifebuoys (in the Plant and Ready for operational phase)

70 Nos

Life Raft

5 Nos

Life Jacket (in the Plant and Ready for operational phase)

5080 Nos

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

DOCUMENT CLASS 2A

Page 13 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Description

Qty

Price Extension

Pos

Helicopter Crash Equipment Cabinet

Chemical Kit

First Aid Kit (FAK)

Electrical Safety Kit (Ready for operational phase)

10 Nos

7 Nos

27 Nos

2 Nos

Stretcher (inside the Fire Point Shelter / Substations and Ready for operational phase)

43 Nos

Fire Blanket (inside the Fire Point Shelter/ Ready for operational phase)

17 Nos

Face Shield Mask (inside the Fire Point Shelter)

36 Nos

Heat Stress Monitor (Ready for operational phase)

15.1

2 Nos

Noise Monitor Dose Meter (Ready for operational phase)

16.1

1 Nos

Safety Gloves (Ready for operational phase)

17.1

700 Nos

Hand held megaphone (Ready phase)

18.1

for operational

4 Nos

Rechargeable torches (Ready for operational phase)

19.1

50 Nos

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

DOCUMENT CLASS 2A

Page 14 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Pos

Description

Qty

Price Extension

Windsock tissue / ring (Ready for operational phase)

20.1

Rescue basket (Ready for operational phase)

21.1

Safety harnesses (Ready for operational phase)

22.1

20 Nos

3 Nos

50 Nos

Complete Firemen’s Equipment Set (Ready for operational phase)

23.2

6 Nos

Scramble Net (HOLD 2)

24.2

Chemical Kit Battery Room

25.2

Multiple gas detectors (Ready for operational phase)

Portable Multiple gas detector with alarm

26.2

Nameplates

27.2

Packing and Preparation for Shipment for equipment and deliverables

Special Tools, Jigs, Templates

28.2

1 set for each pair of Units (for multi-unit installations)

29.2

Construction Spare Part

5 Nos

10 7 Nos

10 Nos

5 Nos

1 set

1 set

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount Separate quotation

in

Included the Purchase Order amount Separate quotation

DOCUMENT CLASS 2A

Page 15 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Pos

Description

Qty

Price Extension

Insurance Spare Parts

30.2

As per VENDOR reviewed list (ref. 1-CF0000-59- PRO-9121-00)

in

the Included Purchase Order amount Separate quotation

31.3

2-years’ Operating Spare Parts List

32.3

Post Order Documentation including final Manual

33.3

As-Built Documentation:

34.3

Project Management Services including coordination of all SubVENDORs

35.3

Post-Award Meetings:

Preparation for and attendance in multiple post-award meetings, at VENDOR and / or PURCHASER office:

  • Kick-off meeting

17.a

  • Pre-inspection meetings

  • Technical clarification meetings

  • Expediting meetings

36.3

per Inspection PURCHASER/COMPANY approved Inspection and Test Plan

Testing

and

as

37.3

Material Certifications

38.3

SAT Procedure and Test

39.3

Site assistance and supervision during installation, pre-commissioning and commissioning

40.3

Training requirements for COMPANY Personnel

Included Purchase Order

in

the

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

Included the Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

in

the Included Purchase Order amount

Optional Price at daily rate

Optional (inclusive of the provision of the training material)

DOCUMENT CLASS 2A

Page 16 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Pos

Description

Qty

Price Extension

41.4

Preservation and packing for sea transport and long- term outdoor site storage for 12 months for complete scope of supply including spares.

42.4

Storage and preservation at vendor’s premises (exceeding free of charge period initial (considered as 90 days)

the

Included in the Purchase Order amount

Optional quotation

DOCUMENT CLASS 2A

Page 17 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

8.1

Battery Limits

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

The SUPPLY will be complete within the following terminal points (included):

• Piping - As per P&ID (applicable for BAS only)

8.2

Exclusions

The following activities and/or materials are excluded from this Scope of SUPPLY:

• Civil works, site preparation and foundation work.

• Equipment unloading and storage at site.

• Field erection.

• Supply of utilities outside the battery limit.

• Supply of anchor bolts: equipment anchor bolts will be provided by PURCHASER and their size shall be selected by VENDOR in accordance with 1-CF0000-07-STD- 2030-01.

• Area lighting.

• Off skid interconnecting piping (VENDOR input required for heat tracing design,

panel supply and connection).

8.3

Surface preparation, Painting and Coating. Requirements for fireproofing

Surface preparation, painting / coating and inspection of the supplied item shall be in accordance with applicable project specification 1-CF0000-25-SPE-0702-00 “PAINTING, COATING AND LINING SPECIFICATION”.

All Painting & Coating procedures shall be prepared by qualified and certified NACE Level III or equivalent certification approved by COMPANY.

8.4

Transport and Installation Requirement

• The Design of the SUPPLY shall consider the Marine transportation loads (either from Manufacturing place to UAE port as agreed with PURCHASER and/or between delivery port and offshore installation location) according to 1-CF0000-07- BOD-1001-00 “Design Criteria for Loadout, Transportation and Lifting of Offshore Islands Modules”.

• Package to be designed to be handled by Cranes (ship crane and/or crawler crane

at site) and/or SMPT.

• Delivery term for Package/Skid:

o BASE CASE: FOB stowed and trimmed on PURCHASER provided

barge/vessel at agreed international port.

o OPTIONAL CASE: Package Delivered by VENDOR at agreed International

Port in UAE.

DOCUMENT CLASS 2A

Page 18 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

• Sea transportation:

If not specified otherwise, the unrestricted motion criteria of Table 7-2 “Default Motion Criteria” of 0030ND - GUIDELINES FOR MARINE TRANSPORTATIONS shall be considered (“Case 2”)

o

o

8.5

Level of packaging

PURCHASER requires the Skid/Package to be modularized to the greatest possible extent to minimize activities at sites (motor + machinery + control panels + lube oil + instrumentation, etc).

This is necessary to reduce the assembly/integration activities at the Islands and at the Module Yards.

8.6

Weight, Dimension and Foundation Loads Monitoring

• VENDOR to include in its proposal the dimension and weight of the items for PURCHASER review, comment, and approval. Agreed weight and dimension shall be binding and not exceeded during the performance of the Purchase Order.

8.7

Transportation Limitation

• VENDOR shall advise PURCHASER about any transport limitation between manufacturing place and international port for shipment which could affect the maximum weight and dimension of the package.

• For the Optional CASE where VENDOR is delivering the items at the agreed international port in UAE, VENDOR to advise about any transport limitation which could affect the maximum weight and dimension of the package.

DOCUMENT CLASS 2A

Page 19 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

8.8

Interface Data for Modularizations Engineering

VENDOR is fully aware of the modularized nature of the Offshore Package and, as such, the VENDOR confirms entering in a Purchase Order on the basis of the typical requirements of modularization activities which include early provision by the VENDOR of all interface data / information to allow PURCHASER to develop his design accordingly.

Among others and without limitation, those interface data/information shall be finalized in the first revision of the following VENDOR documents:

• General Arrangement drawings, including weight, with interconnecting piping, Instrument Junction Boxes and Local Panel Location, Motor and Electrical Equipment Location

As indicated in Attachment 2 – Supplier Documents Requirements List, relevant documentation will be subject to liquidated damages.

8.9

Nameplate

The VENDOR shall prepare and install the nameplates to each item included in the SUPPLY, according to the scope of work.

Nameplate material and size shall be as follows:

• material shall be SS316, 3 mm thickness;

• size shall be a minimum of 4cm x 8cm rectangular shape.

Nameplate shall be submitted to PURCHASER / COMPANY for approval.

8.10

E-Tagging

Not applicable

8.11

Packing and Marking

All materials equipment and spares shall be preserved, and export packed compliant to project document 1-CF0000-51-PRO-9697-00 Preservation Management Procedure, with due consideration for the environmental condition as stated in Basic Engineering Design Data (BEDD) - Doc No: 1-CF0000-59-PHL-0001-00.

Any transport structures, bracings, frames and fixtures required to safely deliver the equipment and material to job site are included within VENDOR’s scope.

Further, VENDOR shall comply with the requirements of the Packing, Marking & Shipping Instructions, doc no. 1-CF0000-58-PRO-0008-00.

8.12

Special Tools, Jigs and Template

The VENDOR, within its bid and its scope of SUPPLY, shall produce a Document titled “List of special Tools, Jigs and Template (SDRL code C25) according to Attachment 2 – Supplier Documents Requirements List.

DOCUMENT CLASS 2A

Page 20 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Such document, to be sent for evaluation and approval of the PURCHASER/COMPANY, shall list any special tool, item, jig or template for use with, or peculiar to, a specific item of equipment, skid or part of it, or elsewhere required for proper installation, assembly and disassembly, component extraction / removal, diagnostic, operation, pre-commissioning, commissioning or start-up activity, repair and / or maintenance.

Any and all Special Tools, jigs and templates shall be part of the SUPPLY, shall be supplied by VENDOR along with the main equipment and their price is deemed to be included in the Purchase Order Amount.

The VENDOR retains the responsibility for the inclusion in the SUPPLY of a full and comprehensive set of any required special tools, jigs and templates.

Special Tools shall be available at site prior to start of commissioning activities.

8.13

Lubricants

Not applicable

8.14

Consumables

Not applicable

8.15

Spare Parts

The spares parts shall include Construction spares, Special tools (as per par. 8.12 above), Capital/Insurance spares and Two-years operation spares in the terms specified herein.

Spare parts management shall be in line with document 1-CF0000-59-PRO-9121-00 “VENDOR guidelines for the spare parts Management”.

During the bidding phase the VENDOR shall provide the relevant lists with unit prices as referred described in 1-CF0000-59-PRO-9121-00 “VENDOR guidelines for the spare parts Management”.

After the Purchase Order award all spares listing shall be provided in the COMPANY prescribed format (SPIR form + SAP-AIN Tool). The VENDOR will be requested to follow requirement set forth in 1-CF0000-59-PRO-9121-00 “VENDOR guidelines for the spare parts Management”. The VENDOR shall assume responsibility and guarantee of manufacturing and delivery of spare parts for their equipment/system for a minimum period of 10 years from the equipment delivery date. If any parts become obsolete, the VENDOR shall guarantee equivalent and suitable parts consistent with the original equipment purchased.

All spare parts shall be packed separately from the main equipment according to the category (Construction spares, Special tools, Capital/Insurance spares, Two-years operational spare parts) and shall be individually labelled. Packing and preservation shall be in accordance with para. 8.11.

DOCUMENT CLASS 2A

Page 21 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

8.15.1

Construction Spare Parts

The VENDOR shall include within its base scope the Construction, Pre-Commissioning and Commissioning Spares, (herein after called “CONSTRUCTION SPARES”) and their price is deemed to be included in the total Purchase Order Amount as separate quotation.

CONSTRUCTION spares are required for installation, pre-commissioning, commissioning and repair or maintenance of the equipment, testing and start-up activities up to PAC and shall be purchased and shipped along with the main equipment.

The VENDOR shall use prescribed format for providing this data in a dedicated document titled Recommended Start-Up & Commissioning Spares List (Priced) (SDRL code J02) according to Attachment 2 – Supplier Documents Requirements List.

8.15.2

Insurance Spare Parts

The VENDOR shall include within its base scope of SUPPLY the Capital/Insurance Spare Parts and their price is deemed to be included in the total Purchase Order Amount as a separate quotation. The VENDOR shall include within its base scope the specified insurance spares listed in 1-CF0000-59-PRO-9121-00 “VENDOR guidelines for the spare parts Management”, during recommend additional Capital/Insurance spare parts that he considers applicable to the SUPPLY.

the bidding phase could

Insurance Spare Parts are equipment, equipment assemblies, or complete items of equipment having long delivery time that are required for replacement of items not subject to deterioration by normal use but failure of which is critical for a continuous and safe operation.

These spares shall be available on site prior to equipment start-up.

These parts shall be subjected to the same stringent inspection requirements as the main equipment.

8.15.3

Two - Years Operating Spare Parts

The VENDOR shall provide a priced list of all spare parts required for 2 (two) years normal operation and maintenance of the equipment for the purpose of supporting operational reliability.

Two - Years Operating Spare are parts, assemblies (including complete spare pumps, instruments, valves etc.), bulk materials normally used or consumed on basis of scheduled maintenance, overhaul, inspection, wear, corrosion, erosion, or deterioration in normal service or any other item / equipment not included in insurance spares list. BUY OUT spares (bearings, mechanical seals, couplings, control valves, safety relief valves, equipment gaskets, and instruments) are considered as a part of Two Years Operating Spare Parts.

The VENDOR shall use prescribed format for providing this data in a dedicated document titled Recommended Spares For 2 Years Operations (Priced) (SDRL code J03) according to Attachment 2 – Supplier Documents Requirements List.

Two Years Operating Spare Parts shall not be included in the scope of purchase however recommendation is to be provided by VENDOR for PURCHASER/COMPANY review.

DOCUMENT CLASS 2A

Page 22 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

8.15.4

VENDOR Requirements once Purchase order has been received from PURCHASER

VENDOR shall submit a SAP-AIN (SPIR) PACKAGE to PURCHASER on or before the scheduled submittal date that will be indicated in the Purchase Order.

The SAP-AIN (SPIR) PACKAGE shall consist of the following:

  1. Completed SAP-AIN document in SAP-AIN

  2. Three (3) hard copies of SAP-AIN – an extract from the SAP-AIN information

provided above.

  1. Three (3) sets of prints of the following documents:

• Spares lists and sectional drawings or equivalent showing location of spares quoted

and referenced on the SAP-AIN.

• Data sheets.

• Product manual / brochures.

• P&IDs for package units.

• Component spares of whole unit shall be listed with recommended OPERATING

SPARES quantity.

  1. Three (3) copies of a letter of transmittal stating:

• Ex-Works (EXW) prices with applicable discounts including quantity discounts.

•

‘VENDORS’ quotation for Operating Spares shall be valid for acceptance by COMPANY up to one (1) year from the date of submittal of acceptable SAP-AIN. VENDORS shall also provide an escalation formula for a period of five (5) years beyond the initial validity period of one (1) year unless otherwise declared by Vendor based on the current market condition.

• Minimum order quantities.

• Other conditions

SAP-AIN stands for SPARE PARTS LIST AND INTERCHANGEABILITY RECORD COMPANY electronic program, web based, for obtaining information on Project Assets and Equipment Data, including: Locations, Asset’s information, Spare Parts, Job Plans, Maintenance Schedules, etc).

SAP-AIN (Asset Intelligence Network) which is an add-on tool of SAP HANA. SAP-AIN activities shall be carried out in the SAP-AIN tool only PURCHASER and SUPPLIER will have the access through Ariba system.

PURCHASER provided electronic SAP-AIN in SAP-AIN Programme shall be completed by the successful VENDOR to quote his recommended Spares for COMPANY’s stock. When completed and approved by PURCHASER/COMPANY, the SAP-AIN form becomes an attachment to the Spares Purchase Order and serves as the basic spare parts documentation for the Offshore Package.

SAP-AIN to include Two Years OPERATING SPARES and also information of insurance spares, if any.

DOCUMENT CLASS 2A

Page 23 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

All details are explained in 1-CF0000-59-PRO-9121-00 “VENDOR guidelines for the spare parts Management”.

REQUIREMENTS FOR VENDOR DOCUMENTATION

All documents (drawings, data sheets, manuals, etc., both hard copies and electronic files) shall be prepared and supplied according to document 1-CF0000-59-PRO-0002-00, “Project Procedure for Document and Drawing Numbering” 1-CF0000-59-PRO-0006-00 “Project Documentation – Reviews, Comments and Approvals” and “Documents Title Blocks” 1-CF0000-59-PRO-0004-00.

The documents submitted by VENDORS shall contain sufficient detailed information to provide PURCHASER / COMPANY with a complete understanding of the supplied equipment/system operation and with sufficient information to enable PURCHASER design of systems and foundations, electrical systems, control and instrumentation systems and piping systems therefore shall include, but not limited to:

interfaces such as

• Design deliverables

• Manufacture / assembly

• Quality Systems

•

Inspection and testing

• Sub VENDORS

• Packing & Shipment

• Storage

•

•

Installation

Interfaces

• SITE testing

• Operation

• Maintenance

• De-commissioning and preservation

The documents shall meet the recognized industry standard and the format to be in accordance with the PROJECT standard as detailed in this Material Requisition / Purchase Order.

VENDOR shall provide PURCHASER with a full set of documentation to the entire satisfaction of PURCHASER/COMPANY according to the VENDOR Document Register (SDRL code A01) according to Attachment 2 – Supplier Documents Requirements List, reviewed and approved by PURCHASER/COMPANY that shall be updated according to PROJECT development.

Should VENDOR fail to deliver any of the required document or Manual, VENDOR shall be liable for and shall pay to PURCHASER as liquidated damages the amount specified in the

DOCUMENT CLASS 2A

Page 24 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Purchase Order according to the requirements set forth in the General Terms and Conditions.

9.1

Supplier Documents Requirements List

The scope of documentation to be submitted by the VENDOR shall include, but not be limited to, the drawings and documents listed in the Supplier Documents Requirements List table (reference shall be made to Attachment 2), which also defines the due dates for each document type, their inclusion in Manuals, list of documents subject to liquidated damages according to General Terms and Conditions.

9.2

Review and comments by PURCHASER

VENDOR documentation review cycle shall follow requirements of 1-CF0000-59-PRO- 0006-00 “Project Documentation – Reviews, Comments and Approvals”.

Review and comments by PURCHASER/COMPANY, or any failure to review, shall not alter any of the terms and conditions of the Purchase Order, nor relieve the VENDOR of any responsibility or liability for the accuracy and completeness of VENDOR data and materials, nor be interpreted so as to imply approval of such documents.

It is the VENDOR’s responsibility to advise PURCHASER/COMPANY about any delay in document preparation or review that can delay shipment.

Without prejudice and in addition to the requirements set forth under Contract General Terms and Conditions and/or any other Contract Documents, the VENDOR shall prepare and transmit/submit to the PURCHASER/COMPANY for approval all documentation produced by VENDOR.

PURCHASER/COMPANY shall notify the VENDOR of his approval, comments or disapproval, together with details of any modifications considered necessary, within forty-two (42) calendar days of receipt of such documentation.

The VENDOR shall resolve the PURCHASER’s/COMPANY’s comments. Documentation so revised by the VENDOR and in compliance with above said comments and any other Purchase Order provision, shall be resubmitted to the PURCHASER for further review and approval/disapproval by PURCHASER/COMPANY within 10 days.

A comments response sheet shall be provided by VENDOR to certify the comments resolution status with proper justification (as referenced in 1-CF0000-59-PRO-0006-00 “Project Documentation – Reviews, Comments and Approvals”).

The modified area of the document shall be indicated as referenced in 1-CF0000-59-PRO- 0006-00 “Project Documentation – Reviews, Comments and Approvals”

If the VENDOR feels that these comments change his contractual obligation (cost and/or schedule), the VENDOR shall notify PURCHASER within 1 (one) week of receipt of the comments; when this time has elapsed, PURCHASER will assume that all the comments shall be incorporated with no cost/schedule change.

DOCUMENT CLASS 2A

Page 25 of 47

Uncontrolled When Printed

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

9.3

3D Model

Not applicable

9.4

As-built drawings

Not applicable

9.5

Manuals: Mechanical Catalogue, Operating & Maintenance Manual, Manufacturing Record Book, Dispatch Dossier

The VENDOR shall submit the complete Mechanical Catalogue, Operating & Maintenance Manual, Manufacturing Record Book and Dispatch Dossier (respectively SDRL code R03, R02, R04, R01) according to Attachment 2 – Supplier Documents Requirements List (paragraph 17.2), as detailed hereinafter:

• An Index for each of the four (4) Manuals (SDRL code A05 according to Attachment 2 – Supplier Documents Requirements List, paragraph 17.2) shall be submitted for PURCHASER/COMPANY review and approval;

•

•

the first issue of Manual shall be issued after PURCHASER/COMPANY approval of the relevant index;

the first issue of the Mechanical Catalogue and of the Operating & Maintenance Manual shall be available to PURCHASER sixty (60) days before the shipping date of the SUPPLY. When two or more shipping dates apply, the above-mentioned documentation shall be available to PURCHASER sixty (60) days before the first shipping date.

The first issue of the manuals can contain drawings and other documents that are still under the approval process.

• Within twenty (20) days from the shipping date, the required number of final copies of the Mechanical Catalogue and Operating & Maintenance Manual shall be submitted to PURCHASER (as-supplied revision, that will be used during installation, pre-commissioning, and commissioning);

A complete set of manuals will be issued for the equipment (or materials) supplied for a certain facility of the Offshore Package. Each set of manuals will include only the documents relevant to that facility (and the documents common to various facilities, if any).

9.5.1

Mechanical Catalogue – R03

The Mechanical Catalogue shall provide the information necessary to understand the complete SUPPLY and shall include all data sheets, specifications, drawings, material lists, performance curves, diagrams and any other document related to the SUPPLY.

VENDOR shall submit the index of the Mechanical Catalogue for review and approval by PURCHASER and COMPANY.

The VENDOR Mechanical Catalogue content shall comply with the following structure, to be maintained to the maximum extent, as applicable, unless otherwise agreed.

INDEX OF CONTENT

DOCUMENT CLASS 2A

Page 26 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

A. PROCESS DATA

  1. Basis Of Design

  2. Description Of Flow (not applicable)

  3. Utilities (not applicable)

  4. Process Schematics (not applicable)

B. GENERAL

  1. Equipment List

  2. Engineering Flow Sheets (not applicable)

  3. Line Classification List (not applicable)

  4. Plot Plan (not applicable)

C. JOB SPECIFICATION (not applicable)

D. EQUIPMENT

a. “As Purchased” Requisitions

b. Outline Drawings

c. Complete parts list showing the number of each part, including sectional drawings with parts identified.

d. Performance Curves or Data (not applicable)

e. Installation, operating and maintenance instructions.

E. GENERAL

  1. Lubrication Schedule (not applicable)

  2. Unpacking and inspection instructions

  3. Lifting and transport instructions

  4. Foundation (not applicable)

  5. Alignment (not applicable)

  6. Levelling (not applicable)

  7. Cleaning

  8. Start-up/shutdown (not applicable)

  9. Trouble shooting (not applicable)

  10. Two Year Spare Parts List

  11. List of all drawings/documents included in the mechanical catalogues

  12. List of all sub-supplied components with manufacturer’s name and model

number

  1. Listing of all special tools required

DOCUMENT CLASS 2A

Page 27 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

  1. PSV register (not applicable)

  2. VENDOR/Sub-Vendor/Agent contact details for after sales service and ordering

of spares.

9.5.2

Operating & Maintenance Manual – R02

The VENDOR shall provide an Operating & Maintenance Manual for the supplied equipment / materials which includes all the requirements contained within the COMPANY maintenance and inspection policy. The Operating & Maintenance Manual content shall be according to the following structure, to be maintained to the maximum extent, as applicable, unless otherwise agreed.

SECTION I – DESCRIPTION

  1. Description of SUPPLY

  2. Basic referenced drawing(s)

  3. Miscellaneous

SECTION II – INSTALLATION AND PRE-COMMISSIONING

•

•

Installation and pre-commissioning instructions shall include all the procedures necessary to store at site, install/erect and prepare the SUPPLY for commissioning.

Installation sequence, inspections, tests, cleaning and flushing, alignment and running in of pumps and compressors, burner checks, instrument calibrations, electrical continuity checks, filling of lubricant and circulating systems, etc. shall be described.

• The manual shall include simplified sketches and diagrams showing procedural

steps and references to more detailed drawings.

SECTION III – COMMISSIONING

• List of required spare parts, consumables, tools, testing instruments, calibration devices and testing facilities at SITE prior to commencement of COMMISSIONING.

• Detailed COMMISSIONING and OPERATIONAL TESTS (OTP) Procedures (clearly marking the steps to be done before achieving READY FOR START UP and the ones to be carried-out later with hydrocarbons) and shall also include the necessary checklists and inspection forms (e.g., Filled-in and signed Vendor’s QCP Check Lists and Commissioning Procedures, Filled-in and Signed SAT Procedures, Witness Test Certificates, Test Arrangement Boundary and Tie-In drawings per each individual Operational Test, Running Logs). In this regard, Vendor shall also refer to Company Document No. ANNEXURE 10.D.10 Section 10: Commissioning.

OTP typical index is the following:

  1. INTRODUCTION

DOCUMENT CLASS 2A

Page 28 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

 1.1. OBJECTIVES  1.2. ABBREVIATIONS  1.3. STEPS SUMMARY

  1. SYSTEM DATA

 2.1. SYSTEM DESCRIPTION  2.2. EQUIPMENT LIST  2.3. SYSTEM BOUNDARIES  2.4. SUB-SYSTEM LIST  2.5. SYSTEM DEPENDANCIES  2.6. SYSTEM DOCUMENTATION

  1. SYSTEM GENERAL PRE-REQUISITES

 3.1. SYSTEM READINESS  3.2. SAFETY  3.3. VENDOR ASSISTANCE  3.4. COMMISSIONING SPARES AND CONSUMABLE

  • 3.4.1. Oil&First Fill
  • 3.4.2. Temporary Systems
  • 3.4.3. Materials and Consumables
  • 3.4.4. Test Equipment and special tools
  1. COMMISSIONING PROCEDURES  4.1. TEST DESCRIPTION  4.2. TEST PREPARATION AND PRELIMINARY CHECKS
  • 4.2.1. Electrical

  • 4.2.2. Mechanical & Process

  • 4.2.3. Instrumentation  4.3. OPERATIONAL TEST

  • 4.3.1. Mechanical & Process

  • 4.3.2. Electrical

  • 4.3.3. Instrument  4.4. CERTIFICATION  4.5. POST TEST CONDITION

  • 4.5.1. Reinstatement

  1. TESTING WITNESS AND ACCEPTANCE CERTIFICATE

  2. APPENDIX

  3. ATTACHMENTS

SECTION IV – OPERATING DATA

  1. Control criteria

  2. Control valves set point list (not applicable)

  3. Safety valves set point list (not applicable)

  4. Initial start-up procedures (not applicable)

  5. Normal start-up and shutdown procedures (not applicable)

  6. Emergency shutdown procedures (not applicable)

DOCUMENT CLASS 2A

Page 29 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

  1. Special operations (not applicable)

  2. Troubleshooting

SECTION V – MAINTENANCE DATA

• Schedules shall be provided for all inspection and maintenance requirements of the SUPPLY, up to and including major overhaul. Every item shall be reviewed for inclusion into the maintenance and inspection activity schedules.

•

Inspection and maintenance procedures shall be supplied for each maintenance operation together with a list of spare parts, tools, jigs and other special tools required. An inventory of special tools complete with identification tag numbers shall be provided by the VENDOR.

• Operating Spare Parts data shall be included. The VENDOR shall demonstrate that the spare parts data provided are adequate, but not excessive, for 2 (two) year of operation based on the required maintenance schedule.

• Procedures for condition monitoring of the equipment shall be included. The purpose of condition monitoring is to ensure correct operation and to provide early detection of malfunction or failure.

9.5.3

Dispatch Dossier - R01

VENDOR shall produce and submit a dispatch dossier.

The Dispatch Dossier will contain those drawings and documents required to facilitate the preservation, long-term storage, maintenance, installation and commissioning of the purchased item.

Attachment 2 – Supplier Documents Requirements List documentation requirements of the Dispatch Dossier.

indicates

the minimum

NOTES:

a) All certificates included which are unique to the material / equipment supplied is to be annotated with P.O. Number, item number and Material Reference Number.

b) Where verified copies are required, they will be stamped as such in red and will

include VENDOR’s name / logo and verifiers’ name.

c) The Dispatch Dossier is to accompany the goods on dispatch and shall appear as a separate item on the shipping documents. One additional copy shall be forwarded to PURCHASER/COMPANY project office.

d) If relevant documentation has been supplied previously in a Dispatch Dossier to the same receiving site, duplication is not required, providing a clear statement to that effect is included in the applicable Section(s) or in the Contents List

DOCUMENT CLASS 2A

Page 30 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

9.6

Maintenance and inspection Information Requirements

VENDOR shall provide all relevant information for the maintenance of the equipment, in line with VENDOR’S best practices.

In addition, these instructions should consider the specific requirements of the applicable international code & standards, e.g. API, ASME, etc.

9.6.1

VENDOR’s Maintenance Deliverables

• Maintenance Plan Matrix for all maintainable part of the supplies, including

instruments, electrical panels, etc. (refer to paragraph 9.6.3).

• Maintenance task list, including spare parts, lubricants and special tools which are

required to perform the relevant maintenance task (refer to paragraph 9.6.4)

9.6.2

Maintenance Information Available from VENDOR’s Manual

VENDOR shall provide the following deliverables and information associated to its equipment for the relevant maintenance:

• General safety precautions

• Equipment parts and functions

• Maintenance procedures, including detailed disassembly / re-assembly procedures, clearances setting, torque setting, tolerances of alignment and other figures quantities and procedures needed for the proper maintenance activity of the equipment.

• Troubleshooting instructions for major failure.

• Lubrication list, schedule and drawings to show lubricant points (to be included in

the maintenance plan, refer to paragraph 9.6.4). – Not applicable

• Special tools list, each special tool should be linked with related Job plan on the

maintenance plan (refer to paragraph 9.6.4). – Not applicable

Proper reference to the general arrangement drawings, outline drawings, schematic drawings, cross-sectional drawings, etc. as required.

9.6.3

Maintenance Plan Matrix

Not applicable

9.6.4

Maintenance Task List

Not applicable

DOCUMENT CLASS 2A

Page 31 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

9.6.5

Inspection Information

Not applicableVendor shall support and collaborate with PURCHASER/IVB during the IVB audit.

9.7

Software and Licenses; deliverables format

Not applicable

PROJECT ADMINISTRATION

The VENDOR must provide all the services and support staff necessary to execute the works.

The VENDOR shall assign a Project Manager/co-ordinator who will act as the VENDOR’s coordinator responsible for the following activities:

• Act as a single point contact for all communication with PURCHASER.

• Monitor, expedite and report progress for all of the VENDOR’s and Sub-Vendor’s activities to ensure compliance with the requirements and the agreed schedule.

• Attend, organize, co-ordinate and chair Kick-off, Pre-inspection, technical, expediting meetings as described hereinafter at PURCHASER’s office or at the VENDOR’s office / manufacturing facility with representatives of PURCHASER and/or COMPANY.

• Keep an up-to-date correspondence

incoming and outgoing correspondence between PURCHASER and VENDOR. Monitor and expedite responses to communications from PURCHASER and/or COMPANY.

log of all

• Co-ordinate and notify required Inspection and Testing activities. Attend Pre- Inspection, Inspections Meeting at VENDOR’s, Sub- VENDORs office/premises.

• Attend to a Weekly Meeting, issuing each time a dedicated Report.

10.1

Participation to meetings

VENDOR shall provide and dispatch its personnel, at PURCHASER’s request, to participate at technical reviews and meeting, such as, but not limiting to:

• Within two weeks of Purchase Order award (or issue of a Letter of Intent) organize, coordinate, and chair a kick-off meeting to be attended by representatives from PURCHASER and COMPANY.

• Pre-inspection meeting (at VENDOR’s shop and/or Sub-Vendor’s shop) prior to

starting fabrication.

• Technical Meetings when the submitted drawings and documents are not sufficient

to provide the required information for engineering activities.

• Weekly Meeting, issuing each time a dedicated Report

DOCUMENT CLASS 2A

Page 32 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

The VENDOR shall provide the necessary representatives to cover all the meeting purposes (inclusive of all travel expenses, travel formalities, lodging, boarding and any other associated costs and expenses), moreover full Scope of SUPPLY shall respect and fulfil the recommendations and prescriptions identified during each of the above meetings at no additional cost for PURCHASER.

10.1.1

HAZOP Meeting

Not applicable

10.1.2

SIL Study

Not applicable

10.1.3

3D Model Review Meeting

Not applicable

10.1.4

HFE and ergonomics

Not applicable

10.2

SUB-VENDORS

For Sub-Supplies included in the SUPPLY, Sub-Vendors shall be selected from ADNOC Approved VENDOR Lists, as detailed here below.

VENDOR shall select Sub-VENDORs from COMPANY’s Approved Vendor List based on specification n. 1-CF0000-25-SPE-9073-00 “Criticality Rating and Inspection Class for Material and Equipment”, as detailed in the following table:

TABLE 5: Bulk (Piping, Pipeline, Structural, and E&I) - Main Vendor

Components (Sub-Vendors)

Tier 01

Tier 02

Tier 03

AVL

CR1

AVL

CR2

CR3

CR4

CTR/VDR

CTR/VDR

CTR/VDR

CTR/VDR

CTR/VDR

CTR/VDR

CTR/VDR

CTR/VDR

CTR/VDR

CTR/VDR

CTR/VDR

Where Tier 01, 02, 03 and abbreviations have the meaning given in the following Notes.

Notes:

  1. Definitions:

a- Tier 01, 02, 03:

DOCUMENT CLASS 2A

Page 33 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Tier 01: Main or major components of the package or system (such as compressor, main motor, alternator, CPU, Vessels, etc.) directly ordered by the Package Vendor.

Tier 02: Sub-Vendor of Tier 01 (such as actuator, motor, Seal System, Plates etc.).

Tier 03: Sub-Vendor of Tier 02

Tier 04: Sub-Vendor of Tier 03

b- CR: Criticality Rating

c- AVL: Approved Vendor List

d- CTR/VDR: PURCHASER or VENDOR’s Approved Sub-Suppliers.

Irrespective of the criticality rating and/or Tier of the VENDOR’s supply chain, structural bulk material, piping bulk material, E&I bulk material, consumables, and VENDOR proprietary items shall be procured from VENDOR’s approved sub-suppliers.

Irrespective of the criticality rating and/or Tier of the VENDOR’s supply chain, all the E&I tagged items (under Tier 01) shall be procured from COMPANY’s AVL.

Irrespective of the criticality rating and/or Tier of the VENDOR’s supply chain, items not included within COMPANY’s AVL Product Groups will be procured from VENDOR’s approved sub-suppliers.

  1. For Structural Steel (i.e. Equal Angles, Unequal Angles, Flat Bars, Round Bar, Joist with Tapered Flanges (RSJ), Parallel Flange Channels (PFC)), in the event AVL’s Vendors have declined to quote (with supporting evidence), the same will be procured by VENDOR from suppliers with previous supply history with ADNOC Group. VENDOR will notify PURCHASER and COMPANY thru a letter for approval.

Based on the specific commodity, the approved vendor list (briefly indicated as AVL in the above table) to be considered shall be Attachment 6_approach 2.3 AVL.

When selecting Sub-Vendor, the VENDOR shall comply also with the place of manufacturing indicated in the approved vendor list

In any case, before placing any Sub-Order for any Sub-SUPPLY, the VENDOR shall submit to PURCHASER / COMPANY the selected Sub-Vendor list for approval. PURCHASER and COMPANY will evaluate and may eventually impose a different Sub-Vendor (included in COMPANY List of Approved Manufacturers), for standardization purposes over the whole PROJECT which shall be accepted by VENDOR without any cost/schedule impact.

Sub-Vendor fabrication is not acceptable without prior Sub-Vendor written approval from COMPANY / PURCHASER.

10.3

Sub-Vendor Management and Control:

VENDOR shall control, co-ordinate, expedite, inspect and resolve all problems with any Sub-Vendor in order to meet the requirements of this Material Requisition.

VENDOR shall guarantee and be responsible for the design, quality and performance of all sub-supplied items. All materials, whether supplied by the VENDOR or its Sub- Vendor, shall be traceable with material certificates.

DOCUMENT CLASS 2A

Page 34 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

The VENDOR shall take full responsibility for the quality of sub-supplied goods.

VENDOR shall ensure that all the relevant information, reference documents, project specifications and documentation requirements are passed on to Sub-Vendors.

VENDOR shall ensure that the Sub-Vendors (the original material manufacturer) shall:

• Operate a quality system in accordance with ISO 9001-2015,

• Are financially stable,

• Comply with all applicable requirements of the Material Requisition and documents

referenced therein,

• Have technical support and resources available to provide a satisfactory after sales

service.

QUALITY REQUIREMENTS

11.1

VENDOR’s Quality System

The VENDOR & Sub-Vendor shall implement, operate and maintain a Quality Management System to ensure that requirements of the Contract and of the standard ISO 9001:2015 are achieved, in compliance with:

• 1-CF0000-54-SPE-9604-00 Quality Assurance Requirement for Vendors.

PURCHASER/COMPANY, or its appointed representative(s), reserve the right to carry out Quality Audits at the VENDOR’s/Sub-Vendor’s office and works, to verify that the Quality Management System requirements are being met.

All the laboratories used for any testing on the project material shall be accredited to ISO 17025 including their Sub-vendors.

11.2

INSPECTION & TESTING REQUIREMENTS

11.2.1

General

The VENDOR is responsible for all Inspection, Testing and Quality Control to ensure that the requirements of this Material Requisition, the referenced documents and equipment Data Sheets are met.

Inspection and Testing shall be performed in accordance with the relevant codes, project specifications, this Material Requisition and Local Authority requirements.

Minimum Inspection requirements shall be in accordance with the Inspection Class which corresponds to the equipment Criticality Rating indicated on the Table below following the requirements of 1-CF0000-25-SPE-9073-00 “Criticality Rating and Inspection Class for Material and Equipment”.

DOCUMENT CLASS 2A

Page 35 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

S. No.

Safety Equipment Description

Criticality Rating

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

Safety Shower Containing Integral Eye Wash

Standalone Safety Shower Containing Integral Eye Wash (at DC)

Portable Safety Shower Containing Integral Eye Wash (at DC) Windsocks With Lights

Lifebuoys

Life Raft

Life Jacket

Helicopter Crash Equipment Cabinet

Chemical Kit

First Aid Kit (FAK)

Electrical Safety Kit

Stretcher

Fire Blanket

Face Shield Mask

Heat Stress Monitor

Noise Monitor Dose Meter

Safety Gloves

Hand held megaphone

Rechargeable torches

Windsock tissue / ring

Rescue basket

Safety harnesses

CR13

CR13

CR13

CR13

CR13

CR1

CR13

CR3

CR3

CR3

CR3

CR3

CR2

CR3

CR3

CR3

CR3

CR3

CR3

CR13

CR3

CR3

DOCUMENT CLASS 2A

Page 36 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Complete Firemen’s Equipment Set

Scramble Net (HOLD 2)

Chemical Kit Battery Room

23

24

25

CR3

CR13

CR3

In addition, inspection class may be elevated by PURCHASER/COMPANY based on criticality of procured materials, lessons learned, performance on projects already executed and during the execution of the project, qualification of personnel etc.

Vendor is responsible for carry out inspection at sub vendor/at source as per inspection test plan.

VENDOR shall meet the requirements of project specification number 1-CF0000-54-PRO- 3005-00 QC Requirements for suppliers of materials, Equipment and services.

Without prejudice and in addition to the requirements set forth under Contract General Terms and Conditions and/or any other Contract Documents, it is understood that inspection or non-inspection, witnessing or non-witnessing, approval or non-approval by the PURCHASER or its representatives, of any matter required to be done by the VENDOR, shall not be construed as acceptance by the PURCHASER nor act as a waiver of the VENDOR’s obligation to comply with the requirements of the Purchase Order nor imply that it is free from defects.

11.2.2

Inspection & Test Plan:

In addition to the standard VENDOR and Sub-Vendor inspection and test procedures, the VENDOR shall comply with the COMPANY / PURCHASER’s test and inspection requirements specified in the Data Sheets and Specifications part of this Material Requisition, called for in the relevant codes, and according to the Local Authority requirements.

VENDOR shall incorporate the inspection requirements, as per the procedure number 1- CF0000-54-PRO-3005-00 QC Requirements for Supplier of Materials, Equipment and Services, covering the equipment supplied into a project specific document titled Inspection & Test Plan (ITP) (SDRL code H03) according to Attachment 2 – Supplier Documents Requirements List.

VENDOR shall utilize the base ITP in AGES-SP-13-002 for the development of detailed ITP upon contract and minimum intervention point shall be as per relevant Clause 15.6.

The VENDOR’s Inspection and Test Plan (ITP) shall document all production steps.

Each step shall relevant project specifications and approved production/testing procedures applicable. The plan shall include separate columns for the inspector of the VENDOR, COMPANY and any Independent Authority.

reference

the

The Inspection and Test Plan shall be submitted to the PURCHASER/COMPANY for review / comment and shall form the basis of the Pre-Inspection Meeting.

11.2.3

Pre-Inspection Meeting

Not applicable

DOCUMENT CLASS 2A

Page 37 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

11.2.4

Statutory Inspection

The VENDOR shall be responsible for the payments of fees and organizing any Third- Party Inspection (TPI) needed to satisfy the requirements of the codes, standards and/or local authorities.

11.2.5

PURCHASER’s/COMPANY’s Inspection

The materials covered in this Material Requisition shall be subject to inspection at source of SUPPLY during various stages of manufacture and final inspection, by the PURCHASER/COMPANY the and/or PURCHASER/COMPANY’s behalf.

Inspection Agency

acting

an

on

Inspection, stage-wise or otherwise, shall be carried out at VENDOR’s/Sub-Vendor’s premises by PURCHASER/COMPANY’s Inspector(s).

The VENDOR shall allow inspection access to PURCHASER’s/COMPANY’s Inspector(s) at all reasonable times.

For notice period of PURCHASER/COMPANY Inspection refer to COMPANY specification AGES-SP-13-002, clause 18.2.

11.2.6

Material Certification and Traceability

VENDOR shall provide all material certificates and shop test certificates for all materials, whether supplied by the VENDOR or Sub-Vendors. They shall be inserted into the Manufacturing Record Book (refer to section 1.1.1) progressively, as they become available and shall be presented to PURCHASER/COMPANY’s Inspector(s) for review.

Materials, Welding, and Inspection shall be fully in accordance with the design codes, Datasheets, Standards, project Specifications and Procedures referenced in this Material Requisition.

It is VENDOR responsibility to ensure that all the purchased material and equipment are not counterfeit material. The requirements related to prevention, detection and control of counterfeit material should be addressed in VENDOR Procedures. Material test summary and traceability supported with Material Test Certificates (MTC) shall be submitted to PURCHASER for review.

Ex-stock, surplus or leftover materials are NOT permitted to be used in COMPANY projects under any conditions.

Material Certification shall cover with NACE MR 0175/ ISO15156 compliance for Sour Service requirement as per applicable scope of supply. (1-CF0000-25-SPE-0031-00).

Compliance for Item description (as per PO) Manufacturing process, Supply condition and heat traceability in accordance relevant test reports for each components shall be included in Material Certification.

11.2.7

Positive Material Identification

VENDOR shall prepare the (PMI) Positive Material Identification Specification (SDRL code P06 according to Attachment 2 – Supplier Documents Requirements List, paragraph 18.3)

DOCUMENT CLASS 2A

Page 38 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

according to the requirements of the specification n° 1-CF0000-25-SPE-0901-00 “Specification for Positive Material Identification” that provides the requirements for material control and material verification programs on ferrous and nonferrous alloys during the construction, installation and inspection of new equipment, process piping systems and welds.

11.2.8

ECAS Certification

The United Arab Emirates (UAE) Government introduced mandatory regulatory control for electrical and mechanical safety, energy efficiency, and measures environmental requirements under a national program called the Emirates Conformity Assessment System (ECAS).

in 2015

The ECAS program scope includes multiple industry sectors from Electrical, Electronic, and Gas Appliances, Machinery, Automotive, Building and Construction, Cosmetics, and Food in the form of issued technical regulations, under the ECAS banner and regulated by the appointed government body, Emirates Authority for Standardization and Metrology (ESMA).

VENDOR shall verify the applicability of ECAS certification and where applicable ECAS certificate shall be provided.

11.3

Dual use requirements

Regulation (EC) No 821/2021, Commission Delegated Regulation (EU) 2023/996 and subsequent modifications, sets up a Community regime for the control (Authorization by the Competent Authority of the Exporter’s European Country) of Dual-Use items when they are exported from or transit through the European Union

PURCHASER will have to ask specific authorization to the competent authority of the items’ originating country.

When a DUAL use materials/Services have to be exported, submission of the relevant request to the ministry of economic development of the UE members countries is required in order to receive the authorization agreement or not.

Vendor to provide indication of which equipment/sub-components / materials / technologies of your product line fall (or may fall) into the above-mentioned EU Regulation. Vendor to indicate the reference to the specific Category/Sub-category in order to univocally determine the equivalence relation.

The VENDOR shall be responsible to identify and communicate DUAL USE materials, under his supply since the technical and commercial offers’ phase.

MATERIAL TAKE OFF, PURCHASE ORDES AND DELIVERY

During the Offshore Package execution, PURCHASER will periodically release Call-off Material Take Offs (MTOs) for purchasing.

For each Call-off MTO, a PURCHASE ORDER shall be placed under the Terms and Conditions of the Project Agreement.

Material Delivery shall be EXW – Ex Works (VENDOR shop).

DOCUMENT CLASS 2A

Page 39 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Material Delivery Time by VENDOR shall be 4 (four) months from the receipt of relevant Call-off Material Take Off. VENDOR shall deliver all Material part of the Scope of SUPPLY of each Material Take Off and relevant PURCHASE ORDER within this Material Delivery Time, not later.

VENDOR ASSISTANCE AND SITE SERVICES

VENDOR shall provide full details for the installation, site testing, commissioning, and start- up of the equipment. All activities are to be conducted in accordance with the project approved Quality Assurance and Quality Control requirements. VENDOR shall also advice recommended preventive maintenance procedures to ensure proper operation and provide extended service life. Detailed preservation check lists shall be developed by VENDOR and provided to PURCHASER for correct implementation and recoding in the CMS.

Moreover, the VENDOR is requested to provide Site Assistance and Training Services as stated hereinafter.

13.1

Site assistance

Equipment VENDOR at the request of PURCHASER will furnish an International Field Service Representative at fabrication yard(s) and Offshore / Island locations, for:

•

•

•

to verify correct quantities, and condition of all materials and subassemblies required for equipment/package erection and installation;

to assist PURCHASER/ Sub-purchaser(s) with equipment/package installation;

to provide Commissioning and Start-up assistance, as required by PURCHASER’s Commissioning team/ COMPANY’s Start-up team.

Dedicated daily rate for the site assistance shall be provided by VENDOR with clearly indication of assumptions and qualifications/exclusions.

Equipment VENDOR will also assist PURCHASER in the preparation of the Training Program and shall allocate detailed rates for his specialist(s) for providing on-the job training to COMPANY O&M personnel.

The construction completion, testing, commissioning and preservation activities shall be maximized in the VENDORs premises/fabrication yard (in a controlled environment). This will improve commissioning schedule at Offshore / Island locations and minimize the cost as all required tools, equipment and utility services for the testing at site. Some site activities as part of module integration and other remaining activities shall be carried out at the Offshore / Island site, in accordance with approved procedures and as per the instructions from VENDOR’s of individual items / equipment / packages.

VENDOR shall guarantee the availability of mechanical, instrumentation, control and electrical skilled personnel for erection, pre-commissioning, complete functional test, commissioning initial start-up of supplied equipment at Onshore fabrication yard & Offshore / Island site. Special equipment or tools necessary for installation, adjustment and commissioning activities shall be at VENDOR’s care, as for as instrumentation and devices for site testing, if applicable as referenced at section 8.12. Specific requirement for VENDOR Packages mechanical completion and preservation/protection are addressed in Document No. 1-CA0000-51-PRO-2053-00 ‘Mechanical Completion Procedure’ and its referenced documents.

DOCUMENT CLASS 2A

Page 40 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Any special test equipment, special tools and spares required for the execution of the pre- commissioning/commissioning activities shall be identified and shall be supplied by VENDOR.

The VENDOR shall provide daily rates for assistance and supervision during installation, pre-commissioning and commissioning according to the C.T.P. form included in General Purchase Conditions.

13.2

Training Requirements for COMPANY Personnel

The VENDOR shall provide an optional quotation to prepare and develop and carry out a specialist training program to impart all necessary skills and knowledge to COMPANY operational and maintenance personnel such as to enable them to competently and safely operate and maintain the facilities according to the requirement of Annexure 10.D.12 Training Requirements for Company Personnel.

For each training, VENDOR shall submit a detailed training Agenda to include as a minimum:

Title of Course

Learning Outcomes

Summary of content

Location

Duration

Targeted Participants

Learning Aids

⦁

⦁

⦁

⦁

⦁

⦁

⦁

VENDOR shall be responsible for the provision of “Training Manuals” for all training courses provided. These manuals shall be so detailed in order that COMPANY personnel can use them to provide additional courses after the facilities have been handed over.

Completed manuals shall be submitted to each course attendee at least four weeks before the training session commences in order that the attendees may become fully familiar with the content of the course and will be retained by the attendee for future reference.

All training materials must be in the English Language.

Colour copies of any presentation slides used in computer or overhead presentations shall be included in each training manual.

Whether and to the extent required by PURCHASER, the VENDOR shall carry out the training at site, as part of the Site Assistance.

SAFETY INFORMATION

The VENDOR shall implement, operate and maintain a HSE Management System to ensure that requirements of the Contract and of the standard ISO 45001:2018 are achieved, in compliance with:

DOCUMENT CLASS 2A

Page 41 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

• 1-CF0000-52-PRO-5806-00 Project HSE Requirements for Subcontractors and

Vendors.

• ANNEXURE 12 Health, Safety and Environment Requirements.

PURCHASER/COMPANY, reserve the right to carry out HSE Audits at the VENDOR’s office and works, to verify that the HSE Management System requirements are being met.

14.1

Safety Information

VENDOR, when applicable and in the scope of the SUPPLY shall provide the following information:

•

Instruction, Operating and Maintenance Manual.

• For Pressure Equipment and Machineries equipped with manholes under inert gas preserving atmosphere, all the safety signs and warning must be reported according to the specification provided and in case visible and understandable. Safety signs must be in English and Arabic language.

• Al packages dimensionally suitable for Manual Handling which weight is more than 23 Kilograms must be labelled with warning signs in English and Arabic Language. See example below.

• PPE included in the scope of SUPPLY must be provided with relevant Instructions

and Certificates (where applicable)

Signages shall be in English and Arabic language.

GUARANTEES

15.1

VENDOR Responsibility

VENDOR shall be responsible for all aspect of the work performed by VENDOR and his Sub-Vendors covered by assigned Order; this shall include, but not limited to, responsibility for management and design development, quality, costs and scheduled performance.

VENDOR shall carry out any work not specified in the assigned Order, which is necessary for the completion of the work; this shall include all integrating and interfacing of facilities and service provided under the assigned contract of the Package.

PURCHASER may audit the VENDOR performance, during all stage of the PROJECT, to ensure compliance with the requirements of the Order.

DOCUMENT CLASS 2A

Page 42 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

Any PURCHASER approval of documents and technical solutions shall in no way relieve VENDOR of his overall responsibilities and obligation for the work under the Order.

Any variation that occurs for a complete and safe operability of the Equipment during detailed engineering in the SUPPLY phase shall be at VENDOR responsibility and cost.

15.2

Mechanical Guarantees

The VENDOR shall guarantee that design and fabrication shall be performed in accordance with good engineering and industrial practice.

All equipment and components parts shall be guaranteed by the VENDOR against defective materials, design and workmanship.

The mechanical warrantee duration is according to the Special Terms and Conditions.

Warrantee shall cover all the SUPPLY and sub-SUPPLY.

VENDOR shall replace parts faulty for design, material and manufacturing in the shortest time.

All relevant cost shall be charged to the VENDOR.

15.3

Performance Guarantees

Not applicable

15.4

Site Acceptance Test

The (SAT) shall satisfactorily demonstrate correct performance of the equipment/material and that the system performs in conjunction with other plant process equipment at site.

The Site Acceptance Test (SAT) procedure shall also include / list the guaranteed points which shall be demonstrated on site.

15.5

Make-good

Not applicable

DOCUMENT CLASS 2A

Page 43 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

INFORMATION REQUIRED ALONG WITH THE BID

As a minimum, following documents shall be supplied along with bid:

• Detailed Scope of SUPPLY with systems descriptions

• Filled in Technical data sheet.

• General arrangement drawing of the complete package

• Weight

• List of exclusion

• Comprehensive Inspection Test Plan

• Sub-Vendor list (VENDOR shall specify in his offer the Manufacturer and the place

of manufacture of all the items included in their equipment package)

• List of special tools, jigs and templates, if any, with Unit price

• Two - Years Operating recommended Spare Parts list along with standard price

lists and applicable discounts in VENDOR’s format

•

Itemized Price List of Insurance spares, as reviewed by VENDOR.

• With reference to section 8.8 Interface Data for Modularization Engineering

VENDOR shall provide the:

o General Arrangement drawings, including weight, with interconnecting piping, Instrument Junction Boxes and Local Panel Location, Motor and Electrical Equipment Location

• Level of packaging as per section 8.5

• Transportation Limitation as per section 8.7

• Execution Plan and Project schedule: Fabrication/Delivery Schedule

• Catalogues and technical brochures.

• VENDOR Organization and Service

• Reference list of equivalent Projects and / or previous Purchase Order with the

same COMPANY.

• Statement of Compliance to the Material Requisition requirements and Technical

Documents (SOC)

VENDOR shall fully compile and submit with his offer a statement of compliance (SOC) to declare the full acceptance of the scope of work and to be fully in compliance with all the requirements of this Material Requisition along with the following attachments.

o Deviation list to project specification, COMPANY specifications and codes & standards, subject to PURCHASER/ COMPANY review and approval. PURCHASERs/COMPANY interpretation shall be final and VENDOR shall accept such interpretations with no change in the delivery and order amount after PO award. If no exceptions are

DOCUMENT CLASS 2A

Page 44 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

pointed out, the offer shall be considered fully complying with all the requirements of this Material Requisition.

o Confirmation of scope of SUPPLY and services by completing and returning a signed copy of the Scope of SUPPLY and Services table included in Section 8 .

o Declaration of full compliance point by point with all Reference documentation listed at section 4 and all applicable Codes and Industries Standards.

o With reference to section 8.8 Interface Data for Modularization Engineering, and section 8.6 Weight, Dimension and Foundation Loads Monitoring VENDOR commitment to maintain the information already provided with the Bid during his performance of the Purchase Order including but not limited to General Arrangements, General Layout, Weights, etc.

Above listed documents shall be sent on electronic supports.

These documents are to be considered necessary for the technical acceptance of the Offer.

The proposals received without some of the required documents shall not be considered and will be rejected.

16.1

Price Breakdown

The following shall be considered in the final Purchase Order amount in case of award but shall be provided as Separate price quotation:

• Special Tools

• Construction Spares (with Unit prices)

•

Insurance Spares (with Unit prices)

The following shall be provided as Optional Price

• 3D model, Training material and attendance

• Site Assistance and Supervision per diem

DOCUMENT CLASS 2A

Page 45 of 47

Uncontrolled When Printed

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

ATTACHMENTS

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

17.1

Attachment 1 – Deviation / Clarification List

DOCUMENT CLASS 2A

Page 46 of 47

Uncontrolled When Printed

S. No. Document Reference

Paragraph Reference

Discipline

Specification Requirement

Clarification / Deviation and Technical Justification

BUYER/CONTRACTOR position

COMPANY position

Status

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

DEVIATIONS LIST

1

2

3

4

5

COMPANY PROJECT No: 4700021770

CONTRACTOR PROJECT No: 67-00106 COMPANY DOCUMENT No. 1-CF0000-40-MOR-0042-00

HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES

Rev

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

00

17.2

Attachment 2 – Supplier Documents Requirements List

DOCUMENT CLASS 2A

Page 47 of 47

Uncontrolled When Printed

GHASHA CONCESSION HAIL AND GHASHA DEVELOPMENT PROJECT

SUPPLIER DOCUMENTS REQUIREMENTS LISTING (SDRL)

Number of Hard Copies

Number of Hard Copies

Number of Hard Copies

I

D E R U Q E R T L U B S A

I

A = CONTROL DOCUMENTS

A01

A02

A03

A04

A05

A06

A07

A09

A10

A11

A12

A13

VENDOR DOCUMENT REGISTER

FABRICATION / PRODUCTION SCHEDULE

PROGRESS REPORTS

BOUGHT OUT ITEMS / SUB ORDER COPIES

TABLE OF CONTENTS

SUPPLIER/SUB-SUPPLIER CONTACT DIRECTORY

PURCHASING/SUB-CONTRACTS EXPORT COMPLIANCE CHECKLIST

LIST OF CONFORMANCE/EXCEPTIONS

SUB-CONTRACTOR WORK PROPOSAL

SAFETY POLICY & PERFORMANCE RECORDS

INSURANCE CONFIRMATION

VENDOR SUB-ORDERS

B = INTERFACE AND ARRANGEMENT DRAWINGS

B01

B02

B03

B04

GENERAL ARRANGEMENT DRAWINGS

√

ACCEPTABLE NOZZLE LOADS

INTERFACE AND CONNECTION SCHEDULE

FOUNDATION LOADING DIAG. & SUPPORT DETAILS

C = DESIGN AND OPERATIONAL DATA

I

N O T A T N E M U C O D L A N F

I

I

D B H T W

I

I

W E V E R R O F

I

D E R U Q E R T A M R O F

E

1

1

1

1

1

1

1

1

1

2

4

PIPING & INSTRUMENT DIAGRAMS (P&ID’S)

√

2

ONE LINE ELECTRICAL DIAGRAMS

SCHEMATICS DIAGRAMS

UTILITIES SCHEDULE

WEIGHT DATA SHEETS

EQUIPMENT DATA SHEETS

NOISE LEVEL DATA SHEETS

SCHEDULE OF ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS

DETAILS DESCRIPTION OF OPERATION

HVAC DUCTING & INSTRUMENT DIAGRAMS & FLOW DIAGRAMS

PROCESS FLOW DIAGRAMS, HEAT & MASS BALANCE

ELECTRICAL POWER SUPPLIES DATA SHEET

ENCLOSURE VENTILATION REQUIREMENTS

INSTRUMENT INDEX AND I/O SCHEDULE

INSTRUMENT DATA SHEET

CAUSE AND EFFECT CHARTS

INSTRUMENT / ELECTRICAL LOGIC DIAGRAM

VDU SCREEN DISPLAY GRAPHICS

BLOCK WIRING SCHEMATICS

C20

VALVE INDEX

C21

C22

C23

C24

C25

C26

VALVE DATA SHEETS

LINE (PIPING) LIST

SUPPLIER MASTER TAG LIST

DRUM LIST

LIST OF SPECIAL TOOLS

BILL OF MATERIAL

D = GENERAL DETAIL AND SUB-ASSEMBLY DRAWINGS

CROSS SECT DWG / EXPLODED VIEW DIAGRAM

MECHANICAL SEAL DRAWINGS

SHAFT ALIGNMENT DRAWINGS

NAME PLATE FORMAT DRAWINGS

SUB ASSEMBLY DRAWINGS

DETAILED FABRICATION DRAWINGS

SHOP DETAILS

INSTALLATION DRAWINGS

C01

C02

C03

C04

C05

C06

C07

C08

C09

C10

C11

C12

C13

C14

C15

C16

C17

C18

C19

D01

D02

D03

D04

D05

D06

D07

D08

D99

√

√

√

√

√

√

√

√

√

√

√

√

3

3

3

3

3

3

3

3

10

1

3

3

MISCELLANEOUS DRAWINGS/DESCRIPTIVE LITERATURE

√

1

e u g o a t a C

l

l

i

a c n a h c e M

I

H C T A P S D D E D U L C N

I

E B O T

I

R E S S O D

S K E E W + O P

L A U N A M M & O

B R M

√

√

√

F = CALCULATIONS & PERFORMANCE DATA

F01

F02

F03

F04

F05

F06

F07

F08

F09

F10

F11

F12

F13

F14

F15

F16

F17

F18

F19

F20

F21

F22

F23

F24

F25

F26

F27

F28

F29

F30

F31

F32

F33

F34

F35

F36

F37

F38

F39

F40

F41

F42

F43

F44

F46

F99

PRESSURE VESSEL/TANK MECH CALCS.

PROCESS/UTILITY CALCULATIONS

STRUCTURAL STEEL CALCULATIONS

FOUNDATION SUPPORT CALCULATIONS

SYSTEM HEAD LOSS CALCULATIONS

LATERAL CRITICAL SPEED CALCULATION

TORSIONAL CRITICAL SPEED CALCULATIONS

BEARING LIFE CALCULATIONS

THRUST BEARING SIZING CALCULATIONS

HEAT EMISSION CALCULATIONS

ACOUSTIC ANALYSIS FOR RECIPROCATING COMPRESSORS

HYDRAULIC CALCULATIONS

EXCHANGER THERMAL RATING CALCULATIONS

INSTRUMENT CALCULATION (ALSO REFER F25)

ENCLOSURE VENTILATION SYSTEM CALCULATIONS

EXHAUST DUCT CALCULATIONS

COUPLING SELECTION CALCULATIONS

LUBE & SEAL OIL SIZING CALCULATIONS

ANTI SURGE VALVE SIZING CALCULATIONS

PULSATION DAMPER DESIGN CALCULATIONS

ROTOR/SHAFT SYSTEM UNBALANCED RESPONSE ANALYSIS

PIPING STRESS ANALYSIS

CRANE FAILURE MODE ANALYSIS

ESD VALVE

RELIEF VALVE & BURSTING DISC CALCS. (REFER F14)

ELECTRICAL PROTECTION STUDY

CURRENT/POTENTIAL (CT/VT) TRANSFORMER CURVES

MOTOR PERFORMANCE CURVES

COMBUSTION GAS TURBINE PERFORMANCE CURVES

CENTRIFUGAL PUMP PERFORMANCE CURVES

ROTARY PUMP CURVES

CENTRIFUGAL COMPRESSOR PERFORMANCE CURVES

FAN PERFORMANCE CURVES

ENGINE PERFORMANCE CURVES

GENERAL PERFORMANCE DATA

SPEED/TORQUE STARTING CURVES

RECIPROCATING PUMP PERFORMANCE CURVES

LIGHTING PERFORMANCE DATA

BATTERY CHARGE/DISCHARGE CALCULATIONS

POWER SYSTEM ANALYSIS DATA

RELIABILITY/AVAILABILITY DATA & CALCULATIONS

PERFORMANCE GUARANTEE

SHORT CIRCUIT CALCULATIONS

NOZZLE LOAD ANALYSIS

SUPPORT CALCULATIONS

MISCELLANEOUS CALCULATIONS

I

D E R U Q E R T L U B S A

I

I

D E R U Q E R T A M R O F

E

I

D B H T W

I

I

W E V E R R O F

I

N O T A T N E M U C O D L A N F

I

I

H C T A P S D D E D U L C N

I

E B O T

I

R E S S O D

S K E E W + O P

L A U N A M M & O

B R M

e u g o a t a C

l

l

i

a c n a h c e M

I

D E R U Q E R T L U B S A

I

L = TEST & INSPECTION REPORTS

L01

L02

L03

L04

L05

L06

L07

L08

L09

L10

L11

L12

L13

L14

L15

L16

L17

L18

L19

MATERIAL TEST CERTIFICATE

WELDER PERFORMANCE QUALIFICATION CERTIFICATES

NDE OPERATOR QUALIFICATIONS

PRODUCTION TEST RESULTS (INCLUDING WELDING)

NDE RECORDS

HEAT TREATMENT RECORDS/STRESS RELIEF CHARTS

MATERIAL TRACEABILITY RECORDS

NAMEPLATE RUBBING/PHOTO’S

ELECTRICAL MACHINERY TYPE TESTS

ROUTINE TEST CERTIFICATE – ELECTRICAL MACHINERY

MEASUREMENT OF RESISTANCE

PAINTING / INSULATION INSPECTION REPORT

CERTIFICATE OF INSTALLATION OF VESSEL INTERNALS/LINING INCLUDING VIDEO DIGITAL PHOTOGRAPHS

EQUIPMENT PRESERVATION CERTIFICATE

CERTIFICATE OF EQUIPMENT CLEANLINESS

LEAKAGE TEST CERTIFICATE

HARDNESS TEST REPORT

PIPE RECONCILIATION

TPI Vendor Inspection Report/EPC FDR(EPC/TPI USE)

M = SHIPPING & PACKING DOCUMENTS

M01

M02

SHIPPING & PACKING DOCUMENTS

HAZARDOUS MATERIAL SHIPPING CERTIFICATES

N = RENEWABLE TEST AND CALIBRATION DATA

N01

N02

N03

N04

N05

N06

N07

N08

N09

N10

N11

N12

N13

N14

N15

N16

N17

PRESSURE TEST CERTIFICATES

INSTRUMENT TEST & CALIBRATION CERTIFICATE

LIFTING EQUIPMENT REGISTER & TEST CERTIFICATES

INSULATION RESISTANCE TEST

PRESSURE VESSEL & EXCHANGER REGISTER & CODE DATA CERTIFICATES (IIA), AB25 MANUFACTURER DATA REPORT FOR PRESSURE VESSELS

CERTIFICATE OF COMPLIANCE

RELEASE NOTES

CERTIFYING AUTHORITY RELEASE NOTES

TECHNICAL DEVIATION REQUESTS

COSHH DATA SHEETS

CERTIFICATE OF CONFORMITY

PROGRAMABLE EQUIPMENT REGISTER AB96 GENERAL ENGINEERING REQUIRMENTS FOR DESIGN & CONSTRUCTION OF PRESSURE PIPING SYSTEMS

√

AB31 DESIGN REGISTRATION APPLICATION

AB83 CONSTRUCTION DATA REPORT FOR PIPING SYSTEMS AB83F CONSTRUCTION DATA REPORT FOR PIPING SYSTEMS MANUFACTURED OUTSIDE ALBERTA

AB41 STATUTORY DECLARATION FORM FOR REGISTRATION OF FITTINGS

P = MATERIAL ENGINEERING DATA (SUPPLIER WELDED)

P01

P02

P03

P04

P05

P06

WELD PROCEDURE SPECIFICATIONS (WPS) & QUALIFICATIONS (WPQ) RECORDS

NON-DESTRUCTIVE EXAMINATION PROCEDURES (NDE)

MANUFACTURING PROCEDURES INCLUDING HEAT TREATMENT

SURFACE PREPARATION & PAINTING PROCEDURE

WELD PROCEDURE FOR CASTING REPAIR

POSITIVE MATERIAL IDENTIFICATION PROCEDURE

G = HANDLING, INSTALLATION & SITE PRESERVATION

Q = MATERIAL CERTIFICATE (FABRICATION SITE WELDED)

G01

G02

G03

G04

G05

G06

G07

ERECTION & INSTALLATION PROCEDURE

UNPACKING & PRESERVATION PROCEDURE

HANDLING & SHIPPING PROCEDURES

PRE-COMMISSIONING/COMMISSIONING PROCEDURES

ERECTION FASTENERS SUMMARY LIST

SLING/LIFTING ARRANGEMENT

MAINTENANCE PROCEDURE FOR LONG-TERM STORAGE

Q01

Q02

R = Manuals

R01

R02

R03

R04

MATERIAL CERTIFICATES - BULK ITEMS

MATERIAL CERTIFICATE - PACKAGE WELDED INTERFACES

DESPATCH DOSSIER

OPERATING/MAINTENANCE MANUAL

MECHANICAL CATALOGUES

MANUFACTURING RECORD BOOK(MRB)

I

N O T A T N E M U C O D L A N F

I

e u g o a t a C

l

l

i

a c n a h c e M

I

H C T A P S D D E D U L C N

I

E B O T

I

R E S S O D

S K E E W + O P

L A U N A M M & O

B R M

√

√

√

√

√

√

√

√

√

√

√

√

√

√

√

√

√

√

√

I

D B H T W

I

I

W E V E R R O F

I

D E R U Q E R T A M R O F

E

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

4

E = INSTRUMENT & ELECTRICAL DRAWINGS

H = MANUFACTURING / QUALITY PROCEDURES

E01

E02

E03

E04

E05

E06

E07

E08

E09

E10

E11

ELECTRICAL CONNECTION DIAGRAMS

INST / ELECT PANEL DETAIL DRAWING

TERMINATION DIAGRAMS

CABLE SCHEDULE

INSTRUMENT TERMINATION & HOOK UP DETAILS

LOOP DIAGRAMS

INSTRUMENT PLC DATA COMMUNICATION PROTOCOL

INSTRUMENT, F&G LOCATION PLANS

SHUTDOWN & CONTROL FUNCTION CHARTS

EARTHING ARRANGEMENTS

ELECTRICAL POWER REQUIREMENTS LIST

√

√

√

√

√

√

√

3

3

3

3

3

3

3

PLEASE NOTE :-

( i ) A detailed description for each of the documents requested is given in the attached sheets. *

CONTRACTOR to refer to ANNEXURE 10G, Section 08 for the applicability of these documents and further requirements.

LEGEND :-

O - REVIEW BY ENGINEERING IN THE PROJECT OFFICE

R - REVIEW BY ENGINEERING AT THE SELLERS WORKS

S - REVIEW BY INSPECTOR AT THE SELLERS WORKS

A - REVIEW BY AUDIT AT THE SELLERS WORKS

F - CERTIFIED DOC. TO BE SENT TO

J -

INCORPORATE CERTIFIED ISSUE IN J01

SITE WITH MATERIALS

K -

INCORPORATE CERTIFIED ISSUE IN K01

H-

DOC SHALL BE RETAINED IN

SAFE CUSTODY BY SELLER

E-FORMAT REQUIRED :-

1 -

ANY

2 - Microstation

3 - NATIVE (WORD, EXCEL)

4 - PDF

H01

H02

H03

H04

H05

H06

H07

H08

H09

H10

H11

ISO9000 REGISTRATION CERT. OTHERWISE QA MANUAL INDEX

QUALITY PLAN

INSPECTION & TEST PLAN

PRESSURE TEST PROCEDURES

PERFORMANCE TESTING AND ACCEPTANCE TEST PROCEDURE.

SOFTWARE QUALITY SYSTEM

WEIGHING PROCEDURE

HEALTH SAFETY & ENVIRONMENTAL MANAGEMENT SYSTEM

HEALTH SAFETY & ENVIRONMENTAL PLAN (HS&E PLAN)

PROPOSED SOFTWARE LISTING

NOISE CRITERIA DATA & TEST PROCEDURES

J = COMMISSIONING, OPERATING, MAINTENANCE & SPARES

J01

J02

J03

LUBE OIL &OPERATING FLUID SCHEDULES

RECOMMENDED START-UP & COMMISSIONING SPARES LIST (PRICED)

RECOMMENDED SPARES FOR 2 YEARS OPERATIONS (PRICED)

K = CERTIFICATION

K01

K02

K03

K04

K05

K06

K07

K08

K09

K10

K11

K12

K13

PERFORMANCE TEST REPORT/RESULTS

FACTORY ACCEPTANCE TEST REPORT (FAT)

VIBRATION REPORT

NOISE REPORT

WEIGHING REPORT & CERTIFICATES

DIMENSIONAL REPORT / DRAWINGS

FIRE TEST REPORTS/CERTIFICATES

EQUIPMENT HAZARDOUS AREA CERTIFICATES

HAZOP REPORTS

REGISTER OF SAFETY RELATED DEVICES

SAFETY INTREGRITY LEVEL (SIL) REPORTS

STUDY REPORTS

FUNCTIONAL TEST REPORTS

√

√

√

√

√

√

√

√

√

√

1

1

1

1

1

1

1

1

1

1

1

1

6

7

8

1

1

1

4

4

1

3

√

√

√

√

√

√

√

Rev

STATUS DESCRIPTION

DATE

Prep

Checked

Approved

SUPPLIER DATA REQUIREMENTS LIST (SDRL)

PO / ENQUIRY No. :

DESCRIPTION :-

DOC. No.: XXXX-XXXX-XX-REQ-XXXX

  SHEET 1 OF

1

ANNEXURE 10G, SECTION 03 APPENDIX 1_SUPPLIER DOCUMENT REQUIREMENT LISTING

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-40-MOR-0042-00

Rev. No. :

00

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

CLASS 2A

Discipline:

40-Process Safety Engineering

Pos No.

Page number

COMPANY Comments Description

1

2

3

4

5

02

07

07

14

14

HOLD to be removed in the next revision Contractor shall confirm these list inclusive of additional Safety equipment(cid:144)s from their developed documents which includes: (HSE Philosophy, EERA , Emergency response plan, Safety Equipment list, Safety Equipment Data Sheets, HSECES performance, Corrective maintenance programs, Spare Parts Lists and Miscellaneous associated documents etc. Confirmation required What is the basis for including these listed Safety & Life Saving Equipment’s ? Contractor not included the list of items as per the Scope of Work Narratives Annexure - Safety Equipment’s list requirements. Describe the content of this kit

COMPANY Originator NAME

Mr Kannan Perumal Mr Saravanan Kalimuthu

CONTRACTOR Confirmation / Explanation

Noted. HOLD-2 has been removed Confirmed

ACTION BY CONTRACTOR

V. Cavaliere V. Cavaliere

Mr Saravanan Kalimuthu

Mr Vinayak Kamat

JV confirms that the list include all the iems of the Attachment 2 of the Scope of Work Narrative as well as all the safety equipments required by the development of detail design. See point 2 above. This is a MR. For details about the content please refer to “SAFETY AND LIFE SAVING EQUIPMENT SPECIFICATION” doc. no. 1-CF0000-40-SPE-0032-00 appendix A11.

V. Cavaliere

V. Cavaliere

Wall mounted Charger along with two (2) number Torches (1 per Substation, IES building and non process building).

Mr Vinayak Kamat

These 50 torches are required as part of RFSU (Attachment 2 of the Scope Of Work Narrative) therefore they are not intended to put inside any of the buildings

V. Cavaliere

File: MacroCommentSheet_EPC 6

Page 1/5

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-40-MOR-0042-00

Rev. No. :

00

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

CLASS 2A

Discipline:

40-Process Safety Engineering

Pos No.

Page number

COMPANY Comments Description

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

ACTION BY CONTRACTOR

1 kit per Substation, IES building and non process building.

Mr Vinayak Kamat

6

7

8

9

10

14

14

14

32

33

Wall mounted Charger along with two (2) number UHF Walkie- Talkie (1 per Substation, IES building and non process building). Wall mounted Electrical PPE Box (1 per Substation, IES building) Portable Lamp with wall mounted chargers (in Each Air lock room) JV to specify here, that during IVB Audit for HSECES vendor shall support auditor/reviewer, as requried. Confirm all vendors are ADNOC approved AVL.

Mr Vinayak Kamat

Mr Vinayak Kamat

These 2 electrical kit are required as part of RFSU (Attachment 2 of the Scope Of Work Narrative) therefore they are not intended to put inside any of the buildings These item are not provided as they are not included neither in the Attachment 2 of “Scope of work for operation” nor in the design development These item are not provided as they are not included neither in the Attachment 2 of “Scope of work for operation” nor in the design development

V. Cavaliere

V. Cavaliere

V. Cavaliere

Mr Kannan Perumal

Agreed. The comments has been incorporated.

V. Cavaliere

Mr Kannan Perumal

Al the Vendor will be from ADNOC AVL. Subvendor wil be selected base of the CR category of the item and acconding to the instruction received by COMPANY for the selection of the SubVendor

V. Cavaliere

File: MacroCommentSheet_EPC 6

Page 2/5

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-40-MOR-0042-00

Rev. No. :

00

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

CLASS 2A

Discipline:

40-Process Safety Engineering

Pos No.

Page number

COMPANY Comments Description

Re-visit the CR as only PPE like helmet, Apron, Safety shoes, head set are considered as PPE and can be CR3. Remaining items falls under HSE Critical itesm and as per Section 7.4 of AGES-SP-13-001 shall be of CR1. update.

11

36

12

13

37

51

Pre-inspection meeting is required as per Quality procedure. Also, being safety critical equipment, required pre-inspection meeting. update. Comments provided in the Specification shall be incorporated as the specification is in Code-2.

Mr Kannan Perumal

Mr Kannan Perumal

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

Mr Kannan Perumal

List has been re-visited

ACTION BY CONTRACTOR

V. Cavaliere

Section 7.4 of the AGES-SP-13-001 doesn’t exist. PPE are any device or appliance designed to be worn or held by an individual for protection against one or more health and safety hazards (as per AGES-SP-13-001) HSECES are Equipment and systems (including in-built software) or any component of these, the failure of which could cause or contribute substantially to; or the purpose of which is to prevent or control the effects of a Major Accident (as per AGES-SP-13-001). Confirmed that the HSECES will be in category CR1. All the other wil be CR3. Pre-inspection meeting is not requied since the material are procured as standard manufactured by Vendor included in the ADNOC AVL Confirmed. Rev. B3 of the specification is issued along with this MR.

V. Cavaliere

V. Cavaliere

File: MacroCommentSheet_EPC 6

Page 3/5

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-40-MOR-0042-00

Rev. No. :

00

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

CLASS 2A

Discipline:

40-Process Safety Engineering

Pos No.

Page number

COMPANY Comments Description

14

15

16

17

18

52

53

53

54

54

JV to ensure all the comments provided in the Specification have been included. Also, all items that is applicable for the DCs or GOP shall be part of the this MR. JV to confirm.

OPEN: All Field instrumentation is Zone-1 applicable as per project requriement. JV to confirm.

Mr Kannan Perumal

Recharagables torches shall be of Zone-1 requirements as it will be used in all HAC zones. JV to confirm

Mr Kannan Perumal

In additional to the design layouts developed detailed engineering, all the items as required in the SOW narrative shall also be included. JV to confirm. Comments provided in the Specification shall be included. JV to note, all items as required as part of the engineering development and additional requriement as defined in SOW narriative shall be part of this MR. JV to confirm.

Mr Kannan Perumal

COMPANY Originator NAME

Mr Kannan Perumal

CONTRACTOR Confirmation / Explanation

Confirmed that all items that is applicable for the DCs or GOP shall be part of the this MR. Rev. B3 of the specification is issued along with this MR.

ACTION BY CONTRACTOR

V. Cavaliere

Noted. Requirement for Zone 1 Field instrument has been added in the SAFETY AND LIFE SAVING EQUIPMENT SPECIFICATION” doc. no. 1-CF0000-40-SPE-0032-00 rev_B3 that is issued along with this MR. Noted. Requirement for Zone 1 has been added in the SAFETY AND LIFE SAVING EQUIPMENT SPECIFICATION” doc. no. 1-CF0000-40-SPE-0032-00 rev_B3 that is issued along with this MR. Confirmed. Refer to point #2 and #3

V. Cavaliere

V. Cavaliere

V. Cavaliere

Mr Kannan Perumal

Confirmed. Refer to point #2 and #4

V. Cavaliere

File: MacroCommentSheet_EPC 6

Page 4/5

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-40-MOR-0042-00

Rev. No. :

00

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

MATERIAL REQUISITION FOR SAFETY AND LIFE SAVING EQUIPMENT

CLASS 2A

Discipline:

40-Process Safety Engineering

Pos No.

Page number

COMPANY Comments Description

19

20

55

56

JV to confirm compliance to proper storage till installation. JV to confirm compliance. OPEN: JV to check with the procurement and confirm compliance. The tracking during the shipment/transportation/preservation/ shall also be tracked before installation.

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

Mr Kannan Perumal

Confirmed

Mr Kannan Perumal

Confirmed. For COMPANY information, when JV issue a purchase request (PR) to Procuprement departement, each group of material is allocated to proper yard/site where finally are material is adreessed.

ACTION BY CONTRACTOR

V. Cavaliere

V. Cavaliere

File: MacroCommentSheet_EPC 6

Page 5/5