1 CF0000 54 PRO 3005 00_01

NOI No.

JV-NPCC- NPCC PO No.

PO Description

Vendor Name

Location

Sub Vendor Name (If applicable)

Location

Inspection Class

JV NPCC - SAIPEM Inpection Agency

JV NPCC - S / TPI Assig Inspect

Inspection Notification Register / Ins

HAIL & GHASHA DEVELOPMENT PROJECT

PUNCH LIST / OUTSTANDING WORK (VENDOR / SUBVENDOR / SUBCONTRACTOR)

Contractor P.O. Number / Rev.

Material Description

Vendor/Manufacturer Name, Location

Punch List No. Rev.No.

Inspection Release Note No. / Rev.No

S/N

Punch Point

Punched By

Category Code

Project Reference (Doc # / Clause #)

Issuance / Acknowledgement

Action By

Vendor (Name & Sign)

Contractor / TPI (Name & Sign)

Company / TPA (Name & Sign)

Verified Close Out By: (To be verified and completed only when all the punch items above are closed and endorsed by COMPANY )

VENDOR / Sub-Vendor

CONTRACTOR / TPI

Name :

Date :

CATEGORY CODES Category A:

Name :

Date :

COMPANY:

Name :

Date :

Punch items shall be closed at Vendor / Sub-Vendor / Sub-Contractor location prior to issuance of Inspection Release Note (IRN)

Category B: Punch items shall be closed Prior to material Receipt inspection at site / fabrication yard of CONTRACTOR

Category C: Punch items shall be closed Prior to relevant stage Inspections after reciept inspection at Site / Fabrication yard of CONTRACTOR. This shall be recategorized for Fabrication / Construction phase based on the criticality.

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

Document title mismatch with EDDR, title to be updated in EDDR CONTRACTOR(CTR) to add the revision markers for all the changes made in this revision as compared to the previous revision. In case of any conflict, requirement specified in AGES-SP-13- 002 and COMPANY interpretation shall be binding

1

2

3

4

01

06

06

08

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

ACTION BY CONTRACTOR

Mr Sajan George

Title updated via DAF No.OFCR-HGDP-DAF-0037

Barbara Pizzuti

SAHCOB010348

Implemented

Barbara Pizzuti

SAHCOB010348

Noted and Confirmed. The Sentence already comply to this comment. To include in this procedure

BarbaraPIzzuti

Order of precedence to be as per MOR. In case of conflict between documents in the same level of hierarchy as listed in MOR, the most stringent and safest requirement shall prevail.

Arrange in alphabetical order

SAHCOB010348

The table in Par 3.2 will be revised accordingly.

BarbaraPIzzuti

File: MacroCommentSheet_EPC 6

Page 1/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

Involvement and responsibility of CTR Quality team during the approval of Vendor’s Quality/Inspection documents, issuance of NOI, IAP to CPY & TPI agency, Review & assignment of TPI, Review/verification of TPI or source inspector reports, verification of Compliance to the PO/contractual specifications, Close out of NCRs related to supplied items, issuance of inspection Release, Responsibility of the OWL/Punch list close out to be included in this section.

COMPANY Originator NAME

SAHCOB010348

5

10

File: MacroCommentSheet_EPC 6

ACTION BY CONTRACTOR

BarbaraPIzzuti

Page 2/13

CONTRACTOR Confirmation / Explanation

Sentence to be incorporated in CONTRACTOR Project Inspection Coordinator (PIC) : The PIC is involved during the approval of Vendor’s Quality/Inspection documents, issuance of NOI, IAP to CPY & TPI agency, Review & assignment of TPI, Review/verification of TPI or source inspector reports, verification of compliance to the PO/Contractual specifications, close out of NCRs related to supplied items, issuance of inspection release and OWL/Punch list close out related to the manufacturing activities.

  1. PQM is not included.
  2. PIC shall report to Procurement QC Lead
  3. Involvement of Quality Control during the TBE stage(Related to inspection related issues only) shall also be addressed

Sentence incorporated: CONTRACTOR Project Inspection Lead (PIL) CONTRACTOR PIL is part of the Quality Control Organization that ensures the co-ordination of all QC activities for the Project. He directly reports to Project Material Manager. CONTRACTOR Project Inspection Coordinator (PIC) CONTRACTOR PIC is the focal point of QC activities for VENDOR QC Organization. PIC is involved during the TBE stage (for inspection related issues only), the approval of Vendor’s Quality/Inspection

documents, KoM, PIM, management of NOI, IAP to CPY & TPI

agency, Review & assignment of TPI, Review/verification of

TPI or source inspector reports, verification of compliance to

the PO/Contractual specifications, close out of NCRs related to

supplied items, issuance of inspection release and

OWL/Punch list close out related to the manufacturing

activities.

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

SAHCOB010348

Implemented

Add: Remote attendance in lieu of Physical attendance shall be subjected to the Company approval. CTR to clearly specify how report distribution to Company will be implemented.

SAHCOB010348

Taking in consideration the scope of the document, the sentence will be revised as : The distribution of the Inspection Reports to COMPANY will be by CONTRACTOR as per PROJECT requirements or as agreed between the Parties. CTR to define the way and timeline of distribution of the Inspection Reports in this procedure.

The distribution of the Inspection Reports to COMPANY will be by CONTRACTOR as set in the Project Coordination & Communication Procedure. Comment already incorporated in the sentence. The item should be considered closed.

ACTION BY CONTRACTOR

BarbaraPIzzuti

BarbaraPIzzuti

BarbaraPIzzuti

6

7

8

13

15

15

Add: with latest Revision and approval status

SAHCOB010348

File: MacroCommentSheet_EPC 6

Page 3/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

add: and to verify and confirm all the items (as a minimum) shall be discussed and concluded during the PIM as per Cl. 19.4 of AGES-SP-13-002

COMPANY Originator NAME

SAHCOB010348

9

17

ACTION BY CONTRACTOR

BarbaraPIzzuti

CONTRACTOR Confirmation / Explanation

Cl.19.4 of AGES-SP-13-002 refer to the PIM agenda to which this paragraph refer to as Attachment #2 . All items listed in the PIM Agenda in the attachment #2 comply in full with the Cl.19.4 of AGES-SP-13-002. This comment is already incorporated in the paragraph CTR to include this comment in this highloighted paragraph.

The aim of this visit is to review all the Purchasing Document requirements, confirm their endorsement and implementation, discuss and come to a final agreement on VENDOR’s Inspection and Test Plan (ITP). All the items (as a minimum) as per Cl. 19.4 of AGES-SP-13-002 (listed in PIM agenda) shall be discussed and concluded during the PIM.

File: MacroCommentSheet_EPC 6

Page 4/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

This list shall also contain the Unprceed PO copy, MR, Key project specifications and TBE and latest VENDOR documents such as data sheets, drawings with latest Revision and approval status

COMPANY Originator NAME

SAHCOB010348

CONTRACTOR Confirmation / Explanation

Not contractually due, these documents are already distributed, transmitted and available to CPY from the other accountable Departments. CPY Commented list shall be part of PIM package. Hence, CTR to include this list under the PIM package documents. Comment not applicable to this paragraph as it refers to vendor doc status allowing PIM to be performed, it does not refer to IAP content

ACTION BY CONTRACTOR

BarbaraPIzzuti

Repetition of same non compliance.

SAHCOB010348

The repetition is related to the “Use as is” concept but with different meaning described in both the Major and Minor Non- Conformance. The topic should be considered closed. Use as is and epitation of non-complaince is different. Hence, CTR to include this comment. Implemented

BarbaraPIzzuti

10

17

11

20

File: MacroCommentSheet_EPC 6

Page 5/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

Contractor to detail the process including the responsibilities of tracking and transferring to the site verification and close out.

SAHCOB010348

12

20

Requirement QC to the Vendor detailing the different type of PLs. The above will be described in a different internal procedure related to Construction. The topic should be considered closed.To discuss- Reference Doc. no to be included in this procedure Paragraph added and the following process will be implemented:

outstanding issue

to identify the disposition and allocate Vendor responsibility to perform the necessary actions or to bear the relevant costs

Site to verify feasibility of dispositions to be carried out at Site by either Vendor or JV

Management System SAP to transfer to Site the activity follow up. This process will upgrade the Cat C PL to “NCR to be closed at Site”

ACTION BY CONTRACTOR

BarbaraPIzzuti

File: MacroCommentSheet_EPC 6

Page 6/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

13

14

15

20

20

21

statements to be continued.. Section 5 shall include the responsibiulities of CONTRACTOR Inspection Lead

SAHCOB010348 SAHCOB010348

Implemented Implemented as follows: CONTRACTOR Project Inspection Lead (PIL)/Procurement QC Lead CONTRACTOR Procurement QC Lead supports the implementation of the Project Quality Management System (PQMS) activities within the project, supervises the project Quality Control (QC) activities and report to CONTRACTOR Project Quality Manager. He/she acts as focal point for quality control related matters within the project and in liaison with external entities.

Add: proceeding for the relevant Activity in the ITP impacted by such non-conformance

SAHCOB010348

Implemented

BarbaraPIzzuti

ACTION BY CONTRACTOR

BarbaraPIzzuti BarbaraPIzzuti

File: MacroCommentSheet_EPC 6

Page 7/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

Include the responsibilities of this position in the section 5.

SAHCOB010348

16

21

Implemented as follows: CONTRACTOR Project Inspection Lead (PIL)/Procurement QC Lead CONTRACTOR Procurement QC Lead supports the implementation of the Project Quality Management System (PQMS) activities within the project, supervises the project Quality Control (QC) activities and report to CONTRACTOR Project Quality Manager. He/she acts as focal point for quality control related matters within the project and in liaison with external entities.

ACTION BY CONTRACTOR

BarbaraPIzzuti

File: MacroCommentSheet_EPC 6

Page 8/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

Include the responsibilities of this position in the section 5.

SAHCOB010348

17

22

Implemented as follows: CONTRACTOR Project Inspection Lead (PIL)/Procurement QC Lead CONTRACTOR Procurement QC Lead supports the implementation of the Project Quality Management System (PQMS) activities within the project, supervises the project Quality Control (QC) activities and report to CONTRACTOR Project Quality Manager. He/she acts as focal point for quality control related matters within the project and in liaison with external entities.

ACTION BY CONTRACTOR

BarbaraPIzzuti

18

19

23

23

Tracking Register to track, monitor the status of closeout of all Observations / Open issues raised in CONTRACTOR/ COMPANY/ VENDOR Inspection Reports of various locations and different items and Inspection Release Note shall be included in this document.

SAHCOB010348

add: with no comment.

SAHCOB010348

The comment seems not to be related to the topic of the paraghraph. All applicable Project QA procedure and specifications are already listed in the Paragraph 4 of this Procedure. The item should be considered closed.-Contractor understanding is not correct-To discuss for implementation of this comment Implemented sentence substituted with § taken from PK-10.E_00

BarbaraPIzzuti

BarbaraPIzzuti

File: MacroCommentSheet_EPC 6

Page 9/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

20

21

22

23

24 25

26

310

310

319

319

320 321

330

Add:

  • Vendor’s International Certifications such as ISO 9001, OSHAS, API etc.
  • Vendor Project Organization chart Include the book marking or Page header at the start of each attachment

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

SAHCOB010348

Implemented

ACTION BY CONTRACTOR

BarbaraPIzzuti

SAHCOB010348

Agreed . The comment will be incorporated adding the reference to the attachment . For example concerning the “Pre- Inspection Meeting Agenda” will be added “Attachment 2”

BarbaraPIzzuti

Proposal

SAHCOB010348

comment no more valid - COMPANY NCR new format adopted BarbaraPIzzuti

Approval authorities shall be same as Correction action proposal Column for IR No. to be added CONTRACTOR signature and company is required. During Discussion with JV lead, it is agreed that Punch list/OWL procedure will be discussed by arranging a separate meeting .In that case ,Punch list and OWL -Procedure no is to be included in this document as reference document.

SAHCOB010348

comment no more valid - COMPANY NCR new format adopted BarbaraPIzzuti

SAHCOB010348 SAHCOB010348 vsubbian

Implemented Implemented The Procedure no.1-CF0000-54-PRO-3005-00 will be added to the PL/OWL Templates in Attachment #9 -To discuss, refer above response on OWL/PL implemented

BarbaraPIzzuti BarbaraPIzzuti BarbaraPIzzuti

File: MacroCommentSheet_EPC 6

Page 10/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

Clarification to be included in this procedure for the future reference and effective implementation

COMPANY Originator NAME

SAHCOB010348

27

28

29

330

330

330

Not acceptable. FAT readiness checklist requirement shall be confirmed and implemented as per AGES-SP-13-002

SAHCOB010348

During Discussion with JV lead, it is agreed that Punch list/OWL procedure will be discussed by arranging a separate meeting .In that case ,Punch list and OWL -Procedure no is to be included in this document as reference document.

Mr Haitham Moukhtar (ADNOC - Upstream)

CONTRACTOR Confirmation / Explanation

The transfer of custody is a QA topic and shall be clarified by QA Department. The item should be considered closed. -To discuss, refer above response on OWL/PL Implemented FAT readiness check list template not found in the AGES-SP- 13-002. Would CPY issue the template to be used in the Project in subject ? As soon as received it will be incorporated in the Procedure. -CTR to implement and attach Pre-IRN check list & FAT readines checklist template in this procedure. CPY will provide template. Implemented The Procedure no.1-CF0000-54-PRO-3005-00 will be added to the PL/OWL Templates in Attachment #9 -To discuss, refer above response on OWL/PL implemented

ACTION BY CONTRACTOR

BarbaraPIzzuti

BarbaraPIzzuti

BarbaraPIzzuti

File: MacroCommentSheet_EPC 6

Page 11/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

COMPANY Originator NAME

CONTRACTOR Confirmation / Explanation

30

31

32

331

331

332

Not acceptable. Comment to be implemented.

SAHCOB010348

Not acceptable as DCA needs to be followed which shall impact the manufacturing. Hence, this NCs shall be closed prior to proceeding for the relevant ITP activity.

SAHCOB010348

Not implemented, recheck and revise

SAHCOB010348

Comment already implemented. The item should be considered closed. Refer above CPY comment for Page 20 (Row 24) above Classification paragraph revised to be in line with NCR procedure Agreed that all the non conformances found before or at PIM, shall be treated as a deviation to the project requirement. Anyway such eventual NC seems to involve the QA instead of the QC related to the manufacturing activities. This topic sould be consiedered closed. CTR to implment the original comment as clarified in Column D. Implemented Note and confirmed. Comment implemened and already in place . The Attachment no. 7 will be revised incorporating the template actualy used.

ACTION BY CONTRACTOR

BarbaraPIzzuti

BarbaraPIzzuti

BarbaraPIzzuti

File: MacroCommentSheet_EPC 6

Page 12/13

ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS

Drawing / Document Number, Title and Revision:

Doc Status Code:

Doc. No.:

1-CF0000-54-PRO-3005-00

Rev. No. :

0

CODE 2-COMMENTS AS NOTED

Doc Class:

Title:

QC REQUIREMENTS FOR SUPPLIERS OF MATERIALS, EQUIPMENT AND SERVICES

CLASS 2A

Discipline:

54-QAQC

Pos No.

Page number

COMPANY Comments Description

Section 6.4, 3rd para - Contractor to detail on how assigned field TPI inspector will have project specifications and reference documents and their approval status

COMPANY Originator NAME

Additional comment

CONTRACTOR Confirmation / Explanation

To be discussed for implementation TPI receive the applicable Project Specification and Reference Documents together with IAP. Comment is out of the scope of the Procedure no.1-CF0000-54-PRO-3005-00.

ACTION BY CONTRACTOR

BarbaraPIzzuti

Section 6.4, 6th para - All Inspection reports to be reviewed by responsible inspection coordinators and take the action for any lack of informations or OEPN OBSERVATIONS, comments, OWL or punch points Section 9.2, 4th para - All inspectors shall review and endorse all the test records on timely basis instead of keeping it till final release stage

Additional comment

To be discussed for implementation It is comfirmed and already in place.

Additional comment

To be discussed for implementation It is comfirmed and already in place.

BarbaraPIzzuti

BarbaraPIzzuti

File: MacroCommentSheet_EPC 6

Page 13/13

Project: Q-32855 - Saipem Hail & Ghasha Folder: Reference documents


Loading authentication...