ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
COMPANY DOC NO: 1-CF0000-59-PRO-0002-00
Rev. 03
ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Contractor Document Number: CF0000-1009002
03
02
Rev
11/12/2023
30/09/2023
IFU
IFU
Issued for Use
A. Parlato S. Feliziani P. Santoni
C. Copelli
Issued for Use
L. Ceoloni S. Feliziani P. Santoni
P. Santoni
Date (DD/MM/YYYY)
Status
Status Description
PREPARED
CHECKED
APPROVED 1
APPROVED 2
This Document is intended for use by ADNOC and its nominated Consultants, Contractors, Manufacturers and Suppliers.
DOCUMENT CLASS - 1
Page 1 of 20
Uncontrolled When Printed
ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
COMPANY DOC NO: 1-CF0000-59-PRO-0002-00
Rev. 03
This document is rolled over from PCSA document no. 1-CF0000-59-PRO-0002-00 Rev. 01
Rev
01
00
B1
A1
Date
(DD/MM/YYYY)
24/04/2023
28/03/2023
17/02/2023
25/01/2023
SUMMARY OF DOCUMENT REVISIONS
Status
Status Description
IFU
IFU
IFA
IFR
Issued for Use
Issued for Use
Issued for COMPANY approval
Issued for Review
DOCUMENT CLASS - 1
Page 2 of 20
Uncontrolled When Printed
ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
COMPANY DOC NO: 1-CF0000-59-PRO-0002-00
Rev. 03
HOLD
Section
Description
HOLD LIST
DOCUMENT CLASS - 1
Page 3 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
TABLE OF CONTENTS
PROJECT OVERVIEW … 5
1.1
EPC for HAIL & GHASHA Development Project … 5
PURPOSE … 6
DEFINITIONS AND ABBREVIATIONS … 6
3.1
3.2
Definitions … 6
Abbreviations … 6
REFERENCE DOCUMENTS … 7
DOCUMENT AND DRAWING NUMBERING – COMPANY NUMBERING SYSTEM . 8
5.1
5.2
5.3
5.4
5.5
5.6
Field Code (BB)… 9
Area Code (CC) … 9
Unit Code (DD) … 10
Discipline code (EE) … 12
Document Type (FFF) … 13
Serial Number (NNNN) … 14
VENDOR DOCUMENTS AND DRAWINGS NUMBERING – COMPANY NUMBERING SYSTEM … 15
SUBCONTRACTOR DOCUMENTS AND DRAWINGS NUMBERING – COMPANY NUMBERING SYSTEM … 15
REVISION NUMBER … 16
DOCUMENT FILE NAMING … 16
9.1
9.2
Isometric Drawings Coding system … 17
Isometric Electronic file naming … 17
DOCUMENT NUMBERING SYSTEM – CONTRACTOR NUMBERING SYSTEM … 17
10.1 Document Creator Code (PP) … 18
10.2 Document sequential number (QQ) … 18
ATTACHMENTS … 20
11.1 Attachment 1 – Supplier Documents Requirements Listing (SDRL) … 20
DOCUMENT CLASS 1
Page 4 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
PROJECT OVERVIEW
1.1
EPC for HAIL & GHASHA Development Project
The Hail & Ghasha Development (HGD) Project is of strategic importance to the Emirate of Abu Dhabi. The Project will develop the untapped oil and gas reserves from the highly sour Hail and Ghasha fields. Production is targeted to start by Q4 2027 with sustainable production of 1 BSCFD of Raw Gas, and max production of 82.5 MSBPD of Oil, 76.3 MSBPD of Condensate, 9000 TPD of Sulphur and 5030 TPD of NGL. In addition, Project will capture 1.52 million tonnes of CO2 per year taking ADNOC’s committed investment for carbon capture capacity. The Hail and Ghasha fields are situated offshore ABU DHABI about 140 km away from ABU DHABI mainland in water depths varying from 0 to 15 meters.
The HGD Project comprises the following:
• Artificial Islands Construction;
• Offshore package – EPC 01: Offshore Drilling Centers (DCs), Subsea Pipelines, Umbilicals, Power Cable Connections, Seawater Intake Structure, Bridges, Risers, Flare Structure, facilities at Ghasha Offshore Processing Plant (“GOP”);
• Onshore package – EPC 02: Manayif Onshore Processing Plant (“OPP”), Manayif
Utilities, Offsite Pipelines & Tie-ins, Main Control and Other Buildings.
The HGD Project will be executed in a single phase approach. It will start production from three Drilling Centres (Reeah, Jzool & Seebah) in Ghasha Field to GOP and from Gaff Island in Hail Field to OPP. Remaining Drilling Centres, gas injection, and other associated facilities will be developed in ‘future’ to sustain production from Hail & Ghasha fields.
Figure 1 - Hail & Ghasha Fields
DOCUMENT CLASS 1
Page 5 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
PURPOSE
The purpose of this document is to describe the numbering system to be used to number documents and drawings of the Project.
DEFINITIONS AND ABBREVIATIONS
3.1
Definitions
COMPANY
Abu Dhabi National Oil Company (ADNOC)
CONTRACTOR
Unincorporated JV NPCC -SAIPEM
PROJECT
SUBCONTRACTOR
Hail and Ghasha Development Project – Package 1: Offshore Facilities
An entity that has been awarded by CONTRACTOR the performance of part of the work or services of the PROJECT.
VENDOR/SUPPLIER
Any and all vendors of materials and equipment in connection with the PROJECT
3.2
Abbreviations
ADNOC
AGES
AGRU
BEDD
BPD
BSCFD
BWPD
CCP
DC
EPC
GOP
H&MB
HGD
HIPPS
HP
HPU
Abu Dhabi National Oil Company
ADNOC Group Engineering Standards and Specifications
Acid Gas Removal Unit
Basic Engineering Design Data
Barrel per Day
Billion Standard Cubic Feet per Day
Barrels of Water Per Day
Compression Centre Platform
Drilling Centre
Engineering, Procurement and Construction
Ghasha Offshore Processing
Heat & Material Balance
Hail & Ghasha Development
High Integrity Pressure Protection System
High Pressure
Hydrogen Production Unit
DOCUMENT CLASS 1
Page 6 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
LP
MSBPD
MMSCFD
Low Pressure
Thousand Standard Barrels per Day
Million Standard Cubic Feet per Day
NGL
OPP
PWT
SOW
SRU
TDS
TGTU
TPD
TSS
UAE
VRU
Natural Gas Liquids
Onshore Processing Plant
Produced Water Treatment
Scope of Work
Sulphur Recovery Unit
Total Dissolved Solids
Tail Gas Treatment Unit
Tonn per Day
Total Suspended Solids
United Arab Emirates
Vapour Recovery Unit
REFERENCE DOCUMENTS
Sl. No.
Document No.
Document Title
1
2
3
4
5
6
1-CF0000-59-PRO-0006-00
1-CF0000-46-PRO-0225-00
PROJECT DOCUMENTATION - REVIEWS, COMMENTS AND APPROVALS S3D IMPLEMENTATION PROCEDURE
1-CF0000-28-KEY-2450-00 WBS AREA & UNIT PLOT PLAN KEY PLAN
1-CF0000-50-PRO-9819-00 DOCUMENT
MANAGEMENT
AND
CONTROL PROCEDURE
1-CF0000-59-PRO-0003-00 PROJECT PROCEDURE FOR TAG NUMBERING PROJECT INSTRUMENT NUMBERING RULES
1-CF0000-16-PRO-0198-00
SPECIFICATION
DOCUMENT CLASS 1
Page 7 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
DOCUMENT AND DRAWING NUMBERING – COMPANY NUMBERING SYSTEM
CONTRACTOR shall code its drawings, specifications, data sheets, plans, procedures and other documents as per the following:
A
-
BBCCDD
EE
-
FFF
NNNN
MM
Where:
A is a prefix and shall be 1 to indicate Package 1.
BB is the Field Code as per par. 5.1 CC is the Area Code as per par. 5.2 DD is the Unit Code as per par. 5.3
EE is the Discipline Code as per par. 5.4
FFF is the Document Type as per par. 5.5
NNNN is the Serial Document Number as per par 5.6
MM is the Sheet Number. Sheet Number shall be a 2-digit numeric string – 00, 01, 02, 03, etc. The number of sheets applied to the documents and drawings. For documents and drawings where there are no sheet numbers, the sheet numeric string shall be 00.
Example: 1-CF5100-28-LST-9001-00
Drawings
Multi sheet drawings may be combined in one document to be identified and numbered as follows:
• The multi-sheet drawings’ COMPANY number identification, will keep 00 as MM (e.g. A-BBCCDD-EE-FFF-NNNN-00); this number will be used as document identification in Aconex/Page;
• The COMPANY drawing number in the title block will indicate the progressive sheet
number with -01 (for the first sheet), -02 (for the second sheet) and so on.
• The sheet number and the total number of sheets (e.g Sh 1 of 2) may be indicated
in the title block (e.g. in the drawing title field).
Single sheet Drawings
For identification purpose in case any single-sheet drawing would require additional sheets during its lifetime, document identification and numbering can be as follows:
DOCUMENT CLASS 1
Page 8 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
• The single sheet drawings’ COMPANY number identification, will keep 00 as MM (e.g. A-BBCCDD-EE-FFF-NNNN-00); this number will be used as document identification in Aconex/Page;
• The COMPANY drawing number in the title block will indicate -01 (for the first and
only one sheet).
5.1
Field Code (BB)
The following Field Code Shall be used in the Document Number
Code CF GH HL MM RW SB
Field Name Common (Offshore) Ghasha Hail Manayif Ruwais Subsea
5.2
Area Code (CC)
The following Area Code Shall be used in the Document Number
Code 00 01 01 02 02 03 03 04 05 06 07 30 49 51 51 60
Area Name Common Reeah (Drill Centre 01) Shalhah (Hail South) Duroob (Drill Centre 02) Mudaifena (Hail South East) Ghaff (Hail 3) HLE Seemeh (Drill Centre 03) Jzool (Drill Centre 04) Ghanem (Drill Centre 05) Seebah (Drill Centre 06) Injection Platform Well Head Tower Compression Centre Platform Chananiz (GOP) Manayif (OPP) Swalem (CLQ)
DOCUMENT CLASS 1
Page 9 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
5.3
Unit Code (DD)
The following Unit Code Shall be used in the Document Number:
Code 00 01 12 14 15 20 21 22 25 26 28 31 32 33 34 35 36 37 38 39 40 41
42
43 44 45 47 48 49 51 52 53 55 56 57 58 59 60 61 62 63 64 65
Unit Name Common / General Wellheads / Manifolds Booster & Export Compression LP Flash Gas Compression Train 1 LP Flash Gas Compression Train 2 Inlet Facilities and Separation Oil Stabilization Train Condensate Stabilization Train Condensate Hydrotreater Oil & Condensate Export and Product Storage Cooling Medium System Acid Gas Removal - Train 1 Acid Gas Removal - Train 2 Injection Platform Jacket Injection Platform Topside Solvent Storage & Transfer Bridge Injection Jacket Gas Compression Injection Topside CO2 export pipeline Sour Gas Dehydration Gas Dehydration & Mercury and Mercaptan Removal - Train 1 Gas Dehydration & Mercury and Mercaptan Removal - Train 2 Sweet Gas Booster Compression Train 1 Sweet Gas Booster Compression Train 2 NGL Storage & Shipping NGL Recovery Units - Train 1 NGL Recovery Units - Train 2 Sales Gas Compression Export Sulphur Recovery - Train 1 Sulphur Recovery - Train 2 Sulphur Recovery - Train 3 Sulfur Storage & Shipping Tail Gas Treatment - Train 1 Tail Gas Treatment - Train 2 Tail Gas Treatment - Train 3 CO2 Recovery & Hydrogen Capture Future Nitrogen Rejection Potable & Utility Water Steam System & Demineralised Water System Air Separation unit Chemical Injection System Fuel Gas System
DOCUMENT CLASS 1
Page 10 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
Code 66 67 68 69 70 71 72
73 74
75 76 77 78 79 80 81 82 84 85 87
89 90
91 92
93 94
95 96 97
98
99
Unit Name Chilled Water System & Propane Refrigeration System Instrument & Service Air System Nitrogen System Diesel System Seawater System Flare System & Vapour Recovery System Produced Water Treatment System & Sour Water Treatment Fire Protection System (Fire Fighting) Drain System, Oily water, Storm Water & Evaporation Pond Oil Free Low TDS Wastewater Treatment System Sewage Treatment Plant Piperacks (Interconnecting Unit) Hot Oil System Non Process Buildings Main Power Distribution & Emergency Power Telecom System Hydrogen Production Unit (HPU) Roads & Fences Harbour & Jetty Facilities Process Buildings (Substation, IES, Operator shelter, etc.) ICSS (MAC) A/G Risers and Shore Approaches Pipelines and Cables (Onshore Section) Subsea Pipeline Gathering Network (DCs Intrafield) Onshore Export Pipelines and Cables (excl. sulphur line) Onshore Sulphur Lines and Cables Export Subsea Umbilicals and Cables Network (DCs Intrafield) Gas Lift Gas Injection A/G Risers and Shore Approaches Pipelines and Cables (DCs Intrafield) Subsea Pipeline Gathering Network (Offshore export to Onshore) Subsea Umbilicals and Cables Network (Offshore export to Onshore)
DOCUMENT CLASS 1
Page 11 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
5.4
Discipline code (EE)
The following Discipline Code shall be used in the Document Number:
Code 01 04 07 10 13 15
16 19 22 23 24 25 26 28 31 32 34 37 40 46 47 50 51 52 53 54 55 57 58 59 70 71 72
Discipline Name
Architectural Process Engineering Civil & Structural Electrical Environmental Control System & Automation includes DCS/ESD/F&G Instrumentation and Analyzers Geotech & Hydraulic Engineering Services (G&HES) Mechanical Engineering-STATIC Mechanical Engineering-ROTATING Mechanical Engineering-PACKAGES Materials Engineering Technology (MET) HVAC Plant Design & Piping (PD&P) Offshore Structures Marine Engineering Pipeline Project Engineering Process Safety Engineering Engineering Management Telecom Project Control / Planning Construction Health Safety and Environment IT QAQC Acceptance and Handover Contracts Procurement Project Mgt / Quality Mgt / Admin Social and HSE Initiatives Start-up / Commissioning Operations Readiness
DOCUMENT CLASS 1
Page 12 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
5.5
Document Type (FFF)
The following Document Type shall be used in the Document Number:
Code
ADD BLD BOD BOM CAL CEC CNN CRT DFD DID DPT DSP DSS DWG FLD FRM GAA GAS GDD GDW HMB HUP IAP ICD INR ISO ITP KEY LAY LOD LOG LOP LST MAN MAR MEL MES MOR MPO MRL MSD MTO PAR
Drawing / Document Type Addendum Block Diagram Basis of Design Bill of Material Calculation Cause and Effect Diagram/Charts Calculation Note Criticality Rating Ducting Flow Diagram Ducting & Instrumentation Diagram Design Pressure – Design Temperature Diagram Decision Support Package Data Sheet Drawing Foundation Loading Diagram Form/Template Glossary of Abbreviations General Arrangements/Elevation General Document Gas Gathering Route Map Heat and Material Balance Hookup Diagram Inspection Assignment Package / PIM Package Inter Connecting Diagram Inspection report (General) Isometric Diagrams Inspection Test Plan Key Plan Layout Drawing Load Summary Logic Diagram Loop Diagram List Manual Material acceptance report/ Material approval request Master Equipment List Method Statement Material Requisition Material Purchase Order Material Lists Material Selection Diagram Material Take Off Purchase Order Recommendation
DOCUMENT CLASS 1
Page 13 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
Code
PAS PFD PHL PID PLN POL PPL PRO PRQ PSD PSF PSL PVL QCP REG REP REQ SAT SCH SCM SKE SLD SOR SOW SPE SRP STD STU SVR TBD TBE TCN TIE TOR TRA TRP UFD VDR VNM WID WIN
Drawing / Document Type Pipeline Alignment Sheet Process Flow Diagram Philosophy Piping & Instrumentation Diagram Plan Policy / Procedure / Process Plot Plan Procedure Pre-qualification Pipe Support Detail Process Safeguarding Diagram Pipe Support Location Plan Project Vendor List Quality Control Procedure Register Report Requisitions Safety Analysis Table Schedule Schematic Diagram Sketch Single Line Diagrams Statement of Requirements Scope of Works Specification Simulation Standard Drawing Studies Site Visit Report Termination Block Diagram Technical Bid Evaluation Technical Note TIE-IN Schedule Term of Reference Task Risk Assessment Technical Report Utility Flow Diagram Vendor Document Register Vendor Manual Wiring Diagram Work Instruction
5.6
Serial Number (NNNN)
The serial number shall be 4-digit sequence number.
DOCUMENT CLASS 1
Page 14 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
VENDOR DOCUMENTS AND DRAWINGS NUMBERING – COMPANY NUMBERING SYSTEM
VENDORS shall code their drawings, specifications, data sheets, plans, procedures and other documents as per the following:
A
-
PEEKKKKKKK
BBCCDD
-
GGG
NNNN
MM
Where:
A is a prefix and shall be 1 to indicate Package 1.
P is a letter and shall be P to indicate Purchase Order. EE is the Discipline Code as per par. 5.4 (Discipline Code is the main discipline driving the PO and is fixed for the respective full PO) KKKKKKK is the Purchase Order Number
BB is the Field Code as per par. 5.1 CC is the Area Code as per par. 5.2 DD is the Unit Code as per par. 5.3
GGG is the SDRL (Supplier Documents Requirements Listing) as per Attachment 1
NNNN is the Serial Document Number as per par 5.6
MM is the Sheet Number. Sheet Number shall be a 2-digit numeric string. The number of sheets applied to the VENDOR documents and drawings shall be 00.
Example: 1-P281235573-CF5100-D99-0005-00
Drawings
For Multi sheet drawings and single sheet drawings numbering kindly refer to section 5 for further explanation.
SUBCONTRACTOR DOCUMENTS AND DRAWINGS NUMBERING – COMPANY NUMBERING SYSTEM
SUBCONTRACTORS shall code their drawings, specifications, data sheets, plans, procedures and other documents as per the following:
A
-
PEEKKKKKKK
BBCCDD
-
GGG
NNNN
MM
Where:
A is a prefix and shall be 1 to indicate Package 1.
DOCUMENT CLASS 1
Page 15 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
P is a letter and shall be A to indicate Agreement. EE is the Discipline Code as per par. 5.4 (Discipline Code is the main discipline driving the PO and is fixed for the respective full PO) KKKKKKK is the Agreement Number
BB is the Field Code as per par. 5.1 CC is the Area Code as per par. 5.2 DD is the Unit Code as per par. 5.3
GGG is the SDRL (Supplier Documents Requirements Listing) as per Attachment 1
NNNN is the Serial Document Number as per par 5.6.
MM is the Sheet Number. Sheet Number shall be a 2-digit numeric string. The number of sheets applied to the SUBCONBTRACTOR documents and drawings shall be 00.
Example: 1-P281235573-CF5100-D99-0005-00 For multi sheet drawings and single sheet drawings numbering kindly refer to section 5 for further explanation.
REVISION NUMBER
Revision sequence shall be according to Reference Document [1].
DOCUMENT FILE NAMING
The name of the Project document files will be assigned, prior to their loading into CONTRACTOR and COMPANY Engineering Documents Management System, as described here below.
File name:
• A-BBCCDD-EE-FFF-NNNN-MM_YY.xxxx
(Ex.1-CF0101-04-DSS-9001-00_A1.docx)
where:
YY= Revision issued to COMPANY (eg. A1, B1, 01 etc.)
xxxx = Extension assigned by the application program indicating the format (e.g.
DOCX for Microsoft Word, DWG for Autocad, XLSX for Excel, etc).
The file name of attachments to Project documents shall be obtained by adding the
following suffix to the file name of the Project document:
•
_AttK (Ex. 1-CF0101-04-DSS-9001-00_A1_Att1.docx)
where:
• K = attachment number (e.g. 1, 2, 3 etc.)
DOCUMENT CLASS 1
Page 16 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
9.1
Isometric Drawings Coding system
Isometric coding uses the piping line numbering and shall be as follows:
BBCCDD-SSS-LLL_WWWW
Where:
BB: Field Code as per par. 5.1
CC: Area Code as per par. 5.2
DD: Unit Code as per par. 5.3
SSS: Sequential Line Number (as per P&IDs)
LLL: Fluid Code (as per P&IDs)
WWWW: WBS Codes As per Reference Document [3]
Each isometric tag is unique in all plant.
Example for line: GH5120-002-HCX-36”-68013SL-H
Isometric number: GH5120-002-HCX_WWWW
Field/Area/ Unit Code (BBCCDD)
Sequential Line Number as per P&IDs (SSS)
Fluid Code as per P&IDs (LLL)
WBS
(WWWW)
GH5120
002
HCX
As per Reference Document [3]
9.2
Isometric Electronic file naming
The name of the CONTRACTOR isometric document will be assigned, prior to their loading into CONTRACTOR and COMPANY Engineering Documents Management System, as described here below:
BBCCDD-SSS-LLL_WWWW.zip
Where the file .zip will contain one PDF file and the native files (PCF or SHA).
DOCUMENT NUMBERING SYSTEM – CONTRACTOR NUMBERING SYSTEM
In addition to the numbering system described above, for the purposes of its internal document management, CONTRACTOR, SUBCONTRACTORS, Third Parties Services providers and VENDORS shall code their drawings, specifications, data sheets, plans, procedures and other documents as per the following:
DOCUMENT CLASS 1
Page 17 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
BBCCDD
PPQQQQQ
Where:
BB is the Field Code as per par. 5.1 CC is the Area Code as per par. 5.2 DD is the Unit Code as per par. 5.3 PP is the Document Creator Code as per par 9.1 QQ is the Document sequential number as per par 9.2
10.1
Document Creator Code (PP)
The following Document creator code shall be used by each party who requires the creation of the document in the document management system.
Code 10 20 30 40 50
Document Creator Saipem Islands Saipem Subsea NPCC Islands NPCC Subsea Saipem Islands (Specific for Drilling Centers)
10.2
Document sequential number (QQ)
The sequential number shall be selected so as to provide a unique PPQQQQQ over the Project.
To support the selection of the document sequential number the following numeric ranges should be used:
MANAGING DEPARTMENT
CONSTRUCTION / INSTALLATION
NUMERIC RANGE 02000-04999
PROCESS UTILITIES PROJECT MANAGEMENT, TECHNICAL MANAGEMENT
COMMISSIONING
QUALITY
PROCUREMENT
PROJECT CONTROL
CIVIL / STRUCTURAL
STATIC EQUIPMENT MACHINERY AND PACKAGES
08000-08999 86000-86999 09000-09499
09500-09599
09600-09699
09700-09799
09800-09999
10000-18999
20000-29999 30000-39899
DOCUMENT CLASS 1
Page 18 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
MANAGING DEPARTMENT
ELECTRICAL CATHODIC PROTECTION INSTRUMENTATION AUTOMATION AND CONTROL TELECOMMUNICATION
PIPING ENGINEERING (Material specs) PIPING ENGINEERING (Stress specifications) PIPING ENGINEERING (Support Specifications) PIPING ENGINEERING (Layouts & MTO)
PIPING ENGINEERING (Coating, painting and insulation) PIPING ENGINEERING (Welding)
PIPELINE
LOSS PREVENTION AND ENVIRONMENT
HEALTH, SAFETY & ENVIRONMENT
POST ORDER
NUMERIC RANGE 40000-46999 47000-47999 50000-59999 48000-48999 49000-49999
60000-60699 61000-61099 61100-61499 62000-67999
60700-60799 60900-60999
80000-83999
85000-85799
85800-85999
73000-73899
DOCUMENT CLASS 1
Page 19 of 20
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY DOCUMENT NO. 1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
Rev
03
ATTACHMENTS
11.1
Attachment 1 – Supplier Documents Requirements Listing (SDRL)
DOCUMENT CLASS 1
Page 20 of 20
Uncontrolled When Printed
GHASHA CONCESSION HAIL AND GHASHA DEVELOPMENT PROJECT
SUPPLIER DOCUMENTS REQUIREMENTS LISTING (SDRL)
Number of Hard Copies
Number of Hard Copies
Number of Hard Copies
I
D E R U Q E R T L U B S A
I
L = TEST & INSPECTION REPORTS
L01
L02
L03
L04
L05
L06
L07
L08
L09
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
MATERIAL TEST CERTIFICATE
WELDER PERFORMANCE QUALIFICATION CERTIFICATES
NDE OPERATOR QUALIFICATIONS
PRODUCTION TEST RESULTS (INCLUDING WELDING)
NDE RECORDS
HEAT TREATMENT RECORDS/STRESS RELIEF CHARTS
MATERIAL TRACEABILITY RECORDS
NAMEPLATE RUBBING/PHOTO’S
ELECTRICAL MACHINERY TYPE TESTS
ROUTINE TEST CERTIFICATE – ELECTRICAL MACHINERY
MEASUREMENT OF RESISTANCE
PAINTING / INSULATION INSPECTION REPORT
CERTIFICATE OF INSTALLATION OF VESSEL INTERNALS/LINING INCLUDING VIDEO DIGITAL PHOTOGRAPHS
EQUIPMENT PRESERVATION CERTIFICATE
CERTIFICATE OF EQUIPMENT CLEANLINESS
LEAKAGE TEST CERTIFICATE
HARDNESS TEST REPORT
PIPE RECONCILIATION
TPI Vendor Inspection Report/EPC FDR(EPC/TPI USE)
M = SHIPPING & PACKING DOCUMENTS
M01
M02
SHIPPING & PACKING DOCUMENTS
HAZARDOUS MATERIAL SHIPPING CERTIFICATES
N = RENEWABLE TEST AND CALIBRATION DATA
N01
N02
N03
N04
N05
N06
N07
N08
N09
N10
N11
N12
N13
N14
N15
N16
N17
PRESSURE TEST CERTIFICATES
INSTRUMENT TEST & CALIBRATION CERTIFICATE
LIFTING EQUIPMENT REGISTER & TEST CERTIFICATES
INSULATION RESISTANCE TEST PRESSURE VESSEL & EXCHANGER REGISTER & CODE DATA CERTIFICATES (IIA), AB25 MANUFACTURER DATA REPORT FOR PRESSURE VESSELS
CERTIFICATE OF COMPLIANCE
RELEASE NOTES
CERTIFYING AUTHORITY RELEASE NOTES
TECHNICAL DEVIATION REQUESTS
COSHH DATA SHEETS
CERTIFICATE OF CONFORMITY
PROGRAMABLE EQUIPMENT REGISTER AB96 GENERAL ENGINEERING REQUIRMENTS FOR DESIGN & CONSTRUCTION OF PRESSURE PIPING SYSTEMS
√
AB31 DESIGN REGISTRATION APPLICATION
AB83 CONSTRUCTION DATA REPORT FOR PIPING SYSTEMS AB83F CONSTRUCTION DATA REPORT FOR PIPING SYSTEMS MANUFACTURED OUTSIDE ALBERTA
AB41 STATUTORY DECLARATION FORM FOR REGISTRATION OF FITTINGS
P = MATERIAL ENGINEERING DATA (SUPPLIER WELDED)
P01
P02
P03
P04
P05
P06
WELD PROCEDURE SPECIFICATIONS (WPS) & QUALIFICATIONS (WPQ) RECORDS
NON-DESTRUCTIVE EXAMINATION PROCEDURES (NDE)
MANUFACTURING PROCEDURES INCLUDING HEAT TREATMENT
SURFACE PREPARATION & PAINTING PROCEDURE
WELD PROCEDURE FOR CASTING REPAIR
POSITIVE MATERIAL IDENTIFICATION PROCEDURE
Q = MATERIAL CERTIFICATE (FABRICATION SITE WELDED)
Q01
Q02
R = Manuals
R01
R02
R03
R04
MATERIAL CERTIFICATES - BULK ITEMS
MATERIAL CERTIFICATE - PACKAGE WELDED INTERFACES
DESPATCH DOSSIER
OPERATING/MAINTENANCE MANUAL
MECHANICAL CATALOGUES
MANUFACTURING RECORD BOOK(MRB)
I
N O T A T N E M U C O D L A N F
I
I
H C T A P S D D E D U L C N
I
E B O T
I
R E S S O D
S K E E W + O P
L A U N A M M & O
B R M
e u g o a t a C
l
l
a c
i
n a h c e M
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
I
D B H T W
I
I
W E V E R R O F
I
D E R U Q E R T A M R O F
E
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
9
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
Rev
STATUS DESCRIPTION
DATE
Prep
Checked
Approved
SUPPLIER DATA REQUIREMENTS LIST (SDRL)
PO / ENQUIRY No. :
DESCRIPTION :-
DOC. No.: XXXX-XXXX-XX-REQ-XXXX
SHEET 1 OF
1
I
D E R U Q E R T L U B S A
I
A = CONTROL DOCUMENTS
A01
A02
A03
A04
A05
A06
A07
A09
A10
A11
A12
A13
VENDOR DOCUMENT REGISTER
FABRICATION / PRODUCTION SCHEDULE
PROGRESS REPORTS
BOUGHT OUT ITEMS / SUB ORDER COPIES
TABLE OF CONTENTS
SUPPLIER/SUB-SUPPLIER CONTACT DIRECTORY
PURCHASING/SUB-CONTRACTS EXPORT COMPLIANCE CHECKLIST
LIST OF CONFORMANCE/EXCEPTIONS
SUB-CONTRACTOR WORK PROPOSAL
SAFETY POLICY & PERFORMANCE RECORDS
INSURANCE CONFIRMATION
VENDOR SUB-ORDERS
B = INTERFACE AND ARRANGEMENT DRAWINGS
B01
B02
B03
B04
GENERAL ARRANGEMENT DRAWINGS
ACCEPTABLE NOZZLE LOADS
INTERFACE AND CONNECTION SCHEDULE
FOUNDATION LOADING DIAG. & SUPPORT DETAILS
C = DESIGN AND OPERATIONAL DATA
C01
C02
C03
C04
C05
C06
C07
C08
C09
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
PIPING & INSTRUMENT DIAGRAMS (P&ID’S)
ONE LINE ELECTRICAL DIAGRAMS
SCHEMATICS DIAGRAMS
UTILITIES SCHEDULE
WEIGHT DATA SHEETS
EQUIPMENT DATA SHEETS
NOISE LEVEL DATA SHEETS
SCHEDULE OF ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS
DETAILS DESCRIPTION OF OPERATION
HVAC DUCTING & INSTRUMENT DIAGRAMS & FLOW DIAGRAMS
PROCESS FLOW DIAGRAMS, HEAT & MASS BALANCE
ELECTRICAL POWER SUPPLIES DATA SHEET
ENCLOSURE VENTILATION REQUIREMENTS
INSTRUMENT INDEX AND I/O SCHEDULE
INSTRUMENT DATA SHEET
CAUSE AND EFFECT CHARTS
INSTRUMENT / ELECTRICAL LOGIC DIAGRAM
VDU SCREEN DISPLAY GRAPHICS
BLOCK WIRING SCHEMATICS
C20
VALVE INDEX
C21
C22
C23
C24
C25
C26
VALVE DATA SHEETS
LINE (PIPING) LIST
SUPPLIER MASTER TAG LIST
DRUM LIST
LIST OF SPECIAL TOOLS
BILL OF MATERIAL
D = GENERAL DETAIL AND SUB-ASSEMBLY DRAWINGS
D01
D02
D03
D04
D05
D06
D07
D08
D99
CROSS SECT DWG / EXPLODED VIEW DIAGRAM
MECHANICAL SEAL DRAWINGS
SHAFT ALIGNMENT DRAWINGS
NAME PLATE FORMAT DRAWINGS
SUB ASSEMBLY DRAWINGS
DETAILED FABRICATION DRAWINGS
SHOP DETAILS
INSTALLATION DRAWINGS
MISCELLANEOUS DRAWINGS/DESCRIPTIVE LITERATURE
E = INSTRUMENT & ELECTRICAL DRAWINGS
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
ELECTRICAL CONNECTION DIAGRAMS
INST / ELECT PANEL DETAIL DRAWING
TERMINATION DIAGRAMS
CABLE SCHEDULE
INSTRUMENT TERMINATION & HOOK UP DETAILS
LOOP DIAGRAMS
INSTRUMENT PLC DATA COMMUNICATION PROTOCOL
INSTRUMENT, F&G LOCATION PLANS
SHUTDOWN & CONTROL FUNCTION CHARTS
EARTHING ARRANGEMENTS
ELECTRICAL POWER REQUIREMENTS LIST
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
I
H C T A P S D D E D U L C N
I
I
R E S S O D
S K E E W + O P
L A U N A M M & O
B R M
E B O T
√
√
√
I
N O T A T N E M U C O D L A N F
I
I
D B H T W
I
I
W E V E R R O F
I
D E R U Q E R T A M R O F
E
1
1
1
1
1
5
1
1
1
1
1
1
2
4
3
3
2
2
2
4
4
3
3
3
3
2
2
3
3
3
3
3
3
1
3
3
3
3
3
3
10
1
1
3
3
3
3
1
1
1
1
3
2
3
3
3
3
1
3
3
3
3
PLEASE NOTE :-
( i ) A detailed description for each of the documents requested is given in the attached sheets. *
CONTRACTOR to refer to ANNEXURE 10G, Section 08 for the applicability of these documents and further requirements.
LEGEND :-
O - REVIEW BY ENGINEERING IN THE PROJECT OFFICE
R - REVIEW BY ENGINEERING AT THE SELLERS WORKS
S - REVIEW BY INSPECTOR AT THE SELLERS WORKS
A - REVIEW BY AUDIT AT THE SELLERS WORKS
F - CERTIFIED DOC. TO BE SENT TO
J -
INCORPORATE CERTIFIED ISSUE IN J01
SITE WITH MATERIALS
K -
INCORPORATE CERTIFIED ISSUE IN K01
H- DOC SHALL BE RETAINED IN
SAFE CUSTODY BY SELLER
E-FORMAT REQUIRED :-
1 - ANY
2 - Microstation
3 - NATIVE (WORD, EXCEL)
4 - PDF
e u g o a t a C
l
l
a c
i
n a h c e M
I
D E R U Q E R T L U B S A
I
F = CALCULATIONS & PERFORMANCE DATA
F01
F02
F03
F04
F05
F06
F07
F08
F09
F10
F11
F12
F13
F14
F15
F16
F17
F18
F19
F20
F21
F22
F23
F24
F25
F26
F27
F28
F29
F30
F31
F32
F33
F34
F35
F36
F37
F38
F39
F40
F41
F42
F43
F44
F46
F99
PRESSURE VESSEL/TANK MECH CALCS.
PROCESS/UTILITY CALCULATIONS
STRUCTURAL STEEL CALCULATIONS
FOUNDATION SUPPORT CALCULATIONS
SYSTEM HEAD LOSS CALCULATIONS
LATERAL CRITICAL SPEED CALCULATION
TORSIONAL CRITICAL SPEED CALCULATIONS
BEARING LIFE CALCULATIONS
THRUST BEARING SIZING CALCULATIONS
HEAT EMISSION CALCULATIONS
ACOUSTIC ANALYSIS FOR RECIPROCATING COMPRESSORS
HYDRAULIC CALCULATIONS
EXCHANGER THERMAL RATING CALCULATIONS
INSTRUMENT CALCULATION (ALSO REFER F25)
ENCLOSURE VENTILATION SYSTEM CALCULATIONS
EXHAUST DUCT CALCULATIONS
COUPLING SELECTION CALCULATIONS
LUBE & SEAL OIL SIZING CALCULATIONS
ANTI SURGE VALVE SIZING CALCULATIONS
PULSATION DAMPER DESIGN CALCULATIONS
ROTOR/SHAFT SYSTEM UNBALANCED RESPONSE ANALYSIS
PIPING STRESS ANALYSIS
CRANE FAILURE MODE ANALYSIS
ESD VALVE
RELIEF VALVE & BURSTING DISC CALCS. (REFER F14)
ELECTRICAL PROTECTION STUDY
CURRENT/POTENTIAL (CT/VT) TRANSFORMER CURVES
MOTOR PERFORMANCE CURVES
COMBUSTION GAS TURBINE PERFORMANCE CURVES
CENTRIFUGAL PUMP PERFORMANCE CURVES
ROTARY PUMP CURVES
CENTRIFUGAL COMPRESSOR PERFORMANCE CURVES
FAN PERFORMANCE CURVES
ENGINE PERFORMANCE CURVES
GENERAL PERFORMANCE DATA
SPEED/TORQUE STARTING CURVES
RECIPROCATING PUMP PERFORMANCE CURVES
LIGHTING PERFORMANCE DATA
BATTERY CHARGE/DISCHARGE CALCULATIONS
POWER SYSTEM ANALYSIS DATA
RELIABILITY/AVAILABILITY DATA & CALCULATIONS
PERFORMANCE GUARANTEE
SHORT CIRCUIT CALCULATIONS
NOZZLE LOAD ANALYSIS
SUPPORT CALCULATIONS
MISCELLANEOUS CALCULATIONS
G = HANDLING, INSTALLATION & SITE PRESERVATION
G01
G02
G03
G04
G05
G06
G07
ERECTION & INSTALLATION PROCEDURE
UNPACKING & PRESERVATION PROCEDURE
HANDLING & SHIPPING PROCEDURES
PRE-COMMISSIONING/COMMISSIONING PROCEDURES
ERECTION FASTENERS SUMMARY LIST
SLING/LIFTING ARRANGEMENT
MAINTENANCE PROCEDURE FOR LONG-TERM STORAGE
H = MANUFACTURING / QUALITY PROCEDURES
H01
H02
H03
H04
H05
H06
H07
H08
H09
H10
H11
ISO9000 REGISTRATION CERT. OTHERWISE QA MANUAL INDEX
QUALITY PLAN
INSPECTION & TEST PLAN
PRESSURE TEST PROCEDURES
PERFORMANCE TESTING AND ACCEPTANCE TEST PROCEDURE.
SOFTWARE QUALITY SYSTEM
WEIGHING PROCEDURE
HEALTH SAFETY & ENVIRONMENTAL MANAGEMENT SYSTEM
HEALTH SAFETY & ENVIRONMENTAL PLAN (HS&E PLAN)
PROPOSED SOFTWARE LISTING
NOISE CRITERIA DATA & TEST PROCEDURES
J = COMMISSIONING, OPERATING, MAINTENANCE & SPARES
J01
J02
J03
LUBE OIL &OPERATING FLUID SCHEDULES
RECOMMENDED START-UP & COMMISSIONING SPARES LIST (PRICED)
RECOMMENDED SPARES FOR 2 YEARS OPERATIONS (PRICED)
K = CERTIFICATION
K01
K02
K03
K04
K05
K06
K07
K08
K09
K10
K11
K12
K13
PERFORMANCE TEST REPORT/RESULTS
FACTORY ACCEPTANCE TEST REPORT (FAT)
VIBRATION REPORT
NOISE REPORT
WEIGHING REPORT & CERTIFICATES
DIMENSIONAL REPORT / DRAWINGS
FIRE TEST REPORTS/CERTIFICATES
EQUIPMENT HAZARDOUS AREA CERTIFICATES
HAZOP REPORTS
REGISTER OF SAFETY RELATED DEVICES
SAFETY INTREGRITY LEVEL (SIL) REPORTS
STUDY REPORTS
FUNCTIONAL TEST REPORTS
√
√
√
√
√
√
√
I
H C T A P S D D E D U L C N
I
E B O T
I
R E S S O D
S K E E W + O P
L A U N A M M & O
B R M
e u g o a t a C
l
l
a c
i
n a h c e M
√
√
√
√
√
√
√
√
√
√
I
N O T A T N E M U C O D L A N F
I
I
D B H T W
I
I
W E V E R R O F
I
D E R U Q E R T A M R O F
E
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
6
7
8
1
1
1
1
1
1
4
4
1
3
3
3
3
ANNEXURE 10G, SECTION 03 APPENDIX 1_SUPPLIER DOCUMENT REQUIREMENT LISTING
ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
Drawing / Document Number, Title and Revision:
Doc Status Code:
Doc. No.:
1-CF0000-59-PRO-0002-00_03
Rev. No. :
03
CODE 1-NO COMMENTS
Doc Class:
Title:
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
CLASS 1
Discipline:
59-Project Mgt_Quality Mgt_Admin
Pos No.
Page number
COMPANY Comments Description
COMPANY Originator NAME
CONTRACTOR Confirmation / Explanation
ACTION BY CONTRACTOR
1 2 3
File: MacroCommentSheet_EPC
Page 1/1
Project: Q-32855 - Saipem Hail & Ghasha Folder: Reference documents