ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
PROJECT PROCEDURE FOR TAG NUMBERING
COMPANY DOC No: 1-CF0000-59-PRO-0003-00
Rev. 02
ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
CONTRACTOR Document Number: CF0000-1009003
02
20/03/2024
IFU
01
03/11/2023
IFU
IFU-ISSUED FOR USE
IFU-ISSUED FOR USE
S. Feliziani
M. Pinzi
P. Santoni
C. Copelli
S. Feliziani
M. Pinzi
S. Feliziani
C. Copelli
Rev
Date (DD/MM/YYYY)
Status
Status Description
PREPARED
CHECKED
APPROVED 1
APPROVED 2
This Document is intended for use by ADNOC and its nominated Consultants, Contractors, Manufacturers and Suppliers.
DOCUMENT CLASS – 2A Page 1 of 54
Uncontrolled When Printed
ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
PROJECT PROCEDURE FOR TAG NUMBERING
COMPANY DOC No: 1-CF0000-59-PRO-0003-00
Rev. 02
This document is rolled over from PCSA document no. 1-CF0000-59-PRO-0003-00 Rev. 00
SUMMARY OF DOCUMENT REVISIONS
Rev
00
A1
Date
(DD/MM/YYYY)
03/03/2023
14/02/2023
Status
IFU
IFR
Status Description
IFU-ISSUED FOR USE
IFR-ISSUED FOR COMPANY REVIEW
DOCUMENT CLASS – 2A Page 2 of 54
Uncontrolled When Printed
ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
PROJECT PROCEDURE FOR TAG NUMBERING
COMPANY DOC No: 1-CF0000-59-PRO-0003-00
Rev. 02
HOLD
Section
Description
HOLD LIST
DOCUMENT CLASS – 2A Page 3 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
TABLE OF CONTENTS
PROJECT OVERVIEW … 6
1.1
EPC for HAIL & GHASHA Development Project … 6
PURPOSE … 7
DEFINITIONS AND ABBREVIATIONS … 7
3.1
3.2
Definitions … 7
Abbreviations … 7
REFERENCE DOCUMENTS … 8
INSTRUCTION FOR VENDOR PACKAGE … 9
TAG SEQUENTIAL NUMBER … 9
STANDARD TAG NAME STRUCTURE … 9
TAG NAME CODES AND EXAMPLE FOR VARIOUS EQUIPMENT TYPES …10
8.1
General Process Equipment …10
8.1.1 Rotating Equipment and Drivers …10
8.1.2 Air Coolers…………………………………………………………………………………….12
8.2
Packaged Equipment …12
8.2.1 Vendor Package Example …13
8.2.2 Packaged compressor Example …14
8.3
8.4
Instrument / Fire and Gas Detectors …14
Electrical Equipment …14
8.4.1 Electrical cables …16
8.4.2 Electrical cable raceways …18
8.4.3 Circuit reference for lighting and small power circuits …18
8.4.4 Electrical trace heating …18
8.5
Telecommunication Equipment …18
8.5.1 Telecommunication panels / consoles …19
8.5.2 Telecommunication cables …19
8.6
8.7
8.8
HVAC Equipment …20
Fire and Safety System Equipment …20
Piping Equipment …21
8.8.1 Sample Connections …21
8.8.2 Piping Line Numbering …21
8.8.3 Piping Speciality items …21
DOCUMENT CLASS 2A
Page 4 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
8.8.4 Manual valve………………………………………………………………………………….22
8.8.5 Tie-In Numbering and identification …23
8.8.6
Interface Point Numbering and Identification …24
8.9
Civil Structure, Buildings and Offshore Structures …25
8.9.1 Civil Structures and Foundations …25
8.9.2 Manholes, Valves, Pit, Catch Basin …26
8.9.3 MODULES TAGGING …27
8.9.4 BUILDINGS……………………………………………………………………………………28
8.10 Cathodic Protection …28
8.11 Mechanical Handling Equipment Codes …29
APPENDICES …30
DOCUMENT CLASS 2A
Page 5 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
PROJECT OVERVIEW
1.1
EPC for HAIL & GHASHA Development Project
The Hail & Ghasha Development (HGD) Project is of strategic importance to the Emirate of Abu Dhabi. The Project will develop the untapped oil and gas reserves from the highly sour Hail and Ghasha fields. Production is targeted to start by Q4 2027 with sustainable production of 1 BSCFD of Raw Gas, and max production of 82.5 MSBPD of Oil, 76.3 MSBPD of Condensate, 9000 TPD of Sulphur and 5030 TPD of NGL. In addition, Project will capture 1.52 million tonnes of CO2 per year taking ADNOC’s committed investment for carbon capture capacity. The Hail and Ghasha fields are situated offshore ABU DHABI about 140 km away from ABU DHABI mainland in water depths varying from 0 to 15 meters.
The HGD Project comprises the following:
• Artificial Islands Construction;
• Offshore package – EPC 01: Offshore Drilling Centres (DCs), Subsea Pipelines, Umbilicals, Power Cable Connections, Seawater Intake Structure, Bridges, Risers, Flare Structure, facilities at Ghasha Offshore Processing Plant (“GOP”);
• Onshore package – EPC 02: Manayif Onshore Processing Plant (“OPP”), Manayif
Utilities, Offsite Pipelines & Tie-ins, Main Control and Other Buildings.
The HGD Project will be executed in a single phase approach. It will start production from three Drilling Centres (Reeah, Jzool & Seebah) in Ghasha Field to GOP and from Gaff Island in Hail Field to OPP. Remaining Drilling Centres, gas injection, and other associated facilities will be developed in ‘future’ to sustain production from Hail & Ghasha fields.
Figure 1 - Hail & Ghasha Fields
DOCUMENT CLASS 2A
Page 6 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
PURPOSE
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
The purpose of this document is to describe the numbering system to be followed for Tagging various plant items for the PROJECT.
DEFINITIONS AND ABBREVIATIONS
3.1
Definitions
COMPANY
Abu Dhabi National Oil Company (ADNOC)
CONTRACTOR
Unincorporated Joint Venture NPCC - SAIPEM
PROJECT
Hail and Ghasha Development Project
OFFSHORE PROJECT
SUBCONTRACTOR
Hail and Ghasha Development Project – Package 1: Offshore Facilities
An entity that has been awarded by CONTRACTOR the performance of part of the work or services of the OFFSHORE PROJECT.
VENDOR/SUPPLIER
Any and all vendors of materials and equipment in connection with the OFFSHORE PROJECT
3.2
Abbreviations
ADNOC
Abu Dhabi National Oil Company
AGES
AGRU
BEDD
BPD
BTEX
BWPD
CCP
CLQ
DC
EPC
GOP
H&MB
HGD
HIPPS
HP
HPU
LP
ADNOC Group Engineering Standards and Specifications
Acid Gas Removal Unit
Basic Engineering Design Data
Barrel per Day
Benzene, Toluene, Ethyl benzene, Xylenes
Barrels of Water Per Day
Compression Centre Platform
Central Living Quarter
Drilling Centre
Engineering, Procurement, Construction
Ghasha Offshore Processing
Heat & Material Balance
Hail & Ghasha Development
High Integrity Pressure Protection System
High Pressure
Hydrogen Production Unit
Low Pressure
DOCUMENT CLASS 2A
Page 7 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
MSBPD
MSCFD
NGL
NORM
NUA
OPP
PWT
SOW
SRU
TDS
TGTU
TPD
UAE
VRU
Thousand Standard Barrels per Day
Million Standard Cubic Feet per Day
Natural Gas Liquids
Naturally Occurring Radioactive Materials
Normally Unattended Asset
Onshore Processing Plant
Produced Water Treatment
Scope of Work
Sulphur Recovery Unit
Total Dissolved Solids
Tail Gas Treatment Unit
Tonn per Day
United Arab Emirates
Vapour Recovery Unit
REFERENCE DOCUMENTS
Sl. No.
Document No.
Document Title
1
2
3
1-CF0000-16-PRO-0198-00
INSTRUMENT NUMBERING RULES
1-CF0000-28-KEY-2450-00
WBS OVERALL AREA KEY PLAN
1-CF0000-59-PRO-0002-00
PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING
DOCUMENT CLASS 2A
Page 8 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
INSTRUCTION FOR VENDOR PACKAGE
The package vendors shall follow below documents for tagging of various package equipment, instruments etc.
• 1-CF0000-59-PRO-0003-00 – PROJECT PROCEDURE FOR TAG NUMBERING
• 1-CF0000-16-PRO-0198-00 – INSTRUMENT NUMBERING RULES
TAG SEQUENTIAL NUMBER
The Tag Sequential Number shall be used as following for this Project.
• Existing Tag Items (Tag item available in previous phase)
CONTRACTOR to maximize the use the same tag number if already available and used in previous phase and if feasible.
• New Tag Items (Tag item not available in previous phase)
CONTRACTOR to assign new sequential number such that new tag number shall not duplicate with any tag items (previous tag number or new tag number).
STANDARD TAG NAME STRUCTURE
Following format shall be used as generic tag name structure.
Unit Number
XXXXXX
Where:
Equipment Type
Sequential Number
Suffix
AA
YYY
ZZ
• XXXXXX is the six-character unit number. The unit numbers are listed in
Appendix-1.
• AA is the Equipment Type. The set of codes for most common equipment types is
listed in Appendices 2 to 14, which list the specialized equipment codes.
• YYY is generally a three-digit sequential equipment number but is expanded to four-
digit sequential number for manual valves. Sequential numbers given in this standard procedure are for examples only.
• ZZ is the suffix, denoting spared equipment or other information.
DOCUMENT CLASS 2A
Page 9 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Example:
Unit Number
GH5121
Equipment Type
Sequential Number
Suffix
V
101
(Refer to Appendix-2 to 14 for list of equipment codes.)
8.1
TAG NAME CODES AND EXAMPLE FOR VARIOUS EQUIPMENT TYPES
General Process Equipment A list of commonly used Equipment Codes can be found in Appendix-2.
8.1.1
Rotating Equipment and Drivers
For maintenance purposes it is necessary to assign separate tag number to the Rotating Equipment and the Driver. The rotating equipment and driver shall have separate codes as follows:
The second and third letters of the Equipment Type code shall be:
-
M for electric motor
-
D for Diesel Engine
-
GT for Gas Turbine
-
ST for Steam Turbine
The following examples are applying the standard codes in Appendix-2:
a. Blowers
Unit Number
GH5100
Equipment Type
Sequential Number
Suffix
B
101
A
b. Blower Electric Motors
Unit Number
Equipment Type
Sequential Number
GH5100
BM
101
Suffix
A
DOCUMENT CLASS 2A
Page 10 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
c. Compressors
Unit Number
GH5149
Equipment Type
Sequential Number
Suffix
C
101
d. Compressor Electric Motors
Unit Number
GH5100
Equipment Type
Sequential Number
Suffix
CM
101
e. Pumps
Unit Number
Equipment Type
Sequential Number
Suffix
GH5100
P
101
A
f. Pump Electric Motors
Unit Number
GH5121
Equipment Type
Sequential Number
PM
101
Suffix
A
g. Diesel Generators
For maintenance purposes it is necessary to assign separate tag names to the diesel motor and generator. Therefor the diesel engine shall have code D and the generators code DG.
Unit Number
GH5169
GH5169
Equipment Type
Sequential
Number
Suffix
D
DG
101
101
DOCUMENT CLASS 2A
Page 11 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
8.1.2
Air Coolers
For maintenance purposes it is necessary to assign separate tag names to air cooler, bay, fan, and electric motors. Therefore, the bay, fan and electric motors shall have separate codes as follows:
a. Air Coolers
Unit Number
Equipment Type
Sequential Number
Suffix
GH5121
E
112
b. Bays
Unit Number
GH5121
c. Fans
Equipment Type
Sequential Number
Suffix
Bay
E
112
A
Unit Number
Equipment Type
Sequential Number
Suffix
Bay
Fan
GH5121
EFA
112
A
1
d. Fan Electric Motors
Unit Number
Equipment Type
Sequential Number
Suffix
Bay
Fan
GH5121
EFAM
112
A
1
8.2
Packaged Equipment
Packaged Equipment may optionally be numbered as sub-assemblies of a “main equipment” item. This may be useful in situations where a vendor package is a “black box” that will be designed by a vendor.
DOCUMENT CLASS 2A
Page 12 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
If this option is followed, then the tag names shall be an ‘auxiliary” extension to the main equipment tag name. The main equipment will usually follow the standard naming convention in section 8 with the auxiliary defined further as below:
Main Equipment, including Driver
- Auxiliary Equipment(if any)
A
B
C
D
E
F
G
H
(A): Unit Code, 6 digits as Appendix-1
(B):
Equipment identification (type) as Appendix-2
(C): Dedicated for equipment drivers such as Motor, Diesel Engine
(D): Sequence number, three digits
(E): Duplication suffix
(F): Auxiliary Equipment Identification — see table below
(G): Sequence Number, two digits
(H): Duplication Suffix
Typical examples are GH5121-ME-302-P01A for a pump mounted on the ME-302 chemical package, or GH5121-C-201-P01A for a lube oil pump associated with the C-201 compressor.
Main Equipment, Including Driver D A
C
B
GH5121
GH5121
GH5121
C
C
C
201
201
201
8.2.1
Vendor Package Example
a. Main Equipment Package
E
A
A
A
- Auxiliary Equipment H G
F
P
PM
01
01
PMH
01
A
A
A
Unit Number
GH5121
Equipment Type
Sequential Number
Suffix
ME
302
b. Package Pumps
Unit Number
Equip. Type
Sequential Number
Suffix
Equip. Type
Sequential Number
Suffix
GH5121
ME
302
P
01
A
DOCUMENT CLASS 2A
Page 13 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
8.2.2
Packaged compressor Example
a. Compressor
Unit Number
GH5121
Equipment Type
C
Sequential Number
101
Suffix
b. Compressor Air Coolers
Unit Number
Equip. Type
Sequential Number
Suffix
Equip. Type
Sequential Number
Suffix
GH5121
C
101
E
01
c. Compressor Air Cooler Fans
Unit Number
Equip. Type
Seq. Number
Suffix
Equip. Type
Associated Equip. Type
Seq. Number
Suffix
MM5121
C
101
E
FA
01
A
d. Compressor Air Cooler Fan Electric Motors
Unit Number
Equip. Type
Seq. Numb. Suffix
Equip. Type
Driver
Seq. Numb.
Suffix
MM5121
C
101
E
M
01
A
8.3
Instrument / Fire and Gas Detectors Tag Numbering for Instrument, Fire and Gas Detectors shall be ruled by “1-CF0000-16- PRO-0198-00 Instrument Numbering Rules” document.
8.4
Electrical Equipment
The Electrical Equipment Tag name structure shall follow the generic structure with minor amendment to identify the equipment voltage. Refer below:
Unit Number
Elect. Equipment
Voltage Code
Sequential Number
Suffix
XXXXXX
AA
B
YYY
ZZ
Where;
• XXXXXX is the six-character unit number.
• AA is the Electrical Equipment Type as listed in Appendix-4.
DOCUMENT CLASS 2A
Page 14 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
• B is the Voltage Code as listed in Appendix-5. (Two characters will be used for
transformers).
• YYY is a three-digit sequential equipment number.
• ZZ is the suffix, denoting parallel or spared equipment or other information.
For example:
a. Electrical Switchgear
Unit Number
Elect. Equipment
Voltage Code
Sequential Number
Suffix
GH5180
SWGR
D
001
Resulting Item Tag Number: GH5180-SWGR-D001
Service Description:
11 kV Switchgear
b. Electrical Distribution Transformer
Unit Number
Elect. Equipment
Voltage Code
Sequential Number
Suffix
GH5180
TR
CD
002
A
Resulting Item Tag Number: GH5180-TR-CD002A
Service Description:
33/11 kV Transformer A
c. UPS System
Unit Number
Elect. Equipment
Voltage Code
Sequential Number
Suffix
GH5180
BC
G
001
Resulting Item Tag Number: GH5180-BC-G001
Service Description:
DC UPS
DOCUMENT CLASS 2A
Page 15 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
d. Auxiliary for Electrical Motor
Electrical Motor Tag (Parent)
Child Electrical Equipment Tag Code
AANNNN-AA-NNN
AAA
Child Electrical Equipment Code:
Code
Description
SH LCS EPB IS
Space Heater Local Control Station Emergency Push Button Isolator
Examples:
GH5121-PM-101A-SH GH5121-PM-101A-LCS GH5121-PM-101A-EPB GH5121-PM-101A-IS
8.4.1
Electrical cables
The electrical cable shall be tagged as per following structure.
a. Single Core Cables
Equipment TAG
Cable Service Level Code (See Table A below)
Cable Service Sequential Suffix No. (See Table B below)
Phase (A,B,C)
XXXXXX-AA-YYYZZ
M
1
/
A
Resulting Item Tag Number: GH5121-PM-101A-M1/A
DOCUMENT CLASS 2A
Page 16 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Table A – Cable Service Level
Code
Cable Service Level
A C D E F H L M P
ANALOG CONTROL DIGITAL 132kV - 220kV FIBRE (OPTICAL FIBRE) 33kV - 11kV POWER 415V - 110V POWER 6.6kV - 3.3kV POWER CT’s (ALL)
Table B – Cable Service Sequential Suffix No.
Code
Control Cables Sequential Suffix Number
A1 C1/C2 C3 C4 C5
4-20mA SCREENED INTERLOCK / INTERTRIP 11kV CIRCUIT BREAKER LOAD SHED POTENTIAL FREE STATUS & ALARMS BUS ZONE PROTECTION-TRIP CIRCUITS
C6+C9 TRANSFORMER TRIP/ALARM
C7 C8 D1 P1 P2 P3
11KV C/B UNDERFREQUENCY LOAD SHED POTENTIAL PREE. STATUS & ALARMS SERIAL LINK RS485 DIFFERENTIAL CT’S TRANSFORMER CT BUS ZONE PROTECTION-CT CIRCUITS
b. Multi Core Cables
Equipment TAG
Cable Service Level Code (See Table A above)
Cable Service Sequential Suffix No. (See Table B above)
XXXXXX-AA-YYYZZ
M
1
Resulting Item Tag Number: GH5121-PM-101A-M1
DOCUMENT CLASS 2A
Page 17 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
8.4.2
Electrical cable raceways
The electrical cable raceways shall be tagged as per GASCO STD-1632-017- Design Standards-Electrical Power-Cable Raceway Numbering System and Service Levels.
8.4.3
Circuit reference for lighting and small power circuits
Lighting fitting, socket outlets and other minor items shall not be individually identified. Lighting and small power items shall be identified by circuit referencing as per ADNOC- OFFSHORE standard “A0-ENG-D-PRO-002 Part A & B”.
8.4.4
Electrical trace heating
Tag numbers for electrical trace heating process lines and instruments shall be as follows:
a. Electrical Trace Heating for Process Line
If Line Number is: GH5101-0002-HCX:
Unit Number
Elect. Equipment
Heat Traced Line
Suffix
GH5101
ETH
0002HCX
Resulting Item Tag Number: GH5101-ETH-0002HCX
Service Description:
Electrical Trace Heating for GH5101-0002-HCX
b. Electrical Trace Heating for Instruments
If instrument is: GH5101-PG-0002:
Unit Number
Elect. Equipment
Heat Traced Instrument
Suffix
GH5101
ETH
PG0002
Resulting Item Tag Number: MM5101-ETH-PG0002
Service Description:
Electrical Trace Heating for GH5101-PG-0002
8.5
Telecommunication Equipment
The Telecommunication Equipment tag name structure shall follow the generic structure with minor amendment to identify the telecom system;
Unit Number
Telecom Equipment
Telecom System
Sequential Number
Suffix
XXXXXX
AA
BB
YYY
ZZ
DOCUMENT CLASS 2A
Page 18 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Where:
• XXXXXX is the six-character unit number.
• AA is the Telecommunication Equipment Type as listed in Appendix-6.
• BB is the Telecom System number as listed in Appendix-7.
• YYY is a three-digit sequential equipment number.
• ZZ is the suffix, denoting spared equipment or other information.
8.5.1
Telecommunication panels / consoles
The tagging of the telecommunication panels / consoles in the Control Room, LER (Local Equipment Room), Substations and other process/non-process buildings shall follow the rules stated in Section 13 of 1-CF0000-16-PRO-0198-00 Instrument Numbering Rules” document.
For Example:
Where:
Building Number
Telecom System (Appendix-7)
Sequential Number
NNN
BB
99
• NNN - CCR, CER, OCR, or IES-nnn sequence no (where nnn is the IES number
as below) 101 to 1nn are the IES numbers for Ghasha 201 to 2nn are the IES numbers for Hail 301 to 3nn are the IES numbers for Compressor Platform 501 to 5nn are the IES numbers for GOP 601 to 6nn are the IES numbers for OPP
• BB is the Telecom System number as listed in Appendix-7 • 99 - Sequence numbers shall be unique, comprising of minimum 2 digit numbers
8.5.2
Telecommunication cables
Telecoms cables number tags shall follow instrument Cable Tag numbering mentioned in the Section 12 of 1-CF0000-16-PRO-0198-00 Instrument Numbering Rules” document.
For Example:
a. Telecom Cable (Multipair/Multicore)
The tag number of multipair/multicore incoming to Junction Box will be the same as JB Tag number followed by suffix
Cable will be identified by a suffix C1. Where there is more than 1 multipair/multicore, incoming cables, the tag number will be identified by suffix C1, C2, etc.
b. Telecom Cable (Field Telecom Equipment)
Single run field cables connected to field Telecom equipment shall adopt the Tag number of equipment itself.
DOCUMENT CLASS 2A
Page 19 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
8.6
HVAC Equipment The full set of HVAC Equipment code is available in Appendix-12. The following example are typical applications.
Main Equipment, including driver
Auxiliary Equipment, if any
A
B
C
D
E
F G
H
I
J
K
(A): Unit Code, 6 digits (B): Building Code, 2 characters (C): Building Number, 3 digits (D): Equipment identification (type) (E): Dedicated for driver of equipment such as Motor (F): Sequence number, three digits (G): Duplication suffix (A, B, C, etc.) (H): Auxiliary Equipment Identification (I): Dedicated for driver of equipment such as Motor (J): Sequence Number, 3 digits (K): Duplication Suffix
HVAC & Sanitary Equipment Example
Unit Number
Building Code (see Appendix- 11)
Building Number
Equipment Type (see Appendix- 12)
Sequential Number
Suffix
GH5179
AD
001
ACU
005
B
8.7
Fire and Safety System Equipment
a. General Fire and Safety Equipment
The full set of Fire and Safety Equipment Codes are available in Appendix-10. An example is :
Unit Number
Equipment Type (Appendix-10)
Serial Number
GH5173
HD
001
DOCUMENT CLASS 2A
Page 20 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
b. Deluge Valves
Tagging for Deluge Valve (Equipment Code “DV”) and associated instrumentation is described in Instrument Numbering Rules Document (1-CF0000-16-PRO-0198-00).
8.8
Piping Equipment
8.8.1
Sample Connections
The fill set of Sample connection codes is given in Appendix-8. An example is;
“SC” Prefix
Unit Number
Type (See Appendix-8)
Sequential Number
SC
GH5121
1C
003
8.8.2
Piping Line Numbering
For piping specification details refer to the following documents:
Piping Material Classes (Offshore) : 1-CF0000-28-MRL-0100-00
An example of the convention applied is;
Unit Number
Line Sequence Number
Service Designation (See Appendix-3 for list)
Nominal Pipe Size (inches)
Piping Specification (Refer piping material class documents listed in section 9.8.2)
Insulation Code/Type (See Appendix- 14 for list)
GH5121
109
HCX
36”
11975068
H
8.8.3
Piping Speciality items
The full set of Speciality item codes is given in Appendix-9. An example is;
“SP” Prefix
Unit Number
Type (see Appendix-9)
Sequential Number
Suffix
SP
GH5121
099
002
001
The sequential number will be used to uniquely identify each installation location, whilst the Suffix will be used to identify groups of SP items which will share a common datasheet.
DOCUMENT CLASS 2A
Page 21 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
For Interlocks System (Type 020) the Sequential number shall be unique for each Interlock system covering a certain number of interlocked items;
The suffix shall be used to differentiate the code to be applied on P&ID for each interlocked item.
8.8.4
Manual valve
Manual valve in process systems used as equipment and/or control valve isolation, bypass and non-return functions with size ≥2” are assigned a tag number in the Asset Register.
The generic coding structure in Section 6 is to be used, with a four-digit sequence number and the following as the Equipment Type.
Valve Code
Valve Type
VA GV AL BV CH SCH WC BF GL YV VN PL WV WF VH HN BP VD KN BD SK FL LS AR AN PN MB MG
Special Valve to be specified Gate Valve Angle Valve Ball Valve Check Valve Safety Check Valve Wafer Check Valve Butterfly Valve or Damper Globe Valve Globe Valve Y Pattern Needle Valve Plug Valve Three Way Valve Four Way Valve Hand Control Valve Hand Regulator Valve with Bleed or Purge Conn. Under Disc Diaphragm Valve Knife Valve Blowdown Valve Stop Check Valve Float Parallel Slide Valve Automatic Recirculation Valve Hand Control Angle Chock Valve Penstock Valve Monoblock DBB Ball Valve Monoblock DBB Gate Valve
DOCUMENT CLASS 2A
Page 22 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
An example applying this convention is;
Unit Number
Equipment Type
Sequential Number
GH5121
BV
0001
8.8.5
Tie-In Numbering and identification
a) Tie-ins designate new connections to existing piping which also include:
• New piping components for new instruments to be installed on existing lines
• New in-line components installed in existing lines e.g. Valves, blinds etc.
Tie-in identification shall follow the below numbering methodology :
Unit Number
XXXXXX
TP
Sequential Number
TP
YYY
Where;
• XXXXXX is the six-character unit number. The unit numbers are listed in
Appendix-1.
• YYY is generally a three-digit sequential equipment number.
Resulting Item Tag Number: GH5192-TP-001
Each tie-in number shall be unique identifier for each particular tie-in point representing a new connection to existing piping. When a tie-in point requires more than one modification to the same connected section of existing piping, the same tie-in number shall be used and alpha suffixes (A/B/C etc.) shall be given to each connection for identification, arrange in the direction of flow.
Tie-in numbers are not to be reused in between revisions where an earlier tie-in had been assigned and then deleted.
Tie-in numbers shall be carried forward from the Tie-in schedule across all documentation and associated drawings.
b) Terminal Point Package designate connections between Package and Contractor
TPP identification shall follow the below numbering methodology:
Package TAG
TPP
Sequential Number
XXXXXX
TPP
YYY
Where;
• XXXXXX is the Package TAG. • YYY is generally a three-digit sequential equipment number.
DOCUMENT CLASS 2A
Page 23 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Resulting Item Tag Number: GH5121-ME-102-TPP-001
Each Terminal Point Package number shall be unique identifier for each particular point.
Terminal Point Package number are not to be reused in between revisions where an earlier tie-in had been assigned and then deleted.
Terminal Point Package numbers shall be carried forward from the Vendor across all documentation and associated drawings.
8.8.6
Interface Point Numbering and Identification
Interface point designate new connections as follows:
• Connection between Contractor SOW and Temporary Items (eg. Temporary Pig
Traps provided by Others)
• Connection between Contractor SOW and Future facilities (eg. Provision for
phase 3 SOW)
Interface point identification shall follow the below numbering methodology:
Unit Number
XXXXXX
IP
IP
Sequential Number
Discipline Code
YYY
ZZ
Where:
• XXXXXX is the six-character unit number. The unit numbers are listed in
Appendix-1.
• YYY is generally a three-digit sequential equipment number.
• ZZ is the discipline relevant to interface as per Appendix-16
Resulting Item Tag Number: GH5192-IP-001-28
Each interface point number shall be unique identifier for each particular point representing a connection as per bullets listed above. When an interface point requires more than one modification to the same connected section of existing piping, the same interface point number shall be used and alpha suffixes (A/B/C etc.) shall be given to each connection for identification, arrange in the direction of flow.
Interface point numbers are not to be reused in between revisions where an earlier interface point had been assigned and then deleted.
Interface point numbers shall be carried forward from the Interface point schedule across all documentation and associated drawings.
DOCUMENT CLASS 2A
Page 24 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
8.9
Civil Structure, Buildings and Offshore Structures
Civil Structures such as roads, culverts and concrete columns are not generally assigned tag names. However significant steel structures, foundations, pipe racks and buildings required tag names for corrosion monitoring, inspection and general maintenance purposes.
8.9.1
Civil Structures and Foundations
a. Structures
All stick built civil structures shall have the following tag:
Area Number
Structure Code
Structure Sequential Number
XXYYAAA
BBB
NNN
Where;
• XX is the Field Code • YY is the Area Code • AAA is the WBS area as defined in 1-CF0000-28-KEY-2450-00 WBS AREA & UNIT
PLOT PLAN KEY PLAN
• BBB is the Structure Code listed in the following table:
Structure Code PLT PSS PRK SHL STR
Structure Type Platform Pipe Support Steel Pipe Rack (Stick Built) Shelter Support Structure
• NNN is a three-digit sequential equipment number.
An example applying this convention is;
Area Number
Structure Code
Structure Sequential Number
GH51G16
PLT
001
For pre-assembled module structures, refer to par. 8.9.2.
b. Foundations
Foundations for equipment are not given tag names but are called up for maintenance by the equipment they belong to. Foundations for pipe racks and structures also do not have tag names, but are called up by the tag for the structure.
DOCUMENT CLASS 2A
Page 25 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
8.9.2
Manholes, Valves, Pit, Catch Basin
The items shall have the following tag:
PREFIX
type
Sequential Number
XXYYZZ
AAA
NNN
Where;
• XX is the Field Code • YY is the Area Code • ZZ is the Unit Code • AAA is the Pit Type listed in the following table (as applicable):
Pit Tag (AAA) AMH
CMH
ACB
AVP
DCO
CCO
FVP
AVP
CVP
Pit Type AOC Manhole
COC Manhole
AOC Catch Basin
AOC Valve Pit
Close Drain Clean Out
COC Clean Out
Firewater Valve Pit
AOC Valve Pit
COC Valve Pit
Examples:
Prefix
Pit Type
Sequential Number
GH5174
GH5174
GH5174
GH5173
GH0174
HL0374
AMH
CMH
CMH
FVP
ACB
CMH
001
001
001
001
001
001
Note: Progressive number will start with Plant (eg GH51) and Pit Type
DOCUMENT CLASS 2A
Page 26 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
8.9.3
MODULES TAGGING
The modules shall have the following tag:
PREFIX
Module type Module sequential
XXYYZZ
AAA
Number
NN
Where;
• XX is the Field Code • YY is the Area Code • ZZ is the Unit Code • AAA is the Module Type listed in the following table (as applicable):
Module Code Code (AAA) BRG
Module Type Bridge
FLR
JCK
TOP
PAR
PAU
PAB
PAS
Flare Structure (Offshore Structure)
Jacket (Offshore Structure)
Topsides (Offshore Structure)
Pre-Assembled Rack
Pre-Assembled Unit
Pre-Assembled Unit
Pre-Assembled Structure
VAU • NN is a two-digit sequential number
Vendor-Assembled Unit
Example of PAR on GOP:
Prefix
GH5100
Module Type
Sequential Number
PAR
06
Example of PAR on DC1:
Prefix
GH0100
Module Type
Sequential Number
PAR
06
Example of PAU on DC1:
Prefix
GH0101
Module Type
Sequential Number
PAU
01
DOCUMENT CLASS 2A
Page 27 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Example of BRG for GOP:
Prefix
Structure Code Sequential Number
GH5170
BRG
01
8.9.4
BUILDINGS
a. Process Buildings
Process Buildings (such as Sub Stations, LERs, Operation Shelters, Maintenance Shelters, Fire Station, etc.) shall be assigned tag numbers linked to the applicable Process Building Sub-Area (xxyy87).
An example is:
Unit Number
GH5187
Building Code (Appendix 11)
Building Sequential Number
SS
001
b. Non-Process Buildings
Non-Process Buildings (such as Gate Houses, Administration Building, Laboratories, Main Control Building, Workshops, Warehouses, etc.) shall be assigned tag numbers linked to the applicable Non-Process Building Sub-Area (xxyy79).
An example is:
Unit Number
MM5179
Building Code (Appendix 11)
Building Sequential Number
AD
001
Resulting Item Tag Number: MM5179-AD-001
Service Description:
Administration Building 1
8.10
Cathodic Protection
The Cathodic protection “Item” tag name follows the standard naming convention described in Section 8 with the Equipment Types allowed in Appendix-13.
A typical example is:
Unit Number
Equipment Type (Appendix 13)
Sequential Number
DOCUMENT CLASS 2A
Page 28 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
MM5121
EE-CC
201
Resulting Item Tag Number: MM5121-EE-CC-201
Service Description:
Cathodic Protection Corrosion Coupon
8.11
Mechanical Handling Equipment Codes
The full set of Mechanical Handling Equipment Codes is given in Appendix-15.
An example is;
Unit Number
Equipment Type (Appendix 15)
Serial Number
GH5171
PCR
001
DOCUMENT CLASS 2A
Page 29 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
APPENDICES
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Appendix-1 Unit Numbers
Appendix-2 Common Process Equipment Codes
Appendix-3 Service Designation / Fluid Codes
Apeendix-4 Electrical Equipment Codes
Appendix-5 Electrical Voltage Codes
Appendix-6 Telecommunication Equipment Codes
Appendix-7 Telecommunication System Number
Appendix-8 Sample Connection Codes
Appendix-9 Piping Speciality Item Codes
Appendix-10 Fire and Safety Equipment Codes
Appendix-11 Building Codes
Appendix-12 HVAC & Sanitary Equipment Codes
Appendix-13 Cathodic Protection Equipment Codes
Appendix-14 Coating / Insulation Codes
Appendix-15 Mechanical Handling Equipment Codes
Appendix-16 Discipline Codes
DOCUMENT CLASS 2A
Page 30 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-1
UNIT NUMBERS
The Unit Numbers for the Hail and Ghasha Development Project facilities are as follows:
Unit is a 6-characted alpha-numeric string formed by concatenation of Field, Area and Sub- Area values selected from Table 1, 2 and 3 below.
Field (Table 1)
Unit Area (Table 2)
Unit (Table 3)
X
X
Y
Y
Z
Z
Table 1 – Field (XX)
Code CF GH HL MM RW SB
Field Name Common (Offshore) Ghasha Hail Manayif Ruwais Subsea
Table 2 – Area (YY)
Shalhah (Hail South)
Seemeh (Drill Centre 03) Jzool (Drill Centre 04)
YY Area Name 00 Common 01 Reeah (Drill Centre 01) 01 02 Duroob (Drill Centre 02) 02 Mudaifena (Hail South East) 03 Ghaff (Hail 3) 03 04 05 Ghanem (Drill Centre 05) Seebah (Drill Centre 06) 06 Injection Platform 07 30 Well Head Tower 49 Compression Centre Platform 51 Chananiz (GOP) 51 Manayif (OPP) Swalem (CLQ) 60
DOCUMENT CLASS 2A
Page 31 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
Note:-
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
(a) Unit in GOP will be GH51ZZ (where ZZ is selected from Table 3) (b) Unit in OPP will be MM51ZZ (where ZZ is selected from Table 3) (c) Unit in Ghasha Wellhead Tower will be GH07ZZ (where ZZ is selected from Table 3)
Table 3 – Unit (ZZ)
Unit Name Common / General Wellheads / Manifolds Booster & Export Compression LP Flash Gas Compression Train 1 LP Flash Gas Compression Train 2 Inlet Facilities and Separation Oil Stabilization Train Condensate Stabilization Train Condensate Hydrotreater Oil & Condensate Export and Product Storage Cooling Medium System Acid Gas Removal - Train 1 Acid Gas Removal - Train 2 Injection Platform Jacket Injection Platform Topside Solvent Storage & Transfer Bridge Injection Jacket Gas Compression Injection Topside CO2 export pipeline Sour Gas Dehydration Gas Dehydration & Mercury and Mercaptan Removal - Train 1 Gas Dehydration & Mercury and Mercaptan Removal - Train 2 Sweet Gas Booster Compression Train 1 Sweet Gas Booster Compression Train 2 NGL Storage & Shipping NGL Recovery Units - Train 1 NGL Recovery Units - Train 2 Sales Gas Compression Export Sulphur Recovery - Train 1 Sulphur Recovery - Train 2 Sulphur Recovery - Train 3 Sulfur Storage & Shipping Tail Gas Treatment - Train 1 Tail Gas Treatment - Train 2 Tail Gas Treatment - Train 3 CO2 Recovery & Hydrogen Capture
ZZ 00 01 12 14 15 20 21 22 25 26 28 31 32 33 34 35 36 37 38 39 40 41
42
43 44 45 47 48 49 51 52 53 55 56 57 58 59
DOCUMENT CLASS 2A
Page 32 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
60 61 62 63 64 65 66 67 68 69 70 71 72
73 74
75 76 77 78 79 80 81 82 84 85 87 89 90
91 92
93 94
95 96 97
98
99
Future Nitrogen Rejection Potable & Utility Water Steam System & Demineralised Water System Air Separation unit Chemical Injection System Fuel Gas System Chilled Water System & Propane Refrigeration System Instrument & Service Air System Nitrogen System Diesel System Seawater System Flare System & Vapour Recovery System Produced Water Treatment System & Sour Water Treatment Fire Protection System (Fire Fighting) Drain System, Oily water, Storm Water & Evaporation Pond Oil Free Low TDS Wastewater Treatment System Sewage Treatment Plant Piperacks Hot Oil System Non Process Buildings Main Power Distribution & Emergency Power Telecom System Hydrogen Production Unit (HPU) Roads & Fences Harbour & Jetty Facilities Process Buildings ICSS (MAC) A/G Risers and Shore Approaches Pipelines and Cables (Onshore Section) Subsea Pipeline Gathering Network (DCs Intrafield) Onshore Export Pipelines and Cables (excl. sulphur line) Onshore Sulphur Lines and Cables Export Subsea Umbilicals and Cables Network (DCs Intrafield) Gas Lift Gas Injection A/G Risers and Shore Approaches Pipelines and Cables (DCs Intrafield) Subsea Pipeline Gathering Network (Offshore export to Onshore) Subsea Umbilicals and Cables Network (Offshore export to Onshore)
DOCUMENT CLASS 2A
Page 33 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-2
COMMON PROCESS EQUIPMENT CODES
Equipment Code
Equipment Type
AG
AGM
Agitator / Mixer
Agitator / Mixer Electric Motor
B
BG
BM
BN
BR
C
CM
CV
D
DA
DC
DG
DR
DS
DV
E
EC
EV
F
FA
Blower
Slide Gate
Blower Electric Motor
Feed Hopper
Boiler
Compressor
Compressor Electric Motor
Conveyors
Diesel Engine
Deaerator
Dust Collector
Diesel Generator
Dryer
Dust Suppression
Diverter Gate
Exchanger or Air Cooler
Expander Compressor
Evaporator
Filter / Coalescer
Exhaust Fan / Fan
FAM
Exhaust Fan Motor / Fan Motor
FE
G
GB
GD
GR
GST
H
HB
HU
Rotary Valve
Generator
Gear box
Granulator Drum
Granulator
Electric Generator Steam Turbine
Heater / Furnace
Burner
Hydraulic Unit
DOCUMENT CLASS 2A
Page 34 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Equipment Code
Equipment Type
J
ME
MD
MS
MX
P
PD
PM
PT
PU
R
RE
S
SC
SE
SR
SU
TK
V
Y
M
GT
ST
TR
W
X
Ejector
Package Equipment
Metal Detector
Magnetic Separator
Mixer
Pump
Power Distribution
Pump Electric Motor
Power Turbine
De-Lumper
Reactor
Chiller Unit
Stack
Belt Scales Vibrating Screen
Stacker/Reclaimer
Sump
Tank / Daily Pit / Remelt Pit
Vessel / Column
Handling Equipment
Electric Motor
Gas Turbine
Steam Turbine
Tower
Reverse Osmosis Unit
Miscellaneous
DOCUMENT CLASS 2A
Page 35 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-3
SERVICE DESIGNATION / FLUID CODES
FLUID CODE AD AF AG ASD ASS AV BA BBD BD BFL BFH BFW BG BIO BWS CAC CAD CBA CCD CD CDC CF CG CH CI CIA CL CO2 COA COF CWR CWS DA DF DMS DMW EB FAG
FLUID TYPE Area Drain (Surface Drainage) Antifoam Acid Gas Asphaltene Dispersant Asphaltene Solvent Ammonia Breathing Air Boiler Blowdown Blowdown LP Boiler Feed Water HP Boiler Feed Water Boiler Feed Water Blanket Gas Biocide Boiler Water Sewer Caustic Concentrated Caustic, Dilute Combustion Air Caustic Closed Drain Closed Drain Closed Drain Cryogenic Freon Refrigerant Chlorine Gas Chemical Corrosion Inhibitor Citric Acid Sodium Hypochlorite Carbon Di-oxide Coagulant Coagulant (FeCl3) Chilled Water Return / Cooling Medium Return Chilled Water Supply / Cooling Medium Supply Dry Air Diesel Fuel Demulsifier Demineralised Water Emulsion Breaker Acid Gas Flare
DOCUMENT CLASS 2A
Page 36 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
FLUID CODE FD FGL FGM FGX FLC FLH FLO FW GD GL GLX H2 HAC HC HCN HCX HFL HO HW IA IG IW LFL LHI LN LO LS MEG MOH N2 OCD OCS OD OXS PA PCH PHS PW QTC RF RG RGX RSX
FLUID TYPE
Fire Deluge Low Pressure Fuel Gas Medium Pressure Fuel Gas Fuel Gas Sour Low Temperature Flare (Cold & Dry Flare) High Pressure & Wet Gas Flare Flocculant Fire Water Glycol Drain Glycol Glycol, Sour Hydrogen Hydrocloric Acid Hydrocarbon Hydrocarbon, Sour, Non-Toxic Hydrocarbon, Sour, Toxic High Pressure Flare Hot Oil Hot Water Instrument Air lnergen Irrigation Water Low Pressure Flare Low Dosage Hydrate Inhibitor Liquid Nitrogen Lube Oil Lean Solvent (Lean Amine) Mono Ethylene Glycol Methanol Nitrogen Open Chemical Drain Oxygen/Chlorine Scavenger Open Drain Oxygen Scavenger Plant Air Pumped Steam Condensate (Hot) Phosphate Potable Water Quench Temperature Control Refrigerant (Propane) Regeneration Gas Regeneration Gas (Hot & Wet/Sour) Rich Solvent, Sour (Rich Amine)
DOCUMENT CLASS 2A
Page 37 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
FLUID CODE RW S8D SAC SAD SC SCC SCH SCL SCM SD SDM SE SEA SHS SI SL SLS SM SO SOB SOH STH STL STM STS SW TAG TW UMB UW VE VT WD WDX WF WFX WS
FLUID TYPE
Raw Water Sulphur Drain Sulphuric Acid, Concentrated Sulphuric Acid, Diluted Steam Condensate (Saturated) Cooled Condensate (Pumped) High Pressure Steam Condensate Low Pressure Steam Condensate Medium Pressure Steam Condensate Solvent Drain Solvent Drain, Amine Sewage Seawater Superheated HRSG Steam Scale Inhibitor Sulphur, Liquid Superheated Low Pressure Steam Fresh Solvent Seal Oil Sodium Bisulfite Sodium Hydroxide High Pressure Steam (Saturated) Low Pressure Steam (Saturated) Medium Pressure Steam (Saturated) Superheated High Pressure Steam Sour Water Treated Acid Gas Treated Water Umbilical (containing Mixed Service Designations) Utility Water Vent Vessel Trim Water Disposal Water Disposal, Sour Well Fluid Well Fluid, Sour Sweet Water
DOCUMENT CLASS 2A
Page 38 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-4
ELECTRICAL EQUIPMENT CODES
Equipment Code ACH AP AW BAT BC BD BM CAP CB CLR CP CS DB DG DS EPB ELP ESP ETH EY GEN IS JB LCS LP LTC MCS MVP NER NET NDS PB PE PS RMU RP SH SO
Equipment Type
Anti-Condensation Heater Alarm Panel Aircraft Warning Light Battery Bank Battery Charger (used for DC UPS) Bus Duct/Bus Trunking Battery Monitor Capacitor Circuit Breaker Current Limiting Reactor Control Panel Change over Switch Electrical Distribution Board in building Diesel Generator Disconnect Switch (e.g. Battery Disconnect Switch) Emergency Push Button Emergency Lighting Panel Emergency Small Power Panel Electrical Trace Heating Tape ECMS System Generator Isolator Junction Box Local Control Station Lighting Panel On Load Tap Changer Motor Control Station Motorized Valve Panel Neutral Earthing Resistor Neutral Earthing Transformer Neutral Disconnecting Switch Power Distribution Board Photo-Cell Photovoltaic System Ring Main Unit Relay Panel, including Interposing Relay Panels Space Heater Socket Outlets
DOCUMENT CLASS 2A
Page 39 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Equipment Code SP SWGR SWGRE TP TR TRE UPS UPB VFD WO
Equipment Type
Small Power Panel Switchgear Switchgear (Emergency) Trace Heating Panel Transformer Emergency Transformer Uninterruptible Power Supply UPS Distribution Board (AC and DC) Variable Frequency Drive Welding Outlets
DOCUMENT CLASS 2A
Page 40 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-5
ELECTRICAL VOLTAGE CODES
Voltage Code A B C D E F G H
X
Voltage Level
220 kV 132 kV 33 kV 11 kV 3.3 kV 110 V,240 V,415 V AC DC Voltage AC UPS output voltage Controls, alarms and indications AC or DC (e.g. ECMS related equipment)
DOCUMENT CLASS 2A
Page 41 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-6
TELECOMMUNICATION EQUIPMENT CODES
Equipment Code TEA0 TEA1 TEA2 TEA3 TEA4 TEC0 TEC1 TEC2 TEC3 TEC4 TEC5 TEC6 TED0 TFC0 TFD0 TFD1 TFD2 TFD3 TFD4 TFD5 TFD6 TFD7 TFE0 TFE1 TFE2 TFE3 TEJB TFM0 TFM1 TFN0 TFP0 TFP1 TFP3 TFP5 TFP7 TFP9 TFR0
Equipment Type
Access Control System Card Reader ACS Controller ACS Sub-controller ACS Server CCTV System CCTV Camera - Non-Hazardous Area CCTV Camera - Hazardous Area CCTV Monitor CCTV Control Station CCTV Network Video Recorder CCTV Encoder Fiber Optic Intrusion Detection System Media Conversion Equipment Data Network System Wireless Access Point Wireless LAN Controller LAN Switch Router Firewall Acceleration Appliance Server Entertainment System Entertainment System Head-end Equipment Entertainment System Set-Top Box Entertainment System VoIP Telephone Telecom Junction Box Marine Radio System Equipment Marine Radio Deskset Equipment Master Clock System Public Address and General Alarm System PAGA Core Equipment PAGA Speaker Outdoor PAGA Speaker Indoor PAGA Beacon PAGA Control Console/Panel Plant Radio System Equipment
DOCUMENT CLASS 2A
Page 42 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Equipment Code TFR1 TFR3 TFR4 TFR6 TFS0 TFV0 TFV1 TFV2 TFV3 TFV4 TFV7 TFV8 TFW0 TFX1 TFY1
Equipment Type
Plant Radio Desk set Equipment Plant Radio Dispatch Console Equipment Plant Radio Mobile Equipment Microwave System Equipment Satellite System Equipment Telephone System IP Telephone Instrument Telephone Instrument Hazardous Area Teleconferencing Instrument Analog Telephone Instrument Videoconferencing Equipment Voice Gateway Antennas Antenna Tower Outdoor Telecommunication Cabinet
DOCUMENT CLASS 2A
Page 43 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-7
TELECOMMUNICATION SYSTEM NUMBER
System Code 10 11 12 13 14 15 16 17 18 19
Telecommunications System
Telecoms - General Security System – Access Control CCTV LAN/Wi-Fi PAGA Radio System (TETRA, Other UHF, VHF) Telephony System/UCC GSM System (3G/4G/5G) Security System – PIDs Voice Recording System
DOCUMENT CLASS 2A
Page 44 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-8
SAMPLE CONNECTION CODES
Type
Description Type
1
1F
2 3
4 5 6 2C
2F
2H
2DC
2DH
3C 3H
1C 1H 4H
CLOSED SYSTEM — HOT VOLATILE / HAZARDOUS / TOXIC LIQUID AND TWO PHASE STREAMS CLOSED SYSTEM — HOT VOLATILE / HAZARDOUS / TOXIC LIQUID AND TWO PHASE STREAMS (FINNED PIPE COOLER) CLOSED SYSTEM — GAS OR LIQUID LETHAL/SOUR SERVICE CLOSED SYSTEM WITH COOLER — SWEET LIQUID FLASHING OR SWEET GAS OPEN SYSTEM — WATER (NON-LETHAL) OPEN SYSTEM — WATER WITH COOLER (NON-LETHAL) MP/LP STEAM SERVICE CLOSED SYSTEM — GAS OR LIQUID LETHAL/SOUR SERVICE CLOSE SYSTEM WITH FINNED PIPE COOLER — GAS OR LIQUID LETHAL/SOUR SERVICE CLOSED SYSTEM WITH COOLER — GAS OR LIQUID LETHAL/SOUR SERVICE CLOSED SYSTEM — GAS OR LIQUID LETHAL/SOUR SERVICE (BY- PASS OF CONTROL VALVE) CLOSED SYSTEM WITH COOLER — GAS OR LIQUID LETHAL/SOUR SERVICE (BY-PASS OF CONTROL VALVE) CLOSED SYSTEM — SWEET LIQUID FLASHING OR SWEET GAS CLOSED SYSTEM WITH COOLER — SWEET LIQUID FLASHING OR SWEET GAS CLOSED SYSTEM — SWEET LIQUID NO FLASHING CLOSED SYSTEM WITH COOLER — SWEET LIQUID NO FLASHING HP STEAM SERVICE
DOCUMENT CLASS 2A
Page 45 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-9
PIPING SPECIALITY ITEM CODES
Piping Specialty Item Code 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 030 031 032 033 034 099
Piping Specialty Item Type
Conical Strainers Y-Type and T-Type Strainers Steam Traps Sight Glasses Injection Quills Sample Probes Flexible Hoses Hose and Hose Connections Flame Arrestors Expansion Bellows Mechanical Coupling Bird Screens Special Valves - Gate Special Valves - Ball Special Valves - Non Slam Check Tilting Type Special Valves - Globe Special Valves - Non Slam Check Axial Type Special Valves - (TBC) Special Valves - Stop Check Valve Valve Interlocks Corrosion Coupon / Probe Filter Safety Shower and Eye Wash Barred Tee Galvanic Spool Misc
Note: SP-099 should be avoided when specific equipment coding is available
DOCUMENT CLASS 2A
Page 46 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-10
FIRE AND SAFETY EQUIPMENT CODES
Equipment Code BA FWMM FWMO FWMP FHB FHD FHM FHR FIV LB MECO2 MEDP MEFM NFC PECO2 PEDP PEFM PEWT RC
Fire Fighting Equipment Type
Breathing Apparatus (fixed systems) Fire Monitor – Fixed, Manual Fire Monitor – self Oscillating Fire Monitor – Portable Hose Boxes Fire Hydrant Fire Hydrant with Monitor Hose Reel Isolation Valve with Post Indicator (for U/G Fire Main) Lifeboats / TEMPSC Mobile Extinguishers – C02 Mobile Extinguishers – Dry Powder Mobile Extinguishers – Foam Flushing Connection Portable Extinguisher – CO2 Portable Extinguisher – Dry Powder Portable Extinguisher – Foam Portable Extinguisher – Water Rescue Cabinet
DOCUMENT CLASS 2A
Page 47 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-11
BUILDING CODES
Building Type
Accommodation / Recreation Building Administration Building Analyser Shelter Canteen Building Control Building Gate House Fire Station Instrument Equipment Shelter (IES) Weigh Station Drivers Toilet / Rest Laboratory Mosque Operator Shelter Shelter (General) Substation Warehouse Workshop Weigh Station Building Toxic Gas Refuge
Code AB AD AS CA CB GH FS IE J2 LA MO OS SH SS WH WK WS TR
DOCUMENT CLASS 2A
Page 48 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-12
HVAC & SANITARY EQUIPMENT TYPE CODES
a. HVAC Equipment
HVAC Equipment
Air Cooled Condensing Unit
Code ACU AHU Air Handling Unit Bag Filter BF BPV Blast Protection Valves CAV Constant Air Volume Terminal Chemical Filter (Box) CF EDH Electrical duct Heater EHU Humidifier EWH Electric water heater Exhaust fan FA Fresh air Handling Unit FAU GTD Gas Tight Damper HCP H.V.A.C. Local Panel
ID
Isolation Manual Damper
MFD Motorized Fire Damper MVD Motorized Damper/ Automatic Damper
P
Pump
H.V.A.C. Compressor Non return damper Heating / Cooling equipment Electric Heater Battery
PAC Packaged Air Conditioner Unit PRD Pressure Relief Damper QC QK QM QT QW Dry Cooler QY RAC Room Air Conditioner RTU Roof Top Unit SA SF SIF VAV Variable Air Volume Terminal VD
Sound Attenuator Supply fan in AHU Sand Inertial Filter
Volume Damper
Air Distribution Equipment (Grills, Vanes and Louvers)
DOCUMENT CLASS 2A
Page 49 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
b. Sanitary Equipment
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
Sanitary Equipment
Code Drinking water fountain DF Eye water EW Hand spray HS Kitchen Sink KS Lavatory LAV Shower SH Service Sink SS Faucet TAP Urinal URI WC Water Closet
DOCUMENT CLASS 2A
Page 50 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-13
CATHODIC PROTECTION EQUIPMENT CODES
Type
Component Type
Linear Anode
Drainage Station
Cathodic Protection Controller
Anode Junction Box Combined Junction Box Corrosion Probe, all types
Tank Bottom Ribbon Anode Transformer Rectifier Unit Zinc Ribbon Anode
EE-ACDC AC/DC Coupon EE-AJB EE-CJB EE-CP EE-CPBA Pipeline Bracelet Anode EE-CPC EE-CPCA Concrete Ribbon Anode EE-CPCU Cathodic Protection RMCS Master Control Unit EE-CPDA Discrete Canister Anode EE-CPGB Cathodic Protection Ground Bed EE-CPLA EE-CPMG Magnesium Anode EE-CPPA Sacrificial Aluminium Offshore Structure Anode EE-CPRS Remote Seabed Anode EE-CPS EE-CPSA Sacrificial Aluminium / Zinc Anode EE-CPTA EE-CPTR EE-CPZA EE-DPTP Drain Point Test Post EE-EBB EE-FTP EE-GTP EE-IJTP EE-LCTP EE-NDB EE-NJB EE-OTP EE-PDB EE-PC EE-PCTP Coupon Test Point EE-PRC EE-RDTP Road Crossing Test Post EE-RE EE-SGPS Cathodic Protection Solar Generator EE-STP Standard Test Post EE-SMPS Switch Mode Power Supply Unit EE-TTP
Equipotential Bond Box Foreign Pipeline Test Post Galvanic Test Post Isolation Joint Test Post Line Current Test Post Negative Distribution Box Negative Junction Box Overhead Line Test Post Positive Distribution Box Polarization Coupon, all types
Polarization Cell / Surge Arrestor
Reference Electrode, all types
Tank Test Post
DOCUMENT CLASS 2A
Page 51 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX -14 COATING / INSULATION CODES
Description
Acoustic Wrapping for CD, SD (Closed Drain) Cold Cold and Acoustic Cold Antifrost Cold Antifrost and Acoustic Electric Traced Fire Proofing Heat Conservation Heat Conservation and Acoustic Hot Insulated with Vapour Barrier Steam Jacket None Internal FBE Lined Externally Wrapped Internal FBE Lined Externally Cold Insulation Internal FBE Lined Externally Hot Insulation Internal FBE Lined Externally Painted Personnel Protection (>70°C) Personnel Protection and Acoustic Internal Refractory Externally Hot Insulation Internal Refractory Externally Painted Steam Trace and Insulation Bolt on Trace and Insulation Painted Wrapping for Underground Pipes
Code A B C CA CF CFA E F H HA HVB J N KB KC KH KV PP PA RH RV S SC V W
DOCUMENT CLASS 2A
Page 52 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-15
MECHANICAL HANDLING EQUIPMENT CODES
Code BDE BMC BMT CHB
CRN
DVT FKL FLS FRM HBR JAW LBM MNR MWP PCD PCR PDE PP SBR STK TRH
TRK
TRP TTR
Description
Bundle Extractor Beam Clamps Beam / Runway Trolley Chain Block Crane (light weight, counter weight, elephant, EOT, gantry, mobile, jib, etc) Davit Forklift Flange Spreader Frame H-Bar Jaw Winch (Tirfor) Lifting Beams Monorails Mobile Elevated Work Platform Pig Cradle Pedestal Crane Pad-eye Pulling Posts Spreader Bar Stacker Trolley Hoists Truck (hand / pallet / tow truck, basket / cylinder / powered trolley, etc) Transport Pallet Tow Trailer
DOCUMENT CLASS 2A
Page 53 of 54
Uncontrolled When Printed
COMPANY PROJECT No: 4700021770
CONTRACTOR PROJECT No: 67-00106
COMPANY DOCUMENT No. 1-CF0000-59-PRO-0003-00
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1 – OFFSHORE FACILITIES
PROJECT PROCEDURE FOR TAG NUMBERING
Rev
02
APPENDIX-16
DISCIPLINE CODES
Code 01 04 07 10 13 15
16 19 22 23 24 25 26 28 31 32 34 37 40 46 47 50 51 52 53 54 55 57 58 59 70 71
Discipline Name
Architectural Process Engineering Civil & Structural Electrical Environmental Control System & Automation includes DCS/ESD/F&G Instrumentation and Analyzers Geotech & Hydraulic Engineering Services (G&HES) Mechanical Engineering-STATIC Mechanical Engineering-ROTATING Mechanical Engineering-PACKAGES Materials Engineering Technology (MET) HVAC Plant Design & Piping (PD&P) Offshore Structures Marine Engineering Pipeline Project Engineering Process Safety Engineering Engineering Management Telecom Project Control / Planning Construction Health Safety and Environment IT QAQC Acceptance and Handover Contracts Procurement Project Mgt / Quality Mgt / Admin Social and HSE Initiatives Start-up / Commissioning
DOCUMENT CLASS 2A
Page 54 of 54
Uncontrolled When Printed
ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
Drawing / Document Number, Title and Revision:
Doc Status Code:
Doc. No.:
1-CF0000-59-PRO-0003-00
Rev. No. :
01
Title:
PROJECT PROCEDURE FOR TAG NUMBERING
Discipline:
59-Project Mgt_Quality Mgt_Admin
CODE 2-COMMENTS AS NOTED
Doc Class:
CLASS 2A
Pos No.
Page number
COMPANY Comments Description
COMPANY Originator NAME
CONTRACTOR Confirmation / Explanation
1 2 3
4
5
6
7
05 06 06
08
18
21
22
04: shall be MSBPD as per BEDD Centre update as ‘data’ 04: Is this applicable for the Well numbering as well?
Sachin Gaikwad Sachin Gaikwad Sachin Gaikwad Chintan Desai
Please Check. Telecom equipment JBs are not covered under Instrument Numbering rules. 04: It shall cover all the types of Check valves as per valve selection philosophy.
Chintan Desai
SubhashNair
Noted and implemented Noted and implemented Noted and implemented No, it is not. Wells, which are out of Contractor scope, have thier own numbering. Comment not applicable, telecom equipment and JB tagging is already included in Appendix 6 Tagging updated according to latest philosophy used into P&ID: CH for all check valves; SCH for all safety check valves (where use of two dissimilar check valve type are required). However, type of valve will be added into Valve Lists.
04: there shall be vendor package tie in numbering methodology available separately, to have unique tie in number for each package independent of main unit numbering
Sachin Gaikwad
Noted and agreed. Tagging of the TPP (Terminal Point Package): “Package TAG”-TPP-”Sequential Number” Ex: GH5121-ME-102-TPP-001
ACTION BY CONTRACTOR
Pinzi Mirco Pinzi Mirco Pinzi Mirco Pinzi Mirco
Gabrielli Lorenzo
Marochi Stefano
Rapuano Carmine
File: MacroCommentSheet_EPC 8.xlsm
Page 1/2
ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS
Drawing / Document Number, Title and Revision:
Doc Status Code:
Doc. No.:
1-CF0000-59-PRO-0003-00
Rev. No. :
01
Title:
PROJECT PROCEDURE FOR TAG NUMBERING
Discipline:
59-Project Mgt_Quality Mgt_Admin
Pos No.
Page number
COMPANY Comments Description
CODE 2-COMMENTS AS NOTED
Doc Class:
CLASS 2A
COMPANY Originator NAME
SubhashNair
8
9
10
11
12
31
33
34
43
44
04: Emergency Diesel Generator package UFDs are prepared under unit “69” with equipment numbering as 69,check and update the UFD numbering or update the document numbering
04: What about the Well head? 04: Check and include the abbreviations for all the chemicals selected by the easy identification 04: Confirm that these are aligned with the legend P&IDs
SubhashNair Sachin Gaikwad
Sachin Gaikwad
04: these needs to be populated based on the system requirements.
Sachin Gaikwad
CONTRACTOR Confirmation / Explanation
Unit 69 is confirmed for Emergency Diesel Generator package. This list is also aligned with doc.no. 1-CF0000-59-PRO-0002- 00 “PROJECT PROCEDURE FOR DOCUMENT AND DRAWING NUMBERING” which is approved in CODE1 by Company. No change for Unit 69 and 80 description.
ACTION BY CONTRACTOR
Pinzi Mirco
Wellheads have thier own numbering. Noted and implemented. All the Chemical Fluids have been added. Noted and agreed. Table updated and aligned with the Table in the P&ID Note and agreed. Table updated based on the requirement.
Pinzi Mirco Rapuano Carmine
Rapuano Carmine
Marochi Stefano
File: MacroCommentSheet_EPC 8.xlsm
Page 2/2
Project: Q-32855 - Saipem Hail & Ghasha Folder: Reference documents