PLANT NORTH
W
G U 1 0 G
G U 5 0 G
N
3 U 0 1 9 6 1 3
” 2
W P
2 2 1
1 6 1 5 H G
” 2
C
3 U 0 2 1 3 1 1
” 2
W P
3 2 1
1 6 1 5 H G
1 0 1 0 0 1 6 1 5 H G
14
3 4 2 0
V G
85
12
8 4
0 . 4
3
0
1 0 1 0 0 1 6 1 5 H G
G U
G A
A/U
W
3 U 0 1 9 6 1 3
3 U 0 2 1 3 1 1
G U 1 0 G
B S 1 0 G
603 48 4.0
0
12
00
3”x2”
G U
G A
A/U
W
3 U 0 1 9 6 1 3
3 U 0 2 1 3 1 1
G U 5 0 G
B S 5 0 G
N
3 U 0 1 9 6 1 3
” 2
W P
2 7 0
1 6 1 5 H G
” 2
C
3 U 0 2 1 3 1 1
” 2
W P
4 2 1
1 6 1 5 H G
60
12
8 4
0 . 4
0
3
1 0 1 0 0 1 6 1 5 H G
14
5 4 2 0
V G
85
12
8 4
0 . 4
3
0
1 0 1 0 0 1 6 1 5 H G
GATE HOUSE
MOBILE LABORATORY
W
CONTRACTOR
BY VENDOR
NOTES 3,4,11,12
A/U
G02SB AG 113120U3
316910U3
2”
LO GV-0019
GH5161-150-PW-2”-113120U3-C
GH516100101
14
W
853 48 4.0
0
12
HOLD 17
CONTRACTOR
BY VENDOR
NOTES 3,4,11,12
A/U
G02UG UG 316910U3
G02SB AG 113120U3
GENERAL NOTES
- FOR ABBREVIATIONS, SYMBOLS AND GENERAL NOTES, REFER TO LEGEND SHEETS 1-CF0000-04-PID-0001-01 TO 0016-01.
- ALL EQUIPMENT, PIPING COMPONENT AND INSTRUMENT TAG NUMBERS IN THIS DRAWING ARE PREFIXED BY FIELD CODE (GH). AREA CODE (51) AND SUB AREA CODE (61) UNLESS SPECIFIED OTHERWISE.
- AN ABBREVIATED DRAWING NUMBER IS SHOWN ON THE OFF.DRAWING CONNECTOR. FOR COMPANY DRAWING NUMBER “1-” IS PREFIXED AND “04-PID-” ADDED BEFORE THE FINAL 6 CHARACTERS OF THE CONNECTOR TAG. E.G.CF0000-0001-00 BECOMES 1-CF0000-04-PID-0001-00 [COMPANY].
NOTES
DELETED. LOCATED NEAR PRODUCTION CHEMICALS CHEMICAL INJECTION PACKAGE (ME-101) LOCATED NEAR SEAWATER CHEMICALS CHEMICAL INJECTION PACKAGE (ME-103) INDICATION SHALL BE GENERATED IN CONTROL ROOM UPON THE ACTIVATION OF SAFETY SHOWER AND EYEWASH STATION FOR DETAILS REFER TO P&ID LEGEND SHEET 1-CF0000-04-PID-0008-01 FLOW TRANSMITTER SHALL BE PROVIDED BY VENDOR PART OF SAFETY SHOWER FOR REMOTE INDICATION. PIPING TO MINIMISE DEADLEG FROM POTABLE WATER HEADER TO ALL USERS. LOCATED NEAR THE HARBOUR CLOSE TO THE CHEMICAL LOADING AREA. POTABLE WATER NETWORK AT THE DEAD ENDS SHALL BE DRAINED AT REGULAR INTERVAL TO AVOID BACTERIAL GROWTH IN STAGNANT PORTION. TYPICAL DRAIN CONNECTION SHOWN NO. OF CONNECTION TO BE CONFIRMED DURING DETAILED ENGINEERING AS PER LAYOUT. AT FOAM SKID IN SOUTH AREA CLOSE TO AREA GH5126. AT CHEMICAL PRODUCTION PACKAGE IN NORTH AREA GH5120. USED WATER FROM SAFETY SHOWER/EYEWASH STATION IS DRAINED THROUGTH PAVED AREA. OVERHEAD TANK WITH CHILLER PROVIDED WITH SHOWER/EYEWAS, REFER TO P&ID LEGEND SHEET 1-CF0000-04-PID-0008-01 FOR DETAILS.
SEAWATER FUTURE TRAIN GH5170
B2
2” NC
GV-0016
00
GH5161-149-PW-2”-113120U3-N
GH5161-148-PW-2”-316910U3-N
GH5161-022-PW-3”-316910U3-N
85
12
8 4
0 4
.
3
0
AG UG
113120U3 316910U3
A/U
W
14
W G U 5 0 G
G U 2 0 G
00
N
3 U 0 1 9 6 1 3
” 2
W P
4 7 0
1 6 1 5 H G
1 0 1 0 0 1 6 1 5 H G
60
12
8 4
0 4
.
3
0
W
G U 2 0 G
G U 4 0 G
2”
LO GV-0247
14
GH5161-081-PW-2”-113120U3-C
GH516100101
853 48 4.0
0
12
HOLD 17
HOLD 17,18
35429 GH5161-1005-02
N
3 U 0 1 9 6 1 3
” 2
W P
1 4 1
1 6 1 5 H G
” 2
C
3 U 0 2 1 3 1 1
” 2
W P
9 7 0
1 6 1 5 H G
00
60
12
8 4
0 . 4
3
0
14
B2
1 0 1 0 0 1 6 1 5 H G
5 4 2 0
V G
1 0 1 0 0 1 6 1 5 H G
85
12
8 4
0 . 4
3
0
B2
G U
A/U
G A
W
3 U 0 1 9 6 1 3
3 U 0 2 1 3 1 1
G U 5 0 G
B S 5 0 G
00
COMBINED WORKSHOP, CHEMICAL STORE & FIRE STATION
G05UG G01UG
W
60
12
8 4
0 . 4
3
0
1 0 1 0 0 1 6 1 5 H G
7 2 1 0
V G
G U
G A
3 U 0 1 9 6 1 3
3 U 0 2 1 3 1 1
G U 1 0 G
A/U
W
B S 1 0 G
N
3 U 0 1 9 6 1 3
” 2
W P
7 9 0
1 6 1 5 H G
14
” 2
85
12
8 4
0 . 4
3
0
1 0 1 0 0 1 6 1 5 H G
C
3 U 0 2 1 3 1 1
” 2
W P
8 9 0
1 6 1 5 H G
MOBILE WORKSHOP - 3
C
3 U 0 2 1 3 1 1
” 2
W P
5 3 1
1 6 1 5 H G 85
12
N
3 0 0 1 5 7 1 1
” 3
W P
2 3 1
1 6 1 5 H G
8 4
0 . 4
0
3
2”
X X X V G
3 U 0 2 1 3 1 1
3 U 0 1 9 6 1 3
G A
G U
B S 5 0 G
A/U
W
G U 5 0 G
14
N
3 U 0 1 9 6 1 3
” 2
W P
9 2 1
1 6 1 5 H G 60
60
12
8 4
0 . 4
3
0
12
HOLD 17
CONTRACTOR BY VENDOR
HOLD 17,18
W
G U 1 0 G
G U 5 0 G
N
3 U 0 1 9 6 1 3
” 2
W P
1 7 0
1 6 1 5 H G
” 2
C
3 U 0 2 1 3 1 1
” 2
W P
8 7 0
1 6 1 5 H G
1 0 1 0 0 1 6 1 5 H G
14
3 1 0 0
V G
85
12
8 4
0 . 4
3
0
1 0 1 0 0 1 6 1 5 H G
G U
G A
A/U
W
3 U 0 1 9 6 1 3
3 U 0 2 1 3 1 1
G U 1 0 G
B S 1 0 G
WASTE MANAGEMENT SHADE
603 48 4.0
0
12
3”x2”
G U
G A
A/U
W
3 U 0 1 9 6 1 3
3 U 0 2 1 3 1 1
G U 5 0 G
B S 5 0 G
N
3 U 0 1 9 6 1 3
” 2
W P
7 2 1
1 6 1 5 H G
” 2
C
3 U 0 2 1 3 1 1
” 2
W P
5 2 1
1 6 1 5 H G
60
12
8 4
0 . 4
0
3
1 0 1 0 0 1 6 1 5 H G
14
4 1 0 0
V G
85
12
8 4
0 . 4
3
0
1 0 1 0 0 1 6 1 5 H G
8 4
0 . 4
3
0
G U
A/U
G A
W
3 U 0 1 9 6 1 3
3 U 0 2 1 3 1 1
G U 5 0 G
B S 5 0 G
N
3 U 0 1 9 6 1 3
” 2
W P
8 2 1
1 6 1 5 H G
” 2
C
3 U 0 2 1 3 1 1
” 2
W P
6 2 1
1 6 1 5 H G
1 0 1 0 0 1 6 1 5 H G
60
12
8 4
0 . 4
3
0
14
5 1 0 0
V G
1 0 1 0 0 1 6 1 5 H G
85
12
8 4
0 4
.
3
0
MOBILE WORKSHOP - 1
MOBILE WORKSHOP - 2
. )
C O N D A ( Y N A P M O C L O L A N O T A N
I
I
I
I
B A H D U B A F O T N E S N O C N E T T R W R O R P E H T T U O H T W E D A M E B O T S
I
I
I
I
T N E M U C O D S H T F O E S U R E H T O R O E R U S O L C S D O N
I
.
I
E C N E D F N O C N
I
D L E H E B O T S
I
I
N O T A M R O F N
I
I
S H T
.
I
Y R A T E R P O R P S
I
I
H C H W N O T A M R O F N
I
I
I
S N A T N O C D N A )
C O N D A ( Y N A P M O C L O L A N O T A N
I
I
I
B A H D U B A F O Y T R E P O R P E H T S
I
T N E M U C O D S H T
I
NOTES 4,6,11,12
W
64
. DELETED.
B2
CONTRACTOR
BY VENDOR
NOTES 3,4,11,12
17
18
. PACKAGE SCOPE OF SUPPLY, NUMBER OF NOZZLES AND RELEVANT LOCATION, SIZE, RATING, ISOLATION AND UTILITIES PROVISION ARE HOLD. . PACKAGE CONTROL SYSTEM WITH RELEVANT NUMBER OF SIGNALS IS HOLD.
HOLDS
G02UG UG 316910U3
A/U
G02SB AG 113120U3
853 48 4.0
0
12
2”
LO GV-0021
14
W
A/U
G02SB AG
G02UG UG 316910U3
113120U3
14
2”
LO GV-0022
853 48 4.0
0
12
W
G02UG UG 316910U3
A/U
G02SB AG 113120U3
2”
LO GV-0023
14
853 48 4.0
0
12
GH5161-155-PW-2”-113120U3-C
GH516100101
HOLD 17
CONTRACTOR
BY VENDOR
NOTES 3,4,11,12
GH5161-153-PW-2”-113120U3-C
GH516100101
HOLD 17
B2
B1
A1
25-02-25
10-09-24
22-12-23
REV.
DATE.
CONTRACTOR
BY VENDOR
NOTES 3,4,11,12
DRAWN:
ISSUED FOR COMPANY APPROVAL (IFA)
ISSUED FOR COMPANY APPROVAL (IFA)
ISSUED FOR COMPANY REVIEW (IFR)
DESCRIPTION
CHECKED:
AF
AF
AF
MR
MR
MR
PS
PS
PS
CC
CC
CC
PRPD
CHKD
APPRD1 APPRD2
SCALE:
NTS
GH5161-151-PW-2”-113120U3-C
GH516100101
HOLD 17
ABU DHABI
NATIONAL OIL COMPANY
PROJECT TITLE
HAIL AND GHASHA DEVELOPMENT PROJECT PACKAGE 1 - OFFSHORE FACILITIES
DRAWING TITLE
PIPING & INSTRUMENT DIAGRAM OFFSHORE UNIT 61 -(GOP) CHANANIZ ISL. POTABLE WATER DISTRIBUTION
DOC. CLASS:
2B
COMPANY JOB NO: 4700021770 CONTRACTOR JOB NO: 67-00106
COMPANY DRAWING NO. 1-GH5161-04-PID-1005-01 CONTRACTOR DRAWING NO. GH5161-1062509
REVISION B2 SHEET SIZE A1
09-10G02UGUGGH5161-154-PW-2”-316910U3-NGH5161-156-PW-2”-316910U3-NGH5161-152-PW-2”-316910U3-N(SHT. 01 OF 02)
PLANT NORTH
35429 GH5161-1005-01
GH5161-022-PW-3”-316910U3-N
GH5161-1006-01 264 PW
C
3 U 0 2 1 3 1 1
” 3
W P
0 0 1
1 6 1 5 H G 85
1 0 1 0 0 1 6 1 5 H G
12
8 4
0 4
.
3
0
GV-3703 3/4”
1 0
8 D
O L
L / B
U A
/
W
B S 4 0 G
G U 4 0 G
3 U 0 2 1 3 1 1
3 U 0 1 9 6 1 3
G A
G U
12
14
1 0 1 0 0 1 6 1 5 H G 60
8 4
0 4
.
3
0
GH5161-015-PW-3”-316910U3-N
N
3 U 0 1 9 6 1 3
” 2
W P
3 7 0
1 6 1 5 H G
1 0 1 0 0 1 6 1 5 H G
N
3 U 0 1 9 6 1 3
” 3
W P
0 7 0
1 6 1 5 H G
1 0 1 0 0 1 6 1 5 H G
60
12
8 4
0 . 4
3
0
B2
GH5161-159-PW-2”-316910U3-N
W
UG 316910U3
A/U
AG 113120U3
G06UG
G06SB 2”
LO GV-0028
14
853 48 4.0
0
12
CONTRACTOR
BY VENDOR
NOTES 3,4,11,12
GH5161-158-PW-2”-113120U3-C
GH516100101
HOLD 17
HOLD 17,18
GENERAL NOTES
- FOR ABBREVIATIONS, SYMBOLS AND GENERAL NOTES, REFER TO LEGEND SHEETS 1-CF0000-04-PID-0001-01 TO 0016-01.
- ALL EQUIPMENT, PIPING COMPONENT AND INSTRUMENT TAG NUMBERS IN THIS DRAWING ARE PREFIXED BY FIELD CODE (GH). AREA CODE (51) AND SUB AREA CODE (61) UNLESS SPECIFIED OTHERWISE.
- AN ABBREVIATED DRAWING NUMBER IS SHOWN ON THE OFF.DRAWING CONNECTOR. FOR COMPANY DRAWING NUMBER “1-” IS PREFIXED AND “04-PID-” ADDED BEFORE THE FINAL 6 CHARACTERS OF THE CONNECTOR TAG. E.G.CF0000-0001-00 BECOMES 1-CF0000-04-PID-0001-00 [COMPANY].
NOTES
DELETED. LOCATED NEAR PRODUCTION CHEMICALS CHEMICAL INJECTION PACKAGE (ME-101) LOCATED NEAR SEAWATER CHEMICALS CHEMICAL INJECTION PACKAGE (ME-103) INDICATION SHALL BE GENERATED IN CONTROL ROOM UPON THE ACTIVATION OF SAFETY SHOWER AND EYEWASH STATION FOR DETAILS REFER TO P&ID LEGEND SHEET 1-CF0000-04-PID-0008-01 FLOW TRANSMITTER SHALL BE PROVIDED BY VENDOR PART OF SAFETY SHOWER FOR REMOTE INDICATION. PIPING TO MINIMISE DEADLEG FROM POTABLE WATER HEADER TO ALL USERS. LOCATED NEAR THE HARBOUR CLOSE TO THE CHEMICAL LOADING AREA. POTABLE WATER NETWORK AT THE DEAD ENDS SHALL BE DRAINED AT REGULAR INTERVAL TO AVOID BACTERIAL GROWTH IN STAGNANT PORTION. TYPICAL DRAIN CONNECTION SHOWN NO. OF CONNECTION TO BE CONFIRMED DURING DETAILED ENGINEERING AS PER LAYOUT. AT FOAM SKID IN SOUTH AREA CLOSE TO AREA GH5126. AT CHEMICAL PRODUCTION PACKAGE IN NORTH AREA GH5120. USED WATER FROM SAFETY SHOWER/EYEWASH STATION IS DRAINED THROUGTH PAVED AREA. OVERHEAD TANK WITH CHILLER PROVIDED WITH SHOWER/EYEWAS, REFER TO P&ID LEGEND SHEET 1-CF0000-04-PID-0008-01 FOR DETAILS.
CONTRACTOR
BY VENDOR
NOTES 4,10,11,12
W
A/U
UG 316910U3 G09UG
AG 113120U3 G09SB
2”
853 48 4.0
0
12 GH5161-082-PW-2”-113120U3-C
LO GV-0241
14
GH516100101
HOLD 17
HOLD 17,18
603 48 4.0
0
12
GH5161-075-PW-2”-316910U3-N
GH516100101
W
G U 4 0 G
G U 6 0 G
W
G U 6 0 G
G U 5 1 G
G09UG G15UG
W
3”x2”
CONTRACTOR
BY VENDOR
NOTES 2,4,11,12
W
A/U
AG 113120U3 G04SB 2”
UG 316910U3 G04UG
853 48 4.0
0
12
GH5161-080-PW-2”-113120U3-C
LO GV-0246
14
GH516100101
HOLD 17
HOLD 17,18
603 48 4.0
0
12
W
UG G04UG 316910U3
A/U
AG G04SB 113120U3
2”
LO GV-0240
14
W
UG 316910U3 G04UG
A/U
AG
113120U3 G04SB 2”
LO GV-0170
14
GH5161-138-PW-2”-316910U3-N
GH516100101
GH5161-137-PW-2”-316910U3-N
GH516100101
HOLDS
17
18
. PACKAGE SCOPE OF SUPPLY, NUMBER OF NOZZLES AND RELEVANT LOCATION, SIZE, RATING, ISOLATION AND UTILITIES PROVISION ARE HOLD. . PACKAGE CONTROL SYSTEM WITH RELEVANT NUMBER OF SIGNALS IS HOLD.
64
. DELETED.
CONTRACTOR
BY VENDOR
NOTES 2,4,11,12
GH5161-139-PW-2”-113120U3-C
GH516100101
HOLD 17
HOLD 17,18
CONTRACTOR
BY VENDOR
NOTES 2,4,11,12
GH5161-140-PW-2”-113120U3-C
GH516100101
HOLD 17
HOLD 17,18
853 48 4.0
0
12
853 48 4.0
0
12
GH5161-157-PW-2”-316910U3-N
W
G U 2 1 G
G U 3 1 G
FUTURE AREA 40
35450 PW GH5140-1100-02
NOTES 4,9,11,12
BY VENDOR
CONTRACTOR
W
AG
A/U
113120U3 G08SB
UG 316910U3 G08UG
2”
LO GV-0242
14
603 48 4.0
0
12
853 48 4.0
0
12
W
W
W
W
W
G15UG G10UG
G11UG
G20UG
G16UG G13UG
W
G13UG G08UG
GH5161-076-PW-2”-316910U3-N
GH516100101
B2
REV.
DRAWN:
2/20/2025
ISSUED FOR COMPANY APPROVAL (IFA)
AF
MR
PS
CC
DATE.
DESCRIPTION
CHECKED:
PRPD
CHKD
APPRD1 APPRD2
SCALE:
NTS
ABU DHABI
NATIONAL OIL COMPANY
PROJECT TITLE
HAIL AND GHASHA DEVELOPMENT PROJECT PACKAGE 1 - OFFSHORE FACILITIES
DRAWING TITLE
PIPING & INSTRUMENT DIAGRAM OFFSHORE UNIT 61 -(GOP) CHANANIZ ISL. POTABLE WATER DISTRIBUTION
DOC. CLASS:
2B
COMPANY JOB NO: 4700021770 CONTRACTOR JOB NO: 67-00106
COMPANY DRAWING NO. 1-GH5161-04-PID-1005-02 CONTRACTOR DRAWING NO. GH5161-1062509
REVISION B2 SHEET SIZE A1
W
G04UG G05UG
” 2 x ” 3
GH5161-146-PW-2”-316910U3-N
GH5161-144-PW-2”-316910U3-N
G U
G A
A/U
W
3 U 0 1 9 6 1 3
3 U 0 2 1 3 1 1
G U 5 0 G
B S 5 0 G
60
12
8 4
0 . 4
3
0
14
4 4 2 0
V G
85
12
8 4
0 . 4
3
0
1 0 1 0 0 1 6 1 5 H G
” 2
C
3 U 0 2 1 3 1 1
” 2
W P
7 7 0
1 6 1 5 H G
G U
G A
A/U
W
3 U 0 1 9 6 1 3
G U 5 0 G
B S 5 0 G
3 U 0 2 1 3 1 1
14
5 2 0 0
V G
85
12
8 4
0 . 4
3
0
1 0 1 0 0 1 6 1 5 H G
” 2
C
3 U 0 2 1 3 1 1
” 2
W P
5 4 1
1 6 1 5 H G
W
G05UG G07UG
G U
G A
A/U
W
3 U 0 1 9 6 1 3
3 U 0 2 1 3 1 1
G U 7 0 G
B S 7 0 G
14
6 2 0 0
V G
85
12
8 4
0 . 4
3
0
1 0 1 0 0 1 6 1 5 H G
” 2
C
3 U 0 2 1 3 1 1
” 2
W P
7 4 1
1 6 1 5 H G
OPERATOR SHELTER GH5187-OS-001
IES GH5187-IE-502
IES GH5187-IE-501
HOLD 17,18
GH5161-083-PW-2”-113120U3-C
HOLD 17
GH516100101
. )
C O N D A ( Y N A P M O C L O L A N O T A N
I
I
I
I
B A H D U B A F O T N E S N O C N E T T R W R O R P E H T T U O H T W E D A M E B O T S
I
I
I
I
T N E M U C O D S H T F O E S U R E H T O R O E R U S O L C S D O N
I
.
I
E C N E D F N O C N
I
D L E H E B O T S
I
I
N O T A M R O F N
I
I
S H T
.
I
Y R A T E R P O R P S
I
I
H C H W N O T A M R O F N
I
I
I
S N A T N O C D N A )
C O N D A ( Y N A P M O C L O L A N O T A N
I
I
I
B A H D U B A F O Y T R E P O R P E H T S
I
T N E M U C O D S H T
I
25-02-2025