HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2 : SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. 00

ATTACHMENT 2 : ADDITIONAL SAFETY EQUIPMENT FOR OPERATION PHASE

CONTRACTOR shall provide additional Safety equipment to ensure emergency response readiness before the READY FOR START-UP (RFSU).

The current FEED design and documentations will be replaced with the revised updates as the revision will introduce amendments to list of Safety equipment identified in the FEED documents and safety equipment layouts.

CONTRACTOR shall fully incorporate this additional Safety equipment’s into their detailed documentations and address all relevant deliverables impacted by this additional safety equipment list.

The below list is not exhaustive but is an indicative listing of various discipline deliverables that may be revised, (HSE Philosophy, EERA , Emergency response plan, Safety Equipment list, Safety Equipment Data Sheets, HSECES performance, Corrective maintenance programs, Spare Parts Lists and Miscellaneous associated documents).

CONTRACTOR is fully responsible for the delivery of the additional Safety equipment in addition to all other safety equipment during execution of the WORKS.

• The below listed Safety Equipment shall be available in advance before READY FOR START-

UP, as part of START-UP safety readiness and emergency response preparedness.

• CONTRACTOR shall provide to COMPANY the Manufacturer’s Catalogue for final approval of

equipment.

• CONTRACTOR shall prepare a specification data sheet for approval of the COMPANY for the

required safety equipment before issuance of the purchase requisition.

• CONTRACTOR shall prepare schedule plan approved by COMPANY detailing the purchase requisition / purchase order dates, material receiving dates and handover to COMPANY date.

• All attached safety equipment shall be subjected to FAT and SAT by the COMPANY. • All attached safety equipment shall be New with long shelf life dates. • CONTRACTOR shall procure all Safety Equipment from the COMPANY Approved Vender supplier register and handover to COMPANY at Ghasha Offshore Processing Plant three months before the READY FOR START-UP.

• CONTRACTOR shall ensure that all Safety Equipment warranty will not commence before

READY FOR START-UP and be valid for a minimum of 2 years

• CONTRACTOR shall ensure that VENDOR will maintain all Safety Equipment for two years and in case of default condition, VENDOR shall provide replacement till repairing. In addition repairing kits shall be provided by VENDOR for on-site repair.

• CONTRACTOR shall meet the spare parts requirements in accordance with the AGREEMENT

and ANNEXURE 10C section 3.

• CONTRACTOR must ensure that VENDOR shall have service center in Abu Dhabi, and will provide details of after sales services and support in Abu Dhabi such as stock of spare parts, repair facility, technical support and training for plant operators and technician.

• CONTRACTOR shall ensure that required training to COMPANY personnel is included in the

LUMP SUM PRICE.

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

• CONTRACTOR shall be responsible for equipment installation as applicable to the specific type

of Safety equipment, to ensure adequate testing, operating and ready to use condition.

ADDITIONAL REQUIRED FIRE AND SAFETY EQUIPMENTS LIST FOR OFFSHORE OPERATIONS

REMARK

In GOP for GOP and DC

S/N

TYPE

QUAN.

GENERAL SPECIFICATION

1

Self-Contained Breathing Apparatus (30 min SCBA)

• SCBA working sets must comply with

PROJECT Specification.

• SCBA rescue sets must comply with

PROJECT Specification.

• Face mask must comply with PROJECT

Specification.

Cylinder

  • Lightweight carbon composite cylinders designed for charging up to 300 barg.
  • Valve arrangement to prevent excess flow

during accidental knockoff.

  • Automatic switch-over valve from supplied

air to cylinder

  • Separate quick connection

fixed

line

for

filling

  • Shock-proof box with pressure gage

100

inspection window

  • Cylinder protective sleeve

Face Mask

  • Certified Work-place Study Protection Factor of at least 350,000PPM (Suitable for 35% H2S environment.

  • Positive pressure type.

  • Where separate components are in more than one size, the same size units are to be easily identifiable (e.g. through colour coding)

  • Natural field of vision, with anti-fog and

anti-scratch.

  • Must provide clear speech and audibility while using (integrated approach preferred, or demonstration of acceptable clarity).

radio units

  • Designed to support/integrate with other in PPE (e.g. protective helmet) built

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 2 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

communication output and connection for Talky Walky (compatible type).

  • Allow for use of spectacles / prescription

lenses.

  • Compatible with significant facial hair subject to successful qualitative fit testing
  • Panoramic Full Face Mask and Air loop

quick fixed airline connection.

Back-Plate / Harness

  • Ergonomic and fully adjustable for fit and

comfort

  • Material suitable for use in an area where is a possibility of high H2S desert

harsh

and

there concentration environment.

  • Light reflecting strips
  • Design provides protection for hoses
  • Drager or equivalent

•

•

•

EEBAs must comply with PROJECT Specification. Face mask must comply with PROJECT Specification. All equipment should be designed for use in an explosive atmosphere.

Cylinder

  • 3-litre Light weight cylinders carbon composite capable of being charged to 300 barg.

  • Valve arrangement to prevent excess flow

during accidental knockoff.

100

In GOP

  • Bottle supported on the back of operator
  • Separate quick connection

fixed

line

for

filling

2

Emergency Escape Breathing Apparatus EEBD (20 min)

Face Mask

  • Quick donning time
  • High Protection Factor (for H2S 35,000

ppm or higher).

  • EEBA with Hood adjustment mask

type Rapid self-

  • Air loop quick fixed airline connection.
  • Automatic positive pressure activation

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 3 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

  • Allow for use of spectacles / prescription

lenses

  • Natural field of vision, with anti-fog and

anti-scratch

  • Compatible with significant facial hair subject to successful qualitative fit testing/ type. CAMLOCK or equivalent.

3

Hood type Filter masks

200

  • Hood type filter masks
  • Endurance time >60 min at 5000PPM H2S
  • Comply with relevant BS EN standards for

respiratory protective devices Sundstrom / Dragger or equivalent

In CLQ rooms

4

Breathing Air Compressor (for filling B.A. Sets and Cylinders)

1

  • Breathing Air Compressor with 2 different filling capacities consist of, 200 bar & 300 bar.

  • Capability of X 4 Air Banks and a 40 meter high pressure Hose, connections manifold and regulator on the rear side of the compressor.

  • Breathing air purification system with

SECURUS

  • Air

filter and air quality monitoring detectors. technology Gas-sensor integrated with the HMI display detects trace amounts of harmful gases (CO, O2, H2S, and CO2) and automatically shuts off unit, while displaying an alarm.

  • PLC based controller with 7” color HMI

touchscreen display

  • NEMA 4 rated electrical enclosure with

UL® listed control panel

  • Compressor low oil pressure and high

temperature safety shutdowns

  • Emergency stop push button
  • Hinged cascade fill control panel with

Lexan laminate air flow/fill schematic

  • Audible alarm on safety shutdowns Inlet filter maintenance indicator

  • Automatic condensate drain system with non-corrosive condensate reservoir and integrated float sensor and automatic “Full” indication and compressor shutdown

  • Two (2) ASME code stamped air cylinders

installed in an integral

In CCR in GOP

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 4 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

rack designed to hold four cylinders Sound attenuating enclosure with slam- action latches and lift-off type hinges NFPA 1901 2016 edition compliant 3 position containment fill station accommodates SCBA or SCUBA cylinders up to 31” overall length

  • Pressure, air quality, diagnostic data with

information screen.

  • Sapir parts, filters and lubrication oil for 2

years. Bauer Compressor or equivalent.

drive

  • Mobile Berthing Air Compressor in wagon diesel/electrical system
  • Dual incorporating automatic belt tensioning system Two refill port with 2 different filling capacities consist of 200 bar & 300 bar.
  • Breathing air purification system with SECURUS. Gas-sensor technology integrated with the HMI display detects trace amounts of harmful gases (CO, O2, H2S, and CO2) and automatically shuts off unit, while displaying an alarm. Breathing air quality & CO monitoring system with calibration kit

5

Portable Breathing Air Compressor

1

1 for GOP

  • PLC based controller with four line text

display

  • NEMA 4 rated electrical enclosure with

UL® listed control panel

  • Automatic condensate drain system with non-corrosive condensate reservoir and integrated float sensor and automatic “Full” indication and compressor shutdown

  • Four (4) 6000 PSIG ASME code stamped

air cylinders Integral SCBA storage for up to twelve (12) SCBA cylinders

  • NFPA 1901 2016 edition compliant 2 position station accommodates SCBA or SCUBA cylinders up to 31” overall length

containment

fill

  • High gloss powder coat paint for a hard

durable finish

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 5 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

  • Hydraulic surge brakes with breakaway

actuator

  • Four (4) bank dual function cascade

controls with air direction valve

  • Formed structural steel frame
  • Rolled shutter door protection for the panel

and fill station

  • Lunette eye hitch, 2 5/16” ball hitch
  • With 40 meter high pressure Hose,

manifold and regulator. Bauer Compressor or equivalent.

  • Mobile Berthing Air Compressor in wagon diesel/electrical system
  • Dual incorporating automatic belt tensioning system

drive

  • Two refill port with 2 different filling capacities consist of 200 bar & 300 bar.

  • Breathing air purification system with SECURUS.Gas-sensor technology integrated with the HMI display detects trace amounts of harmful gases (CO, O2, H2S, and CO2) and automatically shuts off unit, while displaying an alarm. Breathing air quality & CO monitoring system with calibration kit

  • PLC based controller with four line text

display

  • NEMA 4 rated electrical enclosure with

2

UL® listed control panel

DCs

  • Automatic condensate drain system with non-corrosive condensate reservoir and integrated float sensor and automatic “Full” indication and compressor shutdown

  • Four (4) 6000 PSIG ASME code stamped

air cylinders Integral SCBA storage for up to twelve (12) SCBA cylinders

6

Portable Breathing Air Compressor

  • NFPA 1901 2016 edition compliant 2 station position accommodates SCBA or SCUBA cylinders up to 31” overall length

containment

fill

  • High gloss powder coat paint for a hard

durable finish

  • Hydraulic surge brakes with breakaway

actuator

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 6 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

  • Four (4) bank dual function cascade

controls with air direction valve Formed structural steel frame

  • Rolled shutter door protection for the panel

and fill station

  • Lunette eye hitch, 2 5/16” ball hitch
  • With 40 meter high pressure Hose,

manifold and regulator.

Bauer Compressor or equivalent.

  • Air Pack 4 Composite Cylinder Capacity- 9ltr, Cylinder Pressure-300bar, with 2 quick connection high pressure airlines 2 X 25 Meters.

(for MTC)

4 in GOP

Dräger or equivalent

  • Air Pack 4 Composite Cylinder Capacity- 9ltr, Cylinder Pressure-300bar, with 2 quick connection high pressure airlines 2 X 25 Meters.

Dräger or equivalent

  • With basic emergency equipment, fitted with integrated Breathing Air cascade and manifold system, with connections to driver & 4 passengers

  • Equipped with special seats for passenger

wearing SCBA / EEBA .

  • External H2S Monitor with alarm system and HC Monitor with shutdown system.

IVECO or equivalent

(for MTC) 2 in each DC

OP.

2 in GOP

1 ton Dry powder, with a capacity of 4000ltr water and 2000ltr foam concentrate.

in GOP

For other specification refer to R-CA0000-40- SPE-0036 – Specification for Fire Fighting Vehicle

25 seat bus capacity converted fitted with integrated Breathing Air cascade and manifold system, with connections to driver & sufficient for 25 people for one hour.

  • Equipped with special seats for

passengers wearing SCBA / EEBA. External H2S Monitor with alarm system and HC Monitor with shutdown system.

in GOP

7

8

9

Wheeled Air Loop Trolleys

Wheeled Air Loop Trolleys

Quick intervention Emergency Vehicle (Equipped with Air Loop)

10

Firefighting Truck

11

Emergency Buses (Equipped with Air Loop)

4

18

2

1

2

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 7 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

12

H2S Personal monitor

200

13

Multiple Gas Detectors

10

Portable Multiple Gas Detectors with alarms

Heat stress Monitor

5

2

14

15

16

Noise Monitor/ Dose Meter

1/1

3 years Maximum Operating Life, maintenance free /self-calibration, with 10 calibration dock stations. ATEX - Ex ia IIC T4 Ga IP66/67

In CLQ (100+50 spare)

BW / MSA or equivalent

(HC, O2, H2S, CO, SO2) (5 gases detector) for Gas detection / testing, with pump test dock and AGT training.

  • Audible/visual alarms on activation, sensors, battery, pump and circuitry (continuous)

  • ATEX – CE EX II 1 G Ga Ex ia IIC T4

  • EMI/RFI: Complies with EMC Directive

In GOP

2004/108/EC IP66/67

BW / MSA or equivalent

Portable Multiple Gas Detectors, Rig Rat (HC/O2/H2S/ CO)

In GOP

Heat Stress Index measures how hot it feels when humidity is combined with temperature, air movement, and radiant heat.

In/Out Function displays the WBGT value with or without direct sun exposure.

  • Auto Power Off with override, complete

with two AAA batteries

  • Selectable units of °F and °C, intrinsically safe type. Built-in RS-232 interface with optional Windows® compatible software.

Suitable for measuring noise in the field of industrial, health, safety and environmental monitoring. Intrinsically safe type.

1 for GOP

1 for Islands

  • Automatic range: 30 … 130 dB
  • Manual range: 30 … 80 / 50 … 100 / 80 …

In GOP

130 dB

  • Resolution: 0.1 dB
  • Accuracy: ±1.4 dB
  • Memory capacity: 32700 values

Include software for LEQ calculation, with a logger function.

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 8 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

17

Safety Goggles

150

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

In CLQ

Work Coverall

Long sleeve/cotton /Fire resistant

18

19

20

21

Winter Jackets

Safety shoes

Safety helmets

22

Ear Muffs

23

Ear Plugs (reusable type)

24

Reflected safety vest

25

Safety gloves (pairs)

26

Hand held Megaphone

27

28

Rechargeable Torches

Fire Blanket (1.8m x 1.8m)

300

100

150

150

100

500

200

700

4

50

10

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

For Emergency

Intrinsically safe type

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

3 X P in CLQ

In CLQ

In CLQ

In CLQ

In CLQ

In CLQ

In CLQ

OP/MTC

C/R

2 for GOP

2 for DCs

In GOP

5 GOP

5 in CLQ

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 9 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

29

30

31

32

33

34

35

36

37

Windsock / windsock ring

Fire Hoses (25M Length of 66MM C/W 2.5” BS 336 INST Couplings)

Fire Hoses (25M Length of 38MM C/W 1.5” BS 336 INST Couplings)

Dividing Breeching (from 66mm to 2x38mm)

Jet / Spray Nozzle (Constant Flow, 450LPM)

Low Expansion Foam Nozzles

Foam Trolley (120 liters capacity Mobile Foam Unit with Concentrate)

Suction Non- Collapsible Fire Hose

Portable Firewater/Foa m Monitor

20

10

10

8

10

8

Fluorescent orange colour UV proof type./ Steel Ring Fitted complete with all necessary ropes, swivel hook and ready to use. Suitable for the region.

In GOP

Length-25m and dia-64mm.

Angus / Duraline/ equivalent

Length-25m and dia-38mm.

Angus / Duraline/ equivalent

BS336, ISO 9001:2008 standard. Akron /equivalent

Light weight Turbojet Nozzle with Pistol Grip (Max.475 LPM) Non- metallic. Akron /equivalent

In GOP

Light weight nozzle – non-metallic. Akron /equivalent

4

HI-COMBAT AF120. Angus FIRE/equivalent

2

2

5 Inch with strainers

2000 G/M

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 10 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

38

39

Portable Tractable Pump

Jet Water lancer (for line de-blocking)

40 Medical Stretcher

41

42

43

44

45

46

Rescue Basket for work at height emergency

Safety Harnesses

Complete Firemen’s Equipment Sets

Scale for weighing Extinguishers

Meteo station

Life buoys

47

Life jackets

Electrical rescue kit

48

49

1

3

52

3

50

6

2

1

20

50

2

1000 G/M

6x2 for GOP

2x2x10 for each Island

Safety Harnesses for working at height with Shock-absorbers and double lanyard

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

Specification as per ADNOC Personal Protective Equipment Standard HSE-OS- STE02

Table Top Scale, 30 Kg

In CLQ

In GOP

Life buoys provided with lifeline, self-ignition light and smoke marker to be stored in weather proof cabinet / cover.

As per PROJECT Specification.

Life jacket to be stored in weather proof cabinet

As per PROJECT Specification.

INTENTIONALLY KEPT BLANK

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 11 of 13

50

Amphibious vehicles for operation phase

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

Ambiphious crafts to be used as means of escape to sea from Hail Island

for HLE

2

PAX: 6 people

Hull integrity: enclosed Gas and watertight (Vendor to confirm)

External Colour orange

Steering at sea: Tires propel/Outboard motor

Steering on land: tires

Speed: 39 km/h (land), 5 km/h (water)

Craft shall be fitted with integrated Breathing Air cascade and manifold system, compressed air cylinders, and fire extinguishers

Craft shall be equipped with special seats for passenger wearing SCBA / EEBA

Breathing air capacity and max operating distance to be designed based on EER assessment.

ARGO or equivalent

NOTE – All Equipment type, quantities and Data Sheets must be reviewed and approved by COMPANY prior to Issue the Purchase Orders

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 12 of 13

HAIL AND GHASHA DEVELOPMENT PROJECT

PACKAGE 1 – OFFSHORE FACILITIES

ADNOC Project No PXXX

ATTACHMENT 2: SCOPE OF WORK NARRATIVES ADNOC Doc. No. PK1-03.B.04

Rev. B1

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED, AND MAY BECOME OUTDATED

Page 13 of 13

Project: Q-32855 - Saipem Hail & Ghasha Folder: Reference documents


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further