RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 1 OF 30
ADNOC GAS
Instrumentation & Control System Numbering Procedure
COMPANY Contract No.
4700022871
JV TJN RUWAIS Contract No
215122C
Document Class
Class 1
Document Category (for Class 1)
Category 2
OPERATING CENTER Contract No.
OPERATING CENTER Doc Ref.
1
IFC - Issued for Construction
18-Dec-2024 E. Hostequin
0A
ICR - Issued for Client Review
30-Sep-2024 E. Hostequin
0
ICR - Issued for Client Review
16-May-2024 E. Hostequin
K. Michineau M. Joshi R. Ikeya R. Biju
K. Michineau M. Joshi R. Ikeya R. Biju
K. Michineau M. Joshi R. Ikeya R. Biju
S. Deilles F. Kiyoshi
S. Deilles F. Kiyoshi
S. Deilles F. Kiyoshi
Rev.
Revision Purpose
Date
Prepared by Checked by Approved by
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 2 OF 30
Contents
Page
Table of Contents
2.0
1.0
2.7
INTRODUCTION … 5 1.1 Project Objective and Location … 5 1.2 Scope of the Document … 5 1.3 Holds List … 5 1.4 References … 6 1.5 Definitions and Abbreviations … 6 INSTRUMENTATION NUMBERING … 7 Instrument Loop Tag Numbering … 7 2.1 2.2 Instrument Tag Numbering … 8 2.3 Analyser Tag Numbering … 9 2.4 Electrical Motors / Heaters … 10 2.5 Safety and Control Interlock … 11 Junction Boxes and Local Panels Numbering … 12 2.6 2.6.1 Field Instrument and F&G Junction Boxes … 12 2.6.2 Field Local Control Panels … 12 2.6.3 Valve Remote Panels … 13 Instrument and F&G Cables Numbering … 14 2.7.1 Single Cables … 14 2.7.2 Power Cables … 14 2.7.3 Junction Box Multicore Cables … 15 2.7.4 Local Control Panel Multicore Cables … 15 Interconnecting Cables between Systems … 16 2.7.5 2.7.6 Drum Identification … 17 2.8 Numbering of Cabinets within Buildings and Equipment Rooms … 18 2.9 Numbering of Other Control & Instrument Equipment within Buildings and Equipment Rooms … 19 2.10 Numbering of Analyser Shelters and Field Enclosures … 20 2.11 Miscellaneous Instrumentation Equipment Identification … 21 2.11.1 Instrument Air Distributors … 21 2.11.2 Junction Box Frame … 21 2.11.3 Air Volume Tank … 21 2.11.4 Sample Connection … 22 3.0 FIRE AND GAS DEVICE TAGGING RULES … 23 3.1 Fire and Gas Device Loop Numbering System … 23 3.2 Fire and Gas Device Tag Numbering System … 23 4.0 ATTACHMENTS … 24 4.1 Attachment 1 – Instrumentation Identification Letters based on ISA 5.1 … 24 4.2 Attachment 2 - Fire & Gas Loop and Device Types … 27 4.3 Attachment 3 - System Types … 28
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 3 OF 30
4.4 Attachment 4 - Signal Types … 28 4.5 Attachment 5 - Instrument Cabinet Types … 29 4.6 Attachment 6 – Other Control & Instrument Equipment Types [HOLD 6] … 29 4.7 Attachment 7 – Assignment rules for serial numbering … 30
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 4 OF 30
Table of Changes compared to previous revision
Paragraph
Modification description
Remarks / Origin
1.4
Reference [4] changed : “Fire and Gas Design Basis” (RLNG-000-HS-DWG-0201) replaced by “Fire and Gas Detection Drawing – Key Plan” (RLNG-000-HS-BOD-0201)
Fire Detection Zones are shown on F&G Detection Drawings.
1.4 & 2.7.6
Specification for Instrumentation and Telecommunication Cables split in two:
• Specification for Instrumentation Cables; • Specification for Telecommunication
Cables.
2.1 & 2.2
Note 1 related to instrumentation connected to F&G system is removed.
Units for Fire Fighting and Fire Gas System instrumentation are 083, 183 or 283.
2.4
Addition of suffixes for HSK selector:
Heater typical
• • •
“L” for Local; “O” for Off; “R” for Remote.
2.5
2.8
2.9
4.1 – Attachment 1
4.6 – Attachment 6
Addition of “KS” for functional identification of DCS or Package sequences.
Addition of a note for numbering of cabinets permanently bolted together and forming a section.
Clarification for numbering of some equipment not related to a specific system. FG replaced by FI. DV added for Deluge Valves. M loop code also used for motors
Addition of missing equipment: LPE, LPF, IRP
Alignment with P&IDs
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 5 OF 30
1.0
INTRODUCTION
1.1
Project Objective and Location
The ADNOC Ruwais LNG Project is a two train, near net-zero electrically driven LNG facility, targeting international markets. The feed gas for the project is supplied from the Habshan Gas Processing Plant via a new export gas pipeline. The plant will have two 4.8 MTPA (nominal capacity) electric driven LNG Trains with associated LNG storage/marine export facilities and utilities.
Figure 1 – Project Context
The ADNOC Ruwais LNG Project foresees the following main components at the facility:
• Onshore LNG Liquefaction facilities for 2 x 4.8 MTPA electrically driven LNG Trains (9.6MTPA
total)
• Common facilities including inlet receiving facilities, LNG storage, BOG handling, flare,
refrigerant storage and support buildings.
• Utilities to support the facilities including import power from the national grid.
• Marine facilities for LNG export and bunkering.
1.2
Scope of the Document
The purpose of this procedure is to provide the principles of identification and numbering of instrumentation and control system items.
This procedure is also applicable to package suppliers and to all other contractors on the Ruwais LNG Project.
1.3
Holds List
HOLD DESCRIPTION
1
2
3
4
5
HOLD cleared
HOLD cleared
HOLD cleared
HOLD cleared
Sampling connection types
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 6 OF 30
HOLD DESCRIPTION
6
7
8
List of equipment will be updated based on selected control systems.
HOLD cleared
HOLD cleared
1.4
References
Equipment and Component Numbering Procedure Geographical Work Breakdown Structures
[1] RLNG-000-PM-PP-2003 [2] RLNG-000-PM-PP-3107 [3] RLNG-000-HS-DWG-0001 Overall Fire Zone Drawing [4] RLNG-000-HS-DWG-0201 [5] RLNG-000-TE-PP-0001 [6] RLNG-000-IC-SP-0741 [7] RLNG-000-TE-SP-0020
Fire and Gas Detection Drawing – Key Plan Telecommunication Numbering Procedure Specification for Instrument Cables Specification for Telecommunication Cables
1.5
Definitions and Abbreviations
COMPANY
CONTRACTOR
EPC ADOC POC YOC CCB DCS ESD FACP F&G FGS FO ICSS IES MMS SIS UCP
ABU DHABI NATIONAL OIL COMPANY (ADNOC) P.J.S.C. TJN Ruwais, Joint Venture of Technip Energies France-Abu Dhabi, JGC Corporation and National Marines Dredging Company (NMDC) Engineering Procurement Construction Abu Dhabi Operating Center - National Marines Dredging Company Paris Operating Center - Technip Energies Yokohama Operating Center - JGC Corporation Central Control Building Distributed Control System Emergency Shutdown Fire Alarm Control Panel Fire and Gas Fire and Gas System Fiber Optic Integrated Control & Safety System Instrument Equipment Shelter Machine Monitoring System Safety Instrumented System Unit Control Panel
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 7 OF 30
2.0
2.1
INSTRUMENTATION NUMBERING
Loop Tag Numbering
The instrument loops shall be identified as follows:
UUU-X-NNNN
Where:
Unit number
UUU
Three digits for Unit Code (Refer to [1])
Hyphen separator
Function Identifier
Hyphen separator
X
Sequential Number
NNNN
Hyphen separator
One letter used to indicate measured/initiation Variable (Refer to Attachment 1 – Instrumentation Identification Letters based on ISA 5.1)
Hyphen separator
Four-digit sequential number used to indicate loop number. The loop sequential number shall be unique, for a given process unit, whatever the measured variable (P, L, T, F, A…). Special Range will be assigned to each package (refer to Attachment 7 – Assignment rules for serial numbering).
Example:
111-F-0011
for flow loop in process unit 111 (LNG train 1 - Precooling and Propane Cycle / C3-MR Compressors / MCHE / Liquefaction Air Coolers).
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 8 OF 30
2.2
Instrument Tag Numbering
The instrument tags shall be identified as follows:
UUU-XXXXXX-NNNN(A(A))
Where:
Unit number
UUU
Three digits for Unit Code (Refer to [1])
Hyphen separator
Function Identifier
XXXXXX
Hyphen separator
Sequential Number
NNNN
Letters when necessary
(A(A))
Up to six letters: • First letter indicates the measured/initiation Variable. • Second up to fifth succeeding letters indicate the
Modifier (Refer to Attachment 1 – Instrumentation Identification Letters based on ISA 5.1)
Four-digit sequential number, indicating the loop number. Special Range will be assigned to each package (refer to Attachment 7 – Assignment rules for serial numbering).
Used for instance for redundant equipment. More often, no suffix digit will be used, otherwise one suffix, rarely two suffixes. “R” suffix will be used for remote electronic indicator.
Examples:
111-FE-0011
for flow element in process unit 111 (related loop number will be 111-F-0011).
111-FT-0011A
for flow transmitter in process unit 111 (related loop number will be 111-F-0011), for large range if applicable.
111-FT-0011B
for flow transmitter in process unit 111 (related loop number will be 111-F-0011), for small range if applicable.
111-LI-0053R
for the remote electronic indicator related to 111-LT-0053 level transmitter.
112-LZT-0021A for 1st level transmitter in 2oo3 voting (related to 112-L-0021) in unit 112.
112-LZT-0021B for 2nd level transmitter in 2oo3 voting (related to 112-L-0021) in unit 112.
112-LZT-0021C for 3rd level transmitter in 2oo3 voting (related to 112-L-0021) in unit 112.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 9 OF 30
2.3
Analyser Tag Numbering
The analyser tags shall be identified as follows:
UUU-AXXX-NNNN(X)
Where:
Unit number
UUU
Three digits for Unit Code (Refer to [1])
Hyphen separator
Function Identifier
AXXX
Hyphen separator
Sequential Number
NNNN
Letters when necessary
(X)
Up to four letters starting with A:
- AP: Analyser Probe
- AX: Analyser Sampling System
- AE: Analyser Element (like pH, conductivity, Chlorine sensor probe located in the sampling system)
- AT: Analyser Transmitter
- AI: System Indication/ Measurement
- Refer also to Attachment 1 – Instrumentation Identification Letters based on ISA 5.1
Four-digit sequential number, indicating the loop number. (refer to Attachment 7 – Assignment rules for serial numbering) Special letter will be assigned for Analyser Sampling System with:
X = A for Sample Pre-Conditioning System X = B for Sample Conditioning System
Examples:
112-AP-0171
for Analyser Probe of 112-AT-0171
112-AX-0171B
for Sample Conditioning System of 112-AT-0171
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 10 OF 30
2.4
Electrical Motors / Heaters
As for instrumentation devices, tags for electrical users are also identified by their loop and function. For all motors and heaters, the loop code (function identifier) is the letter “M”.
The identification of motor/heater instrumentation signals could not follow the equipment name identification. An instrumentation sequential number, different of equipment identification, is assigned to electrical users.
The function identifiers used for electrical motors/heaters, composed of two or three characters, are listed below:
Loop Identifier M M M M M M M M M M M M M M M M M M
Function Identifier
Description
Suffix
HS HS HS HS HS HSK HSM SC XZS XL XL XL II JI SI XL XL XA
Remote Start pushbutton Remote Stop pushbutton Local Start pushbutton Local Stop pushbutton Local Emergency button Local/Off/Remote selection Main/Stand-by selection Speed control set point Trip command Running status Available status Local/Remote Status Current indication Power indication Speed indication Off position Test position MCC Common Alarm
A B C D E L / O / R
A B C
D E
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 11 OF 30
2.5
Safety and Control Interlock
SIS / FGS / UCP Safety Interlocks and DCS / UCP control interlock shall be numbered as follows:
UUU-FF-NNN(A)
Where:
Unit number
UUU
Three digits for Unit Code (Refer to [1])
Hyphen separator
Functional Identification
Hyphen separator
FF
Sequential Number
NNN
Two-letter for Functional identification as follows : • UZ = SIS, Package and F&G safeguarding logic block. • US = DCS or Package control interlock • KS = DCS or Package sequence
Three-digit sequential numbering. Number “001” to be reserved for unit shutdown (ESD-2 level). Special Range will be assigned to each package.
Letters when necessary
Example:
(A)
For example, for redundant equipment
111-UZ-001
for the general shutdown of Process unit 111.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 12 OF 30
2.6
Junction Boxes and Local Panels Numbering
All junction boxes and local control panels shall be clearly identified by means of unique numbers.
2.6.1 Field Instrument and F&G Junction Boxes
The Junction Boxes shall be identified as follows:
AAA-JXYZ-NNN
Where:
AAA
Three characters for Area Code (WBS) (Refer to [2]).
J
X
Y
Z
NNN
Example:
Hyphen separator
“J” to indicate Junction box One-letter code used to indicate the System type code (Refer to Attachment 3 - System Types). One-letter code used to indicate the Signal type code (Refer to Attachment 4 - Signal Types).
“I” for I.S. signals, “N” otherwise
Hyphen separator Three digits used to identify the JB sequence number (from 001 to 999 with 501 to 999 range assigned to Packages).
A11-JEAI-015
for a SIS junction box in A11 area with IS analog signals.
2.6.2 Field Local Control Panels
The field local control panels shall be identified as follows:
AAA-LPX-NNN
Where:
AAA
Three characters for Area Code (WBS) (Refer to [2]).
LP
X
NNN
Example:
Hyphen separator
“LP” to indicate Local Control Panel One-letter code used to indicate the Instrument System type code (Refer to Attachment 3 - System Types). Hyphen separator
Three digits used to identify the Local Control Panel sequence number. Special Range will be assigned to each package (from 001 to 999 with 501 to 999 range assigned to Packages).
A11-LPU-002
for a Package local control panel located in A11 area.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 13 OF 30
2.6.3 Valve Remote Panels
A Valve Remote panel shall be numbered in the same way as the appropriate instrument Tag number and by adding letter “-VRP” in suffix.
Example:
013-ESDV-0004-VRP Valve remote panel of the 013-ESDV-0004.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 14 OF 30
2.7
Instrument and F&G Cables Numbering
2.7.1 Single Cables
The Instrument / F&G field single cables shall be identified in the same way as the appropriate instrument Tag number, without hyphen separators.
Examples:
051PDT0184
Instrument single pair cable running to a junction box (or directly to a Marshalling Cabinet) from differential pressure transmitter 051-PDT-0184.
020TT0362
Instrument single pair cable running to a junction box (or directly to a Marshalling Cabinet) from temperature transmitter 020-TT-0362.
2.7.2 Power Cables
2.7.2.1 Instrument Power Cables
For instruments with a single power feeder cable, the cable shall be numbered in the same way as the appropriate instrument Tag number, without hyphen separators, and by adding letter “P” in suffix.
Example:
042FT0024P
Power cable supplying flowmeter 042-FT-0024.
2.7.2.2 Other Power Cables
Power cables supplying cabinets shall be identified as follows:
BB(B)NN(A)-AQ-NNN-PX
Where:
BB(B)NN(A) Building tag without hyphen (refer to [1])
A
Q
Hyphen separator
One-letter code used to indicate the Instrument System type code (Refer to Attachment 3 - System Types). One-letter code used to indicate cabinet type (Refer to Attachment 5 - Instrument Cabinet Types).
Hyphen separator
NNN
Three-digit number used to identify the Equipment sequence number
Hyphen separator
PX =
• P1 for power cable from UPS A (45’) • P2 for power cable from UPS B (45’) • P3 for power cable from UPS A (8h) • P4 for power cable from UPS A (8h) • PN for power cable from normal power supply
PX
Examples:
OB01-DS-001-P1
for UPS A (45’) power supply cable to DCS system cabinet in CCB.
SS11C-UU-001-PN
for normal power supply cable to a UCP cabinet located in e-house SS11C.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 15 OF 30
2.7.3
Junction Box Multicore Cables
Tag of a junction box multi-core cable shall be the tag of the junction box with “J” replaced with “C”:
AAA-CXYZ-NNN(-S)
Where:
AAA
C
X
Y Z
NNN (-S)
Example:
Three characters for Area Code (Refer to [2]) Hyphen separator “C” to indicate Cable One-letter code used to indicate the Instrument System type code (Refer to Attachment 3 - System Types). One-letter code used to indicate the Signal type (Refer to). “I” for I.S. signals, “N” otherwise Hyphen separator Three digits same as the JB sequence number Tag suffix code. Empty or Hyphen and 1 character
A11-CEAI-015
Intrinsically safe multicore cable from the SIS junction box A11-JEAI-015
2.7.4 Local Control Panel Multicore Cables
The instrument local control panels shall be identified as follows:
AAA-CPX-NNN(-SS)
Where:
AAA
Three characters for Area Code (Refer to [2])
CP
X
Hyphen separator
“CP” to indicate Local Control Panel Cable One-letter code used to indicate the Instrument System type code (Refer to Attachment 3 - System Types) Same code as for the local control panel.
Hyphen separator
NNN
Three digits used to identify the Local Control Panel sequence number
(-SS)
Multicore cable suffix. Empty or up to 2 numbers to identify the different multicore cables connected to the same local control panel.
Example:
A12-CPU-002-1 First multicore cable connected to A12-LPU-002 local panel.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 16 OF 30
2.7.5
Interconnecting Cables between Systems
Cables between cabinets shall be identified as follows:
CY-BB(B)NN(A)AQNNN-BB(B)NN(A)AQNNN-NN(-SS)
Where:
C
Y
Letter “C” for Cable cable
One-letter code used to indicate the Signal type (Refer to Attachment 4
- Signal Types).
Hyphen separator
BB(B)NN(A)AQNNN
1st cabinet tag number (without hyphens) – Refer to 2.8
Hyphen separator
BB(B)NN(A)AQNNN
2nd cabinet tag number (without hyphens) – Refer to 2.8
NN
(-SS)
Example:
Hyphen separator
Two digits sequential numbers
Multicore cable suffix. Empty or up to 2 numbers for the identification of similar type of cables used in parallel or in series. To be used in particular to discriminate redundant lines A and B.
CF-OB01DS001-OB01ES002-02
for a FO cable between a DCS system cabinet in CCB and a SIS system cabinet in CCB
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 17 OF 30
2.7.6 Drum Identification
Cable drums shall be identified as follows:
SPNN-Cable_Code-NNN
Where:
SPNN
Sub-contractor work package (construction woks). SPNN = • SP03 : LNG Trains • SP04 : LNG Storage Area (excluding LNG Tanks), BOG Compression
& Jetty Topsides
• SP08 : Utilities (Common, Flare, Fire Water and Inlet Facilities) • SP05 : Process Buildings (SS, IES, CCB, JCB) • SP09 : Industrial & Non industrial Buildings • SP07 : LNG Tanks • SP10 : Marine facilities (excluding Jetty Topsides)
Hyphen separator
Cable_Code Cable Code (Refer to [6] and [7])
Hyphen separator
NNN
Three-digit sequence number from 001 to 999
Examples:
SP03-B20P1.5ISWB-003
Drum of 20P-1.5mm2-XLPE-PVC-SWA-PVC (IS) signal cable (fire resistant and buried cable) for LNG Train area.
SP05-J24W-001
Drum of 24-CORE, SWA-PVC Fiber Optic cable (fire resistant and armoured) for installation in CCB.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 18 OF 30
2.8
Numbering of Cabinets within Buildings and Equipment Rooms
Cabinets within CCB, Jetty Control Building, Instrument Equipment Shelters (IES), e-houses… shall be identified as follows:
BB(B)NN(A)-AQ-NNN
Where:
BB(B)NN(A) Building tag without hyphen (refer to [1])
A
Q
Hyphen separator
One-letter code used to indicate the Instrument System type code (Refer to Attachment 3 - System Types). One-letter code used to indicate cabinet type (Refer to Attachment 5 - Instrument Cabinet Types).
Hyphen separator
NNN
Three-digit number used to identify the Equipment sequence number Note: Even if several cabinets are permanently bolted together to form a section, each cabinet shall
have its own tag.
Examples:
OB01-DS-001
for a DCS system cabinet in CCB.
SS11C-UU-001
for a Propane compressor UCP cabinet located in Train 1 Propane Compressor LV E-House.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 19 OF 30
2.9
Numbering of Other Control & Instrument Equipment within Buildings and Equipment Rooms
Equipment (workstations, HMIs…) within CCB, Jetty Control Building, Instrument Equipment Shelters (IES), e-houses… shall be identified as follows:
BB(B)NN(A)-AQQQ-NN(S)
Where:
BB(B)NN(A) Building tag without hyphen (refer to [1])
(A)
QQQ
NN (S)
Hyphen separator One-letter code used to indicate the Instrument System type code (Refer to Attachment 3 - System Types). Empty for some equipment (IRP, FPP…) Three-letter code used to indicate Equipment type (Refer to Attachment 6 – Other Control & Instrument Equipment Types [HOLD 6]). Hyphen separator Two-digit number used to identify the Equipment sequence number Equipment Suffix Code. Empty or 1 character.
Examples:
OB01-DEWS-01
for a DCS engineering workstation in CCB.
OB01-FLPX-01
for a F&G matrix panel in CCB.
SS11C-CEWS-01 for the Propane compressor engineering workstation in Train 1 Propane Compressor
LV E-House.
SS14-IRP-01
for an Interposing Relay Panel in substation SS-14.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 20 OF 30
2.10 Numbering of Analyser Shelters and Field Enclosures
Analyser Shelters shall be identified according to the “Equipment and Component Numbering Procedure” (RLNG-000-PM-PP-2003):
AS-NN
Where:
AS
NN
AS is for Analyser Shelter Hyphen separator Two-digit number used to identify the shelter sequence number
Analyser Field Enclosures shall be identified as follows:
UUU-AC-NN
Where:
UUU
AC
NN
Examples:
Three digits for Unit Code (Refer to [1]) Hyphen separator AC for Analyser Field Enclosure Hyphen separator Two-digit number used to identify the Equipment sequence number
AS-11
for Analyser Shelter in Liquefaction Train 1
A21-AC-01
for Analyser Field Enclosure in Train 2.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 21 OF 30
2.11 Miscellaneous Instrumentation Equipment Identification
2.11.1 Instrument Air Distributors
The instrument air distributors shall be identified as follows:
AAA-IAD-NN
Where:
AAA
Three characters for Area Code (WBS) (Refer to [2]) Hyphen separator
IAD
Three letters used to indicate Instrument Air Distributor
NN
Hyphen separator Two-digit number used to indicate Instrument Air Distributor number. NNN is a sequential number starting at 01
Example:
A14-IAD-01
Air distributor in A14 area.
2.11.2 Junction Box Frame
The Junction box frame shall be identified as follows:
AAA-JBF-NN
Where:
AAA
JBF
NN
Example:
Three characters for Area Code (WBS) (Refer to [2]) Hyphen separator
Three letters used to indicate Junction Box Frame
Hyphen separator Two-digit number used to indicate Instrument Air Distributor number. NNN is a sequential number starting at 01
A12-JBF-01
Junction box frame in A12 area.
2.11.3 Air Volume Tank
The Air volume tank shall be numbered in the same way as the appropriate instrument Tag number and by adding letter “-AVT” in suffix.
Example:
011-BDV-0023-AVT
Air volume tank of the 011-BDV-0023.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 22 OF 30
2.11.4 Sample Connection
The sample connection assemblies shall be identified as follows:
UUU-SPXXY-NNN
Where:
UUU
Three digits for Unit Code (Refer to [1])
Hyphen separator
Two letters “SP” to indicate Sample Connection / Point assembly
Two digits and one letter to identify sampling connection type [HOLD 5]. Starting from 01A. Hyphen separator Three digits number used to indicate Sample assembly number. Unique sequential number starting at 001
SP
XXY
NNN
Example:
111-SP05A-001 for Sample connection type 05A in Process unit 111.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF. RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 23 OF 30
3.0
3.1
FIRE AND GAS DEVICE TAGGING RULES
Fire and Gas Device Loop Numbering System
The Fire and Gas device loops (groups of flame/gas/heat/smoke detectors, MAC, beacons, sounders etc.) shall be identified as follows:
FFFF-Q-NNNN
Where:
FFFF
Q
NNNN
Four characters for Fire Detection Zone, refer to [3] and [4] Hyphen separator “Q” letter code used to identify all Fire and Gas loops. Hyphen separator Four-digit number used to indicate loop number
Example:
02GA-Q-0178
for a Fire and Gas loop in fire detection zone FZ-02-G-A (propane vaporizer equipment in propane liquefaction area, liquefaction train 1).
3.2
Fire and Gas Device Tag Numbering System
Fire and gas devices shall be identified as follows:
FFFF-QXXXXX-NNNN
Where:
FFFF
Q
XXXXX
NNNN
Examples:
Four characters for Fire Detection Zone, refer to [3] and [4] Hyphen separator “Q” letter to identify a F&G device Two up to five-letter code used to indicate the device type (Refer to Attachment 2
- Fire & Gas Loop and Device Types). Hyphen separator Four-digit number used to indicate loop number
02AA-QGDC-0223 for a Catalytic Hydrogen gas detector in fire detection zone FZ-02-A-A in LNG train 1.
03AA-QGDC-0223 for a Catalytic Hydrogen gas detector in fire detection zone FZ-03-A-A in LNG train 2.
04BA-QFDIR-0698 for a Triple IR Flame detector in fire detection zone FZ-04-B-A in LNG tanks area.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF.
CONTRACTOR DOC. REF.
RLNG-000-IC-PP-0001
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 24 OF 30
4.0
4.1
Loop Code
A
B
C
D
E
F
G
H
I
J
K
L
ATTACHMENTS
Attachment 1 – Instrumentation Identification Letters based on ISA 5.1
Description
Physical Tag
Soft Tag
Loop Description
Element
Switch
Gauge
Transmitter (1)
Valve
Indication
Control
Switch Point High
Switch Point Low
Alarm / Trip High
Alarm / Trip Low
Analysis
AE, AP
Analysis (Safety)
AZE, AP
Blowdown Valve
HS, ZSC, ZSO
Corrosion, Erosion
Density / Deluge
CE
DE
Emergency Shutdown Valve
ZSC, ZSO
AT
AZT
ZT
CT
DT
ZT
Flow
FE
FS
FI
FT
Totalised Flow
Flow (Safety)
Unclassified
Hand
Current
Power
Time, Schedule
FZE
FZS
HS
FZT
IT
JT
Level
LS
LG
LT
BDV, BDYV (for solenoid)
DV ESDV, ESDYV (for solenoid), ESDY (for positioner) FV, FYV (for solenoid), FY (for positioner)
HV
LV, LYV (for solenoid), LY (for positioner)
AIC
AI
AZI
ZI
CI
DI
ZLO
ZLC
AAH
AZHH
AAL
AZLL
CAH
DAH
DAL
Output
AY
ZI, ESZY
ZLO
ZLC
ZI
FI
FIC
FAH
FAL
FY
FQI
FZI
HI
II
JI
FZSHH
FZSLL
FZHH
FZLL
JIC
IAH
JAH
IAL
JAL
LI
LIC
LSH
LSL
LAH
LAL
LY
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF.
CONTRACTOR DOC. REF.
RLNG-000-IC-PP-0001
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 25 OF 30
Description
Physical Tag
Soft Tag
Loop Code
Loop Description
Element
Switch
Gauge
Level (Safety)
Motor Operated Valve or Motor (refer to 2.4) Unclassified
Unclassified
LZS
ZSC, ZSO
Transmitter (1)
LZT
ZT
Pressure
PSE
PS
PG
PT
Differential Pressure
PDS
PDG
PDT
PZS
PDZS
Pressure (Safety)
Differential Pressure (Safety) Quantity, Fire & Gas Restriction, Remote Operated Valve (2) Speed, Frequency
Speed (Safety)
RO
SE
SZE
Shutdown Valve
ZSC, ZSO
PZT
PDZT
ST
SZT
ZT
M
N
O
P
Q
R
S
Valve
Indication
Control
Switch Point High
Switch Point Low
Alarm / Trip High
Alarm / Trip Low
Output
LZI
ZI
LZSHH
LZSLL
LZHH
LZLL
MVIC
ZLO
ZLC
PI
PIC
PSH
PSL
PAH
PAL
PY
PDI
PDIC
PDSH
PDSL
PDAH
PDAL
PDY
PZI
PDZI
SI
SZI
ZI
TI
PZSHH
PZSLL
PZHH
PZLL
PDZSHH
PDZSLL
PDZHH
PDZLL
SIC
SAH
SZHH
SAL
SZLL
ZLO
ZLC
SY
ZI
TIC
TSH
TSL
TAH
TAL
TY
MOV
PCV, PV, PYV (for solenoid), PY (for positioner) PDV, PDYV (for solenoid) , PDY (for positioner) PSV
ROV
SDV,, SDYV (for solenoid), SDY (for positioner) TCV, TV, TYV (for solenoid),
T
Temperature
TE TW
TS
TG
TT
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF.
CONTRACTOR DOC. REF.
RLNG-000-IC-PP-0001
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 26 OF 30
Description
Physical Tag
Soft Tag
Loop Code
Loop Description
Element
Switch
Gauge
Transmitter (1)
Valve
Indication
Control
Switch Point High
Switch Point Low
Alarm / Trip High
Alarm / Trip Low
Output
Differential Temperature Temperature (Safety) Multivariable Vibration, Mechanical Analysis Vibration, Mechanical Analysis (Safety) Weight, Force, Torque
Weight (Safety)
TZE TW
VE
VZE
TZS
US
VS
VZS
TZT
VT
VZT
On / Off (Valves)
XS, ZSC, ZSO
ZT
Lamp
XL
Intersystem Event, State, Presence Position, Dimension
XS, XZS
ZSO, ZSC
ZT
U
V
W
X
Y
Z
(1)
xI with “R” suffix in tag for remote local indicator separate from transmitter.
(2)
ROV is a Pipeline terminology for an actuated on/off valve.
TY (for positioner)
XV, XYV (for solenoid)
TDI
TZI
UI
VI
VZI
ZI
ZI
TDIC
UIC
TDAH
TZSHH
TZSLL
TZHH
VSH
VSL
UA
VAH
TDAL
TZLL
TDY
VAL
VY
VZHH
VZLL
ZLO
ZLC
ZLO
ZLC
Table 1 - Instrument Types
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF.
RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
4.2
Attachment 2 - Fire & Gas Loop and Device Types
Loop code
Device Type
Description
REVISION: 1
PAGE 27 OF 30
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
QGDC
QGDIR
QGDBT / QGDBR
Hydrogen gas detector – Catalytic bead type
Hydrocarbon gas detector - IR point type
Hydrocarbon Gas detector Open Path / Line of Sight type – Transmitter / Receiver
QGDA
Acoustic gas detector (ultrasonic leak detector)
QGDLO
Low Oxygen Gas Detector
QFDIR
QFDUI
QFDVI
Triple IR Flame detector
UV/IR Flame detector
Video Image Flame Detector (VIFD)
QFDHR
Heat Detector - Rate Of Rise (ROR)
QFDH
QFDLH
QFDOS
QFDBT / QFDBR
QFDHS
QLDRT
QLDFO
QMAC
QFBA
QGBA
QHA
Heat Detector - Fixed
Linear Heat Detector (LHD)
Smoke Detector - Optical Point
Smoke Detector – Open Path / Line of Sight type (LOS) – Transmitter / Receiver
High Sensitivity Smoke Detection (HSSD)
Low Temperature Detector (RTD) for cold spill detection
Fiber Optic Linear Heat Detector / Low Temperature Detector (FO-LHD) for cold spill detection
Manual Alarm Call Point
Fire Beacon (Red)
Gas Beacon (Blue)
F&G Sounder
Table 2 - Fire & Gas Loop and Device Types
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF.
RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
4.3
Attachment 3 - System Types
REVISION: 1
PAGE 28 OF 30
Code
A
C
D
E
F
H
I
M
O
P
U
X
Name AMADAS – Analyzer Management and Data Acquisition System PGC – Process Gas Chromatography
Compressor Control System
DCS – Distribution Control System
SIS – Safety Instrumented System
Fire & Gas Detection System
HVAC – Heating, Ventilation and Air Conditioning
IAMS - Instrument Asset Management System
Machine Monitoring System
OTS – Operating Training System
Power
Package PLC
Miscellaneous Equipment / System
Table 3 - Instrumentation - System Types
4.4
Attachment 4 - Signal Types
Code A C D E F P T R S V X Z
Description Analogue signals Combined (Analogue and Digital signals) Digital signals Ethernet network Fibre Optical Network signals Power Supply (240Vac) Temperature mV signals Temperature RTD signals Serial Communication Signals Voltage vibration signals 24Vdc output signals Safety Network Communication
Table 4 - Instrumentation - Signal Types
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF.
RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
4.5
Attachment 5 - Instrument Cabinet Types
REVISION: 1
PAGE 29 OF 30
Code F N M P S U V X
Description FO Patch Cabinet Network Cabinet Marshalling Cabinet Power Distribution Cabinet System Cabinet UCP/PLC Cabinet Server Cabinet Miscellaneous Cabinet
Table 5 - Instrumentation – Cabinet Types
4.6
Attachment 6 – Other Control & Instrument Equipment Types [HOLD 6]
Code EWS FPP LPE LPF LSD NTS IRP OWS PRN SER
Description Engineering Workstation Fiber Optic Patch Panel SIS Matrix Panel F&G Matrix Panel Large Screen Display Network Time Server Interposing Relay Panel Operator Workstation Printers Servers
Table 6 - Instrumentation – Other Control & Instrument Equipment Types
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Instrumentation & Control System Numbering Procedure
COMPANY DOCUMENT REF.
RLNG-000-IC-PP-0001
CONTRACTOR DOC. REF.
215122C-000-JSD-1500-0001
REVISION: 1
PAGE 30 OF 30
4.7
Attachment 7 – Assignment rules for serial numbering
General principle for sequential numbering of field instruments:
From 0001 1001 2001 3001 4001 5001 6001 7001 8001 9001
To 0999 1999 2999 3999 4999 5999 6999 7999 8999 9999
Assigned to Common Equipment A* Equipment B* Equipment C* Spare Package - Common Package – Equipment A* or 1st main Equipment* Package – Equipment B* or 2nd main Equipment* Package – Equipment C* or 3rd main Equipment* Package - Spare
If there are identical equipment in a process unit, instrument tag numbers associated with these equipment shall have same tag number except for the first digit that will be sequential. For example, air pressure transmitters at Air Compressor A (042-K-001A) outlet and Air Compressor B (042-K- 001B) outlet will be respectively tagged 042-PT-1002 and 042-PT-2002
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
Project: Q-32859 - NMDC - Ruwais Folder: RFQ Files