Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 32859 NMDC Ruwais

❯

RFQ Files

❯

RLNG 000 PM PP 2003_0D

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 1 OF 38

ADNOC GAS

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY Contract No.

4700022871

JV TJN RUWAIS Contract No

215122C

Document Class

Class 1

Document Category (for Class 1)

Category 2

OPERATING CENTER Contract No.

OPERATING CENTER Doc Ref.

0D

0C

0B

0A

0

ICR – Issued for Client Review

06-Feb-25 C. Thai, G. Rao

B. Schott

S. Deilles

ICR – Issued for Client Review

14-Nov-24 C. Thai, G. Rao

B. Schott

S. Deilles

ICR – Issued for Client Review

17-Jun-24

B. Schott

A de Vandière S. Deilles

ICR – Issued for Client Review

30-Apr-24

B. Schott

A de Vandière S. Deilles

ICR – Issued for Client Review

04-Apr-24

B. Schott

S. Deilles C. Louanchi

Rev.

Revision Purpose

Date

Prepared by

Checked by

Approved by

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 2 OF 38

Table of Contents

Contents

Page

1.0 INTRODUCTION … 4 1.1 Scope of the Document … 4 1.2 Holds List … 4 1.3 References … 5 1.4 Definitions and Abbreviations … 5 2.0 EQUIPMENT NUMBERING … 6 2.1 Main Equipment … 6 2.2 Auxiliary Equipment … 7 3.0 ELECTRICAL EQUIPMENT NUMBERING … 8 3.1 Electrical Equipment In buildings … 8 3.2 Electrical Equipment In field … 8 3.2.1 Motor Equipment’s … 9 3.2.2 Lighting & small power … 9 3.3 Electrical Cables … 10 3.4 Cathodic protection … 11 3.5 Cable Trays / Trenches and Earth Pit … 12 INSTRUMENTATION NUMBERING … 13 4.0 5.0 FIRE AND GAS TAGGING RULES … 15 6.0 TELECOMMUNICATION AND SECURITY NUMBERING … 17 7.0 PROCESS & PIPING LINE NUMBERING … 20 8.0 PIPING CLASSES … 20 9.0 PIPING SPECIALTIES AND MANUAL VALVE … 21 9.1 PIPING SPECIALTIES … 21 9.2 MANUAL VALVE … 21 9.3 EQUIPMENT NOZZLE… 22 9.4 Utility Station … 22 10.0 TECHNICAL BUILDINGS, INDUSTRIAL AND NON-INDUSTRIAL BUILDINGS … 23 11.0 INSULATION … 23 12.0 HVAC EQUIPMENT IDENTIFICATION … 24 13.0 CIVIL ASSET NUMBERING … 25 14.0 MARINE … 27 15.0 FIRE FIGHTING AND SAFETY EQUIPMENT NUMBERING … 29 16.0 Attachments … 30 16.1 Attachment 1 - Unit Numbering … 30 16.2 Attachment 2 - Service - Fluid Codes … 32 16.3 Attachment 3 - Equipment Code identification … 33 16.4 Attachment 4 - Electrical Equipment Type Code … 34 16.5 Attachment 5 - Electrical - Voltage Code … 35 16.6 Attachment 6 - Piping Specialty … 36 16.7 Attachment 7 - HVAC - EQUIPMENT TYPE PREFIX … 37 16.8 Attachment 8 - HVAC - EQUIPMENT TYPE MODIFIER … 37 16.9 Attachment 9 – Manual Valve Type Code … 38

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 3 OF 38

Table of Changes compared to previous revision (for Procedures and Job Specifications only)

Paragraph

Modification description

Remarks / Origin

2.2

3.1

3.5

5.0

9.2

9.4

12

16.1

16.2

16.3

16.7

16.8

16.9

Section updated with Example

Description in table updated

Section added

Section updated Example

Section updated

Section added

Description in Section updated

Unit Desc Updated

Description in table updated

Table updated

Table updated

Table updated

Table updated

13, 14

Cross references updated

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 4 OF 38

1.0

INTRODUCTION

The ADNOC Ruwais LNG Project is a two train, near net-zero electrically driven LNG facility, targeting international markets. The feed gas for the project is supplied from the Habshan Gas Processing Plant via a new export gas pipeline. The plant will have two 4.8 MTPA (nominal capacity) electric driven LNG Trains with associated LNG storage/marine export facilities and utilities.

Figure 1 – Project Context

The ADNOC Ruwais LNG Project foresees the following main components at the facility:

• Onshore LNG Liquefaction facilities for 2 x 4.8 MTPA electrically driven LNG Trains (9.6MTPA

total)

• Common facilities including inlet receiving facilities, LNG storage, BOG handling, flare,

refrigerant storage and support buildings.

• Utilities to support the facilities including import power from the national grid.

• Marine facilities for LNG export and bunkering.

1.1

Scope of the Document

This document aims to establish a unified tagging system for the Ruwais LNG plant including jetty.

1.2

Holds List

HOLD

DESCRIPTION

1

2

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 5 OF 38

1.3

References

[1] TE-PR-064 Procedure of Tagging Of Assets [2] RLNG-000-IC-PP-0001 (215122C-000-JSD-1500-0001) I&C System numbering procedure [3] RLNG-000-TE-PP-0001 (215122C-000-JSD-1530-0001) Telecommunication numbering

procedure

[4] RLNG-000-PI-RP-1021 (FEED ref: 359665-0809-070-SP-1300-001 / CTR ref: 215122C-000-

JSD-1300-1021) Specification for Piping Material Service Classes Index

[5] RLNG-000-PI-RP-1022 (FEED ref: 359665-0809-070-SP-1300-002 / CTR ref: 215122C-000-

JSD-1300-1022) Specification for Piping Material Classes

[6] RLNG-000-IL-SP-0001 (FEED ref: 359665-0809-070-SP-9999-011 / CTR ref: 215122C-000-

JSD-2200-0001) Specification for Thermal and Acoustic Insulation

[7] RLNG-000-IL-SP-0002 (CTR ref: 215122C-000-JSD-2250-0001) Specification for PFP/CSP

Material for Piping and Equipment

[8] RLNG-000-PM-PP-3107 (215122C-000-PP-3107) Geographical Work breakdown Structure [9] RLNG-000-PM-NM-0001 (215122C-000-NM-0001) Equipment List [10] RNLG-000-CV-NM-0001 (215122C-000-NM-2000-0001) Buildings List [11] RLNG-000-HS-DWG-0001 Overall Fire Zone Drawing [12] RLNG-000-HS-BOD-0201 Fire and Gas Design Basis

1.4

Definitions and Abbreviations

COMPANY

CONTRACTOR

EPC ADOC POC YOC

ABU DHABI NATIONAL OIL COMPANY (ADNOC) P.J.S.C. TJN Ruwais, Joint Venture of Technip Energies France-Abu Dhabi, JGC Corporation and National Marines Dredging Company (NMDC) Engineering Procurement Construction Abu Dhabi Operating center - National Marines Dredging Company Paris Operating Center - Technip Energies Yokohama Operating center - JGC Corporation

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 6 OF 38

2.0

EQUIPMENT NUMBERING

2.1

Main Equipment

The Process Equipment Numbering shall be:

Unit number Hyphen separator Equip. code identification Hyphen separator

UUU

X(X)

Sequential Number

NNN

Suffix Code

(A)

Refer to Attachment 1 - Unit Numbering

Refer to Attachment 3 - Equipment Code identification

3 digits. Wherever necessary, the sequential numbering can be adapted to ease the readability. For instance, in the liquefaction unit:

  • Feed Gas Path - Sequential number in “000”
  • MR Path - Sequential number in “100”
  • Propane Path - Sequential number in “200” A, B, C, D, …etc.

Example:

111-E-005 Main Cryogenic heat exchanger, in unit 111

111-V-101 HP MR Separator, vessel from Unit 111

111-K-101 LP MR Compressor, from Unit 111

111-E-105 LP MR Compressor Aftercooler, from Unit 111

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 7 OF 38

2.2

Auxiliary Equipment

The auxiliary numbering will apply only to the equipment that are, on PIDs, within a rectangle identified as “by VENDOR”. The main equipment is numbered as “Process Equipment”. The other equipment, in the rectangle and supplied by the Vendor, will have an “Auxiliary Numbering”. The Auxiliaries of Process Equipment Numbering shall be:

Full Parent Tag Hyphen separator Equip. code identification Sequential Number

UUU-X(X)-NNN(A)

Refer to 2.1 - Main Equipment

X(X)(X)

MM

Refer to Attachment 3 - Equipment Code identification 2 digits

For instance, for the compressors:

111-K-101

LP MR Compressor (parent tag)

111-K-101-Z05

LP MR Compressor Lube Oil Skid

111-K-101-E02

LP MR Compressor Lube Oil Cooler

111-K-101-Z03

LP MR Compressor Dry Gas Seal System

One application for instance: Cooler bays and fans/fan motors

111-E-105 (former 11K-31-E1) LP MR Compressor Aftercooler

Induced Draft Air Cooler 1

  • Bay 111-E-105-B09

    for 09th Bay

  • Fan 111-E-105-B09-FA2 for 2nd Fan in Bay 09

  • Fan 111-E-105-B09-FAM2 for 2nd Fan motor in Bay 09

Compressor Lube oil Cooler

060-K-001A-E01 Compressor Lube oil Cooler 1

060-K-001A-E01-FA01 Compressor Lube oil Cooler 1 Fan 1

060-K-001A-E01-FAM01 Compressor Lube oil Cooler 1 Fan 1 Motor

All equipment tags are listed in: [9] - RLNG-000-PM-NM-0001 (215122C-000-NM-0001) Equipment List

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 8 OF 38

3.0

ELECTRICAL EQUIPMENT NUMBERING

3.1

Electrical Equipment In buildings

The numbering shall be:

Building Tag

BB(B)NN(A)

Hyphen separator

Electrical Equipment Code

Hyphen separator

Voltage Code

Hyphen separator Sequential Number Letters when necessary (e.g redundant equipment)

Examples:

YYYY

Z

NNN

(A)

Building tag without hyphen, Refer to section 10.0 TECHNICAL BUILDINGS, INDUSTRIAL AND NON- INDUSTRIAL BUILDINGS.

Refer to Attachment 4 - Electrical Equipment Type Code

The voltage code refers to the voltage of the higher rated electrical equipment. Refer to Attachment 5 - Electrical - Voltage Code.

3 digits

  • SS11A-ASD-C-001

Adjustable Speed Drive in E-house SS-11A

  • SS11B-SWG-C-001

13.8kV switchgear in E-house SS-11B

  • SS11C-MCC-F-001

Motor Control Center (690/415 LV Switchgear) in E-house SS-11C

3.2

Electrical Equipment In field

The numbering shall be:

Unit number

Hyphen separator

Electrical Equipment Code

Hyphen separator Sequential Number Letters when necessary (e.g redundant equipment)

Examples:

UUU

Refer to Attachment 1 - Unit Numbering

YYYY

NNN

(A)

Refer to Attachment 4 - Electrical Equipment Type Code

3 digits

111-LP-001 First lighting panel in unit 111

111-WO-007 Seventh Welding Outlet in unit 111

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 9 OF 38

3.2.1 Motor Equipment’s

Main Equipment tag in Field

Hyphen separator

Electrical Equipment Code

Sequential Number

Letters when necessary (e.g redundant equipment)

Examples:

UUU-X(X)- NNN(A)

Refer to 2.1 - Main Equipment where XX = PM for Pump motor from Attachment 3 - Equipment Code identification

YYYY

(NN)

Refer to Attachment 4 - Electrical Equipment Type Code 2 digits - optional where there is more than one auxiliary equipment

(A)

Alphabet

120-PM-101A-LCS

Control station for motor 120-PM-101A

120-PM-101A-JB

Power JB for motor 120-PM-101A

120-PM-101A-SH01

First Space heater for motor 120-PM-101A

120-PM-101A-SH02 Second Space heater for motor 120-PM-101A

3.2.2 Lighting & small power

Main Electrical Equipment tag in Field Hyphen separator Circuit Number Hyphen separator

UUU-YYYY- NNN(A)

MM

Refer to 3.2 Electrical Equipment In field

2 digits, Sequential

Electrical Equipment Code

Sequential Number

YYYY

NN

Refer to Attachment 4 - Electrical Equipment Type Code 2 digits

Examples:

120-LDB-001-02-LF03 Lighting fixtures from lighting distribution board 120-LDB-001 (3rd light from 2nd circuit)

120-LDB-001-02-JB03 lighting panel 120-LDB-001)

Intermediate Lighting junction box (3rd light JB from 2nd circuit of

120-SDB-001-05-SO04 Socket Outlet from small power distribution board 120-SDB-001 (4th socket outlet from 5th circuit)

120-SDB-001-05-JB04 4th socket outlet JB from 5th circuit of small power distribution board 120-SDB-001

120-SDB-001-03-MJB02 2nd Junction box 3 phases from 3rd circuit of small power distribution board 120-SDB-001

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 10 OF 38

3.3

Electrical Cables

Main Electrical Equipment tag in Field

UUU-YYYY- NNN(A)

Refer to 3.2 Electrical Equipment In field

or (depending on the case)

In building Hyphen separator Cable Service Code Sequential Number

Phase Identification Nb

BB(B)-NN(A)- YYYY-Z-NNN(A)

Refer to 3.1 Electrical Equipment In buildings

X NN

(ZZ)

One letter from table below 2 digits

(L1, L2, L3 for single core cables)

Where X stands for:

Cable Service Code Description

P

C

A

F

E

Power

Control

Analogue Measurement (CT, RTD, …)

Fibre Optic

Earthing cable

Note: Cable identification refers to end user equipment.

Examples:

  • Power cable: 120-PM-001A-P01

  • Control cable: 120-PM-001A-C01

  • Single core cable 1st phase: SST1-TR-C-001A-P01L1

  • Single core cable 2nd phase: SST1-TR-C-001A-P01L2

  • Single core cable 3rd phase: SST1-TR-C-001A-P01L3

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 11 OF 38

3.4

Cathodic protection

Main Electrical Equipment tag in Field

UUU-YYYY- NNN(A)

Refer to 3.2 Electrical Equipment In field

Where YYYY = TRU for Transformer Rectifier Unit

or (depending on the case)

In building

Hyphen separator Cathodic Electrical Equipment Code Sequential Number

BB(B)-NN(A)- YYYY-Z-NNN(A)

Refer to 3.1 Electrical Equipment In buildings

YY(Y)

NNN

2 to 3 characters, refer to the table below

3 digits, Sequential Number

YY(Y) stands for: Cathodic Electrical Equipment Code

CODE

DESCRIPTION

AJB

Anode Junction Box

AN

CA

NJB

PC

PJB

RE

SP

Anode

Cathodic protection

Negative Junction Box

Polarization Coupon

Positive Junction Box

Reference Electrode

Surge Protector

TRU

Transformer Rectifier Unit

TS

Test Station

Cables will be tagged as per section 3.3 Electrical Cables.

Example: Parent tag shall either be a :

  • Transformer Rectifier Unit (TRU) or

  • Test Station

In the case of: Transformer Rectifier Unit (TRU) : for instance 112-TRU-001

  • For Anode JB:

112-TRU-001-AJB003

  • For Negative JB:

112-TRU-001-NJB03

  • For Positive JB:

112-TRU-001-PJB03

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 12 OF 38

3.5

Cable Trays / Trenches and Earth Pit

Cable Trays / Trenches:

WBS Hyphen separator

Discipline indicator Routing Type indicator

Type of Signal Cable

Hyphen separator Sequential Number

AAA

D V

(Y)

NNN

D - Discipline Indicator:

I: ICST

E: Electrical

V - Routing Type indicator:

U: Under Ground Routing

A: Above Ground Routing

Three Character WBS area code

Discipline indicator (I- ICST, E- Electrical) Routing Type (AG or UG routing) Refer below list Y (optional, applicable for ICST routing): type of signals, Refer below list

3 digit

Y - Type of Signal: Y (applicable for ICST routing): type of signals cable

L: LV

F: FO

I: IS

N: NIS

P: PAGA

Example:

C00-EA-001 Electrical cable tray above ground

C13-IAF-001 Instrument Cable tray above ground for FOC

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 13 OF 38

Earth Pit:

Unit number Hyphen separator Earth Pit type indicator Hyphen separator

Sequential Number Deep well indicator

AAA

XXX

NNN (D)

Three-digits for Unit Code

Earth Pit type indicator Refer Below

3 digit Deep well indicator, one character

Earth Pit type indicator values

EEP - Electrical Earth Pit

IEP – Instrumentation Earth Pit

LEP – Lightning Earth Pit

Example:

111-EEP-001 Earth Pit in LNG Liquefaction unit

4.0

INSTRUMENTATION NUMBERING

This numbering is developed in a dedicated procedure - refer to [2] RLNG-000-IC-PP-0001 (215122C- 000-JSD-1500-0001) I&C System numbering procedure. Below is summary from the document. Full details to be referred from RLNG-000-IC-PP-0001 (215122C-000-JSD-1500-0001) I&C System numbering procedure.

Loop Tag Numbering

Unit number Hyphen separator

Function Identifier

Hyphen separator

UUU

X

Sequential Number

NNNN

Three-digits for Unit Code

One letter used to indicate measured/initiation Variable (Refer to Attachment 1 – Instrumentation Identification Letters based on ISA 5.1

Four-digit sequential number used to indicate loop number. The loop sequential number shall be unique, for a given process unit, whatever the measured variable (P, L, T, F, A…).

111-F-0011 for flow loop in process unit 111(LNG train 1 - Precooling and Propane Cycle / C3-MR Compressors / MCHE / Liquefaction Air Coolers).

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 14 OF 38

Instrument Tag Numbering

Unit number Hyphen separator

UUU

Three-digits for Unit Code

Up to Six-digits.

Function Identifier

XXXXXX

First letter indicates the measured/initiation Variable.

Hyphen separator Sequential Number

NNNN

Letters when necessary

(A(A))

Second up to fifth succeeding letters indicate the Modifier

Four-digit sequential number, indicating the loop number. Used for instance for redundant equipment. More often, no suffix digit will be used, otherwise one suffix, rarely two suffixes. “R” suffix will be used for remote electronic indicator.

Examples:

111-FE-0011

for flow element in process unit 111 (related loop number will be 111-F-0011).

111-FT-0011A for flow transmitter in process unit 111 (related loop number will be 111-F-0011), for large range if applicable

Safety and Control Interlock

SIS / FGS / UCP Safety Interlocks and DCS / UCP control interlock shall be numbered as follows:

Unit number Hyphen separator

Function Identifier

Hyphen separator

UUU

FF

Three-digits for Unit Code

Two-letter for Functional identification as follows : UZ = SIS, Package and F&G safeguarding logic block. US = DCS or Package control interlock KS = DCS or Package sequence

Sequential Number

NNN

Letters when necessary

(A)

Three-digit sequential numbering. Number “001” to be reserved for unit shutdown (ESD-2 level). e.g redundant equipment

Example:

111-UZ-001

for 1st Safety Interlock related to Process unit 111

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 15 OF 38

5.0

FIRE AND GAS TAGGING RULES

This numbering is developed in a dedicated procedure. - refer to [2] RLNG-000-IC-PP-0001 (215122C- 000-JSD-1500-0001) I&C System numbering procedure. Below is summary from the document. Full details to be referred from RLNG-000-IC-PP-0001 (215122C-000-JSD-1500-0001) I&C System numbering procedure.

Fire and Gas Device Loop Numbering System

The Fire and Gas device loops (groups of flame/gas/heat/smoke detectors, MAC, beacons, sounders etc.) shall be identified as follows:

Fire Zone Hyphen separator Function Identifier Hyphen separator Sequential Number

Example:

FFFF

Q

NNNN

Four characters for Fire Detection Zone

“Q” letter to identify a F&G loop

Four-digit sequential number, indicating the loop number.

02GA-Q-0178 for a Fire and Gas loop in fire detection zone FZ-02-G-A (propane vaporizer equipment in propane liquefaction area, liquefaction train 1).

Fire and Gas Device Tag Numbering System

Fire and gas devices shall be identified as follows:

Fire Zone Hyphen separator Function Identifier Modifier indicate the device type Hyphen separator Sequential Number

Examples:

FFFF

Q

Four characters for Fire Zone

“Q” letter to identify a F&G device

XXXXX

Two up to five-letter code used to indicate the device type

NNNN

Four-digit sequential number, indicating the loop number.

02AA-QGDC-0223 for a Catalytic Hydrogen gas detector in fire detection zone FZ-02-A-A in LNG train 1.

03AA-QGDC-0223 for a Catalytic Hydrogen gas detector in fire detection zone FZ-03-A-A in LNG train 2.

04BA-QFDIR-0698 for a Triple IR Flame detector in fire detection zone FZ-04-B-A in LNG tanks area.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 16 OF 38

Instrument and F&G Cables Numbering

Single Cables

The Instrument / F&G field single cables shall be identified in the same way as the appropriate instrument

Tag number, without hyphen separators.

Examples:

051PDT0184 Instrument single pair cable running to a junction box (or directly to a Marshalling

Cabinet) from differential pressure transmitter 051-PDT-0184.

020TT0362

Instrument single pair cable running to a junction box (or directly to a Marshalling Cabinet) from temperature transmitter 020-TT-0362.

Power Cables

Instrument Power Cables

For instruments with a single power feeder cable, the cable shall be numbered in the same way as the

appropriate instrument Tag number, without hyphen separators, and by adding letter “P” in suffix.

Example:

042FT0024P Power cable supplying flowmeter 042-FT-0024.

Other Power Cables

Power cables supplying cabinets shall be identified as follows:

BB(B)NN(A Hyphen separator

BB(B)NN(A

Building tag without hyphen

A

Q

Hyphen separator

Sequential Number

FF

NNN

Power Cable Source Type indicator

PX

Examples:

One-letter code used to indicate the Instrument System type code One-letter code used to indicate cabinet type

Three-digit number used to identify the Equipment sequence number

PX = • P1 for power cable from UPS A (45’) • P2 for power cable from UPS B (45’) • P3 for power cable from UPS A (8h) • P4 for power cable from UPS A (8h) • PN for power cable from normal power supply

OB01-DS-001-P1 for UPS A (45’) power supply cable to DCS system cabinet in CCB.

SS11C-UU-001-PN for normal power supply cable to a UCP cabinet located in e-house SS11C.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 17 OF 38

Sample Connection

The sample connection assemblies shall be identified as follows

Unit number Hyphen separator

Function Identifier

sampling connection type Hyphen separator

Sequential Number

Example:

UUU

SP

XXY

NNN

Three-digits for Unit Code

Two letters “SP” to indicate Sample Connection / Point assembly Two digits and one letter to identify sampling connection type. Starting from 01A

Three digits number used to indicate Sample assembly number. Unique sequential number starting at 001

111-SP05A-001 for Sample connection type 05A in Process unit 111.

6.0

TELECOMMUNICATION AND SECURITY NUMBERING

[13] This numbering is developed in a dedicated procedure - refer to [3] - RLNG-000-TE-PP-0001

(215122C-000-JSD-1530-0001) Telecommunication numbering procedure

Field Device/Enclosure Numbering

Field device and enclosure numbering shall be identified as follows:

Area Code

Hyphen separator

System/Sub System

Equipment Hyphen separator

AAA

XXXX

YYYY

Sequential Number

NNNN

Letter when necessary

(W)

Examples:

Three characters for Area Code (WBS): Refer to reference document RLNG-000-PM-PP-3107 “Geographical Work Breakdown Structure” [3] – Paragraph 3.1 ATTACHMENT 1: List of Geographical Work Breakdown System codes Hyphen separator 3 or 4 letters used to indicate Telecom System or Telecom Sub System 3 or 4 letters used to indicate the equipment Type Hyphen separator Four-digit sequential number used to indicate equipment sequential number Used for instance for redundant equipment: e.g. to differentiate PAGA System A equipment from PAGA System B equipment

A11-PCTVCAM-0002

for the second Process CCTV camera in A11 area

A11-SCTVCAM-0001

for the first Security CCTV camera in A11 area

A12-PAGASPE-0003A for the third PAGA speaker A in A12 area

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 18 OF 38

Building device and enclosure

Building tag

BBBBB

Hyphen separator

System/Sub System

Equipment Hyphen separator

Sequential Number

XXXX

YYYY

NNNN

Letter when necessary

(W)

Building tag without hyphen - Refer to reference document RLNG-000-CV-NM-0001 Building List Summary – Appendix 1 (Building List) Hyphen separator 3 or 4 letters used to indicate Telecom System or Telecom Sub System 3 or 4 letters used to indicate the equipment Type Hyphen separator Four-digit sequential number used to indicate equipment sequential number Used for instance for redundant equipment: e.g. to differentiate PAGA System A equipment from PAGA System B equipment

Examples:

IES11-PAGACAB-0001A

for the PAGA system A cabinet in IES11.

CCB01-FOCSCAB-0001A for the FOCS A FOPP cabinet in CCB.

CCB01-BLANCSW-0002

for the BLAN core switch in CCB (in LAN cabinet)

TELECOMMUNICATION CABLE NUMBERING Below is Tagging Format of Telecom Cable. For More additional please refer Section 3 of RLNG-000- TE-PP-0001

Equipment Cable Numbering

Cable type

C(C)

• C for Copper signal cable

• P for Power cable

• EC for Ethernet Copper cable

• FO for Optical cable

• K for Composite cable

Hyphen separator

• Hyphen separator

Equipment tag

AAAXXXXYYYYNNNN(W)

Equipment tag without hyphen

BBBBBXXXXYYYYNNNN(W)

Hyphen separator

Hyphen separator

Sequential Number

(ZZ)

Optional: to be used when one telecom equipment is connected to more than one cable of same type

From 1 to 2 digits

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 19 OF 38

Examples:

K-A11PCTVCAM0002

for the composite cable of A11-PCTVCAM-0002 camera

K-A11SCTVCAM0001

 for the composite cable of A11-SCTVCAM-0001 camera

C-A12PAGASPE0003A for the copper cable of A12-PAGASPE-0003A speaker

C-CCB01PACSCRD0001 for the copper signal cable of CCB01-PACSCRD-0001 card reader

Cable between Cabinets/Enclosures

Cable type

C(C)

Hyphen separator

• C for copper signal cable

• P for power cable

• EC for Ethernet Copper cable

• FO for optical cable

• K for composite cable

• Hyphen separator

Cabinet/enclosure tags

BBBBBXXXXYYYYNNNN(W)- BBBBBXXXXYYYYNNNN(W)

From/to cabinet/enclosure tags without hyphen

OR

BBBBBXXXXYYYYNNNN(W)- XXXXYYYYNNNN(W)

Hyphen separator

Sequential Number

(ZZ)

Hyphen separator

Optional when from/to cabinet/enclosure having more than one cables of the same type

From 1 to 2 digits

Note : for cable connected between cabinets located within the same building (BBBBB is not repeated)

Examples:

FO-CCB01FOCSCAB0001A-IES11FOCSCAB0001A

FO-IES11PAGACAB0001A-FOCSCAB0001A

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 20 OF 38

7.0

PROCESS & PIPING LINE NUMBERING

The numbering appearing on P&IDs shall be:

Linesize

linesize

Hyphen separator

in inches. The fractions will be written: 1.5”, or 0.5”, for better readability.

Unit number

UUU

3 digits, Refer to Attachment 1 - Unit Numbering

Hyphen separator

Service / fluid

Hyphen separator

FF

2 characters, Refer to Attachment 2 - Service - Fluid Codes

Sequential number

SSSS

4 digits

Hyphen separator

Pipe class

PPPP(P)

Up to 5 characters, refer to section - Insulation thickness is not part of line tag. PIPING CLASSES.

Hyphen separator

Insulation type

NNN

3 characters

Line Sequence number range for each Operating Center:

Each operating Center will work with in below allocated range,

POC 0001 to 2999

POC - Vendor 3001 to 3999

JGC 5001 to 6999

JGC - Vendor 7001 to 7999

ADOC 8001 to 8999

ADOC - Vendor 9001 to 9599

Example:

20”-111-N2-1511-A206N-AHD - 20” line of Nitrogen

4”-076-PW-6402-F10AN-C - 4” line of Potable Water

Insulation thickness:

Insulation thickness is indicated on the line list.

Insulation thickness is not part of line tag.

8.0

PIPING CLASSES

Piping classes will be as per:

359665-0809-070-SP-1300-002 - Specification for Piping Material Classes - revision 0 as stated in ADR- 002

Should some additional piping classes need to be developed for the Project, if one piping class is created from another “close” one, the new created piping class might have 1 additional character (5 characters instead of 4), to keep traceability / readability to the initial one.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 21 OF 38

9.0

PIPING SPECIALTIES AND MANUAL VALVE

9.1

PIPING SPECIALTIES

They shall be numbered:

Unit Number

Separator

Item Identifier

Separator

Sequence Number

Suffix Code

Example:

UUU

Refer to Attachment 1 - Unit Numbering

XXX

Refer to Attachment 6 - Piping Specialty

NNN

(A)

3 digits

A, B,C,D,…etc.

111-SPS-001 Strainer in unit 111

111-SPH-001 Hose connection in Unit 111

9.2

MANUAL VALVE

Manual Valves shown on P&IDs will be tagged. Instrumentation root valves which are not detailed on PIDs (but shown on typical arrangement only) will not be tagged

Unit Number

Separator

Item Identifier

Separator

UUU

Refer to Attachment 1 - Unit Numbering

XXX

Refer to 16.9Attachment 9 – Manual Valve Type Code

Sequence Number

NNNN

4 digits

Manual Valve Sequence number range for each Operating Center:

Each operating Center will work with in below allocated range, Vendor will be allocated tags by the Contractor

POC 0001 to 2999

POC - Vendor 3001 to 3999

JGC 5001 to 6999

JGC - Vendor 7001 to 7999

ADOC 8001 to 8999

ADOC - Vendor 9001 to 9599

Example:

111-GLV-0001 Globe Valve in unit 111

111-BFV-0001 Butterfly Valve in unit 111

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 22 OF 38

9.3

EQUIPMENT NOZZLE

Process nozzles are tagged as NX

  • N constant

  • with X as a number incremented.

Resulting in N1, N2, N3… N10.

Instrument nozzles are tagged as MYZ

  • with M a letter indicating the parameter measured,

  • Y a number incremented.

  • And Z as optional letters A and B for bound instruments (such as differential pressure or level

transmitters).

Resulting in P1, P2, P3, T1, T2, L1A and L1B, P4A and P4B etc.

Mechanical Nozzles are tagged as MK

  • M is constant

  • K is a number incremented.

X, Y and K increments are independent from each other.

9.4

Utility Station

Unit Number

Separator

Item Identifier

Separator

UUU

Refer to Attachment 1 - Unit Numbering

XX

“US” Code indicating Utility station

Sequence Number

NNN

3 digits

Example:

111-US-001 Utility Station in unit 111

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 23 OF 38

10.0

TECHNICAL BUILDINGS, INDUSTRIAL AND NON-INDUSTRIAL BUILDINGS

Building Type

BB(B)

Two to three characters from the table below

Hyphen separator

Sequential Number

Suffix Code

NN

(A)

Two numerical characters

One letter as necessary

Where BB(B) stands for:

SS

MB

OB

CCB

JCB

AS

IES

Electrical Building: Concrete (stick built) SUBSTATION and E-Houses

Mechanical Building: Compressor Building

Operation Building

Central Control Building (Instrumentation Building)

Jetty Control Building (Instrumentation Building)

Analyzer Shelter (Instrumentation Building)

Instrument Equipment Shelter (Instrumentation Building)

The building tags are as listed in [10] - RNLG-000-CV-NM-0001 (215122C-000-NM-2000-0001) Buildings List.

11.0

INSULATION

The insulation codes will be as per the dedicated specifications:

[6] - RLNG-000-IL-SP-0001 (FEED ref: 359665-0809-070-SP-9999-011 / CTR ref: 215122C-000-JSD- 2200-0001) Specification for Thermal and Acoustic Insulation

[7] - RLNG-000-IL-SP-0002 (CTR ref: 215122C-000-JSD-2250-0001) Specification for PFP/CSP Material for Piping and Equipment.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 24 OF 38

12.0 HVAC EQUIPMENT IDENTIFICATION

HVAC Equipment (Fans, Air Handling Units, filters…) shall be tagged as follow:

Building Tag

BB(B)-NN(A)

Refer to section 10.0 TECHNICAL BUILDINGS, INDUSTRIAL AND NON-INDUSTRIAL BUILDINGS.

Hyphen separator

HVAC Equipment code

L(L)

Equipment type Modifier

(M)(M)

One-to two letter code used to indicate Equipment type or function. Refer to Attachment 7 - HVAC - EQUIPMENT TYPE PREFIX . One-or two letter code used to indicate Equipment type prefix modifier. Se One-letter code used to indicate Equipment type or function. Refer to Attachment 8 - HVAC - EQUIPMENT TYPE MODIFIER.

Hyphen separator Sequential Number

NNN

3 digits

  • Each equipment component of packaged equipment shall have a unique number assigned.

  • HVAC Local Control panels, instrumentation and instrument cables linked to the HVAC shall be tagged as per [2] - RLNG-000-IC-PP-0001 (215122C-000-JSD-1500-0001) I&C System numbering procedure.

  • Electrical Power Distribution Panels, Electrical Components and Electrical Cables linked to the

HVAC shall be tagged as per the electrical tagging.

Limit switch & SOV of Gas and Fire dampers shall be tagged as per Instrument and Fire And Gas Numbering.

  • Strainers or any inline piping element shall be tagged as per Attachment 6 - Piping Specialty.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 25 OF 38

13.0 CIVIL ASSET NUMBERING

The several assets from the Civil are numbered as per the below two tables:

CIVIL ASSETS

CODE

STRUCTURE of TAG

EXAMPLE

Structural (named from an equipment)

STR

(UUU-XX-NNN(A) = Equipment tag)- STR-NNN

111-E-005-STR-001

Structural (not named from an equipment)

STR

AAA-STR-NNN

AAA-PR-NNN

AAA-PS-NNN

A12-STR-002

A11-PR-003

G60-PS-001

Piperack

Pipe sleeper

Foundation for building in concrete

Foundation for building (shelter, or structural building)

PR

PS

FDN

FDN

Foundation for equipment

FDN

Foundation for structural (named from an equipment) Foundation for structural (not named from an equipment)

FDN

FDN

Foundation for piperack

FDN

(BB(B)-NN(A) = Building Tag)-FDN- LMM, Note 1

SS-T1-FDN-A06, Note 1

(BB(B)-NN(A) = Building Tag)-FDN- LMM, Note 1

MB-11-FDN-B12, Note 1

(UUU-XX-NNN(A) = Equipment tag)- FDN-LMM, Note 1

111-E-005-FDN-001, Note 1

(UUU-XX-NNN(A) = Equipment tag)- FDN-LMM, Note 1

111-E-005-FDN-001, Note 1

(AAA-STR-NNN=tag structure)-FDN- LMM, Note 1

A12-STR-002-FDN- C04, Note 1

(AAA-PR-NNN = Pipe rack Tag)-FDN- LMM, Note 1 (AAA-XX-XXX=tag pipe support)-FDN- LMM, Note 1

FDN

A11-PR-003-FDN-A06, Note 1

A12-FDN-007

A12-PSS-007

A12-PSN-007

A12-PPF-007

A12-ETS-007

A12-ITS-007

A12-SH-007

A12-RC-007

Foundation for pipe support Piping Support Structure (critical lines) Piping support (non-critical lines)

Piping pedestal foundation

Electrical Tray Support

Instrumentation Tray Support

Plant Shelter

Road Crossing / Bridge

Platform (named from an equipment)

PSS

AAA -PSS-NNN

PSN

AAA -PSN-NNN

PPF

ETS

AAA -PPF-NNN

AAA -ETS-NNN

ITS

AAA -ITS-NNN

AAA -SH-NNN

AAA -RC-NNN

SH

RC

PF

(UUU-XX-NNN(A) = Equipment tag)-PF- NNN

112-C-005-PF-03

Platform (at grade)

PF

AAA-PF-NNN

Any other asset

YY(Y(Y))

AAA-YYYY-NNN, where YYYY from the table below

A12- PF-007

C34-CULV-004

For WBS Numbering please refer to RLNG-000-PM-PP-3107. WBS are further granularly arrangement with Process Unit. Unit and WBS number. relation is also provided in the Document

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 26 OF 38

Note 1: The 3 characters “LMM” coming after “-FDN” could be

sequential, or

a Letter and 2 numbers, where the letter and numbers represent the grid of the foundation.

In the table above:

UUU-X(X)-NNN(A)

AAA

BB(B)-NN(A)

YY(Y(Y))

Refers to the numbering of Main Equipment, in section 2.1 Area Code, from WBS (Work Breakdown Structure) Procedure, and as preliminary example, Refer to document RLNG-000-PM-PP-3107 “Geographical Work Breakdown Structure” [3] – Paragraph 3.1 ATTACHMENT 1: List of Geographical Work Breakdown System codes Refer to section 10.0 TECHNICAL BUILDINGS, INDUSTRIAL AND NON-INDUSTRIAL BUILDINGS Refer to the table below

CODE YY(Y(Y))

BW

CB

BUND WALL

CATCH BASIN

CULV

CULVERT

CIVIL ASSETS

FC

GT

KB

MH

OD

PL

PT

SU

TP

VP

CO

DB

DH

PB

DT

GT

ST

FENCE

GATE

CURB

MANHOLE

OPEN DITCH

PILE

PIT

SUMP/SUMP BOX

CONCRETE TRENCH FOR PIPING

VALVE PIT/VALVE BOX

CLEAN OUT

DUCT BANK

DRAIN HUB

PULLING BOX

DITCH

GUTTER

SAND TRAP

WMH

WEIR MANHOLE

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 27 OF 38

CODE YY(Y(Y))

CIVIL ASSETS

DV

LS

FB

JB

FH

FM

UD

VD

ICB

OCB

DCB

DF

DF

OB

DIVERTER BOX

DIVERTER BOX – LNG

DIVERTER BOX - FIRST FLUSH BASIN

DITCH WATER CATCH BASIN (JUNCTION BOX)

FIRE WATER HYDRANT

FIRE WATER MONITOR

U-DITCH

V-DITCH

INLET CATCH BASIN

OUTLET CATCH BASIN

WEIR BOX

DRT CATCH BASIN

DRIP FUNNEL

DRIP FUNNEL

14.0 MARINE

The several assets from the Marine are numbered as per the below two tables:

Marine ASSETS

STRUCTURE of TAG

EXAMPLE

Marine Equipment

AAA-YY(Y(Y))-NN

E25-QRH-01

Marine Structures

AAA-YYY-NN

E25-MD-01

Marine Piling

AAA- YYY-NNN -PL-LMM, Note 1

E25-MD-01-PL-A06

Note 1: The 3 characters “LMM” coming after “-PL” could be

sequential, or

a Letter and 2 numbers, where the letter and numbers represent the grid of the pile.

In the table above:

AAA

NN YYY

Area Code, from WBS (Work Breakdown Structure), Refer to document RLNG-000-PM-PP-3107 “Geographical Work Breakdown Structure” [3] – Paragraph 3.1 ATTACHMENT 1: List of Geographical Work Breakdown System codes Sequential Number Refer to the table below

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 28 OF 38

MARINE ASSETS

CODE YYY

ATN

BAS

BD

BER

BLA

BOL

CAS

CPS

CUS

EP

Aids to Navigation

Berth Aid System

Berthing Dolphin

Berth

Boat Landing

Bollard

Causeway

Capstan

Current Censor

Expansion Loop

EMS

Environmental Monitoring System

FEN

JTY

HST

IMP

IMT

LLD

MD

NAV

PC

PLT

QRH

TRE

WST

WTS

WW

Fender

Jetty

HeadStock

Impounding Basin Platform

Impounding Basin Trench

Large LED Display

Mooring Dolphin

Navigation System

Pile Cap

Loading Platform

Quick Release Hook

Trestle

Weather Station

Wave and tide Sensor

Walkway

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 29 OF 38

15.0

FIRE FIGHTING AND SAFETY EQUIPMENT NUMBERING

Firefighting and safety equipment shall be tagged as follow:

Unit Number Hyphen separator Functional Identification Hyphen separator Sequential Number

UUU

XX

NNN

Refer to Attachment 1 – Unit Numbering

Indicate the Fire Protection and Personnel Protection Equipment type

3 digits

CODE XX

Fire Protection and Personnel Protection Equipment

DP

DS

DV

FH

FP

FX

GE

HB

HM

HR

HX

OM

SA

SC

SE

SF

SH

SS

WM

WS

Dry Chemical Extinguishing System

Deluge Skid

Deluge Valve

Fire Hydrant

Fire Point

Fire Extinguisher

Gaseous Extinguishing System

Hose Box

Hydrant Monitor

Hose Reel

High Expansion Foam System

Oscillating Monitor

Air breathing Apparatus

International Ship to Shore Connection

Eye Wash Station

First Aid Kit

Smoke Hood

Safety Shower with Eyewash

Water Mist Extinguishing System

Windsock

Example:

111-FX-001 - Fire Extinguisher for LNG Train 1

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 30 OF 38

16.0 ATTACHMENTS

16.1

Attachment 1 - Unit Numbering

Units

Description

000

010

013

019

020

021

035

042

044

053

058

059

060

061

076

077

079

080

081

082

083

084

085

086

088

099

101

111

112

115

General

Feed Gas Inlet facilities

HHR Unit (Future) & Booster Compression (Future)

LNG Storage Tanks area (Tanks excluded)

LNG Storage Tank 1 & 2

LNG Loading Facilities

Refrigerant Storage

Air & Nitrogen

Chilled Water Unit

Outfall Pumping Basin

Fuel Gas

Dry Flare

BOG Compression

BOG Flare

Utility & Potable Water Production

Fire Water

Sanitary Sewer / Sewage Treatment

ICSS, DCS, SIS (FGS is in unit 083)

Telecom

HVAC

Fire Fighting And Fire Gas System

Technical Buildings: Central Control Building (CCB), Instrument Equipment Shelter (IES) and Electrical Sub Stations (SS)

Industrial and Non-Industrial Buildings

Open Drains

Diesel and Emergency Power

Inlet, Utilities and Storage - General

LNG train 1 - General

LNG train 1 - Liquefaction Unit

LNG train 1 - Nitrogen Rejection Unit

LNG train 1 - Cold Closed Drain

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 31 OF 38

Units

Description

177

182

183

186

188

201

211

212

215

277

282

283

286

288

LNG train 1 - Fire Water

LNG train 1 - HVAC

LNG train 1 - Fire Fighting And Fire Gas System

LNG train 1 - Open Drains

LNG train 1 - Diesel and Emergency Power

LNG train 2 - General

LNG train 2 - Liquefaction Unit

LNG train 2 - Nitrogen Rejection Unit

LNG train 2 - Cold Closed Drain

LNG train 2 - Fire Water

LNG train 2 - HVAC

LNG train 2 - Fire Fighting And Fire Gas System

LNG train 2 - Open Drains

LNG train 2 - Diesel and Emergency Power

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 32 OF 38

16.2

Attachment 2 - Service - Fluid Codes

Description

Accidentally contaminated

Bog flare

Boil-off gas

Biocide

Fluid Code

AC

BF

BG

BI

Clean agent fire extinguishing (in buildings only) CA

Continuously contaminated

Dry flare

Corrosion inhibitor

Closed drain

Clean Runoff

Chilled cooling water supply

Clean water

Chilled cooling water return

Dry air

Defrost gas

Open drain

Dry chemical powder

Ethylene

Foam concentrate

Diesel

Fuel gas

Foam solution / fire suppressant

Fire water

CC

CD

CI

CL

CR

CS

CW

CZ

DA

DG

DO

DP

ET

FC

FD

FG

FS

FW

Description Seal gas Hydrocarbon condensate Hydrocarbon liquid Hydrocarbon vapor Instrument air

Liquefied natural gas Liquid nitrogen Lube oil Mixed refrigerant Utility nitrogen, refrigerant N2 Oil mist Plant air Propane Pump trim Potable water Scale inhibitor Sanitary sewer Utility water Atmospheric vent Vessel trim Warm liquid drain Process water Wet flare

Fluid Code

GS

HC

HL

HV

IA

LG

LN

LO

MR

N2

OM

PA

PR

PT

PW

SI

SS

UW

VG

VT

WL

WP

WF

The latest information about service / fluid codes shall be taken from the PID legend sheet.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 33 OF 38

16.3

Attachment 3 - Equipment Code identification

DESCRIPTION

Agitator / Mixer

Air cooler Bay

Column

Column Internal

Deaerator

Exchanger / Air Cooler

Exchanger Internal

Diesel Generator

Electrical Heater

Filter / Coalescer

Fan

Air Cooler Motor (Fan)

Gear Box

Heater

Handling / Crane / Davit Crane

Compressor

Compressor Motor

Compressor LP Casing

Compressor MP Casing

Compressor HP Casing

Inlet Guide Vane

Loading / Unloading Arms

Pumps

Pump motor

Tank

Telecommunication Tower

Basin, Sump, Pit, Stormceptor

Vessel

Vessel Internal

Liquid Turbine Pump

Package units (incl. Flare, …)

Code

AG

B

C

CI

DA

E

EI

EG

EH

F

FA

FAM

GB

H

J

K

KM

LPC

MPC

HPC

IGV

LA

P

PM

T

TW

U

V

VI

XP

Z

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 34 OF 38

16.4

Attachment 4 - Electrical Equipment Type Code

CODE DESCRIPTION

ACDB UPS AC Distribution Board

AP

Annunciation Panel

ASD

Adjustable Speed Drive

AWL

Aircraft Warning Light

AWLP Aircraft Warning Light Panel

BAT

Battery

BC

BD

BDS

CAP

CB

Battery Charger

Bus Duct

Battery Disconnector Switch

Capacitor Bank

Circuit Breaker

CCT

Lighting or small power Circuit

Control Panel

Change over Switch

CP

CS

DB

CODE DESCRIPTION Isolator Switch

ISO

JB

LCS

LDB

LF

Junction Box

Local Control Station

Lighting Distribution Board

Light Fixture

MAM Motor Ammeter MCC Motor Control Center (690/415 LV Switchgear) Main Junction Box (3 ph + N) MJB MVP Motorized Valve Panel NDS NER OLTC On load Tap Changer OWS Operating Workstation Patch panel

Neutral Disconnecting Switch

Neutral Earthing Resistor

PAP

Electrical Distribution Board in building

PDB

Power distribution Board

DCDB UPS DC Distribution Board

ECMS Electrical Control & Monitoring System

EEB

EEP

ELA

Electrical Earth Bar

Electrical Earth Pit

Lightning Arrestor

ELDB Emergency Light Distribution Board

EPB

Emergency Push Button

ES

Earthing Switch

PEC RMU RP SA

Photoelectric Cell

Ring Main Unit

Relay panel

Solar panel array

SDB

Small Power distribution board

SH

SL

SO

Space Heater

Strobe Light

Small Power Socket Outlet

ESDB Emergency Small Power Panel

SPS

Solar Power System

EWS

Engineering Workstation

GCP Generator Control Panel

SS

Soft Starters

SWG

Switchgear

HFC

HFR

HFX

HTP

INV

IRP

Harmonic Filter Capacitor

THY

Thyristor Panel

Harmonic Filter Resistor

Harmonic Filter Reactor

Heat Tracing Panel

Inverter

Instrumentation Panel - Interposing Relay Panel

TJP

Telecom power junction box

TR UPS WO

Transformer

Uninterruptible Power Supply

Welding Outlets

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 35 OF 38

16.5

Attachment 5 - Electrical - Voltage Code

Voltage Code A B C D

E F G H J

Voltage

132 KV 33 kV 11 kV / 13.8 kV 6.6 kV

3.3 kV 690 V 415 V 240 V 110 V DC

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 36 OF 38

16.6

Attachment 6 - Piping Specialty

SP ident

DESCRIPTION

SPC

SPH

Special Check valve (Non-Slam Axial type, Dual plate, Tilting Disc, or depending on the case “dissimilar type” or other check valve with specific requirement not covered by piping class items) Hose connection

SPI

Mechanical Interlock

Miscellaneous (Other than SPC, SPH, SPI, SPS and SPV)

Flame arrestor

Injection Quill

Flexible hose

Liquid Trap

Isolating Joint

Barred Tee

Anchor Flange

Corrosion Coupons

SPX

Corrosion Probe

Special Flange - (Item not covered by Piping class)

Multi-tap Orifice Flange

Special Spool

Special Blank and Spacer - (Item not covered by Piping class)

Vacuum Breaker Valve, Air Release Valve

Expansion Joint

Sight Glass

Insulation Kit

Spray Nozzle

SPS

SPV

Strainer (Item or range not covered by Piping class or/and with specific Process requirement. It can cover Y type, T type, Bucket Type and all Conical Strainers). Special Valves (Valves with specific design requirement or performance not covered by Piping class items).

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 37 OF 38

16.7

Attachment 7 - HVAC - EQUIPMENT TYPE PREFIX

Letter AC

Air Cooled Condensing Unit / Air Condenser

Equipment Type

AH B CB CF CH D

E EH FC G L N

P PU S SU T V

VB W X Y

Air Handling Unit Damper Constant Volume Box Chemical Filter Unit Chiller Moisture Eliminator

Exchanger Electrical heater Fan Coil Unit Grille / Diffuser Sound attenuator Louvre / Wind Shield

Pump Package Unit Air filters / Strainer Split Unit Tank Valve

Variable Volume Box Steam or adiabatic humidifier Exhaust Fan Supply Fan

16.8

Attachment 8 - HVAC - EQUIPMENT TYPE MODIFIER

Letter A B C E F G FG M N P S T U V X

Equipment Type Modifier

Warm air curtain (exchanger) Balancing (damper) Blast (damper) Smoke (exhaust fan / damper) Fire (damper) Gas (damper) Fire and Gas (damper) Motor / Motorized (damper / valve) Non-return (damper) Pressure relief (damper) Shut-off (damper) Floor transfer (grille) Pneumatic (damper / valve) Modulating (damper) Return / Exhaust (grille / diffuser)

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

EQUIPMENT AND COMPONENT NUMBERING PROCEDURE

COMPANY DOCUMENT REF. RLNG-000-PM-PP-2003

CONTRACTOR DOC. REF.

215122C-000-PP-2003

REVISION: 0D

PAGE 38 OF 38

Letter Y

Supply (grille / diffuser)

Equipment Type Modifier

16.9

Attachment 9 – Manual Valve Type Code

Valve Type Code BV BFV CHV DIV FHV GV GLV NLV PLG

Description

Ball Valve Butterfly Valve Check Valve Diaphragm Valve Fire Hydrant Valve Gate Valve Globe Valve Needel Valve Plug Valve

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

Project: Q-32859 - NMDC - Ruwais Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further