RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 1 OF 18
ADNOC GAS
Criticality Rating and Inspection Class Procedure
COMPANY Contract No.
4700022871
JV TJN RUWAIS Contract No
215122C
Document Class
Class 2
Document Category (for Class 1)
NA
OPERATING CENTER Contract No.
OPERATING CENTER Doc Ref.
1B
Issue for Purchase
25-Mar-2025
R. Bagheri
A. De-Vandiere A. de VandiereT. Sakamoto
M. Vallivel
1A
Issue for Purchase
17-Feb-2025
R. Bagheri
A. De-Vandiere A. de VandiereT. Sakamoto
M. Vallivel
1
0
Issue for Purchase
14-Nov-2024
R. Bagheri
A. De-Vandiere A. de VandiereT. Sakamoto
M. Vallivel
Issued for Company Review
22-July-2024
R. Bagheri
A. De-Vandiere A. de VandièreT. Sakamoto
L.Pinto
Rev.
Revision Purpose
Date
Prepared by
Checked by
Approved by
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 2 OF 18
Contents
Page
Table of Contents
1.0
INTRODUCTION … 3 1.1 Scope of the Document … 3 1.2 Holds List … 4 1.3 References … 4 1.4 Definitions and Abbreviations … 4 2.0 CRITICALITY RATING – Rules and Guidelines … 5 2.1 Equipment or bulk items identified in company specification. … 5 2.1.1 Inspection Class … 5 2.1.2 Inspection and Test Plans … 7 2.1.3 ITPs Case by Case Approach … 10 2.2 Equipment or bulk Items NOT identified in company specification. … 11 2.2.1 Contractor CR method definition … 11 2.2.2 Contractor Method for CR … 11 2.2.3 Criteria Rating … 12 3.0 Contractor Lessons learned, … 15 4.0 Attachment 1 … 15
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 3 OF 18
1.0
INTRODUCTION
The ADNOC Ruwais LNG Project is a two train, near net-zero electrically driven LNG facility, targeting international markets. The feed gas for the project is supplied from the Habshan Gas Processing Plant via a new export gas pipeline. The plant will have two 4.8 MTPA (nominal capacity) electric driven LNG Trains with associated LNG storage/ marine export facilities and utilities.
Figure 1- Project Context
The ADNOC Ruwais LNG Project foresees the following main components at the facility:
• •
• •
Onshore LNG liquefaction facilities for 2 x 4.8 MTPA electrically driven LNG Trains (9.6MTPA total) Common facilities including inlet receiving facilities, LNG storage, BOG handling, flare, refrigerant storage and support buildings Utilities to support the facilities including import power from the national grid. Marine facilities for LNG export and bunkering.
1.1
Scope of the Document
The purpose of this procedure is to describe the rules to be followed for determining the Criticality Rating and Inspection Class of equipment or material to be procured in the frame of the Ruwais LNG Project.
This procedure is applicable to JV itemized equipment as well as to Piping, Electrical and Instrumentation material.
Calculation of Criticality Ratings is a mandatory requirement to properly set-up the intensity of Inspection activities and the Quality Control to be implemented during Engineering and Procurement phases and has a direct impact on the VENDOR Qualification process and on the Quality Surveillance level made by CONTRACTOR.
All Criticality Rating is required to be followed as per AGES-SP-13-001, any deviation to lower the Criticality Rating shall need formal approval from Company. Any MR or Commodities not listed in AGES-SP-13-001 is being additionally proposed and added in this Procedure.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 4 OF 18
1.2
Holds List
HOLD
DESCRIPTION
1
NA
1.3
References
[1] Annexure 10E-1: Quality Management Requirements [2] AGES-SP-13-001: Criticality rating specification [3] AGES-SP-13-002 : Procurement Inspection and Certification Requirements in Projects [4] RLNG-000-PM-PP-6014- : VPM Inspection Procedure
1.4
Definitions and Abbreviations
ADOC CPY CR
CTR or TJN
EPC IC ITP POC TJN YOC
Abu Dhabi Operating center- National Marine Dredging Company-NMDC COMPANY - ABU DHABI NATIONAL OIL COMPANY (ADNOC) P.J.S.C. Criticality Rating CONTRACTOR - TJN Ruwais, Joint Venture of Technip Energies France- Abu Dhabi, JGC Corporation and NMDC Energy Engineering Procurement Construction Inspection Class Inspection and Test Plan Paris Operating Center - Technip Energies Joint-Venture : Technip Energies, JGC and NMDC Yokohama Operating center - JGC Corporation
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 5 OF 18
2.0
CRITICALITY RATING – RULES AND GUIDELINES
2.1
EQUIPMENT OR BULK ITEMS IDENTIFIED IN COMPANY SPECIFICATION.
This procedure gives the Criticality Rating and Inspection Class of equipment identified in company specification AGES-SP-13-001 “Appendix 1, Minimum Criticality rating “.
The spreadsheet (Attachment 1) is based on of Ruwais LNG project Material Requisition. In this list the Criticality Rating and Inspection Class are given per Equipment identified in AGES-SP-13-001. The Criticality Rating shall be used to optimize inspection, quality and engineering resources:
CR=1 : quality is vital and must not be compromised CR=2 : quality is of significant importance CR=3 : quality is of moderate importance CR=4 : normal commercial quality is acceptable
For the equipment not listed in Company specification AGES-SP-13-001, the method detailed in paragraph 2.2 is used to identify the CR and IC.
These Items are identified as “new” in the “Attachment 1”.
2.1.1
Inspection Class
The Criticality Rating (CR) is used to determine the Inspection Class (IC) to optimize the required inspection and testing interventions on equipment and materials during procurement phase.
Criticality
RANK
Definition
Rating (CR)
1
High Risk
Inspection class (IC)
1
• Failure would result in immediate danger to life, environment and significant loss of revenue and assets. • Non-performance would result in critical project delays. • Risk of Spare Immediate Availability and Plant full shut down, major LNG Production Loss.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 6 OF 18
2
3
4
Medium Risk
Low Risk
Little Risk
• Failure could lead to dangerous situations to health, environment or property. • Non-performance would have some impact on project schedule. However, at premium costs / actions, schedule will be maintained. • Delay in getting Spares and Plant Partial Shutdown, and Commercial loss.
• Allowed to remain temporarily out of service without serious effect to operations. • Non-performance would have little impact on project schedule.
• Allowed to remain temporarily out of service with no effect to operations. • Non-performance would have no impact project schedule.
2
3
4
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 7 OF 18
2.1.2
Inspection and Test Plans
The inspection Class (IC) is used to determine the inspection activities for ITPs. ITP activities shall be defined according to table 9.1 of AGES-SP-13-001 and according to the Section 15.6 of AGES-SP-13-002 (reported below):
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 8 OF 18
Any reduction from Full (100%) inspection shall be subject to previous written approval by COMPANY
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 9 OF 18
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 10 OF 18
Any derived Criticality Rating that contravene AGES SP-13-001 shall be agreed with CPY
2.1.3
ITPs Case by Case Approach
In general, ITPs shall be prepared according to the AGES-SP-13-002 and Table of section 2.1.1. However, on case by case basis, CONTRACTOR may propose and agree with Company Quality Management Team, less stringent Inspection interventions in ITPs based on Contractor’s previous experience in handling similar items, manageability of supplier / vendor based on proven track record of supplier/vendor, Contractor’s previous ITP experience. Depending upon the Material Requisitions and Commodities to be Procured, ITP would be prepared and Submitted for Company Approval with the Guidance of AGES-SP-13-001 and AGES-SP-13-002.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 11 OF 18
2.2
EQUIPMENT OR BULK ITEMS NOT IDENTIFIED IN COMPANY SPECIFICATION.
2.2.1 Contractor CR method definition
This procedure gives Contractor CR calculation method of equipment, or bulk items not listed in AGES-SP-13-001. The results of assessment and workshops are reported in the spreadsheets “Attachment 1”. The Criticality Rating is the result of an analysis to determine the criticality of equipment to be purchased. Criticality Rating is used into the ITPs to define the Inspection Class.
.
2.2.2 Contractor Method for CR
The Risk Criticality Rating is assessed during multi-discipline workshops during which a notation is defined on the two main criteria: SEVERITY and PROBABILITY described as per table below: The Risk Criticality is a combination of Severity and Probability as shown:
Risk Criticality Rating Table
Probabili ty / Likelihoo d
5
4
3
2
1
10
8
6
4
2
Severity / Consequences
15
12
9
6
3
20
16
12
8
4
25
20
15
10
5
The Risk Criticality Rating result determines the Criticality Level and Criticality Rating for the Equipment/Material as per following table.
Equipment / Material Criticality Rating Table
Risk Criticality Rating
Criticality Level
Criticality Rating
Equipment/ Material
16
12 to 16
6 to 12
< 6
High
Significant
Moderate
Not Critical
1
2
3
4
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 12 OF 18
The Risk Criticality Rating assessment details will be recorded in the Equipment & Material Criticality Rating Calculation Sheet Summary Form as given in Appendix 3.
Each criteria is evaluated by Maximum Value of sub-criteria rated by the disciplines, schedule and inspection during dedicated Workshops.
2.2.3 Criteria Rating
For each main criteria described in §2.1.1, the rating is obtained by multiplying the highest severity corresponding to potential Project impacts or Equipment specific features with the highest probability. The Severity estimates the impact/consequences of the Equipment & Material risk of failure in term of:
• Health, Safety & Environment during Commissioning, • Start-up, and Operation, • Cost for the Equipment or Material itself, • Schedule of the Project, Performance / operation of the Facilities / final product.
The Severity rating is evaluated according to impact definitions given in the Severity Matrix: Severity is defined as the highest rating identified for each of the above 4 risks.
SEVERITY MATRIX
IMPACT OF FAILURE DURING COMMISSIONING, START-UP AND/OR OPERATION ON HEALTH, SAFETY & THE ENVIRONMENT:
-
Fluid handled is perfectly harmless.
-
Fluid handled is not likely to be harmful under normal operating conditions.
-
Fluid handled involves limited risk as regards toxicity, pressure, temperature, corrosion,
stability and flammability.
- Fluid handled features average toxicity, corrosiveness, flammability or is handled at
significant pressure / temperature with regards to mechanical strength.
- Fluid handled is a significant danger because it is toxic, corrosive, flammable, unstable or is
handled under severe pressure / temperature conditions.
COST IMPACT OF EQUIPMENT OR ASSET FAILURE ON THE PROJECT:
-
Negligible inconvenience and/or cost.
-
Limited unavailability and replacement cost and time of Asset or Equipment.
-
Moderate unavailability and replacement cost and time of Asset or Equipment.
-
Significant direct and indirect unavailability and replacement cost and time of Asset or
Equipment.
- Prohibitive direct and indirect unavailability and replacement cost versus operating revenue
of Facilities.
SCHEDULE IMPACT OF QUALITY ISSUES OF SUPPLIER’S ENGINEERING DELIVERABLES OR EQUIPMENT DELIVERY:
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
1
2
3
4
5
1
2
3
4
5
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 13 OF 18
-
Negligible.
-
Moderate.
-
Will affect the Design Schedule or Overall schedule if the delay is significant.
-
Will affect the Design Schedule or Overall Schedule whatever the duration of the delay.
Important because Supplier’s Engineering or Equipment Delivery are on the critical path.
IMPACT OF EQUIPMENT FAILURE ON PERFORMANCE OF THE FACILITIES (BEFORE OR AFTER BEING PUT IN SERVICE):
-
No consequence on operation of the Facilities.
-
Limited consequences due to presence of standby equipment, by-pass of defective item or
ease of replacement.
-
Reduced operating capacity without loss of integrity of the Facilities.
-
By-pass or replacement of defective item with loss of functional integrity of the Facilities.
-
Hazardous operating conditions with severe or unacceptable consequences on operation of
the Facilities.
1 2
3
4
5
1
2
3
4
5
When determining Severity against any of the above criteria, if there is a doubt as to the rating, then the higher value should be selected.
The Probability estimates the likelihood of the Equipment & Material “failure” for each specific phase of the Project that is under Contractor control, due to:
•
•
•
Design novelties, complexity, etc.
Manufacturing & Testing complexity, associated risks transferred to suppliers, etc.
Installation on Construction Site.
For each of these phases, the rating of Probability is evaluated according to the definitions given in the Probability Matrix. Probability is defined as the highest rating identified for the above 3 phases.
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 14 OF 18
PROBABILITY MATRIX
Probability rating definitions (as per GTF-GPS-COR-14301-07 Threat Criticality Rating Matrix):
Probability Criteria Description
Not known to occur (below 1% probability)
Not likely to occur (1% to 10% probability)
(1)
(2)
Reasonable possibility of occurrence (10% to 30% probability)
Likely to occur (30% to 60% probability)
Very likely to occur (above 60% probability)
(4)
(5)
(3)
In order to help in this assessment, the following topics have been prepared to guide the discussion:
DESIGN:
-
Standard design with standard requirements.
-
Proven technology with customary particular specifications.
-
Proven technology with specified adjustments or specific requirements.
-
Proven technology with particular stringent or non-code-based specifications.
-
Non-proven technology, prototype, or complex sub-assembly / package unit.
MANUFACTURING AND TESTING PROCESSES AND TECHNIQUES (INCLUDING FAT):
-
Fabrication and testing involve only few known and simple activities.
-
A significant number of known and simple activities are involved.
-
Several complex or critical activities.
-
Many complex or critical activities.
-
Complex and unusual activities involving a SIT.
EQUIPMENT INSTALLATION (INCLUDING DURING ONSHORE CONSTRUCTION AND OFFSHORE TRANSPORTATION PHASES):
-
Straightforward installation involving only few known and simple activities for selected Asset.
-
Significant number of known and simple activities for selected Asset.
-
Several complex or critical activities within battery limits of selected Asset.
-
Many complex or critical activities nearing battery limits of selected Asset.
-
Complex and unusual activities for selected Asset or requiring Asset modification / upgrade.
1 2
3
4
5
1
2 3
4
5
1
2
3
4
5
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
RUWAIS LNG PROJECT
Criticality rating and inspection class procedure
COMPANY DOCUMENT REF. CONTRACTOR DOC. REF.
RLNG-000-PM-PP-2004 215122C-000-PP-2004
REVISION: 1B
PAGE 15 OF 18
When determining Probability against any of the above criteria, if there is a doubt as to the rating, then the higher value should be selected.
First of a kind or non-proven technology may be considered even if applied to a single part or fabrication phase of the Equipment.
3.0
CONTRACTOR LESSONS LEARNED,
Based on CONTRACTOR lessons learned from years of experience and input from numerous inspection tasks completed on various projects, CONTRACTOR is preparing the Inspection and Test Plan and recommendation which will be discussed on case per case with Company.
4.0
ATTACHMENT 1
Material Requisition list and selected Criticality Rating / Inspection Class with calculation sheet of pressurized tagged equipment .
The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.
Project N° : 215122C Project Title : Ruwais LNG Project Document Title : Criticality Rating Revision Number : 1 B
Page 16 of 18
Doc Title
Client Document Reference
Contractor Document Reference
Primary MR Lead TEN / JGC / NMDC
CONTRACTOR Discipline (internal)
Single/Multiple
TYPE
Equipment Tag
Design P (Bar g)
P Factor (AGES Table 7.2)
Design T (°C)
T Factor (AGES Table 7.3)
PSC (AGES Table 7.1)
CF (AGES Table 7.4) (PT X)
PF (AGES Table 7.5)
MF (AGES § 7.3 a,b)
Calc. CR (PF-MF)
Min CR as per AGES
Selec. CR
Note
LP MR Compressor
MP/HP MR Compressor
Propane Compressor
Internal
Internal
Internal
215122C-000-MR-1010-0001
215122C-000-MR-1010-0001
215122C-000-MR-1010-0001
TEN
TEN
TEN
Rotating
Rotating
Rotating
Material Requisition Dry gas flare Package
RLNG-059-PA-R-5001
215122C-059-MR-0186-5001
JGC
Combustion
BOG Flare Material Reaquisition for Columns
RLNG-061-MS-R-9001 RLNG-000-MS-R-0501
215122C-061-MR-0186-9001 215122C-000-MR-0510-0501
Material Requisition for Shell & Tube Heat Exchanger and Special Kettles
RLNG-000-MS-R-0602
215122C-000-MR-0610-0602
Material Requisitions for Ambient Liquid Ethylene Vaporizers, Ethylene Heaters, Ethylene Storage Bullets
RLNG-000-MS-R-5331
215122C-000-MR-0670-5331
Internal - Material Requisition for Main Cryogenic Heat Exchangers Material Requisition for Brazed Aluminium Heat Exchanger
RLNG-000-MS-R-0005 RLNG-000-MS-R-0661
215122C-000-MR-0650-0001 215122C-000-MR-0662-0661
NMDC TEN
TEN
JGC
TEN TEN
Package Pressure Vessel & Heat Exchanger
Pressure Vessel & Heat Exchanger
Static
Pressure Vessel & Heat Exchanger Pressure Vessel & Heat Exchanger
Single
Single
Single
Single
Single Single
Single
Single
Single Single
Material Requisition for Air Cooled Heat Exchanger
RLNG-000-MS-R-0001M
215122C-000-MR-0710-0001
TEN
Pressure Vessel & Heat Exchanger
Multiple
Material Requisition for Large Stainless Steel Drums
RLNG-000-MS-R-0801M
215122C-000-MR-0810-0001M
TEN
Pressure Vessel & Heat Exchanger
Multiple
Material Requisition for Large Carbon Steel Drums
RLNG-000-MS-R-0802
215122C-000-MR-0810-0002
TEN
Pressure Vessel & Heat Exchanger
Single
Material requisition for other CS/SS drums
RLNG-000-MS-R-5303M
215122C-000-MR-0810-5303M
JGC
Static
Multiple
Material requisitions for filters
RLNG-000-MS-R-5501
215122C-000-MR-0840-5501
JGC
Static
Single
Material Requisition for Vessels Internals
RLNG-000-MS-R-0871M
215122C-000-MR-0870-0871M
TEN
Pressure Vessel & Heat Exchanger
Multiple
Material Requisition for Wieland Tubes
RLNG-111-PV-R-0601
215122C-111-MR-0610-0601
TEN
Pressure Vessel & Heat Exchanger
Single
Material Requisition for Cryogenic Centrifugal pumps
RLNG-000-MR-R-2004
215122C-000-MR-0910-2004
TEN
Rotating
Material Requisition for Centrifugal Pumps - Non API Sump pumps Material Requisition for API Centrifugal Pumps Material Requisition for Sewage Transfer Pumps
RLNG-000-MR-R-09201M RLNG-000-MR-R-5006M RLNG-079-MR-R-5009
215122C-000-MR-0910-9201M 215122C-000-MR-0910-5006M 215122C-079-MR-0910-5009
NMDC JGC JGC
Rotating Rotating Rotating
Material Requisition for Non API Centrifugal horizontal Pumps - Main
RLNG-000-MR-R-5007M
215122C-000-MR-0910-5007M
JGC
Rotating
Material Requisition for Fire Water Pumps
RLNG-077-MR-R-5008
215122C-077-MR-0960-5008
JGC
Rotating
Material requisition for NRU Compressors Material Requisition for BOG Compressors
RLNG-000-MR-R-2001 RLNG-000-MR-R-2002
215122C-000-MR-1011-2001 215122C-000-MR-1011-2002
TEN NMDC
Rotating Rotating
Single
Multiple Multiple Single
Multiple
Single
Single Single
Material Requisition for Air Compressors
RLNG-042-MR-R-5080
215122C-042-MR-1013-5080
JGC
Rotating
Single
Material Requisition for Emergency Air Compressor
RLNG-042-MR-R-5084
215122C-042-MR-1031-5084
JGC
Rotating
Material Requisition for Liquid Turbines
RLNG-000-MR-R-2003
215122C-000-MR-1130-2003
Material Requisition for Electrical Gas Heaters Package
RLNG-000-PA-R-0001M
215122C-000-MR-1680-0001M
Material Requisitions for Electrical Immersion Heaters Material Requisition Liquid Nitrogen Storage and Vaporisation Package MR for Emergency Diesel Generators (EDG) Package
RLNG-000-PA-R-0002M
215122C-000-MR-1680-0002M
RLNG-042-PA-R-5001 RLNG-088-PA-R-9109M
215122C-042-MR-4112-5001 215122C-000-MR-4123-9109M
TEN
TEN
TEN
JGC NMDC
Rotating
Package
Package
Package Package
Material Requisition Chemical injection Package
RLNG-076-PA-R-5021
215122C-076-MR-4046-5021
JGC
Package
Material Requisition Air Compressor Dryer Package Safety Equipment - Deluge Skids Safety Equipment - Jetty Remote Controlled Monitors
RLNG-076-PA-R-5021
215122C-076-MR-4046-5021
RLNG-042-PA-R-5011 RLNG-000-PA-R-0007M RLNG-021-HS-R-8849
215122C-042-MR-4171-5011 215122C-000-MR-1930-0001M 215122C-021-MR-1920-8849
Safety Equipment - High Expansion Foam Fire Fighting System
RLNG-000-HS-R-8850M
215122C-000-MR-1935-8850M
Safety Showers Material Requisition Potable Water Treatment Filter Material Requisition for Cooling Water Chiller Package and Potable Water Cooler
RLNG-000-HS-R-8851M RLNG-076-PA-R-5011
215122C-000-MR-1950-8851M 215122C-076-MR-0214-5001
RLNG-044-PA-R-5021
215122C-044-MR-4151-5021
Material Requisition Sewage treatment Package
Material Requisition Stormceptor Packages Anchor Bolts Material Requisitions for Tower Gangway Material Requisitions for LNG Loading Arms Material requisition for Overhead Cranes Package Material requisition for Handling devices Package
RLNG-079-PA-R-5011 RLNG-079-PA-R-5011 RLNG-000-PA-R-5001 RLNG-000-CV-R-0002 RLNG-021-PA-R-9110 RLNG-021-PA-R-9108 RLNG-000-PA-R-0014M RLNG-000-PA-R-0015
215122C-079-MR-0212-5011 215122C-079-MR-0212-5011 215122C-000-MR-4250-5001 215122C-000-MR-1710-0001 215122C-021-MR-4061-9110 215122C-021-MR-4026-9108 215122C-000-MR-4065-0001M 215122C-000-MR-4067-0001
JGC
JGC TEN NMDC
NMDC
NMDC JGC
JGC
JGC JGC JGC TEN NMDC NMDC TEN TEN
Package
Package Package Safety
Safety
Safety Package
Package
Package Package Package Civil Package Package Package Package
Single
Single
Multiple
Multiple
Single Multiple
Single
Single
Single Multiple Single
Multiple
Multiple Single
Single
Single Single Consolidate Consolidate Single Single Multiple Consolidate
1
1
1
1
1 1
1
1
1 1
2
2
1
2
1
2
1
1
2 2 1
2
1
1 1
1
1
1
2
2
1 2
1
1
1 2 1
2
2 1
1
1 1 3 3 1 1 2 3
111(211)-K-101
111(211)-K-102
111(211)-K-201
059-Z-001 - Dry Gas Flare 059-Z-001-Z01 059-Z-001-Z02 061-Z-001 112-C-001 & 212-C-001 111(211)-E-001/002/003/004 101/102/103/104/203 035-V-004A/B - Ethylene Storage Bullets 035-E-001A/B/C/D/E/F/G/H/I/J/K/L - Ambient Ethylene Vaporizer 035-E-002A/B/C/D - Ethylene Heater 111-E-005 112(212)-E-001/002
112 (212)-E-003, 004,005,006; 111(211)-E- 201,204,202,105,106,107
111 (211)-V-101;102 060-V-001 111(211)-V-201;202;203;204;205; 206;207;103
042-V-001A/B - Wet Air Receiver 042-V-003A/B - Dry Air Receiver 059-V-001 - Dry Gas Flare KOD 035-V-001 - Propane Moisture Guard Bed 035-V-002 - Propane Mercury Guard Bed 035-V-005 - Ethylene Mercury Adsorber 044-V-001 - Cooling Water Expansion Drum
010-F-001A/B - Inlet Gas Filter 035-F-001 - Propane Moisture Guard Bed After Filter 035-F-002 - Propane Mercury Guard Bed After Filter 035-F-005 - Ethylene Mercury Absorber After Filter 111(211)-VI-201;202 ;203;204;206;101; 102;103 112(212)-CI-001
111(211)-EI-001;002;003 ;004;101;102;103;104
020-P-001,002 ABCD 112(212)-P-001A/B 111(211)-P-201
035-P-003 - Propane Make-Up Pump 079-P-101A/B - Operator Cabin Sewage Transfer Pumps 044-P-001A/B/C - CW Circulation Pumps 076-P-001A/B - Utility Water Pumps 076-P-002A - Potable Water Pumps 079-P-103A - Treated Water Pumps 077-P-001A/B/C - FW Pumps 077-P-001B-T01 - Diesel Tank 077-P-002A - Firewater Jockey Pump 077-Z-001A/B - Main FW Pump Package 077-Z-002A - FW Jockey pump Package
077-P-002B - FW Jockey Pump 112(212)-K-001 060-K-001A/B/C 042-K-001A - Air Compressor A 042-K-001A-E01 - Air Fin Cooler 042-K-001A-F01 - Air Intake Filter 042-K-001A-V01 - 1st stage KOD 042-K-001A-V02 - 2nd stage KOD 042-K-001B - Air Compressor B 042-K-001B-E01 - Air fin cooler 042-K-001B-F01 - Air Intake Filter 042-K-001B-V01 - 1st stage KOD 042-K-001B-V02 - 2nd Stage KOD 042-Z-001A - Air Compressor A PKG 042-Z-001B - Air Compressor B PKG 042-Z-001A-SPX01 - Blow-off SIlencer 042-Z-001B-SPX01 - Blow-off Silencer 042-K-002 - Emergency Air Compressor 042-K-002-T01 - Diesel Tank 042-Z-002 - Package 111(211)-XP-101 112(212)-XP-001 111(211)-EH-001 059-H-001A/B 115-EH-001 042-Z-004 - Liquid N2 PKG
076-Z-001 - Potable water sodium Hypochlorite Injection PKG 076-Z-004 - Corrosion Inhibitor Injection Package
076-Z-001 - Potable water sodium Hypochlorite Injection PKG 076-Z-004 - Corrosion Inhibitor Injection Package 042-Z-003A/B - Air Dryer PKG Deluge Skid
076-Z-002 - Potable Water treatment PKG
044-Z-001 - Cooling Water Chiller PKG
079-Z-101 - Sewage Treatment PKG 079-Z-101 - Sewage Treatment PKG 086-U-106, 107, 108, 109, 112 - Stormceptors
1
1 1
1
1
1 1
1
1
1
1
1
1
1
1
1 1 4
4
4
1 3
4
4
1
1
1
Novated LLI
3
3 3
3
3
3 3
3
3
3
3
3
3
3
3
5 3 5
5
4
3 3
4
4
3
3
3
4
3
2
4 5
5
3
3 2 5
1
75
75 75
25
75
25 25
25
25
50
75
75
25
25
50
300 75 1200
1200
600
50 75
600
600
25
25
75
600
300
60
600 1200
1200
300
300 60 1600
3
1
1
1
1
1 1
1
1
1 1
1
1
1
2
2 1
2
1
1 1
2
1
2
2
1
2
1
2
NA
1
2 1 2
2
1
1 1
1
1
1
2 1 2
2
1
1 1
Calculation to be fixed when Material is identified in prposal
2
2 2
2
2
2 2
2
2
2
2
2
2
2
2
3 2 4
4
1
1 1
1
1
1 1
1
1
1
1
1
1
1
1
1 1 1
1
1
1 1
1
1
1 1
1
1
1
1
1
1
1
1
2 1 3
3
4 by vendor
0 1
2 1
2 2
4
4
2
2
2
4
3
2
4 4
4
3
3 2 4
1
1
3
2
1
1
1
1
1
1
1
1
1 0
1
1
1 1 1
1
3
1
1
1
3
2
1
3 4
3
2
2 1 3
1
2
1
1
2
2 1
2
2
2 1 NA
2
2 1
2
2 2 NA 1 NA 1 NA NA
2
1
1
1
1 1
2
1
2 1 2
2
2 1
2
2 1 3 1 1 1 2 2
PSC calculation if Chemical is non-flammable - most likely scenario
PSC calculation if Chemical is flammable
SS Pressure Vessel
PSC calculation if Chemical is non-flammable - most likely scenario PSC calculation if Chemical is flammable
10
8.5 10.5
95
11
95 95
75.8
75.8
58.6
10
11
75.8
95
46
7.5 26.65 8.3
4.5
16
53 93
3
3 3
1
3
1 1
1
1
2
-196
-175 -196
-45.5
-196
-176 -196
-45.5
-172
-45.5
3
-196
3
1
1
2
3 3 3
3
3
2 1
-110
-196
-45.5
-196
-175 -6.7 65
87
85
-10 220
11.013
3
87
11.013
95
95
10.3
10
6
6
12 9.8
10
20
9 9 1
3
1
1
3
87
-176
-46
-196
3
4 Bulk Items; calculation is not required
87
3
3
87
87
4
4
3 3
4 4 Bulk Items; calculation is not required
87 38
Bulk Items; calculation is not required
Bulk Items; calculation is not required 4
87
3
3
87
4
3 3 4
87 87 87
4 4 4 Bulk Items; calculation is not required Bulk Items; calculation is not required 1 Bulk Items; calculation is not required Bulk Items; calculation is not required
-175
3
021-LA-001A/B/C, 021-LA-002,021-LA-003A/B/C, 021-LA-004
16.4
THE TERMS OF CONTRACT / AGREEMENT NO: CON22-146 SHALL APPLY FOR ANY DISCLOSURE OF THIS DOCUMENT TO ANY THIRD PARTY.
Project N° : 215122C Project Title : Ruwais LNG Project Document Title : Criticality Rating Revision Number : 1 B
Page 17 of 18
Doc Title
Client Document Reference
Contractor Document Reference
Primary MR Lead TEN / JGC / NMDC
CONTRACTOR Discipline (internal)
Single/Multiple
TYPE
Equipment Tag
Design P (Bar g)
P Factor (AGES Table 7.2)
Design T (°C)
T Factor (AGES Table 7.3)
PSC (AGES Table 7.1)
CF (AGES Table 7.4) (PT X)
PF (AGES Table 7.5)
MF (AGES § 7.3 a,b)
Calc. CR (PF-MF)
Min CR as per AGES
Selec. CR
Note
035-V-003A/B - Propane Storage Bullets
16.9
Material Requisitions for Propane Storage Bullets MR for Vessels inert packing (Guard beds)
RLNG-000-MS-R-5301 RLNG-000-MS-R-6001
215122C-000-MR-2543-5301 215122C-000-MR-0800-6001
RLNG-000-EL-R-5060
215122C-000-MR-1621-5060
Material Requisition for Cable Gland Material Requisition for 132KV Cable Termination and Splicing Material Material Requisition for Electrical Power and Control Cables Material Requisition for Lighting Fixtures Material Requisition for Lighting & Small Power Distribution Panels Material Requisition for Power Transformers and Neutral Earthing Resistor Material Requisition for 132kV Gas Insulated Switchgear Material Requisition for HV Switchgear and Ring Main Unit (RMU) Material Requisition for LV Switchgear Material Requisition for HV & LV Bus Ducts Material Requisition for HV Capacitor Bank Material Requisition for Electrical Control and Monitoring System (ECMS) Material Requisition for AC & DC UPS Material Requisition for Electric Heat Trace Material Requisition for Local Control Station and Isolation Switch Material Requisition for Receptacle MR Integrated Control and Safety System (DCS, SIS, FGS)
RLNG-000-EL-R-5069 RLNG-000-EL-R-5062 RLNG-000-EL-R-5064 RLNG-000-EL-R-5065 RLNG-000-EL-R-5051M RLNG-000-EL-R-5052 RLNG-000-EL-R-5053M RLNG-000-EL-R-5054M RLNG-000-EL-R-5055M RLNG-000-EL-R-5056M RLNG-000-EL-R-5057M RLNG-000-EL-R-5058M RLNG-000-EL-R-5059 RLNG-000-EL-R-5066 RLNG-000-EL-R-5067 RLNG-000-IC-R-0101
215122C-000-MR-1621-5069 215122C-000-MR-1621-5062 215122C-000-MR-1630-5064 215122C-000-MR-1631-5065 215122C-000-MR-1641-5051M 215122C-000-MR-1651-5051 215122C-000-MR-1652-5053M 215122C-000-MR-1654-5054M 215122C-000-MR-1654-5055M 215122C-000-MR-1656-5056M 215122C-000-MR-1661-5057M 215122C-000-MR-1671-5058M 215122C-000-MR-1682-5059 215122C-000-MR-1627-5066 215122C-000-MR-1625-5067 215122C-000-MR-1510-0001
MR Telecom System Integrator
RLNG-000-TE-R-0001
215122C-000-MR-1530-0001
MR Machine Monitoring System MR Machine Monitoring System - Harware MR Packaged Analysers MR Manual Sampling Systems MR Instrumentation & Telecommunication Cables MR Control Valves / Self Actuated Valves MR Severe Service Control Valves MR On/Off Ball Valve MR On/Off Butterfly Valves MR Safety Relief Valves & Rupture Disks MR Orifice Plate and Restriction Orifice MR Venturi MR Vortex Meter MR Rotameters MR Coriolis Mass Flow Meters MR Ultrasonic Flow Meter MR Radar Level Transmitter MR Magnetic Level Gauge MR Pressure & Differential Pressure Transmiters MR Pressure & Differential Pressure Gauges MR Thermocouple / RTD with Well and Transmitters MR Instrumentation Junction Boxes MR F&G Detectors MR Flow Metering Station Material Requisition for Motor Operated Valves (Ball) MR Pitot & Annubar Fire Protection Equipment: Hydrants,Hose Boxes, Monitors, Deluge Nozzels, Fire Point, Extinguishers
RLNG-000-IC-R-0143 RLNG-000-IC-R-0143 RLNG-000-IC-R-0601 RLNG-000-IC-R-0682 RLNG-000-IC-R-0741 RLNG-000-IC-R-0411M RLNG-000-IC-R-0412M RLNG-000-IC-R-0431M RLNG-000-IC-R-0434M RLNG-000-IC-R-0451M RLNG-000-IC-R-0462M RLNG-000-IC-R-0465M RLNG-000-IC-R-0471M RLNG-000-IC-R-0472M RLNG-000-IC-R-0476 RLNG-000-IC-R-0477M RLNG-000-IC-R-0527M RLNG-000-IC-R-0522M RLNG-000-IC-R-0531M RLNG-000-IC-R-0532M RLNG-000-IC-R-0542M RLNG-000-IC-R-0751 RLNG-000-IC-R-0661M RLNG-000-IC-R-5001 RLNG-000-IC-R-5308 RLNG-000-IC-R-0467
215122C-000-MR-1514-0003 215122C-000-MR-1514-0003 215122C-000-MR-1560-0001 215122C-000-MR-1568-0002 215122C-000-MR-1574-0001 215122C-000-MR-1541-0001M 215122C-000-MR-1541-0002M 215122C-000-MR-1543-0001M 215122C-000-MR-1543-0004M 215122C-000-MR-1545-0001M 215122C-000-MR-1546-0002M 215122C-000-MR-1546-0005M 215122C-000-MR-1547-0001M 215122C-000-MR-1547-0002M 215122C-000-MR-1547-0006 215122C-000-MR-1547-0007M 215122C-000-MR-1552-0007M 215122C-000-MR-1552-0022M 215122C-000-MR-1553-0001M 215122C-000-MR-1553-0002M 215122C-000-MR-1554-0002M 215122C-000-MR-1575-0001 215122C-000-MR-1566-0001M 215122C-000-MR-1584-5001 215122C-000-MR-1543-5308 215122C-000-MR-1546-0007
RLNG-000-HS-R-0003
215122C-000-MR-1900-0003
Personnal protection equipment: SCBA, compressor, lifebuoys, lifejackets, windsocks
RLNG-000-HS-R-0004
215122C-000-MR-1900-0004
Material Requisition for Cathodic protection Material Requisition for Corrosion Monitoring of concrete pile rebars Composite Block Piping Supports (cold supports) Polyurethane Piping Supports Variable Spring Supports Constant Spring Supports Tie Rods Sliding Plates Attenuation Acoustic Pads Heat Isolation Blocks Rigid Struts Shock Absorbers Stuctural Steel Material Requisition for HDPE Pipe and Piping Components (U/G) Material Requisition for CPVC Pipes and Piping Components Gate, Globe and Check Valves (Forged) Gate, Globe and Check Valves (Casted) Butterfly Valves High Performance Butterfly Valves Concentric Type Ball valves Non-Slam Check Valves - Axial Types and Tilting Disc Type Material Requisition for Dual Plates Check Valves (Cryogenic and Non- Cryogenic) Non Slam Check Valves - Dual Plate Type Material Requisition for Cryogenic Gate, Globe & Check Valves (Casted) Material Requisition for Cryogenic Gate, Globe & Check Valves (Forged) Material Requisition for Cryogenic Butterfly valves Material Requisition for Cryogenic Ball Valves Material Requisition for Ductile Iron Gate, Globe and Check valves Bronze Gate, Globe and Check valves Material Requisition for CS & LTCS Seamless Pipes Material Requisition for CS & LTCS Welded Pipes Material Requisition for SS Seamless Pipe Material Requisition for SS Welded Pipe Material Requisition for SS, CS & LTCS Butt Welded Fittings Material Requisition for SS, CS & LTCS Forged Fittings Material Requisition for SS, CS & LTCS Flanges and Orifice Flanges Gaskets and Insulation Kits Boltings Paddle Blanks, Spacers and Spectacle Blinds Hoses & Hoses Connections Strainers (All types) Interlock Devices Valve Turning Devices MR for Chemicals MR for Catalysts MR for Refrigerant MR for Liquid Nitrogen Material Requisition for Pig Receiver Material Requisition for Barred Tee Material Requisition for Trap Drain, Air Trap Special Instrument for Utility and Inlet Area Safety Signs Material Requisition for Junction Box Material Requisition for HV Cable Termination Kits Material Requisition for 132kV Power Cables
RLNG-000-MT-R-5071 RLNG-000-MT-R-0003 RLNG-000-PI-R-0201 RLNG-000-PI-R-0202 RLNG-000-PI-R-0203 RLNG-000-PI-R-0204 RLNG-000-PI-R-0205 RLNG-000-PI-R-0206 RLNG-000-PI-R-0207 RLNG-000-PI-R-0208 RLNG-000-PI-R-0209 RLNG-000-PI-R-0210 RLNG-000-CV-R-0003 RLNG-000-PI-R-5104 RLNG-000-PI-R-5103 RLNG-000-PI-R-1010 RLNG-000-PI-R-1011 RLNG-000-PI-R-1012 RLNG-000-PI-R-1013 RLNG-000-PI-R-1014 RLNG-000-PI-R-1040
215122C-000-MR-2410-5071 215122C-000-MR-2410-0002 215122C-000-MR-1382-0001 215122C-000-MR-1382-0002 215122C-000-MR-1383-0001 215122C-000-MR-1383-0002 215122C-000-MR-1383-0003 215122C-000-MR-1384-0001 215122C-000-MR-1384-0002 215122C-000-MR-1384-0003 215122C-000-MR-1385-0001 215122C-000-MR-1386-0001 215122C-000-MR-1800-0001 215122C-000-MR-1308-5104 215122C-000-MR-1308-5103 215122C-000-MR-1310-1010 215122C-000-MR-1310-1011 215122C-000-MR-1310-1012 215122C-000-MR-1310-1013 215122C-000-MR-1310-1014 215122C-000-MR-1310-1040
RLNG-000-PI-R-1015
215122C-000-MR-1310-1015
RLNG-000-PI-R-1041 RLNG-000-PI-R-1017 RLNG-000-PI-R-1023 RLNG-000-PI-R-1018 RLNG-000-PI-R-1019 RLNG-000-PI-R-5314 RLNG-000-PI-R-1021 RLNG-000-PI-R-1050 RLNG-000-PI-R-1051 RLNG-000-PI-R-1052 RLNG-000-PI-R-1053 RLNG-000-PI-R-1060 RLNG-000-PI-R-1062 RLNG-000-PI-R-1064 RLNG-000-PI-R-1070 RLNG-000-PI-R-1072 RLNG-000-PI-R-1080 RLNG-000-PI-R-1081 RLNG-000-PI-R-1082 RLNG-000-PI-R-1085 RLNG-000-PI-R-1088 RLNG-000-PR-R-6001 RLNG-000-PR-R-6002 RLNG-000-PR-R-6003 RLNG-000-PR-R-6004 RLNG-000-PI-R-5306 RLNG-000-PI-R-5307 RLNG-000-PI-R-5305 RLNG-000-IC-R-5008 RLNG-000-HS-R-0005 RLNG-000-EL-R-5063 RLNG-000-EL-R-5068 RLNG-000-EL-R-5061
215122C-000-MR-1310-1041 215122C-000-MR-1314-1017 215122C-000-MR-1314-1023 215122C-000-MR-1314-1018 215122C-000-MR-1314-1019 215122C-000-MR-1310-5314 215122C-000-MR-1317-1021 215122C-000-MR-1321-1050 215122C-000-MR-1321-1051 215122C-000-MR-1324-1052 215122C-000-MR-1324-1053 215122C-000-MR-1330-1060 215122C-000-MR-1340-1062 215122C-000-MR-1350-1064 215122C-000-MR-1360-1070 215122C-000-MR-1370-1072 215122C-000-MR-1393-1080 215122C-000-MR-1394-1081 215122C-000-MR-1395-1082 215122C-000-MR-1397-1085 215122C-000-MR-1399-1088 215122C-000-MR-2600-6001 215122C-000-MR-2600-6002 215122C-000-MR-2600-6003 215122C-000-MR-2600-6004 215122C-000-MR-0837-5306 215122C-000-MR-1340-5307 215122C-000-MR-1392-5305 215122C-000-MR-1555-5008 215122C-000-MR-1900-0005 215122C-000-MR-1626-5063 215122C-000-MR-1621-5068 215122C-000-MR-1621-5061
Material Requisition for Steel Structure Work Package II
RLNG-000-CV-R-5003
215122C-000-MR-1800-5001
JGC JGC
JGC
JGC JGC JGC JGC JGC JGC JGC JGC JGC JGC JGC JGC JGC JGC JGC TEN
TEN
TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN JGC JGC TEN
TEN
TEN
JGC TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN JGC JGC TEN TEN TEN TEN TEN TEN
TEN
TEN TEN TEN TEN TEN JGC TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN TEN JGC JGC JGC JGC JGC JGC JGC JGC TEN JGC JGC JGC
JGC
Material Requisitions for Steel Structure Work Package 3
RLNG-000-CV-R-8003
215122C-000-MR-1800-8001
NMDC
Storage Tanks Project Engineering
Electrical
Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Instrument
Instrument
Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument Instrument
Safety
Safety
Electrical Corrosion Piping Piping Piping Piping Piping Piping Piping Piping Piping Piping Civil Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material
Piping Material
Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Piping Material Process Process Process Process Piping Material Piping Material Piping Material Instrument Safety Electrical Electrical Electrical
Civil
Civil
Single Single
Consolidate
Single Consolidate Consolidate Consolidate Multiple Single Multiple Multiple Multiple Multiple Multiple Multiple Consolidate Consolidate Consolidate Consolidate
Consolidate
Consolidate Consolidate Consolidate Consolidate Consolidate Multiple Multiple Multiple Multiple Multiple Multiple Multiple Multiple Multiple Single Multiple Multiple Multiple Multiple Multiple Multiple Consolidate Multiple Single Single Multiple
Consolidate
Consolidate
Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Single Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate
Consolidate
Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Consolidate Single Single Single Single Single Single Single Single Consolidate Consolidate Consolidate Single
Single
Single
1 1
3
1 3 3 3 2 1 2 2 2 2 2 2 3 3 3 3
3
3 3 3 3 3 2 2 2 2 2 2 2 2 2 1 2 2 2 2 2 2 3 2 1 1 2
3
3
3 3 3 3 3 3 3 3 3 3 3 3 1 3 3 3 3 3 3 3 3
3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 1 1 1 1 1 1 1 1 3 3 3 1
1
1
3
1 Bulk Items; calculation is not required
-47
Bulk Items; calculation is not required
Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required
Bulk Items; calculation is not required
Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required
Bulk Items; calculation is not required
Bulk Items; calculation is not required
Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required
Bulk Items; calculation is not required
Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required calculation is not required calculation is not required calculation is not required calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required
Bulk Items; calculation is not required
Bulk Items; calculation is not required
3
75
2
1
1
2 NA
2
2 3 3 3 2 1 2 2 2 2 2 1 3 2 3 1
3
2 1 2 2 2 1 1 1 1 1 2 2 NA NA 2 2 3 3 3 3 3 NA 1 2 1 2
2
3
3 3 NA NA 3 3 NA 3 NA NA NA NA 1 1 NA 2,1* 2,1* 2,1* 2,1* 2,1* 2,1*
2,1*
2,1* 1 1 1 1 NA NA 2 2 2 2 2 2 2 2 3 2 3 2 2 NA NA NA NA NA 1 1 1 3 4 3 2 2
1
1
1 4
2
2 3 3 3 2 1 2 2 2 2 2 1 3 2 3 1
3
2 1 2 2 2 1 1 1 1 1 2 2 3 3 2 2 3 3 3 3 3 3 1 2 1 2
2
3
3 3 4 4 3 3 4 3 4 4 4 4 1 1 3 2,1* 2,1* 2,1* 2,1* 2,1* 2,1*
2,1*
2,1* 1 1 1 1 3 3 2 2 2 2 2 2 2 2 3 2 3 2 2 4 4 4 4 4 1 1 1 3 4 3 2 2
1
1
*CR=1 if sever Service or 600# and above or 300# for 18” and above *CR=1 if sever Service or 600# and above or 300# for 18” and above *CR=1 if sever Service or 600# and above or 300# for 18” and above *CR=1 if sever Service or 600# and above or 300# for 18” and above *CR=1 if sever Service or 600# and above or 300# for 18” and above *CR=1 if sever Service or 600# and above or 300# for 18” and above
*CR=1 if sever Service or 600# and above or 300# for 18” and above
*CR=1 if sever Service or 600# and above or 300# for 18” and above
non-Load bearing Structural steels, which may be considered CR-2 or CR-3 depending upon the Criticality. non-Load bearing Structural steels, which may be considered CR-2 or CR-3 depending upon the Criticality
THE TERMS OF CONTRACT / AGREEMENT NO: CON22-146 SHALL APPLY FOR ANY DISCLOSURE OF THIS DOCUMENT TO ANY THIRD PARTY.
Project N° : 215122C Project Title : Ruwais LNG Project Document Title : Criticality Rating Revision Number : 1 B
Page 18 of 18
Doc Title
Client Document Reference
Contractor Document Reference
Primary MR Lead TEN / JGC / NMDC
CONTRACTOR Discipline (internal)
Single/Multiple
TYPE
Equipment Tag
Design P (Bar g)
P Factor (AGES Table 7.2)
Design T (°C)
T Factor (AGES Table 7.3)
PSC (AGES Table 7.1)
CF (AGES Table 7.4) (PT X)
PF (AGES Table 7.5)
MF (AGES § 7.3 a,b)
Calc. CR (PF-MF)
Min CR as per AGES
Selec. CR
Note
Material Requisition for Power Distribution Boards & Dry Type Transformer MR Thermowells & Thermometers MR Power Distribution & Interposing Relay Cabinet MR MCT LNG Tanks HVAC , AHU, PACU, ACCU, Chilled water unit (Exd); HVAC UCP, MCCs F&G damper, Humidifiers, Filters, Louvres, Sound attenuators, Pumps, Field Instruments
Fire Water Tank
Utility Water Tank
Treated Water Tank
Potable Water Tank
RLNG-000-EL-R-5072M RLNG-000-IC-R-0541M RLNG-000-IC-R-0214 RLNG-000-IC-R-0215 NA NA
215122C-000-MR-1657-5072M 215122C-000-MR-1554-0011M 215122C-000-MR-1521-0004 215122C-000-MR-1521-0005 NA NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
JGC TEN TEN TEN NA NA
NA
NA
NA
NA
NA
Electrical Instrument Instrument Instrument Pressure Vessel & Heat Exchanger Sub- Contracting
Multiple Multiple Consolidate Consolidate NA NA
Sub- Contracting
Sub-Contracting
Sub-Contracting
Sub-Contracting
Sub-Contracting
NA
NA
NA
NA
NA
2 2 3 3 NA NA
NA
NA
T-001/T002
0.29
077-T-001A/B
NA
076-T-001
NA
079-T-101
NA
076-T-002
Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required Bulk Items; calculation is not required 1 Bulk Items; calculation is not required
-168
1
Bulk Items; calculation is not required
3
4
4
4
87
87
87
87
4
4
4
4
2.4
1
1
1
3
5
5
5
5
25
1200
1600
1600
1600
2
4
4
4
4
2 3 3 4 1 2
3
2
2
2
2
2 3 3 4 1 2
3
2
2
2
2
1
1
1
1
1
1
3
3
3
3
Design pressure specified in the document (Bar g) is conservative and used to calculate the Criticality Rating, equipment Design pressure to be as per Tank Datasheet Design pressure specified in the document (Bar g) is conservative and used to calculate the Criticality Rating, equipment Design pressure to be as per Tank Datasheet Design pressure specified in the document (Bar g) is conservative and used to calculate the Criticality Rating, equipment Design pressure to be as per Tank Datasheet Design pressure specified in the document (Bar g) is conservative and used to calculate the Criticality Rating, equipment Design pressure to be as per Tank Datasheet
THE TERMS OF CONTRACT / AGREEMENT NO: CON22-146 SHALL APPLY FOR ANY DISCLOSURE OF THIS DOCUMENT TO ANY THIRD PARTY.