3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 1 OF 12

ADNOC GAS

3D CAD REQUIREMENTS FOR VENDORS

COMPANY Contract No.

4700022871

JV TJN RUWAIS Contract No

215122C

Document Class

Class 2

Document Category (for Class 1)

OPERATING CENTER Contract No.

OPERATING CENTER Doc Ref.

1

0

IFC - Issued for Construction

20-Feb-2025

C.Pena

S.Bouguera

S.Deilles

ICR - Issued for Client Review

29-Jul-2024

C.Pena

S.Bouguera

S.Deilles

Rev.

Revision Purpose

Date

Prepared by Checked by Approved by

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 2 OF 12

Table of Contents

Contents

Page

1.0

INTRODUCTION… 4 1.1  Scope of the Document … 4 1.2  Holds List … 4 1.3  References … 4 1.4  Definitions and Abbreviations … 5 2.0  VENDOR 3D MODEL CONTENT … 6 3.0  DELIVERY AND FORMAT REQUIREMENTS … 7 3.1  VENDOR 3D model delivery schedule … 7 4.0  VENDOR 3D model format and settings requirements … 7 IMPORT FROM THIRD PARTIES SOFTWARE … 8 5.0 Level of Detail and Information (LOD/LOI) … 8 5.1 IFC files … 8 5.2 5.3  Navisworks files … 9 6.0  DATA EXCHANGE … 9 7.0  Appendix … 10

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 3 OF 12

Table of Changes compared to previous revision (for Procedures and Job Specifications only)

Paragraph

Modification description

Remarks / Origin

New document – No change from a previous one.

1.3

2.0

5.0

References

References added

VENDOR 3D MODEL CONTENT

Required added

IMPORT FROM THIRD PARTIES SOFTWARE

Export to IFC explained

APPENDIX 2

Level Of Information

Attributes added

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 4 OF 12

1.0

INTRODUCTION

The ADNOC Ruwais LNG Project is a two train, near net-zero electrically driven LNG facility, targeting international markets. The feed gas for the project is supplied from the Habshan Gas Processing Plant via a new export gas pipeline. The plant will have two 4.8 MTPA (nominal capacity) electric driven LNG Trains with associated LNG storage/marine export facilities and utilities.

Figure 1 – Project Context

The ADNOC Ruwais LNG Project foresees the following main components at the facility:

 Onshore LNG Liquefaction facilities for 2 x 4.8 MTPA electrically driven LNG Trains (9.6MTPA

total)

 Common facilities including inlet receiving facilities, LNG storage, BOG handling, flare,

refrigerant storage and support buildings.

 Utilities to support the facilities including import power from the national grid.

 Marine facilities for LNG export and bunkering.

1.1

Scope of the Document

The purpose of this document is to establish processes to be applied by VENDOR to provide a package or equipment 3D model to be imported in the CONTRACTOR main 3D model. It also defines the minimum and maximum level of details of the 3D model to be provided by VENDOR.

This document is applicable to mechanical rotating and package VENDOR, not to pressure vessel VENDOR.

1.2

Holds List

HOLD

DESCRIPTION

1

1.3

References

[1] 215122C-000-PP-2103 FRS – Functional Requirements Specification

[2] TE-PR-064 Procedure of Tagging of Assets

[3] TE-PR-063 Numbering of Engineering Drawings Procedure

[4] Annexure 10A-4 – IT Requirements.

[5] TE-PR-042 (Rev.1) Computer Aided Drafting Procedure.

[6] TE-PR-043 (Rev 1) Project Asset Information Handover Procedure.

[7] TE-PR-050 (Rev 0) As Built Procedure.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 5 OF 12

[8] TE-ST-005 (Rev 2) Engineering Data Deliverable.

[9] TE-ST-006 (Rev 0) SmartPlant Data Deliverable Standards.

[10] Smart Plant Engineering Solutions Guidelines.

[11] 215122C-000-PP-2003 - Equipment and Component Numbering Procedure

[12] RLNG-000-IC-PP-0001- Instrumentation & Control System Numbering Procedure

1.4

Definitions and Abbreviations

COMPANY

CONTRACTOR

EPC ADOC POC YOC VENDOR IFC LOD LOI ACC

ABU DHABI NATIONAL OIL COMPANY (ADNOC) P.J.S.C. TJN Ruwais, Joint Venture of Technip Energies France-Abu Dhabi, JGC Corporation and National Marines Dredging Company (NMDC) Engineering Procurement Construction Abu Dhabi Operating center - National Marines Dredging Company Paris Operating Center - Technip Energies Yokohama Operating center - JGC Corporation Supplier that sells goods or service to Contractor Industry Foundation Classes Level Of Detail Level Of Information Autodesk Construction Cloud

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 6 OF 12

2.0

VENDOR 3D MODEL CONTENT

The purpose of this paragraph is to provide guidelines about the content and level of details expected in the VENDOR 3D model (required minimum level of details and maximum acceptable level of details).

Typically, VENDOR shall include main geometric envelope of main equipment and subcomponents (the scope has been limited to the materials that is supplied by VENDOR including the following in his 3D model:

 Main and sub equipment including manholes location including davit with opening envelopes to

reserve the maintenance space or check clash with other object.

 Main and secondary access & handling ways with envelopes (including for valve handling) with

sufficient head clearance.

 Primary, secondary structure.

 Ladders, platforms, stairways, grating/plating, handrail, and other tertiary structure.

 Plant operating and maintenance envelopes such as handling means, permanent lifting beams,

davit, hatches.

 All piping layouts including valves (including handwheel, levers, actuators), fittings, accessories,

all supports types and arrangement.



Insulation envelope on equipment, piping, and instrument

 Electrical and instrumentation cable trays and supports or envelope reservation up to the skid’s

edge and highlight interface.

 Electrical and

instrumentation Junction boxes with opening envelopes

including

sunshades/canopies when required.

 Electrical motor, transformer, rectifier, bus bar, terminal boxes, light fixture, socket. (scope of

supply part of vendor) and other electrical items

 Local control panel, cabinet with opening envelopes including sunshades and canopies

 Safety system (ex: vendor supplied deluge system)

 Noise enclosure or other enclosure



Instrumentation gauge, transmitters, instrument safety devices with its stanchion

 Eye bath and safety shower

 Maintenance envelope with compliant head clearance (height)

 Tie-in points (nozzles, cable entry, etc…)

 External attachments such as lug, trunnion, pin, clip, stamp, name plate, support

 Door opening envelope for access/maintenance.

 Hoisting facilities and sample station.

 Vendor Piping Specifications to be implemented in S3D

 High-resolution picture of the 3D model SKID included all listed details as an example.

All items shown in the VENDOR 3D model shall be tagged as per Equipment/ Line/ Structure/ Building/ Piping Components Tag Numbering Procedure “TE-PR-064 Procedure of Tagging of Assets”,” RLNG- 000-IC-PP-0001 Instrumentation & Control System Numbering Procedure”, “RLNG-000-PM-PP-2003

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 7 OF 12

Equipment and Component Numbering Procedure”, TE-PR-063 Numbering of Engineering Drawings Procedure, whenever applicable, i.e.:



Item is included in the 3D Model, as required above.

CONTRACTOR does not request VENDOR to provide conception / construction level of details in VENDOR 3D Model which has no added value for CONTRACTOR engineering, i.e.:



Internals details of equipment

 Construction details such as bolting, gasket, chamfers, springs, etc…

Should VENDOR for his internal work process need to model high level of details, CONTRACTOR requests VENDOR to provide a cleaned-up and customized VENDOR 3D model version without high level of construction details, and for any submission of VENDOR 3D model to CONTRACTOR.

3.0

DELIVERY AND FORMAT REQUIREMENTS

3.1

VENDOR 3D model delivery schedule

VENDOR will have to provide VENDOR 3D Model file for merging into CONTRACTOR 3D Model.

VENDOR 3D Model shall be provided at same time of each revision of General Arrangement drawing (3D Model doc code to be created), in line with Document and Drawing Supply implemented in Scope of Supply Part II of Material Requisition.

4.0

VENDOR 3D MODEL FORMAT AND SETTINGS REQUIREMENTS

For each revision of the VENDOR 3D Model, the native format, a Navisworks 2023 format (.nwd) and IFC shall be provided.

VENDOR is responsible to ensure full conformity and quality checking between VENDOR 3D Model and GAD / Drawings under VENDOR responsibility.

The VENDOR 3D Model will be imported in CONTRACTOR 3D Model. The software used by CONTRACTOR is Hexagon Smart 3D (S3D 13.1).

For that purpose, CONTRACTOR will only accept from VENDOR file formats defined in paragraph 5 “Import from Third Parties Software”.

The VENDOR 3D Model shall follow the coordinate system of CONTRACTOR 3D Model. North is Y direction, West is X direction, and Up is Z direction.

The datum point of VENDOR 3D Model shall be same as datum point where specified in GAD/Drawing. If GAD/Drawing does not specify datum point, the datum point of VENDOR 3D Model shall be the north/west corner on package skid.

The datum point of VENDOR 3D Model shall follow the overall plot plan coordination system.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 8 OF 12

5.0

IMPORT FROM THIRD PARTIES SOFTWARE

The following 3D file formats are accepted for VENDOR 3D Model: The order of preferences for 3D Extensions that VENDOR shall provide for their model is the following (VENDOR shall propose the preferred file format for CONTRACTOR’s approval):



IFC and NWD (Navisworks)

If some tools do not support exporting to IFC, vendor can use third tools like Navisworks “Codemill IFC Exporter” API to export to IFC with the same LOI of the source tool or other, or other applications can export in IFC format.

If VENDOR intends to use another 3D Model format, this shall be formally agreed and validated by CONTRACTOR.

It shall be noted that the revision of the files provided by VENDOR will be managed automatically by Autodesk Construction Cloud (ACC).

Note: Each Operating Center (OC) will be responsible for managing their respective Vendor models with the rules define by the Host.

5.1

Level of Detail and Information (LOD/LOI)

The level of detail should be the simplest as possible, only external shape and simple shape should be used. Vendor should avoid using complex shape like spring or torus. Small detail like bolt or identification plate should be removed from the model. (See APPENDIX 1: Level Of Detail and APPENDIX 2: Level Of Information)

The model should be divided by Discipline

 Piping (Support, Valve…)

 Structure

 Civil



Instrumentation

 Electrical

The information provided should be According to (RLNG-000-PM-PP-2104-Functional Requirement Specification) and specification provided by discipline.

5.2

IFC files

It is possible to import IFC 2x3 files into overall S3D model.

Maximum allowed file size in S3D is 50MB (Remark: size is limited to 50MB: VENDOR shall be instructed to optimize & reduce 3D Model as much as possible).

Over this size, Import of IFC file is not possible.

Consequently, the files size must not exceed this limit. VENDOR can scatter the 3D model file in several files to reduce the size of each submitted file.

The VENDOR shall adjust the level of details of VENDOR 3D as per CONTRACTOR needs to reduce the size of IFC file.

In addition to the CAD submittals, the VENDOR shall submit the Model at LOD 300/350/400/500. It’s the granularities of the geometric representation of the digital models and the good description of data and properties (LOI), included for an object in the model at the various stages of design and operation. Files must be split and organized by area and by disciplines.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 9 OF 12

Convention for names of files: Vendor_Tag _Discpline.ifc

5.3

Navisworks files

VENDOR is requested to mandatory generate some Navisworks files (.nwd) at each release of 3D Model native files. These files shall have the same LOD as the IFC.

The Navisworks files shall be compatible with Navisworks 2023.

Maximum allowed file size in S3D is 50MB (Remark: size is limited to 50MB: VENDOR shall be instructed to optimize & reduce 3D Model as much as possible.).

Over this size, import of .nwd file is not possible.

VENDOR shall provide the files for the same content in two formats, .nwd.

Convention for names of files:

 Vendor_Tag _Discipline.nwd

6.0

DATA EXCHANGE

VENDOR shall use the interface of Platform Autodesk Construction Cloud (ex BIM 360) for exchange all 3D models, to deposit and/or retrieve the 3D Models, in a dedicated space for him.

As a result, all native files (.IFC, .NWD) generated by VENDOR shall be compatible with Autodesk Construction Cloud (BIM 360).

Platform access will be provided by CONTRACTOR.

Note: Each Operating Center (OC) will be responsible for managing their respective Vendor models with the rules define by the Host.

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 10 OF 12

7.0

APPENDIX

APPENDIX 1: Level Of Detail

According BS EN ISO 19650, Level Of Development = Level of Graphical Detail + Level of Information Included (LOD = LOd +LOI)

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 11 OF 12

APPENDIX 2: Level Of Information

Object

Attributes

Pipeline

Name

SequenceNumber

Routing From

Routing To

P&ID Number

FluidCode

Name

Description

Fluid Requirment

Fluid Type

NominalDiameter

Specification

InsulationPurpose

Insulation Material

PipeRun

InsulationThickness

Operating Minimum Pressure

Operating Maximum Pressure

Operating MinimumTemperature

Operating MaximumTemperature

Design Minimum Pressure

Design Maximum Pressure

Design MinimumTemperature

Design MaximumTemperature

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

RUWAIS LNG PROJECT

3D CAD REQUIREMENTS FOR VENDORS

COMPANY DOCUMENT REF. RLNG-000-PM-SP-2305 215122C-000-JSM-2305 CONTRACTOR DOC. REF.

REVISION: 1

PAGE 12 OF 12

Object

Attributes

Equipment (Mechanical/Process/Electrical/Instrument)

Equipment Component

Nozzle

ItemTag

Description

Material

Insulation Type

Thickness

Equipment Prefix

Equipment Sequence Number

Equipment Suffix

Equipment Dimension

Equipment Class

ItemTag

ItemTag

ItemTag

Description

Piping Instrument Properties

Measured Variable

Instrument Type modifier

Civil/Structural

Tag suffix

Handrails

Ladders

Stairs

Hangers

Slabs Members

Footings

Equipment Foundations

Plates

Stiffeners

Edge Reinforcements

Beams

The terms of Contract / Agreement No: CON22-146 shall apply for any disclosure of this document to any third party.

Project: Q-32859 - NMDC - Ruwais Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further