CONTROL VALVE MANIFOLD NOTE 1
CONTROL VALVE WITH BY-PASS
POSITIVE ISOLATION
PERMANENT UTILITY INJECTION
NOTE 1
IN ALL CASES DRUMS, COLUMNS, FILTERS, PUMPS, COMPRESSORS AND ALL PRESSURE VESSELS SHALL BE PROVIDED WITH ISOLATION DEVICES FOR MAINTENANCE:
INJECTION CAN BE MADE DURING UNIT NORMAL OPERATION
-FOR OPERATING TEMPERATURE ≥ 0°C
MIN
SPECTACLE BLINDS
SPADES AND SPACERS
FROM UTILITY HEADER
NOTE 12
NOTE 6
NOTE 6
NOTE 3
NOTE 9
B1
NOTE 9
B1
IF REQUIRED
NOTE 2
NOTE 6
IF REQUIRED
CONTROL VALVE WITHOUT BY-PASS
NOTE 5
NOTE 4 IF REQUIRED
NOTE 6
NOTE 3
NOTE 9
B1
NOTE 9
B1
NOTE 6
IF REQUIRED
NOTES 2, 4 NOTES 2, 4
BLOCK VALVE WITH SPADE ARRANGEMENTS NOTES 2, 8
-
WHEN BLOCK VALVES ARE FLANGED ARRANGEMENT IS AS FOLLOWS:
-
WHEN BLOCK VALVES ARE WELDED ARRANGEMENT IS AS FOLLOWS:
-
Ø < 8”
0B
MIN
- Ø ≥ 8”
B1
NOTE 9
- FOR THE BUTTERFLY BLOCK VALVES THE ARRANGEMENT IS AS FOLLOWS
RATING ANSI
150#
300#
600#
900#
1500# AND UP
Ø ≤ 12”
Ø ≤ 10”
Ø ≤ 8”
Ø ≤ 6”
Ø ≤ 4”
Ø ≥ 14”
Ø ≥ 12”
Ø ≥ 10”
Ø ≥ 8”
Ø ≥ 6”
- FOR LINE WITH OPERATING TEMPERATURE < 0°C AND WITH COLD INSULATION, SPECTACLE BLINDS SHALL NOT BE USED AND ONLY SPACERS OR SPADES SHALL BE INSTALLED.
PERMANENT NITROGEN PURGE FOR CRYOGENIC SERVICE
NOTE 1
0B
N2
FROM HEADER
600MM MIN
NOTE 10
N
C
0B
0B
S S E C O R P
E N I L
0B
B1
NOTE 9
7 E T O N
S S E C O R P
E N I L
NOTE 11
0B
B1
NOTE 11
INJECTION IS MADE ONLY DURING UNIT SHUTDOWN (PROCESS SIDE IS DEPRESSURIZED)
MIN
FROM UTILITY HEADER
NOTE 11
NOTE 11
7 E T O N
S S E C O R P
E N I L
PURGING INJECTION ARRANGEMENT FOR FLARE HEADERS NOTE 1
NON PERMANENT NITROGEN INJECTION NOTE 1
N2
FROM HEADER
NOTE 11
LO
PG
IN VIEW
FI
1”
N2
SPH
2”
NOTE 6
NOTE 7
0B
FG
FROM HEADER
S S E C O R P
E N L
I
B1
NOTE 9
0B
0B
NOTE 11
PG
IN VIEW
FI
I
N M
7 E T O N
S S E C O R P
E N L
I
V
3/4”
600MM MIN
0B
0B
NOTE 10
D
3/4”
LO
0B
600MM MIN
3/4”
B1
NOTE 9
B1
NOTE 9
BLEED VALVE TO BE PROVIDED FOR LINE > DN 8”
- WHEN BLOCK VALVES ARE WELDED OR WHEN BLOCK VALVES ARE BUTTERFLY VALVES IN A DOUBLE BLOCK AND BLEED ARRANGEMENT THE ARRANGEMENT IS AS FOLLOWS:
DEFROST GAS INJECTION NOTES 1, 9
B1
NOTE 9
UTILITY STATION HOLD 1
1”
N2
2”
SPH
0B
B1
NOTE 9
DG
FROM HEADER
MIN
NOTE 6
0B
NOTE 6
600MM MIN
0B
B1
NOTE 9
7 E T O N
S S E C O R P
E N I L
CHEMICAL INJECTION
NOTE 1
0B
- WHEN THE PROCESS LINE CAN BE ISOLATED WITHOUT A FULL SHUTDOWN OF THE ASSOCIATED PROCESS. (I.E. AT FILLING LINE TO UTILITY WATER TANK)
SYMBOL ON P&ID
DETAILED REPRESENTATION
0B
0B
SPX
XXXX
NOTE 11
S S E C O R P
E N I L
FLOW
NOTE 11
RS
NOTE 11
CHEMICAL LINE
D
- WHEN THE PROCESS LINE CAN’T BE ISOLATED WITHOUT A FULL SHUTDOWN OF THE ASSOCIATED PROCESS. (I.E. AT SUCTION OF POTABLE WATER PUMPS)
SYMBOL ON P&ID
DETAILED REPRESENTATION
NON PERMANENT UTILITY CONNECTION NOTE 1
0B
SPX
XXXX
NOTE 11
ACCESS FITTING
NOTE 11
NOTE 11
CHEMICAL LINE
D
FOR HAZARDOUS SERVICE
UC
MIN
D
FOR NON- HAZARDOUS SERVICE
NOTE 7
UC
S S E C O R P
E N L
I
NOTE 7
S S E C O R P
E N L
I
S S E C O R P
E N I L
FLOW
0B
SBB AND DBB DETAILS NOTE 1
0B
SYMBOL ON P&ID
DETAILED REPRESENTATION
GENERAL NOTES :
A. PIPING VENTS, DRAINS AND SAMPLE POINTS ARE 3/4” MINIMUM. FOR VENTS AND
DRAINS, ANY HORIZONTAL VALVE ON THE THE RIGHT HAND SIDE OF THE VERTICAL PIPELINE IS TO BE READ AS A DRAIN VALVE AND ANY HORIZONTAL VALVE ON THE LEFT HAND SIDE OF THE VERTICAL PIPELINE IS TO BE READ AS A VENT VALVE CONNECTION.
B. ALL VALVE CONNECTIONS TO ATMOSPHERE IN PROCESS SERVICE WILL BE PLUGGED
OR TO HAVE BLIND FLANGE.
C. THE RESPONSIBILITY OF ADMINISTRATIVE CONTROLS FOR VALVES NOTED CSO, CSC,
LO OR LC IS ACCEPTED BY OWNER. APPROVAL IS REQUIRED BY OWNER FOR ALL SUCH MEASURES.
B B S
B B D
NOTES :
VALVE TYPE IN ACCORDANCE WITH PIPING CLASS. FOR CONTROL VALVE OPEN BY INSTRUMENT AIR FAILURE (FO), ONE MAINTENANCE BLEED WILL BE INSTALLED UPSTREAM OF CONTROL VALVE. FOR CONTROL VALVE CLOSED BY INSTRUMENT AIR FAILURE (FC), FAIL LOCKED IN POSITION (FL) OR TOXIC, CORROSIVE SERVICE, TWO MAINTENANCE BLEEDS WILL BE INSTALLED, ONE UPSTREAM AND ONE DOWNSTREAM OF THE CONTROL VALVE FAILURE POSITION ACCORDING TO PID. IF HAND WHEEL IS INSTALLED, NO DOWNSTREAM MAINTENANCE BLEED IS REQUIRED. THE NEED FOR INSTALLATION OF BLOCK VALVES, BY-PASS VALVE AND HAND WHEEL AROUND THE CONTROL VALVE TO BE DETERMINED ON A CASE BY CASE BASIS BY PROCESS. SINGLE OR DOUBLE BLOCK AND BLEED AS REQUIRED. REFER TO ISOLATION PHILOSOPHY N° : RLNG-000-PR-PP-0003.
TOP OR SIDE CONNECTION. FOR TYPE OF POSITIVE ISOLATION REFER TO POSITIVE ISOLATION TABLE. HAZARDOUS SERVICES (INCLUDING HYDROCARBONS, EXCLUDING CHEMICAL) VENT TO FLARE AND DRAIN TO A CLOSED DRAIN SYSTEM. ALL DRAINS SHALL BE HARDPIPED TO FLARE HEADER OR DRAIN HEADER TYPE B1 REFER TO LEGENDS SHEET P&ID N° : RLNG-000-PR-PID-0013. DISSIMILAR TYPE CHECK VALVES. SPEC BREAKS TO BE DETERMINED ON A CASE BY CASE BASIS BY PROCESS. DISSIMIAR CHECK VALVES TO BE CONSIDERED IN CASE OF NITROGEN CONTAMINATION BY HYDROCARBON.
0B
HOLDS :
- DETAIL TO BE DEVELOPED LATER.
A
B
C
D
E
F
G
0B
0A
0
12-Feb-2025
25-Oct-2024
05-Jul-2024
REV
DATE
SCALE:
DRAWN:
IFD - Issued for Design
VCH
AK/SB/JGO
ADE
IFH - ISSUED FOR HAZOP
VCH
AK/SB/JGO
ADE
ICR - ISSUED FOR CLIENT REVIEW
VCH
AK/SB/JGO
ADE
DESCRIPTION
CHKD:
DRAWN
CHKD
APPRD
APPRD:
NONE
VCH
AK/SB/JGO
ADE
H
CONTRACTOR
PROJECT TITLE
RUWAIS LNG PROJECT
DRAWING TITLE
PIPING & INSTRUMENTATION DIAGRAM UNIT 000 General TYPICAL DETAILS FOR PIPING ARRANGEMENT 1
UNIT:
000 CONTR. PROJ. No.
PLANT:
RUWAIS
215122C
DOC. CLASS:
1.5 CONT. DWG. No.:
DOC. CAT:
2
215122C-000-PID-0090-0011
I
J
i
.
I
d p B 0 _ 1 1 0 0
D P R P
0 0 0
G N L R
: .
O N D A C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ADNOC GAS AGREEMENT No.
4700022871
OC DWG. No.:
ADNOC GAS PROJ. No.
22-146
ADNOC GAS DWG. No. RLNG-000-PR-PID-0011
SHEET REV. 0B 01/01 SHEET SIZE : A1
A
B
C
D
E
F
G
H
I
J
R O F Y L P P A L L A H S 6 4 1
2 2 N O C
:
O N T N E M E E R G A
/
T C A R T N O C F O S M R E T E H T
.
I
Y T R A P D R H T Y N A O T T N E M U C O D S H T F O E R U S O L C S D Y N A
I
I
Project: Q-32859 - NMDC - Ruwais Folder: RFQ Files