PRESSURE RELIEF VALVE
NOTES 1, 9, 15,19
PRESSURE RELIEF VALVE TO ATMOSPHERE
NOTES 1, 9, 15, 19
SINGLE BLOCK VALVING
DOUBLE BLOCK VALVING
0B
NOTES 3, 5,16,18
NOTES 3, 5,16,18
NOTES 3, 5,16,18
NOTES 3, 5, 16, 18
TO FLARE HEADER
TO FLARE HEADER
PSV
V
ILO
FB
PSV
V
ILO
FB
NOTE 13
TO FLARE HEADER
ILO
FB
ILO
FB
NOTE 13
TO FLARE HEADER
PSV
V
PSV
V
V
NOTE 10
SPISPI
V
NOTE 10
SPISPI
ILO
FB
ILC
FB
V
ILO
FB
NOTE 10
SPI SPISPI
V
V
V
ILC
FB
NOTE 10
SPISPI SPI
ILO
FB
ILC
FB
B3
600MM MIN
NOTE 2
TO FLARE HEADER
B3
V
600MM MIN.
NOTE 2
TO FLARE HEADER
S R
NOTE 17
FROM PROTECTED EQUIPMENT / PROCESS LINE
WITH SPARE NORMAL CASE
WITHOUT SPARE PARTICULAR CASE
ATM TO
SAFE LOCATION
ATM TO ATM TO SAFE LOCATION SAFE LOCATION
ATM TO
SAFE LOCATION
NOTES 3, 5,16,18
NOTES 3, 5,16,18
NOTES 3, 5,16,18
PSV
PSV
NOTE 6
PSV
NOTE 6
NOTE 6
NOTE 8
NOTE 6
NOTE 8
V
V
NOTE 10 SPISPI
ILO
FB
ILC
FB
0B
V
LO
FB
NOTE 4
NOTE 4
TYPICAL ARRANGEMENT FOR COLD INSULATED SYSTEMS RELIEF VALVE
DEPRESSURIZATION VALVE NOTES 1, 9, 19
NON INSULATED PART
.
I
N M M M 0 0 9
0B
NON INSULATED
PART
I
N M M M 0 0 0 1
N
C
I
N M M M 0 0 9
1000MM MIN
NON INSULATED
PART
N
C
I
N M M M 0 0 0 1
I
N M M M 0 0 9
N
C
I
N M M M 0 0 9
0B
NOTE 7
LO FB
BDV
RO
MIN
IF REQUIRED FOR
HP/LP OR HP AND LOW TEMP.
NOTE 11
HOLD 1
B4
FO
D
600MM MIN
NOTE 2
IF REQUIRED FOR LOW TEMPERATURE
LO FB
TO FLARE HEADER
HOLDS :
- SUPPLY AND INSTALLATION OF PIPING MATERIALS PENDING COR 4C IMPLEMENTATION.
COLD INSULATED EQUIPMENT
COLD INSULATED LINE
COLD INSULATED LINE
COLD INSULATED LINE
THERMAL EXPANSION RELIEF VALVE
NOTES 1, 9, 15,19
TSV DISCHARGING IN DEDICATED SYSTEM
TSV DISCHARGING IN SAME SYSTEM
TSV DISCHARGING TO FLARE
NOTES 16,18
TSV
V
LO
FB
NOTES 16,18
TSV
V
LO
FB
NOTES 16,18
TSV
V
LO
FB
TO FLARE HEADER
V
V
V
LO
FB
LO
FB
LO
FB
PROCESS LINE
PROCESS LINE / RELIEF HEADER
PROCESS LINE
PROCESS LINE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
GENERAL NOTES :
A. PIPING VENTS, DRAINS AND SAMPLE POINTS ARE 3/4” MINIMUM. FOR VENTS
AND DRAINS, ANY HORIZONTAL VALVE ON THE THE RIGHT HAND SIDE OF THE VERTICAL PIPELINE IS TO BE READ AS A DRAIN VALVE AND ANY HORIZONTAL VALVE ON THE LEFT HAND SIDE OF THE VERTICAL PIPELINE IS TO BE READ AS A VENT VALVE CONNECTION.
A
B. ALL VALVE CONNECTIONS TO ATMOSPHERE IN PROCESS SERVICE WILL BE PLUGGED
OR BLIND FLANGE.
C. THE RESPONSIBILITY OF ADMINISTRATIVE CONTROLS FOR VALVES NOTED CSO, CSC,
LO OR LC IS ACCEPTED BY OWNER. APPROVAL IS REQUIRED BY OWNER FOR ALL SUCH MEASURES.
NOTES :
VALVE TYPE IN ACCORDANCE WITH PIPING CLASS. DISTANCE 600MM MIN IS ONLY REQUIRED IN CASE OF COLD DEPRESSURIZATION TO AVOID ICING OF THE BLOCK VALVE OR BDV.
0B
SPARING OF RELIEF VALVES TO BE ON CASE BY CASE BASIS, BASED ON PROCESS AVAILABILITY. REQUIREMENT FOR MANUAL DEPRESSURIZATION TO BE DETERMINED ON A CASE BY CASE BASIS. DISTANCE BETWEEN RELIEF VALVE AND REDUCER TO BE MINIMIZED. DRIP HOLE AT LOW POINT : DIAMETER = 10 MM FOR NON-HYDROCARBON SERVICE. SINGLE OR DOUBLE BLOCK AND BLEED AS REQUIRED. REFER TO ISOLATION PHILOSOPHY N° : RLNG-000-PR-PP-0003. PIPING CLASS BREAK CAN BE DIFFERENT ACCORDING TO PROCESS CONDITIONS UPSTREAM AND DOWNSTREAM RELIEF VALVE. FOR MORE INFORMATION. REFER TO ISOLATION PHILOSOPHY N° : RLNG-000-PR-PP-0003. FOR PSV, THE SPECIAL PIPING ITEM IS A SWITCHING DEVICE WITH MECHANICAL INTERLOCKING SYSTEM TO ENSURE A PSV IS CONTINUOUSLY ONLINE DURING CHANGE OVER OPERATION.
0B
IT SHOULD BE THAT ALL HAZARDOUS SERVICES (INCLUDING HYDROCARBONS, EXCLUDING CHEMICAL) VENT TO FLARE AND DRAIN TO A CLOSED DRAIN SYSTEM. ALL DRAINS SHALL BE HARDPIPED TO FLARE HEADER OR DRAIN HEADER (TYPE 1) REFER TO LEGENDS SHEET P&ID N° : RLNG-000-PR-PID-0013. DELETED.
ALL CLOSED PRESSURE RELIEF VALVE DISCHARGE LEADS SHALL BE FREE DRAINING FROM THE PRESSURE RELIEF VALVE TO THE TOP OF THE DISCHARGE HEADER. EACH LEAD IS TO BE CHECKED FOR A DOWNWARD SLOPE AFTER CONSTRUCTION.IMPULSE LINE FOR PILOT OPERATED VALVES SHALL BE FREE DRAINING.
DELETED.
FOR UNSPARED PRESSURE RELIEVING DEVICES, WHEN AN INLET STOP VALVE IS PROVIDED BETWEEN A VESSEL AND ITS PRESSURE RELIEVING DEVICE OR WHEN A DISCHARGE STOP VALVE IS PROVIDED BETWEEN A PRESSURE RELIEVING DEVICE AND A COMMON DISCHARGE HEADER,THE STOP VALVE SHALL BE ARRANGED SO THAT IT CAN BE LOCKED. WRITTEN ADMINISTRATIVE PROCEDURES SHALL ENSURE THAT THE STOP VALVE WILL NOT BE CLOSED WHILE THE VESSEL IS IN OPERATION EXCEPT BY AN AUTHORIZED PERSON WHO SHALL REMAIN STATIONED THERE DURING THE VESSEL’S OPERATION AND WHO SHALL AGAIN LOCK THE STOP VALVE OPEN BEFORE LEAVING. UNDER NO CONDITION SHALL A DISCHARGE STOP VALVE BE CLOSED, WHILE THE VESSEL IS IN OPERATION, BEFORE THE INLET STOP VALVE IS CLOSED (REFER TO ASME PRESSURE VESSEL CODE SECTION VIII APPENDIX M). BLOCK VALVES IN RELIEF VALVE INLET AND DISCHARGE LINES MUST HAVE STEMS IN HORIZONTAL POSITION IF GATE VALVES ARE USED. THE SAME IS VALID FOR ANY VALVE IN THE PIPING BETWEEN THE RELIEF VALVE AND THE VESSEL IT IS PROTECTING. REMOVABLE SPOOL INSTALLED WHEN PSV IS INSTALLED DIRECTLY ON THE EQUIPMENT. WHEN PSV IS INSTALLED ON A PROCESS LINE, NO REMOVABLE SPOOL IS REQUIRED. PSV GOVERNING CASE INDICATION.
REQUIREMENT FOR CAVITY VENTING ON BLOCK VALVES TO BE CONSIDERED AS PER ISOLATION PHILOSOPHY RLNG-000-PR-PP-003.
B
C
D
E
F
G
0B
0A
0
12-Feb-2025
25-Oct-2024
05-Jul-2024
REV
DATE
SCALE:
DRAWN:
IFD - Issued for Design
VCH
AK/SB/JGO
ADE
IFH - ISSUED FOR HAZOP
VCH
AK/SB/JGO
ADE
ICR - ISSUED FOR CLIENT REVIEW
VCH
AK/SB/JGO
ADE
DESCRIPTION
CHKD:
DRAWN
CHKD
APPRD
APPRD:
NONE
VCH
AK/SB/JGO
ADE
H
CONTRACTOR
PROJECT TITLE
RUWAIS LNG PROJECT
DRAWING TITLE
PIPING & INSTRUMENTATION DIAGRAM UNIT 000 General TYPICAL DETAILS FOR PIPING ARRANGEMENT 2
UNIT:
000 CONTR. PROJ. No.
PLANT:
RUWAIS
215122C
DOC. CLASS:
1.5 CONT. DWG. No.:
DOC. CAT:
2
215122C-000-PID-0090-0012
ADNOC GAS AGREEMENT No.
4700022871
OC DWG. No.:
ADNOC GAS PROJ. No.
22-146
ADNOC GAS DWG. No. RLNG-000-PR-PID-0012
SHEET REV. 0B 01/01 SHEET SIZE : A1
I
J
i
.
I
d p B 0 _ 2 1 0 0
D P R P
0 0 0
G N L R
: .
O N D A C
NOTE 4
S R
NOTE 17
FROM PROTECTED EQUIPMENT / PROCESS LINE
I
N M M M 0 0 0 1
N C
MIN.
A
B
C
D
E
F
G
H
I
J
R O F Y L P P A L L A H S 6 4 1
2 2 N O C
:
O N T N E M E E R G A
/
T C A R T N O C F O S M R E T E H T
.
I
Y T R A P D R H T Y N A O T T N E M U C O D S H T F O E R U S O L C S D Y N A
I
I
Project: Q-32859 - NMDC - Ruwais Folder: RFQ Files