HORIZONTAL VESSEL

SINGLE BLOCK AND BLEED ARRANGEMENT

NOTE 14

D

TO CLOSED DRAIN HEADER AS PER PID

RECOVERED DRAINAGE

NOTES 1, 2, 3

VERTICAL VESSELS OR LINES

SINGLE BLOCK AND BLEED ARRANGEMENT

LPT

PROCESS LINE

D

TO CLOSED DRAIN HEADER AS PER PID

CONNECTION ON CRYOGENIC SERVICES

SINGLE BLOCK AND BLEED ARRANGEMENT

NOTE 4

NOTE 10

D

600MM MIN

TO CLOSED DRAIN HEADER AS PER PID

DOUBLE BLOCK AND BLEED ARRANGEMENT

DOUBLE BLOCK AND BLEED ARRANGEMENT

DOUBLE BLOCK AND BLEED ARRANGEMENT

MAINTENANCE DRAIN ARRANGEMENT WITH OPERATIONAL DRAIN

NOTES 1, 2, 15

SINGLE BLOCK AND BLEED ARRANGEMENT

GENERAL NOTES : A. PIPING VENTS, DRAINS AND SAMPLE POINTS ARE 3/4” MINIMUM. FOR VENTS AND

DRAINS, ANY HORIZONTAL VALVE ON THE THE RIGHT HAND SIDE OF THE VERTICAL PIPELINE IS TO BE READ AS A DRAIN VALVE AND ANY HORIZONTAL VALVE ON THE LEFT HAND SIDE OF THE VERTICAL PIPELINE IS TO BE READ AS A VENT VALVE CONNECTION.

B. ALL VALVE CONNECTIONS TO ATMOSPHERE IN PROCESS SERVICE WILL BE

PROCESS LINE

PLUGGED OR BLIND FLANGE.

C. THE RESPONSIBILITY OF ADMINISTRATIVE CONTROLS FOR VALVES NOTED CSO,

CSC, LO OR LC IS ACCEPTED BY OWNER. APPROVAL IS REQUIRED BY OWNER FOR ALL SUCH MEASURES.

MIN

NOTE 13

MIN

NOTE 13

0B

D

D

0B

0B

TO CLOSED DRAIN HEADER

NOTES :

TO REFRIGERANT RECOVERY HEADER

NOTE 14

D

D

TO CLOSED DRAIN HEADER AS PER PID

LPT

PROCESS LINE

NOTE 14

D

D

TO CLOSED DRAIN HEADER AS PER PID

P&ID REPRESENTATION

BLEED VALVE CONNECTED TO CLOSED DRAIN SYSTEM NOTES 1, 12

INSTALLATION HOLD 1

NOTE 4

NOTE 10

D

D

600MM MIN

TO CLOSED DRAIN HEADER AS PER PID

DOUBLE BLOCK AND BLEED ARRANGEMENT

PROCESS LINE

MIN

NOTE 13

0B

D

MIN

NOTE 13

0B

D

D

TO CLOSED DRAIN HEADER

TO REFRIGERANT RECOVERY HEADER

MAINTENANCE DRAIN NOTES 11, 15

B1

SINGLE BLOCK AND BLEED ARRANGEMENT

MAINTENANCE DRAIN FOR LEVEL INSTRUMENT

B2

NOTES 7, 11, 15

SINGLE BLOCK AND BLEED ARRANGEMENT

BX

NOTES 3, 12

P&ID

HOLD 1

NOTE 14

0B

1:500

MIN

NOTE 13

D

3/4”

4 E T O N

0B

TO CLOSED DRAIN / FLARE HEADER AS PER PID

2”

2”

2”

P&ID

HOLD 1

0B

NOTE 14

1:500

MIN NOTE 13

D

3/4”

NOTE 4

NOTE 10

TO CLOSED DRAIN/FLARE HEADER

DOUBLE BLOCK AND BLEED ARRANGEMENT

DOUBLE BLOCK AND BLEED ARRANGEMENT

D

3/4”

D

3/4”

D

3/4”

P&ID

HOLD 1

NOTE 14

0B

1:500

MIN

NOTE 13

D

3/4”

4 E T O N

0B

TO CLOSED DRAIN / FLARE HEADER AS PER PID

D

3/4”

D

3/4”

D

3/4”

P&ID

HOLD 1

NOTE 14

0B

1:500

MIN

NOTE 13

D

3/4”

NOTE 4

NOTE 10

TO CLOSED DRAIN / FLARE HEADER

A

B

C

D

E

F

G

VALVE TYPE IN ACCORDANCE WITH PIPING CLASS.

SINGLE OR DOUBLE BLOCK AND BLEED AS REQUIRED. REFER TO ISOLATION PHILOSOPHY N° : RLNG-000-PR-PP-0003.

TYPICAL DRAIN OR VENT ARRANGEMENT TO CLOSED DRAIN SYSTEM AND FLARE SYSTEM RESPECTIVELY AS IDENTIFIED IN P&ID.

PIPING SPEC OF MAIN LINE OR FLARE LINE WHICHEVER IS MORE STRINGENT.

PIPING SPEC OF FLARE/DRAIN HEADER WHERE LINE IS ROUTED TO.

DELETED.

ALL INSTRUMENTS AND LEVEL GAUGES HAVING SPECTACLE BLIND PREFERABLY IN OPEN POSITION FOR EASY OF OPERATION. IN SUCH CASE, COMPANY TO ENSURE PROPER CLOSURE OF LEVEL INSTRUMENT DRAIN VALVES AFTER COMPLETING THE DRAINING ACTIVITY.

DELETED.

DELETED.

CLOSED DRAIN PIPING SPEC. CLOSED DRAIN SUB-HEADERS AND HEADERS ARE SEGRAGATED FOR EACH PIPE RATING CLASS IN LINE WITH PROCESS PIPING UP TO CLOSED DRAIN DRUM NOZZLE. ON A CASE BY CASE BASIS SOME DRAINS/VENTS COULD BE COMBINED UPSTREAM CHECK VALVE AND POSITIVE ISOLATION (PRESSURE, SERVICE, MAINTENANCE SEQUENCE COMPATIBILITY REVIEW).

ALL HAZARDOUS SERVICES (INCLUDING HYDROCARBONS, EXCLUDING CHEMICAL) VENT TO FLARE AND DRAIN TO A CLOSED DRAIN SYSTEM. ALL DRAINS SHALL BE HARDPIPED TO FLARE HEADER OR DRAIN HEADER.

DISTANCE 600MM MIN IS ONLY REQUIRED IN CASE OF COLD DEPRESSURIZATION TO AVOID ICING OF THE BLOCK VALVE.

POSITIVE ISOLATION TO BE SELECTED AS PER TABLE ON RLNG-000-PR-PID-0011 DEPENDING ON SERVICE AND LINE SIZE DIAMETER.

REQUIREMENT FOR CAVITY VENTING ON BLOCK VALVES TO BE CONSIDERED AS PER ISOLATION PHILOSOPHY RLNG-000-PR-PP-003.

HOLDS :

  1. SUPPLY AND INSTALLATION OF PIPING MATERIALS PENDING COR 4C

IMPLEMENTATION.

0B

0A

0

12-Feb-2025

25-Oct-2024

05-Jul-2024

REV

DATE

SCALE:

DRAWN:

IFD - Issued for Design

VCH

AK/SB/JGO

ADE

IFH - ISSUED FOR HAZOP

VCH

AK/SB/JGO

ADE

ICR - ISSUED FOR CLIENT REVIEW

VCH

AK/SB/JGO

ADE

DESCRIPTION

CHKD:

DRAWN

CHKD

APPRD

APPRD:

NONE

VCH

AK/SB/JGO

ADE

H

P&ID REPRESENTATION

NOTES 3, 12

B3

BLEED VALVE CONNECTED TO FLARE SYSTEM

NOTES 1, 12

P&ID REPRESENTATION

0B

NOTE 14

0B

1:500

NOTE 4 NOTE 5

TO FLARE HEADER AS PER PID

NOTES 3, 12

B4

INSTALLATION HOLD 1

NOTES 11, 15

V

3/4”

NOTE 13

HOLD 1 P&ID

INSTALLATION HOLD 1

NOTE 15

NOTE 14

P&ID

HOLD 1

0B

1:500

CONTRACTOR

PROJECT TITLE

RUWAIS LNG PROJECT

TO FLARE HEADER

DRAWING TITLE

PIPING & INSTRUMENTATION DIAGRAM UNIT 000 General TYPICAL DETAILS FOR PIPING ARRANGEMENT 3

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

ADNOC GAS AGREEMENT No.

4700022871

OC DWG. No.:

ADNOC GAS PROJ. No.

22-146

ADNOC GAS DWG. No. RLNG-000-PR-PID-0013

SHEET REV. 0B 01/01 SHEET SIZE : A1

UNIT:

000 CONTR. PROJ. No.

PLANT:

RUWAIS

215122C

DOC. CLASS:

1.5 CONT. DWG. No.:

DOC. CAT:

2

215122C-000-PID-0090-0013

I

J

i

.

I

d p B 0 _ 3 1 0 0

D P R P

0 0 0

G N L R

: .

O N D A C

A

B

C

D

E

F

G

H

I

J

R O F Y L P P A L L A H S 6 4 1

2 2 N O C

:

O N T N E M E E R G A

/

T C A R T N O C F O S M R E T E H T

.

I

Y T R A P D R H T Y N A O T T N E M U C O D S H T F O E R U S O L C S D Y N A

I

I

Project: Q-32859 - NMDC - Ruwais Folder: RFQ Files


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further