HORIZONTAL VESSEL
SINGLE BLOCK AND BLEED ARRANGEMENT
NOTE 14
D
TO CLOSED DRAIN HEADER AS PER PID
RECOVERED DRAINAGE
NOTES 1, 2, 3
VERTICAL VESSELS OR LINES
SINGLE BLOCK AND BLEED ARRANGEMENT
LPT
PROCESS LINE
D
TO CLOSED DRAIN HEADER AS PER PID
CONNECTION ON CRYOGENIC SERVICES
SINGLE BLOCK AND BLEED ARRANGEMENT
NOTE 4
NOTE 10
D
600MM MIN
TO CLOSED DRAIN HEADER AS PER PID
DOUBLE BLOCK AND BLEED ARRANGEMENT
DOUBLE BLOCK AND BLEED ARRANGEMENT
DOUBLE BLOCK AND BLEED ARRANGEMENT
MAINTENANCE DRAIN ARRANGEMENT WITH OPERATIONAL DRAIN
NOTES 1, 2, 15
SINGLE BLOCK AND BLEED ARRANGEMENT
GENERAL NOTES : A. PIPING VENTS, DRAINS AND SAMPLE POINTS ARE 3/4” MINIMUM. FOR VENTS AND
DRAINS, ANY HORIZONTAL VALVE ON THE THE RIGHT HAND SIDE OF THE VERTICAL PIPELINE IS TO BE READ AS A DRAIN VALVE AND ANY HORIZONTAL VALVE ON THE LEFT HAND SIDE OF THE VERTICAL PIPELINE IS TO BE READ AS A VENT VALVE CONNECTION.
B. ALL VALVE CONNECTIONS TO ATMOSPHERE IN PROCESS SERVICE WILL BE
PROCESS LINE
PLUGGED OR BLIND FLANGE.
C. THE RESPONSIBILITY OF ADMINISTRATIVE CONTROLS FOR VALVES NOTED CSO,
CSC, LO OR LC IS ACCEPTED BY OWNER. APPROVAL IS REQUIRED BY OWNER FOR ALL SUCH MEASURES.
MIN
NOTE 13
MIN
NOTE 13
0B
D
D
0B
0B
TO CLOSED DRAIN HEADER
NOTES :
TO REFRIGERANT RECOVERY HEADER
NOTE 14
D
D
TO CLOSED DRAIN HEADER AS PER PID
LPT
PROCESS LINE
NOTE 14
D
D
TO CLOSED DRAIN HEADER AS PER PID
P&ID REPRESENTATION
BLEED VALVE CONNECTED TO CLOSED DRAIN SYSTEM NOTES 1, 12
INSTALLATION HOLD 1
NOTE 4
NOTE 10
D
D
600MM MIN
TO CLOSED DRAIN HEADER AS PER PID
DOUBLE BLOCK AND BLEED ARRANGEMENT
PROCESS LINE
MIN
NOTE 13
0B
D
MIN
NOTE 13
0B
D
D
TO CLOSED DRAIN HEADER
TO REFRIGERANT RECOVERY HEADER
MAINTENANCE DRAIN NOTES 11, 15
B1
SINGLE BLOCK AND BLEED ARRANGEMENT
MAINTENANCE DRAIN FOR LEVEL INSTRUMENT
B2
NOTES 7, 11, 15
SINGLE BLOCK AND BLEED ARRANGEMENT
BX
NOTES 3, 12
P&ID
HOLD 1
NOTE 14
0B
1:500
MIN
NOTE 13
D
3/4”
4 E T O N
0B
TO CLOSED DRAIN / FLARE HEADER AS PER PID
2”
2”
2”
P&ID
HOLD 1
0B
NOTE 14
1:500
MIN NOTE 13
D
3/4”
NOTE 4
NOTE 10
TO CLOSED DRAIN/FLARE HEADER
DOUBLE BLOCK AND BLEED ARRANGEMENT
DOUBLE BLOCK AND BLEED ARRANGEMENT
D
3/4”
D
3/4”
D
3/4”
P&ID
HOLD 1
NOTE 14
0B
1:500
MIN
NOTE 13
D
3/4”
4 E T O N
0B
TO CLOSED DRAIN / FLARE HEADER AS PER PID
D
3/4”
D
3/4”
D
3/4”
P&ID
HOLD 1
NOTE 14
0B
1:500
MIN
NOTE 13
D
3/4”
NOTE 4
NOTE 10
TO CLOSED DRAIN / FLARE HEADER
A
B
C
D
E
F
G
VALVE TYPE IN ACCORDANCE WITH PIPING CLASS.
SINGLE OR DOUBLE BLOCK AND BLEED AS REQUIRED. REFER TO ISOLATION PHILOSOPHY N° : RLNG-000-PR-PP-0003.
TYPICAL DRAIN OR VENT ARRANGEMENT TO CLOSED DRAIN SYSTEM AND FLARE SYSTEM RESPECTIVELY AS IDENTIFIED IN P&ID.
PIPING SPEC OF MAIN LINE OR FLARE LINE WHICHEVER IS MORE STRINGENT.
PIPING SPEC OF FLARE/DRAIN HEADER WHERE LINE IS ROUTED TO.
DELETED.
ALL INSTRUMENTS AND LEVEL GAUGES HAVING SPECTACLE BLIND PREFERABLY IN OPEN POSITION FOR EASY OF OPERATION. IN SUCH CASE, COMPANY TO ENSURE PROPER CLOSURE OF LEVEL INSTRUMENT DRAIN VALVES AFTER COMPLETING THE DRAINING ACTIVITY.
DELETED.
DELETED.
CLOSED DRAIN PIPING SPEC. CLOSED DRAIN SUB-HEADERS AND HEADERS ARE SEGRAGATED FOR EACH PIPE RATING CLASS IN LINE WITH PROCESS PIPING UP TO CLOSED DRAIN DRUM NOZZLE. ON A CASE BY CASE BASIS SOME DRAINS/VENTS COULD BE COMBINED UPSTREAM CHECK VALVE AND POSITIVE ISOLATION (PRESSURE, SERVICE, MAINTENANCE SEQUENCE COMPATIBILITY REVIEW).
ALL HAZARDOUS SERVICES (INCLUDING HYDROCARBONS, EXCLUDING CHEMICAL) VENT TO FLARE AND DRAIN TO A CLOSED DRAIN SYSTEM. ALL DRAINS SHALL BE HARDPIPED TO FLARE HEADER OR DRAIN HEADER.
DISTANCE 600MM MIN IS ONLY REQUIRED IN CASE OF COLD DEPRESSURIZATION TO AVOID ICING OF THE BLOCK VALVE.
POSITIVE ISOLATION TO BE SELECTED AS PER TABLE ON RLNG-000-PR-PID-0011 DEPENDING ON SERVICE AND LINE SIZE DIAMETER.
REQUIREMENT FOR CAVITY VENTING ON BLOCK VALVES TO BE CONSIDERED AS PER ISOLATION PHILOSOPHY RLNG-000-PR-PP-003.
HOLDS :
- SUPPLY AND INSTALLATION OF PIPING MATERIALS PENDING COR 4C
IMPLEMENTATION.
0B
0A
0
12-Feb-2025
25-Oct-2024
05-Jul-2024
REV
DATE
SCALE:
DRAWN:
IFD - Issued for Design
VCH
AK/SB/JGO
ADE
IFH - ISSUED FOR HAZOP
VCH
AK/SB/JGO
ADE
ICR - ISSUED FOR CLIENT REVIEW
VCH
AK/SB/JGO
ADE
DESCRIPTION
CHKD:
DRAWN
CHKD
APPRD
APPRD:
NONE
VCH
AK/SB/JGO
ADE
H
P&ID REPRESENTATION
NOTES 3, 12
B3
BLEED VALVE CONNECTED TO FLARE SYSTEM
NOTES 1, 12
P&ID REPRESENTATION
0B
NOTE 14
0B
1:500
NOTE 4 NOTE 5
TO FLARE HEADER AS PER PID
NOTES 3, 12
B4
INSTALLATION HOLD 1
NOTES 11, 15
V
3/4”
NOTE 13
HOLD 1 P&ID
INSTALLATION HOLD 1
NOTE 15
NOTE 14
P&ID
HOLD 1
0B
1:500
CONTRACTOR
PROJECT TITLE
RUWAIS LNG PROJECT
TO FLARE HEADER
DRAWING TITLE
PIPING & INSTRUMENTATION DIAGRAM UNIT 000 General TYPICAL DETAILS FOR PIPING ARRANGEMENT 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ADNOC GAS AGREEMENT No.
4700022871
OC DWG. No.:
ADNOC GAS PROJ. No.
22-146
ADNOC GAS DWG. No. RLNG-000-PR-PID-0013
SHEET REV. 0B 01/01 SHEET SIZE : A1
UNIT:
000 CONTR. PROJ. No.
PLANT:
RUWAIS
215122C
DOC. CLASS:
1.5 CONT. DWG. No.:
DOC. CAT:
2
215122C-000-PID-0090-0013
I
J
i
.
I
d p B 0 _ 3 1 0 0
D P R P
0 0 0
G N L R
: .
O N D A C
A
B
C
D
E
F
G
H
I
J
R O F Y L P P A L L A H S 6 4 1
2 2 N O C
:
O N T N E M E E R G A
/
T C A R T N O C F O S M R E T E H T
.
I
Y T R A P D R H T Y N A O T T N E M U C O D S H T F O E R U S O L C S D Y N A
I
I
Project: Q-32859 - NMDC - Ruwais Folder: RFQ Files