Flameproof Chiller Unit - Zone 1
An essential optional fitting for Hughes emergency tank showers
operating in extreme hot climates. The heat of the sun can
increase the water temperature within the tank shower to levels
which may scald a user upon activation. This flameproof chiller is
suitable for use in hazardous environments, ATEX Zone 1, and will
maintain the water temperature within the tank between 16-38C
as per EN15154 and ANSI Z358.1-2014 requirements.
• Durable marine grade copper-free aluminium light alloy control
enclosure
• Ability to set required water temperature (factory set to 25C) • Retrofittable to your existing Hughes emergency tank showers
Specifications
MATERIALS OF CONSTRUCTION
CASING MATERIAL
CASING MATERIAL FINISH
SERVICES
SUITABLE ENVIRONMENT
UNIT CLASSIFICATION
TOTAL COOLING DUTY
REFRIGERANT
INGRESS PROTECTION
CONNECTION SIZE
ELECTRICAL POWER SUPPLY - SINGLE PHASE CHILLER
Zinc Coated Mild Steel (Zintec)
Polyester Industrial Powder Coated
ATEX Certified, Zone 1
EX II 2G IIB T4
3 kW
R134a suitable for very high ambient operation (non-ozone depleting)
IP 66
3/4” 220-240V/1Ph/50hz
- THREE PHASE CHILLER
380-420V/3Ph/50hz or 440-480V/3Ph/60h
TOTAL POWER CONSUMPTION - SINGLE PHASE CHILLER
1.96kW
- THREE PHASE CHILLER
1.79kW
RUNNING CURRENT - SINGLE PHASE CHILLER
15.15A
- THREE PHASE CHILLER
4.35A
AMBIENT OPERATING TEMPERATURE
OPERATING LIMITS
FLUID TEMPERATURE RANGE
DIMENSIONS & WEIGHT
0C / 32F to 60C / 140F
18C / 64F to 36C / 97F
DIMENSIONS - STANDARD ORIENTATION (WxDxH)
698mm (27.5in) x 1017mm (40in) x 1175mm (46.2in)
WEIGHT
230kg / 507lb
www.hughes-safety.comProduct DatasheetFlameproof Chiller Unit - Zone 1
1
35
5 1
0 0 2
0 6 2
0 0 2
5 1
TYP 4 OFF
13 THRU
2 8 0 1
2 7 1 1
0 9
A
A
B
C
D
E
F
6
7
NOTES: 1.
II 2G IIB T4.
7
8
NOTES:
TANK WATER CHILLER UNIT ATEX CLASSIFICATION:
II 2G IIB T4.
ATEX OPERATING LIMITS: 0 C TO +60 C.
8
UNIT CASING MATERIAL: POWDER COATED ZINTEC.
UNIT WEIGHT: 195kg.
BHZ1-0030B11
BHZ1-0030C11
BHZ1-0030G11
BHZ1-0030G11
POWER SUPPLY.
TANK WATER CHILLER UNIT ATEX CLASSIFICATION:
POWER SUPPLY: SEE TABLE BELOW:
ATEX OPERATING LIMITS: 0 C TO +60 C.
UNIT CASING MATERIAL: POWDER COATED ZINTEC.
BHZ1-0030G11
UNIT WEIGHT: 195kg.
POWER SUPPLY: SEE TABLE BELOW:
BHZ1-0030B11
BHZ1-0030C11
BHZ1-0030G11
NOMINAL 230V/1PH/50Hz
NOMINAL 250V/1PH/60Hz
380-420V/3PH/50Hz
A
420-460V/3PH/60Hz
CONTROL PANEL IS SUPPLIED WITH M32 CABLE ENTRY FOR
NOMINAL 230V/1PH/50Hz
POWER SUPPLY.
NOMINAL 250V/1PH/60Hz
TANK WATER CHILLER UNIT NOMINAL COOLING DUTY: 3kW.
380-420V/3PH/50Hz
WATER PIPE CONNECTIONS ARE 3/4” BSP CONNECTIONS.
420-460V/3PH/60Hz
REFRIGERATION SYSTEM FITTED WITH HIGH PRESSURE SAFETY
CONTROL PANEL IS SUPPLIED WITH M32 CABLE ENTRY FOR
SWITCH 27.6barg/400psig.
TANK WATER CHILLER UNIT NOMINAL COOLING DUTY: 3kW.
WATER PIPE CONNECTIONS ARE 3/4” BSP CONNECTIONS.
FAN MOUNTING PLATE RING.
REFRIGERATION SYSTEM FITTED WITH HIGH PRESSURE SAFETY
REFER TO THE INSTALLATION, OPERATION AND
DO NOT OPEN COVERS WHEN UNIT IS ENERGISED.
ENSURE TIP CLEARANCE OF 5mm BETWEEN FAN BLADE AND
MAINTENANCE MANUAL TO ENSURE INTEGRITY OF THE TANK
WATER CHILLER UNIT. USERS MUST FAMILIARISE THEMSELVES
WITH ALL COMPONENTS BEFORE CARRYING OUT ANY
B
SWITCH 27.6barg/400psig.
DO NOT OPEN COVERS WHEN UNIT IS ENERGISED.
ENSURE TIP CLEARANCE OF 5mm BETWEEN FAN BLADE AND
FAN MOUNTING PLATE RING.
MAINTENANCE.
REFER TO THE INSTALLATION, OPERATION AND
MAINTENANCE MANUAL TO ENSURE INTEGRITY OF THE TANK
WATER CHILLER UNIT. USERS MUST FAMILIARISE THEMSELVES
WITH ALL COMPONENTS BEFORE CARRYING OUT ANY
MAINTENANCE.
2
3
830
35
W O L F
35
3
4
FLOW
FLOW
FLOW
1
2
35
5 1
0 0 2
830
0 6 2
0 0 2
5 1
TYP 4 OFF
13 THRU
VIEW ON A-A
971
799
VIEW ON A-A
971
799
172
2 8 0 1
2 7 1 1
0 9
CLIENT CABLE ENTRY
M12 UNIT EARTH STUD
172
F L O W
PLAN VIEW
698
CLIENT CABLE ENTRY
W O L F
5 1 0 1
F L O W
PLAN VIEW
698
0 9 4
2 8 6
4
5
5
6
FLOW
5 1 0 1
0 9 4
2 8 6
M12 UNIT EARTH STUD
A
A
M12 UNIT EARTH STUD
INLET PIPE CONNECTION
OUTLET PIPE CONNECTION
80
106
LEFT SIDE ELEVATION
FRONT ELEVATION
RIGHT SIDE ELEVATION
5
6
1
REAR ELEVATION
A
B
C
D
E
F
C
D
E
INLET PIPE CONNECTION
5
6
1
SHEET No: 1 OF 2
SCALE: 1:15
REVISION:
C1
A3 SIZE
7
DRAWING No:
BHZ200-0004
7
8
MATERIAL:
CLIENT:
N/A
FINISH:
PROJECT:
N/A
THIRD ANGLE
PROJECTION
MODEL No:
TITLE:
BHZ1-0030X11
MODEL No:
BHZ1-0030X11
TITLE:
BHZ1 3kW TANK WATER CHILLER UNIT
GENERAL ARRANGEMENT
THIS IS A CAD PRODUCED DRAWING
BHZ1 3kW TANK WATER CHILLER UNIT
& MUST NOT BE MODIFIED MANUALLY
GENERAL ARRANGEMENT
A3 SIZE
DRAWING No:
BHZ200-0004
F
SHEET No: 1 OF 2
SCALE: 1:15
REVISION:
C1
LEFT SIDE ELEVATION
FRONT ELEVATION
A
DOCUMENT No.
DESCRIPTION
REFERENCE DOCUMENTS
C1
02.02.2021
S.M.S.
S.M.
D.C.
TITLE BLOCK UPDATED
M12 UNIT EARTH STUD
OUTLET PIPE CONNECTION
UNLESS OTHERWISE SPECIFIED:
80
RIGHT SIDE ELEVATION
BASELINE
DO NOT SCALE DRAWING
REAR ELEVATION
ALL DIMENSIONS IN mm
CLIENT:
106
PROJECT:
© This drawing is the copyright and property of Nucore Group Ltd. All rights reserved. This drawing shall not be reproduced in any form, transmitted or used for any purpose other than which it was provided without prior written consent.
THIS IS A CAD PRODUCED DRAWING & MUST NOT BE MODIFIED MANUALLY
5
6
REVISION
REVISIONS
3
4
NUCORE GROUP LTD UNIT 4C, THE CORE, BERRYHILL CRESCENT, BRIDGE OF DON, ABERDEEN, AB23 8AN Email: productsenquiries@nucore-group.com WEB: www.nucore-group.com TEL. +44 (0) 1224 707080
NUCORE GROUP LTD UNIT 4C, THE CORE, BERRYHILL CRESCENT, BRIDGE OF DON, ABERDEEN, AB23 8AN Email: productsenquiries@nucore-group.com WEB: www.nucore-group.com TEL. +44 (0) 1224 707080
5
THIRD ANGLE PROJECTION
6
8
© This drawing is the copyright and property of Nucore Group Ltd. All rights FINISH: reserved. This drawing shall not be reproduced in any form, transmitted or used for any purpose other than which it was provided without prior written consent.
D.C. D.C. REFERENCE DOCUMENTS APPVD CLIENT
AS BUILT ISSUED FOR CONSTRUCTION
BASELINE
UNLESS OTHERWISE SPECIFIED:
DO NOT SCALE DRAWING
ALL DIMENSIONS IN mm
REV
DATE
BY
MATERIAL:
N/A
M.K.S. M.K.S.
S.M. S.M.
DESCRIPTION
HVAC & REF.
APPVD
N/A
CHKD
CHKD
4
DOCUMENT No.
C B
16.05.2018 24.04.2018
C1
02.02.2021
S.M.S.
C B
16.05.2018 24.04.2018
M.K.S. M.K.S.
S.M.
S.M. S.M.
D.C.
D.C. DRW 001 Rev A-3 D.C.
TITLE BLOCK UPDATED
AS BUILT ISSUED FOR CONSTRUCTION
REV
DATE
BY
CHKD
APPVD
CHKD
APPVD
HVAC & REF.
CLIENT
REVISION
REVISIONS
DRW 001 Rev A-3
2
2
3
A
B
C
D
E
F
Hughes Safety Showers Ltd, Whitefield Road, Bredbury, Stockport SK6 2SS UK T: +44 (0)161 430 6618 E: sales@hughes-safety.comGeneral Arrangement Drawingwww.hughes-safety.com
Project: Q-32976 - Tecnmont SKIKDA Folder: Project Root