Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

01/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

Total No. of Sheets : 57

INSTRUMENTATION TYPICAL INSTALLATION DETAILS-

PIPING & INSTRUMENTATION BATTERY LIMIT

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

2

1

0

27/Nov/2024 IFF - Issued for Final

H. Khan

P. Gaikwad

E. Magadeev

23/Aug/2024 IOC - Implementation of comments

D. Panchal

P. Gaikwad

E. Magadeev

24/Jul/2024

IFA - Issued for Approval

D. Panchal

P. Gaikwad

E. Magadeev

REV

DATE

DESCRIPTION

Emetteur

Verificateur

Approbateur

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

02/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

INDEX OF SHEETS

INDEX ISSUE

INDEX ISSUE

INDEX ISSUE

Sheet No.

0

1

2

Sheet No.

51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68

X X X X X X X X X X

X X

X X X

X X X X X X X X X X

X X

X X X

X X X X X X X X X X

X X

X X X

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Sheet No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

0

1

2

X X

X X

X X

X

X

X

X X

X X

X X

X X X

X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X

X X X

X X X

X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X

X X X

X X X

X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X

X X X

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

04/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

  1. PURPOSE

Purpose of the specification is to define the battery limit between INSTR / PIPING and STEQU of Eng. detail and supply. This specification defines in detail the size and type of the instrument process connections. Instrument connection details and instrument installation are developed within the document 4439-KA-DT-120000001 Typical Installation for Process Connections - Analysis System - Process Units Licensed By UOP 4439-KA-DT-130000001 Typical Installation for Process Connections - Analysis System - Utilities 4439-KK-DT-120000003 Typical Installation for Process Connections - Process Units Licensed By UOP 4439-KK-DT-130000003 Typical Installation for Process Connections - Utilities 4439-KK-DT-140000003 Typical Installation for Process Connections - Offsites 4439-KK-DT-200000003 Typical Installation for Process Connections - OSBL for Instrument battery limit purpose. Instrument connections defined in this specification shall be according to Piping Classes. Typical number (e.g. Type 1A) shall be included in “PIPING TYPICAL INSTALLATION ENGINEERING SPECIFICATION (4439-XH-SL-000000003)”.

The following symbol Will be used to represent the supply split limit between Instrumentation (INSTR) and Piping (PIPING) or Static Equipment (STEQU):

INSTR

PIPING / STEQU

1.1 GENERAL NOTES

a)

b)

c)

d)

e)

f)

g)

h)

i) j)

k)

l)

Process side of all the connections shall be as per PIPING specs and relevant typical installation (according to the pipe and/or equipment Mechanical Data Sheet (MDS) ). Orifice flange shall be min. 300# rating.

PID symbol shown on this document may not match with process P&ID symbols. In case of doubt, please refer to Instrument Department for clarification.

Minimum flange rating on Equipment for Instrument nozzle shall be as per PIPING class. Minimum flange rating on pipe shall be according to PIPING class. The rating on Equipment and Pipe (if different from Piping classes) shall be indicated on P&ID by Process Department.

INSTRUMENTATION and STEQU shall ensure that thermowell shall not be clashing with Vessel internals. Position of INSTRUMENT ( Nozzle elevation ) shall be defined by PROCESS and INSTRUMENTATION. Elevation, orientation of temperature nozzle shall be agreed between PROCESS,STEQU and INSTRUMENTATION to ensure Thermowell is in contact with process fluid and also shall be checked with Piping to provide necessary clearance for installation, removal and accessibility.

For extended diaphragm type seals with 3” Nozzle, Extension Length (L) and Extension Diameter (D) to be verified with PIPING/STEQU on each installation. All instrument process connections (Tapping point) when required by Client specification shall be located such that they are accessible from grade, walkways or movable platforms based on frequency of maintenance requirement and Project specifications. Piping to model the envelope for maintenance purpose around the instruments connections where required (e.g flushing ring with drain).

Piping isolation valves (Single or Double), Bleed Valves, shall be as shown in P&ID & Legend Sheets. Orifice flanges for flow elements, bolts, nuts and gasket supplied by Instrumentation Dept. for line size >= 2” according to piping classes.

Supply of bolts, nuts and gasket for all flanged connections and battery limit are in Piping Scope if not differently indicated. Piping shall indicate in the piping classes the connection type for instruments connection that is threaded or welded connection.

m)

Drain & vent will be collected by Piping Dept. as specified in P&ID and Legend sheet.

n)

o)

p)

q)

All inline instruments will be erected at site by Piping Dept. Supporting of inline instruments where required shall be in piping scope.

If design pressure of line / vessel exceeds maximum pressure allowable by ASME B16.5/ B16.47, rating of flanges shall be verified & increased when required.

For UOP licensed unit refer Annexure 1 for Instrument Installation and connection requirement. Items highlighted in pink ( ) color in Annexure-1 shall be supplied and installed by Piping Department. All the interconnections with piping shall be always SW/BW or NPT depending on piping classes. In case licensors require a flanged piping root valves then a counter flanges with drilled hole shall be supplied by piping. The hole shall be always SW/BW or NPT depending on piping classes for instrumentation connections.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

06/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

1.2 INSTRUMENT ACCESSIBILITY

a)

b)

c)

d)

Each instrument requiring frequent maintenance (routine access) (see below point d for list of such instruments) shall be properly located in order to satisfy an easy access, workers safety conditions as well as efficiency. Piping to provide necessary clearance for removal of instruments and accessories.

Instrument accessibility, being able to induce heavy consequence on piping or platform layout, shall be considered as soon as possible during the detailed engineering stage.

Routine access locations shall be reached by means of platforms or fixed ladders (Monkey).

The following instruments and accessories shall be considered as routine access location: •Control Valves, On-Off valves, safety valves, transmitters, local controllers, local converters, in-line flow meters, level gauges, level switches, pressure gauges, pressure switches, temperature gauges, sampling loops, oriffice plates with flow transmitter directly installed on-line (close coupled installation), thermocouples/RTD with temperature electronic transmitter head mounted, analyser sample take off

e)

The following instruments shall be considered as non-routine access location: •Orifice plate, Pressure taps, thermocouple, RTDs, Thermowells (test well).

1.3 REFERENCE DOCUMENTS

a)

b)

c)

(4439-KK-SG-000000001) - INSTRUMENT GENERAL SPECIFICATION.

(4439-XH-SL-000000003) - PIPING TYPICAL INSTALLATION ENGINEERING SPECIFICATION.

(4439-XH-SL-000000001) - PIPING MATERIAL DATA SHEET SPECIFICATION (PIPE CLASSES IN MARIANOUTPUT FORMAT).

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

07/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

  1. PROCESS CONNECTIONS SUMMARY TABLE

All process side connections shall be threaded as per ANSI-B1.20.1(NPT), flanged as per ANSI B16.5 or socket welding B16.11 (according to the pipe and equipment characteristics) as follows :

INSTRUMENT TYPE

EQUIPMENT

PIPE / STAND PIPE

2.1 ANALYSIS

Analyzer

2.2 FLOW

  • Flanged Taps (below 900 lb)

  • Flanged Taps (900 lb & above)

  • Annubar / Pitot

  • Purge Rotameter

2.3 LEVEL

  • Taps for Diff. pressuer type Level

measurement

  • Diff. pressure transmitter with

Diaphragm seal level measurement

  • Magnetic level indicator

  • Stand pipe

  • Radar / GWR with external chamber side mounted

  • Radar / GWR without

stilling well top mounted

3/4”, 1”, 1 1/2” or 2” Flanged (with valve according to process installation details) (HOLD)

(Interface at Instr. Scope)

  • 1/2”NPT / SW / BW

  • 3/4”SW

  • 1 1/2” Flange 300# (min.) (with valve)

Size will be defined by Vendor.

  • 1/2” NPT

2” Flanged

3” Flanged

2” Flanged

3/4” NPT(F) / SW / BW

3” Flanged

1” Flanged

2” Flanged (min.) (note-1)

2” Flanged

4” Flanged

2” Flanged

  • Displacer transmitter with external

2” Flanged

2” Flanged

chamer side mounted

2.4 PRESSURE

  • Pressure Gauge without

diaphragm seal

  • Pressure Gauge with

diaphragm seal

2” Flanged

3” Flanged

  • Pressure transmitter without

2” Flanged

diaphragm seal

  • Pressure transmitter with

diaphragm seal

3” Flanged

  • Differential Pressure transmitter without

2” Flanged

diaphragm Seal

  • Differential Pressure transmitter with

3” Flanged

3/4” NPT

3” Flanged

3/4” NPT

3” Flanged

3/4” NPT

3” Flanged

diaphragm Seal

2.5 TEMPERATURE

  • Thermowell

2” Flanged

1 1/2” Flanged

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Notes:

  1. In case of dp transmitter with diaphragm seal installed on the standpipe, then the standpipe size shall be 3” flanged.
  2. Probe pipe size as per wake frequency calculations.
  3. At piping and instrument interface point, piping to provide connection type & size, as per typical shown below in this document.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

4439-KK-SG-000000003

Format :

Page :

A4

10/68

2

Echelle :

Rev :

2

2.1 - SAMPLE TAKE-OFF WITH MANUAL RETRACTION PROBE AND ISOLATION VALVE ( PROBE DETAIL-A )

P&ID SYMBOL

DESCRIPTION

INSTRUMENT / PIPING ARRANGEMENT

OPTICAL SAMPLE PROBE WITH MANUAL RETRACTION BY ANALYSER VENDOR

INSTR PIPING

AT

ANALYZER PROBE

TAG NUMBER

600-AT-001

600-AT-002

600-AT-003

600-AT-004

600-AT-005

600-AT-006

NOZZLE / ISOLATION VALVE 2” 600# RF Flanged 2” 600# RF Flanged 2” 600# RF Flanged 2” 600# RF Flanged 2” 600# RF Flanged 2” 600# RF Flanged

NOTES:

  1. PROBE BY INSTRUMENTATION DEPARTMENT.
  2. BOLTS, NUTS AND GASKETS BY PIPING

DEPARTMENT.

2.1 - FIXED PROBE -AS PER UOP STANDARD DRAWING ( PROBE DETAIL-B )

P&ID SYMBOL

DESCRIPTION

INSTRUMENT / PIPING ARRANGEMENT

AT

ANALYZER PROBE

TAG NUMBER

600-AT-007

700-AT-001

700-AT-002

700-AT-003

700-AT-004

700-AT-005

NOZZLE

1 1/2” 300# RF Flanged

1 1/2” 600# RF Flanged

1 1/2” 600# RF Flanged

1 1/2” 600# RF Flanged

1 1/2” 150# RF Flanged

1 1/2” 300# RF Flanged

INSTR PIPING

NOTES:

  1. PROBE BY INSTRUMENTATION DEPARTMENT.
  2. BOLTS, NUTS AND GASKETS BY PIPING

DEPARTMENT.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

4439-KK-SG-000000003

Format :

Page :

A4

11/68

2

Echelle :

Rev :

2

2.1 - FIXED PROBE WITH ISOLATION VALVE ( PROBE DETAIL-C )

P&ID SYMBOL

DESCRIPTION

INSTRUMENT / PIPING ARRANGEMENT

COMPANION FLANGE INTERNAL WITH DOUBLE COMPRESSION FITTING 1/4”

INSTR PIPING

AT

ANALYZER PROBE

TAG NUMBER

870-AT-001

820-AT-003

830-AT-001

830-AT-002

870-AT-003

NOZZLE / ISOLATION VALVE

1 1/2” 150# RF Flanged

1 1/2” 150# RF Flanged

1 1/2” 150# RF Flanged

1 1/2” 150# RF Flanged

1 1/2” 150# RF Flanged

NOTES:

  1. PROBE BY INSTRUMENTATION DEPARTMENT.
  2. BOLTS, NUTS AND GASKETS BY PIPING

DEPARTMENT.

2.1 - ANALYZER (Probe detail) A

A

A

Ø

ø= 73.0 mm (for nozzle size 11/2”)

Ø

45°

LAP TO BE INSTALLED BETWEEN TWO FLANGES (11/2” according to Piping Class)

0 1

UPSTREAM GROOVING

A

LAP FINISHING AS PER PIPING SPEC.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

L= (See Note 1)

DNXX PIPE , SCH XX (NOTE 2)

NOTES:

  1. PROBE INSERTION LENGTH L = MIN 1/3RD AND MAX UP

TO CENTER OF PROCESS LINE ID.

  1. PIPE SIZE AND SCHEDULE AS PER WAKE FREQUENCY

CALCULATIONS.

2 7 , 3 1

9.24

13.72

VIEW A-A

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

4439-KK-SG-000000003

Format :

Page :

A4

12/68

2

Echelle :

Rev :

2

2.1 - SAMPLE TAKE-OFF WITHOUT PROBE WITH ISOLATION VALVE ( PROBE DETAIL-D )

P&ID SYMBOL

DESCRIPTION

INSTRUMENT / PIPING ARRANGEMENT

AT

ANALYZER PROBE

TAG NUMBER

965-AT-001

ISOLATION VALVE 3/4” 150# RF FLANGED

COMPANION FLANGE WITH DOUBLE COMPRESSION FITTING 1/4”

INSTR PIPING

NOTES:

ISOLATION VALVE, NUTS AND GASKET BY PIPING.

  1. COMPANION FLANGE WITH COMPRESSION FITTING

Table A

BY INST.

Pipe

Tag

Pipe Class

P&ID

Line No.

DN &

SCH

PROBE Ø (mm)

PROBE

Length

“L”

(mm)

Probe Type

600-AT-001

4439-VZ-DM-0600-5406

B4A1BZ

PROBE DETAIL A

(*)

(*)

6”-P-600-014-B4A1BZ-HC

6”

600-AT-002

4439-VZ-DM-0600-5406

B4A1BZ

PROBE DETAIL A

(*)

(*)

6”-P-600-015-B4A1BZ-HC

6”

600-AT-003

4439-VZ-DM-0600-5407

B4A1BZ

PROBE DETAIL A

(*)

(*)

6”-P-600-020-B4A1BZ-HC

6”

600-AT-004

4439-VZ-DM-0600-5407

B4A1BZ

PROBE DETAIL A

(*)

(*)

6”-P-600-021-B4A1BZ-HC

6”

600-AT-005

4439-VZ-DM-0600-5408

B4A1BZ

PROBE DETAIL A

(*)

(*)

6”-P-600-021-B4A1BZ-HC

6”

600-AT-006

4439-VZ-DM-0600-5408

B4A1BZ

PROBE DETAIL A

(*)

(*)

6”-P-600-013-B4A1BZ-HC

6”

600-AT-007

4439-VZ-DM-0600-5413

B2A1BZ

PROBE DETAIL B

(*)

(*)

4”-P-600-054-B2A1BZ-HC

4”

700-AT-001

4439-VZ-DM-0700-5503

B4A1BZ

PROBE DETAIL B

(*)

(*)

6”-P-700-001-B4A1BZ-HC

6”

700-AT-002

4439-VZ-DM-0700-5511

B4A1BZ

PROBE DETAIL B

(*)

(*)

6”-P-700-063-B4A1BZ-HC

6”

700-AT-003

4439-VZ-DM-0700-5518

B4A1BZ

PROBE DETAIL B

(*)

(*)

4”-P-700-106-B4A1BZ-HC

4”

700-AT-004

4439-VZ-DM-0700-5512

B1A1BZ

PROBE DETAIL B

(*)

(*)

8”-P-700-068-B1A1BZ-HC

8”

700-AT-005

4439-VZ-DM-0700-5519

B2A1BZ

PROBE DETAIL B

(*)

(*)

6”-P-700-115-B2A1BZ-HC

6”

870-AT-001

4439-WZ-DM-0870-0002

B1A2

PROBE DETAIL C

(*)

(*)

12”-CWR-870-001-B1A2-NI

12”

870-AT-003

4439-WZ-DM-0870-0002

B1A2

PROBE DETAIL C

(*)

(*)

12”-CWS-870-004-B1A2-NI

12”

820-AT-003

4439-WZ-DM-0820-0002

MS51NN

PROBE DETAIL C

(*)

(*)

6”-IA-820-003-MS51NN-NI

6”

830-AT-001

4439-WZ-DM-0830-0001

B1A1NN

PROBE DETAIL C

(*)

(*)

12”-N-830-002-B1A1NN-NI

12”

830-AT-002

4439-WZ-DM-0830-0001

B1A1NN

PROBE DETAIL C

(*)

(*)

12”-N-830-002-B1A1NN-NI

12”

965-AT-001

4439-VZ-DM-0965-0008

B1A2NA

PROBE DETAIL D

(*)

(*)

2”-P-965-035-B1A2NA-NI

2”

(*) Details shall be updated after receipt of the same from Analyser Vendor,

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

14/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

ORIENTATION TAPPING POINT HORIZONTAL PIPE : FOR SINGLE TRANSMITTER

⇐

45°

⇐

45°

A

B

C

D

= <

45°

= <

45°

ORIENTATION SCEDULE

FLUID

PREFERRED

ALTERNATE (SPACE CONSTRAINS)

GAS

LIQUID

STEAM & CONDENSATING VAPORS

A

C

C

B

D

B

NOTE :

For Vertical Pipe, Taps shall be located in horizontal axis perpendicular to vertical pipe for all fluid services. Flow direction shall be from bottom to top for liquids. For gases flow shall be from top to bottom. For UOP plant,

  • UOP typicals will be followed for hook-up orientation.
  • For liquid, steam, or condensable vapor lines the taps shall be in the horizontal.Tap locations other than in the horizontal, such as 45° taps, are not acceptable.
  • For gas lines, the taps shall be in the vertical on the top or not more than 45° from the vertical on the top.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

15/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

TAPPING POINT ORIENTATION (LIQUID SERVICE)

DETAIL 1 ORIFICE TAPPING ORIENTATION - HORIZONTAL LINES

DETAIL 2 ORIFICE TAPPING ORIENTATION - HORIZONTAL LINES

LIQUID SERVICE (PREFERRED)

LIQUID SERVICE (ALTERNATE)

FLOW

HP

LP

PLAN

LP

FLOW

HP

PLAN

DETAIL 3 ORIFICE TAPPING ORIENTATION - VERTICAL LINES FLOW - UPWARDS FOR LIQUID

DETAIL 4 ORIFICE TAPPING ORIENTATION FOR DUAL TAPS

HORIZONTAL LINES - LIQUID SERVICE

LP

HP

W O L F

PLAN

FLOW

HP

HP

LP

LP

PLAN

CLEARANCE FOR ORIFICE PLATES

CLEARANCE FOR ORIFICE PLATES

900

900

600

600

SHADED AREAS TO BE KEPT CLEAR

0 0 6

0 0 6

0 0 6

SHADED AREAS TO BE KEPT CLEAR

0 0 6

& S A G

M A E T S

I

D U Q L

I

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

16/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

TAPPING POINT ORIENTATION (GAS/STEAM SERVICE)

DETAIL 1 ORIFICE TAPPING ORIENTATION - HORIZONTAL LINES DRY GAS (PREFERRED)

DETAIL 2 ORIFICE TAPPING ORIENTATION - HORIZONTAL LINES STEAM SERVICE (PREFERRED)

FLOW

LP

HP

PLAN

FLOW

HP

LP

PLAN

DETAIL 3 ORIFICE TAPPING ORIENTATION - HORIZONTAL LINES DRY GAS/STEAM SERVICE (ALTERNATE)

DETAIL 4 ORIFICE TAPPING ORIENTATION - VERTICAL LINES FLOW - DOWNWARDS FOR GAS OR STEAM

W O L F

HP

LP

PLAN

FLOW

LP

HP

PLAN

DETAIL 5 ORIFICE TAPPING ORIENTATION FOR DUAL TAPS HORIZONTAL LINES - GAS SERVICE

FLOW

HP

HP

LP

LP

PLAN

Note: Refer the sketch to page 15 for clearance of orifice plates.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

17/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

TAPPING POINT ORIENTATION

MULTIPLE TRANSMITTERS DETAIL FOR GAS SERVICE - FOR ASME FLANGE CLASS 300 AND 600

1/2” PIPE

1/2” PIPE

1/2” PIPE

MULTIPLE TRANSMITTERS DETAIL FOR GAS SERVICE - FOR ASME FLANGE CLASS 900, 1500 AND 2500

3/4” PIPE

3/4” PIPE

MULTIPLE TRANSMITTERS DETAIL FOR LIQUID, STEAM - FOR ASME FLANGE CLASS 300 AND 600

1/2” PIPE

1/2” PIPE

1/2” PIPE

1/2” PIPE

MULTIPLE TRANSMITTERS DETAIL FOR LIQUID, STEAM - FOR ASME FLANGE CLASS 900, 1500 AND 2500

3/4” PIPE

3/4” PIPE

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

18/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

3.2 - FLOW TAPPING POINT ORIENTATION

NOTES:

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

ALL PIPING UPTO AND INCLUDING THE FIRST ROOT VALVE WILL BE SUPPLIED AND INSTALLED BY PIPING, AS PER PIPING SPECIFICATION. 4439-XH-SL-000000003 ” PIPING TYPICAL INSTALLATION ENGINEERING SPECIFICATION ” FOR MINIMUM STRAIGHT RUN REQUIREMENTS FOR ORIFICE PLATE INSTALLATIONS. REFER SHEET NO. - 20.

  1. DOUBLE ISOLATION VALVES SHALL BE USED, WHERE REQUIRED AS INDICATED ON P&ID’s TYPE SHALL BE ACCORDING

TO PIPING CLASS. ORIFICE METERLINE (FOR LIQUID SERVICE) SHALL BE ROUTED AT ELEVATION OF MINIMUM 2.1 METER FROM GRADE LEVEL OR PLATFORM. REFER FLOW ELEMENT VENDOR DRAWINGS FOR TAP ORIENTATION ANGLE ( ).

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

FI*


FT

FI*


FT

FI*


FT

TYPE 1F

TYPE 1F1

TYPE 1F2

ORIFICE PLATE ASSEMBLY FOR LINE SIZE ≥ 2 Flanged taps (below 900#)

PIPING END CONNECTION SHALL BE 1/2” NPT(F) / 1/2” SW / 1/2” BW in-line with pipe class

FLOW

FLANGE CONNECTION 1/2” NPT(F) / 1/2” SW / 1/2” BW in-line with pipe class

(*)

INSTR

PIPING

INSTR

NOTE 1 & 2

ORIFICE PLATE ASSEMBLY FOR LINE SIZE ≥ 2 Flanged taps (below 900#)

When 4th character of PIPING CLASS is “4” - correspond to corrosion allowance is 0.250 inch (6mm)

2

ORIFICE PLATE ASSEMBLY FOR LINE SIZE ≥ 2 Flanged taps (below 900#)

APPLICABLE PIPE CLASS: B1A2BN, B1A2BZ, B1A2NA, B1A2NAM,B1A2NN, B2A2BZ, B2A2NA, B2A2NN,B4A2BZ, B4A2HN, B4A2NA, B4A2NN, E4A2HY, MS31NN, MS32NN

PIPING

INSTR

PIPING

PIPING END CONNECTION SHALL BE 1” NPT(F) / 1” SW / 1” BW in-line with pipe class - When 4th character of PIPING CLASS is “4” - correspond to corrosion allowance is 0.250 inch (6mm)

FLOW

FLANGE CONNECTION (**) 1” NPT(F) / 1” SW / 1” BW in-line with pipe class - When 4th character of PIPING CLASS is “4” - correspond to corrosion allowance is 0.250 inch (6mm)

PIPING

PIPING END CONNECTION SHALL BE 3/4” NPT(F) / 3/4” SW / 3/4” BW in-line with pipe class

FLOW

FLANGE CONNECTION 3/4” NPT(F) / 3/4” SW / 3/4” BW in-line with pipe class

(*)

INSTR

(*)

PIPING

(*)

INSTR

NOTE 1 & 2

INSTR

PIPING

INSTR

PIPING

INSTR

NOTE 1 & 2

PIPING

INSTR

PIPING

NOTES :

  1. Orifice Flange, bolts, nuts, gasket, jackscrew and orifice plate by instrument department.
  2. Orifice Flange Rating shall be min 300#.
  3. For tap orientation, see sheet 14,15,16 &17.
  4. For minimum length of straight pipe see sheet 20.
  5. Orifice mounting horizontal on horizontal pipe and vertical on vertical pipe with flow from bottom to top for liquids,

for gases flow shall be from top to bottom.

  1. Isolation valves type shall be as indicated on P&ID’s and according to PMS.
  2. Instrument connection type will be compression fitting 1/2” SW, BW or NPT-M x 12 mm base on PIPING CLASS (ref. also to note “q” on sheet 04) (*) The nipple on measuring flanges will be supplied by Piping Dept.The dimension of nipple will be decided by

Piping department with respect to Pipe class, corrosion allowance and thickness of insulation of pipe.

(**) Bore ID To match pipe class nipple schedule

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

19/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 1FF

FI*


FT

TYPE 1FF1

FI*


FT

PIPING END CONNECTION SHALL BE 3/4” SW / 3/4” BW in-line with pipe class.

ORIFICE PLATE ASSEMBLY FOR LINE SIZE ≥ 2” Flanged taps (Rating 900# & Above)

FLANGE CONNECTION (**) 3/4” SW / 3/4” BW in-line with pipe class.

(*)

(*)

INSTR

PIPING

INSTR

FLOW

NOTE 1 & 2

PIPING

INSTR

PIPING

ORIFICE PLATE ASSEMBLY FOR LINE SIZE ≥ 2” Flanged taps (Rating 900# & Above)

PIPING END CONNECTION SHALL BE 1” SW / 1” BW in-line with pipe class -When 4th character of PIPING CLASS is “4” - correspond to corrosion allowance is 0.250 inch (6mm)

When 4th character of PIPING CLASS is “4” - correspond to corrosion allowance is 0.250 inch (6mm)

FLANGE CONNECTION 1” SW / 1” BW in-line with pipe class -When 4th character of PIPING CLASS is “4” - correspond to corrosion allowance is 0.250 inch (6mm)

(*)

INSTR

PIPING

INSTR

(*)

FLOW

NOTE 1 & 2

PIPING

INSTR

PIPING

NOTES :

  1. Orifice Flange, bolts, nuts, gasket, jackscrew and orifice plate by

instrument department.

  1. Orifice Flange Rating shall be as per pipe class.

  2. For tap orientation, see sheet 14,15,16 &17.

  3. For minimum length of straight pipe see sheet 20.

  4. Orifice mounting horizontal on horizontal pipe and vertical on vertical pipe with flow from bottom to top for liquids, for gases flow shall be from top to bottom.

  5. Isolation valves type shall be as indicated on P&ID’s and according to PMS.

(*) The nipple on measuring flanges will be supplied by Piping Dept.

The dimension of nipple will be decided by Piping department with respect to Pipe class, corrosion allowance and thickness of insulation of pipe.

(**) Bore ID To match pipe class nipple schedule

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

20/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

    PIPING ARRANGEMENTS FOR ORIFICE PLATE INSTALLATIONS
   ( WITH TAPPED ORIFICE FLANGES )

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

21/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

ORIFICE TAPPING ORIENTATION FOR LINED PIPES

W O L F

BY INST.

BY PIPING

HP

LP

1/2” NPT THREAD FEMALE CONNECTION SEE NOTE-1

PIPING

1/2” NPT PLUG

INSTR

ORIFICE PLATE

PIPING

PIPING BY BY INST.

CARRIER RINGS TO BE PROVIDED BY INSTRUMENT

ORIFICE WITH CARRIER RINGS (SEE NOTE-3)

NOTES:

All piping up to and including the first root valve will be supplied and installed by piping. For minimum straight run requirements for orifice plate installations refer sheet 20. Orifice plate, carrier rings with tappings shall be supplied by orifice plate vendor.

  1. Flanges, bolts, nuts and gasket provided by PIPING.
  2. Isolation valves type shall be as indicated on P&ID’s and according to PMS.

45

45

PLAN

Example of orientation for liquid service

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

22/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 2F

FI*


FT

PRE-FAB METER RUN PIPE SIZE 1”, 1 1/2”

PIPING END CONNECTION SHALL BE 1/2” NPT(F) / 1/2” SW / 1/2” BW in-line with pipe class (Refer Note-3)

1/2” NPT (F) 1/2” SW / 1/2” BW in-line with pipe class

1/2”(*)

1/2”(*)

INSTR

PIPING

INSTR

FLOW

PIPING Refer Note-2, 4

INSTR

Refer Note-1

INSTR

PIPING Refer Note-2, 4

NOTES : 1)

Internal flanges, bolts, nuts and orifice gaskets shall be provided by Instr. Orifice flange shall be minimum 300# . Gaskets between process flanges, bolts and nuts by Piping. Flange rating as per Piping class.

  1. For tap orientation, see sheet 14,15,16 &17.

Meter run end connection flanges shall be as per Piping class. In case Threading connection is not allowed in piping classes, Piping to consult Instrument dept. Isolation valves type shall be as indicated on P&ID’s and according to PMS.

(*) The nipple & valves on measuring flanges will be supplied by

Piping Dept. The dimension of nipple/valves will be decided by Piping department with respect to Pipe class, corrosion allowance and thickness of insulation of pipe.

(**) Bore ID To match pipe class nipple schedule.

INTEGRAL ORIFICE FOR PIPE <1”

PIPING

INSTR

PIPING

NOTES :

  1. Bolts, nuts and gaskets by Piping
  2. Minimum flange rating shall be 300#.

TYPE 3F

FI*


FT

INTEGRAL

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

23/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

RESTRICTION ORIFICE

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

TYPE 4F

RO


TYPE 5F

RO


MULTI

TYPE 6F

FI*


FT

PIPING

INSTR

PIPING

ORIFICE PLATE

NOTES : 1)

Flanges, bolts, nuts and gaskets by Piping. Only orifice plate by Instrument.

  1. Flange rating as per P&ID’s and piping class.

RESTRICTION ORIFICE MULTI-STEP WITH FLANGED CONNECTION

PIPING

INSTR

PIPING

NOTES :

  1. Bolts, nuts and gaskets by Piping Department.
  2. Flange rating as per P&ID’s and PMS.

PITOT TUBE (ANNUBAR) (AVERAGING PITOT)

INSTR

PIPING

0 5 1

0 5 1

FLOW

INSERT - RETRACT DEVICE WITH FULL BORE BALL VALVE

NOZZEL 1 1/2” FLANGED (NOTE 4) (REFER NOTE-1 And 2)

OPPOSITE SIDE SUPPORT

NOTES :

  1. Minimum flange rating 300# .
  2. For orientation & straight length requirements refer sheet 24.
  3. The dimension shown shall be confirmed by Piping dept.
  4. Size will be confirmed later, after selection of vendor

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

24/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

PITOT TUBE MINIMUM STRAIGHT RUNS AND INSTALLATION REQUIREMENTS

MINIMUM DIAMETERS OF STRAIGHT PIPE

A

B

UPSTREAM DIMENSION

WITH VANES

A’

C

C’

WITHOUT VANES

IN PLANE A

OUT OF PLANE A

7

9

C’

C

A’

A

C’

C

A’

A

C’

C

A’

A

B

B

B

B

B

B

C’

C

A’

B

A

B

C’

C

A’

B

A

B

C’

C

A’

B

9

14

19

24

8

8

8

8

24

24

6

3

3

8

4

4

9

4

5

8

4

4

8

4

4

9

4

5

ORIENTATION - HORIZONTAL PIPES LIQUIDS & STEAM

DOWNSTREAM DIMENSION

NOTE 6

END SUPPORT (NOTE 6)

B

3

3

4

3

3

4

END ELEVATION

10^

10^

NOTE: FILL TEES REQUIRED FOR STEAM

ELEVATION

GAS

160^

45^ PREFERRED

160^

45^ PREFERRED

10^

10^

NOTE 6 ELEVATION

END SUPPORT (NOTE 6) END ELEVATION

ORIENTATION - VERTICAL PIPES

NOTE 6

STEAM TOP

PLAN VIEW

GASES/LIQUIDS TOP

GAS

LIQUID

BOTTOM ELEVATION

BOTTOM ELEVATION

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

NOTES:

The chart shown describes the minimum number of pipe diameters upstream and downstream of the pitot tube. Longer lengths are always preferred (if available) for accurate flow measurement. Where repeatability only is necessary i.e. for minimum flow or in a pump circuit with a flat head curve allow 2d upstream and 2d downstream. This applies only to this type of application. For all other applications refer to table. Information shown is based on dietrich standard annubar installation guidelines. Check compatability when other manufacturers are specified. Opposing support bars to be provided per manufacturer’s recommendation. (to be confirmed by Instr. Dept). Pitot tubes required on underground pipes as per P&ID will be installed in a maintenance pit with adequate space for operation and maintenance. Construction drawing from Civil to be checked by Instrumentation. In case of high velocity application or larger line size, end supports to be provided by pitot tube supplier. End supports may be stub ended or flange ended for lined pipes.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

25/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

VENTURI TUBE. FLANGED TYPE ( Rating Below 900#)

TYPE 7F

FI*


FT

INSTR.

PIPING.

INSTR.

Flanged Connection PIPING

Piping end connection shall be 1/2” NPT (F)

1/2” SW / 1/2” BW in-line with pipe class

1/2” (*)

1/2” NPT (F) / 1/2” SW / 1/2” BW in-line with pipe class

1/2” (*)

INSTR NOTE (1)

PIPING

NOTES :

  1. Bolts, nuts and gaskets by Piping Department. For tap orientation see sheet 14,15,16 &17. For min. lenght of straight pipe see sheet 27,

In case Threading connection is not allowed in piping classes, Piping to consult Instrument Dept. 3) Rating shall be as per P&ID’s and PMS.

(*) The nipple & valves on measuring flanges will be supplied by Piping Dept. The dimension of nipple/valves will be decided by Piping department with respect to Pipe class, corrosion allowance and thickness of insulation of pipe.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

26/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 8F

FI*


FT

VENTURI TUBE. FLANGED TYPE (Rating 900# & Above)

INSTR.

PIPING.

INSTR.

FLOW

Flanged Connection PIPING

PIPING END CONNECTION SHALL BE 3/4” SW / 3/4” BW in-line with pipe class

3/4” (*)

(**)

3/4” SW / 3/4” BW in-line with pipe class

3/4” (*)

(**)

INSTR NOTE (1)

PIPING

NOTES :

  1. Bolts, nuts and gasket by Piping Department. For tap orientation see sheet 14,15,16 &17. For min. length of straight pipe, see sheet 27.
  2. Rating shall be as per P&ID’s and PMS.

(*) The nipple & valves on measuring flanges will be supplied by Piping Dept. The dimension of nipple/valves will be decided and welded at site by Piping department with respect to Pipe class, corrosion allowance and thickness of insulation of pipe. (**) Bore ID To match pipe class nipple schedule.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

27/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

PIPING ARRANGEMENTS FOR VENTURI INSTALLATION

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

28/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

ULTRASONIC FLOW METER (CLAMP-ON TYPE)

Clamp-on transducers

TYPE 9F

FI*


FT

CLAMP_ON

TYPE 10F

FI*


FT

FLOW

D

CLAMP-ON METERS

NOTES :

  1. Transducers are clamped on the pipe by Instrumentation

Department.

  1. Minimum straight run requirements to be defined after vendor

selection.

Preliminary straight pipe length shall be considered as - Upstream : minimum 10D Downstream : minimum 5D

ULTRASONIC FLOW METER (INSERTION TYPE)

CLEARANCE ZONE FOR MECHANISM WITHDRAWAL

95045^ 1050

HORIZONTAL CL

PIPE

VERTICAL CL

PIPING

INSTR.

PIPING

NOTE 1

1050

CLEARANCE ZONE FOR MECHANISM WITHDRAWAL 950

NOTES :

  1. Bolts, nuts and gaskets by Piping.

  2. Minimum straight run requirements shall be defined after

vendor selection.

Preliminary straight pipe length shall be considered as - Upstream : minimum 20D Downstream : minimum 10D Flange rating as per P&ID’s and PMS.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

29/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW P&ID SYMBOL

TYPE 11F

FI*


FT

INSTALLATION HORIZONTAL AND VERTICAL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

VORTEX FLOW METER

FLANGED TYPE

NOTE 1

NOTE 3,4

NOTE 3,4

PIPING

INSTR

PIPING

NOTES :

  1. Bolts, nuts and gaskets by Piping.
  2. Flow direction in vertical line shall be upward for liquid and

downward for gas / steam.

  1. If in case of meter size is smaller than line size concentric type

reducer to be used.

  1. Reducer to be provided after meeting straight length requirement.
  2. Flange rating as per P&ID’s and PMS.

PIPING ARRANGEMENTS FOR VORTEX FLOWMETER INSTALLATIONS

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

30/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 12F

MASSFLOW (CORIOLIS) (IN LINE INSTALLATION)

FI*


FT

PIPING

INSTR

PIPING

NOTE 1

FLOW

NOTE 3

Mounting with Case Down (liquid applications)

PIPING

INSTR

PIPING

Mounting with Case Up (gas applications)

NOTE 1

FLOW

NOTE 3

I

G N P P

I

Mounting in a Vertical Line (slurry or draining applications)

R T S N

I

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

I

G N P P

I

FLOW

NOTES :

  1. Bolts, nuts and gaskets by Piping.
  2. Flowmeter shall be located at suitable distance from Pump

Discharge to avoid transfer pump vibration to meter.

  1. Supports may be requested as per Vendor recommendation

in later stage. Supports by Piping (avoid all vibrations in pipe). Support on both sides of mass flow meter shall be provided by pipping in order to avoid/minimise vibrations.

  1. Flange rating as per P&ID’s and PMS.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

31/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.2 - FLOW

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 13F

FG


OR

FI*


FT


TYPE 14F

FI*


FT

ΔT

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

VARIABLE AREA FLOW METER OR VARIABLE AREA FLOW TRANSMITTER

PIPING

PIPING

INSTR

INSTR

PIPING

F L O W

F L O W

PIPING

INSTR

NOTES :

  1. Bolts, nuts and gaskets by Piping.
  2. To be installed in vertical position.
  3. Rating flange as per P&ID’s and PMS.
  4. Installed in vertical.

THERMAL MASS FLOW METER

INSERTION TYPE

e c n a r a e l C

) 3

e t o N

(

A

D O

FULL BORE BALL VALVE m 1” m 0 5 1

INSTR

PIPING

FLOW

INSERT - RETRACT DEVICE WITH VALVE

1” Note 2

R E T E M A D

I

I

E D S T U O G N P P

I

I

NOTES :

  1. Bolt, nuts, gaskets by Piping.

  2. Piping to provide a Special weldolet/half coupling along with weldneck flange with inner diameter to suit the outer diameter of the probe.

  3. Clearance shall be minimum, OD of pipe + A .

MIN. UPSTREAM STRAIGHT RUN - 20D () MIN. DOWNSTREAM STRAIGHT RUN - 10D () (*) PRELIMINARY DATA TO BE CONFIRMED BY INSTR. VENDOR

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

32/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

MAGNETIC FLOW METER

NOTE 1

2.2 - FLOW P&ID SYMBOL

TYPE 15F

FT

FI*


M

INSTALLATION HORIZONTAL AND VERTICAL

PIPING

INSTR

PIPING

NOTES :

  1. Bolts, nuts and gaskets by Piping.

  2. Straight run (*) shall be as follows-

Upstream > 5D Downstream > 2D (*) - May Change as per manufacturer recomdation.

Where D= Pipe Diameter.

  1. Flow direction in vertical line shall be upward for liquid and

downward for gas / steam.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

34/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 1L

DIFFERENTIAL PRESSURE LEVEL TRANSMITTER ON EQUIPMENT

LT

LI*


STEQU

Counter Blind Flange with 3/4” NPT(F) Hole to be provided by piping

LP SIDE

2”

NOTE 3

2”

HP SIDE

PIPING

INSTR

Counter Blind Flange with 3/4” NPT(F) Hole to be provided by piping

NOTES :

  1. Bolts, nuts and gaskets by Piping.
  2. HP side & LP side : Tubing.
  3. Isolation valves type shall be according to P&ID’s legend sheet and PMS.

TYPE 2L

2”

TYPE 3L

3”

LT

LI*


LI*


LT

LEVEL TRANSMITTER WITH DIFFERENTIAL PRESSURE SYSTEM

NOTE 3

Counter Blind Flange with 3/4” NPT(F) Hole to be provided by piping

2”

HP SIDE

STEQU

PIPING

INSTR

NOTES :

  1. Bolts, nuts and gaskets by Piping.
  2. HP side : Tubing.

LP side : Vent to atmosphere.

  1. Isolation valves type shall be according to P&ID’s legend sheet and PMS.

DIFFERENTIAL PRESSURE LEVEL TRANSMITTER (WITH ONE DIAPHRAGM SEAL)

PIPING

INSTR

STEQU

3”

NOTE 1

NOTE 3

NOTE 1

NOTES :

  1. Bolts, nuts and gasket by Piping.
  2. Refer sheet - 36 for bleed/washing detail.
  3. Isolation valves type shall be according to P&ID’s legend sheet and PMS.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

35/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

TYPE 4L

3”

3”

LT

LI*


DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

DIFFERENTIAL PRESSURE LEVEL TRANSMITTER ON EQUIPMENT

(WITH TWO DIAPHRAGM SEALS AND CAPILLARIES)

STEQU

PIPING

INSTR

3”

PIPING

INSTR

3”

NOTE-1

STEQU

HP side & LP side : Diaphragm seal with capillary.

NOTES :

  1. Stud,bolts, nuts and gasket by Piping.
  2. Refer sheet - 36 for bleed/washing detail.
  3. Double isolation valve shall be used as per Piping class

specification and as indicated in the P&ID.

  1. Isolation valves type shall be according to P&ID’s legend

sheet and PMS.

DIFFERENTIAL PRESSURE LEVEL TRANSMITTER

(WITH TWO REMOTE EXTENDED DIAPHRAGM TYPE)

STEQU

INSTR

LT

LI*


STEQU

INSTR

TYPE 5L

3”

3”

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

NOTE-1

NOTES :

  1. Bolts, studs and gaskets shall be supplied by Piping.
  2. Diaphragm extension length and diameter shall be supplied

by instrument in accordance with equipment nozzle.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

36/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

TYPICAL BLEED RING / FLUSHING RING DETAILS

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

NOTE - 4

1/2” NIPPLE as per pipe class

NOTE - 3

“D” “d”

NOTE - 3

1/2” NIPPLE as per pipe class

NOTE :-

  1. GATE VALVE END CONNECTION SHALL BE AS PER PIPING CLASS.

IN CASE GATE VALVE END CONNECTION IS FLGD AS PER PIPING CLASS, PIPING TO PROVIDE COMPANION BLIND FLANGE ONLY, (NIPPLE & CAPS WILL NOT BE REQUIRED)

  1. DRAIN / VENT NIPPLE AFTER THE DRIP RING SHALL BE PRE-WELDED AT MANUFACTURER WORK & SAME IS NOT

INCLUDED IN THE ABOVE MTO TABLE. 4) CAP OR FLANGE AS PER PIPING CLASS. FLUSHING RING ASSEMBLY TO BE SUPPLED BY PIPING. 5) DIMENSIONS “D” AND “d” SHALL BE ACCORDING TO REQUIRED FLANGE SIZE SHOWN ON RELEVANT SKETCH 6) REMOTE DIAPHRAGM 3” SHALL BE SUPPLIED BY INSTRUMENTATION 7) BOLTS , NUTS AND GASKET SHALL BE SUPPLIED BY PIPING. 8) BLEED , RING / FLUSHING ARRANGEMENTS SHALL BE PROVIDED BY PIPING. 9) VENT OR DRAIN SHALL BE ROUTED BY PIPING AS SHOWN IN P & ID’S.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

37/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

TYPE 6L

RADAR

NON - CONTACT RADAR OR GUIDED WAVE RADAR LEVEL TRANSMITTER WITH EXTERNAL CHAMBER

LT


LI*


RAD GWR

4” 300# Min

INSTR

PIPING

STEQU

PIPING

LT

E C A P S E C N A N E T N A M

I

2 E T O N R E F E R

L A W A R D H T W

I

2” 300# Min.

2”

3/4”

NOTE 4

2” 300# Min.

2”

3/4” FLANGE CONNECTION

4”CAGE

INSTR

3/4”

PIPING

PIPING

INSTR

NOTE 4

NOTES :

  1. Bolts, nuts and gasket by Piping.

  2. Withdrawal access space required.

Withdrawal space = C. to C. Distance + 500mm. Isolation valves type shall be according to P&ID’s legend sheet and PMS.

L

L

  1. Vent and drain shall be routed by piping as shown in P&ID’s.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

38/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 7L

LT LG

4”

RAD WAV MAG

TOP MOUNTED RADAR TYPE LEVEL TRANSMITTER WITH STILLING WELL

TOP MOUNTED MAGNETIC LEVEL GAUGE WITH STILLING WELL

4” ANSI 300# MIN.

INSTR

VESSEL/ PIPING

2

TYPE 7L1

LT

8”

TGS

TOP MOUNTED TANK GAUGING SYSTEM (TGS)TYPE LEVEL TRANSMITTER WITH STILLING WELL

0 0 1

0 0 1

0 0 1

STILLING WELL 3” (*)

HOLES Ø 20mm

(*) Schedule to be decided by Vessel Vendor

  • Long bolts, nuts and gaskets by Piping.
  • Stilling well by vessel Vendor. Stilling well length according to

vessel height up to 100mm above bottom of vessel.

  • 20mm holes on stilling well at every 100mm internal.

8” ANSI 300# (HOLD)

INSTR

VESSEL/ PIPING

STILLING WELL

HOLD

  1. FLANGE SIZE RATING AND STILLING WELL DETAILS WILL BE CONFIRMED LATER BASED ON SELECTION OF TGS VENDOR.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

39/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 8L

2”

2”

LT

DISP

LI*


DISPLACER LEVEL TRANSMITTER WITH EXTERNAL CAGE (SIDE-SIDE ORIENTATION)

RANGE A 14” = 356mm 32” = 813mm 48” = 1219mm 60” = 1524mm 72” = 1829mm 84” = 2134mm 96” = 2438mm 120” = 3048mm

2” ANSI NOTE 2

A

2” ANSI NOTE 2

4” ANSI

PIPING

Tx Flanged 3/4” ANSI

INSTR

STEQU PIPING

NOTE 3

INSTR

PIPING

MID RANGE

4” CAGE

Flanged 3/4” ANSI

PIPING INSTR

INSTR

PIPING

NOTE 3

NOTES :

  1. Bolts, Nuts and Gaskets by Piping Department.

Isolation valves type shall be according to P&ID’s legend sheet and PMS.

  1. Vent and drain shall be routed by piping as shown in

P&ID’s.

TYPE 9L

LI*


LT

CAP ULT

2”

TOP MOUNTED LEVEL INSTRUMENT CAPACITANCE OR ULTRASONIC TYPE

H

L

NOTE 2

NOTE 4 2” FLANGED

INSTR

STEQU

m m 0 7 1

NOTE 3

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

NOTES : 1)

Instrument head dimension `H’ will be as per vendor drawing.

  1. Necessary clearance distance shall be considered for Instrument removal / maintenance considering (H+L). Insertion length L will be defined by Instrumentation based on Process data sheets.

  2. Bolts, nuts and gaskets by Piping.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

40/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

STEQU

2”

NOTE 1

2” FLANGED

R T S N

I

R T S N

I

NOTE 3

PIPING

3/4”

INSTR

3/4” FLANGE CONNECTION

3/4” FLANGE CONNECTION

I

G N P P

I

I

G N P P

I

2”

NOTE 2

INSTR

3/4”

PIPING

NOTE 3

NOTES :

  1. Bolts, nuts and gaskets by Piping.

Isolation valve type as indicated in P&ID’s or legend sheet and PMS.

  1. Vent and drain shall be routed by piping as shown in P&ID’s.

TYPE 10L

LEVEL GAUGE

(MAGNETIC TYPE)

2”

2”

LG


MAG

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

41/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 11L

LA*


LS

2”

VIBR

SIDE MOUNTED LEVEL

SWITCH VIBRATION TYPE

STEQU

INSTR

2” FLANGED

NOTE 3

MECHANICAL PROTECTION

BY STEQU

H

200mm

170mm L

NOTE 2

NOTES :

Instrument head dimension `H’ will be as per vendor drawing. Necessary clearance distance shall be consider for Instrument removal.

  1. For liquid application, nozzle can be straight horizontal. Probe

length to be decided by Instru. during engineering detail development.

  1. Bolts, nuts and gaskets by Piping.

TYPE 12L

LS

2”

VIBR

LA*


LEVEL SWITCH

(VIBRATION / TUNING FORK)

ON PIPE

PIPING

INSTR

2” FLANGED NOTE 3

**

L

H

NOTE 2

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

  • Nozzle length to be decided by piping. ** Probe insertion length by Instru.

NOTES :

Instrument head dimension `H’ will be as per vendor drawing.

  1. Necessary clearance distance shall be consider for Instrument

removal.

  1. Bolts, nuts and gaskets by Piping.
  2. Rating According to P&ID’s and Piping class.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

42/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 13L

LEVEL TRANSMITTER (DP TYPE) AND LEVEL GAUGE ON STAND PIPE

STEQU

PIPING

NOTE 1

INSTR

PIPING

3/4”

PIPING

3/4”

2” 300#

2” 300#

3/4”

3/4”

1”

LI*


LT

LG


1” 3/4”

3/4”

2”

2”

NOTE 3

NOTE 1

3”

3”

NOTE-4

NOTE 1

INSTR

3/4” Flange

1”

I

G N P P

I

R T S N

I

1”

3/4” Flange

INSTR

3/4”

3/4”

PIPING

NOTE 1

Vent and drain shall be routed by piping as shown in P&ID’s.

NOTES : 1) 2) Stand pipe, bolts, nuts, and gaskets by piping department. 3) Refer Sheet no. 34 & 35 for DP LT Installation detail. 4) Elevation and distance between nozzles shall be defined by Process and Instrumentation. 5) Standpipe isolation valve shall be as per p&id indication and

project requirements.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

43/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

TYPE 14L

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

LEVEL TRANSMITTER (DP TYPE) AND LEVEL GAUGE ON STAND PIPE

INSTR PIPING

STEQU

PIPING

NOTE 1

2” 300#

2” 300#

3/4”

1”

3/4”

3/4”

LI*


LT

LG


3/4”

1”

3/4”

3/4”

2”

2”

INSTR

PIPING

3/4”

1”

I

G N P P

I

3/4”

PIPING

3/4”

INSTR 3/4” Flange

R T S N

I

3/4”

Note 4

1”

3/4” Flange

INSTR

3/4”

3/4”

PIPING

NOTE 1

3/4” NPT(F) / 3/4” SW / 3/4” BW in-line with pipe class

NOTES :

  1. Vent and drain shall be routed by piping as shown in P&ID’s.
  2. Stand pipe, bolts, nuts, and gaskets by piping department.
  3. Refer Sheet no. 34 & 35 for DP LT Installation detail.
  4. Elevation and distance between nozzles shall be

defined by Process and Instrumention.

  1. Standpipe dimension shall be 2”
  2. Standpipe isolation valve shall be as per p&id indication and project requirements.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

44/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 15L

LT

LI*


DIFFERENTIAL PRESSURE LEVEL TRANSMITTER ON LINE (REMOTE MOUNTED)

PIPING

INSTR

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

~

3”

3”

~

TYPE 16L

DIFFERENTIAL PRESSURE LEVEL TRANSMITTER ON LINE

(WITH TWO DIAPHRAGM SEALS AND CAPILLARIES)

LT

LI*


3/4”

3/4”

3/4” NPT (F) CONNECTION

NOTE 2

PIPING

INSTR NOTE 2

3”

3”

PIPING

INSTR

NOTE 4

3”

3”

NOTE 3

NOTE 5

HP side & LP side : Diaphragm seal with capillary.

NOTES :

  1. Stud,bolts, nuts and gasket by Piping.
  2. Refer sheet 36 for spacer design .

Isolation valves type shall be according to P&ID’s legend sheet and PMS.

  1. Bleed ring / Flushing arrangements shall be provided by

piping. Incase of open drain, PIPING Dept. to provide plug or flange at vent and drain, as applicable according to Piping Spec, for double isolation purpose.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

45/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.3 - LEVEL

GAMMA RAY

P&I SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 17L

NUCLEAR LEVEL TRANSMITTER

LT XXXX

LX XXXX

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

ARRANGEMENT FOR ADJACENT VESSELS

IF RADIATION SOURCE ARE INSTALLED ONE CLOSE TO THE OTHER THE SOURCES AND THE DETECTORS SHALL BE LOCATED SO THAT RADIATION BEAMS DO NOT INTERFERE AS SHOWN BELOW.

D≥2.5m

RADIATION BEAM

RADIATION BEAM

DETECTOR

DETECTOR

SOURCE HOLDER

D≥2.5m

SOURCE HOLDER

DETECTOR

N O I T A D A R

I

M A E B

SOURCE HOLDER

N O I T A D A R

I

M A E B

SUPPORT THE SUPPORTS OF THE GAMMA RAY INSTRUMENT, SUPPLIED BY THE INSTRUMENT MANUFACTURER, SHALL BE INSTALLED ON THE VESSEL BY THE VESSEL MANUFACTURER IN ACCORDANCE WITH THE INSTRUCTIONS OF THE INSTRUMENT MANUFACTURER.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

48/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

HORIZONTAL PIPE : PRESSURE TAP ORIENTATION

⇐

45°

A

B

C

= <

45°

D

ORIENTATION SCHEDULE

FLUID

PREFERRED

ALTERNATE (SPACE CONSTRAINS)

GAS / STEAM

LIQUID

A

C (NOTE 2)

B

D

NOTE :

  1. For Vertical Pipe, Taps shall be located in horizontal axis perpendicular to vertical pipe for all fluid services.
  2. For liquid service, pressure gauges shall have taps located on the process pipe line.
  3. For UOP plant, UOP typicals will be followed for hook-up Orientation.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

49/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 1P

PRESSURE GAUGE

PG


2

INSTR

PIPING

3/4” NPTF CONNECTION

3/4”

SEE NOTE 1

HORIZONTAL LINE INSTALLATION

NOTES :

1)When 4th character of PIPING CLASS is “4”-correspond to

corrosion allowance is 0.250 inch (6mm),1”NPTF connection to be provided at battery limit and all piping valves shall be of size 1”

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

50/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 2P

PG


2”

PRESSURE GAUGE EQUIPMENT INSTALLATION

INSTR

PIPING

2”

STEQU

Counter blind flange with 3/4” NPTF connection to be supplied by piping.

2

2

TYPE 3P

4” (min)

Counter blind flange with 3/4” NPTF connection to be supplied by piping.

2”

PG


INSTR

2”

PIPING

STEQU

PIPING

NOTES :

  1. Bolts, nuts and gaskets by Piping.
  2. Isolation valves type shall be according to P&ID’s legend

sheet and PMS.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

51/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 4P

PRESSURE GAUGE WITH

DIAPHRAGM SEAL - ONLINE (LINE SIZE ≥ 3”)

PG


3”

INSTR

NOTE-3

PIPING

3”

NOTE-1

NOTE-2

4” (min)

INSTR

PIPING

3”

NOTE-4

LINE INSULATION

HORIZONTAL LINE

VERTICAL LINE

INSTALLATION

INSTALLATION

NOTES :

  1. Stud bolts, nuts and gaskets by Piping.
  2. Refer sheet 36 for spacer design Bleed/Flushing Ring Detail.
  3. Isolation valves type shall be according to P&ID’s legend sheet

and PMS.

  1. Support if Required Shall Be Supplied By Piping.

PRESSURE GAUGE WITH

EXTENDED DIAPHRAGM

SEAL WITH CAPILLARY

(INSTALLED ON THE EQUIPMENT)

TYPE 5P

PG


3”

NOTE-1

FLANGE 3”

INSTR

STEQU

EQUIPMENT

NOTES :

  1. Studs, Bolts, and gaskets by Piping.
  2. Diaphragm extension length and diameter shall be in accordance

with equipment nozzle.

TYPE 6P

PG


3”

PRESSURE GAUGE WITH

EXTENDED DIAPHRAGM SEAL WITH CAPILLARY ON-LINE (LINE SIZE ≥ 3”)

INSTR

PIPING

3”

NOTE-1

FLANGED 3”

NOTES :

  1. Stud Bolts, and gaskets by Piping.
  2. Diaphragm extension length and diameter shall be in accordance

with pipe nozzle projection and schedule.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

52/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 7P

PG


3”

PRESSURE GAUGE

WITH DIAPHRAGM SEAL

(WITHOUT CAPILLARY)

(EQUIPMENT

INSTALLATION)

INSTR

PIPING

3”

NOTE 2

STEQU

NOTES :

  1. Stud bolts, nuts and gaskets by Piping.
  2. Refer sheet 36 for spacer design Bleed/Flushing Ring Detail.
  3. Isolation valves type shall be according to P&ID’s legend

sheet and PMS.

PRESSURE GAUGE

WITH DIAPHRAGM SEAL

(WITH CAPILLARY)

(EQUIPMENT

INSTALLATION)

TYPE 8P

PG


3”

3”

PG


INSTR

PIPING

NOTE 2

3”

STEQU

PIPING

INSTR

NOTE 2

3”

STEQU

NOTES :

  1. Stud bolts, nuts and gaskets by Piping.
  2. Refer sheet 36 for spacer design Bleed/Flushing Ring Detail.
  3. Isolation valves type shall be according to P&ID’s legend

sheet and PMS.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

53/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

TYPE 9P

PI*


PT

TYPE 10P

PI*


PT

2”

PRESSURE TRANSMITTER

(REMOTE MOUNTED)

PIPING CONNECTION

PIPING

INSTR

3/4”

SEE NOTE 2

3/4” NPTF by Piping SEE NOTE 2

NOTES.

  1. Isolation valves type shall be according to P&ID’s legend

sheet and PMS.

  1. When 4th character of PIPING CLASS is “4” - correspond to corrosion allowance is 0.250 inch (6mm), 1” NPTF connection to be provided at battery limit and all piping valves shall be of size 1”

VESSEL CONNECTION

PIPING

STEQU

INSTR

counter blind flange with 3/4”NPT(F) hole to be supplied by piping.

PRESSURE TRANSMITTER

(EQUIPMENT INSTALLATION)

2”

3/4” NPTF by Piping

2”

NOTE 2

NOTES :

  1. Bolts, nuts and gaskets by Piping.

Isolation valves type shall be according to P&ID’s legend sheet and PMS.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

54/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 11P

TYPE 12P

2”

2”

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

DIFFERENTIAL PRESSURE

TRANSMITTER

(REMOTE MOUNTED)

PDT

PDI*


PIPING

INSTR

3/4” NPTF by Piping

3/4”

3/4”

DIFFERENTIAL PRESSURE

TRANSMITTER

(EQUIPMENT INSTALLATION)

PDT

PDI*


NOTES :

  1. Isolation valves type shall be according to P&ID’s legend

sheet and PMS.

PIPING

INSTR

Counter blind flange with 3/4”NPT(F) hole to be supplied by piping.

2”

2”

2”

2”

PIPING

INSTR

NOTES :

  1. Bolts, nuts and gaskets by Piping.
  2. Isolation valves type shall be according to P&ID’s legend

sheet and PMS.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

55/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 13P

PI*


PT

~

~

PRESSURE TRANSMITTER

WITH DIAPHRAGM SEAL

(WITH CAPILLARY)

LINE SIZE > 3”

1 E T O N

INSTR

PIPING

NOTE 3

3”

HORIZONTAL LINE INSTALLATION

INSTR

PIPING NOTE 3

3” 3”

VERTICAL LINE INSTALLATION

NOTES :

  1. Long bolts, nuts and gaskets by Piping.
  2. Isolation valves type shall be according to P&ID’s legend

sheet and PMS.

  1. Refer sheet 36 for spacer design.

TYPE 14P

PRESSURE TRANSMITTER

EQUIPMENT MOUNTING

PI*


PT

3”

TYPE 15P

PI*


PT

~

~

WITH EXTENDED DIAPHRAGM

INSTALLED ON EQUIPMENT/

LINE

CAPILLARY

3” FLANGE

NOTE-1

INSTR

STEQU

LINE MOUNTING

CAPILLARY

3” FLANGE (*)

NOTE-1

INSTR

PIPING

NOTES :

  1. Studs, bolts and gaskets by Piping.
  2. Diaphragm extension length and diameter shall be in accordance

with nozzle projection and schedule (Pipe and Equipment). (*) Rating & shall be according P&ID’s and Piping Class.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

56/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 16P

PRESSURE TRANISMITTER

WITH DIAPHRAGM SEAL

EQUIPMENT INSTALLATION

(WITH CAPILLARY)

OR

PI*


PI*


PT

3”

EQUIPMENT

PIPING

INSTR

NOTE 2

EQUIPMENT

3”

STEQU

INSTR

PIPING

NOTE 2

3”

STEQU

EQUIPMENT

NOTES :

  1. Long bolts, nuts and gaskets by Piping.
  2. Refer sheet 36 for spacer design.
  3. Isolation valves type shall be according to P&ID’s legend

sheet and PMS.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

57/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 17P

PCV


TYPE 18P

PCV


T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

3/4” NPTF CONNECTION

NOTE-2

INSTR

3/4”

PIPING

PIPING

INSTR

PIPING

NOTE-3

NOTES :

  1. Bolts, nuts and gaskets by Piping.

  2. External tapping wherever applicable shall be informed by Instrument Dept. to Piping Dept. on case to case basis.

  3. Up stream tapping or down stream tapping as per P&ID

P&ID & Process data sheet.

  1. Rating as per P&ID and piping class.

SELF ACTUATED PRESSURE

VALVE WITH EXTERNAL TAPPING ON PIPE

SELF ACTUATED PRESSURE

VALVE WITH INTERNAL PRESSURE CONNECTION

PIPING

INSTR

PIPING

NOTES :

  1. Stus bolts, nuts and gaskets by Piping.
  2. Rating as per P&ID and piping class.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

58/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 19P

PSV


PRESSURE SAFETY VALVE AND THERMAL RELIEF VALVE

D 8

FB

TYPE 20P

PILOT OPERATED VALVE WITH EXTERNAL SENSING

P

PSV


INSTR

PIPING

INSTR

PIPING

NOTES :

  1. Stud bolts, nuts and gaskets by Piping.
  2. For Steam service, Piping to maintain straight

distance of 8D from fitting or 90° bend upstream.

2

INSTR

PIPING

NOTE-1

INSTR

PIPING

Piping end connection shall be 3/4” NPT(F)

INSTR PIPING

3/4” Valves as per Piping Specification

NOTES :

  1. Max distance of remote sensing tubing from process tap to

Pilot valve is 3 meters.

  1. Flanges, bolts, nuts, isolation valves and gaskets for external

tapping by Piping Department.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

59/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 21P

PRESSURE / VACUUM RELIEF VALVE

PIPING

INSTR

PSV


INSTR

PIPING / STEQU

NOTES :

  1. Stud bolts, nuts and gaskets by Piping.

  2. Rating shall be as indicated in P&ID’s.

INSTR

PIPING / STEQU

NOTES :

  1. Stud bolts, nuts and gaskets by Piping.

  2. Rating shall be as indicated in P&ID’s.

TYPE 22P

VACUUM RELIEF VALVE

PSV


T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

60/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.4 - PRESSURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 23P

RUPTURE DISC

RD


NOTE 1

PIPING

INSTR

PIPING

NOTES :

  1. Stud,bolts, nuts and gaskets by Piping.

  2. Rating shall be as indicated in P&ID”s.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

63/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.5 - TEMPERATURE

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

TYPE 1T

OR

TI*


TI*


TT

TEMPERATURE TRANSMITTER WITH ELEMENT AND THERMOWELL

TYPE 2T

TG


TEMPERATURE GAUGE WITH THERMOWELL

TYPE 3T

TW


THERMOWELL

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

TEMPERATURE INSTRUMENTS

316L SS AS MINIMUM

INSTR

FLANGED CONNECTION PIPING INSTALLATION

STUD,BOLT MATERIAL SEE NOTE 4 ON PAGE 64

FLANGED 1 1/2”

PIPING

NOTE 1

H T G N E L

I

N O T C E J O R P

E L B A T E E S

W O L E B

VESSEL INSTALLATION

PIPE MINIMUM NOMINAL (SEE NOTE 3) STUD,BOLT MATERIAL SEE NOTE 4 ON PAGE 64

316L SS AS MINIMUM

INSTR

VESSEL

NOTE 1

FLANGED 2”

I

N O T C E J O R P

H T G N E L

E L B A T E E S

W O L E B

NOTES :

  1. Stud bolts, nuts and gaskets by Piping.
  2. Thermo well Flange Rating shall be as per Pipe Class.
  3. Pipe minimum nominal diameter is 4” for “NON-UOP units”

and 6” for UOP units”

PIPING STANDOUTS TABLE

Sr. No.

Pipe Class Rating

Thermowell Flange Rating

Insulation Thickness

Projection Length

Remark

150#

300#

600#

900#

150#

300#

600#

900#

1

2

3

4

5

up to 60mm

up to 60mm

up to 60mm

150mm

if insulation thk. is > 60mm, projection shall be considered as 225mm 150mm if insulation thk. is > 60mm, projection shall be considered as 225mm 150mm if insulation thk. is > 60mm, projection shall be considered as 225mm

up to 60mm

150mm

if insulation thk. is > 60mm, projection shall be considered as 225mm

if insulation thk. is > 60mm, projection shall be considered as 225mm

1500#

1500#

up to 60mm

150mm

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

64/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.5 - TEMPERATURE

NOTES

ALL PIPING MATERIALS INCLUDING GASKETS AND BOLTS TO BE SUPPLIED BY PIPING UNLESS OTHERWISE INDICATED.

  1. MINIMUM LINE SIZE FOR FLANGED THERMOWELL INSTALLATIONS SHALL BE 4” (100 MM) FOR “NON-UOP UNITS” AND 6”.

(150 MM) FOR “UOP UNITS”.

  1. MINIMUM FLANGE RATING FOR THERMOWELL AS PER PIPE CLASS.

ALL MATERIALS TO BE IN ACCORDANCE WITH PIPE SPECIFICATION. THERMOWELL TO BE MINIMUM 316L STAINLESS STEEL.

UNDER NO CIRCUMSTANCES MAY A WELL BE INSTALLED IN AN INVERTED POSITION WITHOUT PRIOR APPROVAL FROM INSTRUMENTATION / PROCESS DEPT.

CLOSE CO-ORDINATION OF PIPING DESIGN AND INSTRUMENTATION / PROCESS DEPT. IS ESSENTIAL TO ENSURE CORRECT INSTALLATION.

  1. PIPING GROUP SHALL USE DIMENSIONS REFERRING TO STANDOUT TABLE ON SHEET 063. ANY VARIATION IN

COMPONENTS SHALL BE APPROVED BY INSTRUMENTATION / PROCESS DEPT. BEFORE PROCEEDING.

  1. PRESSURE-TEMPERATURE RATING OF FLANGE SHOULD BE VERIFIED WITH ASME B16.5 FOR RESPECTIVE FLANGE

MATERIAL AT LDT DESIGN PRESSURE AND TEMPERATURE.

  1. STATIC DEPARTMENT WILL ENSURE THAT THERMOWELL IS NOT CLASHING WITH VESSEL INTERNALS. ELEVATION,

ORIENTATION OF TEMPERATURE NOZZLE SHALL BE AGREED WITH PROCESS TO ENSURE THERMOWELL IS IN CONTACT WITH PROCESS FLUID AND ALSO SHALL BE CHECKED WITH PIPING TO ENSURE PROPER ACCESSIBILITY AND ORIENTATION.

  1. CLEARANCE REQUIRED FOR REMOVAL OF THERMOWELL & MEASUREMENT ELEMENT SHALL BE > NOZZLE

PROJECTION + 19.6 in / 500mm.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

66/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.6 - CONTROL VALVES, ON-OFF VALVES

P&ID SYMBOL

DESCRIPTION

INSTRUMENT/PIPING ARRANGEMENT

0 0 3

) * (

CONTROL VALVE

FV LV PV TV

) 1 E T O N

(

(NOTE 1)

PIPING

INSTR

PIPING

NOTES :

  1. For Valve dimension refer Vendor Drawing.
  2. Bolts, nuts and gaskets by Piping Department. (*) -Minimum clearance for maintenance is based on valve vendor recommedation.

BDV ESDV SDV XV UV

ON-OFF VALVES

0 0 3

) * (

) 1 E T O N

(

(NOTE 1)

PIPING

INSTR

PIPING

NOTES :

  1. For Valve dimension refer Vendor Drawing.
  2. Bolts, nuts and gaskets by Piping Department. (*) -Minimum clearance for maintenance is based on valve vendor recommedation.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

67/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.7 - INSTRUMENT AIR DISTRIBUTION INTERFACE

AIR TAP FOR INSTRUMENT AIR MANIFOLD

Instrument Air Header

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

) * ( .

I

N M

PIPING

INSTR

1” 150# RF Flange (Note-1)

Rating and Facing as per Instrument air Pipe CLass

Instrument Air Manifold

Continuied on individual Pneumatic hook-up Sheets

Continuied on individual Pneumatic hook-up Sheets

To Instrument Air User

To Instrument Air User

NOTES :

  1. Bolts, nuts and gaskets by Piping.
  2. Number of users is indicative only. For exact number refer to document

4439-KK-DT-120000005 Typical Installation for Process Connections - Process Units Licensed By UOP 4439-KK-DT-130000005 Typical Installation for Process Connections - Utilities 4439-KK-DT-140000005 Typical Installation for Process Connections - Offsites 4439-KK-DT-200000005 Typical Installation for Process Connections - OSBL

  1. Root valve installation on header to be according to project requirements.
  2. Isolation Valve Provided by piping shall be accessible. (*) As short as possible.

Maitre de I’Ouvrage :

Nom du projet :

Identifiant Entrepreneur :

  Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023

4439-KK-SG-000000003

Format :

Page :

A4

68/68

Entrepreneur :

Titre du Document :

INSTRUMENTATION TYPICAL INSTALLATION DETAILS PIPING & INSTRUMENTATION BATTERY LIMIT

Echelle :

Rev :

2

2.7 - INSTRUMENT AIR DISTRIBUTION INTERFACE

AIR TAP FOR DIRECT CONNECTION TO INSTRUMENT AIR USERS

~

BRANCH

PIPING

INSTR

1/2” NPT (F) (BY PIPING)

~

NOTE 1

TO INSTRUMENT AIR USER

~

MAIN INSTR. AIR HEADER SEE PIPING DRAWING

R E D A E H B U S

R E D A E H B U S

~

~

1/2” NPT (F) (BY PIPING)

NOTE 4

NOTE 1

TO INSTRUMENT AIR USER

PIPING

INST.

T N E S N O C

N E T T I R W

R O R P

I

T U O H T I W

, E S O P R U P

Y N A

R O F

S R E H T O

Y B

D E S U

E B

T O N N A C

D N A

Y T R E P O R P

S ’ T N O M N C E T

I

S

I

T N E M U C O D

I

S H T

NOTES :

  1. To be located close to the Instrument air user, approximately 500mm.

  2. Drain at low point.

  3. Root valve installation on header according to project requirements.

  4. For Specific cases as marked in UDD the end connection shall be 1”NPT(F) or 3/4” NPT(F).

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

GATE VALVE

GLOBE VALVE

NEEDLE VALVE

H -

HIGH PRESSURE TAP

L - LOW PRESSURE TAP

P - PLUGGED

ALTERNATE VENTURI DETAIL

(WHEN VENTURI IS SPECIFIED)

FLOW

(cid:129)” SOLID

PLUG

VALVING, TAPS, AND IMPULSE

PIPING AS PER ORIFICE

INSTALLATION.

PIPE

MULTIPLE TRANSMITTERS DETAIL

PIPE

PIPE

2’-0” (600) MAXIMUM

NOTE 6

) 0 5 4 (

” 6

’ 1

M U M I X A M

(cid:129)” PIPE

NOTE 4

2’-0” (600) MAXIMUM

L

H

DIFFERENTIAL

PRESSURE

INSTRUMENT

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

PIPE STRAP (NOTE 5)

FLOW

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

VERTICAL (TOP)

ORIFICE TAPS

SCREWED CAP

DO NOT SEAL WELD

(cid:129)” SOLID PLUG

1’-0”(300)

DIFFERENTIAL PRESSURE

INSTRUMENT

NOTE 4

MINIMUM

H

L

NOTE 4

NOTE 6

) 0 0 6 (

” 0

’ 2

M U M I X A M

NOTE 12

W O L F

PIPE STRAP

(NOTE 5)

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

(cid:129)” SOLID

PLUG

SCREWED CAP

(DO NOT SEAL

(cid:129)” PIPE

WELD)

(cid:129)” PIPE

2’-0” (600) MAXIMUM

QUALTRAX 11494

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

ORIFICE METER PIPING ASSEMBLIES FOR DRY GAS SERVICE

(METER LOCATED NEAR AND ABOVE ORIFICE -FOR ASME FLANGE CLASS 300 AND 600)

6-115-11

DATE

28MAR22

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

DIFFERENTIAL

PRESSURE

INSTRUMENT

5 VALVE MANIFOLD

(SEE DETAIL)

H

L

(cid:129)” TUBING

(cid:129)” PIPE

VERTICAL (TOP)

ORIFICE TAPS

TUBING AND MANIFOLD

2” INSTRUMENT MOUNTING

SUPPORT PIPE

) 0 0 6 (

” 0

’ 2

M U M I X A M

FLOW

PIPE STRAP

(NOTE 5)

(cid:129)” SOLID PLUG

PIPE STRAP

(NOTE 5)

NOTE 12

W O L F

PROCESS

P

P

TEST

TEST

INSTRUMENT

5 VALVE MANIFOLD

DETAIL

2” INSTRUMENT MOUNTING

SUPPORT PIPE

DIFFERENTIAL PRESSURE

INSTRUMENT

(cid:129)” SOLID PLUG

H

MINIMUM

L

(cid:129)” PIPE

(cid:129)” TUBING

5 VALVE MANIFOLD

(SEE DETAIL)

) 0 0 6 (

” 0

’ 2

M U M I X A M

NOTES:

(cid:129)” PIPE

THE USE OF TUBING INSTEAD OF PIPE SHALL BE IN ACCORDANCE WITH UOP STANDARD SPECIFICATION 8-11 PIPING.

  1. DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

  2. PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

TUBING

USE FLANGES FOR SOCKET WELD PIPING AND UNION FOR SCREWED PIPING. NOT REQUIRED WHEN USING

REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

ALTERNATE MOUNTING: SUPPORT INSTRUMENT FROM ADJACENT PIPE RACK, GRADE, GRATING, OR FROM

STRUCTURAL STEEL. INSTALLATION SHALL ALLOW FOR PROCESS THERMAL EXPANSION OF PIPING.

  1. PROVIDE UNION FOR SCREWED PIPING ONLY.

  2. ORIFICE FLANGE TAPS AND PLUGS SHALL BE SEAL WELDED.

  3. CAPPED TEES AT ORIFICE FLANGE SHALL BE ACCESSIBLE FOR REAMING.

FOR INSTALLATIONS WHERE TWO TRANSMITTERS ARE REQUIRED, EACH TRANSMITTER SHALL BE INSTALLED FROM

ITS OWN SET OF ORIFICE TAPS IN ACCORDANCE WITH THIS DRAWING.

EACH TRANSMITTER SHALL HAVE ITS OWN SET OF ISOLATING ((cid:129)” GATE) VALVES FOR INSTALLATIONS WHERE

MORE THAN ONE TRANSMITTER IS REQUIRED TO BE INSTALLED FROM ONE SET OF ORIFICE TAPS.

(cid:129)” PIPE

TUBING

ALL GLOBE AND GATE VALVES ARE (cid:129)”.

VERTICAL UPFLOW IS PERMITTED.

  1. DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

GLOBE VALVE

H -

HIGH PRESSURE TAP

L - LOW PRESSURE TAP

PIPE

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

ORIFICE METER PIPING ASSEMBLIES DRY GAS SERVICE

(METER LOCATED NEAR AND ABOVE ORIFICE - FOR ASME FLANGE CLASS 900, 1500 AND 2500)

6-139-8

DATE

28MAR22

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

2’-6” (750) MAXIMUM

ƒ” BREAK

FLANGES

(NOTE 4)

) 0 5 4 (

” 6

’ 1

M U M I X A M

NOTE 6

ƒ” PIPE

ƒ”

(cid:129)”

L

2’-0” (600) MAXIMUM

DIFFERENTIAL PRESSURE

INSTRUMENT

H

REDUCER

ƒ” BREAK FLANGES

(NOTE 4)

2” INSTRUMENT MOUNTING

SUPPORT PIPE

PIPE STRAP (NOTE 5)

FLOW

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

VERTICAL (TOP)

ORIFICE TAPS

SCREWED CAP

DO NOT SEAL WELD

ƒ” SOLID PLUG

1’-0”(300)

W O L F

NOTE 11

DIFFERENTIAL PRESSURE

INSTRUMENT

ƒ” BREAK FLANGES

(NOTE 4)

MINIMUM

PIPE STRAP (NOTE 5)

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

ƒ” SOLID PLUG

ƒ” BREAK FLANGES

(NOTE 4)

H

L

(cid:129)”

REDUCER

2’-0” (600) MAXIMUM

) 0 5 7 (

” 6

’ 2

M U M I X A M

ƒ” PIPE

NOTE 6

SCREWED CAP

DO NOT SEAL WELD

QUALTRAX 11501

MULTIPLE TRANSMITTERS DETAIL

ƒ” PIPE

ƒ” PIPE

NOTES:

PROVIDE GUSSETING AS REQUIRED TO DISTRIBUTE STRESS.

  1. DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

  2. PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

NOT REQUIRED WHEN USING REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

ALTERNATE MOUNTING: SUPPORT INSTRUMENT FROM ADJACENT PIPE RACK, GRATING, OR FROM STRUCTURAL STEEL.

INSTALLATION SHALL ALLOW FOR PROCESS THERMAL EXPANSION OF PIPING.

PROVIDE BREAK FLANGES IN ORDER TO EASE ORIFICE PLATE INSTALLATION.

  1. ORIFICE FLANGE TAPS AND PLUGS SHALL BE SEAL WELDED.

FOR INSTALLATIONS WHERE TWO TRANSMITTERS ARE REQUIRED, EACH TRANSMITTER SHALL BE INSTALLED

FROM ITS OWN SET OF ORIFICE TAPS IN ACCORDANCE WITH THIS DRAWING.

EACH TRANSMITTER SHALL HAVE ITS OWN SET OF ISOLATING (ƒ” GLOBE) VALVES FOR INSTALLATIONS

WHERE MORE THAN ONE TRANSMITTER IS REQUIRED TO BE INSTALLED FROM ONE SET OF ORIFICE TAPS.

ALL GLOBE VALVES ARE ƒ”.

VERTICAL UPFLOW IS PERMITTED.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

GATE VALVE

GLOBE VALVE

NEEDLE VALVE

H -

HIGH PRESSURE TAP

L - LOW PRESSURE TAP

P - PLUGGED

ALTERNATE VENTURI DETAIL

(WHEN VENTURI IS SPECIFIED)

FLOW

VALVING AND IMPULSE

PIPING AS PER ORIFICE

INSTALLATION.

Â(cid:129)” SOLID

PIPE

MULTIPLE TRANSMITTERS DETAIL

PIPE STRAP

(NOTE 5)

FLOW

MINIMUM

2” INSTRUMENT

MOUNTING SUPPORT PIPE

DIFFERENTIAL

PRESSURE

INSTRUMENT

PIPE

L

H

2’-0” (600) MAXIMUM

NOTE 6

Â(cid:129)”

2’-0” (600) MAXIMUM

NOTE 4

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM



SOLID

PLUG

HORIZONTAL

ORIFICE TAPS

) 0 0 6 (

” 0

’ 2

M U M I X A M

SCREWED CAP

DO NOT SEAL

WELD

SCREWED CAP

DO NOT SEAL

Â(cid:129)”

PIPE

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

ORIFICE METER PIPING ASSEMBLIES

LIQUID, STEAM OR CONDENSABLE VAPOR SERVICE

(METER LOCATED NEAR AND BELOW ORIFICE -FOR ASME FLANGE CLASS 300 AND 600)

6-116-10

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

TUBING AND MANIFOLD

Â(cid:129)” S

PLUG

PIPE STRAP

(NOTE 5)

FLOW

MINIMUM

HORIZONTAL

ORIFICE TAPS

Â(cid:129)”

M U M I X A M

) 0 0 6 (

” 0

’ 2

H

L

Â(cid:129)” TU

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

PROCESS

TEST

TEST

P

P

INSTRUMENT

5 VALVE MANIFOLD

DETAIL

” 0

’ 2

) 0 0 6 (

M U M I X A M

L

H

W O L F

5 VALVE MANIFOLD

(SEE DETAIL)

MINIMUM

DIFFERENTIAL

PRESSURE

INSTRUMENT

DIFFERENTIAL

PRESSURE

INSTRUMENT

5 VALVE MANIFOLD

(SEE DETAIL)

Â(cid:129)” SO

PLUG

Â(cid:129)”

Â(cid:129)” TU

NOTE 12

PIPE STRAP

(NOTE 5)

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

Â(cid:129)” SOLID

WELD

2’-0” (600) MAXIMUM

NOTE 12

W O L F

NOTE 6

) 0 0 6 (

” 0

’ 2

M U M I X A M

DIFFERENTIAL

PRESSURE

INSTRUMENT

PIPE STRAP

(NOTE 5)

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

1’-0”(300)

H

L

MINIMUM

Â(cid:129)”

NOTES:

Â(cid:129)”

THE USE OF TUBING INSTEAD OF PIPE SHALL BE IN ACCORDANCE WITH UOP STANDARD SPECIFICATION 8-11 PIPING.

DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

USE FLANGES FOR SOCKET WELD PIPING AND UNION FOR SCREWED PIPING. NOT REQUIRED WHEN

USING REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

ALTERNATE MOUNTING: SUPPORT INSTRUMENT FROM ADJACENT PIPE RACK, GRADE, GRATING, OR FROM STRUCTURAL

STEEL. INSTALLATION SHALL ALLOW FOR PROCESS THERMAL EXPANSION OF PIPING.

PROVIDE UNION FOR SCREWED PIPING ONLY.

ORIFICE FLANGE TAPS AND PLUGS SHALL BE SEAL WELDED.

CAPPED TEES AT ORIFICE FLANGE SHALL BE ACCESSIBLE FOR REAMING.

TUBING

Â(cid:129)”

SCREWED CAP

(DO NOT

SEAL WELD)

QUALTRAX 11495

NOTE 4

Â(cid:129)”

FOR INSTALLATIONS WHERE TWO TRANSMITTERS ARE REQUIRED, EACH TRANSMITTER SHALL BE INSTALLED

FROM ITS OWN SET OF ORIFICE TAPS IN ACCORDANCE WITH THIS DRAWING.

EACH TRANSMITTER SHALL HAVE ITS OWN SET OF ISOLATING (Â(cid:129)” GATE) VALVES FOR INSTALLATIONS WH

MORE THAN ONE TRANSMITTER IS REQUIRED TO BE INSTALLED FROM ONE SET OF ORIFICE TAPS.

ALL GLOBE AND GATE VALVES ARE

UPFLOW IS PERMITTED FOR LIQUIDS THAT ARE NOT NEAR THEIR BUBBLE POINTS. UPFLOW IS NOT

TUBING

RECOMMENDED FOR STEAM AND CONDENSABLE VAPORS.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

GLOBE VALVE

H -

HIGH PRESSURE TAP

L - LOW PRESSURE TAP

PIPE

PIPE STRAP

(NOTE 5)

FLOW

2” INSTRUMENT

MOUNTING SUPPORT PIPE

ƒ” SOLID

PLUG

MINIMUM

HORIZONTAL

ORIFICE TAPS

ƒ”

) 0 0 6 ( ” 0

’ 2

M U M I X A M

REDUCER

(cid:129)”

L

H

2’-0” (600) MAXIMUM

DIFFERENTIAL

PRESSURE

INSTRUMENT

NOTE 6

ƒ” PIPE

SCREWED CAP

DO NOT SEAL

WELD

2’-6” (750) MAXIMUM

ƒ” BREAK FLANGES

(NOTE 4)

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

ƒ” SOLID PLUG

NOTE 11

W O L F

ƒ” PIPE

NOTE 6

2’-0” (600) MAXIMUM

) 0 5 7 (

” 6

’ 2

M U M I X A M

SCREWED CAP

DO NOT SEAL WELD

DIFFERENTIAL

PRESSURE

INSTRUMENT

(cid:129)”

1’-0”(300)

H

L

(cid:129)”

PIPE STRAP

(NOTE 5)

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

MINIMUM

ƒ” BREAK

FLANGES

(NOTE 4)

REDUCER

ƒ” BREAK

FLANGES

(NOTE 4)

QUALTRAX 11502

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

ORIFICE METER PIPING ASSEMBLIES LIQUID, STEAM

OR CONDENSABLE VAPOR SERVICE

(METER LOCATED NEAR AND BELOW ORIFICE - FOR ASME FLANGE CLASS 900, 1500 AND 2500)

6-140-8

DATE

28MAR22

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

MULTIPLE TRANSMITTERS DETAIL

ƒ” PIPE

ƒ” PIPE

NOTES:

PROVIDE GUSSETING AS REQUIRED TO DISTRIBUTE STRESS.

  1. DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

  2. PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

NOT REQUIRED WHEN USING REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

ALTERNATE MOUNTING: SUPPORT INSTRUMENT FROM ADJACENT PIPE RACK, GRADE, GRATING, OR FROM

STRUCTURAL STEEL. INSTALLATION SHALL ALLOW FOR PROCESS THERMAL EXPANSION OF PIPING.

PROVIDE BREAK FLANGES IN ORDER TO EASE ORIFICE PLATE INSTALLATION.

  1. ORIFICE FLANGE TAPS AND PLUGS SHALL BE SEAL WELDED.

FOR INSTALLATIONS WHERE TWO TRANSMITTERS ARE REQUIRED, EACH TRANSMITTER SHALL BE INSTALLED FROM

ITS OWN SET OF ORIFICE TAPS IN ACCORDANCE WITH THIS DRAWING.

EACH TRANSMITTER SHALL HAVE ITS OWN SET OF ISOLATING (ƒ” GLOBE) VALVES FOR INSTALLATIONS WHERE

MORE THAN ONE TRANSMITTER IS REQUIRED TO BE INSTALLED FROM ONE SET OF ORIFICE TAPS.

ALL GLOBE VALVES ARE ƒ”.

UPFLOW IS PERMITTED FOR LIQUIDS THAT ARE NOT NEAR THEIR BUBBLE POINTS. UPFLOW IS NOT RECOMMENDED

FOR STEAM AND CONDENSABLE VAPORS.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

GLOBE VALVE

NEEDLE VALVE

P -

PLUGGED

SEAL WELD, ONLY IF

NOTE 5 IS REQUIRED

(cid:129)” SCREWED TEE

REDUCER

ƒ”

DETAIL A

GENERAL SERVICE

FOR ASME FLANGE CLASS 150, 300 AND 600

PI

NOTE 5, WHEN

REQUIRED

(cid:129)”

SCREWED CAP

DO NOT SEAL WELD

REMAINING

IMPULSE LINE

TO BE VERTICAL

REDUCER

SEAL WELD FOR

SOCKET WELD PIPE CLASSES

(cid:129)”

ƒ”

PIPE

ALTERNATE VERTICAL LINE INSTALLATION

NOTE 5,

WHEN

REQUIRED

PI

INSTRUMENT

TEST

P

2 VALVE MANIFOLD

(SEE DETAIL)

(cid:129)” TUBING

(WHEN REQUIRED FOR

REMOTE MOUNTING)

ƒ”

ƒ” PIPE

PROCESS

2 VALVE MANIFOLD

DETAIL

REMAINING

IMPULSE LINE

TO BE VERTICAL

ƒ” PIPE

(cid:129)” TUBING

ƒ”

TUBING AND MANIFOLD

ALTERNATE VERTICAL LINE INSTALLATION

DETAIL B

STEAM OR HIGH TEMPERATURE CONDENSING VAPOR SERVICE

FOR ASME FLANGE CLASS I5O, 300 AND 600

FOR ALTERNATE

VERTICAL LINE INSTALLATION AND 2 VALVE

MANIFOLD DETAIL, SEE DETAIL A ABOVE

SIPHON, BEND IN FIELD

(PREFABRICATED GAUGE

SIPHON IS AN

ACCEPTABLE ALTERNATE)

(cid:129)” SCREWED TEE

REDUCER

PI

PI

(cid:129)” SCREWED COUPLING

APPROXIMATELY 6” (150)

SCREWED CAP

DO NOT SEAL WELD

SIPHON, BEND IN FIELD

(PREFABRICATED GAUGE

SIPHON IS AN

ACCEPTABLE ALTERNATE)

2 VALVE MANIFOLD

(SEE DETAIL)

(cid:129)” TUBING

ƒ”

SOCKET WELD PIPE CLASSES

SEAL WELD FOR

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

PRESSURE GAUGE PIPING ASSEMBLIES

6-101-9

DATE

28MAR22

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

SCREWED

REDUCING

COUPLING

SEAL WELD

ƒ”

ƒ”

ƒ”

DETAIL C HYDROFLUORIC ACID SERVICE

PI

REDUCING CONNECTOR

PIPE TO TUBE

…” OUTSIDE DIAMETER

WHEN PROJECT REQUIRES “A” AND “T” VALVES

ONLY “T” VALVES SHALL BE USED

FOR DETAIL C INSTALLATIONS

COPPER TUBING

REMAINING IMPULSE LINE

SLOPE

3’-0” (900)

MINIMUM

(cid:129)”

REDUCER

) 0 5 1 (

” 6

TO BE VERTICAL

REDUCER

(cid:129)”

SLOPE

ƒ”

3’-0” (900)

MINIMUM

PIPE

DRAIN FUNNEL

TO ACID SEWER

ALTERNATE PIPE VERTICAL LINE INSTALLATION

DETAIL D

FOR USE ON INSTRUMENT IMPULSE PIPING

FOR ASME FLANGE CLASS 150, 300 AND 600

SEAL WELD,

ONLY IF

NOTE 5 IS

REQUIRED

(cid:129)” SCREWED

TEE

PI

(cid:129)”

NOTE 5, WHEN

REQUIRED

SCREWED CAP

DO NOT SEAL WELD

PI

NOTE 5,

WHEN

REQUIRED

SEAL WELD FOR

2 VALVE MANIFOLD

SOCKET WELD LINES

(SEE DETAIL)

(cid:129)” TUBING

INSTRUMENT

TEST

P

PROCESS

2 VALVE MANIFOLD

DETAIL

(cid:129)”

PIPE

NOTE 6 WHEN

REQUIRED

(cid:129)”

SCREWED

REDUCING

COUPLING

SEAL

WELD

ƒ” TEE

ƒ”

NOTES:

TUBING AND MANIFOLD

DETAIL E

HIGH PRESSURE SERVICE

FOR ASME FLANGE CLASS 900, 1500 AND 2500

PI

SEAL WELD WHEN

NOTE 6 IS REQUIRED

ƒ”

SCREWED CAP

DO NOT SEAL WELD

ƒ”

PROVIDE GUSSETING AS REQUIRED

TO DISTRIBUTE STRESS

FOR DETAIL E INSTALLATIONS

ƒ”

ƒ”

PIPE

ALTERNATE VERTICAL LINE INSTALLATION

THE USE OF TUBING INSTEAD OF PIPE SHALL BE IN ACCORDANCE WITH UOP STANDARD SPECIFICATION 8-11 PIPING.

DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

PIPE

TUBING AND MANIFOLD

QUALTRAX 11484

FOR HORIZONTAL LINES PRESSURE CONNECTION SHALL BE ON TOP OF THE LINE.

PULSATION DAMPENER, EXCESS FLOW CHECK OR DIAPHRAGM SEAL.

PULSATION DAMPENER AND/OR EXCESS FLOW CHECK VALVE, INSTALLED IN THE VERTICAL.

  1. DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

ƒ” PIPE

ƒ”

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

GLOBE VALVE

NEEDLE VALVE

P -

PLUGGED

SIPHON

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

PRESSURE INSTRUMENT PIPING ASSEMBLIES

(FOR ASME FLANGE CLASS 150, 300 AND 600)

6-102-8

DATE

28MAR22

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

APPROXIMATELY

6” (150)

(cid:129)”

PROVIDE SIPHON IN LINE FOR

STEAM OR HIGH TEMPERATURE

CONDENSING VAPOR SERVICE.

BEND IN FIELD

NOTE: PREFABRICATED GAUGE SIPHON

IS AN ACCEPTABLE ALTERNATE.

PIPE

2’-0” (600) MAXIMUM

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

REPLACE PIPE ELBOW WITH

TEE WHEN PRESSURE GAUGE IS

SPECIFIED TO BE INSTALLED

WITH PRESSURE INSTRUMENT.

PRESSURE INSTRUMENT

NOTE 4

SUPPORT PIPE

2” INSTRUMENT MOUNTING

(cid:129)”

SCREWED CAP

DO NOT SEAL

WELD

(cid:129)” PIPE

REDUCER

ƒ”

PIPE STRAP

(NOTE 5)

) 0 0 6 (

” 0

’ 2

M U M I X A M

CONNECTION

ON TOP OF PIPE

TUBING AND MANIFOLD

PRESSURE INSTRUMENT

2 VALVE MANIFOLD

(SEE DETAIL)

INSTRUMENT

TEST

P

PROCESS

2 VALVE MANIFOLD

DETAIL

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

2’-0” (600) MAXIMUM

2” INSTRUMENT MOUNTING

SUPPORT PIPE

INSTALL TEE WHEN PRESSURE

GAUGE IS SPECIFIED TO BE

INSTALLED WITH PRESSURE

INSTRUMENT. PROVIDE

SUPPORT FOR PRESSURE

GAUGE AS REQUIRED.

(cid:129)” TUBING

ƒ”

CONNECTION

ON TOP OF

PIPE

PIPE STRAP

(NOTE 5)

) 0 0 6 (

” 0

’ 2

M U M I X A M

ƒ” PIPE

ƒ” PIPE

2 VALVE MANIFOLD

(SEE DETAIL)

(cid:129)” TUBING

(cid:129)” TUBING

ƒ”

ALTERNATE INSTRUMENT

ALTERNATE VERTICAL

LINE INSTALLATION

ALTERNATE INSTRUMENT

ALTERNATE VERTICAL LINE INSTALLATION

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

ƒ”

THE USE OF TUBING INSTEAD OF PIPE SHALL BE IN ACCORDANCE WITH UOP STANDARD SPECIFICATION 8-11 PIPING.

NOTES:

DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

USE FLANGES FOR SOCKET WELD PIPING AND UNION FOR SCREWED PIPING. NOT REQUIRED WHEN USING

REMOVABLE MOUNTING ADAPTOR ON INSTRUMENT BODY.

ALTERNATE MOUNTING: SUPPORT INSTRUMENT FROM ADJACENT PIPE RACK OR FROM STRUCTURAL STEEL.

INSTALLATION SHALL ALLOW FOR PROCESS THERMAL EXPANSION OF PIPING.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11485

Revision

Indication

R

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

PRESSURE INSTRUMENT PIPING ASSEMBLY (FOR ASME FLANGE CLASS 900, 1500 AND 2500)

6-155-7

DATE

28MAR22

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

GLOBE VALVE

SIPHON

APPROXIMATELY

PROVIDE SIPHON IN LINE FOR

6” (150)

STEAM OR HIGH TEMPERATURE

CONDENSING VAPOR SERVICE.

BEND IN FIELD

ƒ”

NOTE: PREFABRICATED GAUGE SIPHON

  IS AN ACCEPTABLE ALTERNATE.

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

ƒ”

ƒ”

) 0 5 7 (

” 6

’ 2

M U M I X A M

PIPE

2’-0” (600) MAXIMUM

(cid:129)”

PRESSURE INSTRUMENT

2” INSTRUMENT MOUNTING

SUPPORT PIPE

REDUCER

BREAK FLANGES

(NOTE 4)

ƒ”

PIPE STRAP

(NOTE 5)

SCREWED CAP

DO NOT SEAL WELD

CONNECTION

ON TOP OF PIPE

ƒ”

ƒ”

ƒ”

ALTERNATE INSTRUMENT

ALTERNATE VERTICAL LINE INSTALLATION

NOTES:

PROVIDE GUSSETING AS REQUIRED TO DISTRIBUTE STRESS.

DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

NOT REQUIRED WHEN USING REMOVABLE MOUNTING ADAPTOR ON INSTRUMENT BODY.

ALTERNATE MOUNTING: SUPPORT INSTRUMENT FROM ADJACENT PIPE RACK OR FROM STRUCTURAL STEEL.

INSTALLATION SHALL ALLOW FOR PROCESS THERMAL EXPANSION OF PIPING.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11511

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

DETAIL A

(GENERAL SERVICE)

DIFFERENTIAL PRESSURE INSTRUMENT

SUPPORT PIPE

2” INSTRUMENT MOUNTING

6”(150) X 6”(150) PLATE

Â(cid:129)”

(cid:0)»

VALVE A

ƒ”

MINIMUM

2’-0”(600) MAXIMUM

ƒ” P

(cid:0)»

VALVE A

MINIMUM

Â(cid:129)”

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

Â(cid:129)”

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

SCREWED CAP

DO NOT

SEAL WELD

VALVE B

PIPE

) 0 0 6 ( ” 0

’ 2

M U M I X A M

(NOTE 4)

VALVE B

USE FITTINGS OR

BEND PIPE TO SUIT,

PROVIDE FOR EXPANSION

USE FITTINGS OR

BEND PIPE TO SUIT,

PROVIDE FOR EXPANSION

DIFFERENTIAL

PRESSURE

INSTRUMENT

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

6”(150) X 6”(150) PLATE

ƒ”

2 VALVE

MANIFOLD

(SEE DETAIL)

P



MINIMUM

2’-0” (600) MAXIMUM

Â(cid:129)” TU

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

P

INSTRUMENT

ƒ”

(cid:0)»

MINIMUM

PROCESS

2 VALVE MANIFOLD

DETAIL

Â(cid:129)” TU

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

DIFFERENTIAL PRESSURE INSTRUMENT PIPING ASSEMBLY

FOR DRY GAS SERVICE (FOR ASME FLANGE CLASS 150, 300 AND 600)

6-159-5

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

(LOW DIFFERENTIAL PRESSURE SERVICE)

DETAIL B

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

6”(150) X

6”(150) PLATE

DIFFERENTIAL

PRESSURE

INSTRUMENT

Â(cid:129)” P

Â(cid:129)”

Â(cid:129)”

(NOTE 4)

MINIMUM

(cid:0)»

ƒ”

LOW DIFFERENTIAL

PRESSURE EQUIPMENT

(cid:0)»

) 0 0 6 (

” 0

’ 2

M U M I X A M

SCREWED CAP

DO NOT SEAL

WELD

(cid:0)»

DIFFERENTIAL

PRESSURE

INSTRUMENT

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

6”(150) X

6”(150) PLATE

NOTE 5

Â(cid:129)”

(cid:0)»

ƒ”

CONNECTION ON

TOP OF LINE

INSTRUMENT

TEST

TEST

P

P

MINIMUM

MINIMUM

PIPE

LOW DIFFERENTIAL

PRESSURE EQUIPMENT

5 VALVE

MANIFOLD

(SEE DETAIL)

PROCESS

5 VALVE MANIFOLD

DETAIL



TUBING

(cid:0)»

MINIMUM

(cid:0)»

) 0 0 6 (

” 0

’ 2

M U M I X A M

ƒ”



TUBING

(cid:0)»

MINIMUM

ƒ”

LOW DIFFERENTIAL

PRESSURE EQUIPMENT

Â(cid:129)” TU

M U M I N I M

M U M I N I M

M U M I N I M

M U M I N I M

TUBING AND MANIFOLD

ƒ”

CONNECTION ON

TOP OF LINE

MINIMUM

LOW DIFFERENTIAL

PRESSURE EQUIPMENT

TUBING AND MANIFOLD

NOTES:

PROVIDE UNION FOR SCREWED PIPING ONLY.

THE USE OF TUBING INSTEAD OF PIPE SHALL BE IN ACCORDANCE WITH UOP STANDARD SPECIFICATION 8-11 PIPING.

THE USE OF A BYPASS OR A 5 VALVE MANIFOLD WITH AN EQUALIZING VALVE IS PERMITTED

DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

WHERE CONTAMINATION OR A HAZARDOUS CONDITION WILL NOT RESULT.

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

VALVE B MAY BE ELIMINATED IF VALVE A IS EASILY ACCESSIBLE, ON THE SAME PLATFORM, AND

USE FLANGES FOR SOCKET WELD PIPING AND UNION FOR SCREWED PIPING. NOT REQUIRED WHEN

NEARBY THE TRANSMITTER.

USING REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

LEGEND

REDUCER

GATE VALVE

GLOBE VALVE

NEEDLE VALVE

P

PLUGGED

QUALTRAX 11514

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

DIFFERENTIAL PRESSURE INSTRUMENT PIPING ASSEMBLY

FOR DRY GAS SERVICE (FOR ASME FLANGE CLASS 900, 1500 AND 2500)

6-162-5

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

DETAIL A

(GENERAL SERVICE)

DETAIL B

(LOW DIFFERENTIAL PRESSURE SERVICE)

DIFFERENTIAL

PRESSURE

INSTRUMENT

6” (150) X

6” (150)

PLATE

(cid:0)»

VALVE A

ƒ”

MINIMUM

4’-0” (1200) MAXIMUM

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

Â(cid:129)”

ƒ” P

ƒ” B

FLANGES

(NOTE 4)

) 0 0 6 (

” 0

’ 2

M U M I X A M

VALVE B

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

USE FITTINGS OR

BEND PIPE TO SUIT,

PROVIDE FOR EXPANSION

ƒ”

(cid:0)»

VALVE A

MINIMUM

ƒ”

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

SCREWED CAP

DO NOT SEAL

WELD

VALVE B

USE FITTINGS OR

BEND PIPE TO SUIT,

PROVIDE FOR EXPANSION

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

6” (150) X

6” (150)

PLATE

DIFFERENTIAL

PRESSURE

INSTRUMENT

Â(cid:129)”

ƒ” B

FLANGES

(NOTE 4)

) 0 0 6 (

” 0

’ 2

M U M I X A M

(cid:0)»

ƒ”

NOTE 7

(cid:0)»

SCREWED CAP

DO NOT SEAL

WELD

ƒ”

(cid:0)»

ƒ” P

MINIMUM

MINIMUM

LOW DIFFERENTIAL

PRESSURE EQUIPMENT

CONNECTION ON

TOP OF LINE

MINIMUM

ƒ” P

LOW DIFFERENTIAL

PRESSURE EQUIPMENT

(cid:0)»

ƒ”

M U M I N I M

M U M I N I M

PIPE

PIPE

NOTES:

PROVIDE GUSSETING AS REQUIRED TO DISTRIBUTE STRESS.

THE USE OF A BYPASS IS PERMITTED WHERE CONTAMINATION OR A HAZARDOUS CONDITION WILL NOT RESULT.

DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

VALVE B MAY BE ELIMINATED IF VALVE A IS EASILY ACCESSIBLE, ON THE SAME PLATFORM, AND NEARBY THE TRANSMITTER.

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

PROVIDE BREAK FLANGES, IF REQUIRED, TO EASE INSTALLATION OF THE LOW DIFFERENTIAL PRESSURE EQUIPMENT.

NOT REQUIRED WHEN USING REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

LEGEND

REDUCER

GLOBE VALVE

QUALTRAX 11517

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

GATE VALVE

GLOBE VALVE

NEEDLE VALVE

DETAIL A

GENERAL SERVICE

VALVE A

REDUCER

ƒ”



MINIMUM

USE FITTINGS OR

BEND PIPE TO SUIT,

PROVIDE FOR EXPANSION

DIFFERENTIAL PRESSURE INSTRUMENT PIPING ASSEMBLY FOR

LIQUID, STEAM OR CONDENSABLE VAPOR SERVICE

(FOR ASME FLANGE CLASS 150, 300 AND 600)

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

P - PLUGGED

ƒ” P

Â(cid:129)” P

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

DETAIL B

LOW DIFFERENTIAL PRESSURE SERVICE

(cid:0)»

MINIMUM

VALVE A

REDUCER

Â(cid:129)”

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

ƒ”



USE FITTINGS OR

BEND PIPE TO

SUIT, PROVIDE

FOR EXPANSION

ƒ”

(cid:0)»

MINIMUM

MINIMUM

Â(cid:129)” TU

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

Â(cid:129)” TU

PRESSURE

DIFFERENTIAL

INSTRUMENT

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

6” (150) X

6” (150)

PLATE

2 VALVE

MANIFOLD

(SEE

DETAIL)

P

2” INSTRUMENT

VALVE B

MOUNTING

SUPPORT PIPE

6” (150)

X 6” (150)

PLATE

DIFFERENTIAL

PRESSURE

INSTRUMENT

NOTE 4

VALVE B

2’-0” (600) MAXIMUM

PIPE

SCREWED CAP

DO NOT SEAL

WELD

PROCESS

2’-0” (600) MAXIMUM

P

TUBING AND MANIFOLD

INSTRUMENT

2 VALVE MANIFOLD

DETAIL

NOTES:

THE USE OF TUBING INSTEAD OF PIPE SHALL BE IN ACCORDANCE WITH UOP STANDARD SPECIFICATION 8-11 PIPING.

DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

USE FLANGES FOR SOCKET WELD PIPING AND UNION FOR SCREWED PIPING. NOT REQUIRED WHEN USING

REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

PROVIDE UNION FOR SCREWED PIPING ONLY.

THE USE OF A BYPASS OR A 5 VALVE MANIFOLD WITH AN EQUALIZING VALVE IS PERMITTED WHERE CONTAMINATION

OR A HAZARDOUS CONDITION WILL NOT RESULT.

VALVE B MAY BE ELIMINATED IF VALVE A IS EASILY ACCESSIBLE, ON THE SAME PLATFORM, AND NEARBY THE TRANSMITTER.

PROCESS CONNECTIONS MAY BE AT DIFFERENT ELEVATIONS. TRANSMITTER SHALL BE CALIBRATED ACCORDINGLY.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11504

” 0

’ 2

) 0 0 6 (

M U M I X A M

MINIMUM

(cid:0)»

MINIMUM

M U M I N I M

M U M I N I M

M U M I N I M

M U M I N I M

ƒ”

) 0 0 6 (

” 0

’ 2

M U M I X A M

Â(cid:129)”

PIPE

MINIMUM

(cid:0)»

” 0

’ 2

) 0 0 6 (

M U M I X A M

Â(cid:129)” TU

TUBING AND MANIFOLD

ƒ”

LOW DIFFERENTIAL

PRESSURE EQUIPMENT

REDUCER

Â(cid:129)” P

MINIMUM

(cid:0)»

ƒ”

LOW DIFFERENTIAL

PRESSURE EQUIPMENT

Â(cid:129)” TU

PROCESS

TEST

TEST

P

P

INSTRUMENT

5 VALVE MANIFOLD

DETAIL

MINIMUM

REDUCER

NOTE 5

6-144-8

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

MINIMUM

(cid:0)»

LOW

DIFFERENTIAL

PRESSURE

EQUIPMENT

Â(cid:129)”

DIFFERENTIAL

PRESSURE

INSTRUMENT

SCREWED CAP

DO NOT SEAL WELD

NOTE 4

MINIMUM

MINIMUM

(cid:0)»

Â(cid:129)” TU

ƒ”

LOW

DIFFERENTIAL

PRESSURE

EQUIPMENT

DIFFERENTIAL

PRESSURE

INSTRUMENT

5 VALVE

MANIFOLD

(SEE DETAIL)

LEGEND

GLOBE VALVE

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

DIFFERENTIAL PRESSURE INSTRUMENT PIPING ASSEMBLY FOR LIQUID, STEAM OR CONDENSABLE VAPOR SERVICE

(FOR ASME FLANGE CLASS 900, 1500 AND 2500)

6-147-7

DATE

28MAR22

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

DETAIL A

GENERAL SERVICE

VALVE A

ƒ” PIPE

USE FITTINGS OR

BEND PIPE TO SUIT,

PROVIDE FOR EXPANSION

ƒ” PIPE

ƒ”

MINIMUM

ƒ”

MINIMUM

DIFFERENTIAL

PRESSURE

INSTRUMENT

ƒ” PIPE

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

VALVE A

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

6” (150) X

6” (150)

PLATE

USE FITTINGS OR

BEND PIPE TO SUIT,

PROVIDE FOR EXPANSION

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

ƒ” PIPE

VALVE B

(cid:129)” PIPE

REDUCER

M U M I X A M

) 0 0 6 (

” 0

’ 2

VALVE B

4’-0” (1200) MAXIMUM

SCREWED CAP

DO NOT SEAL

WELD

PIPE

NOTES:

PROVIDE GUSSETING AS REQUIRED TO DISTRIBUTE STRESS.

DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

NOT REQUIRED WHEN USING REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

THE USE OF A BYPASS IS PERMITTED WHERE CONTAMINATION OR A HAZARDOUS CONDITION WILL NOT RESULT.

VALVE B MAY BE ELIMINATED IF VALVE A IS EASILY ACCESSIBLE, ON THE SAME PLATFORM, AND NEARBY THE TRANSMITTER.

PROCESS CONNECTIONS MAY BE AT DIFFERENT ELEVATIONS. TRANSMITTER SHALL BE CALIBRATED ACCORDINGLY.

PROVIDE BREAK FLANGES, IF REQUIRED, TO EASE INSTALLATION OF THE LOW DIFFERENTIAL PRESSURE EQUIPMENT.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11506

ƒ” BREAK FLANGES

(NOTE 4)

ƒ” PIPE

(cid:129)” PIPE

DETAIL B

LOW DIFFERENTIAL PRESSURE SERVICE

MINIMUM

MINIMUM

NOTE 8

ƒ” PIPE

M U M I X A M

) 0 0 6 (

” 0

’ 2

MINIMUM

ƒ”

LOW

DIFFERENTIAL

PRESSURE

EQUIPMENT

ƒ” PIPE

DIFFERENTIAL

PRESSURE

INSTRUMENT

(cid:129)” PIPE

SCREWED CAP

REDUCER

DO NOT SEAL WELD

ƒ” BREAK FLANGES

(NOTE 4)

MINIMUM

ƒ” PIPE

LOW DIFFERENTIAL

PRESSURE EQUIPMENT

ƒ”

ƒ” PIPE

M U M I N I M

M U M I N I M

PIPE

Revision

Indication

R

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

TYPICAL ANALYZER INSTALLATION

6-152-7

DATE

28MAR22

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

(cid:129)” ATMOSPHERIC

VENT TO SAFE

LOCATION

SEAL VENT POT

3” (75)

(cid:129)” INSTRUMENT

AIR SUPPLY

HEATED ANALYZER HOUSE

CARRIER GAS, WHEN REQUIRED

(STAINLESS STEEL TUBING)

‚” STAINLESS STEEL TUBING

1’-0” (300) MAXIMUM

‚”

SCREWED CAP

DO NOT SEAL WELD

NOTE 2

ƒ” CIRCULATING

ƒ”

SAMPLE LOOP

PROCESS LINE

‚” (SAMPLE)

ƒ” SAMPLE

RETURN

STEAM TRAP

STEAM

SUPPLY

CONDENSATE

RETURN OR

DRAIN

ALTERNATE

SAMPLE

ƒ”

HYDROCARBON

DRAIN

NOTES:

PIPING SHALL BE IN ACCORDANCE WTH PIPE SPECIFICATIONS.

CIRCULATING SAMPLE LOOP LENGTH SHALL BE KEPT TO A MINIMUM. THE LENGTH BETWEEN

THE UPSTREAM PROCESS LINE CONNECTION POINT AND THE ANALYZER SAMPLE TAKE-OFF

POINT SHALL BE SHORT ENOUGH TO ENSURE A SAMPLE TRANSPORT TIME OF LESS THAN 60

SECONDS BETWEEN THE TWO POINTS.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

LEGEND

REDUCER

GLOBE VALVE

GATE VALVE

NEEDLE VALVE

QUALTRAX 11509

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

R

M

ORIFICE PLATE

(WITH TAPPED ORIFICE FLANGES)

PIPING ARRANGEMENTS FOR ORIFICE PLATE INSTALLATIONS

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

6-112-6

DATE

06APR20

STATUS

REAFFIRMED

SPONSOR

APPROVED

RED

MJM

GLOBE,

CONTROL,

OR CHECK

VALVE

TWO

PLANE

FLOW

ECCENTRIC

REDUCER OR

EXPANDER

LESS

THAN 10D

K

H

G

FLOW

10D OR

GREATER

F

VALVE

D

A

Z

TEE, CROSS,

OR LATERAL

CONCENTRIC

EXPANDER

WIDE OPEN

GATE OR

BALL VALVE

CONCENTRIC

REDUCER

  • WHEN DISTANCE BETWEEN ELBOWS IS 10D OR LESS.

CONCENTRIC

REDUCER OR

EXPANDER

ECCENTRIC

REDUCER OR

EXPANDER

NOMINAL PIPE

DIAMETER

D

A

7D

F

10D

G

14D

H

15D

K

18D

M

31D

R

38D

Z

5D

LENGTH OF STRAIGHT RUN



1

(270)

1’-3” (385)

1’-9” (535)

1’-1 (575)

2’-3” (690)

3’-1 (1185)

4’-9” (1450)

 (195)

2”

3”

4”

6”

8”

1’-2” (360)

1’-8” (510)

2’-4” (715)

2’-6” (765)

3’-0” (915)

5’-2” (1575)

6’-4” (1935)

10” (255)

1’-9” (535)

2’-6”

(765)

3’-6” (1070)

3’-9”

(1145)

4’-6” (1375)

7’-9” (2365)

9’-6” (2900)

1’-3” (385)

2’-4” (715)

3’-4” (1020)

4’-8” (1425)

5’-0” (1525)

6’-0” (1830)

10’-4”

(3150)

12’-8”

(3865)

1’-8” (510)

3’-6” (1070)

5’-0” (1525)

7’-0” (2135)

7’-6” (2290)

9’-0” (2745)

15’-6”

(4725)

19’-0”

(5795)

2’-6” (765)

4’-8” (1425)

6’-8” (2035)

9’-4” (2845)

10’-0”

(3050)

12’-0”

(3660)

20’-8”

(6300)

25’-4”

(7725)

3’-4” (1020)

10”

5’-10”

(1780)

8’-4” (2540)

11’-8”

(3560)

12’-6”

(3810)

15’-0”

(4575)

25’-10” (7875)

31’-8”

(9655)

4’-2” (1270)

12”

14”

16”

7’-0” (2135)

10’-0”

(3050)

14’-0”

(4270)

15’-0”

(4575)

18’-0”

(5490)

31’-0”

(9450)

38’-0”

(11585)

5’-0” (1525)

8’-2” (2490)

11’-8”

(3560)

16’-4”

(4980)

17’-6”

(5335)

21’-0”

(6405)

36’-2”

(11025)

44’-4”

(13515)

5’-10”

(1780)

9’-4” (2845)

13’-4”

(4065)

18’-8”

(5690)

20’-0”

(6100)

24’-0”

(7320)

41’-4”

(12600)

50’-8”

(15445)

6’-8” (2035)

18”

10’-6”

(3200)

15’-0”

(4575)

21’-0”

(6405)

22’-6”

(6860)

27’-0”

(8230)

46’-6”

(14175)

57’-0”

(17375)

7’-6” (2290)

20”

11’-8”

(3560)

16’-8”

(5080)

23’-4”

(7115)

25’-0”

(7620)

30’-0”

(9145)

51’-8”

(15750)

63’-4”

(19305)

8’-4” (2540)

24”

14’-0”

(4270)

20’-0”

(6100)

28’-0”

(8535)

30’-0”

(9145)

36’-0”

(10975)

62’-0”

(18900)

76’-0”

(23165)

10’-0”

(3050)

NOTES:

TABULATED DIMENSIONS ARE GENERALLY BASED ON INFORMATION IN THE INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO) 5167-1 AND ALSO

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), FLUID METERS - 6th EDITION, AT A MAXIMUM ORIFICE DIAMETER RATIO (d/D) OF 0.70.

THE DIMENSIONS SHOWN ARE TO THE UPSTREAM FACE OF THE ORIFICE PLATE AND ARE THE MINIMUM REQUIRED. WHEN POSSIBLE THE DIMENSIONS SHOULD BE INCREASED.

WHEN SEVERAL FITTINGS (OTHER THAN 90° BENDS) ARE UPSTREAM OF THE ORIFICE PLATE, THE FIRST FITTING CLOSEST TO THE ORIFICE PLATE SHALL BE PER THE TABLE.

THE MINIMUM STRAIGHT LENGTH FROM THE SECOND FITTING (TO THE FIRST FITTING) SHALL BE Â(cid:129) OF THE DIMENSION LISTED IN THE TABLE FOR THE SECOND FITT

WHEN BENDS ARE USED INSTEAD OF FITTINGS TO CHANGE DIRECTION, DIMENSION LINES SHALL BE TO TANGENT LINE OF BEND.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11493

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

K

H

G

F

A

FLOW

10D OR

GREATER

TWO

PLANE

FLOW

GLOBE,

CONTROL,

OR CHECK

VALVE

LESS

THAN

10D

CONCENTRIC

REDUCER

TEE,

CROSS, OR

LATERAL

CONCENTRIC

WIDE OPEN

EXPANDER

GATE OR

BALL VALVE

WHEN DISTANCE BETWEEN ELBOWS IS 10D OR LESS.

VENTURI INLET

PIPING ARRANGEMENTS FOR VENTURI INSTALLATIONS

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

6-134-5

DATE

06APR20

STATUS

REAFFIRMED

SPONSOR

APPROVED

RED

MJM

VALVE

Z

D

CONCENTRIC

REDUCER OR

EXPANDER

NOMINAL

PIPE

DIAMETER

D

3”

4”

6”

8”

LENGTH OF STRAIGHT RUN

A

3D

F

3.5D

G

4.5D

H

20D

K

29.5D

Z

4D

9”

(230)

1

(270)

1’-

(345)

5’-0” (1525)

7’-6” (2290)

1’-0” (305)

1’-0” (305)

1’-2” (360)

1’-6” (460)

6’-8” (2035)

10’-0”

(3050)

1’-4” (410)

1’-6” (460)

1’-9” (540)

2’-3” (690)

10’-0”

(3050)

15’-0”

(4575)

2’-0” (610)

2’-0” (610)

2’-4” (715)

3’-0” (915)

13’-4”

(4065)

20’-0”

(6100)

2’-8” (815)

10”

2’-6” (765)

2’-11”

(890)

3’-9”

(1145)

16’-8”

(5080)

25’-0”

(7620)

3’-4” (1020)

12”

3’-0” (915)

3’-6” (1070)

4’-6” (1375)

20’-0”

(6100)

30’-0”

(9145)

4’-0” (1220)

14”

3’-6” (1070)

4’-1” (1245)

5’-3” (1605)

23’-4”

(7115)

35’-0”

(10670)

4’-8” (1425)

16”

4’-0” (1220)

4’-8” (1425)

6’-0” (1830)

26’-8”

(8130)

40’-0”

(12195)

5’-4” (1630)

18”

4’-6” (1375)

5’-3” (1605)

6’-9” (2060)

30’-0”

(9145)

45’-0”

(13720)

6’-0” (1830)

20”

5’-0” (1525)

5’-10”

(1780)

7’-6” (2290)

33’-4”

(10160)

50’-0”

(15240)

6’-8”

(2035)

24”

6’-0” (1830)

7’-0” (2135)

9’-0” (2745)

40’-0”

(12195)

60’-0”

(18290)

8’-0” (2440)

NOTES:

TABULATED DIMENSIONS ARE BASED ON INFORMATION IN THE INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO) 5167-1 AND ALSO

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), FLUID METERS - 6th EDITION, AT A MAXIMUM THROAT DIAMETER RATIO (d/D) OF 0.75.

DIMENSIONS SHOWN ARE THE MINIMUM REQUIRED. WHEN POSSIBLE THEY SHOULD BE INCREASED.

WHEN SEVERAL FITTINGS (OTHER THAN 90° BENDS) ARE UPSTREAM OF THE VENTURI, THE FIRST FITTING CLOSEST TO THE VENTURI SHALL BE PER THE TABLE. THE

MINIMUM STRAIGHT LENGTH FROM THE SECOND FITTING (TO THE FIRST FITTING) SHALL BE Â(cid:129) OF THE DIMENSION LISTED IN THE TABLE FOR THE SECOND FITT

WHEN BENDS ARE USED INSTEAD OF FITTINGS TO CHANGE DIRECTION, DIMENSION LINES SHALL BE TO TANGENT LINE OF BEND.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11500

Revision

Indication

R

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

PIPING ARRANGEMENTS FOR

VORTEX FLOWMETER INSTALLATIONS

K

H

G

6-160-5

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

VORTEX

FLOWMETER

INLET

TWO

PLANE

FLOW

GLOBE,

CONTROL,

OR CHECK

VALVE

F

VALVE

LESS

THAN 10D

FLOW

10D OR

GREATER

D

Z

A

TEE,

CROSS, OR

LATERAL

CONCENTRIC

EXPANDER

CONCENTRIC

CONCENTRIC

REDUCER

REDUCER OR

EXPANDER

WHEN DISTANCE BETWEEN

ELBOWS IS 10D OR LESS.

WIDE OPEN

GATE OR

BALL VALVE

NOMINAL

PIPE

DIAMETER

D

(cid:0)»

(cid:0)»

LENGTH OF STRAIGHT RUN

A

15D

F

20D

G

25D

H

40D

K

50D

Z

5D



(195)

10”

(255)

1’

(320)

1’-8” (510)

2’-1” (635)



(65)

11‚”

(290)

1’-3”

(385)

1’-

(480)

2’-6” (765)

3’-

(955)

 (100)

1”

1’-3”

(385)

1’-8”

(510)

2’-1” (635)

3’-4”

(1020)

4’-2”

(1270)

5”

(130)



1’-1 (575)

2’-6” (765)

3’-

(955)

5’-0” (1525)

6’-3” (1905)

8”

(205)

2”

3”

4”

6”

8”

2’-6” (765)

3’-4”

(1020)

4’-2” (1270)

6’-8” (2035)

8’-4” (2540)

10” (255)

3’-9”

(1145)

5’-0”

(1525)

6’-3” (1905)

10’-0”

(3050)

12’-6”

(3810)

1’-3” (385)

5’-0” (1525)

6’-8”

(2035)

8’-4” (2540)

13’-4”

(4065)

16’-8”

(5080)

1’-8” (510)

7’-6” (2290)

10’-0”

(3050)

12’-6”

(3810)

20’-0”

(6100)

25’-0”

(7620)

2’-6” (765)

10’-0”

(3050)

13’-4”

(4065)

16’-8”

(5080)

26’-8”

(8130)

33’-4”

(10160)

3’-4” (1020)

10”

12’-6”

(3810)

16’-8”

(5080)

20’-10” (6350)

33’-4”

(10160)

41’-8”

(12700)

4’-2” (1270)

12”

15’-0”

(4575)

20’-0”

(6100)

25’-0”

(7620)

40’-0”

(12195)

50’-0”

(15240)

5’-0” (1525)

14”

17’-6”

(5335)

23’-4”

(7115)

29’-2”

(8890)

46’-8”

(14225)

58’-4”

(17780)

5’-10”

(1780)

16”

20’-0”

(6100)

26’-8”

(8130)

33’-4”

(10160)

53’-4”

(16260)

66’-8”

(20320)

6’-8” (2035)

NOTES:

DIMENSIONS SHOWN ARE MINIMUM REQUIRED. WHEN POSSIBLE THEY SHOULD BE INCREASED. IF A CONFLICT

OCCURS BETWEEN THIS DRAWING AND VENDOR INFORMATION, THE MAXIMUM DIMENSION SHOULD BE USED.

WHEN BENDS ARE USED INSTEAD OF FITTINGS TO CHANGE DIRECTION, DIMENSION LINES SHALL BE TO

TANGENT LINE OF BEND.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11515

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

NOTE:

INLET SHALL BE

TAG NUMBER

LINE SIZE

INDICATED ON TAB

FLANGE CLASS

FOR RAISED FACE

BORE

FLANGES ORIFICE

PLATES.

MATERIAL

DETAIL C

DATA TAB

2”(50)

MINIMUM

„” (3)

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

ORIFICE PLATES

6-111-9

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

1” (25)

MINIMUM

„” (3)

DATA TAB

DETAIL C

NOTE 9

“A”

C

CALCULATION

TO DETERMINE

d

BEVEL PER

DETAIL D

1 ‚” (32)

MINIMUM

…” (10)

ROD

) 8

E T O N (

” Y ”

” A ”

DATA TAB

DETAIL C

” Y ”

) 8

E T O N (

THE ANGLE OF THE

BEVEL SHALL BE

APPROXIMATELY

45 DEGREES.

CALCULATION

TO DETERMINE

…” (10) TAP

” P ”

d

” G ”

ORIFICE

DIAMETER

d

FLOW

QUADRANT EDGE

(QUARTER CIRCLE)

ORIFICE PLATE

(a)

r

(c)

r

ROUNDED EDGE

IS CIRCLE

‚

(b)

FLOW

r

(d)

r

FLOW

C

“T”

‘” (2.4) DIAMETER

WEEP HOLE (NOTES 2, 4)

C

3 / ” (1.2) LESS

64

THAN INSIDE

RADIUS OF PIPE

3

/ ” (1.2)

64

LESS THAN

INSIDE RADIUS

OF PIPE

BEVEL

PER DETAIL D

NOTE:

DO NOT BEVEL

ECCENTRIC

NOTE:

PLATE

ORIFICE PLATES.

PLATE THICKNESS “T” SHOULD EQUAL THE RADIUS “r”

/ ” (2.4) DIAMETER

3

32

C

WEEP HOLE (NOTES 2, 4)

“W”

NOTE:

“t”

NOTE 5

INSIDE DIAMETER

TO SUIT PIPE SIZE

FLOW ARROW

STAMPED

ON RING

AS SHOWN IN (a), BUT NEVER SMALLER THAN VALUES

OF “T” LISTED IN THE TABLE. IF PLATE THICKNESS EQUAL

TO “r” IS IMPRACTICAL, THEN CONSTRUCTIONS SHOWN IN

(b) OR (c) MAY BE USED. FOR d/D RATIOS

GREATER THAN 0.63 USE (d). VALUES OF “r” MAY BE

DETAIL A

FOR ASME RAISED FACE FLANGES

DETAIL B

FOR ASME RING JOINT FLANGES

DETAIL D

OBTAINED FROM FLOW MEASUREMENT ENGINEERING

HANDBOOK, BY RICHARD MILLER, 3RD EDITION.

3”

4”

5”

6”

8”

PIPE

“T”

SIZE

(NOTE 3)

“A”

FLANGE CLASS

“P”

“W”

“G”

FLANGE CLASS

FLANGE CLASS

FLANGE CLASS

150

300

600

900

1500

2500

300 & 600

900

1500

2500

300 & 600

900

1500

2500

300 & 600

900

1500

2500

1”

„” (3)

2†”

(67)

1‚”

„” (3)

3”

(76)

1

„” (3)

3…”

(86)

2‡”

(73)

3‚”

(83)



(95)

2”

„” (3)

4„” (105)

4…”

(111)

2

„” (3)

4‡” (124)

5„” (130)

3„”

(79)



(89)

3‡”

(98)

5†”

(143)



(165)

3…”

(86)

4„” (105)

4†”

(117)

2”

(51)

2…”

(60)

(cid:0)» ”

(68)

2…”

(60)

2…”

(60)

3‚”

(83)

1” (25)

1” (25)

S”

(8)

S”

(8)

1” (25)



(27)

S”

(8)

‹”

(11)

1

 (146)

3‚”

(83)



(95)

4”

(102)



(27)

‹” (11)

2”

„” (3)

5…” (137)

5‡” (149)

6†” (168)

6‡” (175)

 (197)

4‡” (124)

5…” (137)

5”

(127)

„” (3)

6‡” (175)

7„” (181)

7†” (194)

8„” (206)

8‚” (210)

9‚” (235)

5‡” (149)

6…” (162)

6‰”

(157)

„” (3)

 (197)

 (216)

 (241)

 (248)

10” (254)

11”

(279)

7„” (181)

7†” (194)



(191)

6†” (168)

4”

(102)

4‚” (108)

4…”

(111)



(27)



(27)



(27)



(27)

1‰”

(30)

1‰”

(30)

1S”

(33)

1‹”

(37)

‹”

(11)

‹”

(11)

‹”

(11)

‹” (11)

PIPE

SIZE

1”

1‚”

(cid:0)»

(13)

2

(cid:0)»

(13)

†”

(16)

(cid:0)»

(19)

3”

4”

5”

6”

8”

„” (3)

 (222)

9‡” (251)

1

(267)

11…”

(289)

11„”

(283)

1

(318)

‚” (6)

11”

(279)

12„”

(308)

12†”

(321)

14„”

(359)

13‡”

(352)

15‚”

(387)

8S”

(211)

10†”

(270)

9”

(229)



(27)

1„”

(29)

1‹”

(37)

‹”

(11)

(cid:0)»

(13)

(cid:0)»

(19)

11”

(279)



(27)

1S”

(33)



(40)

‹”

(11)

†”

(16)

‡”

(22)

10”

‚” (6)

13…”

(340)

14‚”

(362)

1

(400)

17„” (435)

1

(476)

1

(324)

1

(343)



(27)

1S”

(33)

1‡”

(48)

‹”

(11)

†”

(16)

1„”

(29)

10”

12”

‚” (6)

16„”

(410)

16†”

(422)

18” (457)

19†”

(498)

2

(521)

21†”

(549)

15” (381)

16”

(406)



(27)



(40)

2”

(51)

‹” (11)

‡”

(22)

1‚”

(32)

12”

14”

‚” (6)

1

(451)

19„”

(486)

19…”

(492)

2

(521)

2

(578)

16”

‚” (6)

20‚”

(514)

21‚”

(540)

22‚”

(565)

22†”

(575)

25‚”

(641)

18”

…” (9.5)

21†”

(549)

2

(597)

24„”

(613)

25„”

(638)

2

(705)

20”

…” (9.5)

23‡”

(606)

2

(654)

26‡”

(683)

2

(699)

2

(756)

24”

…” (9.5)

28‚”

(718)

3

(775)

31„”

(791)

33” (838)

3

(902)

1

(419)

1

(470)

21”

(533)

23” (584)

27‚”

(692)



(27)

1S”

(33)



(44)

‹”

(11)

†”

(16)

1”

(25)

1‰”

(30)

1‹”

(37)

2”

(51)

‹”

(11)

†”

(16)

1„”

(29)

1‰”

(30)



(40)

2”

(51)

‹”

(11)

(cid:0)»

(19)

1„”

(29)

1‚”

(32)



(40)

2„”

(54)

(cid:0)»

(13)

(cid:0)»

(19)

1‚”

(32)

1‹”

(37)

1‡”

(48)

2S”

(59)

†”

(16)

1” (25)

1…”

(35)

14”

16”

18”

20”

24”

NOTES:

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO) 5167-2, IS CONSIDERED SUPPLEMENTARY TO THIS

FOR RING TYPE JOINT FLANGES:

DRAWING. IF A CONFLICT OCCURS, THIS DRAWING SHALL GOVERN.

a. OCTAGONAL RING-SUITABLE FOR FLAT BOTTOM GROOVE. PITCH DIAMETER “P” AND CONTOUR OF RING CONFORM TO ASME STANDARD B16.5.

WEEP HOLES ARE ACCEPTABLE BUT ARE NOT REQUIRED. OMIT WEEP HOLES IF THE ORIFICE BORE DIAMETER IS LESS THAN 1” (25).

b. MATERIAL OF RING GASKET AND MATERIAL OF ORIFICE PLATE - SEE UOP PROJECT SPECIFICATION.

ORIFICE PLATE THICKNESS “T” AS SHOWN IS FOR SERVICE UNDER 650°F (343°C). FOR SERVICES ABOVE THIS

ECCENTRIC ORIFICE PLATES SHALL NOT BE BEVELED. THE ECCENTRIC ORIFICE PLATE SHALL BE MANUFACTURED SUCH

TEMPERATURE, INCREASE PLATE THICKNESS “T” BY „” (3).

THAT NO PORTION OF THE HOLE SHALL BE CLOSER THAN 1% OF THE PIPE DIAMETER TO THE PIPE WALL.

IF WEEP HOLES ARE USED, THEY SHALL BE INSTALLED AT THE TOP IN LIQUID LINES, AND AT THE BOTTOM IN GAS OR VAPOR LINES.

THE MINIMUM “Y” DIMENSION SHALL BE 4” (100) OR SHALL EXTEND BEYOND THE OUTSIDE DIAMETER OF

THE THICKNESS “t” OF THE ORIFICE PLATE AT THE ORIFICE EDGE SHALL BE BETWEEN 0.005D AND 0.02D, (D=PIPE

THE FLANGE A MINIMUM OF 2” (50), WHICHEVER IS GREATER.

INSIDE DIAMETER). WHERE REQUIRED, THE ORIFICE PLATE SHALL BE BEVELED ON THE DOWNSTREAM SIDE IN ORDER TO

FOR SURFACE FINISH REQUIREMENTS OF GASKET ZONE, SEE UOP PROJECT SPECIFICATION.

MEET THE MAXIMUM THICKNESS “t” REQUIREMENTS.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11492

Revision

Indication

R

NOTES:

REFER TO LEVEL DETAILS FOR CLOSED VENT AND/OR DRAIN PIPING, AS REFERENCED ON PIPING AND INSTRUMENT DIAGRAM.

DO NOT SEAL WELD SCREWED PIPING WHERE IT IS ATTACHED TO LEVEL INSTRUMENTS.

WHEN THE PIPING AND INSTRUMENT DIAGRAM SPECIFIES SPECIAL TRIM FOR THESE VALVES, THE VENT AND DRAIN VALVES SHALL

HAVE THE SAME SPECIAL TRIM.

VALVE IS REQUIRED FOR ASME FLANGE CLASS 900, 1500 AND 2500, AND OPTIONAL FOR ASME FLANGE CLASS 150, 300, AND 600.

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

EXTERNAL DISPLACEMENT AND OTHER CHAMBER TYPE LEVEL INSTRUMENT PIPING ASSEMBLIES

6-109-8

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

NOTE 1

ƒ” GATE (NOT

ƒ” G

SCREWED CAP

DO NOT SEAL

WELD

REDUCER

NOTE 1

ƒ” GATE (NOT

ƒ” G

SCREWED CAP

DO NOT SEAL

WELD

REDUCER,

WHEN REQUIRED

NOTE 3

NOTE 3

NOTE 3

NOTE 3

NOTE 1

REDUCER

ƒ” G

ƒ” GATE (NOT

M U M I N I M

SCREWED CAP

DO NOT SEAL WELD

NOTE 1

REDUCER

ƒ” G

ƒ” GATE (NOT

M U M I N I M

SCREWED CAP

DO NOT SEAL WELD

ASSEMBLY WITH CLOSED VENT

ASSEMBLY WITHOUT CLOSED VENT

ASSEMBLY WITH CLOSED VENT

ASSEMBLY WITHOUT CLOSED VENT

AND/OR DRAIN SYSTEM (NOTE 1).

AND/OR DRAIN SYSTEM.

AND/OR DRAIN SYSTEM (NOTE 1).

AND/OR DRAIN SYSTEM.

DETAIL A

DETAIL C

TOP AND BOTTOM FLANGED CONNECTIONS.

SIDE AND BOTTOM FLANGED CONNECTIONS.

NOTE 3

NOTE 1

NOTE 1

ƒ” GATE (NOT

ƒ” G

SCREWED CAP

DO NOT SEAL

WELD

REDUCER

NOTE 1

ƒ” GATE (NOT

ƒ” G

SCREWED CAP

DO NOT SEAL

WELD

REDUCER,

WHEN REQUIRED

NOTE 3

NOTE 3

NOTE 3

REDUCER, WHEN REQUIRED

ƒ” G

ƒ” GATE (NOT

M U M I N I M

SCREWED CAP

DO NOT SEAL WELD

REDUCER, WHEN REQUIRED

ƒ” G

ƒ” GATE (NOT

M U M I N I M

SCREWED CAP

DO NOT SEAL WELD

NOTE 1

ASSEMBLY WITH CLOSED VENT

ASSEMBLY WITHOUT CLOSED

ASSEMBLY WITH CLOSED VENT

ASSEMBLY WITHOUT CLOSED VENT

AND/OR DRAIN SYSTEM (NOTE 1).

VENT AND/OR DRAIN SYSTEM.

AND/OR DRAIN SYSTEM (NOTE 1).

AND/OR DRAIN SYSTEM.

DETAIL B

TOP AND SIDE FLANGED CONNECTIONS.

DETAIL D

SIDE AND SIDE FLANGED CONNECTIONS.

QUALTRAX 11490

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

Revision

Indication

R

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

DISPLACEMENT LEVEL AND GAUGE GLASS

FLUSHING OIL PIPING ASSEMBLY

6-151-6

DATE

06APR20

STATUS

REAFFIRMED

SPONSOR

APPROVED

RED

MJM

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

1” CLASS 300 RAISED

FACE FLANGES WITH

RESTRICTION ORIFICE

(SEE DETAIL)

(cid:0)»

1”

PRESSURE GAUGE

(SEE UOP PROJECT SPECIFICATION)

SCREWED TEE

DO NOT SEAL WELD

SCREWED CAP

(cid:0)»

(cid:0)»

SEAL WELD

1 ” FLUSHING OIL

1”

1”

1”

(cid:0)»

STRAINER WITH 30 MESH

STAINLESS STEEL SCREEN

DISPLACEMENT

LEVEL

GAUGE GLASS

1”

(25)

STAMP ORIFICE

SIZE ON TAB

” 4

) 0 0 1 (

„” (3) x 2‡” (73)

OUTSIDE DIAMETER

STAINLESS STEEL PLATE

„” (3) ORIFICE

THE GASKET CONTACT PORTION

OF THE ORIFICE PLATE SHALL

HAVE A SURFACE FINISH OF

125 MICROINCH R

a

MINIMUM TO

250 MICROINCH R

a

MAXIMUM.

DETAIL

NOTES:

PIPING AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

  1. DO NOT SEAL WELD CONNECTIONS AT INSTRUMENTS.

  2. DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11508

LEGEND

REDUCER

CHECK VALVE

GLOBE VALVE

GATE VALVE

Revision

Indication

R

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

6-142-7

DATE

28MAR22

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

REACTOR DIFFERENTIAL PRESSURE INSTRUMENT PIPING ASSEMBLY

STATUS

REAFFIRMED

(FOR ASME FLANGE CLASS 900, 1500, AND 2500)

SPONSOR

APPROVED

SBH

AG

LEGEND

CHECK VALVE

GLOBE VALVE

H -

HIGH PRESSURE TAP

L - LOW PRESSURE TAP

PIPE

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

DIFFERENTIAL

PRESSURE

INSTRUMENT

REDUCER

H

L

MINIMUM

6” (150) X 6” (150) PLATE

(cid:129)” PIPE

ƒ” BREAK FLANGES

(NOTE 4)

) 0 5 7 (

” 6

’ 2

M U M I X A M

2’-0” (600) MAXIMUM

ƒ”

ƒ”

SCREWED CAP

DO NOT SEAL

WELD

ƒ”

ƒ”

ƒ” PURGE GAS

(NOTE 7)

ƒ”

REDUCER

(LOCATE AT PURGE TEE)

ƒ”

ƒ”

ƒ”

1(cid:129)”

ƒ” PURGE GAS

(NOTE 7)

ƒ” PURGE GAS

(NOTE 7)

REDUCER

(LOCATE AT

PURGE TEE)

ALTERNATE LOW PRESSURE TAP WHEN REQUIRED

PROVIDE FOR EXPANSION

CONNECTION

ON TOP

OF PIPE

PROVIDE FOR EXPANSION

REACTOR

MINIMUM

1(cid:129)”

W O L F

1(cid:129)”

MINIMUM

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

1(cid:129)”

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

CONNECTION

ON TOP OF PIPE

NOTES:

PROVIDE GUSSETING AS REQUIRED TO DISTRIBUTE STRESS.

  1. DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

NOT REQUIRED WHEN USING REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

DIFFERENTIAL PRESSURE INSTRUMENT MUST BE MOUNTED ABOVE OR AT THE SAME ELEVATION AS THE TOP PRESSURE TAP.

WHERE INSTRUMENT IMPULSE LINES CONNECT TO PURGE GAS LINES WITH SPECIAL TRIM VALVES, ALL VALVES IN THE

INSTRUMENT LINES SHALL HAVE THE SAME SPECIAL TRIM, EXCEPT THE FIRST BLOCK VALVE AT THE PROCESS LINE.

THIS BLOCK VALVE SHALL FOLLOW THE REQUIREMENTS SET FORTH IN UOP PROJECT SPECIFICATION 801 PIPING FOR

THE PROCESS LINES.

ALL PURGE GAS CONNECTIONS SHALL BE AT THE SAME ELEVATION.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11503

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

CHECK VALVE

GLOBE VALVE

NEEDLE VALVE

H -

HIGH PRESSURE TAP

L - LOW PRESSURE TAP

P - PLUGGED

(cid:129)” BREAK FLANGES (NOTE 4)

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

PIPE

H

L

MINIMUM

) 0 5 7 (

” 6

’ 2

M U M I X A M

ƒ” PURGE GAS

(NOTE 8)

ƒ”

ƒ” PURGE

GAS

(NOTE 8)

ƒ”

SCREWED CAP

DO NOT SEAL WELD

REDUCER

(LOCATE AT PURGE TEE)

2’-0” (600) MAXIMUM

(cid:129)”

ƒ”

1”

CONNECTION

ON TOP

OF PIPE

MINIMUM

1”

W O L F

MINIMUM

1”

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

CONNECTION

ON TOP OF PIPE

DIFFERENTIAL

PRESSURE

INSTRUMENT

6” (150) X 6” (150) PLATE

SCREWED CAP

DO NOT SEAL

WELD

(cid:129)”

ƒ”

ƒ” PURGE GAS

(NOTE 8)

ƒ”

REDUCER

(LOCATE AT

PURGE TEE)

ALTERNATE LOW

PRESSURE TAP

WHEN REQUIRED

PROVIDE FOR

EXPANSION

1”

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

QUALTRAX 11507

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

REACTOR DIFFERENTIAL PRESSURE INSTRUMENT PIPING ASSEMBLY

(FOR ASME FLANGE CLASS 150, 300 AND 600)

6-148-7

DATE

28MAR22

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

TUBING AND MANIFOLD

5 VALVE MANIFOLD (SEE DETAIL)

(cid:129)” TUBING

DIFFERENTIAL

PRESSURE

INSTRUMENT

6” (150) X 6”

(150) PLATE

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

H

L

2’-0” (600) MAXIMUM

ƒ” PIPE

MINIMUM

) 0 5 7 (

” 6

’ 2

M U M I X A M

ƒ”

ƒ” PURGE GAS

ƒ” PIPE

PIPE (NOTE 8)

INSTRUMENT

TEST

TEST

P

P

PROCESS

5 VALVE MANIFOLD

DETAIL

(cid:129)” TUBING

ƒ”

ƒ” PURGE

GAS PIPE

(NOTE 8)

ƒ” PIPE

ALTERNATE LOW

PRESSURE TAP

WHEN REQUIRED

ƒ”

1”

CONNECTION

ON TOP

OF PIPE

(cid:129)” TUBING

ƒ” PURGE GAS PIPE

(NOTE 8)

PROVIDE FOR EXPANSION

(cid:129)” TUBING

(NOTE 7)

REACTOR

MINIMUM

1”

W O L F

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

NOTES:

CONNECTION

ON TOP OF PIPE

THE USE OF TUBING INSTEAD OF PIPE SHALL BE IN ACCORDANCE WITH UOP STANDARD SPECIFICATION 8-11 PIPING.

  1. DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

NOT REQUIRED WHEN USING REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

DIFFERENTIAL PRESSURE INSTRUMENT MUST BE MOUNTED ABOVE OR AT THE SAME ELEVATION AS THE TOP PRESSURE TAP.

WHERE INSTRUMENT MANIFOLDS AND IMPULSE LINES CONNECT TO PURGE GAS LINES WITH SPECIAL TRIM VALVES,

ALL VALVES IN THE INSTRUMENT MANIFOLDS AND LINES SHALL HAVE THE SAME SPECIAL TRIM, EXCEPT THE

FIRST BLOCK VALVE AT THE PROCESS LINE. THIS BLOCK VALVE SHALL FOLLOW THE REQUIREMENTS SET FORTH IN

UOP PROJECT SPECIFICATION 801 PIPING FOR THE PROCESS LINES.

TUBING SHALL BE ADEQUATELY SUPPORTED WITH A MINIMUM NUMBER OF CONNECTING FITTINGS.

  1. ALL PURGE GAS CONNECTIONS SHALL BE AT THE SAME ELEVATION.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

PROVIDE FOR EXPANSION

PROVIDE FOR EXPANSION

REACTOR

(cid:129)” TUBING

(NOTE 7)

MINIMUM

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

1”

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

LEGEND

GLOBE VALVE

NEEDLE VALVE

H -

HIGH PRESSURE TAP

L - LOW PRESSURE TAP

P - PLUGGED

QUALTRAX 11516

PIPE

MINIMUM

Â(cid:129)” BREAK FLANGES (NOT

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

DIFFERENTIAL

PRESSURE

INSTRUMENT

H

L

6” (150) X

6” (150)

PLATE

SCREWED CAP

(DO NOT

SEAL WELD)

2’-0”(600) MAXIMUM



REDUCER

SCREWED CAP

(DO NOT SEAL WELD)

PROVIDE FOR EXPANSION



(cid:0)»

CONNECTION

ON TOP OF PIPE

REDUCER

ALTERNATE LOW

PRESSURE TAP

WHEN REQUIRED

PROVIDE FOR EXPANSION

(cid:0)»

REACTOR INLET PIPING

REACTOR

MINIMUM

(cid:0)»

(cid:0)»

W O L F

MINIMUM

(cid:0)»

CONNECTION

ON TOP OF PIPE

REACTOR

OUTLET

PIPING

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

NON-PURGED REACTOR DIFFERENTIAL PRESSURE

INSTRUMENT PIPING ASSEMBLY (FOR ASME FLANGE CLASS 150, 300 AND 600)

6-161-5

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

DIFFERENTIAL

PRESSURE

INSTRUMENT

6” (150) X

6” (150)

PLATE

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

ALTERNATE LOW

PRESSURE TAP

WHEN REQUIRED

PROVIDE FOR

EXPANSION

TUBING AND MANIFOLD

5 VALVE MANIFOLD

(SEE DETAIL)

MINIMUM

H

L

2’-0”(600) MAXIMUM

Â(cid:129)” TU

(NOTE 6)

INSTRUMENT

TEST

TEST

P

P

PROCESS

5 VALVE MANIFOLD

DETAIL

(cid:0)»

PROVIDE FOR EXPANSION

(cid:0)»

CONNECTION

ON TOP OF PIPE

REACTOR INLET PIPING

REACTOR

MINIMUM

(cid:0)»

W O L F

Â(cid:129)” TU

(NOTE 6)

MINIMUM

(cid:0)»

CONNECTION

ON TOP OF PIPE

REACTOR OUTLET PIPING

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

NOTES:

THE USE OF TUBING INSTEAD OF PIPE SHALL BE IN ACCORDANCE WITH UOP STANDARD SPECIFICATION 8-11 PIPING.

  1. DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

PIPE AND NIPPLES BETWEEN FITTINGS SHALL BE OF MINIMUM LENGTH.

NOT REQUIRED WHEN USING REMOVABLE MOUNTING ADAPTORS ON INSTRUMENT BODY.

  1. DIFFERENTIAL PRESSURE INSTRUMENT MUST BE MOUNTED ABOVE OR AT THE SAME ELEVATION AS THE TOP PRESSURE TAP.

TUBING SHALL BE ADEQUATELY SUPPORTED WITH A MINIMUM NUMBER OF CONNECTING FITTINGS.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

Revision

Indication

R

DIFFERENTIAL PRESSURE INSTALLATION

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

POWDERED CATALYST INSTRUMENT PIPING ASSEMBLIES

6-122-9

DATE

28MAR22

STATUS

REVISED

SPONSOR

APPROVED

SBH

AG

DIFFERENTIAL PRESSURE

TRANSMITTER (NOTE 2)

M U M I N I M

L

H

5 VALVE MANIFOLD

(SEE DETAIL B)

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

NOTE 7

Â(cid:129)” SCREWED

DO NOT SEAL WELD

SUPPORT AS

REQUIRED

TO LOW PRESSURE

R

“DA”, “DN”, OR “DG”

CONNECTION

(SEE DETAIL A)

SUPPORT AS

REQUIRED

PROVIDE FOR

EXPANSION

(SEE DETAIL D)

Â(cid:129)”

(NOTE 11)

INSTRUMENT

INSTRUMENT

N

P

N

N

P

TEST

TEST

N

P

TEST

N

N

N

PROCESS

PROCESS

DETAIL B

5 VALVE MANIFOLD

2 VALVE MANIFOLD

DETAIL

DETAIL

PROVIDE FOR

EXPANSION

(SEE DETAIL D)

) 0 0 0 1 (

” 0

’ 3

N U R

L A C I T R E V

N I M

NOTE 8

1”

(25)

STAMP ORIFICE

SIZE ON TAB

NOZZLE ON

VESSEL OR

STANDPIPE

Â(cid:129)” PIPE TO INSTRU

(NOTE 11)

AS REQUIRED FOR

ADDITIONAL TRANSMITTER

REDUCER

(cid:0)»

(cid:0)»

NOTES 3 AND 5

NOTE 4

P

NOTE 9

NOTE 3

NOTE 10

TO HIGH PRESSURE

“DA”, “DN”, OR “DG”

R

CONNECTION

(SEE DETAIL A)

) 0 0 1 (

” 4

„” (3) X 2‚” (57)

OUTSIDE DIAMETER

STAINLESS STEEL PLATE

ˆ” (2) ORI

THE GASKET CONTACT PORTION OF

THE ORIFICE PLATE SHALL HAVE A

SURFACE FINISH OF 125 MICROINCH R MINIMUM

TO 250 MICROINCH R MAXIMUM.

FOR “DA”

POINTS ONLY

R

P

REDUCING

FLANGE

DETAIL A

“DA”, “DN” AND “DG” POINT

R

PURGE CONNECTION FOR INSTRUMENTS

R

ƒ” NITROGEN FOR “DN” P

ƒ” INSTRUMENT AIR FOR “DA” P

ƒ” PURGE GAS FOR “DG” P

LEGEND

GATE VALVE

N

H -

HIGH PRESSURE TAP

NEEDLE VALVE

L - LOW PRESSURE TAP

CHECK VALVE

P - PLUGGED

PRESSURE INSTALLATION

TWO VALVE

MANIFOLD

(SEE DETAIL B)

PRESSURE

TRANSMITTER

(NOTE 2)

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

NOTE 7

Â(cid:129)” SCREWED

DO NOT SEAL WELD

PROVIDE FOR

EXPANSION

(SEE DETAIL D)

MINIMUM

2” INSTRUMENT

MOUNTING

SUPPORT PIPE

SUPPORT AS

REQUIRED

SLOPE 1” PER FOOT

(80mm PER METER)

MINIMUM

DETAIL C

60°

60°

DETAIL D

EXPANSION LOOP SHALL BE

LOCATED IN VERTICAL RUN

AND FREE DRAINING

NOTES:

ALL SECTIONS OF IMPULSE LINES SHALL EVENLY SLOPE TO AVOID HIGH AND LOW SPOTS, AS SHOWN.

DIFFERENTIAL TRANSMITTER AND PRESSURE TRANSMITTER SHALL BE LOCATED ON NEXT PLATFORM ABOVE HIGHEST

PRESSURE TAP, ON HANDRAIL SIDE OF PLATFORM AT APPROXIMATELY 3’-0” (1000) WORKING HEIGHT, AND IN NO

CASE LESS THAN 3’-0” (1000) FROM THE VESEL WALL. TRANSMITTER TO BE SHIELDED FROM RADIANT HEAT.

OUTSIDE SCREW AND YOKE GATE VALVE. INSTALL WITH RISING STEM UP.

PROVIDE 6’ (1800) OR MORE CLEARANCE AT THIS POINT TO ENABLE USE OF REAMER. FOR DETAILS SEE UOP STANDARD

DRAWING 6-123, PRESSURE TAP REAMER.

THIS VALVE MUST BE A SCREWED VALVE. THREAD TO MATCH PRESSURE TAP REAMER. SEE UOP STANDARD DRAWING 6-123.

DO NOT SEAL WELD SCREWED CONNECTIONS AT INSTRUMENT.

2 VALVE MANIFOLD

(SEE DETAIL B)

INSTALL PRESSURE GAUGES WHEN REQUIRED. SEE UOP PROJECT SPECIFICATIONS.

ƒ” SCH 160 SEAMLESS PIPE. MINIMUM LENGTH OF STRAIGHT PIPE BETWEEN FITTI

ƒ” RAISED FACE FLANGES WITH RESTRICTION ORIFICE. SEE DETAI

Â(cid:129)”

(NOTE 11)

TO “DA”, “DN”, OR “DG” R

CONNECTION

(SEE DETAIL A)

Â(cid:129)”

STRAINER SHALL BE COMPLETE WITH 30 MESH STAINLESS STEEL SCREEN. DO NOT INSTALL DRAIN VALVE FOR “DG”

R

AND “DN” POINTS.

ALTERNATE INSTRUMENT

THE USE OF TUBING INSTEAD OF PIPE SHALL BE IN ACCORDANCE WITH UOP STANDARD SPECIFICATION 8-11

PIPING. TUBING SHALL BE DESIGNED TO MINIMIZE THE USE OF CONNECTOR COUPLINGS.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11497

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

Revision

Indication

R

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

PRESSURE TAP REAMER

6” (150) DIAMETER HANDWHEEL

1‚”

(32)

6-123-8

DATE

23MAY23

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

STEEL GLAND

STEEL STUFFING BOX

ƒ” FO

STEEL

SCREWED TEE

ƒ” SCHEDUL

SEAMLESS STEEL PIPE

NIPPLE 9” (230) LONG

(MAY SHORTEN ACCORDING

TO ACCESSABILITY)

‚” (6) STEEL ROD

FLEXIBLE

GRAPHITE

PACKING

ROUND HEAD

STEEL PLUG

) 5 2 5 1 (

” 0

’ 5

ƒ”

(NATIONAL STANDARD

PIPE TAPER THREAD)

(NOTE 2)

‚” (6) DRILL

(WELD TO ROD)

WELD BEAD

(DO NOT GRIND

SMOOTH)

” †

) 6 1 (

” „ 1

) 8 2 (

ƒ”

17

/ ” (7) DIAMETER

64

” …

” †

” …

) 0 1 (

) 6 1 (

) 0 1 (

” … 1

) 5 3 (

Â(cid:129)” (13) DIAM

13 / ” DIAMETER

16

16 THREADS PER INCH

AMERICAN STANDARD

STEEL GLAND

1Â(cid:129)” (38) DIAM

OR HEXAGONAL

13 / ” DIAMETER

16

16 THREADS PER INCH

AMERICAN STANDARD

” ‚ 1

” 1

) 2 3 (

) 5 2 (

” ‚ 2

) 7 5 (

17

/ ” (7) DIAMETER

64

ASSEMBLY

STEEL STUFFING BOX

33

64/ ” (13) DIAMETER

NOTES:

THIS ASSEMBLY IS NOT INTENDED FOR USE AT OPERATING PRESSURES ABOVE 50 PSIG (3.5 KG/CM (G)).

THIS THREAD MUST MATCH VALVE SHOWN IN UOP STANDARD DRAWING 6-122.

REAMER MAY BE CONSTRUCTED USING METRIC THREADS STANDARDS.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11498

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

Revision

Indication

R

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

6-127-6

DATE

06APR20

STATUS

REAFFIRMED

SPONSOR

APPROVED

RED

MJM

STEAM TRAP PIPING ASSEMBLIES (CONTINUOUS FLOW FLOAT TRAP)

CONDENSATE

RETURN

CONDENSATE

RETURN

HEADER

NOTE 4

HEADER

NOTE 4

NEEDLE VALVE OR

FLOATING DISC VENT

(WHEN SPECIFIED)

THERMOSTATIC VENT

(WHEN SPECIFIED)

TRAP DISCHARGING TO CONDENSATE HEADER

NEEDLE VALVE OR

FLOATING DISC VENT

(WHEN SPECIFIED)

THERMOSTATIC VENT

(WHEN SPECIFIED)

NOTE 4

NOTE 4

TO SUMP

TO SUMP

TRAP DISCHARGING TO SUMP

NOTES:

MATERIAL FOR TRAP INLET SHALL BE AS SPECIFIED FOR THE STEAM LINE. MATERIAL

FOR TRAP DISCHARGE SHALL BE AS SPECIFIED FOR THE CONDENSATE HEADER.

HORIZONTAL RUNS SHALL BE HELD TO A MINIMUM AND SLOPED WHERE POSSIBLE.

DO NOT SEAL WELD SCREWED CONNECTIONS AT TRAP OR VENT.

LINE DOWNSTREAM OF TRAP SHALL BE A MINIMUM OF ONE SIZE LARGER THAN INLET

LINE (CALCULATIONS TO DETERMINE).

LEGEND

REDUCER

CHECK VALVE

GLOBE VALVE

GATE VALVE

QUALTRAX 11499

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

QUALTRAX 11486

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

THERMOWELLS

6-105-10

DATE

06APR20

STATUS

REAFFIRMED

SPONSOR

APPROVED

RED

MJM

Â(cid:129)” NPT (NATI

STANDARD PIPE

TAPER THREAD)

1.315

(33)

SEE UOP PROJECT SPECIFICATION.

FLANGE FURNISHED AND FABRICATED

BY THERMOWELL SUPPLIER.

ASME B16.5 FLANGE. FOR SIZE AND CLASS

SEAL WELD

1” NPT

†” (16)

¿ » ï

) 8 3 (

Â(cid:129)”

‰” (5) RADIUS

CURVE AND

TAPER

TANGENTIALLY

H T G N E L

) 1

E T O N (

STEM SHALL

BE BUFFED

AND POLISHED

” ‚

) 6 (

ALL THREADS IN FLANGE SHALL BE COVERED BY

THREADS ON THE THERMOWELL (CHASE THREADS TO SUIT)

‡” (22) MAXIMUM (NOTE 2)

BORE SHALL BE CONCENTRIC WITH OUTSIDE

DIAMETER WITHIN 10% OF WALL THICKNESS

•”± 0.002 (8.73 ± 0.05)

MAXIMUM (NOTE 2)

†” (15.9)

Â(cid:129)” NPT (NATI

STANDARD PIPE

TAPER THREAD)

1” NPT

H T G N E L

) 1

E T O N (

CURVE AND

TAPER

TANGENTIALLY

STEM SHALL

BE BUFFED

AND POLISHED

” ‚

) 6 (



(38)

) 6 1 (

” †

) 2 2 (

” ‡

) 6 (

” ‚

»

) 3 1 (

” ‡

) 2 2 (

‰” (5) RADIUS

‡” (22) MAXIMUM (NOTE 2)

BORE SHALL BE CONCENTRIC WITH OUTSIDE

DIAMETER WITHIN 10% OF WALL THICKNESS

•”± 0.002 (8.73 ± 0.05)

MAXIMUM (NOTE 2)

†” (15.9)

FLANGED THERMOCOUPLE / RESISTANCE ELEMENT THERMOWELL

DETAIL A

DETAIL B

FLANGED TEST THERMOWELL SAME AS DETAIL A

EXCEPT WITH PLUG AND CHAIN PER DETAIL Z

CHAIN

ATTACHED

WITH DRIVE

SCREWS

KNURLED

HEAD

Â(cid:129)”

SCREWED THERMOCOUPLE / RESISTANCE ELEMENT THERMOWELL

DETAIL E

DETAIL F

SCREWED TEST THERMOWELL SAME AS DETAIL E

EXCEPT WITH PLUG AND CHAIN PER DETAIL Z

DETAIL Z

NOTES:

SEE UOP PROJECT SPECIFICATION FOR LENGTH DATA.

CONFIRM INSIDE AND OUTSIDE DIAMETER BASED ON TEMPERATURE ELEMENT AND MINIMUM

WALL THICKNESS REQUIREMENTS.

USE OF FULL PENETRATION WELDS WITH 100% RADIOGRAPHIC TESTING AS AN ALTERNATE

DESIGN IS ACCEPTABLE. PARTIAL PENETRATION WELDS ARE NOT ACCEPTABLE.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

(cid:0) Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

QUALTRAX 11487

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

THERMOMETER ASSEMBLIES

6-106-9

DATE

06APR20

STATUS

REAFFIRMED

SPONSOR

APPROVED

RED

MJM

H T G N E L

M E T S

R E T E M O M R E H T

) 1

E T O N (

” …

±

” 2

) 0 1

±

0 5 (

” 1

) 5 2 (

STEM SHALL

BE BUFFED

AND POLISHED

” ‚

) 6 (

Â(cid:129)” NPT (NATI

STANDARD PIPE

TAPER THREAD)

1” NPT

‰” (5) RADIUS

‡” (22) MAXIMUM

(NOTE 2)

•”± 0.002 (8.73 ± 0.05)

MAXIMUM (NOTE 2)

†”

(15.9)

DETAIL A

H T G N E L

M E T S

R E T E M O M R E H T

) 1

E T O N (

SEAL

WELD

” …

±

” 2

) 0 1

±

0 5 (

1” NPT

‰” (5)

RADIUS

STEM SHALL

BE BUFFED

AND POLISHED

” ‚

) 6 (

Â(cid:129)” NPT (NATIO

STANDARD PIPE

TAPER THREAD)

ALL THREADS IN FLANGE

SHALL BE COVERED BY

THREADS ON THE THERMOWELL

(CHASE THREADS TO SUIT)

ASME B16.5 FLANGE. FOR SIZE AND CLASS

SEE UOP PROJECT SPECIFICATION. FLANGE

FURNISHED AND FABRICATED BY THERMOWELL

CHAIN ATTACHED

WITH DRIVE

SCREWS

KNURLED

HEAD

Â(cid:129)”

SUPPLIER.

‡” (22) MAXIMUM

(NOTE 2)

•”± 0.002 (8.73 ± 0.05)

MAXIMUM (NOTE 2)

†”

(15.9)

DETAIL B

DETAIL Z

THERMOMETER WITH SCREWED THERMOWELL

THERMOMETER WITH FLANGED THERMOWELL

DETAIL C

DETAIL D

SCREWED TEST THERMOWELL SAME AS DETAIL A

FLANGED TEST THERMOWELL SAME AS DETAIL B

EXCEPT WITH PLUG AND CHAIN PER DETAIL Z

EXCEPT WITH PLUG AND CHAIN PER DETAIL Z

AND WITHOUT THERMOMETER

AND WITHOUT THERMOMETER

NOTES:

SEE UOP PROJECT SPECIFICATION FOR LENGTH DATA.

CONFIRM INSIDE AND OUTSIDE DIAMETER BASED ON THERMOMETER AND MINIMUM WALL THICKNESS REQUIREMENTS.

DIAL THERMOMETER COMPLETE WITH THERMOWELL SHALL BE FURNISHED BY THERMOMETER SUPPLIER.

THERMOWELL AND THERMOMETER SHALL BE INSTALLED SUCH THAT THERMOMETER DIAL IS NOT IN THE HORIZONTAL

PLANE. WHERE NECESSARY A SWIVEL NECK THERMOMETER MAY BE USED.

USE OF FULL PENETRATION WELDS WITH 100% RADIOGRAPHIC TESTING AS AN ALTERNATE

DESIGN IS ACCEPTABLE. PARTIAL PENETRATION WELDS ARE NOT ACCEPTABLE.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

TEMPERATURE SENSOR TERMINAL HEAD ASSEMBLIES

6-107-10

DATE

23MAY23

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

HEAD AND

TERMINAL

CONNECTOR

NOTE 3

Â(cid:129)” CONDUIT NIP

MINIMUM LENGTH

1Â(cid:129)”

‚” SET SCREW

HEAD AND

TERMINAL

CONNECTOR

(cid:0)»

(13)

6” (150)

CONNECT TO

THERMOWELL

NOTE 3

CONNECTOR

NOTE 1

Â(cid:129)”

(NATIONAL

STANDARD PIPE

TAPER THREAD)

ƒ” X Â(cid:129)” BU

Â(cid:129)” U

(COMPLETE)

CONNECTOR

NOTE 1

DETAIL A

1” SCHEDULE

80 PIPE

HEAD AND

TERMINAL

CONNECTOR

Â(cid:129)” SCHED

40 PIPE

SCREWED INTO

HEADER

THERMOWELL

1” NPT (NATIONAL

(FURNISHED IN

FIELD TO FIT)

STANDARD PIPE

TAPER THREAD)

ƒ”

BUSHING

DETAIL C

FOR USE WITH THERMOCOUPLE THERMOWELLS

FOR USE WITH THERMOCOUPLE WELL INSIDE

NOTE 3

HEATER TUBE HEADER COMPARTMENT

Â(cid:129)” CONDUIT NI

MINIMUM LENGTH 11/2 ” (38)

Â(cid:129)” UNION (COMPL

LENGTH 3” (75)

TO 6” (150)

Â(cid:129)” NPT (NATI

STANDARD PIPE

TAPER THREAD)

Â(cid:129)” SCHEDULE 40

SCREWED INTO HEADER

THERMOWELL

ƒ” X Â(cid:129)” BU

(FURNISHED IN FIELD)

CONNECTOR

NOTE 1

HEAD AND

TERMINAL

CONNECTOR

Â(cid:129)” STAINLESS S

COMPRESSION FITTING

Â(cid:129)” CONDUIT NIP

MINIMUM LENGTH

1Â(cid:129)”

CONDUIT OUTLET

BODY (NOTE 2)

DETAIL D

FOR USE WITH THERMOCOUPLE WELL OUTSIDE

HEATER TUBE HEADER COMPARTMENT

MINERAL OXIDE INSULATED

STAINLESS STEEL SHEATH

THERMOCOUPLE ELEMENT

NOTE 3

ƒ” X Â(cid:129)” BU

CONNECTOR

NOTE 1

Â(cid:129)” U

(COMPLETE)

Â(cid:129)” NPT (NATIO

STANDARD PIPE

CONNECTOR

TAPER THREAD)

NOTE 1

3” COVER

FOR USE WITH MINERAL OXIDE INSULATED STAINLESS STEEL

FOR USE WITH RESISTANCE ELEMENT THERMOWELLS

DETAIL E

DETAIL F

SHEATH THERMOCOUPLE ELEMENT

QUALTRAX 11488

NOTES:

LIQUID TIGHT FLEXIBLE CONNECTION ASSEMBLY (BY OTHERS). INSTALL AS

DRIP LOOP.

CONDUIT OUTLET BODY SHALL BE SUITABLE FOR THE ELECTRICAL CLASSIFICATION OF

THE INSTALLATION.

FASTEN THE CAP TO THE BASE BY A SMALL CHAIN ON A SWIVEL.

CAPS SHALL BE PROVIDED WITH SCREW DRIVER SLOT, AND A HEAT AND MOISTURE

RESISTANT GASKET.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

MINIMUM SIZE 3”.

FOR SMALLER LINES

INCREASE TO 3” AS

INDICATED

) 1

E T O N (

” C ”

1” CLASS

3000

THREADED

ELBOLET

FLOW

) 1

E T O N (

M U M I N I M

” C ”

) 0 5 1 (

” 6

LONG WELDING

NECK NOZZLE

FOR SIZE AND

CLASS SEE

UOP PROJECT

SPECIFICATION

MINIMUM SIZE 3”.

FOR SMALLER LINES

INCREASE TO 3” AS

INDICATED

FLOW

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

THERMOWELL AND SKIN THERMOCOUPLE INSTALLATION ASSEMBLIES

6-108-9

DATE

23MAY23

STATUS

REAFFIRMED

SPONSOR

APPROVED

SBH

AG

ƒ” (19) INSIDE DIAME

THERMOCOUPLE WASHER

TO CLEAR OUTSIDE

DIAMETER OF WELD

SHEATHED TYPE

THERMOCOUPLE

ASSEMBLY

Â(cid:129)” (13) DIAMETER X 1Â(cid:129)”

LONG THREADED STUD WITH WASHER

AND 2 HEX NUTS.

THE SHEATH MUST EXTEND OUTSIDE

ANY INSULATION IN ORDER TO

AVOID EXPOSING THE THERMOCOUPLE

LEAD WIRE INSULATION TO

EQUIPMENT TEMPERATURES.

REDUCER

REDUCER

THERMOCOUPLE ATTACHMENT METHOD

SCREWED

ELBOW INSTALLATION

FLANGED

) 1

E T O N (

” C ”

1” CLASS 3000 FULL

COUPLING OR

THREDOLET

) 1

E T O N (

M U M I N I M

” C ”

) 0 5 1 (

” 6

LONG WELDING

NECK NOZZLE

FOR SIZE AND

CLASS SEE

UOP PROJECT

SPECIFICATION

MINIMUM SIZE 6”.

1’-0” (300)

FOR SMALLER LINES INCREASE

1’-0” (300)

SCREWED

FLANGED

TO 6” AS INDICATED

VESSEL AND LINE INSTALLATION

DETAIL A

NOTES:

“C” DIMENSION SHALL BE A MINIMUM OF 3’-0” (915) CLEAR SPACE FOR REMOVAL OF TEMPERATURE SENSOR.

INCREASE CLEARANCE FOR VESSEL THERMOWELLS.

WHEN INSTALLING REDUCERS IN A HORIZONTAL LINE, USE THE ECCENTRIC TYPE TO AVOID POCKETS.

FLANGES SHALL BE ASME B16.5 STANDARD.

INSIDE DIAMETER OF FLANGED CONNECTION SHALL BE A MINIMUM OF 1” (25).

FOR THERMOWELL INSTALLATIONS WHERE THE FLUID VELOCITY IS A CONCERN, THE ELBOW INSTALLATION SHOULD

BE CONSIDERED.

ELBOW INSTALLATION IS PREFERRED FOR LINES 6” AND SMALLER.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

QUALTRAX 11489

LOW CHROMIUM SHELL

OVERLAY

ENiCrFe-2 OR ENiCrFe-3

WELDED PRIOR TO FINAL

POST WELD HEAT TREATMENT

NOTE: THE WELD PAD SHALL BE OF

SUFFICIENT THICKNESS SUCH THAT

THE HEAT INPUT FROM WELDING

THE STUD WILL NOT IMPART A

HEAT AFFECTED ZONE (HAZ) INTO

THE LOW CHROMIUM SHELL

STUD

(NELSON TYPE PREFERRED)

ASTM A-193 B8

WELDED AFTER FINAL

POST WELD HEAT TREATMENT

HEX NUTS

ASTM A-194 8

PREFERRED METHOD FOR REACTOR / VESSEL

THE STUD AND HEX NUTS SHALL BE THE SAME METALLURGY AS THE EQUIPMENT

TO WHICH THEY ARE ATTACHED.

STUDS (NELSON TYPE PREFERRED) SHALL BE WELDED DIRECTLY (WITHOUT OVERLAY) TO THE

EQUIPMENT PRIOR TO FINAL POST WELD HEAT TREATMENT IN THE FABRICATOR’S SHOP.

PREFERRED METHOD FOR PIPE

ALTERNATE METHOD FOR REACTOR / VESSEL

NOTE:

STUDS MUST BE PROTECTED DURING SHIPMENT OF EQUIPMENT TO PREVENT BREAKAGE

SKIN THERMOCOUPLE FOR EXTERNAL INSTALLATION

DETAIL B

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

INSIDE OF REACTOR

LIFTING LUG

DETAIL H

A

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

FLANGED MULTI-THERMOWELL ASSEMBLY WITH INTEGRAL SUPPORT

6-156-8

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

„” NPT (TYPICAL)

SEAL WELD (TYPICAL)

NOTE 4

PACKING GLAND (TYPICAL)

TRANSITION THERMOCOUPLE

FITTING (TYPICAL)

C NOZZLE

INSTALLATION SHOWN IS FOR

ONE WELL. OTHERS TO BE THE

SAME. ALL BENDS TO BE LONG

RADIUS.

NOTE 4

3”(75)

(MINIMUM)

FLEXIBLE

CONDUIT

3” BLIND FLANGE

(NOTE 1 AND NOTE 7)

BORE BY VENDOR

(TYPICAL)

TYPICAL

NOTE 3

„ (3)

‚” X-STRONG

CHAMFER

SEAMLESS PIPE

(TYPICAL)

„ (3)

„ (3)

NOTE 1

DO NOT WELD TO BEAM

2”

1”

(50)

(25)

DETAIL F

(TYPICAL)

G

„”

(3)

TEE BEAM

C

C

B

B

Â(cid:129) INSIDE DIAM

NOTE 1

C

REACTOR

DUMMY ‚” X-STRONG

SEAMLESS PIPE

BLOCKED OFF BOTH ENDS

G

D

D

SPACER

DETAIL E

(TYPICAL)

8”

(200)

INSIDE OF

REACTOR

2” ± „”

(50 ± 3)

U BOLT RETAINER

(BY REACTOR VENDOR)

BEAM SUPPORT PLATE

AND GUSSET PLATE

(BY REACTOR VENDOR)

REMOTE

MOUNTED

THERMOCOUPLE

HEAD

LIFTING

LUG

3” BLIND FLANGE

(NOTE 1 AND NOTE 7)

1 ‚” (30)

(TYPICAL)

A

BY CONTRACTOR

ELEVATION

C

NOZZLE

C NOZZLE

‚” X-STRONG

SEAMLESS PIPE

(TYPICAL)

2-6(50-150)

2-6(50-150)

TYPICAL

TACKWELD (TYPICAL)

DUMMY ‚”

X-STRONG

SEAMLESS

PIPE

TACKWELD

2-6(50-150)

2-6(50-150)

TYPICAL

SPACER

DETAIL E

SPACER

DETAIL E

TACKWELD

TACKWELD

(cid:0)»

(19)

C NOZZLE

” … 1

) 5 3 (

»

) 9 1 (

‚”

(6)

‚”

(6)

1…”

(35)

SECTION B-B

SECTION A-A

TACKWELD

(TYPICAL)

(NOTE 1)

C

REACTOR

2”

(50)

2”

(50)

C NOZZLE

NOTE 6

TEE BEAM

(NOTE 5)

‚” X-STRONG

SEAMLESS PIPE

(TYPICAL)

C NOZZLE

„ (3)

„ (3)

TEE BEAM

(NOTE 5)

„ (3)

„ (3)

C

NOZZLE

(cid:0)»

(14)

C

NOZZLE

‚”

(6)

MR RADIUS

»

) 3 1 (

) 5 2 (

” 1

TEE BEAM

(NOTE 5)

Â(cid:129)” (13) P

‚”

(6)

„” (3) DIA SHEATHED

THERMOCOUPLE (TYPICAL)

Ë

‚” (6) DIAMETER

HEAT TRANSFER

BLOCK

SECTION C-C

SECTION D-D

DETAIL E

SPACER

DETAIL F



(40)

(cid:0)»

(20)

‹“(12) X ‹“(12)

ƒ” (20) DIA

‚” (6) PLATE

»

) 0 2 (

¿ » ï

) 4 6 (

NOTES:

SEE UOP PROJECT SPECIFICATION 640 FOR PACKING GLANDS, FLANGE CLASS AND FACING, THERMOWELL

LENGTHS AND THERMOWELL MATERIAL, TACKWELDS AND LONG RADIUS BENDS.

ALL MATERIAL SHALL BE TYPE 321 STAINLESS STEEL OR 347 STAINLESS STEEL UNLESS NOTED.

THERMOWELL WELDS SHALL NOT OVERLAP.

EACH THERMOCOUPLE MUST BE REMOVED AFTER INITIAL ASSEMBLY TO INSURE PROPER GLAND CONNECTIONS.

ALTERNATIVES TO WELDED TEE BEAM CONSTRUCTION INCLUDE COMMERCIALLY AVAILABLE TEE BEAM

„ (3)

OR TEE BEAM MACHINED FROM A SOLID BAR.

LONG RADIUS

BEND (NOTE I)

‚” X-STRONG

SEAMLESS PIPE

(TYPICAL)

SECTION G-G

SPACER

TEE BEAM

DETAIL E

(NOTE 5)

(TYPICAL)

BLIND FLANGE

QUALTRAX 11512

DUMMY PIPE OMITTED FOR CLARITY

COMPLETE ASSEMBLY, INCLUDING WELDS, MUST FIT WITHIN A 2Â(cid:129)” (65) DIAMETER CIR

CONTRACTOR SHALL COORDINATE WITH VESSEL FABRICATOR AND THERMOWELL VENDOR TO ENSURE PROPER

FLANGE CLASS AND ALIGNMENT OF THE FLANGE AND NOZZLE BOLTING PATTERNS. THE THERMOWELL ASSEMBLY

DETAIL H

LIFTING LUG

SHALL BE ORIENTATED AS SHOWN IN SECTI0NS A-A AND B-B.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

(cid:0) (cid:0) (cid:0) Revision

Indication

R

FLEXIBLE CONDUIT

CONNECT THERMOCOUPLE

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

INSTALLATION SHOWN IS

FOR ONE WELL. OTHERS TO

BE THE SAME. ALL BENDS

TO BE LONG RADIUS

A

CLAMP

(TO ACCOMODATE 5

FLEXIBLE CONDUIT/CABLES

4” (100)

MINIMUM

A-FRAME

LOCATE LONGEST

WELL IN THE

CENTER

FLANGED MULTI-THERMOWELL ASSEMBLY

LEAD WIRE TO TERMINAL

STRIP IN JUNCTION BOX

TO BE CONNECTED TO

BACK OF JUNCTION BOX

C NOZZLE

MAXIMUM DIMENSION

INCLUDING WELD PLUS

REQUIREMENTS FOR GUIDE

WELD

6-158-7

DATE

05APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AED

AMG

NOTE 5

BLIND FLANGE

) 5 7 ( ” 3

M U M I N I M

A

BORE BY VENDOR

(TYPICAL)

WELD (TYPICAL)

(NOTE 3)

†” OUTSIDE DIAMETER X 10

GAUGE SEAMLESS TUBING

(TYPICAL) (NOTE 6)

THERMOWELLS TO BE

EQUALLY SPACED ABOUT

CENTERLINE (NOTE 2)

PLAN VIEW

GUIDE

(TYPICAL) DETAIL B

(NOTE 7)

DRILL AND TAP

FOR FLEXIBLE

CONDUIT FITTING

GUIDE

(NOTE 7)

END CAP

(TYPICAL)

NOTE 8

STAGGER THERMOCOUPLE

CONDUIT CONNECTIONS

SYMMETRICALLY

JUNCTION BOX

WITH TERMINAL STRIP (NOTE 4)

(BACK VIEW)

THESE DIMENSIONS TO

BE KEPT AT A MAXIMUM

WITHOUT INTERFERING WITH

THE REMOVAL OF PACKING

GLAND AND FLANGE BOLTS

2†”

(67)

CLAMP

SEE UOP PROJECT SPECIFICATION 640

PROVIDE FOR ‚” (6) CLEARANCE

ON EACH SIDE

WELD

CLAMP

WELD

„” (3) PLATE

TYPE 316

STAINLESS

STEEL

WELD

„” (3) X 1Â(cid:129)

PLATE TYPE 316

STAINLESS STEEL

WELD

„” (3) PLATE

TYPE 316

STAINLESS STEEL

NOTES:

) 5 7 (

” 3

M U M I N I M

M U M I N I M

) 0 5 2 (

” 0 1

SPOOL

3 32/ ” (2) STRAP

SEAMLESS

TUBING

” 1

) 5 2 (

REMOVE SECTION OF

GUIDE FOR WELL DROP

OFF AS REQUIRED

ROUND OFF ALL EDGES

TOP AND BOTTOM

TACK WELD GUIDE TO LONGEST

WELL ONLY (1-‚” (30) LONG

BEAD TOP AND BOTTOM)

VIEW A-A

A-FRAME

DETAIL B

GUIDE

DETAILS, DIMENSIONS AND NOTES IN UOP PROJECT SPECIFICATIONS TAKE PRECEDENCE OVER THOSE SHOWN HEREON.

SEE UOP PROJECT SPECIFICATIONS FOR NOZZLE INSIDE DIAMETER, PACKING GLANDS, FLANGE CLASS AND SIZE,

THERMOWELL LENGTHS, THERMOWELL MATERIAL, TOTAL NUMBER OF WELLS, AND OVERALL DIAMETER OF WELL BUNDLE.

THERMOWELL WELDS SHALL NOT OVERLAP.

ANCHOR JUNCTION BOX TO PLATFORM RAILING ABOVE VESSEL FLANGE.

EACH THERMOCOUPLE MUST BE REMOVED AFTER INITIAL ASSEMBLY TO INSURE PROPER GLAND CONNECTIONS.

THERMOWELLS TO BE ONE CONTINUOUS PIECE WITH THE SAME OUTSIDE DIAMETER THRU FULL LENGTH.

COUPLINGS OR SPLICING OF WELL NOT PERMITTED.

  1. REMOVE SECTION OF GUIDE FOR WELL DROP OFF AS REQUIRED.

  2. WELD END CAP TO TUBE.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

TRANSITION

THERMOCOUPLE

FITTING

(TYPICAL)

PACKING GLAND

(TYPICAL)

SEAL WELD

(TYPICAL)

„” (3) NPT

(TYPICAL)

Y L E T A M I X O R P P A

S E D I U G

T R A P A

) 0 1 6 (

” 0

’ 2

L A N O I T I D D A

E T A C O L

) 5 7 (

” 3

S E D I U G

E T A C O L

L L E W

H C A E

F O

D N E

M O R F

0 4 6

N O I T A C I F I C E P S

T C E J O R P

P O U

E E S

ASSEMBLY

QUALTRAX 11513

Revision

Indication

R

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

6

E T O N

4

E T O N

6

E T O N

UPPER LEVEL

NOZZLE

3

E T O N

VISUAL

INDICATOR

CONNECTION

LEVEL TRANSMITTER

CONNECTION

LOWER

LEVEL

NOZZLE

5

E T O N

3

E T O N

UPPER LEVEL

NOZZLE

TOP OF VESSEL

VISUAL

INDICATOR

CONNECTION

LEVEL TRANSMITTER

CONNECTION

5

E T O N

PIPE COLUMN

PIPE

COLUMN

LEVEL TRANSMITTER

CONNECTION (NOTE 7)

VISUAL INDICATOR

CONNECTION

6

E T O N

LOWER LEVEL

NOZZLE

LEVEL TRANSMITTER

CONNECTION (NOTE 7)

VISUAL INDICATOR

CONNECTION

VERTICAL VESSELS OR LIQUID

FULL HORIZONTAL VESSELS

(PIPE COLUMN FOR LEVEL TRANSMITTER

HORIZONTAL VESSELS

(EXCEPT LIQUID FULL VESSELS)

(PIPE COLUMN FOR LEVEL TRANSMITTER

AND ONE OR MORE VISUAL LEVEL INDICATORS)

AND ONE OR MORE VISUAL LEVEL INDICATORS)

LEVEL

TRANSMITTER

CONNECTION

4

E T O N

VISUAL

INDICATOR

CONNECTION

UPPER LEVEL

NOZZLE

5

E T O N

LOWER

LEVEL

NOZZLE

UPPER LEVEL

CONNECTION

LEVEL TRANSMITTER

NOZZLE

TOP OF VESSEL

VISUAL

INDICATOR

CONNECTION

5

E T O N

LOWER LEVEL

NOZZLE

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

TYPICAL LEVEL INSTRUMENT INSTALLATION

8-121-7

DATE

23MAY23

STATUS

REAFFIRMED

SPONSOR

APPROVED

MCN

AMG

UPPER INTERFACE

LEVEL NOZZLE

LEVEL TRANSMITTER CONNECTION

3

E T O N

VISUAL

INDICATOR

CONNECTION

PIPE

COLUMN

LOWER

INTERFACE

LEVEL NOZZLE

6

E T O N

5

E T O N

LEVEL TRANSMITTER

CONNECTION (NOTE 7)

VISUAL INDICATOR

CONNECTION

HORIZONTAL VESSEL DROP LEG

(PIPE COLUMN FOR LEVEL TRANSMITTER AND

ONE VISUAL LEVEL INDICATOR)

LEVEL TRANSMITTER

CONNECTION (NOTE 7)

VISUAL INDICATOR

CONNECTION

6

E T O N

ALTERNATE FOR VERTICAL VESSELS, LIQUID

FULL HORIZONTAL VESSELS AND

HORIZONTAL VESSEL DROP LEG

(FOR LEVEL TRANSMITTER

AND ONE VISUAL LEVEL INDICATOR)

QUALTRAX 11524

NOTES:

DETAILS, DIMENSIONS AND NOTES IN UOP PIPING AND INSTRUMENT DIAGRAMS AND PROJECT SPECIFICATION-VESSELS

TAKE PRECEDENCE OVER THOSE SHOWN HEREON.

ALL FLANGES CONNECTING TO VESSEL LEVEL NOZZLES ARE TO BE SAME SIZE, CLASS, AND FACING AS VESSEL FLANGES.

SEE UOP PROJECT SPECIFICATION-VESSELS FOR NOZZLE ELEVATION AND SPACING. IF PIPE COLUMN EXCEEDS

15’-0” (4600mm), PROVIDE ADDITIONAL LEVEL NOZZLES AND OVERLAPPING PIPE COLUMNS.

SEE UOP PROJECT SPECIFICATION - VESSELS FOR NOZZLE ELEVATION AND SPACING. THE MAXIMUM SPAN

LEVEL TRANSMITTER

CONNECTION (NOTE 7)

BETWEEN NOZZLES IS 9’-0” (2700mm).

VISUAL INDICATOR

CONNECTION

SEE UOP PIPING AND INSTRUMENT DIAGRAM FOR SPECIFIED RANGE AND (WHERE SPECIFIED) CENTER OF RANGE

FOR LEVEL TRANSMITTERS. FOR DIFFERENTIAL PRESSURE TYPE LEVEL TRANSMITTERS, NOZZLE SPACING SHALL

BE EQUAL TO THE SPECIFIED LEVEL TRANSMITTER RANGE.

ALTERNATE FOR HORIZONTAL VESSELS

EXCEPT FOR LOWER 6” (150mm) BETWEEN LOWER LEVEL NOZZLE AND BOTTOM TANGENT LINE. THE MAXIMUM GAUGE

(EXCEPT LIQUID FULL VESSELS)

(FOR LEVEL TRANSMITTER

AND ONE VISUAL LEVEL INDICATOR)

GLASS LENGTH IS 5’-6” (1650mm). THE MAXIMUM MAGNETIC INDICATOR LENGTH IS 15’-0” (4600mm). IF MORE

THAN ONE VISUAL INDICATOR IS REQUIRED, USE THE PIPE COLUMN DESIGN AND PROVIDE 1” (25mm) MINIMUM

VISUAL OVERLAP.

PROVIDE ONE OR MORE VISUAL INDICATORS TO COVER, AS A MINIMUM, THE ENTIRE RANGE OF THE SPECIFIED

LEVEL TRANSMITTER(S). FOR DROP LEGS, THE VISUAL INDICATOR MUST COVER ENTIRE LENGTH OF DROP LEG

THE LOWER LEVEL TRANSMITTER CONNECTION ELEVATION MAY BE HIGHER THAN THE VESSEL LOWER NOZZLE.

HOWEVER, ALL PIPING FROM CHAMBER TYPE LEVEL INSTRUMENTS SHALL BE FREE DRAINING TO LOWER LEVEL NOZZLE.

Revision

Indication

R

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

GAUGE GLASS PIPING ASSEMBLIES GENERAL SERVICE

8-101-9

DATE

28APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AB

AMG

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

Â(cid:129)” THREA

PLUG

Â(cid:129)” GAT

BALL VALVE

GAUGE VALVE

GAUGE VALVE

ƒ” THREADED COUP

NOTE 1

SEAL WELD IN

SOCKET WELD

CLASSES

SEAL WELD IN

SOCKET WELD

CLASSES

NOTE 1

ƒ” THRE

COUPLING

Â(cid:129)” GAT

BALL VALVE

Â(cid:129)” THREADED

Â(cid:129)” THREA

PLUG

Â(cid:129)” GAT

BALL VALVE

ƒ” THREADED COUP

NOTE 1

SEAL WELD IN

SOCKET WELD

GAUGE VALVE

CLASSES

GAUGE VALVE

NOTE 1

SEAL WELD IN

SOCKET WELD

CLASSES

ƒ” THREA

COUPLING

Â(cid:129)” THREADED

Â(cid:129)” GAT

BALL VALVE

LG-T OR LG-R (WITH GAUGE VALVES)

LG-T OR LG-R (WITH GAUGE VALVES)

Â(cid:129)” THREA

PLUG

Â(cid:129)” GAT

BALL VALVE

GAUGE VALVE

GAUGE VALVE

Â(cid:129)” GAT

BALL VALVE

ƒ” THREADED COUP

NOTE 1

SEAL WELD IN

SOCKET WELD

CLASSES

Â(cid:129)” THREA

PLUG

Â(cid:129)” THREA

PLUG

Â(cid:129)” GAT

BALL VALVE

ƒ” THREADED COUP

NOTE 1

SEAL WELD IN

SOCKET WELD

CLASSES

GAUGE VALVE

Â(cid:129)” THREADED

NOTE 1

GAUGE VALVE

NOTE 1

SEAL WELD IN

SOCKET WELD

CLASSES

ƒ” THREA

COUPLING

Â(cid:129)” THREADED

SEAL WELD IN SOCKET

WELD CLASSES

Â(cid:129)” GAT

BALL VALVE

ƒ” THRE

COUPLING

Â(cid:129)” THREADED

LG-T OR LG-R (WITH GAUGE VALVES)

LG-T OR LG-R (WITH GAUGE VALVES)

NOTES:

VALVES SHOWN AS DOTTED ARE INDICATED ON PIPING AND INSTRUMENT DIAGRAM. THESE VALVES, AS WELL AS

OTHER VALVES AND PIPING SHOWN IN ABOVE DETAILS SHALL FOLLOW THE SAME PIPE CLASS.

THREADED CONNECTIONS AT GAUGE VALVES AND GLASSES SHALL NOT BE SEAL WELDED.

QUALTRAX 11518

Revision

Indication

R

STANDARD DRAWING UOP ENGINEERING DEPARTMENT

GAUGE GLASS PIPING ASSEMBLIES (CAUSTIC OR OTHER SERVICE NOT PERMITTING GAUGE VALVES)

Â(cid:129)” THREADED

Â(cid:129)” THREADED

8-125-9

DATE

28APR21

STATUS

REAFFIRMED

SPONSOR

APPROVED

AB

AMG

Â(cid:129)” GAT

BALL VALVE

NOTE 1

(cid:0)»

BREAK FLANGE

ƒ” X Â(cid:129)” RE

Â(cid:129)” GAT

BALL VALVE

NOTE 1

(cid:0)»

BREAK FLANGE

ƒ” X Â(cid:129)” RE

(cid:0)»

NOTE 1

BREAK FLANGE

ƒ” X Â(cid:129)” RE

…” STEEL TUBING

6”

(150)

Â(cid:129)” GAT

BALL VALVE

MALE REDUCING

CONNECTOR

PIPE TO

TUBE FITTING

BREAK FLANGE

NOTE 1

ƒ” X Â(cid:129)” RE

…” STEEL TUBING

6”

(150)

CAUSTIC SEWER

Â(cid:129)” GAT

BALL VALVE

MALE REDUCING

CONNECTOR

PIPE TO

TUBE FITTING

CAUSTIC SEWER LG-T OR LG-R (WITHOUT GAUGE VALVES)

LG-T OR LG-R (WITHOUT GAUGE VALVES)

Â(cid:129)” THREA

PLUG

Â(cid:129)” GAT

BALL VALVE

ƒ” X Â(cid:129)” RE

(cid:0)»

Â(cid:129)” THREA

PLUG

Â(cid:129)” GAT

BALL VALVE

ƒ” X Â(cid:129)” RE

(cid:0)»

NOTE 1

NOTE 1

Â(cid:129)” GAT

BALL VALVE

MALE REDUCING

CONNECTOR

PIPE TO

TUBE FITTING

BREAK FLANGE

NOTE 1

ƒ” X Â(cid:129)” RE

…” STEEL TUBING

BREAK FLANGE

NOTE 1

Â(cid:129)” GAT

BALL VALVE

ƒ” X Â(cid:129)” RE

CAUSTIC SEWER

6”

(150)

MALE REDUCING

CONNECTOR

PIPE TO

TUBE FITTING

…” STEEL TUBING

6”

(150)

CAUSTIC SEWER

LG-T OR LG-R (WITHOUT GAUGE VALVES)

LG-T OR LG-R (WITHOUT GAUGE VALVES)

NOTES:

VALVES SHOWN AS DOTTED ARE INDICATED ON PIPING AND INSTRUMENT DIAGRAM. THESE VALVES, AS WELL AS OTHER VALVES

AND PIPING SHOWN IN ABOVE DETAILS SHALL FOLLOW THE SAME PIPE CLASS.

DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLMETERS.

QUALTRAX 11525

. N IO S IS M R E P N E T IT R W ‘S P O U T U O H IT W S R E H T O O T D E S O L C IS D R , O D E T A IC L P U , D E S O P R U P Y N A R O F D E S U E B T O N T S U M D N A L IA T N E ID F N O C IS T N E M U C O D IS H T IN N IO T A M R O F IN E H

  • T L IA T N E ID F N O C

Project: Q-32976 - Tecnmont SKIKDA Folder: Reference Documents


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further