Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 32976 Tecnmont SKIKDA

❯

RFQ Files

❯

Reference Documents

❯

4439 VZ DM 0000 0008_1

TYPICAL DETAILS OF PIPING FOR CLOSED SAMPLING SYSTEMS

TYPE A SAMPLE CONNECTION AS INDICATED ON PIPING AND INSTRUMENT DIAGRAM

CLOSED SAMPLING SYSYTEM FLOW THROUGH TO DRAIN TYPE

TYPE D SAMPLE CONNECTION AS INDICATED ON PIPING AND INSTRUMENT DIAGRAM

TYPE D

8

1

GENERAL NOTES:

CLOSED SAMPLING SYSTEM, FLOW THROUGH TO PROCESS TYPE

TYPE A

8

1

DETECTOR TUBE SAMPLE (SEE DETAIL “DT”) REQUIRED ONLY WHEN NOTED AT SPECIFIC SAMPLE LOCATIONS ON THE P&ID

6

3/4”

3/4”

LO FREE DRAINING

) 0 0 6 (

” 0

’ 2

I

N M

TO FLARE HEADER

” 4 / 3

1

9

7

3

6

3/4”

1

6

3/4”

1

1

1

PROCESS LINE

4

5

1

1

CLOSED SAMPLING SYSTEM, FLOW THROUGH TO VENT TYPE

DETECTOR TUBE SAMPLE (SEE DETAIL “DT”) REQUIRED ONLY WHEN NOTED AT SPECIFIC SAMPLE LOCATIONS ON THE P&ID

6

” 4 /

3

6

3/4”

1

PROCESS LINE

4

5

I

N M

) 0 0 6 (

” 0

’ 2

TO FLARE HEADER

3/4”

3/4”

LO FREE DRAINING

7

2

1

1

TYPE B

8

1

TYPE C

  • SINGLE OR DOUBLE BLOCK VALVES AS APPLICABLE TO THE PROCESS SERVICE

PROCESS LINE

6

3/4”

V

FC

3/4”

3/4”

SAMPLE POINT MAY BE LOCATED AT CONTROL VALVE ASSEMBLY, PUMP OR OTHER EQUIPMENT WHERE ADEQUATE PRESSURE DIFFERENTIAL CAN BE OBTAINED

TYPE A SC

SAMPLE NUMBER

UNIT PREFIX (IF REQUIRED)

  • VALVES ARE INDICATED ON PID

1

TYPE B SAMPLE CONNECTION AS INDICATED ON PIPING AND INSTRUMENT DIAGRAM

  • SINGLE OR DOUBLE BLOCK VALVES AS APPLICABLE TO THE PROCESS SERVICE

PROCESS LINE

6

TYPE B -SC-

1

3/4”

SAMPLE NUMBER

UNIT PREFIX (IF REQUIRED)

1

  • VALVES ARE INDICATED ON PID

PROCESS LINE

EQUIPMENT:

TYPE C SAMPLE CONNECTION AS INDICATED ON PIPING AND INSTRUMENT DIAGRAM

3/4”x1/2”

1/2”

2”x1/2”

1/2”

12

SAMPLING BOTTLE

12

SAMPLING BOTTLE

CWD/CWS

CWD/CWS

  • SINGLE OR DOUBLE BLOCK VALVES AS

APPLICABLE TO THE PROCESS SERVICE

PROCESS LINE

6

TYPE C -SC-

1

3/4”

SAMPLE NUMBER

UNIT PREFIX (IF REQUIRED)

I

T N E S N O C N E T T R W R O R P T U O H T W

I

I

,

E S O P R U P Y N A R O F S R E H T O Y B D E S U E B T O N N A C D N A Y T R E P O R P S T N O M N C E T S

I

’

I

T N E M U C O D S H T

I

5

4

3/4”

E N I L S S E C O R P

6

3/4”

13

3/4”

3/4”

3/4”

6

3/4”

TYPE D

XX-SC-XXXX

E N I L S S E C O R P

I

I

G N N A R D E E R F

14

DETAIL “DT”

TYPICAL DETAIL OF DETECTOR TUBE SAMPLE

DETAIL “DTC”

TYPICAL DETAIL OF DETECTOR TUBE SAMPLE CONTRACTOR TO DETERMINE FINAL NOZZLE SIZE PER TESTING REQUIREMENTS (CCR SPECIFIC)

1

” 2 / 1

10

1

I

N M

1/2”S

6

7

1

” 2 / 1

1 1/2” (40)

10

3/4”

FIF

” 0

’ 1

) 0 0 3 (

1/2”S

I

N M

7

NOTES:

CLOSED SAMPLING SYSTEM TYPE A - SEE PROJECT SPECIFICATION 835.

CLOSED SAMPLING SYSTEM TYPE B - SEE PROJECT SPECIFICATION 835.

SAMPLE INLET AND RETURN CONNECTIONS MUST HAVE A MINIMUM PRESSURE DIFFERENTIAL OF 10 PSI (0.7 KG/CM²) TO MAINTAIN FLOW THROUGH SAMPLE CYLINDER.

SAMPLE COOLER - SEE STANDARD DRAWINGS 8-102 AND 8-103.

SAMPLE COOLER IS REQUIRED WHEN THE PROCESS MATERIAL BEING SAMPLED IS AT A TEMPERATURE OF 150° F (60°C) OR HIGHER.

SPECIFIC REQUIREMENTS FOR HEAT TRACING AND OBJECTIVE TEMPERATURE SHALL BE AS INDICATED AT THE SAMPLE POINT LOCATION ON THE PIPING AND INSTRUMENT DIAGRAM. WHEN HEAT TRACING IS REQUIRED, THE CLOSED SAMPLING SYSTEM SHALL INCLUDE A HEATED ENCLOSURE.

MAKE CONNECTION ON TOP OF PIPE.

VALVES AND PIPING INDICATED AT SAMPLING DETAILS SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN ON THE PIPING AND INSTRUMENT DIAGRAM.

AT LOCATIONS WHERE A CLASS BREAK IS INDICATED, CLASS BREAK SHALL BE OF SAME TYPE AS SHOWN ON THE PIPING AND INSTRUMENT DIAGRAM.

LOCATE TEE IN VERTICAL RUN OF PIPE.

  1. TO ATMOSPHERE AT SAFE LOCATION

  2. SPILLAGE FROM SAMPLE POINT DIVERTED TO CWD OR OWS BASED ON SAMPLE TYPE.

UTILITY CONNECTION.

  1. THERE ARE FIVE CLOSED DRAIN SYSTEM

(CD) FOR STREAMS COMING FROM UNIT 100/200/300 (CDA) FOR STREAMS COMING FROM UNIT 400/500/600 (CDB) FOR STREAMS COMING FROM BENZENE STORAGE (CDD) FOR STREAMS COMING FROM UNIT 700 (CDF) FOR STREAMS COMING FROM FLARE UNIT

CCR NITROGEN HEADER

VENDOR TCM

B1A1

7

HOLDS:

EQUIPMENT LIST

1

0

IFH–Issued for HAZOP

25/Jun/2024

IFA-Issued for Approval

K.Jeetu

K.Jeetu

A.Lo Verso/G.Acerbi/ E.Magadeev/ H.Aljarrah

A.Lo Verso/G.Acerbi/ E.Magadeev/ H.Aljarrah

A.Lo Verso

A.Lo Verso

 Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023 CT-EPC/017/SH/EPM/RPC-X/2023

PIPING & INSTRUMENTATION DIAGRAM GENERAL NOTES, SYMBOL AND LEGEND PIPING SYMBOLS 8

4439-VZ-DM-0000-0008

A1

Echelle :

1/1

1 of 1

Rev :

1

11/Oct/2024

Project: Q-32976 - Tecnmont SKIKDA Folder: Reference Documents


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further