Infinity

Not logged in
Home

❯

Reference Examples

❯

Q 32976 Tecnmont SKIKDA

❯

RFQ Files

❯

Reference Documents

❯

4439 VZ DM 0000 0011_1

DETAIL “TA” UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP.

DETAIL “TC” SEAL QUENCH SYSTEM VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP.

DETAIL “TH” UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP.

DETAIL “TL”

UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP

PUMP SEAL SYSTEM DETAILS

GENERAL NOTES:

FREE DRAINING

1

I

I

G N N A R D E E R F

1

LO

5

5

FO

5

SEAL POT

1

S M

1

S M

5

COOLING WATER RETURN

FREE DRAINING

2

1 A 1 B

I

I

3/4” G N N A R D E E R F

B1A1

FREE DRAINING

FREE DRAINING

LO

” 0

’ 2

) 0 0 6 (

I

N M

7

WATER

3/4”

5°C

MS-1

FREE DRAINING

1

B1A1

FREE DRAINING

FREE DRAINING

LO

” 0

’ 2

) 0 0 6 (

I

N M

7

4

H

H

L

PI

LI

” 4 / 3

C ° 5

OWS

COOLING WATER SUPPLY

COOLING WATER RETURN

I

I

G N N A R D E E R F

5

FO

LO

5

1

5

SEAL POT

1

S M

1

S M

5

4

H

H

L

PI

LI

COOLING WATER SUPPLY

FREE DRAINING

2

3/4”

1 A 1 B

I

I

G N N A R D E E R F

B1A1

FREE DRAINING

FREE DRAINING

LO

NOTES:

” 0

’ 2

) 0 0 6 (

I

N M

7

  1. VENT FROM OTHER SEAL POT(S) (AS REQUIRED).

  2. DRAIN FROM OTHER SEAL POT(S) (AS REQUIRED).

. 3. DESTINATION AS INDICATED IN P&ID

  1. MAKE CONNECTION ON TOP OF PIPE.

4

  1. FURNISHED WITH PUMP.

FREE DRAINING

1

I

I

G N N A R D E E R F

LO

5

5

FO

5

SEAL POT

1

S M

1

S M

1

PI

LI

H

H

L

COOLING WATER RETURN

COOLING WATER SUPPLY

I

T N E S N O C N E T T R W R O R P T U O H T W

I

I

,

E S O P R U P Y N A R O F S R E H T O Y B D E S U E B T O N N A C D N A Y T R E P O R P S T N O M N C E T S

I

’

6

3

DETAIL “TP” UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP.

DETAIL “TS” UNPRESSURIZED DUAL (TANDEM) SEAL FLUSHING SYSTEM VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP.

FREE DRAINING

1

B1A1

FREE DRAINING

LO

FREE DRAINING

TO STRIPPER RECEIVER

FREE DRAINING

1

I

I

G N N A R D E E R F

I

I

G N N A R D E E R F

B1A1

FREE DRAINING

FREE DRAINING

LO

” 0

’ 2

) 0 0 6 (

I

N M

7

I

T N E M U C O D S H T

I

COOLING WATER RETURN

LO

5

1

5

FO

5

SEAL POT

1

S M

1

S M

5

PI

LI

H

H

L

COOLING WATER SUPPLY

COOLING WATER RETURN

5

FO

LO

5

1

5

SEAL POT

1

S M

1

S M

5

4

H

H

L

PI

LI

COOLING WATER SUPPLY

FREE DRAINING

2

1 A 1 B

I

I

3/4” G N N A R D E E R F

FREE DRAINING

2

1 A 1 B

I

I

3/4” G N N A R D E E R F

SSU

SSU

DETAIL “PA”

NON-CONTACTING (CONTAINMENT SEAL) FOR NON-CONDENSING LEACKAGE ON UNPRESSURIZED DUAL SEALS. VALVES AND PIPING SHALL BE OF THE SAME METALLURGY TYPE AND CLASS AS SHOWN AT THE PUMP

B1A1

FREE DRAINING

FREE DRAINING

LO

” 0

’ 2

) 0 0 6 (

I

N M

7

LO

5

4

H

5

FO

PI

PT

5

3/4”

5

1

H

FI

H

PI

8

FT

8

PT

FE

8

FO

1

8

PCV

BUFFER GAS PANEL (FURNISHED WITH PUMP)

8

8

3/4”

BUFFER GAS SUPPLY

CONTAINMENT SEAL

  1. THERE ARE FIVE CLOSED DRAIN SYSTEM. (CD) FOR STREAMS COMING FROM UNIT 100/200/300. (CDA) FOR STREAMS COMING FROM UNIT 400/500/600. (CDB) FOR STREAMS COMING FROM BENZENE STORAGE. (CDD) FOR STREAMS COMING FROM UNIT 700. (CDF) FOR STREAMS COMING FROM FLARE UNIT. SELECTION OF CRITERIA FOR REQUIREMENT FOR CLOSED DRAIN IS AS PER UOP CRITERIA AND ALSO FOR STREAM CONTAINING >12.5%OR MORE C7 THRU C9 AROMATICS THEY ALSO NEED TO GO TO CLOSED DRAIN SYSTEM.

  2. RELIEF HEADER (DEFAULT), VENT HEADER OR AS INDICATED IN TEXT AT THE INDIVIDUAL SERVICE.

  3. BUFFER GAS PANEL (FURNISHED WITH PUMP)

1

HOLDS:

EQUIPMENT LIST

1

0

IFH–Issued for HAZOP

25/Jun/2024

IFA-Issued for Approval

K.Jeetu

K.Jeetu

A.Lo Verso/G.Acerbi/ E.Magadeev/ H.Aljarrah

A.Lo Verso/G.Acerbi/ E.Magadeev/ H.Aljarrah

A.Lo Verso

A.Lo Verso

 Realisation en EPC d'installations de production de

LINEAR-ALKYL-BENZENE <> a SKIKDA ALGERIE CT-EPC/017/SH/EPM/RPC-X/2023 CT-EPC/017/SH/EPM/RPC-X/2023

PIPING & INSTRUMENTATION DIAGRAM GENERAL NOTES, SYMBOL AND LEGEND PIPING SYMBOLS 11

4439-VZ-DM-0000-0011

A1

Echelle :

1/1

1 of 1

Rev :

1

11/Oct/2024

Project: Q-32976 - Tecnmont SKIKDA Folder: Reference Documents


Loading authentication...

Graph View

Backlinks

  • 00 Index

Created with Infinity Constructor © 2025

  • Elynox | Go Further