Metrics — Q-TEST-2 Dry Run (Q-32859)
Project: Q-TEST-2 | Customer: NMDC | Complexity: High | Efficiency Target: ≥70% time reduction (pilot)
Summary Metrics
- Files processed (indexed): 5
- Pages processed: n/a (md conversions)
- High-risk requirements (count): 2 (power; classification)
- RFIs drafted (count): 1
- Deviations proposed / accepted: 2 / 0 (pending RFI)
- Open items (TQs/RFIs pending): Standards baseline; component classifications; IP by component; test scope; MR quantities
CF01
- Anchors confirmed: Offer/Datasheet with GAD/Chiller DS
- Missing Docs list: Instrumentation baseline
- Integrity issues: n/a
- Revisions timeline summary: Rev.1 compliance note present
- TQ tracker count: 0 (mock)
CF02
- Requirements extracted: 3 (subset)
- High-risk surfaced: 2
- Normalization issues resolved: n/a
CF03
- Dual power detected: Y
- Weakest-link area class: IIB T4 (offered) — required TBD
- Deviation candidates flagged: class/T‑class; test scope
- CPQ implications: None pending RFI
CF04
- Handoff summary generated: Y
- Prequalification annex included: N
- Submission email drafted: N (mock)
Notes & Lessons
- Example subset requires RFI to set baseline; the process supports this gracefully.