Metrics — Q TEST 2 Dry Run (Q 32859)

Metrics — Q-TEST-2 Dry Run (Q-32859)

Project: Q-TEST-2 | Customer: NMDC | Complexity: High | Efficiency Target: ≥70% time reduction (pilot)

Summary Metrics

  • Files processed (indexed): 5
  • Pages processed: n/a (md conversions)
  • High-risk requirements (count): 2 (power; classification)
  • RFIs drafted (count): 1
  • Deviations proposed / accepted: 2 / 0 (pending RFI)
  • Open items (TQs/RFIs pending): Standards baseline; component classifications; IP by component; test scope; MR quantities

CF01

  • Anchors confirmed: Offer/Datasheet with GAD/Chiller DS
  • Missing Docs list: Instrumentation baseline
  • Integrity issues: n/a
  • Revisions timeline summary: Rev.1 compliance note present
  • TQ tracker count: 0 (mock)

CF02

  • Requirements extracted: 3 (subset)
  • High-risk surfaced: 2
  • Normalization issues resolved: n/a

CF03

  • Dual power detected: Y
  • Weakest-link area class: IIB T4 (offered) — required TBD
  • Deviation candidates flagged: class/T‑class; test scope
  • CPQ implications: None pending RFI

CF04

  • Handoff summary generated: Y
  • Prequalification annex included: N
  • Submission email drafted: N (mock)

Notes & Lessons

  • Example subset requires RFI to set baseline; the process supports this gracefully.